PacSci EMC September 2017 Strategic Affordability Analysis Supplier Proposal Adequacy Guidelines

Upload: others

Post on 24-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMCSeptember 2017

Strategic Affordability AnalysisSupplier Proposal Adequacy Guidelines

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Purpose of this Guidelinebull This guideline explains the basic requirements for proposals submitted to

PSEMC when cost or pricing data are required

bull This guideline does not apply to proposals that are

bull Valued at less than the cost or pricing threshold set in FAR 15403-4bull Based on competitionbull Based on commercial pricing

bull Questions regarding these requirements should be addressed to yourPSEMC Supply Chain contact

2

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Table of Contentsbull When cost or pricing data is required the supplierrsquos proposal needs to

include the following sections

3

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Table of Contentsbull Summary cost element breakdowns and consolidated Bills of Material

(BOM) are the two most frequently missed items in supplier proposals

bull Additional areas of proposal support which are not applicable to most proposals

4

Required Items Page FAR Reference

Commercial Justification Pg 38-40 FAR 2101 amp FAR 15403

Change Proposal Pg 41-46 FAR 15408 Table 15-2 III B

Additional Guidance Pg 47 PSEMC Support

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklistbull PSEMC Policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals that exceed theCost amp Pricing Thresholdbull Additionally PSEMC request the cost element breakdown bill of material and labor

detail in Excel format

bull The purpose of this form is as followsbull To provide the supplier with a checklist to help ensure that all the supporting

documentation has been included so the proposal will be deemed adequate byPSEMC our customer and the DCAA

bull To provide PSEMC with a tool to more quickly verify where the supportingdocumentation can be found in the proposal

bull An example is provided on the next slide and under the commercialjustification section of this module

5

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03

6

Proposal Pricing Instructions

Supplier Proposal Adequacy Checklist

Completion of this checklist and supporting information is required for all single source proposals that exceed the TINA threshold where no valid exception (FAR 15403-1) applies If the supplier is claiming an exemption for commercial terms only the first line on the checklist is applicable Supplier

Supplier Proposal Number

Exemption to CampP Data Commercial Item (Section 3 of Instruction)

Support Included

Located in Section Page

Pricing Proposal Coversheet or Equivalent (21 of Instruction)

Included Located in Section Page

Point of Contact (21 of Instruction) Included Located in Section Page

DCMADCAA Points of Contact (Include Name Phone Address Cage Code and E-mail Address) (21 of Instruction)

Included Located in Section Page

Cost Element Detail and Cost Element Summary (24 of Instruction)

Included Located in Section Page

Individual Bill of Material and Consolidated Bill of Material (25 of Instruction)

Included Located in Section Page

Material Basis of Estimate (251 of Instruction) and Copies of POsQuotes

Included Located in Section Page

Sub-tier Cost Analysis (if required) (251 of Instruction)

Included Located in Section Page or ECDs

Labor History (26 amp 261 of Instruction) and Basis of Estimate

Included Located in Section Page

Support for ODC (27 of Instruction) Included Located in Section Page

Support for Rates (17 and 28 of Instruction) Included Located in Section Page

Nonrecurring Engineering (NRE) (14 and 15) Use of Government Property to Include Serial Tooling andor Special Test Equipment

Included Located in Section Page

Expenditure Plan (Required to Support Cost Type Proposals or Performance Based Progress Payments)

Included Located in Section Page

Supplier By Signing below you are confirming that required cost and pricing data is part of your proposal and meets the requirements of Pacific Scientificrsquos proposal pricing instructions Sellerrsquos Representative (type or Print)

Signature

Date (MMDDYYYY)

Pacific Scientific By Signing below the supplier manager is confirming receipt of the items required for this proposal and meets the requirements of Pacific Scientificrsquos proposal pricing instructions Buyer (Type or Print)

Signature

Date (MMDDYYYY)

Supplier Manager (Type or Print)

Signature

Date (MMDDYYYY)

PacSciLogo150dpi_4inch

Proposal Pricing Instructions

Supplier Proposal Adequacy Checklist

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cover Sheetbull Include a cover sheet that includes the following information

bull Solicitation Numberbull Name and Address of offerorbull Name and Telephone number of point of contactbull Name address phone number and email for your DCMA and DCAAbull Type of contract actionbull Proposed cost profit or fee and total price ndash maximum proposal valuebull If you will require the use of government propertybull Whether your organization is subject to cost accounting standards (CAS) ndash see

details in FAR 15-408 Table 15-2 I A (8)bull The statement designated in FAR 15408 Table 15-2 I A (9)bull Date of Submissionbull Name title and signature of authorized representative

bull Most contractors use the Government Form 1411 or equivalent

bull An example is provided on the next slide

7

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cover Sheet Example ndashReference Form DI-SUP-105F02

8

Point of Contact

Proposed Cost

Period of Performance

DCAA Contact Information

Include Statement from FAR 15408 Table 15-2 IA (9)

DCMA Contact Information

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Indexbull Include an index that references where the supporting data for your

estimates is located in the proposalbull The Index should include the following information

bull Title of information being referenced (Summary cost element breakdown materiallabor etc

bull Location in the proposal (page number or file name and page if located in a separatefiledocument)

bull An example is provided in the next slide

9

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Index ExampleProposal No HLQxxxxxDate January xx xxxx ABC Company

Index1 Cover sheet Page xx

2 Business section Page xx

21 Assumptions and Conditions Page xx

3 Pricing Page xx

31 Unit Pricing Page xx

32 Cost Element by Part Number Page xx

33 Cost Element Summary Page xx

4 Material Page xx

41 Bill of Materials by Part Number Page xx

42 Consolidated Bill of Materials Page xx

43 Purchase Orders and Quotes (File PO-QuotesPDF) Page xx

5 Labor Page xx

6 Etc Page xx

10

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cost Element Breakdown by Line Itembull A cost element breakdown is required for each proposed line item If the

proposal covers multiple price points or multiple years a cost elementbreakdown will be required for each price point for each year

bull For example assume your proposal includes the following three line items

bull You would need to provide separate cost element breakdowns for parts ABCABB and the NRE See the next slide for an example

Slight differences due to rounding

11

Part Number Quantity Unit Price Total PricePart ABC 50 $12500 $625000Part ABB 75 $10300 $772500NRE 1 $145000Total $1542500

FAR 15408 Table 15-2 I D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cost Element Breakdown by Line Item Example

12FAR 15408 Table 15-2 I D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdownbull When more than one contract line item (Part Number NRE etc) is

proposed you must provide summary total amounts covering all items foreach element of cost If the proposal covers a high mid and low point thesummary needs to only be for those points not all the differentcombinations that can result from range pricing If the proposal is formultiple years there needs to be a summary for each of the yearsbull For example if your proposal included the following

bull You would need to provide a summary by cost element that includes the totalproposed value of $1542500 See the next slide for an example showing thethree individual cost elements being combined into a summary

Slight differences due to rounding

13

Part Number Quantity Unit Price Total PricePart ABC 50 $12500 $625000Part ABB 75 $10300 $772500NRE 1 $145000Total $1542500

FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdown - Example

14FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdown - Example

15

bull If the proposal is a base year plus option years there needs to be asummary Cost Element Breakdown for each of the years at the points in theRFP requiring Cost or Pricing data

FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Include a BOM for each individual part proposed A BOM is a list of the raw

materials subassemblies etc needed to manufacture a product

bull Provide your BOMs in Excel formatbull The consolidated and individual BOMs need to identify the following for each line

itembull Part Number and descriptionbull Supplierbull Quantitybull Unit Price ndash Unit pricing on the BOM should tie to the supportbull Total Pricebull Basis for pricing (vendor quotes purchase orders)

Source of pricing (purchase order quotes etc) must be referenced in the BOM

bull PSEMC will require copies of the support (ie quotes purchase orders) for asample of the items on the BOM during the cost analysis

16FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If attritionyield or scrap are added to your material you will need to submit

adequate basis of estimates and support as appropriate

bull There are time when your BOM may be impacted by minimum buys or NREthat is passed along from your supplier If this happens make sure this isclearly identified on the BOM and the support quotes or purchase orders

bull In addition to the individual BOMs FAR requires a consolidated BOM inyour proposal A consolidated BOM is a listing of the material needed forthe proposal A consolidated BOM combines all the materials for each ofthe parts being procured as well as assemblies services or materialassociated with NRE

17FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Individual Bills of Material Example

18

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Material Examplebull Below is an example of a consolidated BOM This BOM was developed by

taking the three individual BOMrsquos on the previous page and combining themtogetherbull In a consolidated BOM part numbers and quantities should be combined (or

subtotaled) if they are the same parts For example the BOMs for Part Nos ABCand ABB both require the same Connector and Screw In the consolidated BOMthe requirements have been combined and reflect the total number of Connectorsand Screws that will be needed for this proposal

19

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Materialbull If the proposal is for a base year plus option years there needs to be a

consolidated BOM for each of the years at each of the points in the RFPrequiring cost or pricing

bull To determine if a subtier cost analysis is required you need to add togetherthe anticipated costs for each supplier for all years In the above examplethere are two suppliers that will require cost analysis (Ford and Motion)

20

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Supplier proposals

bull A cost analysis report is required if any of your suppliersrsquo proposals exceedthe Truth in Negotiations Act (TINA) threshold These need to be submittedwith your proposal

bull If the cost analysis for a supplier is not complete at the time of your proposalsubmittal a schedule listing the estimated completion dates for each supplierneeds to be provided in the proposal

bull If an exemption applies that eliminates the need for a cost analysis (commercial orcompetitively priced) documentation needs to be provided to support these claims

21FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If you claim your supplier was competed and the value is over the TINA

threshold you will need to provide the following

bull Evidence that an RFP or solicitation to bid was sent to two or more supplierscapable of providing the goods or services requested

bull Copies of the quotes received from each of the suppliers who were competedbull Supplierrsquos analysis with basis of rationale for why the winning bid represents the best value

(lowest price technical considerations etc)

bull If you claim your supplierrsquos parts or services are commercial refer to thecommercial section in this document

22FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Refer to the detailed instructions in the RFP when your proposal supports a

base year plus options contract or a long term agreement Guidance shouldbe provided here on the consolidation and subtier requirements If youhave any questions regarding this contact your PSEMC Supply Chainrepresentative

bull Inter-organizational costs

bull Inter-organizational costs are defined as the costs of items transferred betweendivisions within the same company

bull If you have bid any inter-organizational costs in your proposal you will need toprovide a cost element breakdown for each inter-organizational transfer andsupport as appropriate

bull One more thing

bull If you have a supplier with a value in excess of $135 million or is greater than 10percent of your total proposal and exceeds the TINA threshold FAR 15408 Table15-2 requires that we submit the supplierrsquos proposal and cost or pricing data withour own proposal

23FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Provide a time-phased (eg monthly quarterly) breakdown of labor hours ratesand cost by appropriate category and furnish basis for estimates

24FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Proposed labor hours are generally a combination of direct and support laborhours

bull Direct Labor Hours ndash Hours that can be identified specifically to a final end itembull Support Labor Hours ndash Hours that cannot be specifically identified to one end item For

example a production manager may be in charge of overseeing the manufacturing ofmultiple parts

25FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull You need to provide a breakdown of the labor hours by labor category and

function along with a basis of estimate for the proposed labor hours

bull For example if you propose 500 hours for an end item you would need to providea breakdown by categoryfunction (assembly inspection supervisor engineeretc) You also will need to provide a detailed basis of estimate for eachcategoryfunction showing how your arrived at the hours for the proposed laborcategory

bull Generally the basis should be actual production history An alternative approach isthe use of engineering estimates if the item has not been manufactured before

bull Cost Accounting Standards (CAS) 401 requires that a company isconsistent between proposals and accounting practices The way acompany estimates its labor hours needs to also be the way it accumulatesits production history

26FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours ExampleProposal No HLQxxxxxDate January 1 20xx ABC Corporation

Labor HoursProposed Labor Hours ndash 8279 hrsunit for Part ABC

27

Direct Labor HrsUnitAssembly 3800 Machinist 350 QA 762 Engineer 1 238

Subtotal 5151

Production Support HrsUnitMfg Supervisor 920Eng Supervisor 368QA supervisor 920Production Mgr 920

Subtotal 3128

Total Hrs 8279

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Example ndash Actual Production History

28

ProposedDuration - Months 7 9 24 12 Qty 30 39 110 50 End Date 11152006 982007 912009

Direct Labor Total Hrs HrsUnit Total Hours HrsUnit Total Hrs HrsUnit Total Hrs HrsUnitAssembly 1836 6120 1675 4295 4338 3944 1900 3800 Machinist 169 564 154 396 400 363 175 350 QA 368 1238 336 862 870 791 381 762 Engineer 1 115 383 105 269 272 247 119 238

Production Support Total Hrs Total Hrs Total Hrs Total Hrs HrsUnitMFG Supervisor 268 345 920 460 920 Eng Supervisor 107 138 184 184 368 QA Supervisor 268 345 920 460 920 Production Mgr 268 345 920 460 920

HrsUnit 8279

Acutal Production History - Part ABC

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Examples ndash Basis of Estimatebull Basis of estimate for direct labor

bull Proposed direct labor hours were developed by apply a 90 percent learningcurve to the production labor history for part BBC You need to provide abasis for the 90 percent curve

bull Basis of estimate for the manufacturing supervisorbull The manufacturing supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 920 hours were used over a 24-month periodSince the current proposal has been estimated to cover 12 months 460hours were applied to the manufacturing supervisor (920 divided by 2)

bull Basis of estimate for engineering supervisorbull The engineering supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 184 hours were necessary to complete the taskThis task is similar and so we estimate 184 hours

29

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Direct Costs (ODC)bull List other expenses not otherwise included under material and labor (eg

travel freight) and provide basis for pricing

bull For example the basis for travel would include the location number of tripsnumber of people attending and the estimated expenses for the travel

30FAR 15408 Table 15-2 II D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Completion of this checklist and supporting information is required for all single source proposals that exceed the TINA threshold where no valid exception (FAR 15403-1) applies

If the supplier is claiming an exemption for commercial terms only the first line on the checklist is applicable

Supplier

enspenspenspenspensp

Supplier Proposal Number

enspenspenspenspensp

Exemption to CampP Data Commercial Item

(Section 3 of Instruction)

|_| Support Included

Located in Section Page

enspenspenspenspensp

Pricing Proposal Coversheet or Equivalent (21 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Point of Contact (21 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

DCMADCAA Points of Contact (Include Name Phone Address Cage Code and E-mail Address) (21 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Cost Element Detail and Cost Element Summary (24 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Individual Bill of Material and Consolidated Bill of Material (25 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Material Basis of Estimate (251 of Instruction) and Copies of POsQuotes

|_| Included

Located in Section Page

enspenspenspenspensp

Sub-tier Cost Analysis (if required) (251 of Instruction)

|_| Included

Located in Section Page or ECDs

enspenspenspenspensp

Labor History (26 amp 261 of Instruction) and Basis of Estimate

|_| Included

Located in Section Page

enspenspenspenspensp

Support for ODC (27 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Support for Rates (17 and 28 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Nonrecurring Engineering (NRE) (14 and 15) Use of Government Property to Include Serial Tooling andor Special Test Equipment

|_| Included

Located in Section Page

enspenspenspenspensp

Expenditure Plan (Required to Support Cost Type Proposals or Performance Based Progress Payments)

|_| Included

Located in Section Page

enspenspenspenspensp

Supplier

By Signing below you are confirming that required cost and pricing data is part of your proposal and meets the requirements of Pacific Scientificrsquos proposal pricing instructions

Sellerrsquos Representative (type or Print)

enspenspenspenspensp

Signature

enspenspenspenspensp

Date (MMDDYYYY)

enspenspenspenspensp

Pacific Scientific

By Signing below the supplier manager is confirming receipt of the items required for this proposal and meets the requirements of Pacific Scientificrsquos proposal pricing instructions

Buyer (Type or Print)

enspenspenspenspensp

Signature

enspenspenspenspensp

Date (MMDDYYYY)

enspenspenspenspensp

Supplier Manager (Type or Print)

enspenspenspenspensp

Signature

enspenspenspenspensp

Date (MMDDYYYY)

enspenspenspenspensp

Page 2: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Purpose of this Guidelinebull This guideline explains the basic requirements for proposals submitted to

PSEMC when cost or pricing data are required

bull This guideline does not apply to proposals that are

bull Valued at less than the cost or pricing threshold set in FAR 15403-4bull Based on competitionbull Based on commercial pricing

bull Questions regarding these requirements should be addressed to yourPSEMC Supply Chain contact

2

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Table of Contentsbull When cost or pricing data is required the supplierrsquos proposal needs to

include the following sections

3

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Table of Contentsbull Summary cost element breakdowns and consolidated Bills of Material

(BOM) are the two most frequently missed items in supplier proposals

bull Additional areas of proposal support which are not applicable to most proposals

4

Required Items Page FAR Reference

Commercial Justification Pg 38-40 FAR 2101 amp FAR 15403

Change Proposal Pg 41-46 FAR 15408 Table 15-2 III B

Additional Guidance Pg 47 PSEMC Support

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklistbull PSEMC Policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals that exceed theCost amp Pricing Thresholdbull Additionally PSEMC request the cost element breakdown bill of material and labor

detail in Excel format

bull The purpose of this form is as followsbull To provide the supplier with a checklist to help ensure that all the supporting

documentation has been included so the proposal will be deemed adequate byPSEMC our customer and the DCAA

bull To provide PSEMC with a tool to more quickly verify where the supportingdocumentation can be found in the proposal

bull An example is provided on the next slide and under the commercialjustification section of this module

5

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03

6

Proposal Pricing Instructions

Supplier Proposal Adequacy Checklist

Completion of this checklist and supporting information is required for all single source proposals that exceed the TINA threshold where no valid exception (FAR 15403-1) applies If the supplier is claiming an exemption for commercial terms only the first line on the checklist is applicable Supplier

Supplier Proposal Number

Exemption to CampP Data Commercial Item (Section 3 of Instruction)

Support Included

Located in Section Page

Pricing Proposal Coversheet or Equivalent (21 of Instruction)

Included Located in Section Page

Point of Contact (21 of Instruction) Included Located in Section Page

DCMADCAA Points of Contact (Include Name Phone Address Cage Code and E-mail Address) (21 of Instruction)

Included Located in Section Page

Cost Element Detail and Cost Element Summary (24 of Instruction)

Included Located in Section Page

Individual Bill of Material and Consolidated Bill of Material (25 of Instruction)

Included Located in Section Page

Material Basis of Estimate (251 of Instruction) and Copies of POsQuotes

Included Located in Section Page

Sub-tier Cost Analysis (if required) (251 of Instruction)

Included Located in Section Page or ECDs

Labor History (26 amp 261 of Instruction) and Basis of Estimate

Included Located in Section Page

Support for ODC (27 of Instruction) Included Located in Section Page

Support for Rates (17 and 28 of Instruction) Included Located in Section Page

Nonrecurring Engineering (NRE) (14 and 15) Use of Government Property to Include Serial Tooling andor Special Test Equipment

Included Located in Section Page

Expenditure Plan (Required to Support Cost Type Proposals or Performance Based Progress Payments)

Included Located in Section Page

Supplier By Signing below you are confirming that required cost and pricing data is part of your proposal and meets the requirements of Pacific Scientificrsquos proposal pricing instructions Sellerrsquos Representative (type or Print)

Signature

Date (MMDDYYYY)

Pacific Scientific By Signing below the supplier manager is confirming receipt of the items required for this proposal and meets the requirements of Pacific Scientificrsquos proposal pricing instructions Buyer (Type or Print)

Signature

Date (MMDDYYYY)

Supplier Manager (Type or Print)

Signature

Date (MMDDYYYY)

PacSciLogo150dpi_4inch

Proposal Pricing Instructions

Supplier Proposal Adequacy Checklist

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cover Sheetbull Include a cover sheet that includes the following information

bull Solicitation Numberbull Name and Address of offerorbull Name and Telephone number of point of contactbull Name address phone number and email for your DCMA and DCAAbull Type of contract actionbull Proposed cost profit or fee and total price ndash maximum proposal valuebull If you will require the use of government propertybull Whether your organization is subject to cost accounting standards (CAS) ndash see

details in FAR 15-408 Table 15-2 I A (8)bull The statement designated in FAR 15408 Table 15-2 I A (9)bull Date of Submissionbull Name title and signature of authorized representative

bull Most contractors use the Government Form 1411 or equivalent

bull An example is provided on the next slide

7

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cover Sheet Example ndashReference Form DI-SUP-105F02

8

Point of Contact

Proposed Cost

Period of Performance

DCAA Contact Information

Include Statement from FAR 15408 Table 15-2 IA (9)

DCMA Contact Information

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Indexbull Include an index that references where the supporting data for your

estimates is located in the proposalbull The Index should include the following information

bull Title of information being referenced (Summary cost element breakdown materiallabor etc

bull Location in the proposal (page number or file name and page if located in a separatefiledocument)

bull An example is provided in the next slide

9

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Index ExampleProposal No HLQxxxxxDate January xx xxxx ABC Company

Index1 Cover sheet Page xx

2 Business section Page xx

21 Assumptions and Conditions Page xx

3 Pricing Page xx

31 Unit Pricing Page xx

32 Cost Element by Part Number Page xx

33 Cost Element Summary Page xx

4 Material Page xx

41 Bill of Materials by Part Number Page xx

42 Consolidated Bill of Materials Page xx

43 Purchase Orders and Quotes (File PO-QuotesPDF) Page xx

5 Labor Page xx

6 Etc Page xx

10

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cost Element Breakdown by Line Itembull A cost element breakdown is required for each proposed line item If the

proposal covers multiple price points or multiple years a cost elementbreakdown will be required for each price point for each year

bull For example assume your proposal includes the following three line items

bull You would need to provide separate cost element breakdowns for parts ABCABB and the NRE See the next slide for an example

Slight differences due to rounding

11

Part Number Quantity Unit Price Total PricePart ABC 50 $12500 $625000Part ABB 75 $10300 $772500NRE 1 $145000Total $1542500

FAR 15408 Table 15-2 I D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cost Element Breakdown by Line Item Example

12FAR 15408 Table 15-2 I D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdownbull When more than one contract line item (Part Number NRE etc) is

proposed you must provide summary total amounts covering all items foreach element of cost If the proposal covers a high mid and low point thesummary needs to only be for those points not all the differentcombinations that can result from range pricing If the proposal is formultiple years there needs to be a summary for each of the yearsbull For example if your proposal included the following

bull You would need to provide a summary by cost element that includes the totalproposed value of $1542500 See the next slide for an example showing thethree individual cost elements being combined into a summary

Slight differences due to rounding

13

Part Number Quantity Unit Price Total PricePart ABC 50 $12500 $625000Part ABB 75 $10300 $772500NRE 1 $145000Total $1542500

FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdown - Example

14FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdown - Example

15

bull If the proposal is a base year plus option years there needs to be asummary Cost Element Breakdown for each of the years at the points in theRFP requiring Cost or Pricing data

FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Include a BOM for each individual part proposed A BOM is a list of the raw

materials subassemblies etc needed to manufacture a product

bull Provide your BOMs in Excel formatbull The consolidated and individual BOMs need to identify the following for each line

itembull Part Number and descriptionbull Supplierbull Quantitybull Unit Price ndash Unit pricing on the BOM should tie to the supportbull Total Pricebull Basis for pricing (vendor quotes purchase orders)

Source of pricing (purchase order quotes etc) must be referenced in the BOM

bull PSEMC will require copies of the support (ie quotes purchase orders) for asample of the items on the BOM during the cost analysis

16FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If attritionyield or scrap are added to your material you will need to submit

adequate basis of estimates and support as appropriate

bull There are time when your BOM may be impacted by minimum buys or NREthat is passed along from your supplier If this happens make sure this isclearly identified on the BOM and the support quotes or purchase orders

bull In addition to the individual BOMs FAR requires a consolidated BOM inyour proposal A consolidated BOM is a listing of the material needed forthe proposal A consolidated BOM combines all the materials for each ofthe parts being procured as well as assemblies services or materialassociated with NRE

17FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Individual Bills of Material Example

18

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Material Examplebull Below is an example of a consolidated BOM This BOM was developed by

taking the three individual BOMrsquos on the previous page and combining themtogetherbull In a consolidated BOM part numbers and quantities should be combined (or

subtotaled) if they are the same parts For example the BOMs for Part Nos ABCand ABB both require the same Connector and Screw In the consolidated BOMthe requirements have been combined and reflect the total number of Connectorsand Screws that will be needed for this proposal

19

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Materialbull If the proposal is for a base year plus option years there needs to be a

consolidated BOM for each of the years at each of the points in the RFPrequiring cost or pricing

bull To determine if a subtier cost analysis is required you need to add togetherthe anticipated costs for each supplier for all years In the above examplethere are two suppliers that will require cost analysis (Ford and Motion)

20

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Supplier proposals

bull A cost analysis report is required if any of your suppliersrsquo proposals exceedthe Truth in Negotiations Act (TINA) threshold These need to be submittedwith your proposal

bull If the cost analysis for a supplier is not complete at the time of your proposalsubmittal a schedule listing the estimated completion dates for each supplierneeds to be provided in the proposal

bull If an exemption applies that eliminates the need for a cost analysis (commercial orcompetitively priced) documentation needs to be provided to support these claims

21FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If you claim your supplier was competed and the value is over the TINA

threshold you will need to provide the following

bull Evidence that an RFP or solicitation to bid was sent to two or more supplierscapable of providing the goods or services requested

bull Copies of the quotes received from each of the suppliers who were competedbull Supplierrsquos analysis with basis of rationale for why the winning bid represents the best value

(lowest price technical considerations etc)

bull If you claim your supplierrsquos parts or services are commercial refer to thecommercial section in this document

22FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Refer to the detailed instructions in the RFP when your proposal supports a

base year plus options contract or a long term agreement Guidance shouldbe provided here on the consolidation and subtier requirements If youhave any questions regarding this contact your PSEMC Supply Chainrepresentative

bull Inter-organizational costs

bull Inter-organizational costs are defined as the costs of items transferred betweendivisions within the same company

bull If you have bid any inter-organizational costs in your proposal you will need toprovide a cost element breakdown for each inter-organizational transfer andsupport as appropriate

bull One more thing

bull If you have a supplier with a value in excess of $135 million or is greater than 10percent of your total proposal and exceeds the TINA threshold FAR 15408 Table15-2 requires that we submit the supplierrsquos proposal and cost or pricing data withour own proposal

23FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Provide a time-phased (eg monthly quarterly) breakdown of labor hours ratesand cost by appropriate category and furnish basis for estimates

24FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Proposed labor hours are generally a combination of direct and support laborhours

bull Direct Labor Hours ndash Hours that can be identified specifically to a final end itembull Support Labor Hours ndash Hours that cannot be specifically identified to one end item For

example a production manager may be in charge of overseeing the manufacturing ofmultiple parts

25FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull You need to provide a breakdown of the labor hours by labor category and

function along with a basis of estimate for the proposed labor hours

bull For example if you propose 500 hours for an end item you would need to providea breakdown by categoryfunction (assembly inspection supervisor engineeretc) You also will need to provide a detailed basis of estimate for eachcategoryfunction showing how your arrived at the hours for the proposed laborcategory

bull Generally the basis should be actual production history An alternative approach isthe use of engineering estimates if the item has not been manufactured before

bull Cost Accounting Standards (CAS) 401 requires that a company isconsistent between proposals and accounting practices The way acompany estimates its labor hours needs to also be the way it accumulatesits production history

26FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours ExampleProposal No HLQxxxxxDate January 1 20xx ABC Corporation

Labor HoursProposed Labor Hours ndash 8279 hrsunit for Part ABC

27

Direct Labor HrsUnitAssembly 3800 Machinist 350 QA 762 Engineer 1 238

Subtotal 5151

Production Support HrsUnitMfg Supervisor 920Eng Supervisor 368QA supervisor 920Production Mgr 920

Subtotal 3128

Total Hrs 8279

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Example ndash Actual Production History

28

ProposedDuration - Months 7 9 24 12 Qty 30 39 110 50 End Date 11152006 982007 912009

Direct Labor Total Hrs HrsUnit Total Hours HrsUnit Total Hrs HrsUnit Total Hrs HrsUnitAssembly 1836 6120 1675 4295 4338 3944 1900 3800 Machinist 169 564 154 396 400 363 175 350 QA 368 1238 336 862 870 791 381 762 Engineer 1 115 383 105 269 272 247 119 238

Production Support Total Hrs Total Hrs Total Hrs Total Hrs HrsUnitMFG Supervisor 268 345 920 460 920 Eng Supervisor 107 138 184 184 368 QA Supervisor 268 345 920 460 920 Production Mgr 268 345 920 460 920

HrsUnit 8279

Acutal Production History - Part ABC

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Examples ndash Basis of Estimatebull Basis of estimate for direct labor

bull Proposed direct labor hours were developed by apply a 90 percent learningcurve to the production labor history for part BBC You need to provide abasis for the 90 percent curve

bull Basis of estimate for the manufacturing supervisorbull The manufacturing supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 920 hours were used over a 24-month periodSince the current proposal has been estimated to cover 12 months 460hours were applied to the manufacturing supervisor (920 divided by 2)

bull Basis of estimate for engineering supervisorbull The engineering supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 184 hours were necessary to complete the taskThis task is similar and so we estimate 184 hours

29

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Direct Costs (ODC)bull List other expenses not otherwise included under material and labor (eg

travel freight) and provide basis for pricing

bull For example the basis for travel would include the location number of tripsnumber of people attending and the estimated expenses for the travel

30FAR 15408 Table 15-2 II D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Completion of this checklist and supporting information is required for all single source proposals that exceed the TINA threshold where no valid exception (FAR 15403-1) applies

If the supplier is claiming an exemption for commercial terms only the first line on the checklist is applicable

Supplier

enspenspenspenspensp

Supplier Proposal Number

enspenspenspenspensp

Exemption to CampP Data Commercial Item

(Section 3 of Instruction)

|_| Support Included

Located in Section Page

enspenspenspenspensp

Pricing Proposal Coversheet or Equivalent (21 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Point of Contact (21 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

DCMADCAA Points of Contact (Include Name Phone Address Cage Code and E-mail Address) (21 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Cost Element Detail and Cost Element Summary (24 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Individual Bill of Material and Consolidated Bill of Material (25 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Material Basis of Estimate (251 of Instruction) and Copies of POsQuotes

|_| Included

Located in Section Page

enspenspenspenspensp

Sub-tier Cost Analysis (if required) (251 of Instruction)

|_| Included

Located in Section Page or ECDs

enspenspenspenspensp

Labor History (26 amp 261 of Instruction) and Basis of Estimate

|_| Included

Located in Section Page

enspenspenspenspensp

Support for ODC (27 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Support for Rates (17 and 28 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Nonrecurring Engineering (NRE) (14 and 15) Use of Government Property to Include Serial Tooling andor Special Test Equipment

|_| Included

Located in Section Page

enspenspenspenspensp

Expenditure Plan (Required to Support Cost Type Proposals or Performance Based Progress Payments)

|_| Included

Located in Section Page

enspenspenspenspensp

Supplier

By Signing below you are confirming that required cost and pricing data is part of your proposal and meets the requirements of Pacific Scientificrsquos proposal pricing instructions

Sellerrsquos Representative (type or Print)

enspenspenspenspensp

Signature

enspenspenspenspensp

Date (MMDDYYYY)

enspenspenspenspensp

Pacific Scientific

By Signing below the supplier manager is confirming receipt of the items required for this proposal and meets the requirements of Pacific Scientificrsquos proposal pricing instructions

Buyer (Type or Print)

enspenspenspenspensp

Signature

enspenspenspenspensp

Date (MMDDYYYY)

enspenspenspenspensp

Supplier Manager (Type or Print)

enspenspenspenspensp

Signature

enspenspenspenspensp

Date (MMDDYYYY)

enspenspenspenspensp

Page 3: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Table of Contentsbull When cost or pricing data is required the supplierrsquos proposal needs to

include the following sections

3

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Table of Contentsbull Summary cost element breakdowns and consolidated Bills of Material

(BOM) are the two most frequently missed items in supplier proposals

bull Additional areas of proposal support which are not applicable to most proposals

4

Required Items Page FAR Reference

Commercial Justification Pg 38-40 FAR 2101 amp FAR 15403

Change Proposal Pg 41-46 FAR 15408 Table 15-2 III B

Additional Guidance Pg 47 PSEMC Support

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklistbull PSEMC Policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals that exceed theCost amp Pricing Thresholdbull Additionally PSEMC request the cost element breakdown bill of material and labor

detail in Excel format

bull The purpose of this form is as followsbull To provide the supplier with a checklist to help ensure that all the supporting

documentation has been included so the proposal will be deemed adequate byPSEMC our customer and the DCAA

bull To provide PSEMC with a tool to more quickly verify where the supportingdocumentation can be found in the proposal

bull An example is provided on the next slide and under the commercialjustification section of this module

5

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03

6

Proposal Pricing Instructions

Supplier Proposal Adequacy Checklist

Completion of this checklist and supporting information is required for all single source proposals that exceed the TINA threshold where no valid exception (FAR 15403-1) applies If the supplier is claiming an exemption for commercial terms only the first line on the checklist is applicable Supplier

Supplier Proposal Number

Exemption to CampP Data Commercial Item (Section 3 of Instruction)

Support Included

Located in Section Page

Pricing Proposal Coversheet or Equivalent (21 of Instruction)

Included Located in Section Page

Point of Contact (21 of Instruction) Included Located in Section Page

DCMADCAA Points of Contact (Include Name Phone Address Cage Code and E-mail Address) (21 of Instruction)

Included Located in Section Page

Cost Element Detail and Cost Element Summary (24 of Instruction)

Included Located in Section Page

Individual Bill of Material and Consolidated Bill of Material (25 of Instruction)

Included Located in Section Page

Material Basis of Estimate (251 of Instruction) and Copies of POsQuotes

Included Located in Section Page

Sub-tier Cost Analysis (if required) (251 of Instruction)

Included Located in Section Page or ECDs

Labor History (26 amp 261 of Instruction) and Basis of Estimate

Included Located in Section Page

Support for ODC (27 of Instruction) Included Located in Section Page

Support for Rates (17 and 28 of Instruction) Included Located in Section Page

Nonrecurring Engineering (NRE) (14 and 15) Use of Government Property to Include Serial Tooling andor Special Test Equipment

Included Located in Section Page

Expenditure Plan (Required to Support Cost Type Proposals or Performance Based Progress Payments)

Included Located in Section Page

Supplier By Signing below you are confirming that required cost and pricing data is part of your proposal and meets the requirements of Pacific Scientificrsquos proposal pricing instructions Sellerrsquos Representative (type or Print)

Signature

Date (MMDDYYYY)

Pacific Scientific By Signing below the supplier manager is confirming receipt of the items required for this proposal and meets the requirements of Pacific Scientificrsquos proposal pricing instructions Buyer (Type or Print)

Signature

Date (MMDDYYYY)

Supplier Manager (Type or Print)

Signature

Date (MMDDYYYY)

PacSciLogo150dpi_4inch

Proposal Pricing Instructions

Supplier Proposal Adequacy Checklist

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cover Sheetbull Include a cover sheet that includes the following information

bull Solicitation Numberbull Name and Address of offerorbull Name and Telephone number of point of contactbull Name address phone number and email for your DCMA and DCAAbull Type of contract actionbull Proposed cost profit or fee and total price ndash maximum proposal valuebull If you will require the use of government propertybull Whether your organization is subject to cost accounting standards (CAS) ndash see

details in FAR 15-408 Table 15-2 I A (8)bull The statement designated in FAR 15408 Table 15-2 I A (9)bull Date of Submissionbull Name title and signature of authorized representative

bull Most contractors use the Government Form 1411 or equivalent

bull An example is provided on the next slide

7

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cover Sheet Example ndashReference Form DI-SUP-105F02

8

Point of Contact

Proposed Cost

Period of Performance

DCAA Contact Information

Include Statement from FAR 15408 Table 15-2 IA (9)

DCMA Contact Information

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Indexbull Include an index that references where the supporting data for your

estimates is located in the proposalbull The Index should include the following information

bull Title of information being referenced (Summary cost element breakdown materiallabor etc

bull Location in the proposal (page number or file name and page if located in a separatefiledocument)

bull An example is provided in the next slide

9

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Index ExampleProposal No HLQxxxxxDate January xx xxxx ABC Company

Index1 Cover sheet Page xx

2 Business section Page xx

21 Assumptions and Conditions Page xx

3 Pricing Page xx

31 Unit Pricing Page xx

32 Cost Element by Part Number Page xx

33 Cost Element Summary Page xx

4 Material Page xx

41 Bill of Materials by Part Number Page xx

42 Consolidated Bill of Materials Page xx

43 Purchase Orders and Quotes (File PO-QuotesPDF) Page xx

5 Labor Page xx

6 Etc Page xx

10

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cost Element Breakdown by Line Itembull A cost element breakdown is required for each proposed line item If the

proposal covers multiple price points or multiple years a cost elementbreakdown will be required for each price point for each year

bull For example assume your proposal includes the following three line items

bull You would need to provide separate cost element breakdowns for parts ABCABB and the NRE See the next slide for an example

Slight differences due to rounding

11

Part Number Quantity Unit Price Total PricePart ABC 50 $12500 $625000Part ABB 75 $10300 $772500NRE 1 $145000Total $1542500

FAR 15408 Table 15-2 I D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cost Element Breakdown by Line Item Example

12FAR 15408 Table 15-2 I D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdownbull When more than one contract line item (Part Number NRE etc) is

proposed you must provide summary total amounts covering all items foreach element of cost If the proposal covers a high mid and low point thesummary needs to only be for those points not all the differentcombinations that can result from range pricing If the proposal is formultiple years there needs to be a summary for each of the yearsbull For example if your proposal included the following

bull You would need to provide a summary by cost element that includes the totalproposed value of $1542500 See the next slide for an example showing thethree individual cost elements being combined into a summary

Slight differences due to rounding

13

Part Number Quantity Unit Price Total PricePart ABC 50 $12500 $625000Part ABB 75 $10300 $772500NRE 1 $145000Total $1542500

FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdown - Example

14FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdown - Example

15

bull If the proposal is a base year plus option years there needs to be asummary Cost Element Breakdown for each of the years at the points in theRFP requiring Cost or Pricing data

FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Include a BOM for each individual part proposed A BOM is a list of the raw

materials subassemblies etc needed to manufacture a product

bull Provide your BOMs in Excel formatbull The consolidated and individual BOMs need to identify the following for each line

itembull Part Number and descriptionbull Supplierbull Quantitybull Unit Price ndash Unit pricing on the BOM should tie to the supportbull Total Pricebull Basis for pricing (vendor quotes purchase orders)

Source of pricing (purchase order quotes etc) must be referenced in the BOM

bull PSEMC will require copies of the support (ie quotes purchase orders) for asample of the items on the BOM during the cost analysis

16FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If attritionyield or scrap are added to your material you will need to submit

adequate basis of estimates and support as appropriate

bull There are time when your BOM may be impacted by minimum buys or NREthat is passed along from your supplier If this happens make sure this isclearly identified on the BOM and the support quotes or purchase orders

bull In addition to the individual BOMs FAR requires a consolidated BOM inyour proposal A consolidated BOM is a listing of the material needed forthe proposal A consolidated BOM combines all the materials for each ofthe parts being procured as well as assemblies services or materialassociated with NRE

17FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Individual Bills of Material Example

18

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Material Examplebull Below is an example of a consolidated BOM This BOM was developed by

taking the three individual BOMrsquos on the previous page and combining themtogetherbull In a consolidated BOM part numbers and quantities should be combined (or

subtotaled) if they are the same parts For example the BOMs for Part Nos ABCand ABB both require the same Connector and Screw In the consolidated BOMthe requirements have been combined and reflect the total number of Connectorsand Screws that will be needed for this proposal

19

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Materialbull If the proposal is for a base year plus option years there needs to be a

consolidated BOM for each of the years at each of the points in the RFPrequiring cost or pricing

bull To determine if a subtier cost analysis is required you need to add togetherthe anticipated costs for each supplier for all years In the above examplethere are two suppliers that will require cost analysis (Ford and Motion)

20

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Supplier proposals

bull A cost analysis report is required if any of your suppliersrsquo proposals exceedthe Truth in Negotiations Act (TINA) threshold These need to be submittedwith your proposal

bull If the cost analysis for a supplier is not complete at the time of your proposalsubmittal a schedule listing the estimated completion dates for each supplierneeds to be provided in the proposal

bull If an exemption applies that eliminates the need for a cost analysis (commercial orcompetitively priced) documentation needs to be provided to support these claims

21FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If you claim your supplier was competed and the value is over the TINA

threshold you will need to provide the following

bull Evidence that an RFP or solicitation to bid was sent to two or more supplierscapable of providing the goods or services requested

bull Copies of the quotes received from each of the suppliers who were competedbull Supplierrsquos analysis with basis of rationale for why the winning bid represents the best value

(lowest price technical considerations etc)

bull If you claim your supplierrsquos parts or services are commercial refer to thecommercial section in this document

22FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Refer to the detailed instructions in the RFP when your proposal supports a

base year plus options contract or a long term agreement Guidance shouldbe provided here on the consolidation and subtier requirements If youhave any questions regarding this contact your PSEMC Supply Chainrepresentative

bull Inter-organizational costs

bull Inter-organizational costs are defined as the costs of items transferred betweendivisions within the same company

bull If you have bid any inter-organizational costs in your proposal you will need toprovide a cost element breakdown for each inter-organizational transfer andsupport as appropriate

bull One more thing

bull If you have a supplier with a value in excess of $135 million or is greater than 10percent of your total proposal and exceeds the TINA threshold FAR 15408 Table15-2 requires that we submit the supplierrsquos proposal and cost or pricing data withour own proposal

23FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Provide a time-phased (eg monthly quarterly) breakdown of labor hours ratesand cost by appropriate category and furnish basis for estimates

24FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Proposed labor hours are generally a combination of direct and support laborhours

bull Direct Labor Hours ndash Hours that can be identified specifically to a final end itembull Support Labor Hours ndash Hours that cannot be specifically identified to one end item For

example a production manager may be in charge of overseeing the manufacturing ofmultiple parts

25FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull You need to provide a breakdown of the labor hours by labor category and

function along with a basis of estimate for the proposed labor hours

bull For example if you propose 500 hours for an end item you would need to providea breakdown by categoryfunction (assembly inspection supervisor engineeretc) You also will need to provide a detailed basis of estimate for eachcategoryfunction showing how your arrived at the hours for the proposed laborcategory

bull Generally the basis should be actual production history An alternative approach isthe use of engineering estimates if the item has not been manufactured before

bull Cost Accounting Standards (CAS) 401 requires that a company isconsistent between proposals and accounting practices The way acompany estimates its labor hours needs to also be the way it accumulatesits production history

26FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours ExampleProposal No HLQxxxxxDate January 1 20xx ABC Corporation

Labor HoursProposed Labor Hours ndash 8279 hrsunit for Part ABC

27

Direct Labor HrsUnitAssembly 3800 Machinist 350 QA 762 Engineer 1 238

Subtotal 5151

Production Support HrsUnitMfg Supervisor 920Eng Supervisor 368QA supervisor 920Production Mgr 920

Subtotal 3128

Total Hrs 8279

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Example ndash Actual Production History

28

ProposedDuration - Months 7 9 24 12 Qty 30 39 110 50 End Date 11152006 982007 912009

Direct Labor Total Hrs HrsUnit Total Hours HrsUnit Total Hrs HrsUnit Total Hrs HrsUnitAssembly 1836 6120 1675 4295 4338 3944 1900 3800 Machinist 169 564 154 396 400 363 175 350 QA 368 1238 336 862 870 791 381 762 Engineer 1 115 383 105 269 272 247 119 238

Production Support Total Hrs Total Hrs Total Hrs Total Hrs HrsUnitMFG Supervisor 268 345 920 460 920 Eng Supervisor 107 138 184 184 368 QA Supervisor 268 345 920 460 920 Production Mgr 268 345 920 460 920

HrsUnit 8279

Acutal Production History - Part ABC

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Examples ndash Basis of Estimatebull Basis of estimate for direct labor

bull Proposed direct labor hours were developed by apply a 90 percent learningcurve to the production labor history for part BBC You need to provide abasis for the 90 percent curve

bull Basis of estimate for the manufacturing supervisorbull The manufacturing supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 920 hours were used over a 24-month periodSince the current proposal has been estimated to cover 12 months 460hours were applied to the manufacturing supervisor (920 divided by 2)

bull Basis of estimate for engineering supervisorbull The engineering supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 184 hours were necessary to complete the taskThis task is similar and so we estimate 184 hours

29

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Direct Costs (ODC)bull List other expenses not otherwise included under material and labor (eg

travel freight) and provide basis for pricing

bull For example the basis for travel would include the location number of tripsnumber of people attending and the estimated expenses for the travel

30FAR 15408 Table 15-2 II D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Completion of this checklist and supporting information is required for all single source proposals that exceed the TINA threshold where no valid exception (FAR 15403-1) applies

If the supplier is claiming an exemption for commercial terms only the first line on the checklist is applicable

Supplier

enspenspenspenspensp

Supplier Proposal Number

enspenspenspenspensp

Exemption to CampP Data Commercial Item

(Section 3 of Instruction)

|_| Support Included

Located in Section Page

enspenspenspenspensp

Pricing Proposal Coversheet or Equivalent (21 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Point of Contact (21 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

DCMADCAA Points of Contact (Include Name Phone Address Cage Code and E-mail Address) (21 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Cost Element Detail and Cost Element Summary (24 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Individual Bill of Material and Consolidated Bill of Material (25 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Material Basis of Estimate (251 of Instruction) and Copies of POsQuotes

|_| Included

Located in Section Page

enspenspenspenspensp

Sub-tier Cost Analysis (if required) (251 of Instruction)

|_| Included

Located in Section Page or ECDs

enspenspenspenspensp

Labor History (26 amp 261 of Instruction) and Basis of Estimate

|_| Included

Located in Section Page

enspenspenspenspensp

Support for ODC (27 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Support for Rates (17 and 28 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Nonrecurring Engineering (NRE) (14 and 15) Use of Government Property to Include Serial Tooling andor Special Test Equipment

|_| Included

Located in Section Page

enspenspenspenspensp

Expenditure Plan (Required to Support Cost Type Proposals or Performance Based Progress Payments)

|_| Included

Located in Section Page

enspenspenspenspensp

Supplier

By Signing below you are confirming that required cost and pricing data is part of your proposal and meets the requirements of Pacific Scientificrsquos proposal pricing instructions

Sellerrsquos Representative (type or Print)

enspenspenspenspensp

Signature

enspenspenspenspensp

Date (MMDDYYYY)

enspenspenspenspensp

Pacific Scientific

By Signing below the supplier manager is confirming receipt of the items required for this proposal and meets the requirements of Pacific Scientificrsquos proposal pricing instructions

Buyer (Type or Print)

enspenspenspenspensp

Signature

enspenspenspenspensp

Date (MMDDYYYY)

enspenspenspenspensp

Supplier Manager (Type or Print)

enspenspenspenspensp

Signature

enspenspenspenspensp

Date (MMDDYYYY)

enspenspenspenspensp

Page 4: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Table of Contentsbull Summary cost element breakdowns and consolidated Bills of Material

(BOM) are the two most frequently missed items in supplier proposals

bull Additional areas of proposal support which are not applicable to most proposals

4

Required Items Page FAR Reference

Commercial Justification Pg 38-40 FAR 2101 amp FAR 15403

Change Proposal Pg 41-46 FAR 15408 Table 15-2 III B

Additional Guidance Pg 47 PSEMC Support

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklistbull PSEMC Policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals that exceed theCost amp Pricing Thresholdbull Additionally PSEMC request the cost element breakdown bill of material and labor

detail in Excel format

bull The purpose of this form is as followsbull To provide the supplier with a checklist to help ensure that all the supporting

documentation has been included so the proposal will be deemed adequate byPSEMC our customer and the DCAA

bull To provide PSEMC with a tool to more quickly verify where the supportingdocumentation can be found in the proposal

bull An example is provided on the next slide and under the commercialjustification section of this module

5

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03

6

Proposal Pricing Instructions

Supplier Proposal Adequacy Checklist

Completion of this checklist and supporting information is required for all single source proposals that exceed the TINA threshold where no valid exception (FAR 15403-1) applies If the supplier is claiming an exemption for commercial terms only the first line on the checklist is applicable Supplier

Supplier Proposal Number

Exemption to CampP Data Commercial Item (Section 3 of Instruction)

Support Included

Located in Section Page

Pricing Proposal Coversheet or Equivalent (21 of Instruction)

Included Located in Section Page

Point of Contact (21 of Instruction) Included Located in Section Page

DCMADCAA Points of Contact (Include Name Phone Address Cage Code and E-mail Address) (21 of Instruction)

Included Located in Section Page

Cost Element Detail and Cost Element Summary (24 of Instruction)

Included Located in Section Page

Individual Bill of Material and Consolidated Bill of Material (25 of Instruction)

Included Located in Section Page

Material Basis of Estimate (251 of Instruction) and Copies of POsQuotes

Included Located in Section Page

Sub-tier Cost Analysis (if required) (251 of Instruction)

Included Located in Section Page or ECDs

Labor History (26 amp 261 of Instruction) and Basis of Estimate

Included Located in Section Page

Support for ODC (27 of Instruction) Included Located in Section Page

Support for Rates (17 and 28 of Instruction) Included Located in Section Page

Nonrecurring Engineering (NRE) (14 and 15) Use of Government Property to Include Serial Tooling andor Special Test Equipment

Included Located in Section Page

Expenditure Plan (Required to Support Cost Type Proposals or Performance Based Progress Payments)

Included Located in Section Page

Supplier By Signing below you are confirming that required cost and pricing data is part of your proposal and meets the requirements of Pacific Scientificrsquos proposal pricing instructions Sellerrsquos Representative (type or Print)

Signature

Date (MMDDYYYY)

Pacific Scientific By Signing below the supplier manager is confirming receipt of the items required for this proposal and meets the requirements of Pacific Scientificrsquos proposal pricing instructions Buyer (Type or Print)

Signature

Date (MMDDYYYY)

Supplier Manager (Type or Print)

Signature

Date (MMDDYYYY)

PacSciLogo150dpi_4inch

Proposal Pricing Instructions

Supplier Proposal Adequacy Checklist

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cover Sheetbull Include a cover sheet that includes the following information

bull Solicitation Numberbull Name and Address of offerorbull Name and Telephone number of point of contactbull Name address phone number and email for your DCMA and DCAAbull Type of contract actionbull Proposed cost profit or fee and total price ndash maximum proposal valuebull If you will require the use of government propertybull Whether your organization is subject to cost accounting standards (CAS) ndash see

details in FAR 15-408 Table 15-2 I A (8)bull The statement designated in FAR 15408 Table 15-2 I A (9)bull Date of Submissionbull Name title and signature of authorized representative

bull Most contractors use the Government Form 1411 or equivalent

bull An example is provided on the next slide

7

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cover Sheet Example ndashReference Form DI-SUP-105F02

8

Point of Contact

Proposed Cost

Period of Performance

DCAA Contact Information

Include Statement from FAR 15408 Table 15-2 IA (9)

DCMA Contact Information

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Indexbull Include an index that references where the supporting data for your

estimates is located in the proposalbull The Index should include the following information

bull Title of information being referenced (Summary cost element breakdown materiallabor etc

bull Location in the proposal (page number or file name and page if located in a separatefiledocument)

bull An example is provided in the next slide

9

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Index ExampleProposal No HLQxxxxxDate January xx xxxx ABC Company

Index1 Cover sheet Page xx

2 Business section Page xx

21 Assumptions and Conditions Page xx

3 Pricing Page xx

31 Unit Pricing Page xx

32 Cost Element by Part Number Page xx

33 Cost Element Summary Page xx

4 Material Page xx

41 Bill of Materials by Part Number Page xx

42 Consolidated Bill of Materials Page xx

43 Purchase Orders and Quotes (File PO-QuotesPDF) Page xx

5 Labor Page xx

6 Etc Page xx

10

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cost Element Breakdown by Line Itembull A cost element breakdown is required for each proposed line item If the

proposal covers multiple price points or multiple years a cost elementbreakdown will be required for each price point for each year

bull For example assume your proposal includes the following three line items

bull You would need to provide separate cost element breakdowns for parts ABCABB and the NRE See the next slide for an example

Slight differences due to rounding

11

Part Number Quantity Unit Price Total PricePart ABC 50 $12500 $625000Part ABB 75 $10300 $772500NRE 1 $145000Total $1542500

FAR 15408 Table 15-2 I D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cost Element Breakdown by Line Item Example

12FAR 15408 Table 15-2 I D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdownbull When more than one contract line item (Part Number NRE etc) is

proposed you must provide summary total amounts covering all items foreach element of cost If the proposal covers a high mid and low point thesummary needs to only be for those points not all the differentcombinations that can result from range pricing If the proposal is formultiple years there needs to be a summary for each of the yearsbull For example if your proposal included the following

bull You would need to provide a summary by cost element that includes the totalproposed value of $1542500 See the next slide for an example showing thethree individual cost elements being combined into a summary

Slight differences due to rounding

13

Part Number Quantity Unit Price Total PricePart ABC 50 $12500 $625000Part ABB 75 $10300 $772500NRE 1 $145000Total $1542500

FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdown - Example

14FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdown - Example

15

bull If the proposal is a base year plus option years there needs to be asummary Cost Element Breakdown for each of the years at the points in theRFP requiring Cost or Pricing data

FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Include a BOM for each individual part proposed A BOM is a list of the raw

materials subassemblies etc needed to manufacture a product

bull Provide your BOMs in Excel formatbull The consolidated and individual BOMs need to identify the following for each line

itembull Part Number and descriptionbull Supplierbull Quantitybull Unit Price ndash Unit pricing on the BOM should tie to the supportbull Total Pricebull Basis for pricing (vendor quotes purchase orders)

Source of pricing (purchase order quotes etc) must be referenced in the BOM

bull PSEMC will require copies of the support (ie quotes purchase orders) for asample of the items on the BOM during the cost analysis

16FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If attritionyield or scrap are added to your material you will need to submit

adequate basis of estimates and support as appropriate

bull There are time when your BOM may be impacted by minimum buys or NREthat is passed along from your supplier If this happens make sure this isclearly identified on the BOM and the support quotes or purchase orders

bull In addition to the individual BOMs FAR requires a consolidated BOM inyour proposal A consolidated BOM is a listing of the material needed forthe proposal A consolidated BOM combines all the materials for each ofthe parts being procured as well as assemblies services or materialassociated with NRE

17FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Individual Bills of Material Example

18

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Material Examplebull Below is an example of a consolidated BOM This BOM was developed by

taking the three individual BOMrsquos on the previous page and combining themtogetherbull In a consolidated BOM part numbers and quantities should be combined (or

subtotaled) if they are the same parts For example the BOMs for Part Nos ABCand ABB both require the same Connector and Screw In the consolidated BOMthe requirements have been combined and reflect the total number of Connectorsand Screws that will be needed for this proposal

19

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Materialbull If the proposal is for a base year plus option years there needs to be a

consolidated BOM for each of the years at each of the points in the RFPrequiring cost or pricing

bull To determine if a subtier cost analysis is required you need to add togetherthe anticipated costs for each supplier for all years In the above examplethere are two suppliers that will require cost analysis (Ford and Motion)

20

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Supplier proposals

bull A cost analysis report is required if any of your suppliersrsquo proposals exceedthe Truth in Negotiations Act (TINA) threshold These need to be submittedwith your proposal

bull If the cost analysis for a supplier is not complete at the time of your proposalsubmittal a schedule listing the estimated completion dates for each supplierneeds to be provided in the proposal

bull If an exemption applies that eliminates the need for a cost analysis (commercial orcompetitively priced) documentation needs to be provided to support these claims

21FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If you claim your supplier was competed and the value is over the TINA

threshold you will need to provide the following

bull Evidence that an RFP or solicitation to bid was sent to two or more supplierscapable of providing the goods or services requested

bull Copies of the quotes received from each of the suppliers who were competedbull Supplierrsquos analysis with basis of rationale for why the winning bid represents the best value

(lowest price technical considerations etc)

bull If you claim your supplierrsquos parts or services are commercial refer to thecommercial section in this document

22FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Refer to the detailed instructions in the RFP when your proposal supports a

base year plus options contract or a long term agreement Guidance shouldbe provided here on the consolidation and subtier requirements If youhave any questions regarding this contact your PSEMC Supply Chainrepresentative

bull Inter-organizational costs

bull Inter-organizational costs are defined as the costs of items transferred betweendivisions within the same company

bull If you have bid any inter-organizational costs in your proposal you will need toprovide a cost element breakdown for each inter-organizational transfer andsupport as appropriate

bull One more thing

bull If you have a supplier with a value in excess of $135 million or is greater than 10percent of your total proposal and exceeds the TINA threshold FAR 15408 Table15-2 requires that we submit the supplierrsquos proposal and cost or pricing data withour own proposal

23FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Provide a time-phased (eg monthly quarterly) breakdown of labor hours ratesand cost by appropriate category and furnish basis for estimates

24FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Proposed labor hours are generally a combination of direct and support laborhours

bull Direct Labor Hours ndash Hours that can be identified specifically to a final end itembull Support Labor Hours ndash Hours that cannot be specifically identified to one end item For

example a production manager may be in charge of overseeing the manufacturing ofmultiple parts

25FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull You need to provide a breakdown of the labor hours by labor category and

function along with a basis of estimate for the proposed labor hours

bull For example if you propose 500 hours for an end item you would need to providea breakdown by categoryfunction (assembly inspection supervisor engineeretc) You also will need to provide a detailed basis of estimate for eachcategoryfunction showing how your arrived at the hours for the proposed laborcategory

bull Generally the basis should be actual production history An alternative approach isthe use of engineering estimates if the item has not been manufactured before

bull Cost Accounting Standards (CAS) 401 requires that a company isconsistent between proposals and accounting practices The way acompany estimates its labor hours needs to also be the way it accumulatesits production history

26FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours ExampleProposal No HLQxxxxxDate January 1 20xx ABC Corporation

Labor HoursProposed Labor Hours ndash 8279 hrsunit for Part ABC

27

Direct Labor HrsUnitAssembly 3800 Machinist 350 QA 762 Engineer 1 238

Subtotal 5151

Production Support HrsUnitMfg Supervisor 920Eng Supervisor 368QA supervisor 920Production Mgr 920

Subtotal 3128

Total Hrs 8279

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Example ndash Actual Production History

28

ProposedDuration - Months 7 9 24 12 Qty 30 39 110 50 End Date 11152006 982007 912009

Direct Labor Total Hrs HrsUnit Total Hours HrsUnit Total Hrs HrsUnit Total Hrs HrsUnitAssembly 1836 6120 1675 4295 4338 3944 1900 3800 Machinist 169 564 154 396 400 363 175 350 QA 368 1238 336 862 870 791 381 762 Engineer 1 115 383 105 269 272 247 119 238

Production Support Total Hrs Total Hrs Total Hrs Total Hrs HrsUnitMFG Supervisor 268 345 920 460 920 Eng Supervisor 107 138 184 184 368 QA Supervisor 268 345 920 460 920 Production Mgr 268 345 920 460 920

HrsUnit 8279

Acutal Production History - Part ABC

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Examples ndash Basis of Estimatebull Basis of estimate for direct labor

bull Proposed direct labor hours were developed by apply a 90 percent learningcurve to the production labor history for part BBC You need to provide abasis for the 90 percent curve

bull Basis of estimate for the manufacturing supervisorbull The manufacturing supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 920 hours were used over a 24-month periodSince the current proposal has been estimated to cover 12 months 460hours were applied to the manufacturing supervisor (920 divided by 2)

bull Basis of estimate for engineering supervisorbull The engineering supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 184 hours were necessary to complete the taskThis task is similar and so we estimate 184 hours

29

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Direct Costs (ODC)bull List other expenses not otherwise included under material and labor (eg

travel freight) and provide basis for pricing

bull For example the basis for travel would include the location number of tripsnumber of people attending and the estimated expenses for the travel

30FAR 15408 Table 15-2 II D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Completion of this checklist and supporting information is required for all single source proposals that exceed the TINA threshold where no valid exception (FAR 15403-1) applies

If the supplier is claiming an exemption for commercial terms only the first line on the checklist is applicable

Supplier

enspenspenspenspensp

Supplier Proposal Number

enspenspenspenspensp

Exemption to CampP Data Commercial Item

(Section 3 of Instruction)

|_| Support Included

Located in Section Page

enspenspenspenspensp

Pricing Proposal Coversheet or Equivalent (21 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Point of Contact (21 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

DCMADCAA Points of Contact (Include Name Phone Address Cage Code and E-mail Address) (21 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Cost Element Detail and Cost Element Summary (24 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Individual Bill of Material and Consolidated Bill of Material (25 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Material Basis of Estimate (251 of Instruction) and Copies of POsQuotes

|_| Included

Located in Section Page

enspenspenspenspensp

Sub-tier Cost Analysis (if required) (251 of Instruction)

|_| Included

Located in Section Page or ECDs

enspenspenspenspensp

Labor History (26 amp 261 of Instruction) and Basis of Estimate

|_| Included

Located in Section Page

enspenspenspenspensp

Support for ODC (27 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Support for Rates (17 and 28 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Nonrecurring Engineering (NRE) (14 and 15) Use of Government Property to Include Serial Tooling andor Special Test Equipment

|_| Included

Located in Section Page

enspenspenspenspensp

Expenditure Plan (Required to Support Cost Type Proposals or Performance Based Progress Payments)

|_| Included

Located in Section Page

enspenspenspenspensp

Supplier

By Signing below you are confirming that required cost and pricing data is part of your proposal and meets the requirements of Pacific Scientificrsquos proposal pricing instructions

Sellerrsquos Representative (type or Print)

enspenspenspenspensp

Signature

enspenspenspenspensp

Date (MMDDYYYY)

enspenspenspenspensp

Pacific Scientific

By Signing below the supplier manager is confirming receipt of the items required for this proposal and meets the requirements of Pacific Scientificrsquos proposal pricing instructions

Buyer (Type or Print)

enspenspenspenspensp

Signature

enspenspenspenspensp

Date (MMDDYYYY)

enspenspenspenspensp

Supplier Manager (Type or Print)

enspenspenspenspensp

Signature

enspenspenspenspensp

Date (MMDDYYYY)

enspenspenspenspensp

Page 5: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklistbull PSEMC Policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals that exceed theCost amp Pricing Thresholdbull Additionally PSEMC request the cost element breakdown bill of material and labor

detail in Excel format

bull The purpose of this form is as followsbull To provide the supplier with a checklist to help ensure that all the supporting

documentation has been included so the proposal will be deemed adequate byPSEMC our customer and the DCAA

bull To provide PSEMC with a tool to more quickly verify where the supportingdocumentation can be found in the proposal

bull An example is provided on the next slide and under the commercialjustification section of this module

5

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03

6

Proposal Pricing Instructions

Supplier Proposal Adequacy Checklist

Completion of this checklist and supporting information is required for all single source proposals that exceed the TINA threshold where no valid exception (FAR 15403-1) applies If the supplier is claiming an exemption for commercial terms only the first line on the checklist is applicable Supplier

Supplier Proposal Number

Exemption to CampP Data Commercial Item (Section 3 of Instruction)

Support Included

Located in Section Page

Pricing Proposal Coversheet or Equivalent (21 of Instruction)

Included Located in Section Page

Point of Contact (21 of Instruction) Included Located in Section Page

DCMADCAA Points of Contact (Include Name Phone Address Cage Code and E-mail Address) (21 of Instruction)

Included Located in Section Page

Cost Element Detail and Cost Element Summary (24 of Instruction)

Included Located in Section Page

Individual Bill of Material and Consolidated Bill of Material (25 of Instruction)

Included Located in Section Page

Material Basis of Estimate (251 of Instruction) and Copies of POsQuotes

Included Located in Section Page

Sub-tier Cost Analysis (if required) (251 of Instruction)

Included Located in Section Page or ECDs

Labor History (26 amp 261 of Instruction) and Basis of Estimate

Included Located in Section Page

Support for ODC (27 of Instruction) Included Located in Section Page

Support for Rates (17 and 28 of Instruction) Included Located in Section Page

Nonrecurring Engineering (NRE) (14 and 15) Use of Government Property to Include Serial Tooling andor Special Test Equipment

Included Located in Section Page

Expenditure Plan (Required to Support Cost Type Proposals or Performance Based Progress Payments)

Included Located in Section Page

Supplier By Signing below you are confirming that required cost and pricing data is part of your proposal and meets the requirements of Pacific Scientificrsquos proposal pricing instructions Sellerrsquos Representative (type or Print)

Signature

Date (MMDDYYYY)

Pacific Scientific By Signing below the supplier manager is confirming receipt of the items required for this proposal and meets the requirements of Pacific Scientificrsquos proposal pricing instructions Buyer (Type or Print)

Signature

Date (MMDDYYYY)

Supplier Manager (Type or Print)

Signature

Date (MMDDYYYY)

PacSciLogo150dpi_4inch

Proposal Pricing Instructions

Supplier Proposal Adequacy Checklist

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cover Sheetbull Include a cover sheet that includes the following information

bull Solicitation Numberbull Name and Address of offerorbull Name and Telephone number of point of contactbull Name address phone number and email for your DCMA and DCAAbull Type of contract actionbull Proposed cost profit or fee and total price ndash maximum proposal valuebull If you will require the use of government propertybull Whether your organization is subject to cost accounting standards (CAS) ndash see

details in FAR 15-408 Table 15-2 I A (8)bull The statement designated in FAR 15408 Table 15-2 I A (9)bull Date of Submissionbull Name title and signature of authorized representative

bull Most contractors use the Government Form 1411 or equivalent

bull An example is provided on the next slide

7

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cover Sheet Example ndashReference Form DI-SUP-105F02

8

Point of Contact

Proposed Cost

Period of Performance

DCAA Contact Information

Include Statement from FAR 15408 Table 15-2 IA (9)

DCMA Contact Information

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Indexbull Include an index that references where the supporting data for your

estimates is located in the proposalbull The Index should include the following information

bull Title of information being referenced (Summary cost element breakdown materiallabor etc

bull Location in the proposal (page number or file name and page if located in a separatefiledocument)

bull An example is provided in the next slide

9

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Index ExampleProposal No HLQxxxxxDate January xx xxxx ABC Company

Index1 Cover sheet Page xx

2 Business section Page xx

21 Assumptions and Conditions Page xx

3 Pricing Page xx

31 Unit Pricing Page xx

32 Cost Element by Part Number Page xx

33 Cost Element Summary Page xx

4 Material Page xx

41 Bill of Materials by Part Number Page xx

42 Consolidated Bill of Materials Page xx

43 Purchase Orders and Quotes (File PO-QuotesPDF) Page xx

5 Labor Page xx

6 Etc Page xx

10

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cost Element Breakdown by Line Itembull A cost element breakdown is required for each proposed line item If the

proposal covers multiple price points or multiple years a cost elementbreakdown will be required for each price point for each year

bull For example assume your proposal includes the following three line items

bull You would need to provide separate cost element breakdowns for parts ABCABB and the NRE See the next slide for an example

Slight differences due to rounding

11

Part Number Quantity Unit Price Total PricePart ABC 50 $12500 $625000Part ABB 75 $10300 $772500NRE 1 $145000Total $1542500

FAR 15408 Table 15-2 I D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cost Element Breakdown by Line Item Example

12FAR 15408 Table 15-2 I D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdownbull When more than one contract line item (Part Number NRE etc) is

proposed you must provide summary total amounts covering all items foreach element of cost If the proposal covers a high mid and low point thesummary needs to only be for those points not all the differentcombinations that can result from range pricing If the proposal is formultiple years there needs to be a summary for each of the yearsbull For example if your proposal included the following

bull You would need to provide a summary by cost element that includes the totalproposed value of $1542500 See the next slide for an example showing thethree individual cost elements being combined into a summary

Slight differences due to rounding

13

Part Number Quantity Unit Price Total PricePart ABC 50 $12500 $625000Part ABB 75 $10300 $772500NRE 1 $145000Total $1542500

FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdown - Example

14FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdown - Example

15

bull If the proposal is a base year plus option years there needs to be asummary Cost Element Breakdown for each of the years at the points in theRFP requiring Cost or Pricing data

FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Include a BOM for each individual part proposed A BOM is a list of the raw

materials subassemblies etc needed to manufacture a product

bull Provide your BOMs in Excel formatbull The consolidated and individual BOMs need to identify the following for each line

itembull Part Number and descriptionbull Supplierbull Quantitybull Unit Price ndash Unit pricing on the BOM should tie to the supportbull Total Pricebull Basis for pricing (vendor quotes purchase orders)

Source of pricing (purchase order quotes etc) must be referenced in the BOM

bull PSEMC will require copies of the support (ie quotes purchase orders) for asample of the items on the BOM during the cost analysis

16FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If attritionyield or scrap are added to your material you will need to submit

adequate basis of estimates and support as appropriate

bull There are time when your BOM may be impacted by minimum buys or NREthat is passed along from your supplier If this happens make sure this isclearly identified on the BOM and the support quotes or purchase orders

bull In addition to the individual BOMs FAR requires a consolidated BOM inyour proposal A consolidated BOM is a listing of the material needed forthe proposal A consolidated BOM combines all the materials for each ofthe parts being procured as well as assemblies services or materialassociated with NRE

17FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Individual Bills of Material Example

18

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Material Examplebull Below is an example of a consolidated BOM This BOM was developed by

taking the three individual BOMrsquos on the previous page and combining themtogetherbull In a consolidated BOM part numbers and quantities should be combined (or

subtotaled) if they are the same parts For example the BOMs for Part Nos ABCand ABB both require the same Connector and Screw In the consolidated BOMthe requirements have been combined and reflect the total number of Connectorsand Screws that will be needed for this proposal

19

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Materialbull If the proposal is for a base year plus option years there needs to be a

consolidated BOM for each of the years at each of the points in the RFPrequiring cost or pricing

bull To determine if a subtier cost analysis is required you need to add togetherthe anticipated costs for each supplier for all years In the above examplethere are two suppliers that will require cost analysis (Ford and Motion)

20

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Supplier proposals

bull A cost analysis report is required if any of your suppliersrsquo proposals exceedthe Truth in Negotiations Act (TINA) threshold These need to be submittedwith your proposal

bull If the cost analysis for a supplier is not complete at the time of your proposalsubmittal a schedule listing the estimated completion dates for each supplierneeds to be provided in the proposal

bull If an exemption applies that eliminates the need for a cost analysis (commercial orcompetitively priced) documentation needs to be provided to support these claims

21FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If you claim your supplier was competed and the value is over the TINA

threshold you will need to provide the following

bull Evidence that an RFP or solicitation to bid was sent to two or more supplierscapable of providing the goods or services requested

bull Copies of the quotes received from each of the suppliers who were competedbull Supplierrsquos analysis with basis of rationale for why the winning bid represents the best value

(lowest price technical considerations etc)

bull If you claim your supplierrsquos parts or services are commercial refer to thecommercial section in this document

22FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Refer to the detailed instructions in the RFP when your proposal supports a

base year plus options contract or a long term agreement Guidance shouldbe provided here on the consolidation and subtier requirements If youhave any questions regarding this contact your PSEMC Supply Chainrepresentative

bull Inter-organizational costs

bull Inter-organizational costs are defined as the costs of items transferred betweendivisions within the same company

bull If you have bid any inter-organizational costs in your proposal you will need toprovide a cost element breakdown for each inter-organizational transfer andsupport as appropriate

bull One more thing

bull If you have a supplier with a value in excess of $135 million or is greater than 10percent of your total proposal and exceeds the TINA threshold FAR 15408 Table15-2 requires that we submit the supplierrsquos proposal and cost or pricing data withour own proposal

23FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Provide a time-phased (eg monthly quarterly) breakdown of labor hours ratesand cost by appropriate category and furnish basis for estimates

24FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Proposed labor hours are generally a combination of direct and support laborhours

bull Direct Labor Hours ndash Hours that can be identified specifically to a final end itembull Support Labor Hours ndash Hours that cannot be specifically identified to one end item For

example a production manager may be in charge of overseeing the manufacturing ofmultiple parts

25FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull You need to provide a breakdown of the labor hours by labor category and

function along with a basis of estimate for the proposed labor hours

bull For example if you propose 500 hours for an end item you would need to providea breakdown by categoryfunction (assembly inspection supervisor engineeretc) You also will need to provide a detailed basis of estimate for eachcategoryfunction showing how your arrived at the hours for the proposed laborcategory

bull Generally the basis should be actual production history An alternative approach isthe use of engineering estimates if the item has not been manufactured before

bull Cost Accounting Standards (CAS) 401 requires that a company isconsistent between proposals and accounting practices The way acompany estimates its labor hours needs to also be the way it accumulatesits production history

26FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours ExampleProposal No HLQxxxxxDate January 1 20xx ABC Corporation

Labor HoursProposed Labor Hours ndash 8279 hrsunit for Part ABC

27

Direct Labor HrsUnitAssembly 3800 Machinist 350 QA 762 Engineer 1 238

Subtotal 5151

Production Support HrsUnitMfg Supervisor 920Eng Supervisor 368QA supervisor 920Production Mgr 920

Subtotal 3128

Total Hrs 8279

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Example ndash Actual Production History

28

ProposedDuration - Months 7 9 24 12 Qty 30 39 110 50 End Date 11152006 982007 912009

Direct Labor Total Hrs HrsUnit Total Hours HrsUnit Total Hrs HrsUnit Total Hrs HrsUnitAssembly 1836 6120 1675 4295 4338 3944 1900 3800 Machinist 169 564 154 396 400 363 175 350 QA 368 1238 336 862 870 791 381 762 Engineer 1 115 383 105 269 272 247 119 238

Production Support Total Hrs Total Hrs Total Hrs Total Hrs HrsUnitMFG Supervisor 268 345 920 460 920 Eng Supervisor 107 138 184 184 368 QA Supervisor 268 345 920 460 920 Production Mgr 268 345 920 460 920

HrsUnit 8279

Acutal Production History - Part ABC

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Examples ndash Basis of Estimatebull Basis of estimate for direct labor

bull Proposed direct labor hours were developed by apply a 90 percent learningcurve to the production labor history for part BBC You need to provide abasis for the 90 percent curve

bull Basis of estimate for the manufacturing supervisorbull The manufacturing supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 920 hours were used over a 24-month periodSince the current proposal has been estimated to cover 12 months 460hours were applied to the manufacturing supervisor (920 divided by 2)

bull Basis of estimate for engineering supervisorbull The engineering supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 184 hours were necessary to complete the taskThis task is similar and so we estimate 184 hours

29

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Direct Costs (ODC)bull List other expenses not otherwise included under material and labor (eg

travel freight) and provide basis for pricing

bull For example the basis for travel would include the location number of tripsnumber of people attending and the estimated expenses for the travel

30FAR 15408 Table 15-2 II D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Completion of this checklist and supporting information is required for all single source proposals that exceed the TINA threshold where no valid exception (FAR 15403-1) applies

If the supplier is claiming an exemption for commercial terms only the first line on the checklist is applicable

Supplier

enspenspenspenspensp

Supplier Proposal Number

enspenspenspenspensp

Exemption to CampP Data Commercial Item

(Section 3 of Instruction)

|_| Support Included

Located in Section Page

enspenspenspenspensp

Pricing Proposal Coversheet or Equivalent (21 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Point of Contact (21 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

DCMADCAA Points of Contact (Include Name Phone Address Cage Code and E-mail Address) (21 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Cost Element Detail and Cost Element Summary (24 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Individual Bill of Material and Consolidated Bill of Material (25 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Material Basis of Estimate (251 of Instruction) and Copies of POsQuotes

|_| Included

Located in Section Page

enspenspenspenspensp

Sub-tier Cost Analysis (if required) (251 of Instruction)

|_| Included

Located in Section Page or ECDs

enspenspenspenspensp

Labor History (26 amp 261 of Instruction) and Basis of Estimate

|_| Included

Located in Section Page

enspenspenspenspensp

Support for ODC (27 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Support for Rates (17 and 28 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Nonrecurring Engineering (NRE) (14 and 15) Use of Government Property to Include Serial Tooling andor Special Test Equipment

|_| Included

Located in Section Page

enspenspenspenspensp

Expenditure Plan (Required to Support Cost Type Proposals or Performance Based Progress Payments)

|_| Included

Located in Section Page

enspenspenspenspensp

Supplier

By Signing below you are confirming that required cost and pricing data is part of your proposal and meets the requirements of Pacific Scientificrsquos proposal pricing instructions

Sellerrsquos Representative (type or Print)

enspenspenspenspensp

Signature

enspenspenspenspensp

Date (MMDDYYYY)

enspenspenspenspensp

Pacific Scientific

By Signing below the supplier manager is confirming receipt of the items required for this proposal and meets the requirements of Pacific Scientificrsquos proposal pricing instructions

Buyer (Type or Print)

enspenspenspenspensp

Signature

enspenspenspenspensp

Date (MMDDYYYY)

enspenspenspenspensp

Supplier Manager (Type or Print)

enspenspenspenspensp

Signature

enspenspenspenspensp

Date (MMDDYYYY)

enspenspenspenspensp

Page 6: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03

6

Proposal Pricing Instructions

Supplier Proposal Adequacy Checklist

Completion of this checklist and supporting information is required for all single source proposals that exceed the TINA threshold where no valid exception (FAR 15403-1) applies If the supplier is claiming an exemption for commercial terms only the first line on the checklist is applicable Supplier

Supplier Proposal Number

Exemption to CampP Data Commercial Item (Section 3 of Instruction)

Support Included

Located in Section Page

Pricing Proposal Coversheet or Equivalent (21 of Instruction)

Included Located in Section Page

Point of Contact (21 of Instruction) Included Located in Section Page

DCMADCAA Points of Contact (Include Name Phone Address Cage Code and E-mail Address) (21 of Instruction)

Included Located in Section Page

Cost Element Detail and Cost Element Summary (24 of Instruction)

Included Located in Section Page

Individual Bill of Material and Consolidated Bill of Material (25 of Instruction)

Included Located in Section Page

Material Basis of Estimate (251 of Instruction) and Copies of POsQuotes

Included Located in Section Page

Sub-tier Cost Analysis (if required) (251 of Instruction)

Included Located in Section Page or ECDs

Labor History (26 amp 261 of Instruction) and Basis of Estimate

Included Located in Section Page

Support for ODC (27 of Instruction) Included Located in Section Page

Support for Rates (17 and 28 of Instruction) Included Located in Section Page

Nonrecurring Engineering (NRE) (14 and 15) Use of Government Property to Include Serial Tooling andor Special Test Equipment

Included Located in Section Page

Expenditure Plan (Required to Support Cost Type Proposals or Performance Based Progress Payments)

Included Located in Section Page

Supplier By Signing below you are confirming that required cost and pricing data is part of your proposal and meets the requirements of Pacific Scientificrsquos proposal pricing instructions Sellerrsquos Representative (type or Print)

Signature

Date (MMDDYYYY)

Pacific Scientific By Signing below the supplier manager is confirming receipt of the items required for this proposal and meets the requirements of Pacific Scientificrsquos proposal pricing instructions Buyer (Type or Print)

Signature

Date (MMDDYYYY)

Supplier Manager (Type or Print)

Signature

Date (MMDDYYYY)

PacSciLogo150dpi_4inch

Proposal Pricing Instructions

Supplier Proposal Adequacy Checklist

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cover Sheetbull Include a cover sheet that includes the following information

bull Solicitation Numberbull Name and Address of offerorbull Name and Telephone number of point of contactbull Name address phone number and email for your DCMA and DCAAbull Type of contract actionbull Proposed cost profit or fee and total price ndash maximum proposal valuebull If you will require the use of government propertybull Whether your organization is subject to cost accounting standards (CAS) ndash see

details in FAR 15-408 Table 15-2 I A (8)bull The statement designated in FAR 15408 Table 15-2 I A (9)bull Date of Submissionbull Name title and signature of authorized representative

bull Most contractors use the Government Form 1411 or equivalent

bull An example is provided on the next slide

7

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cover Sheet Example ndashReference Form DI-SUP-105F02

8

Point of Contact

Proposed Cost

Period of Performance

DCAA Contact Information

Include Statement from FAR 15408 Table 15-2 IA (9)

DCMA Contact Information

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Indexbull Include an index that references where the supporting data for your

estimates is located in the proposalbull The Index should include the following information

bull Title of information being referenced (Summary cost element breakdown materiallabor etc

bull Location in the proposal (page number or file name and page if located in a separatefiledocument)

bull An example is provided in the next slide

9

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Index ExampleProposal No HLQxxxxxDate January xx xxxx ABC Company

Index1 Cover sheet Page xx

2 Business section Page xx

21 Assumptions and Conditions Page xx

3 Pricing Page xx

31 Unit Pricing Page xx

32 Cost Element by Part Number Page xx

33 Cost Element Summary Page xx

4 Material Page xx

41 Bill of Materials by Part Number Page xx

42 Consolidated Bill of Materials Page xx

43 Purchase Orders and Quotes (File PO-QuotesPDF) Page xx

5 Labor Page xx

6 Etc Page xx

10

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cost Element Breakdown by Line Itembull A cost element breakdown is required for each proposed line item If the

proposal covers multiple price points or multiple years a cost elementbreakdown will be required for each price point for each year

bull For example assume your proposal includes the following three line items

bull You would need to provide separate cost element breakdowns for parts ABCABB and the NRE See the next slide for an example

Slight differences due to rounding

11

Part Number Quantity Unit Price Total PricePart ABC 50 $12500 $625000Part ABB 75 $10300 $772500NRE 1 $145000Total $1542500

FAR 15408 Table 15-2 I D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cost Element Breakdown by Line Item Example

12FAR 15408 Table 15-2 I D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdownbull When more than one contract line item (Part Number NRE etc) is

proposed you must provide summary total amounts covering all items foreach element of cost If the proposal covers a high mid and low point thesummary needs to only be for those points not all the differentcombinations that can result from range pricing If the proposal is formultiple years there needs to be a summary for each of the yearsbull For example if your proposal included the following

bull You would need to provide a summary by cost element that includes the totalproposed value of $1542500 See the next slide for an example showing thethree individual cost elements being combined into a summary

Slight differences due to rounding

13

Part Number Quantity Unit Price Total PricePart ABC 50 $12500 $625000Part ABB 75 $10300 $772500NRE 1 $145000Total $1542500

FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdown - Example

14FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdown - Example

15

bull If the proposal is a base year plus option years there needs to be asummary Cost Element Breakdown for each of the years at the points in theRFP requiring Cost or Pricing data

FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Include a BOM for each individual part proposed A BOM is a list of the raw

materials subassemblies etc needed to manufacture a product

bull Provide your BOMs in Excel formatbull The consolidated and individual BOMs need to identify the following for each line

itembull Part Number and descriptionbull Supplierbull Quantitybull Unit Price ndash Unit pricing on the BOM should tie to the supportbull Total Pricebull Basis for pricing (vendor quotes purchase orders)

Source of pricing (purchase order quotes etc) must be referenced in the BOM

bull PSEMC will require copies of the support (ie quotes purchase orders) for asample of the items on the BOM during the cost analysis

16FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If attritionyield or scrap are added to your material you will need to submit

adequate basis of estimates and support as appropriate

bull There are time when your BOM may be impacted by minimum buys or NREthat is passed along from your supplier If this happens make sure this isclearly identified on the BOM and the support quotes or purchase orders

bull In addition to the individual BOMs FAR requires a consolidated BOM inyour proposal A consolidated BOM is a listing of the material needed forthe proposal A consolidated BOM combines all the materials for each ofthe parts being procured as well as assemblies services or materialassociated with NRE

17FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Individual Bills of Material Example

18

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Material Examplebull Below is an example of a consolidated BOM This BOM was developed by

taking the three individual BOMrsquos on the previous page and combining themtogetherbull In a consolidated BOM part numbers and quantities should be combined (or

subtotaled) if they are the same parts For example the BOMs for Part Nos ABCand ABB both require the same Connector and Screw In the consolidated BOMthe requirements have been combined and reflect the total number of Connectorsand Screws that will be needed for this proposal

19

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Materialbull If the proposal is for a base year plus option years there needs to be a

consolidated BOM for each of the years at each of the points in the RFPrequiring cost or pricing

bull To determine if a subtier cost analysis is required you need to add togetherthe anticipated costs for each supplier for all years In the above examplethere are two suppliers that will require cost analysis (Ford and Motion)

20

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Supplier proposals

bull A cost analysis report is required if any of your suppliersrsquo proposals exceedthe Truth in Negotiations Act (TINA) threshold These need to be submittedwith your proposal

bull If the cost analysis for a supplier is not complete at the time of your proposalsubmittal a schedule listing the estimated completion dates for each supplierneeds to be provided in the proposal

bull If an exemption applies that eliminates the need for a cost analysis (commercial orcompetitively priced) documentation needs to be provided to support these claims

21FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If you claim your supplier was competed and the value is over the TINA

threshold you will need to provide the following

bull Evidence that an RFP or solicitation to bid was sent to two or more supplierscapable of providing the goods or services requested

bull Copies of the quotes received from each of the suppliers who were competedbull Supplierrsquos analysis with basis of rationale for why the winning bid represents the best value

(lowest price technical considerations etc)

bull If you claim your supplierrsquos parts or services are commercial refer to thecommercial section in this document

22FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Refer to the detailed instructions in the RFP when your proposal supports a

base year plus options contract or a long term agreement Guidance shouldbe provided here on the consolidation and subtier requirements If youhave any questions regarding this contact your PSEMC Supply Chainrepresentative

bull Inter-organizational costs

bull Inter-organizational costs are defined as the costs of items transferred betweendivisions within the same company

bull If you have bid any inter-organizational costs in your proposal you will need toprovide a cost element breakdown for each inter-organizational transfer andsupport as appropriate

bull One more thing

bull If you have a supplier with a value in excess of $135 million or is greater than 10percent of your total proposal and exceeds the TINA threshold FAR 15408 Table15-2 requires that we submit the supplierrsquos proposal and cost or pricing data withour own proposal

23FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Provide a time-phased (eg monthly quarterly) breakdown of labor hours ratesand cost by appropriate category and furnish basis for estimates

24FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Proposed labor hours are generally a combination of direct and support laborhours

bull Direct Labor Hours ndash Hours that can be identified specifically to a final end itembull Support Labor Hours ndash Hours that cannot be specifically identified to one end item For

example a production manager may be in charge of overseeing the manufacturing ofmultiple parts

25FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull You need to provide a breakdown of the labor hours by labor category and

function along with a basis of estimate for the proposed labor hours

bull For example if you propose 500 hours for an end item you would need to providea breakdown by categoryfunction (assembly inspection supervisor engineeretc) You also will need to provide a detailed basis of estimate for eachcategoryfunction showing how your arrived at the hours for the proposed laborcategory

bull Generally the basis should be actual production history An alternative approach isthe use of engineering estimates if the item has not been manufactured before

bull Cost Accounting Standards (CAS) 401 requires that a company isconsistent between proposals and accounting practices The way acompany estimates its labor hours needs to also be the way it accumulatesits production history

26FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours ExampleProposal No HLQxxxxxDate January 1 20xx ABC Corporation

Labor HoursProposed Labor Hours ndash 8279 hrsunit for Part ABC

27

Direct Labor HrsUnitAssembly 3800 Machinist 350 QA 762 Engineer 1 238

Subtotal 5151

Production Support HrsUnitMfg Supervisor 920Eng Supervisor 368QA supervisor 920Production Mgr 920

Subtotal 3128

Total Hrs 8279

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Example ndash Actual Production History

28

ProposedDuration - Months 7 9 24 12 Qty 30 39 110 50 End Date 11152006 982007 912009

Direct Labor Total Hrs HrsUnit Total Hours HrsUnit Total Hrs HrsUnit Total Hrs HrsUnitAssembly 1836 6120 1675 4295 4338 3944 1900 3800 Machinist 169 564 154 396 400 363 175 350 QA 368 1238 336 862 870 791 381 762 Engineer 1 115 383 105 269 272 247 119 238

Production Support Total Hrs Total Hrs Total Hrs Total Hrs HrsUnitMFG Supervisor 268 345 920 460 920 Eng Supervisor 107 138 184 184 368 QA Supervisor 268 345 920 460 920 Production Mgr 268 345 920 460 920

HrsUnit 8279

Acutal Production History - Part ABC

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Examples ndash Basis of Estimatebull Basis of estimate for direct labor

bull Proposed direct labor hours were developed by apply a 90 percent learningcurve to the production labor history for part BBC You need to provide abasis for the 90 percent curve

bull Basis of estimate for the manufacturing supervisorbull The manufacturing supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 920 hours were used over a 24-month periodSince the current proposal has been estimated to cover 12 months 460hours were applied to the manufacturing supervisor (920 divided by 2)

bull Basis of estimate for engineering supervisorbull The engineering supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 184 hours were necessary to complete the taskThis task is similar and so we estimate 184 hours

29

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Direct Costs (ODC)bull List other expenses not otherwise included under material and labor (eg

travel freight) and provide basis for pricing

bull For example the basis for travel would include the location number of tripsnumber of people attending and the estimated expenses for the travel

30FAR 15408 Table 15-2 II D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Completion of this checklist and supporting information is required for all single source proposals that exceed the TINA threshold where no valid exception (FAR 15403-1) applies

If the supplier is claiming an exemption for commercial terms only the first line on the checklist is applicable

Supplier

enspenspenspenspensp

Supplier Proposal Number

enspenspenspenspensp

Exemption to CampP Data Commercial Item

(Section 3 of Instruction)

|_| Support Included

Located in Section Page

enspenspenspenspensp

Pricing Proposal Coversheet or Equivalent (21 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Point of Contact (21 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

DCMADCAA Points of Contact (Include Name Phone Address Cage Code and E-mail Address) (21 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Cost Element Detail and Cost Element Summary (24 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Individual Bill of Material and Consolidated Bill of Material (25 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Material Basis of Estimate (251 of Instruction) and Copies of POsQuotes

|_| Included

Located in Section Page

enspenspenspenspensp

Sub-tier Cost Analysis (if required) (251 of Instruction)

|_| Included

Located in Section Page or ECDs

enspenspenspenspensp

Labor History (26 amp 261 of Instruction) and Basis of Estimate

|_| Included

Located in Section Page

enspenspenspenspensp

Support for ODC (27 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Support for Rates (17 and 28 of Instruction)

|_| Included

Located in Section Page

enspenspenspenspensp

Nonrecurring Engineering (NRE) (14 and 15) Use of Government Property to Include Serial Tooling andor Special Test Equipment

|_| Included

Located in Section Page

enspenspenspenspensp

Expenditure Plan (Required to Support Cost Type Proposals or Performance Based Progress Payments)

|_| Included

Located in Section Page

enspenspenspenspensp

Supplier

By Signing below you are confirming that required cost and pricing data is part of your proposal and meets the requirements of Pacific Scientificrsquos proposal pricing instructions

Sellerrsquos Representative (type or Print)

enspenspenspenspensp

Signature

enspenspenspenspensp

Date (MMDDYYYY)

enspenspenspenspensp

Pacific Scientific

By Signing below the supplier manager is confirming receipt of the items required for this proposal and meets the requirements of Pacific Scientificrsquos proposal pricing instructions

Buyer (Type or Print)

enspenspenspenspensp

Signature

enspenspenspenspensp

Date (MMDDYYYY)

enspenspenspenspensp

Supplier Manager (Type or Print)

enspenspenspenspensp

Signature

enspenspenspenspensp

Date (MMDDYYYY)

enspenspenspenspensp

Page 7: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cover Sheetbull Include a cover sheet that includes the following information

bull Solicitation Numberbull Name and Address of offerorbull Name and Telephone number of point of contactbull Name address phone number and email for your DCMA and DCAAbull Type of contract actionbull Proposed cost profit or fee and total price ndash maximum proposal valuebull If you will require the use of government propertybull Whether your organization is subject to cost accounting standards (CAS) ndash see

details in FAR 15-408 Table 15-2 I A (8)bull The statement designated in FAR 15408 Table 15-2 I A (9)bull Date of Submissionbull Name title and signature of authorized representative

bull Most contractors use the Government Form 1411 or equivalent

bull An example is provided on the next slide

7

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cover Sheet Example ndashReference Form DI-SUP-105F02

8

Point of Contact

Proposed Cost

Period of Performance

DCAA Contact Information

Include Statement from FAR 15408 Table 15-2 IA (9)

DCMA Contact Information

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Indexbull Include an index that references where the supporting data for your

estimates is located in the proposalbull The Index should include the following information

bull Title of information being referenced (Summary cost element breakdown materiallabor etc

bull Location in the proposal (page number or file name and page if located in a separatefiledocument)

bull An example is provided in the next slide

9

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Index ExampleProposal No HLQxxxxxDate January xx xxxx ABC Company

Index1 Cover sheet Page xx

2 Business section Page xx

21 Assumptions and Conditions Page xx

3 Pricing Page xx

31 Unit Pricing Page xx

32 Cost Element by Part Number Page xx

33 Cost Element Summary Page xx

4 Material Page xx

41 Bill of Materials by Part Number Page xx

42 Consolidated Bill of Materials Page xx

43 Purchase Orders and Quotes (File PO-QuotesPDF) Page xx

5 Labor Page xx

6 Etc Page xx

10

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cost Element Breakdown by Line Itembull A cost element breakdown is required for each proposed line item If the

proposal covers multiple price points or multiple years a cost elementbreakdown will be required for each price point for each year

bull For example assume your proposal includes the following three line items

bull You would need to provide separate cost element breakdowns for parts ABCABB and the NRE See the next slide for an example

Slight differences due to rounding

11

Part Number Quantity Unit Price Total PricePart ABC 50 $12500 $625000Part ABB 75 $10300 $772500NRE 1 $145000Total $1542500

FAR 15408 Table 15-2 I D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cost Element Breakdown by Line Item Example

12FAR 15408 Table 15-2 I D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdownbull When more than one contract line item (Part Number NRE etc) is

proposed you must provide summary total amounts covering all items foreach element of cost If the proposal covers a high mid and low point thesummary needs to only be for those points not all the differentcombinations that can result from range pricing If the proposal is formultiple years there needs to be a summary for each of the yearsbull For example if your proposal included the following

bull You would need to provide a summary by cost element that includes the totalproposed value of $1542500 See the next slide for an example showing thethree individual cost elements being combined into a summary

Slight differences due to rounding

13

Part Number Quantity Unit Price Total PricePart ABC 50 $12500 $625000Part ABB 75 $10300 $772500NRE 1 $145000Total $1542500

FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdown - Example

14FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdown - Example

15

bull If the proposal is a base year plus option years there needs to be asummary Cost Element Breakdown for each of the years at the points in theRFP requiring Cost or Pricing data

FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Include a BOM for each individual part proposed A BOM is a list of the raw

materials subassemblies etc needed to manufacture a product

bull Provide your BOMs in Excel formatbull The consolidated and individual BOMs need to identify the following for each line

itembull Part Number and descriptionbull Supplierbull Quantitybull Unit Price ndash Unit pricing on the BOM should tie to the supportbull Total Pricebull Basis for pricing (vendor quotes purchase orders)

Source of pricing (purchase order quotes etc) must be referenced in the BOM

bull PSEMC will require copies of the support (ie quotes purchase orders) for asample of the items on the BOM during the cost analysis

16FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If attritionyield or scrap are added to your material you will need to submit

adequate basis of estimates and support as appropriate

bull There are time when your BOM may be impacted by minimum buys or NREthat is passed along from your supplier If this happens make sure this isclearly identified on the BOM and the support quotes or purchase orders

bull In addition to the individual BOMs FAR requires a consolidated BOM inyour proposal A consolidated BOM is a listing of the material needed forthe proposal A consolidated BOM combines all the materials for each ofthe parts being procured as well as assemblies services or materialassociated with NRE

17FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Individual Bills of Material Example

18

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Material Examplebull Below is an example of a consolidated BOM This BOM was developed by

taking the three individual BOMrsquos on the previous page and combining themtogetherbull In a consolidated BOM part numbers and quantities should be combined (or

subtotaled) if they are the same parts For example the BOMs for Part Nos ABCand ABB both require the same Connector and Screw In the consolidated BOMthe requirements have been combined and reflect the total number of Connectorsand Screws that will be needed for this proposal

19

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Materialbull If the proposal is for a base year plus option years there needs to be a

consolidated BOM for each of the years at each of the points in the RFPrequiring cost or pricing

bull To determine if a subtier cost analysis is required you need to add togetherthe anticipated costs for each supplier for all years In the above examplethere are two suppliers that will require cost analysis (Ford and Motion)

20

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Supplier proposals

bull A cost analysis report is required if any of your suppliersrsquo proposals exceedthe Truth in Negotiations Act (TINA) threshold These need to be submittedwith your proposal

bull If the cost analysis for a supplier is not complete at the time of your proposalsubmittal a schedule listing the estimated completion dates for each supplierneeds to be provided in the proposal

bull If an exemption applies that eliminates the need for a cost analysis (commercial orcompetitively priced) documentation needs to be provided to support these claims

21FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If you claim your supplier was competed and the value is over the TINA

threshold you will need to provide the following

bull Evidence that an RFP or solicitation to bid was sent to two or more supplierscapable of providing the goods or services requested

bull Copies of the quotes received from each of the suppliers who were competedbull Supplierrsquos analysis with basis of rationale for why the winning bid represents the best value

(lowest price technical considerations etc)

bull If you claim your supplierrsquos parts or services are commercial refer to thecommercial section in this document

22FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Refer to the detailed instructions in the RFP when your proposal supports a

base year plus options contract or a long term agreement Guidance shouldbe provided here on the consolidation and subtier requirements If youhave any questions regarding this contact your PSEMC Supply Chainrepresentative

bull Inter-organizational costs

bull Inter-organizational costs are defined as the costs of items transferred betweendivisions within the same company

bull If you have bid any inter-organizational costs in your proposal you will need toprovide a cost element breakdown for each inter-organizational transfer andsupport as appropriate

bull One more thing

bull If you have a supplier with a value in excess of $135 million or is greater than 10percent of your total proposal and exceeds the TINA threshold FAR 15408 Table15-2 requires that we submit the supplierrsquos proposal and cost or pricing data withour own proposal

23FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Provide a time-phased (eg monthly quarterly) breakdown of labor hours ratesand cost by appropriate category and furnish basis for estimates

24FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Proposed labor hours are generally a combination of direct and support laborhours

bull Direct Labor Hours ndash Hours that can be identified specifically to a final end itembull Support Labor Hours ndash Hours that cannot be specifically identified to one end item For

example a production manager may be in charge of overseeing the manufacturing ofmultiple parts

25FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull You need to provide a breakdown of the labor hours by labor category and

function along with a basis of estimate for the proposed labor hours

bull For example if you propose 500 hours for an end item you would need to providea breakdown by categoryfunction (assembly inspection supervisor engineeretc) You also will need to provide a detailed basis of estimate for eachcategoryfunction showing how your arrived at the hours for the proposed laborcategory

bull Generally the basis should be actual production history An alternative approach isthe use of engineering estimates if the item has not been manufactured before

bull Cost Accounting Standards (CAS) 401 requires that a company isconsistent between proposals and accounting practices The way acompany estimates its labor hours needs to also be the way it accumulatesits production history

26FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours ExampleProposal No HLQxxxxxDate January 1 20xx ABC Corporation

Labor HoursProposed Labor Hours ndash 8279 hrsunit for Part ABC

27

Direct Labor HrsUnitAssembly 3800 Machinist 350 QA 762 Engineer 1 238

Subtotal 5151

Production Support HrsUnitMfg Supervisor 920Eng Supervisor 368QA supervisor 920Production Mgr 920

Subtotal 3128

Total Hrs 8279

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Example ndash Actual Production History

28

ProposedDuration - Months 7 9 24 12 Qty 30 39 110 50 End Date 11152006 982007 912009

Direct Labor Total Hrs HrsUnit Total Hours HrsUnit Total Hrs HrsUnit Total Hrs HrsUnitAssembly 1836 6120 1675 4295 4338 3944 1900 3800 Machinist 169 564 154 396 400 363 175 350 QA 368 1238 336 862 870 791 381 762 Engineer 1 115 383 105 269 272 247 119 238

Production Support Total Hrs Total Hrs Total Hrs Total Hrs HrsUnitMFG Supervisor 268 345 920 460 920 Eng Supervisor 107 138 184 184 368 QA Supervisor 268 345 920 460 920 Production Mgr 268 345 920 460 920

HrsUnit 8279

Acutal Production History - Part ABC

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Examples ndash Basis of Estimatebull Basis of estimate for direct labor

bull Proposed direct labor hours were developed by apply a 90 percent learningcurve to the production labor history for part BBC You need to provide abasis for the 90 percent curve

bull Basis of estimate for the manufacturing supervisorbull The manufacturing supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 920 hours were used over a 24-month periodSince the current proposal has been estimated to cover 12 months 460hours were applied to the manufacturing supervisor (920 divided by 2)

bull Basis of estimate for engineering supervisorbull The engineering supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 184 hours were necessary to complete the taskThis task is similar and so we estimate 184 hours

29

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Direct Costs (ODC)bull List other expenses not otherwise included under material and labor (eg

travel freight) and provide basis for pricing

bull For example the basis for travel would include the location number of tripsnumber of people attending and the estimated expenses for the travel

30FAR 15408 Table 15-2 II D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 8: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cover Sheet Example ndashReference Form DI-SUP-105F02

8

Point of Contact

Proposed Cost

Period of Performance

DCAA Contact Information

Include Statement from FAR 15408 Table 15-2 IA (9)

DCMA Contact Information

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Indexbull Include an index that references where the supporting data for your

estimates is located in the proposalbull The Index should include the following information

bull Title of information being referenced (Summary cost element breakdown materiallabor etc

bull Location in the proposal (page number or file name and page if located in a separatefiledocument)

bull An example is provided in the next slide

9

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Index ExampleProposal No HLQxxxxxDate January xx xxxx ABC Company

Index1 Cover sheet Page xx

2 Business section Page xx

21 Assumptions and Conditions Page xx

3 Pricing Page xx

31 Unit Pricing Page xx

32 Cost Element by Part Number Page xx

33 Cost Element Summary Page xx

4 Material Page xx

41 Bill of Materials by Part Number Page xx

42 Consolidated Bill of Materials Page xx

43 Purchase Orders and Quotes (File PO-QuotesPDF) Page xx

5 Labor Page xx

6 Etc Page xx

10

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cost Element Breakdown by Line Itembull A cost element breakdown is required for each proposed line item If the

proposal covers multiple price points or multiple years a cost elementbreakdown will be required for each price point for each year

bull For example assume your proposal includes the following three line items

bull You would need to provide separate cost element breakdowns for parts ABCABB and the NRE See the next slide for an example

Slight differences due to rounding

11

Part Number Quantity Unit Price Total PricePart ABC 50 $12500 $625000Part ABB 75 $10300 $772500NRE 1 $145000Total $1542500

FAR 15408 Table 15-2 I D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cost Element Breakdown by Line Item Example

12FAR 15408 Table 15-2 I D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdownbull When more than one contract line item (Part Number NRE etc) is

proposed you must provide summary total amounts covering all items foreach element of cost If the proposal covers a high mid and low point thesummary needs to only be for those points not all the differentcombinations that can result from range pricing If the proposal is formultiple years there needs to be a summary for each of the yearsbull For example if your proposal included the following

bull You would need to provide a summary by cost element that includes the totalproposed value of $1542500 See the next slide for an example showing thethree individual cost elements being combined into a summary

Slight differences due to rounding

13

Part Number Quantity Unit Price Total PricePart ABC 50 $12500 $625000Part ABB 75 $10300 $772500NRE 1 $145000Total $1542500

FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdown - Example

14FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdown - Example

15

bull If the proposal is a base year plus option years there needs to be asummary Cost Element Breakdown for each of the years at the points in theRFP requiring Cost or Pricing data

FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Include a BOM for each individual part proposed A BOM is a list of the raw

materials subassemblies etc needed to manufacture a product

bull Provide your BOMs in Excel formatbull The consolidated and individual BOMs need to identify the following for each line

itembull Part Number and descriptionbull Supplierbull Quantitybull Unit Price ndash Unit pricing on the BOM should tie to the supportbull Total Pricebull Basis for pricing (vendor quotes purchase orders)

Source of pricing (purchase order quotes etc) must be referenced in the BOM

bull PSEMC will require copies of the support (ie quotes purchase orders) for asample of the items on the BOM during the cost analysis

16FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If attritionyield or scrap are added to your material you will need to submit

adequate basis of estimates and support as appropriate

bull There are time when your BOM may be impacted by minimum buys or NREthat is passed along from your supplier If this happens make sure this isclearly identified on the BOM and the support quotes or purchase orders

bull In addition to the individual BOMs FAR requires a consolidated BOM inyour proposal A consolidated BOM is a listing of the material needed forthe proposal A consolidated BOM combines all the materials for each ofthe parts being procured as well as assemblies services or materialassociated with NRE

17FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Individual Bills of Material Example

18

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Material Examplebull Below is an example of a consolidated BOM This BOM was developed by

taking the three individual BOMrsquos on the previous page and combining themtogetherbull In a consolidated BOM part numbers and quantities should be combined (or

subtotaled) if they are the same parts For example the BOMs for Part Nos ABCand ABB both require the same Connector and Screw In the consolidated BOMthe requirements have been combined and reflect the total number of Connectorsand Screws that will be needed for this proposal

19

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Materialbull If the proposal is for a base year plus option years there needs to be a

consolidated BOM for each of the years at each of the points in the RFPrequiring cost or pricing

bull To determine if a subtier cost analysis is required you need to add togetherthe anticipated costs for each supplier for all years In the above examplethere are two suppliers that will require cost analysis (Ford and Motion)

20

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Supplier proposals

bull A cost analysis report is required if any of your suppliersrsquo proposals exceedthe Truth in Negotiations Act (TINA) threshold These need to be submittedwith your proposal

bull If the cost analysis for a supplier is not complete at the time of your proposalsubmittal a schedule listing the estimated completion dates for each supplierneeds to be provided in the proposal

bull If an exemption applies that eliminates the need for a cost analysis (commercial orcompetitively priced) documentation needs to be provided to support these claims

21FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If you claim your supplier was competed and the value is over the TINA

threshold you will need to provide the following

bull Evidence that an RFP or solicitation to bid was sent to two or more supplierscapable of providing the goods or services requested

bull Copies of the quotes received from each of the suppliers who were competedbull Supplierrsquos analysis with basis of rationale for why the winning bid represents the best value

(lowest price technical considerations etc)

bull If you claim your supplierrsquos parts or services are commercial refer to thecommercial section in this document

22FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Refer to the detailed instructions in the RFP when your proposal supports a

base year plus options contract or a long term agreement Guidance shouldbe provided here on the consolidation and subtier requirements If youhave any questions regarding this contact your PSEMC Supply Chainrepresentative

bull Inter-organizational costs

bull Inter-organizational costs are defined as the costs of items transferred betweendivisions within the same company

bull If you have bid any inter-organizational costs in your proposal you will need toprovide a cost element breakdown for each inter-organizational transfer andsupport as appropriate

bull One more thing

bull If you have a supplier with a value in excess of $135 million or is greater than 10percent of your total proposal and exceeds the TINA threshold FAR 15408 Table15-2 requires that we submit the supplierrsquos proposal and cost or pricing data withour own proposal

23FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Provide a time-phased (eg monthly quarterly) breakdown of labor hours ratesand cost by appropriate category and furnish basis for estimates

24FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Proposed labor hours are generally a combination of direct and support laborhours

bull Direct Labor Hours ndash Hours that can be identified specifically to a final end itembull Support Labor Hours ndash Hours that cannot be specifically identified to one end item For

example a production manager may be in charge of overseeing the manufacturing ofmultiple parts

25FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull You need to provide a breakdown of the labor hours by labor category and

function along with a basis of estimate for the proposed labor hours

bull For example if you propose 500 hours for an end item you would need to providea breakdown by categoryfunction (assembly inspection supervisor engineeretc) You also will need to provide a detailed basis of estimate for eachcategoryfunction showing how your arrived at the hours for the proposed laborcategory

bull Generally the basis should be actual production history An alternative approach isthe use of engineering estimates if the item has not been manufactured before

bull Cost Accounting Standards (CAS) 401 requires that a company isconsistent between proposals and accounting practices The way acompany estimates its labor hours needs to also be the way it accumulatesits production history

26FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours ExampleProposal No HLQxxxxxDate January 1 20xx ABC Corporation

Labor HoursProposed Labor Hours ndash 8279 hrsunit for Part ABC

27

Direct Labor HrsUnitAssembly 3800 Machinist 350 QA 762 Engineer 1 238

Subtotal 5151

Production Support HrsUnitMfg Supervisor 920Eng Supervisor 368QA supervisor 920Production Mgr 920

Subtotal 3128

Total Hrs 8279

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Example ndash Actual Production History

28

ProposedDuration - Months 7 9 24 12 Qty 30 39 110 50 End Date 11152006 982007 912009

Direct Labor Total Hrs HrsUnit Total Hours HrsUnit Total Hrs HrsUnit Total Hrs HrsUnitAssembly 1836 6120 1675 4295 4338 3944 1900 3800 Machinist 169 564 154 396 400 363 175 350 QA 368 1238 336 862 870 791 381 762 Engineer 1 115 383 105 269 272 247 119 238

Production Support Total Hrs Total Hrs Total Hrs Total Hrs HrsUnitMFG Supervisor 268 345 920 460 920 Eng Supervisor 107 138 184 184 368 QA Supervisor 268 345 920 460 920 Production Mgr 268 345 920 460 920

HrsUnit 8279

Acutal Production History - Part ABC

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Examples ndash Basis of Estimatebull Basis of estimate for direct labor

bull Proposed direct labor hours were developed by apply a 90 percent learningcurve to the production labor history for part BBC You need to provide abasis for the 90 percent curve

bull Basis of estimate for the manufacturing supervisorbull The manufacturing supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 920 hours were used over a 24-month periodSince the current proposal has been estimated to cover 12 months 460hours were applied to the manufacturing supervisor (920 divided by 2)

bull Basis of estimate for engineering supervisorbull The engineering supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 184 hours were necessary to complete the taskThis task is similar and so we estimate 184 hours

29

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Direct Costs (ODC)bull List other expenses not otherwise included under material and labor (eg

travel freight) and provide basis for pricing

bull For example the basis for travel would include the location number of tripsnumber of people attending and the estimated expenses for the travel

30FAR 15408 Table 15-2 II D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 9: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Indexbull Include an index that references where the supporting data for your

estimates is located in the proposalbull The Index should include the following information

bull Title of information being referenced (Summary cost element breakdown materiallabor etc

bull Location in the proposal (page number or file name and page if located in a separatefiledocument)

bull An example is provided in the next slide

9

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Index ExampleProposal No HLQxxxxxDate January xx xxxx ABC Company

Index1 Cover sheet Page xx

2 Business section Page xx

21 Assumptions and Conditions Page xx

3 Pricing Page xx

31 Unit Pricing Page xx

32 Cost Element by Part Number Page xx

33 Cost Element Summary Page xx

4 Material Page xx

41 Bill of Materials by Part Number Page xx

42 Consolidated Bill of Materials Page xx

43 Purchase Orders and Quotes (File PO-QuotesPDF) Page xx

5 Labor Page xx

6 Etc Page xx

10

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cost Element Breakdown by Line Itembull A cost element breakdown is required for each proposed line item If the

proposal covers multiple price points or multiple years a cost elementbreakdown will be required for each price point for each year

bull For example assume your proposal includes the following three line items

bull You would need to provide separate cost element breakdowns for parts ABCABB and the NRE See the next slide for an example

Slight differences due to rounding

11

Part Number Quantity Unit Price Total PricePart ABC 50 $12500 $625000Part ABB 75 $10300 $772500NRE 1 $145000Total $1542500

FAR 15408 Table 15-2 I D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cost Element Breakdown by Line Item Example

12FAR 15408 Table 15-2 I D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdownbull When more than one contract line item (Part Number NRE etc) is

proposed you must provide summary total amounts covering all items foreach element of cost If the proposal covers a high mid and low point thesummary needs to only be for those points not all the differentcombinations that can result from range pricing If the proposal is formultiple years there needs to be a summary for each of the yearsbull For example if your proposal included the following

bull You would need to provide a summary by cost element that includes the totalproposed value of $1542500 See the next slide for an example showing thethree individual cost elements being combined into a summary

Slight differences due to rounding

13

Part Number Quantity Unit Price Total PricePart ABC 50 $12500 $625000Part ABB 75 $10300 $772500NRE 1 $145000Total $1542500

FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdown - Example

14FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdown - Example

15

bull If the proposal is a base year plus option years there needs to be asummary Cost Element Breakdown for each of the years at the points in theRFP requiring Cost or Pricing data

FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Include a BOM for each individual part proposed A BOM is a list of the raw

materials subassemblies etc needed to manufacture a product

bull Provide your BOMs in Excel formatbull The consolidated and individual BOMs need to identify the following for each line

itembull Part Number and descriptionbull Supplierbull Quantitybull Unit Price ndash Unit pricing on the BOM should tie to the supportbull Total Pricebull Basis for pricing (vendor quotes purchase orders)

Source of pricing (purchase order quotes etc) must be referenced in the BOM

bull PSEMC will require copies of the support (ie quotes purchase orders) for asample of the items on the BOM during the cost analysis

16FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If attritionyield or scrap are added to your material you will need to submit

adequate basis of estimates and support as appropriate

bull There are time when your BOM may be impacted by minimum buys or NREthat is passed along from your supplier If this happens make sure this isclearly identified on the BOM and the support quotes or purchase orders

bull In addition to the individual BOMs FAR requires a consolidated BOM inyour proposal A consolidated BOM is a listing of the material needed forthe proposal A consolidated BOM combines all the materials for each ofthe parts being procured as well as assemblies services or materialassociated with NRE

17FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Individual Bills of Material Example

18

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Material Examplebull Below is an example of a consolidated BOM This BOM was developed by

taking the three individual BOMrsquos on the previous page and combining themtogetherbull In a consolidated BOM part numbers and quantities should be combined (or

subtotaled) if they are the same parts For example the BOMs for Part Nos ABCand ABB both require the same Connector and Screw In the consolidated BOMthe requirements have been combined and reflect the total number of Connectorsand Screws that will be needed for this proposal

19

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Materialbull If the proposal is for a base year plus option years there needs to be a

consolidated BOM for each of the years at each of the points in the RFPrequiring cost or pricing

bull To determine if a subtier cost analysis is required you need to add togetherthe anticipated costs for each supplier for all years In the above examplethere are two suppliers that will require cost analysis (Ford and Motion)

20

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Supplier proposals

bull A cost analysis report is required if any of your suppliersrsquo proposals exceedthe Truth in Negotiations Act (TINA) threshold These need to be submittedwith your proposal

bull If the cost analysis for a supplier is not complete at the time of your proposalsubmittal a schedule listing the estimated completion dates for each supplierneeds to be provided in the proposal

bull If an exemption applies that eliminates the need for a cost analysis (commercial orcompetitively priced) documentation needs to be provided to support these claims

21FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If you claim your supplier was competed and the value is over the TINA

threshold you will need to provide the following

bull Evidence that an RFP or solicitation to bid was sent to two or more supplierscapable of providing the goods or services requested

bull Copies of the quotes received from each of the suppliers who were competedbull Supplierrsquos analysis with basis of rationale for why the winning bid represents the best value

(lowest price technical considerations etc)

bull If you claim your supplierrsquos parts or services are commercial refer to thecommercial section in this document

22FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Refer to the detailed instructions in the RFP when your proposal supports a

base year plus options contract or a long term agreement Guidance shouldbe provided here on the consolidation and subtier requirements If youhave any questions regarding this contact your PSEMC Supply Chainrepresentative

bull Inter-organizational costs

bull Inter-organizational costs are defined as the costs of items transferred betweendivisions within the same company

bull If you have bid any inter-organizational costs in your proposal you will need toprovide a cost element breakdown for each inter-organizational transfer andsupport as appropriate

bull One more thing

bull If you have a supplier with a value in excess of $135 million or is greater than 10percent of your total proposal and exceeds the TINA threshold FAR 15408 Table15-2 requires that we submit the supplierrsquos proposal and cost or pricing data withour own proposal

23FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Provide a time-phased (eg monthly quarterly) breakdown of labor hours ratesand cost by appropriate category and furnish basis for estimates

24FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Proposed labor hours are generally a combination of direct and support laborhours

bull Direct Labor Hours ndash Hours that can be identified specifically to a final end itembull Support Labor Hours ndash Hours that cannot be specifically identified to one end item For

example a production manager may be in charge of overseeing the manufacturing ofmultiple parts

25FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull You need to provide a breakdown of the labor hours by labor category and

function along with a basis of estimate for the proposed labor hours

bull For example if you propose 500 hours for an end item you would need to providea breakdown by categoryfunction (assembly inspection supervisor engineeretc) You also will need to provide a detailed basis of estimate for eachcategoryfunction showing how your arrived at the hours for the proposed laborcategory

bull Generally the basis should be actual production history An alternative approach isthe use of engineering estimates if the item has not been manufactured before

bull Cost Accounting Standards (CAS) 401 requires that a company isconsistent between proposals and accounting practices The way acompany estimates its labor hours needs to also be the way it accumulatesits production history

26FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours ExampleProposal No HLQxxxxxDate January 1 20xx ABC Corporation

Labor HoursProposed Labor Hours ndash 8279 hrsunit for Part ABC

27

Direct Labor HrsUnitAssembly 3800 Machinist 350 QA 762 Engineer 1 238

Subtotal 5151

Production Support HrsUnitMfg Supervisor 920Eng Supervisor 368QA supervisor 920Production Mgr 920

Subtotal 3128

Total Hrs 8279

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Example ndash Actual Production History

28

ProposedDuration - Months 7 9 24 12 Qty 30 39 110 50 End Date 11152006 982007 912009

Direct Labor Total Hrs HrsUnit Total Hours HrsUnit Total Hrs HrsUnit Total Hrs HrsUnitAssembly 1836 6120 1675 4295 4338 3944 1900 3800 Machinist 169 564 154 396 400 363 175 350 QA 368 1238 336 862 870 791 381 762 Engineer 1 115 383 105 269 272 247 119 238

Production Support Total Hrs Total Hrs Total Hrs Total Hrs HrsUnitMFG Supervisor 268 345 920 460 920 Eng Supervisor 107 138 184 184 368 QA Supervisor 268 345 920 460 920 Production Mgr 268 345 920 460 920

HrsUnit 8279

Acutal Production History - Part ABC

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Examples ndash Basis of Estimatebull Basis of estimate for direct labor

bull Proposed direct labor hours were developed by apply a 90 percent learningcurve to the production labor history for part BBC You need to provide abasis for the 90 percent curve

bull Basis of estimate for the manufacturing supervisorbull The manufacturing supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 920 hours were used over a 24-month periodSince the current proposal has been estimated to cover 12 months 460hours were applied to the manufacturing supervisor (920 divided by 2)

bull Basis of estimate for engineering supervisorbull The engineering supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 184 hours were necessary to complete the taskThis task is similar and so we estimate 184 hours

29

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Direct Costs (ODC)bull List other expenses not otherwise included under material and labor (eg

travel freight) and provide basis for pricing

bull For example the basis for travel would include the location number of tripsnumber of people attending and the estimated expenses for the travel

30FAR 15408 Table 15-2 II D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 10: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Index ExampleProposal No HLQxxxxxDate January xx xxxx ABC Company

Index1 Cover sheet Page xx

2 Business section Page xx

21 Assumptions and Conditions Page xx

3 Pricing Page xx

31 Unit Pricing Page xx

32 Cost Element by Part Number Page xx

33 Cost Element Summary Page xx

4 Material Page xx

41 Bill of Materials by Part Number Page xx

42 Consolidated Bill of Materials Page xx

43 Purchase Orders and Quotes (File PO-QuotesPDF) Page xx

5 Labor Page xx

6 Etc Page xx

10

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cost Element Breakdown by Line Itembull A cost element breakdown is required for each proposed line item If the

proposal covers multiple price points or multiple years a cost elementbreakdown will be required for each price point for each year

bull For example assume your proposal includes the following three line items

bull You would need to provide separate cost element breakdowns for parts ABCABB and the NRE See the next slide for an example

Slight differences due to rounding

11

Part Number Quantity Unit Price Total PricePart ABC 50 $12500 $625000Part ABB 75 $10300 $772500NRE 1 $145000Total $1542500

FAR 15408 Table 15-2 I D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cost Element Breakdown by Line Item Example

12FAR 15408 Table 15-2 I D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdownbull When more than one contract line item (Part Number NRE etc) is

proposed you must provide summary total amounts covering all items foreach element of cost If the proposal covers a high mid and low point thesummary needs to only be for those points not all the differentcombinations that can result from range pricing If the proposal is formultiple years there needs to be a summary for each of the yearsbull For example if your proposal included the following

bull You would need to provide a summary by cost element that includes the totalproposed value of $1542500 See the next slide for an example showing thethree individual cost elements being combined into a summary

Slight differences due to rounding

13

Part Number Quantity Unit Price Total PricePart ABC 50 $12500 $625000Part ABB 75 $10300 $772500NRE 1 $145000Total $1542500

FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdown - Example

14FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdown - Example

15

bull If the proposal is a base year plus option years there needs to be asummary Cost Element Breakdown for each of the years at the points in theRFP requiring Cost or Pricing data

FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Include a BOM for each individual part proposed A BOM is a list of the raw

materials subassemblies etc needed to manufacture a product

bull Provide your BOMs in Excel formatbull The consolidated and individual BOMs need to identify the following for each line

itembull Part Number and descriptionbull Supplierbull Quantitybull Unit Price ndash Unit pricing on the BOM should tie to the supportbull Total Pricebull Basis for pricing (vendor quotes purchase orders)

Source of pricing (purchase order quotes etc) must be referenced in the BOM

bull PSEMC will require copies of the support (ie quotes purchase orders) for asample of the items on the BOM during the cost analysis

16FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If attritionyield or scrap are added to your material you will need to submit

adequate basis of estimates and support as appropriate

bull There are time when your BOM may be impacted by minimum buys or NREthat is passed along from your supplier If this happens make sure this isclearly identified on the BOM and the support quotes or purchase orders

bull In addition to the individual BOMs FAR requires a consolidated BOM inyour proposal A consolidated BOM is a listing of the material needed forthe proposal A consolidated BOM combines all the materials for each ofthe parts being procured as well as assemblies services or materialassociated with NRE

17FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Individual Bills of Material Example

18

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Material Examplebull Below is an example of a consolidated BOM This BOM was developed by

taking the three individual BOMrsquos on the previous page and combining themtogetherbull In a consolidated BOM part numbers and quantities should be combined (or

subtotaled) if they are the same parts For example the BOMs for Part Nos ABCand ABB both require the same Connector and Screw In the consolidated BOMthe requirements have been combined and reflect the total number of Connectorsand Screws that will be needed for this proposal

19

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Materialbull If the proposal is for a base year plus option years there needs to be a

consolidated BOM for each of the years at each of the points in the RFPrequiring cost or pricing

bull To determine if a subtier cost analysis is required you need to add togetherthe anticipated costs for each supplier for all years In the above examplethere are two suppliers that will require cost analysis (Ford and Motion)

20

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Supplier proposals

bull A cost analysis report is required if any of your suppliersrsquo proposals exceedthe Truth in Negotiations Act (TINA) threshold These need to be submittedwith your proposal

bull If the cost analysis for a supplier is not complete at the time of your proposalsubmittal a schedule listing the estimated completion dates for each supplierneeds to be provided in the proposal

bull If an exemption applies that eliminates the need for a cost analysis (commercial orcompetitively priced) documentation needs to be provided to support these claims

21FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If you claim your supplier was competed and the value is over the TINA

threshold you will need to provide the following

bull Evidence that an RFP or solicitation to bid was sent to two or more supplierscapable of providing the goods or services requested

bull Copies of the quotes received from each of the suppliers who were competedbull Supplierrsquos analysis with basis of rationale for why the winning bid represents the best value

(lowest price technical considerations etc)

bull If you claim your supplierrsquos parts or services are commercial refer to thecommercial section in this document

22FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Refer to the detailed instructions in the RFP when your proposal supports a

base year plus options contract or a long term agreement Guidance shouldbe provided here on the consolidation and subtier requirements If youhave any questions regarding this contact your PSEMC Supply Chainrepresentative

bull Inter-organizational costs

bull Inter-organizational costs are defined as the costs of items transferred betweendivisions within the same company

bull If you have bid any inter-organizational costs in your proposal you will need toprovide a cost element breakdown for each inter-organizational transfer andsupport as appropriate

bull One more thing

bull If you have a supplier with a value in excess of $135 million or is greater than 10percent of your total proposal and exceeds the TINA threshold FAR 15408 Table15-2 requires that we submit the supplierrsquos proposal and cost or pricing data withour own proposal

23FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Provide a time-phased (eg monthly quarterly) breakdown of labor hours ratesand cost by appropriate category and furnish basis for estimates

24FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Proposed labor hours are generally a combination of direct and support laborhours

bull Direct Labor Hours ndash Hours that can be identified specifically to a final end itembull Support Labor Hours ndash Hours that cannot be specifically identified to one end item For

example a production manager may be in charge of overseeing the manufacturing ofmultiple parts

25FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull You need to provide a breakdown of the labor hours by labor category and

function along with a basis of estimate for the proposed labor hours

bull For example if you propose 500 hours for an end item you would need to providea breakdown by categoryfunction (assembly inspection supervisor engineeretc) You also will need to provide a detailed basis of estimate for eachcategoryfunction showing how your arrived at the hours for the proposed laborcategory

bull Generally the basis should be actual production history An alternative approach isthe use of engineering estimates if the item has not been manufactured before

bull Cost Accounting Standards (CAS) 401 requires that a company isconsistent between proposals and accounting practices The way acompany estimates its labor hours needs to also be the way it accumulatesits production history

26FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours ExampleProposal No HLQxxxxxDate January 1 20xx ABC Corporation

Labor HoursProposed Labor Hours ndash 8279 hrsunit for Part ABC

27

Direct Labor HrsUnitAssembly 3800 Machinist 350 QA 762 Engineer 1 238

Subtotal 5151

Production Support HrsUnitMfg Supervisor 920Eng Supervisor 368QA supervisor 920Production Mgr 920

Subtotal 3128

Total Hrs 8279

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Example ndash Actual Production History

28

ProposedDuration - Months 7 9 24 12 Qty 30 39 110 50 End Date 11152006 982007 912009

Direct Labor Total Hrs HrsUnit Total Hours HrsUnit Total Hrs HrsUnit Total Hrs HrsUnitAssembly 1836 6120 1675 4295 4338 3944 1900 3800 Machinist 169 564 154 396 400 363 175 350 QA 368 1238 336 862 870 791 381 762 Engineer 1 115 383 105 269 272 247 119 238

Production Support Total Hrs Total Hrs Total Hrs Total Hrs HrsUnitMFG Supervisor 268 345 920 460 920 Eng Supervisor 107 138 184 184 368 QA Supervisor 268 345 920 460 920 Production Mgr 268 345 920 460 920

HrsUnit 8279

Acutal Production History - Part ABC

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Examples ndash Basis of Estimatebull Basis of estimate for direct labor

bull Proposed direct labor hours were developed by apply a 90 percent learningcurve to the production labor history for part BBC You need to provide abasis for the 90 percent curve

bull Basis of estimate for the manufacturing supervisorbull The manufacturing supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 920 hours were used over a 24-month periodSince the current proposal has been estimated to cover 12 months 460hours were applied to the manufacturing supervisor (920 divided by 2)

bull Basis of estimate for engineering supervisorbull The engineering supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 184 hours were necessary to complete the taskThis task is similar and so we estimate 184 hours

29

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Direct Costs (ODC)bull List other expenses not otherwise included under material and labor (eg

travel freight) and provide basis for pricing

bull For example the basis for travel would include the location number of tripsnumber of people attending and the estimated expenses for the travel

30FAR 15408 Table 15-2 II D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 11: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cost Element Breakdown by Line Itembull A cost element breakdown is required for each proposed line item If the

proposal covers multiple price points or multiple years a cost elementbreakdown will be required for each price point for each year

bull For example assume your proposal includes the following three line items

bull You would need to provide separate cost element breakdowns for parts ABCABB and the NRE See the next slide for an example

Slight differences due to rounding

11

Part Number Quantity Unit Price Total PricePart ABC 50 $12500 $625000Part ABB 75 $10300 $772500NRE 1 $145000Total $1542500

FAR 15408 Table 15-2 I D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cost Element Breakdown by Line Item Example

12FAR 15408 Table 15-2 I D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdownbull When more than one contract line item (Part Number NRE etc) is

proposed you must provide summary total amounts covering all items foreach element of cost If the proposal covers a high mid and low point thesummary needs to only be for those points not all the differentcombinations that can result from range pricing If the proposal is formultiple years there needs to be a summary for each of the yearsbull For example if your proposal included the following

bull You would need to provide a summary by cost element that includes the totalproposed value of $1542500 See the next slide for an example showing thethree individual cost elements being combined into a summary

Slight differences due to rounding

13

Part Number Quantity Unit Price Total PricePart ABC 50 $12500 $625000Part ABB 75 $10300 $772500NRE 1 $145000Total $1542500

FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdown - Example

14FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdown - Example

15

bull If the proposal is a base year plus option years there needs to be asummary Cost Element Breakdown for each of the years at the points in theRFP requiring Cost or Pricing data

FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Include a BOM for each individual part proposed A BOM is a list of the raw

materials subassemblies etc needed to manufacture a product

bull Provide your BOMs in Excel formatbull The consolidated and individual BOMs need to identify the following for each line

itembull Part Number and descriptionbull Supplierbull Quantitybull Unit Price ndash Unit pricing on the BOM should tie to the supportbull Total Pricebull Basis for pricing (vendor quotes purchase orders)

Source of pricing (purchase order quotes etc) must be referenced in the BOM

bull PSEMC will require copies of the support (ie quotes purchase orders) for asample of the items on the BOM during the cost analysis

16FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If attritionyield or scrap are added to your material you will need to submit

adequate basis of estimates and support as appropriate

bull There are time when your BOM may be impacted by minimum buys or NREthat is passed along from your supplier If this happens make sure this isclearly identified on the BOM and the support quotes or purchase orders

bull In addition to the individual BOMs FAR requires a consolidated BOM inyour proposal A consolidated BOM is a listing of the material needed forthe proposal A consolidated BOM combines all the materials for each ofthe parts being procured as well as assemblies services or materialassociated with NRE

17FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Individual Bills of Material Example

18

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Material Examplebull Below is an example of a consolidated BOM This BOM was developed by

taking the three individual BOMrsquos on the previous page and combining themtogetherbull In a consolidated BOM part numbers and quantities should be combined (or

subtotaled) if they are the same parts For example the BOMs for Part Nos ABCand ABB both require the same Connector and Screw In the consolidated BOMthe requirements have been combined and reflect the total number of Connectorsand Screws that will be needed for this proposal

19

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Materialbull If the proposal is for a base year plus option years there needs to be a

consolidated BOM for each of the years at each of the points in the RFPrequiring cost or pricing

bull To determine if a subtier cost analysis is required you need to add togetherthe anticipated costs for each supplier for all years In the above examplethere are two suppliers that will require cost analysis (Ford and Motion)

20

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Supplier proposals

bull A cost analysis report is required if any of your suppliersrsquo proposals exceedthe Truth in Negotiations Act (TINA) threshold These need to be submittedwith your proposal

bull If the cost analysis for a supplier is not complete at the time of your proposalsubmittal a schedule listing the estimated completion dates for each supplierneeds to be provided in the proposal

bull If an exemption applies that eliminates the need for a cost analysis (commercial orcompetitively priced) documentation needs to be provided to support these claims

21FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If you claim your supplier was competed and the value is over the TINA

threshold you will need to provide the following

bull Evidence that an RFP or solicitation to bid was sent to two or more supplierscapable of providing the goods or services requested

bull Copies of the quotes received from each of the suppliers who were competedbull Supplierrsquos analysis with basis of rationale for why the winning bid represents the best value

(lowest price technical considerations etc)

bull If you claim your supplierrsquos parts or services are commercial refer to thecommercial section in this document

22FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Refer to the detailed instructions in the RFP when your proposal supports a

base year plus options contract or a long term agreement Guidance shouldbe provided here on the consolidation and subtier requirements If youhave any questions regarding this contact your PSEMC Supply Chainrepresentative

bull Inter-organizational costs

bull Inter-organizational costs are defined as the costs of items transferred betweendivisions within the same company

bull If you have bid any inter-organizational costs in your proposal you will need toprovide a cost element breakdown for each inter-organizational transfer andsupport as appropriate

bull One more thing

bull If you have a supplier with a value in excess of $135 million or is greater than 10percent of your total proposal and exceeds the TINA threshold FAR 15408 Table15-2 requires that we submit the supplierrsquos proposal and cost or pricing data withour own proposal

23FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Provide a time-phased (eg monthly quarterly) breakdown of labor hours ratesand cost by appropriate category and furnish basis for estimates

24FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Proposed labor hours are generally a combination of direct and support laborhours

bull Direct Labor Hours ndash Hours that can be identified specifically to a final end itembull Support Labor Hours ndash Hours that cannot be specifically identified to one end item For

example a production manager may be in charge of overseeing the manufacturing ofmultiple parts

25FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull You need to provide a breakdown of the labor hours by labor category and

function along with a basis of estimate for the proposed labor hours

bull For example if you propose 500 hours for an end item you would need to providea breakdown by categoryfunction (assembly inspection supervisor engineeretc) You also will need to provide a detailed basis of estimate for eachcategoryfunction showing how your arrived at the hours for the proposed laborcategory

bull Generally the basis should be actual production history An alternative approach isthe use of engineering estimates if the item has not been manufactured before

bull Cost Accounting Standards (CAS) 401 requires that a company isconsistent between proposals and accounting practices The way acompany estimates its labor hours needs to also be the way it accumulatesits production history

26FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours ExampleProposal No HLQxxxxxDate January 1 20xx ABC Corporation

Labor HoursProposed Labor Hours ndash 8279 hrsunit for Part ABC

27

Direct Labor HrsUnitAssembly 3800 Machinist 350 QA 762 Engineer 1 238

Subtotal 5151

Production Support HrsUnitMfg Supervisor 920Eng Supervisor 368QA supervisor 920Production Mgr 920

Subtotal 3128

Total Hrs 8279

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Example ndash Actual Production History

28

ProposedDuration - Months 7 9 24 12 Qty 30 39 110 50 End Date 11152006 982007 912009

Direct Labor Total Hrs HrsUnit Total Hours HrsUnit Total Hrs HrsUnit Total Hrs HrsUnitAssembly 1836 6120 1675 4295 4338 3944 1900 3800 Machinist 169 564 154 396 400 363 175 350 QA 368 1238 336 862 870 791 381 762 Engineer 1 115 383 105 269 272 247 119 238

Production Support Total Hrs Total Hrs Total Hrs Total Hrs HrsUnitMFG Supervisor 268 345 920 460 920 Eng Supervisor 107 138 184 184 368 QA Supervisor 268 345 920 460 920 Production Mgr 268 345 920 460 920

HrsUnit 8279

Acutal Production History - Part ABC

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Examples ndash Basis of Estimatebull Basis of estimate for direct labor

bull Proposed direct labor hours were developed by apply a 90 percent learningcurve to the production labor history for part BBC You need to provide abasis for the 90 percent curve

bull Basis of estimate for the manufacturing supervisorbull The manufacturing supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 920 hours were used over a 24-month periodSince the current proposal has been estimated to cover 12 months 460hours were applied to the manufacturing supervisor (920 divided by 2)

bull Basis of estimate for engineering supervisorbull The engineering supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 184 hours were necessary to complete the taskThis task is similar and so we estimate 184 hours

29

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Direct Costs (ODC)bull List other expenses not otherwise included under material and labor (eg

travel freight) and provide basis for pricing

bull For example the basis for travel would include the location number of tripsnumber of people attending and the estimated expenses for the travel

30FAR 15408 Table 15-2 II D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 12: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Cost Element Breakdown by Line Item Example

12FAR 15408 Table 15-2 I D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdownbull When more than one contract line item (Part Number NRE etc) is

proposed you must provide summary total amounts covering all items foreach element of cost If the proposal covers a high mid and low point thesummary needs to only be for those points not all the differentcombinations that can result from range pricing If the proposal is formultiple years there needs to be a summary for each of the yearsbull For example if your proposal included the following

bull You would need to provide a summary by cost element that includes the totalproposed value of $1542500 See the next slide for an example showing thethree individual cost elements being combined into a summary

Slight differences due to rounding

13

Part Number Quantity Unit Price Total PricePart ABC 50 $12500 $625000Part ABB 75 $10300 $772500NRE 1 $145000Total $1542500

FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdown - Example

14FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdown - Example

15

bull If the proposal is a base year plus option years there needs to be asummary Cost Element Breakdown for each of the years at the points in theRFP requiring Cost or Pricing data

FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Include a BOM for each individual part proposed A BOM is a list of the raw

materials subassemblies etc needed to manufacture a product

bull Provide your BOMs in Excel formatbull The consolidated and individual BOMs need to identify the following for each line

itembull Part Number and descriptionbull Supplierbull Quantitybull Unit Price ndash Unit pricing on the BOM should tie to the supportbull Total Pricebull Basis for pricing (vendor quotes purchase orders)

Source of pricing (purchase order quotes etc) must be referenced in the BOM

bull PSEMC will require copies of the support (ie quotes purchase orders) for asample of the items on the BOM during the cost analysis

16FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If attritionyield or scrap are added to your material you will need to submit

adequate basis of estimates and support as appropriate

bull There are time when your BOM may be impacted by minimum buys or NREthat is passed along from your supplier If this happens make sure this isclearly identified on the BOM and the support quotes or purchase orders

bull In addition to the individual BOMs FAR requires a consolidated BOM inyour proposal A consolidated BOM is a listing of the material needed forthe proposal A consolidated BOM combines all the materials for each ofthe parts being procured as well as assemblies services or materialassociated with NRE

17FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Individual Bills of Material Example

18

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Material Examplebull Below is an example of a consolidated BOM This BOM was developed by

taking the three individual BOMrsquos on the previous page and combining themtogetherbull In a consolidated BOM part numbers and quantities should be combined (or

subtotaled) if they are the same parts For example the BOMs for Part Nos ABCand ABB both require the same Connector and Screw In the consolidated BOMthe requirements have been combined and reflect the total number of Connectorsand Screws that will be needed for this proposal

19

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Materialbull If the proposal is for a base year plus option years there needs to be a

consolidated BOM for each of the years at each of the points in the RFPrequiring cost or pricing

bull To determine if a subtier cost analysis is required you need to add togetherthe anticipated costs for each supplier for all years In the above examplethere are two suppliers that will require cost analysis (Ford and Motion)

20

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Supplier proposals

bull A cost analysis report is required if any of your suppliersrsquo proposals exceedthe Truth in Negotiations Act (TINA) threshold These need to be submittedwith your proposal

bull If the cost analysis for a supplier is not complete at the time of your proposalsubmittal a schedule listing the estimated completion dates for each supplierneeds to be provided in the proposal

bull If an exemption applies that eliminates the need for a cost analysis (commercial orcompetitively priced) documentation needs to be provided to support these claims

21FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If you claim your supplier was competed and the value is over the TINA

threshold you will need to provide the following

bull Evidence that an RFP or solicitation to bid was sent to two or more supplierscapable of providing the goods or services requested

bull Copies of the quotes received from each of the suppliers who were competedbull Supplierrsquos analysis with basis of rationale for why the winning bid represents the best value

(lowest price technical considerations etc)

bull If you claim your supplierrsquos parts or services are commercial refer to thecommercial section in this document

22FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Refer to the detailed instructions in the RFP when your proposal supports a

base year plus options contract or a long term agreement Guidance shouldbe provided here on the consolidation and subtier requirements If youhave any questions regarding this contact your PSEMC Supply Chainrepresentative

bull Inter-organizational costs

bull Inter-organizational costs are defined as the costs of items transferred betweendivisions within the same company

bull If you have bid any inter-organizational costs in your proposal you will need toprovide a cost element breakdown for each inter-organizational transfer andsupport as appropriate

bull One more thing

bull If you have a supplier with a value in excess of $135 million or is greater than 10percent of your total proposal and exceeds the TINA threshold FAR 15408 Table15-2 requires that we submit the supplierrsquos proposal and cost or pricing data withour own proposal

23FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Provide a time-phased (eg monthly quarterly) breakdown of labor hours ratesand cost by appropriate category and furnish basis for estimates

24FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Proposed labor hours are generally a combination of direct and support laborhours

bull Direct Labor Hours ndash Hours that can be identified specifically to a final end itembull Support Labor Hours ndash Hours that cannot be specifically identified to one end item For

example a production manager may be in charge of overseeing the manufacturing ofmultiple parts

25FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull You need to provide a breakdown of the labor hours by labor category and

function along with a basis of estimate for the proposed labor hours

bull For example if you propose 500 hours for an end item you would need to providea breakdown by categoryfunction (assembly inspection supervisor engineeretc) You also will need to provide a detailed basis of estimate for eachcategoryfunction showing how your arrived at the hours for the proposed laborcategory

bull Generally the basis should be actual production history An alternative approach isthe use of engineering estimates if the item has not been manufactured before

bull Cost Accounting Standards (CAS) 401 requires that a company isconsistent between proposals and accounting practices The way acompany estimates its labor hours needs to also be the way it accumulatesits production history

26FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours ExampleProposal No HLQxxxxxDate January 1 20xx ABC Corporation

Labor HoursProposed Labor Hours ndash 8279 hrsunit for Part ABC

27

Direct Labor HrsUnitAssembly 3800 Machinist 350 QA 762 Engineer 1 238

Subtotal 5151

Production Support HrsUnitMfg Supervisor 920Eng Supervisor 368QA supervisor 920Production Mgr 920

Subtotal 3128

Total Hrs 8279

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Example ndash Actual Production History

28

ProposedDuration - Months 7 9 24 12 Qty 30 39 110 50 End Date 11152006 982007 912009

Direct Labor Total Hrs HrsUnit Total Hours HrsUnit Total Hrs HrsUnit Total Hrs HrsUnitAssembly 1836 6120 1675 4295 4338 3944 1900 3800 Machinist 169 564 154 396 400 363 175 350 QA 368 1238 336 862 870 791 381 762 Engineer 1 115 383 105 269 272 247 119 238

Production Support Total Hrs Total Hrs Total Hrs Total Hrs HrsUnitMFG Supervisor 268 345 920 460 920 Eng Supervisor 107 138 184 184 368 QA Supervisor 268 345 920 460 920 Production Mgr 268 345 920 460 920

HrsUnit 8279

Acutal Production History - Part ABC

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Examples ndash Basis of Estimatebull Basis of estimate for direct labor

bull Proposed direct labor hours were developed by apply a 90 percent learningcurve to the production labor history for part BBC You need to provide abasis for the 90 percent curve

bull Basis of estimate for the manufacturing supervisorbull The manufacturing supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 920 hours were used over a 24-month periodSince the current proposal has been estimated to cover 12 months 460hours were applied to the manufacturing supervisor (920 divided by 2)

bull Basis of estimate for engineering supervisorbull The engineering supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 184 hours were necessary to complete the taskThis task is similar and so we estimate 184 hours

29

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Direct Costs (ODC)bull List other expenses not otherwise included under material and labor (eg

travel freight) and provide basis for pricing

bull For example the basis for travel would include the location number of tripsnumber of people attending and the estimated expenses for the travel

30FAR 15408 Table 15-2 II D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 13: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdownbull When more than one contract line item (Part Number NRE etc) is

proposed you must provide summary total amounts covering all items foreach element of cost If the proposal covers a high mid and low point thesummary needs to only be for those points not all the differentcombinations that can result from range pricing If the proposal is formultiple years there needs to be a summary for each of the yearsbull For example if your proposal included the following

bull You would need to provide a summary by cost element that includes the totalproposed value of $1542500 See the next slide for an example showing thethree individual cost elements being combined into a summary

Slight differences due to rounding

13

Part Number Quantity Unit Price Total PricePart ABC 50 $12500 $625000Part ABB 75 $10300 $772500NRE 1 $145000Total $1542500

FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdown - Example

14FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdown - Example

15

bull If the proposal is a base year plus option years there needs to be asummary Cost Element Breakdown for each of the years at the points in theRFP requiring Cost or Pricing data

FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Include a BOM for each individual part proposed A BOM is a list of the raw

materials subassemblies etc needed to manufacture a product

bull Provide your BOMs in Excel formatbull The consolidated and individual BOMs need to identify the following for each line

itembull Part Number and descriptionbull Supplierbull Quantitybull Unit Price ndash Unit pricing on the BOM should tie to the supportbull Total Pricebull Basis for pricing (vendor quotes purchase orders)

Source of pricing (purchase order quotes etc) must be referenced in the BOM

bull PSEMC will require copies of the support (ie quotes purchase orders) for asample of the items on the BOM during the cost analysis

16FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If attritionyield or scrap are added to your material you will need to submit

adequate basis of estimates and support as appropriate

bull There are time when your BOM may be impacted by minimum buys or NREthat is passed along from your supplier If this happens make sure this isclearly identified on the BOM and the support quotes or purchase orders

bull In addition to the individual BOMs FAR requires a consolidated BOM inyour proposal A consolidated BOM is a listing of the material needed forthe proposal A consolidated BOM combines all the materials for each ofthe parts being procured as well as assemblies services or materialassociated with NRE

17FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Individual Bills of Material Example

18

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Material Examplebull Below is an example of a consolidated BOM This BOM was developed by

taking the three individual BOMrsquos on the previous page and combining themtogetherbull In a consolidated BOM part numbers and quantities should be combined (or

subtotaled) if they are the same parts For example the BOMs for Part Nos ABCand ABB both require the same Connector and Screw In the consolidated BOMthe requirements have been combined and reflect the total number of Connectorsand Screws that will be needed for this proposal

19

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Materialbull If the proposal is for a base year plus option years there needs to be a

consolidated BOM for each of the years at each of the points in the RFPrequiring cost or pricing

bull To determine if a subtier cost analysis is required you need to add togetherthe anticipated costs for each supplier for all years In the above examplethere are two suppliers that will require cost analysis (Ford and Motion)

20

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Supplier proposals

bull A cost analysis report is required if any of your suppliersrsquo proposals exceedthe Truth in Negotiations Act (TINA) threshold These need to be submittedwith your proposal

bull If the cost analysis for a supplier is not complete at the time of your proposalsubmittal a schedule listing the estimated completion dates for each supplierneeds to be provided in the proposal

bull If an exemption applies that eliminates the need for a cost analysis (commercial orcompetitively priced) documentation needs to be provided to support these claims

21FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If you claim your supplier was competed and the value is over the TINA

threshold you will need to provide the following

bull Evidence that an RFP or solicitation to bid was sent to two or more supplierscapable of providing the goods or services requested

bull Copies of the quotes received from each of the suppliers who were competedbull Supplierrsquos analysis with basis of rationale for why the winning bid represents the best value

(lowest price technical considerations etc)

bull If you claim your supplierrsquos parts or services are commercial refer to thecommercial section in this document

22FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Refer to the detailed instructions in the RFP when your proposal supports a

base year plus options contract or a long term agreement Guidance shouldbe provided here on the consolidation and subtier requirements If youhave any questions regarding this contact your PSEMC Supply Chainrepresentative

bull Inter-organizational costs

bull Inter-organizational costs are defined as the costs of items transferred betweendivisions within the same company

bull If you have bid any inter-organizational costs in your proposal you will need toprovide a cost element breakdown for each inter-organizational transfer andsupport as appropriate

bull One more thing

bull If you have a supplier with a value in excess of $135 million or is greater than 10percent of your total proposal and exceeds the TINA threshold FAR 15408 Table15-2 requires that we submit the supplierrsquos proposal and cost or pricing data withour own proposal

23FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Provide a time-phased (eg monthly quarterly) breakdown of labor hours ratesand cost by appropriate category and furnish basis for estimates

24FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Proposed labor hours are generally a combination of direct and support laborhours

bull Direct Labor Hours ndash Hours that can be identified specifically to a final end itembull Support Labor Hours ndash Hours that cannot be specifically identified to one end item For

example a production manager may be in charge of overseeing the manufacturing ofmultiple parts

25FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull You need to provide a breakdown of the labor hours by labor category and

function along with a basis of estimate for the proposed labor hours

bull For example if you propose 500 hours for an end item you would need to providea breakdown by categoryfunction (assembly inspection supervisor engineeretc) You also will need to provide a detailed basis of estimate for eachcategoryfunction showing how your arrived at the hours for the proposed laborcategory

bull Generally the basis should be actual production history An alternative approach isthe use of engineering estimates if the item has not been manufactured before

bull Cost Accounting Standards (CAS) 401 requires that a company isconsistent between proposals and accounting practices The way acompany estimates its labor hours needs to also be the way it accumulatesits production history

26FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours ExampleProposal No HLQxxxxxDate January 1 20xx ABC Corporation

Labor HoursProposed Labor Hours ndash 8279 hrsunit for Part ABC

27

Direct Labor HrsUnitAssembly 3800 Machinist 350 QA 762 Engineer 1 238

Subtotal 5151

Production Support HrsUnitMfg Supervisor 920Eng Supervisor 368QA supervisor 920Production Mgr 920

Subtotal 3128

Total Hrs 8279

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Example ndash Actual Production History

28

ProposedDuration - Months 7 9 24 12 Qty 30 39 110 50 End Date 11152006 982007 912009

Direct Labor Total Hrs HrsUnit Total Hours HrsUnit Total Hrs HrsUnit Total Hrs HrsUnitAssembly 1836 6120 1675 4295 4338 3944 1900 3800 Machinist 169 564 154 396 400 363 175 350 QA 368 1238 336 862 870 791 381 762 Engineer 1 115 383 105 269 272 247 119 238

Production Support Total Hrs Total Hrs Total Hrs Total Hrs HrsUnitMFG Supervisor 268 345 920 460 920 Eng Supervisor 107 138 184 184 368 QA Supervisor 268 345 920 460 920 Production Mgr 268 345 920 460 920

HrsUnit 8279

Acutal Production History - Part ABC

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Examples ndash Basis of Estimatebull Basis of estimate for direct labor

bull Proposed direct labor hours were developed by apply a 90 percent learningcurve to the production labor history for part BBC You need to provide abasis for the 90 percent curve

bull Basis of estimate for the manufacturing supervisorbull The manufacturing supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 920 hours were used over a 24-month periodSince the current proposal has been estimated to cover 12 months 460hours were applied to the manufacturing supervisor (920 divided by 2)

bull Basis of estimate for engineering supervisorbull The engineering supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 184 hours were necessary to complete the taskThis task is similar and so we estimate 184 hours

29

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Direct Costs (ODC)bull List other expenses not otherwise included under material and labor (eg

travel freight) and provide basis for pricing

bull For example the basis for travel would include the location number of tripsnumber of people attending and the estimated expenses for the travel

30FAR 15408 Table 15-2 II D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 14: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdown - Example

14FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdown - Example

15

bull If the proposal is a base year plus option years there needs to be asummary Cost Element Breakdown for each of the years at the points in theRFP requiring Cost or Pricing data

FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Include a BOM for each individual part proposed A BOM is a list of the raw

materials subassemblies etc needed to manufacture a product

bull Provide your BOMs in Excel formatbull The consolidated and individual BOMs need to identify the following for each line

itembull Part Number and descriptionbull Supplierbull Quantitybull Unit Price ndash Unit pricing on the BOM should tie to the supportbull Total Pricebull Basis for pricing (vendor quotes purchase orders)

Source of pricing (purchase order quotes etc) must be referenced in the BOM

bull PSEMC will require copies of the support (ie quotes purchase orders) for asample of the items on the BOM during the cost analysis

16FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If attritionyield or scrap are added to your material you will need to submit

adequate basis of estimates and support as appropriate

bull There are time when your BOM may be impacted by minimum buys or NREthat is passed along from your supplier If this happens make sure this isclearly identified on the BOM and the support quotes or purchase orders

bull In addition to the individual BOMs FAR requires a consolidated BOM inyour proposal A consolidated BOM is a listing of the material needed forthe proposal A consolidated BOM combines all the materials for each ofthe parts being procured as well as assemblies services or materialassociated with NRE

17FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Individual Bills of Material Example

18

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Material Examplebull Below is an example of a consolidated BOM This BOM was developed by

taking the three individual BOMrsquos on the previous page and combining themtogetherbull In a consolidated BOM part numbers and quantities should be combined (or

subtotaled) if they are the same parts For example the BOMs for Part Nos ABCand ABB both require the same Connector and Screw In the consolidated BOMthe requirements have been combined and reflect the total number of Connectorsand Screws that will be needed for this proposal

19

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Materialbull If the proposal is for a base year plus option years there needs to be a

consolidated BOM for each of the years at each of the points in the RFPrequiring cost or pricing

bull To determine if a subtier cost analysis is required you need to add togetherthe anticipated costs for each supplier for all years In the above examplethere are two suppliers that will require cost analysis (Ford and Motion)

20

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Supplier proposals

bull A cost analysis report is required if any of your suppliersrsquo proposals exceedthe Truth in Negotiations Act (TINA) threshold These need to be submittedwith your proposal

bull If the cost analysis for a supplier is not complete at the time of your proposalsubmittal a schedule listing the estimated completion dates for each supplierneeds to be provided in the proposal

bull If an exemption applies that eliminates the need for a cost analysis (commercial orcompetitively priced) documentation needs to be provided to support these claims

21FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If you claim your supplier was competed and the value is over the TINA

threshold you will need to provide the following

bull Evidence that an RFP or solicitation to bid was sent to two or more supplierscapable of providing the goods or services requested

bull Copies of the quotes received from each of the suppliers who were competedbull Supplierrsquos analysis with basis of rationale for why the winning bid represents the best value

(lowest price technical considerations etc)

bull If you claim your supplierrsquos parts or services are commercial refer to thecommercial section in this document

22FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Refer to the detailed instructions in the RFP when your proposal supports a

base year plus options contract or a long term agreement Guidance shouldbe provided here on the consolidation and subtier requirements If youhave any questions regarding this contact your PSEMC Supply Chainrepresentative

bull Inter-organizational costs

bull Inter-organizational costs are defined as the costs of items transferred betweendivisions within the same company

bull If you have bid any inter-organizational costs in your proposal you will need toprovide a cost element breakdown for each inter-organizational transfer andsupport as appropriate

bull One more thing

bull If you have a supplier with a value in excess of $135 million or is greater than 10percent of your total proposal and exceeds the TINA threshold FAR 15408 Table15-2 requires that we submit the supplierrsquos proposal and cost or pricing data withour own proposal

23FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Provide a time-phased (eg monthly quarterly) breakdown of labor hours ratesand cost by appropriate category and furnish basis for estimates

24FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Proposed labor hours are generally a combination of direct and support laborhours

bull Direct Labor Hours ndash Hours that can be identified specifically to a final end itembull Support Labor Hours ndash Hours that cannot be specifically identified to one end item For

example a production manager may be in charge of overseeing the manufacturing ofmultiple parts

25FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull You need to provide a breakdown of the labor hours by labor category and

function along with a basis of estimate for the proposed labor hours

bull For example if you propose 500 hours for an end item you would need to providea breakdown by categoryfunction (assembly inspection supervisor engineeretc) You also will need to provide a detailed basis of estimate for eachcategoryfunction showing how your arrived at the hours for the proposed laborcategory

bull Generally the basis should be actual production history An alternative approach isthe use of engineering estimates if the item has not been manufactured before

bull Cost Accounting Standards (CAS) 401 requires that a company isconsistent between proposals and accounting practices The way acompany estimates its labor hours needs to also be the way it accumulatesits production history

26FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours ExampleProposal No HLQxxxxxDate January 1 20xx ABC Corporation

Labor HoursProposed Labor Hours ndash 8279 hrsunit for Part ABC

27

Direct Labor HrsUnitAssembly 3800 Machinist 350 QA 762 Engineer 1 238

Subtotal 5151

Production Support HrsUnitMfg Supervisor 920Eng Supervisor 368QA supervisor 920Production Mgr 920

Subtotal 3128

Total Hrs 8279

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Example ndash Actual Production History

28

ProposedDuration - Months 7 9 24 12 Qty 30 39 110 50 End Date 11152006 982007 912009

Direct Labor Total Hrs HrsUnit Total Hours HrsUnit Total Hrs HrsUnit Total Hrs HrsUnitAssembly 1836 6120 1675 4295 4338 3944 1900 3800 Machinist 169 564 154 396 400 363 175 350 QA 368 1238 336 862 870 791 381 762 Engineer 1 115 383 105 269 272 247 119 238

Production Support Total Hrs Total Hrs Total Hrs Total Hrs HrsUnitMFG Supervisor 268 345 920 460 920 Eng Supervisor 107 138 184 184 368 QA Supervisor 268 345 920 460 920 Production Mgr 268 345 920 460 920

HrsUnit 8279

Acutal Production History - Part ABC

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Examples ndash Basis of Estimatebull Basis of estimate for direct labor

bull Proposed direct labor hours were developed by apply a 90 percent learningcurve to the production labor history for part BBC You need to provide abasis for the 90 percent curve

bull Basis of estimate for the manufacturing supervisorbull The manufacturing supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 920 hours were used over a 24-month periodSince the current proposal has been estimated to cover 12 months 460hours were applied to the manufacturing supervisor (920 divided by 2)

bull Basis of estimate for engineering supervisorbull The engineering supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 184 hours were necessary to complete the taskThis task is similar and so we estimate 184 hours

29

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Direct Costs (ODC)bull List other expenses not otherwise included under material and labor (eg

travel freight) and provide basis for pricing

bull For example the basis for travel would include the location number of tripsnumber of people attending and the estimated expenses for the travel

30FAR 15408 Table 15-2 II D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 15: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summary Cost Element Breakdown - Example

15

bull If the proposal is a base year plus option years there needs to be asummary Cost Element Breakdown for each of the years at the points in theRFP requiring Cost or Pricing data

FAR 15408 Table 15-2 I E

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Include a BOM for each individual part proposed A BOM is a list of the raw

materials subassemblies etc needed to manufacture a product

bull Provide your BOMs in Excel formatbull The consolidated and individual BOMs need to identify the following for each line

itembull Part Number and descriptionbull Supplierbull Quantitybull Unit Price ndash Unit pricing on the BOM should tie to the supportbull Total Pricebull Basis for pricing (vendor quotes purchase orders)

Source of pricing (purchase order quotes etc) must be referenced in the BOM

bull PSEMC will require copies of the support (ie quotes purchase orders) for asample of the items on the BOM during the cost analysis

16FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If attritionyield or scrap are added to your material you will need to submit

adequate basis of estimates and support as appropriate

bull There are time when your BOM may be impacted by minimum buys or NREthat is passed along from your supplier If this happens make sure this isclearly identified on the BOM and the support quotes or purchase orders

bull In addition to the individual BOMs FAR requires a consolidated BOM inyour proposal A consolidated BOM is a listing of the material needed forthe proposal A consolidated BOM combines all the materials for each ofthe parts being procured as well as assemblies services or materialassociated with NRE

17FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Individual Bills of Material Example

18

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Material Examplebull Below is an example of a consolidated BOM This BOM was developed by

taking the three individual BOMrsquos on the previous page and combining themtogetherbull In a consolidated BOM part numbers and quantities should be combined (or

subtotaled) if they are the same parts For example the BOMs for Part Nos ABCand ABB both require the same Connector and Screw In the consolidated BOMthe requirements have been combined and reflect the total number of Connectorsand Screws that will be needed for this proposal

19

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Materialbull If the proposal is for a base year plus option years there needs to be a

consolidated BOM for each of the years at each of the points in the RFPrequiring cost or pricing

bull To determine if a subtier cost analysis is required you need to add togetherthe anticipated costs for each supplier for all years In the above examplethere are two suppliers that will require cost analysis (Ford and Motion)

20

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Supplier proposals

bull A cost analysis report is required if any of your suppliersrsquo proposals exceedthe Truth in Negotiations Act (TINA) threshold These need to be submittedwith your proposal

bull If the cost analysis for a supplier is not complete at the time of your proposalsubmittal a schedule listing the estimated completion dates for each supplierneeds to be provided in the proposal

bull If an exemption applies that eliminates the need for a cost analysis (commercial orcompetitively priced) documentation needs to be provided to support these claims

21FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If you claim your supplier was competed and the value is over the TINA

threshold you will need to provide the following

bull Evidence that an RFP or solicitation to bid was sent to two or more supplierscapable of providing the goods or services requested

bull Copies of the quotes received from each of the suppliers who were competedbull Supplierrsquos analysis with basis of rationale for why the winning bid represents the best value

(lowest price technical considerations etc)

bull If you claim your supplierrsquos parts or services are commercial refer to thecommercial section in this document

22FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Refer to the detailed instructions in the RFP when your proposal supports a

base year plus options contract or a long term agreement Guidance shouldbe provided here on the consolidation and subtier requirements If youhave any questions regarding this contact your PSEMC Supply Chainrepresentative

bull Inter-organizational costs

bull Inter-organizational costs are defined as the costs of items transferred betweendivisions within the same company

bull If you have bid any inter-organizational costs in your proposal you will need toprovide a cost element breakdown for each inter-organizational transfer andsupport as appropriate

bull One more thing

bull If you have a supplier with a value in excess of $135 million or is greater than 10percent of your total proposal and exceeds the TINA threshold FAR 15408 Table15-2 requires that we submit the supplierrsquos proposal and cost or pricing data withour own proposal

23FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Provide a time-phased (eg monthly quarterly) breakdown of labor hours ratesand cost by appropriate category and furnish basis for estimates

24FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Proposed labor hours are generally a combination of direct and support laborhours

bull Direct Labor Hours ndash Hours that can be identified specifically to a final end itembull Support Labor Hours ndash Hours that cannot be specifically identified to one end item For

example a production manager may be in charge of overseeing the manufacturing ofmultiple parts

25FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull You need to provide a breakdown of the labor hours by labor category and

function along with a basis of estimate for the proposed labor hours

bull For example if you propose 500 hours for an end item you would need to providea breakdown by categoryfunction (assembly inspection supervisor engineeretc) You also will need to provide a detailed basis of estimate for eachcategoryfunction showing how your arrived at the hours for the proposed laborcategory

bull Generally the basis should be actual production history An alternative approach isthe use of engineering estimates if the item has not been manufactured before

bull Cost Accounting Standards (CAS) 401 requires that a company isconsistent between proposals and accounting practices The way acompany estimates its labor hours needs to also be the way it accumulatesits production history

26FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours ExampleProposal No HLQxxxxxDate January 1 20xx ABC Corporation

Labor HoursProposed Labor Hours ndash 8279 hrsunit for Part ABC

27

Direct Labor HrsUnitAssembly 3800 Machinist 350 QA 762 Engineer 1 238

Subtotal 5151

Production Support HrsUnitMfg Supervisor 920Eng Supervisor 368QA supervisor 920Production Mgr 920

Subtotal 3128

Total Hrs 8279

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Example ndash Actual Production History

28

ProposedDuration - Months 7 9 24 12 Qty 30 39 110 50 End Date 11152006 982007 912009

Direct Labor Total Hrs HrsUnit Total Hours HrsUnit Total Hrs HrsUnit Total Hrs HrsUnitAssembly 1836 6120 1675 4295 4338 3944 1900 3800 Machinist 169 564 154 396 400 363 175 350 QA 368 1238 336 862 870 791 381 762 Engineer 1 115 383 105 269 272 247 119 238

Production Support Total Hrs Total Hrs Total Hrs Total Hrs HrsUnitMFG Supervisor 268 345 920 460 920 Eng Supervisor 107 138 184 184 368 QA Supervisor 268 345 920 460 920 Production Mgr 268 345 920 460 920

HrsUnit 8279

Acutal Production History - Part ABC

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Examples ndash Basis of Estimatebull Basis of estimate for direct labor

bull Proposed direct labor hours were developed by apply a 90 percent learningcurve to the production labor history for part BBC You need to provide abasis for the 90 percent curve

bull Basis of estimate for the manufacturing supervisorbull The manufacturing supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 920 hours were used over a 24-month periodSince the current proposal has been estimated to cover 12 months 460hours were applied to the manufacturing supervisor (920 divided by 2)

bull Basis of estimate for engineering supervisorbull The engineering supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 184 hours were necessary to complete the taskThis task is similar and so we estimate 184 hours

29

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Direct Costs (ODC)bull List other expenses not otherwise included under material and labor (eg

travel freight) and provide basis for pricing

bull For example the basis for travel would include the location number of tripsnumber of people attending and the estimated expenses for the travel

30FAR 15408 Table 15-2 II D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 16: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Include a BOM for each individual part proposed A BOM is a list of the raw

materials subassemblies etc needed to manufacture a product

bull Provide your BOMs in Excel formatbull The consolidated and individual BOMs need to identify the following for each line

itembull Part Number and descriptionbull Supplierbull Quantitybull Unit Price ndash Unit pricing on the BOM should tie to the supportbull Total Pricebull Basis for pricing (vendor quotes purchase orders)

Source of pricing (purchase order quotes etc) must be referenced in the BOM

bull PSEMC will require copies of the support (ie quotes purchase orders) for asample of the items on the BOM during the cost analysis

16FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If attritionyield or scrap are added to your material you will need to submit

adequate basis of estimates and support as appropriate

bull There are time when your BOM may be impacted by minimum buys or NREthat is passed along from your supplier If this happens make sure this isclearly identified on the BOM and the support quotes or purchase orders

bull In addition to the individual BOMs FAR requires a consolidated BOM inyour proposal A consolidated BOM is a listing of the material needed forthe proposal A consolidated BOM combines all the materials for each ofthe parts being procured as well as assemblies services or materialassociated with NRE

17FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Individual Bills of Material Example

18

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Material Examplebull Below is an example of a consolidated BOM This BOM was developed by

taking the three individual BOMrsquos on the previous page and combining themtogetherbull In a consolidated BOM part numbers and quantities should be combined (or

subtotaled) if they are the same parts For example the BOMs for Part Nos ABCand ABB both require the same Connector and Screw In the consolidated BOMthe requirements have been combined and reflect the total number of Connectorsand Screws that will be needed for this proposal

19

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Materialbull If the proposal is for a base year plus option years there needs to be a

consolidated BOM for each of the years at each of the points in the RFPrequiring cost or pricing

bull To determine if a subtier cost analysis is required you need to add togetherthe anticipated costs for each supplier for all years In the above examplethere are two suppliers that will require cost analysis (Ford and Motion)

20

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Supplier proposals

bull A cost analysis report is required if any of your suppliersrsquo proposals exceedthe Truth in Negotiations Act (TINA) threshold These need to be submittedwith your proposal

bull If the cost analysis for a supplier is not complete at the time of your proposalsubmittal a schedule listing the estimated completion dates for each supplierneeds to be provided in the proposal

bull If an exemption applies that eliminates the need for a cost analysis (commercial orcompetitively priced) documentation needs to be provided to support these claims

21FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If you claim your supplier was competed and the value is over the TINA

threshold you will need to provide the following

bull Evidence that an RFP or solicitation to bid was sent to two or more supplierscapable of providing the goods or services requested

bull Copies of the quotes received from each of the suppliers who were competedbull Supplierrsquos analysis with basis of rationale for why the winning bid represents the best value

(lowest price technical considerations etc)

bull If you claim your supplierrsquos parts or services are commercial refer to thecommercial section in this document

22FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Refer to the detailed instructions in the RFP when your proposal supports a

base year plus options contract or a long term agreement Guidance shouldbe provided here on the consolidation and subtier requirements If youhave any questions regarding this contact your PSEMC Supply Chainrepresentative

bull Inter-organizational costs

bull Inter-organizational costs are defined as the costs of items transferred betweendivisions within the same company

bull If you have bid any inter-organizational costs in your proposal you will need toprovide a cost element breakdown for each inter-organizational transfer andsupport as appropriate

bull One more thing

bull If you have a supplier with a value in excess of $135 million or is greater than 10percent of your total proposal and exceeds the TINA threshold FAR 15408 Table15-2 requires that we submit the supplierrsquos proposal and cost or pricing data withour own proposal

23FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Provide a time-phased (eg monthly quarterly) breakdown of labor hours ratesand cost by appropriate category and furnish basis for estimates

24FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Proposed labor hours are generally a combination of direct and support laborhours

bull Direct Labor Hours ndash Hours that can be identified specifically to a final end itembull Support Labor Hours ndash Hours that cannot be specifically identified to one end item For

example a production manager may be in charge of overseeing the manufacturing ofmultiple parts

25FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull You need to provide a breakdown of the labor hours by labor category and

function along with a basis of estimate for the proposed labor hours

bull For example if you propose 500 hours for an end item you would need to providea breakdown by categoryfunction (assembly inspection supervisor engineeretc) You also will need to provide a detailed basis of estimate for eachcategoryfunction showing how your arrived at the hours for the proposed laborcategory

bull Generally the basis should be actual production history An alternative approach isthe use of engineering estimates if the item has not been manufactured before

bull Cost Accounting Standards (CAS) 401 requires that a company isconsistent between proposals and accounting practices The way acompany estimates its labor hours needs to also be the way it accumulatesits production history

26FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours ExampleProposal No HLQxxxxxDate January 1 20xx ABC Corporation

Labor HoursProposed Labor Hours ndash 8279 hrsunit for Part ABC

27

Direct Labor HrsUnitAssembly 3800 Machinist 350 QA 762 Engineer 1 238

Subtotal 5151

Production Support HrsUnitMfg Supervisor 920Eng Supervisor 368QA supervisor 920Production Mgr 920

Subtotal 3128

Total Hrs 8279

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Example ndash Actual Production History

28

ProposedDuration - Months 7 9 24 12 Qty 30 39 110 50 End Date 11152006 982007 912009

Direct Labor Total Hrs HrsUnit Total Hours HrsUnit Total Hrs HrsUnit Total Hrs HrsUnitAssembly 1836 6120 1675 4295 4338 3944 1900 3800 Machinist 169 564 154 396 400 363 175 350 QA 368 1238 336 862 870 791 381 762 Engineer 1 115 383 105 269 272 247 119 238

Production Support Total Hrs Total Hrs Total Hrs Total Hrs HrsUnitMFG Supervisor 268 345 920 460 920 Eng Supervisor 107 138 184 184 368 QA Supervisor 268 345 920 460 920 Production Mgr 268 345 920 460 920

HrsUnit 8279

Acutal Production History - Part ABC

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Examples ndash Basis of Estimatebull Basis of estimate for direct labor

bull Proposed direct labor hours were developed by apply a 90 percent learningcurve to the production labor history for part BBC You need to provide abasis for the 90 percent curve

bull Basis of estimate for the manufacturing supervisorbull The manufacturing supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 920 hours were used over a 24-month periodSince the current proposal has been estimated to cover 12 months 460hours were applied to the manufacturing supervisor (920 divided by 2)

bull Basis of estimate for engineering supervisorbull The engineering supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 184 hours were necessary to complete the taskThis task is similar and so we estimate 184 hours

29

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Direct Costs (ODC)bull List other expenses not otherwise included under material and labor (eg

travel freight) and provide basis for pricing

bull For example the basis for travel would include the location number of tripsnumber of people attending and the estimated expenses for the travel

30FAR 15408 Table 15-2 II D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 17: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If attritionyield or scrap are added to your material you will need to submit

adequate basis of estimates and support as appropriate

bull There are time when your BOM may be impacted by minimum buys or NREthat is passed along from your supplier If this happens make sure this isclearly identified on the BOM and the support quotes or purchase orders

bull In addition to the individual BOMs FAR requires a consolidated BOM inyour proposal A consolidated BOM is a listing of the material needed forthe proposal A consolidated BOM combines all the materials for each ofthe parts being procured as well as assemblies services or materialassociated with NRE

17FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Individual Bills of Material Example

18

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Material Examplebull Below is an example of a consolidated BOM This BOM was developed by

taking the three individual BOMrsquos on the previous page and combining themtogetherbull In a consolidated BOM part numbers and quantities should be combined (or

subtotaled) if they are the same parts For example the BOMs for Part Nos ABCand ABB both require the same Connector and Screw In the consolidated BOMthe requirements have been combined and reflect the total number of Connectorsand Screws that will be needed for this proposal

19

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Materialbull If the proposal is for a base year plus option years there needs to be a

consolidated BOM for each of the years at each of the points in the RFPrequiring cost or pricing

bull To determine if a subtier cost analysis is required you need to add togetherthe anticipated costs for each supplier for all years In the above examplethere are two suppliers that will require cost analysis (Ford and Motion)

20

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Supplier proposals

bull A cost analysis report is required if any of your suppliersrsquo proposals exceedthe Truth in Negotiations Act (TINA) threshold These need to be submittedwith your proposal

bull If the cost analysis for a supplier is not complete at the time of your proposalsubmittal a schedule listing the estimated completion dates for each supplierneeds to be provided in the proposal

bull If an exemption applies that eliminates the need for a cost analysis (commercial orcompetitively priced) documentation needs to be provided to support these claims

21FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If you claim your supplier was competed and the value is over the TINA

threshold you will need to provide the following

bull Evidence that an RFP or solicitation to bid was sent to two or more supplierscapable of providing the goods or services requested

bull Copies of the quotes received from each of the suppliers who were competedbull Supplierrsquos analysis with basis of rationale for why the winning bid represents the best value

(lowest price technical considerations etc)

bull If you claim your supplierrsquos parts or services are commercial refer to thecommercial section in this document

22FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Refer to the detailed instructions in the RFP when your proposal supports a

base year plus options contract or a long term agreement Guidance shouldbe provided here on the consolidation and subtier requirements If youhave any questions regarding this contact your PSEMC Supply Chainrepresentative

bull Inter-organizational costs

bull Inter-organizational costs are defined as the costs of items transferred betweendivisions within the same company

bull If you have bid any inter-organizational costs in your proposal you will need toprovide a cost element breakdown for each inter-organizational transfer andsupport as appropriate

bull One more thing

bull If you have a supplier with a value in excess of $135 million or is greater than 10percent of your total proposal and exceeds the TINA threshold FAR 15408 Table15-2 requires that we submit the supplierrsquos proposal and cost or pricing data withour own proposal

23FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Provide a time-phased (eg monthly quarterly) breakdown of labor hours ratesand cost by appropriate category and furnish basis for estimates

24FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Proposed labor hours are generally a combination of direct and support laborhours

bull Direct Labor Hours ndash Hours that can be identified specifically to a final end itembull Support Labor Hours ndash Hours that cannot be specifically identified to one end item For

example a production manager may be in charge of overseeing the manufacturing ofmultiple parts

25FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull You need to provide a breakdown of the labor hours by labor category and

function along with a basis of estimate for the proposed labor hours

bull For example if you propose 500 hours for an end item you would need to providea breakdown by categoryfunction (assembly inspection supervisor engineeretc) You also will need to provide a detailed basis of estimate for eachcategoryfunction showing how your arrived at the hours for the proposed laborcategory

bull Generally the basis should be actual production history An alternative approach isthe use of engineering estimates if the item has not been manufactured before

bull Cost Accounting Standards (CAS) 401 requires that a company isconsistent between proposals and accounting practices The way acompany estimates its labor hours needs to also be the way it accumulatesits production history

26FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours ExampleProposal No HLQxxxxxDate January 1 20xx ABC Corporation

Labor HoursProposed Labor Hours ndash 8279 hrsunit for Part ABC

27

Direct Labor HrsUnitAssembly 3800 Machinist 350 QA 762 Engineer 1 238

Subtotal 5151

Production Support HrsUnitMfg Supervisor 920Eng Supervisor 368QA supervisor 920Production Mgr 920

Subtotal 3128

Total Hrs 8279

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Example ndash Actual Production History

28

ProposedDuration - Months 7 9 24 12 Qty 30 39 110 50 End Date 11152006 982007 912009

Direct Labor Total Hrs HrsUnit Total Hours HrsUnit Total Hrs HrsUnit Total Hrs HrsUnitAssembly 1836 6120 1675 4295 4338 3944 1900 3800 Machinist 169 564 154 396 400 363 175 350 QA 368 1238 336 862 870 791 381 762 Engineer 1 115 383 105 269 272 247 119 238

Production Support Total Hrs Total Hrs Total Hrs Total Hrs HrsUnitMFG Supervisor 268 345 920 460 920 Eng Supervisor 107 138 184 184 368 QA Supervisor 268 345 920 460 920 Production Mgr 268 345 920 460 920

HrsUnit 8279

Acutal Production History - Part ABC

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Examples ndash Basis of Estimatebull Basis of estimate for direct labor

bull Proposed direct labor hours were developed by apply a 90 percent learningcurve to the production labor history for part BBC You need to provide abasis for the 90 percent curve

bull Basis of estimate for the manufacturing supervisorbull The manufacturing supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 920 hours were used over a 24-month periodSince the current proposal has been estimated to cover 12 months 460hours were applied to the manufacturing supervisor (920 divided by 2)

bull Basis of estimate for engineering supervisorbull The engineering supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 184 hours were necessary to complete the taskThis task is similar and so we estimate 184 hours

29

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Direct Costs (ODC)bull List other expenses not otherwise included under material and labor (eg

travel freight) and provide basis for pricing

bull For example the basis for travel would include the location number of tripsnumber of people attending and the estimated expenses for the travel

30FAR 15408 Table 15-2 II D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 18: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Individual Bills of Material Example

18

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Material Examplebull Below is an example of a consolidated BOM This BOM was developed by

taking the three individual BOMrsquos on the previous page and combining themtogetherbull In a consolidated BOM part numbers and quantities should be combined (or

subtotaled) if they are the same parts For example the BOMs for Part Nos ABCand ABB both require the same Connector and Screw In the consolidated BOMthe requirements have been combined and reflect the total number of Connectorsand Screws that will be needed for this proposal

19

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Materialbull If the proposal is for a base year plus option years there needs to be a

consolidated BOM for each of the years at each of the points in the RFPrequiring cost or pricing

bull To determine if a subtier cost analysis is required you need to add togetherthe anticipated costs for each supplier for all years In the above examplethere are two suppliers that will require cost analysis (Ford and Motion)

20

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Supplier proposals

bull A cost analysis report is required if any of your suppliersrsquo proposals exceedthe Truth in Negotiations Act (TINA) threshold These need to be submittedwith your proposal

bull If the cost analysis for a supplier is not complete at the time of your proposalsubmittal a schedule listing the estimated completion dates for each supplierneeds to be provided in the proposal

bull If an exemption applies that eliminates the need for a cost analysis (commercial orcompetitively priced) documentation needs to be provided to support these claims

21FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If you claim your supplier was competed and the value is over the TINA

threshold you will need to provide the following

bull Evidence that an RFP or solicitation to bid was sent to two or more supplierscapable of providing the goods or services requested

bull Copies of the quotes received from each of the suppliers who were competedbull Supplierrsquos analysis with basis of rationale for why the winning bid represents the best value

(lowest price technical considerations etc)

bull If you claim your supplierrsquos parts or services are commercial refer to thecommercial section in this document

22FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Refer to the detailed instructions in the RFP when your proposal supports a

base year plus options contract or a long term agreement Guidance shouldbe provided here on the consolidation and subtier requirements If youhave any questions regarding this contact your PSEMC Supply Chainrepresentative

bull Inter-organizational costs

bull Inter-organizational costs are defined as the costs of items transferred betweendivisions within the same company

bull If you have bid any inter-organizational costs in your proposal you will need toprovide a cost element breakdown for each inter-organizational transfer andsupport as appropriate

bull One more thing

bull If you have a supplier with a value in excess of $135 million or is greater than 10percent of your total proposal and exceeds the TINA threshold FAR 15408 Table15-2 requires that we submit the supplierrsquos proposal and cost or pricing data withour own proposal

23FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Provide a time-phased (eg monthly quarterly) breakdown of labor hours ratesand cost by appropriate category and furnish basis for estimates

24FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Proposed labor hours are generally a combination of direct and support laborhours

bull Direct Labor Hours ndash Hours that can be identified specifically to a final end itembull Support Labor Hours ndash Hours that cannot be specifically identified to one end item For

example a production manager may be in charge of overseeing the manufacturing ofmultiple parts

25FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull You need to provide a breakdown of the labor hours by labor category and

function along with a basis of estimate for the proposed labor hours

bull For example if you propose 500 hours for an end item you would need to providea breakdown by categoryfunction (assembly inspection supervisor engineeretc) You also will need to provide a detailed basis of estimate for eachcategoryfunction showing how your arrived at the hours for the proposed laborcategory

bull Generally the basis should be actual production history An alternative approach isthe use of engineering estimates if the item has not been manufactured before

bull Cost Accounting Standards (CAS) 401 requires that a company isconsistent between proposals and accounting practices The way acompany estimates its labor hours needs to also be the way it accumulatesits production history

26FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours ExampleProposal No HLQxxxxxDate January 1 20xx ABC Corporation

Labor HoursProposed Labor Hours ndash 8279 hrsunit for Part ABC

27

Direct Labor HrsUnitAssembly 3800 Machinist 350 QA 762 Engineer 1 238

Subtotal 5151

Production Support HrsUnitMfg Supervisor 920Eng Supervisor 368QA supervisor 920Production Mgr 920

Subtotal 3128

Total Hrs 8279

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Example ndash Actual Production History

28

ProposedDuration - Months 7 9 24 12 Qty 30 39 110 50 End Date 11152006 982007 912009

Direct Labor Total Hrs HrsUnit Total Hours HrsUnit Total Hrs HrsUnit Total Hrs HrsUnitAssembly 1836 6120 1675 4295 4338 3944 1900 3800 Machinist 169 564 154 396 400 363 175 350 QA 368 1238 336 862 870 791 381 762 Engineer 1 115 383 105 269 272 247 119 238

Production Support Total Hrs Total Hrs Total Hrs Total Hrs HrsUnitMFG Supervisor 268 345 920 460 920 Eng Supervisor 107 138 184 184 368 QA Supervisor 268 345 920 460 920 Production Mgr 268 345 920 460 920

HrsUnit 8279

Acutal Production History - Part ABC

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Examples ndash Basis of Estimatebull Basis of estimate for direct labor

bull Proposed direct labor hours were developed by apply a 90 percent learningcurve to the production labor history for part BBC You need to provide abasis for the 90 percent curve

bull Basis of estimate for the manufacturing supervisorbull The manufacturing supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 920 hours were used over a 24-month periodSince the current proposal has been estimated to cover 12 months 460hours were applied to the manufacturing supervisor (920 divided by 2)

bull Basis of estimate for engineering supervisorbull The engineering supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 184 hours were necessary to complete the taskThis task is similar and so we estimate 184 hours

29

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Direct Costs (ODC)bull List other expenses not otherwise included under material and labor (eg

travel freight) and provide basis for pricing

bull For example the basis for travel would include the location number of tripsnumber of people attending and the estimated expenses for the travel

30FAR 15408 Table 15-2 II D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 19: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Material Examplebull Below is an example of a consolidated BOM This BOM was developed by

taking the three individual BOMrsquos on the previous page and combining themtogetherbull In a consolidated BOM part numbers and quantities should be combined (or

subtotaled) if they are the same parts For example the BOMs for Part Nos ABCand ABB both require the same Connector and Screw In the consolidated BOMthe requirements have been combined and reflect the total number of Connectorsand Screws that will be needed for this proposal

19

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Materialbull If the proposal is for a base year plus option years there needs to be a

consolidated BOM for each of the years at each of the points in the RFPrequiring cost or pricing

bull To determine if a subtier cost analysis is required you need to add togetherthe anticipated costs for each supplier for all years In the above examplethere are two suppliers that will require cost analysis (Ford and Motion)

20

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Supplier proposals

bull A cost analysis report is required if any of your suppliersrsquo proposals exceedthe Truth in Negotiations Act (TINA) threshold These need to be submittedwith your proposal

bull If the cost analysis for a supplier is not complete at the time of your proposalsubmittal a schedule listing the estimated completion dates for each supplierneeds to be provided in the proposal

bull If an exemption applies that eliminates the need for a cost analysis (commercial orcompetitively priced) documentation needs to be provided to support these claims

21FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If you claim your supplier was competed and the value is over the TINA

threshold you will need to provide the following

bull Evidence that an RFP or solicitation to bid was sent to two or more supplierscapable of providing the goods or services requested

bull Copies of the quotes received from each of the suppliers who were competedbull Supplierrsquos analysis with basis of rationale for why the winning bid represents the best value

(lowest price technical considerations etc)

bull If you claim your supplierrsquos parts or services are commercial refer to thecommercial section in this document

22FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Refer to the detailed instructions in the RFP when your proposal supports a

base year plus options contract or a long term agreement Guidance shouldbe provided here on the consolidation and subtier requirements If youhave any questions regarding this contact your PSEMC Supply Chainrepresentative

bull Inter-organizational costs

bull Inter-organizational costs are defined as the costs of items transferred betweendivisions within the same company

bull If you have bid any inter-organizational costs in your proposal you will need toprovide a cost element breakdown for each inter-organizational transfer andsupport as appropriate

bull One more thing

bull If you have a supplier with a value in excess of $135 million or is greater than 10percent of your total proposal and exceeds the TINA threshold FAR 15408 Table15-2 requires that we submit the supplierrsquos proposal and cost or pricing data withour own proposal

23FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Provide a time-phased (eg monthly quarterly) breakdown of labor hours ratesand cost by appropriate category and furnish basis for estimates

24FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Proposed labor hours are generally a combination of direct and support laborhours

bull Direct Labor Hours ndash Hours that can be identified specifically to a final end itembull Support Labor Hours ndash Hours that cannot be specifically identified to one end item For

example a production manager may be in charge of overseeing the manufacturing ofmultiple parts

25FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull You need to provide a breakdown of the labor hours by labor category and

function along with a basis of estimate for the proposed labor hours

bull For example if you propose 500 hours for an end item you would need to providea breakdown by categoryfunction (assembly inspection supervisor engineeretc) You also will need to provide a detailed basis of estimate for eachcategoryfunction showing how your arrived at the hours for the proposed laborcategory

bull Generally the basis should be actual production history An alternative approach isthe use of engineering estimates if the item has not been manufactured before

bull Cost Accounting Standards (CAS) 401 requires that a company isconsistent between proposals and accounting practices The way acompany estimates its labor hours needs to also be the way it accumulatesits production history

26FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours ExampleProposal No HLQxxxxxDate January 1 20xx ABC Corporation

Labor HoursProposed Labor Hours ndash 8279 hrsunit for Part ABC

27

Direct Labor HrsUnitAssembly 3800 Machinist 350 QA 762 Engineer 1 238

Subtotal 5151

Production Support HrsUnitMfg Supervisor 920Eng Supervisor 368QA supervisor 920Production Mgr 920

Subtotal 3128

Total Hrs 8279

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Example ndash Actual Production History

28

ProposedDuration - Months 7 9 24 12 Qty 30 39 110 50 End Date 11152006 982007 912009

Direct Labor Total Hrs HrsUnit Total Hours HrsUnit Total Hrs HrsUnit Total Hrs HrsUnitAssembly 1836 6120 1675 4295 4338 3944 1900 3800 Machinist 169 564 154 396 400 363 175 350 QA 368 1238 336 862 870 791 381 762 Engineer 1 115 383 105 269 272 247 119 238

Production Support Total Hrs Total Hrs Total Hrs Total Hrs HrsUnitMFG Supervisor 268 345 920 460 920 Eng Supervisor 107 138 184 184 368 QA Supervisor 268 345 920 460 920 Production Mgr 268 345 920 460 920

HrsUnit 8279

Acutal Production History - Part ABC

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Examples ndash Basis of Estimatebull Basis of estimate for direct labor

bull Proposed direct labor hours were developed by apply a 90 percent learningcurve to the production labor history for part BBC You need to provide abasis for the 90 percent curve

bull Basis of estimate for the manufacturing supervisorbull The manufacturing supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 920 hours were used over a 24-month periodSince the current proposal has been estimated to cover 12 months 460hours were applied to the manufacturing supervisor (920 divided by 2)

bull Basis of estimate for engineering supervisorbull The engineering supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 184 hours were necessary to complete the taskThis task is similar and so we estimate 184 hours

29

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Direct Costs (ODC)bull List other expenses not otherwise included under material and labor (eg

travel freight) and provide basis for pricing

bull For example the basis for travel would include the location number of tripsnumber of people attending and the estimated expenses for the travel

30FAR 15408 Table 15-2 II D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 20: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Consolidated Bill of Materialbull If the proposal is for a base year plus option years there needs to be a

consolidated BOM for each of the years at each of the points in the RFPrequiring cost or pricing

bull To determine if a subtier cost analysis is required you need to add togetherthe anticipated costs for each supplier for all years In the above examplethere are two suppliers that will require cost analysis (Ford and Motion)

20

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Supplier proposals

bull A cost analysis report is required if any of your suppliersrsquo proposals exceedthe Truth in Negotiations Act (TINA) threshold These need to be submittedwith your proposal

bull If the cost analysis for a supplier is not complete at the time of your proposalsubmittal a schedule listing the estimated completion dates for each supplierneeds to be provided in the proposal

bull If an exemption applies that eliminates the need for a cost analysis (commercial orcompetitively priced) documentation needs to be provided to support these claims

21FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If you claim your supplier was competed and the value is over the TINA

threshold you will need to provide the following

bull Evidence that an RFP or solicitation to bid was sent to two or more supplierscapable of providing the goods or services requested

bull Copies of the quotes received from each of the suppliers who were competedbull Supplierrsquos analysis with basis of rationale for why the winning bid represents the best value

(lowest price technical considerations etc)

bull If you claim your supplierrsquos parts or services are commercial refer to thecommercial section in this document

22FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Refer to the detailed instructions in the RFP when your proposal supports a

base year plus options contract or a long term agreement Guidance shouldbe provided here on the consolidation and subtier requirements If youhave any questions regarding this contact your PSEMC Supply Chainrepresentative

bull Inter-organizational costs

bull Inter-organizational costs are defined as the costs of items transferred betweendivisions within the same company

bull If you have bid any inter-organizational costs in your proposal you will need toprovide a cost element breakdown for each inter-organizational transfer andsupport as appropriate

bull One more thing

bull If you have a supplier with a value in excess of $135 million or is greater than 10percent of your total proposal and exceeds the TINA threshold FAR 15408 Table15-2 requires that we submit the supplierrsquos proposal and cost or pricing data withour own proposal

23FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Provide a time-phased (eg monthly quarterly) breakdown of labor hours ratesand cost by appropriate category and furnish basis for estimates

24FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Proposed labor hours are generally a combination of direct and support laborhours

bull Direct Labor Hours ndash Hours that can be identified specifically to a final end itembull Support Labor Hours ndash Hours that cannot be specifically identified to one end item For

example a production manager may be in charge of overseeing the manufacturing ofmultiple parts

25FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull You need to provide a breakdown of the labor hours by labor category and

function along with a basis of estimate for the proposed labor hours

bull For example if you propose 500 hours for an end item you would need to providea breakdown by categoryfunction (assembly inspection supervisor engineeretc) You also will need to provide a detailed basis of estimate for eachcategoryfunction showing how your arrived at the hours for the proposed laborcategory

bull Generally the basis should be actual production history An alternative approach isthe use of engineering estimates if the item has not been manufactured before

bull Cost Accounting Standards (CAS) 401 requires that a company isconsistent between proposals and accounting practices The way acompany estimates its labor hours needs to also be the way it accumulatesits production history

26FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours ExampleProposal No HLQxxxxxDate January 1 20xx ABC Corporation

Labor HoursProposed Labor Hours ndash 8279 hrsunit for Part ABC

27

Direct Labor HrsUnitAssembly 3800 Machinist 350 QA 762 Engineer 1 238

Subtotal 5151

Production Support HrsUnitMfg Supervisor 920Eng Supervisor 368QA supervisor 920Production Mgr 920

Subtotal 3128

Total Hrs 8279

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Example ndash Actual Production History

28

ProposedDuration - Months 7 9 24 12 Qty 30 39 110 50 End Date 11152006 982007 912009

Direct Labor Total Hrs HrsUnit Total Hours HrsUnit Total Hrs HrsUnit Total Hrs HrsUnitAssembly 1836 6120 1675 4295 4338 3944 1900 3800 Machinist 169 564 154 396 400 363 175 350 QA 368 1238 336 862 870 791 381 762 Engineer 1 115 383 105 269 272 247 119 238

Production Support Total Hrs Total Hrs Total Hrs Total Hrs HrsUnitMFG Supervisor 268 345 920 460 920 Eng Supervisor 107 138 184 184 368 QA Supervisor 268 345 920 460 920 Production Mgr 268 345 920 460 920

HrsUnit 8279

Acutal Production History - Part ABC

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Examples ndash Basis of Estimatebull Basis of estimate for direct labor

bull Proposed direct labor hours were developed by apply a 90 percent learningcurve to the production labor history for part BBC You need to provide abasis for the 90 percent curve

bull Basis of estimate for the manufacturing supervisorbull The manufacturing supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 920 hours were used over a 24-month periodSince the current proposal has been estimated to cover 12 months 460hours were applied to the manufacturing supervisor (920 divided by 2)

bull Basis of estimate for engineering supervisorbull The engineering supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 184 hours were necessary to complete the taskThis task is similar and so we estimate 184 hours

29

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Direct Costs (ODC)bull List other expenses not otherwise included under material and labor (eg

travel freight) and provide basis for pricing

bull For example the basis for travel would include the location number of tripsnumber of people attending and the estimated expenses for the travel

30FAR 15408 Table 15-2 II D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 21: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Supplier proposals

bull A cost analysis report is required if any of your suppliersrsquo proposals exceedthe Truth in Negotiations Act (TINA) threshold These need to be submittedwith your proposal

bull If the cost analysis for a supplier is not complete at the time of your proposalsubmittal a schedule listing the estimated completion dates for each supplierneeds to be provided in the proposal

bull If an exemption applies that eliminates the need for a cost analysis (commercial orcompetitively priced) documentation needs to be provided to support these claims

21FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If you claim your supplier was competed and the value is over the TINA

threshold you will need to provide the following

bull Evidence that an RFP or solicitation to bid was sent to two or more supplierscapable of providing the goods or services requested

bull Copies of the quotes received from each of the suppliers who were competedbull Supplierrsquos analysis with basis of rationale for why the winning bid represents the best value

(lowest price technical considerations etc)

bull If you claim your supplierrsquos parts or services are commercial refer to thecommercial section in this document

22FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Refer to the detailed instructions in the RFP when your proposal supports a

base year plus options contract or a long term agreement Guidance shouldbe provided here on the consolidation and subtier requirements If youhave any questions regarding this contact your PSEMC Supply Chainrepresentative

bull Inter-organizational costs

bull Inter-organizational costs are defined as the costs of items transferred betweendivisions within the same company

bull If you have bid any inter-organizational costs in your proposal you will need toprovide a cost element breakdown for each inter-organizational transfer andsupport as appropriate

bull One more thing

bull If you have a supplier with a value in excess of $135 million or is greater than 10percent of your total proposal and exceeds the TINA threshold FAR 15408 Table15-2 requires that we submit the supplierrsquos proposal and cost or pricing data withour own proposal

23FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Provide a time-phased (eg monthly quarterly) breakdown of labor hours ratesand cost by appropriate category and furnish basis for estimates

24FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Proposed labor hours are generally a combination of direct and support laborhours

bull Direct Labor Hours ndash Hours that can be identified specifically to a final end itembull Support Labor Hours ndash Hours that cannot be specifically identified to one end item For

example a production manager may be in charge of overseeing the manufacturing ofmultiple parts

25FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull You need to provide a breakdown of the labor hours by labor category and

function along with a basis of estimate for the proposed labor hours

bull For example if you propose 500 hours for an end item you would need to providea breakdown by categoryfunction (assembly inspection supervisor engineeretc) You also will need to provide a detailed basis of estimate for eachcategoryfunction showing how your arrived at the hours for the proposed laborcategory

bull Generally the basis should be actual production history An alternative approach isthe use of engineering estimates if the item has not been manufactured before

bull Cost Accounting Standards (CAS) 401 requires that a company isconsistent between proposals and accounting practices The way acompany estimates its labor hours needs to also be the way it accumulatesits production history

26FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours ExampleProposal No HLQxxxxxDate January 1 20xx ABC Corporation

Labor HoursProposed Labor Hours ndash 8279 hrsunit for Part ABC

27

Direct Labor HrsUnitAssembly 3800 Machinist 350 QA 762 Engineer 1 238

Subtotal 5151

Production Support HrsUnitMfg Supervisor 920Eng Supervisor 368QA supervisor 920Production Mgr 920

Subtotal 3128

Total Hrs 8279

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Example ndash Actual Production History

28

ProposedDuration - Months 7 9 24 12 Qty 30 39 110 50 End Date 11152006 982007 912009

Direct Labor Total Hrs HrsUnit Total Hours HrsUnit Total Hrs HrsUnit Total Hrs HrsUnitAssembly 1836 6120 1675 4295 4338 3944 1900 3800 Machinist 169 564 154 396 400 363 175 350 QA 368 1238 336 862 870 791 381 762 Engineer 1 115 383 105 269 272 247 119 238

Production Support Total Hrs Total Hrs Total Hrs Total Hrs HrsUnitMFG Supervisor 268 345 920 460 920 Eng Supervisor 107 138 184 184 368 QA Supervisor 268 345 920 460 920 Production Mgr 268 345 920 460 920

HrsUnit 8279

Acutal Production History - Part ABC

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Examples ndash Basis of Estimatebull Basis of estimate for direct labor

bull Proposed direct labor hours were developed by apply a 90 percent learningcurve to the production labor history for part BBC You need to provide abasis for the 90 percent curve

bull Basis of estimate for the manufacturing supervisorbull The manufacturing supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 920 hours were used over a 24-month periodSince the current proposal has been estimated to cover 12 months 460hours were applied to the manufacturing supervisor (920 divided by 2)

bull Basis of estimate for engineering supervisorbull The engineering supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 184 hours were necessary to complete the taskThis task is similar and so we estimate 184 hours

29

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Direct Costs (ODC)bull List other expenses not otherwise included under material and labor (eg

travel freight) and provide basis for pricing

bull For example the basis for travel would include the location number of tripsnumber of people attending and the estimated expenses for the travel

30FAR 15408 Table 15-2 II D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 22: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull If you claim your supplier was competed and the value is over the TINA

threshold you will need to provide the following

bull Evidence that an RFP or solicitation to bid was sent to two or more supplierscapable of providing the goods or services requested

bull Copies of the quotes received from each of the suppliers who were competedbull Supplierrsquos analysis with basis of rationale for why the winning bid represents the best value

(lowest price technical considerations etc)

bull If you claim your supplierrsquos parts or services are commercial refer to thecommercial section in this document

22FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Refer to the detailed instructions in the RFP when your proposal supports a

base year plus options contract or a long term agreement Guidance shouldbe provided here on the consolidation and subtier requirements If youhave any questions regarding this contact your PSEMC Supply Chainrepresentative

bull Inter-organizational costs

bull Inter-organizational costs are defined as the costs of items transferred betweendivisions within the same company

bull If you have bid any inter-organizational costs in your proposal you will need toprovide a cost element breakdown for each inter-organizational transfer andsupport as appropriate

bull One more thing

bull If you have a supplier with a value in excess of $135 million or is greater than 10percent of your total proposal and exceeds the TINA threshold FAR 15408 Table15-2 requires that we submit the supplierrsquos proposal and cost or pricing data withour own proposal

23FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Provide a time-phased (eg monthly quarterly) breakdown of labor hours ratesand cost by appropriate category and furnish basis for estimates

24FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Proposed labor hours are generally a combination of direct and support laborhours

bull Direct Labor Hours ndash Hours that can be identified specifically to a final end itembull Support Labor Hours ndash Hours that cannot be specifically identified to one end item For

example a production manager may be in charge of overseeing the manufacturing ofmultiple parts

25FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull You need to provide a breakdown of the labor hours by labor category and

function along with a basis of estimate for the proposed labor hours

bull For example if you propose 500 hours for an end item you would need to providea breakdown by categoryfunction (assembly inspection supervisor engineeretc) You also will need to provide a detailed basis of estimate for eachcategoryfunction showing how your arrived at the hours for the proposed laborcategory

bull Generally the basis should be actual production history An alternative approach isthe use of engineering estimates if the item has not been manufactured before

bull Cost Accounting Standards (CAS) 401 requires that a company isconsistent between proposals and accounting practices The way acompany estimates its labor hours needs to also be the way it accumulatesits production history

26FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours ExampleProposal No HLQxxxxxDate January 1 20xx ABC Corporation

Labor HoursProposed Labor Hours ndash 8279 hrsunit for Part ABC

27

Direct Labor HrsUnitAssembly 3800 Machinist 350 QA 762 Engineer 1 238

Subtotal 5151

Production Support HrsUnitMfg Supervisor 920Eng Supervisor 368QA supervisor 920Production Mgr 920

Subtotal 3128

Total Hrs 8279

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Example ndash Actual Production History

28

ProposedDuration - Months 7 9 24 12 Qty 30 39 110 50 End Date 11152006 982007 912009

Direct Labor Total Hrs HrsUnit Total Hours HrsUnit Total Hrs HrsUnit Total Hrs HrsUnitAssembly 1836 6120 1675 4295 4338 3944 1900 3800 Machinist 169 564 154 396 400 363 175 350 QA 368 1238 336 862 870 791 381 762 Engineer 1 115 383 105 269 272 247 119 238

Production Support Total Hrs Total Hrs Total Hrs Total Hrs HrsUnitMFG Supervisor 268 345 920 460 920 Eng Supervisor 107 138 184 184 368 QA Supervisor 268 345 920 460 920 Production Mgr 268 345 920 460 920

HrsUnit 8279

Acutal Production History - Part ABC

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Examples ndash Basis of Estimatebull Basis of estimate for direct labor

bull Proposed direct labor hours were developed by apply a 90 percent learningcurve to the production labor history for part BBC You need to provide abasis for the 90 percent curve

bull Basis of estimate for the manufacturing supervisorbull The manufacturing supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 920 hours were used over a 24-month periodSince the current proposal has been estimated to cover 12 months 460hours were applied to the manufacturing supervisor (920 divided by 2)

bull Basis of estimate for engineering supervisorbull The engineering supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 184 hours were necessary to complete the taskThis task is similar and so we estimate 184 hours

29

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Direct Costs (ODC)bull List other expenses not otherwise included under material and labor (eg

travel freight) and provide basis for pricing

bull For example the basis for travel would include the location number of tripsnumber of people attending and the estimated expenses for the travel

30FAR 15408 Table 15-2 II D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 23: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Materialbull Refer to the detailed instructions in the RFP when your proposal supports a

base year plus options contract or a long term agreement Guidance shouldbe provided here on the consolidation and subtier requirements If youhave any questions regarding this contact your PSEMC Supply Chainrepresentative

bull Inter-organizational costs

bull Inter-organizational costs are defined as the costs of items transferred betweendivisions within the same company

bull If you have bid any inter-organizational costs in your proposal you will need toprovide a cost element breakdown for each inter-organizational transfer andsupport as appropriate

bull One more thing

bull If you have a supplier with a value in excess of $135 million or is greater than 10percent of your total proposal and exceeds the TINA threshold FAR 15408 Table15-2 requires that we submit the supplierrsquos proposal and cost or pricing data withour own proposal

23FAR 15408 Table 15-2 II A

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Provide a time-phased (eg monthly quarterly) breakdown of labor hours ratesand cost by appropriate category and furnish basis for estimates

24FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Proposed labor hours are generally a combination of direct and support laborhours

bull Direct Labor Hours ndash Hours that can be identified specifically to a final end itembull Support Labor Hours ndash Hours that cannot be specifically identified to one end item For

example a production manager may be in charge of overseeing the manufacturing ofmultiple parts

25FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull You need to provide a breakdown of the labor hours by labor category and

function along with a basis of estimate for the proposed labor hours

bull For example if you propose 500 hours for an end item you would need to providea breakdown by categoryfunction (assembly inspection supervisor engineeretc) You also will need to provide a detailed basis of estimate for eachcategoryfunction showing how your arrived at the hours for the proposed laborcategory

bull Generally the basis should be actual production history An alternative approach isthe use of engineering estimates if the item has not been manufactured before

bull Cost Accounting Standards (CAS) 401 requires that a company isconsistent between proposals and accounting practices The way acompany estimates its labor hours needs to also be the way it accumulatesits production history

26FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours ExampleProposal No HLQxxxxxDate January 1 20xx ABC Corporation

Labor HoursProposed Labor Hours ndash 8279 hrsunit for Part ABC

27

Direct Labor HrsUnitAssembly 3800 Machinist 350 QA 762 Engineer 1 238

Subtotal 5151

Production Support HrsUnitMfg Supervisor 920Eng Supervisor 368QA supervisor 920Production Mgr 920

Subtotal 3128

Total Hrs 8279

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Example ndash Actual Production History

28

ProposedDuration - Months 7 9 24 12 Qty 30 39 110 50 End Date 11152006 982007 912009

Direct Labor Total Hrs HrsUnit Total Hours HrsUnit Total Hrs HrsUnit Total Hrs HrsUnitAssembly 1836 6120 1675 4295 4338 3944 1900 3800 Machinist 169 564 154 396 400 363 175 350 QA 368 1238 336 862 870 791 381 762 Engineer 1 115 383 105 269 272 247 119 238

Production Support Total Hrs Total Hrs Total Hrs Total Hrs HrsUnitMFG Supervisor 268 345 920 460 920 Eng Supervisor 107 138 184 184 368 QA Supervisor 268 345 920 460 920 Production Mgr 268 345 920 460 920

HrsUnit 8279

Acutal Production History - Part ABC

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Examples ndash Basis of Estimatebull Basis of estimate for direct labor

bull Proposed direct labor hours were developed by apply a 90 percent learningcurve to the production labor history for part BBC You need to provide abasis for the 90 percent curve

bull Basis of estimate for the manufacturing supervisorbull The manufacturing supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 920 hours were used over a 24-month periodSince the current proposal has been estimated to cover 12 months 460hours were applied to the manufacturing supervisor (920 divided by 2)

bull Basis of estimate for engineering supervisorbull The engineering supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 184 hours were necessary to complete the taskThis task is similar and so we estimate 184 hours

29

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Direct Costs (ODC)bull List other expenses not otherwise included under material and labor (eg

travel freight) and provide basis for pricing

bull For example the basis for travel would include the location number of tripsnumber of people attending and the estimated expenses for the travel

30FAR 15408 Table 15-2 II D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 24: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Provide a time-phased (eg monthly quarterly) breakdown of labor hours ratesand cost by appropriate category and furnish basis for estimates

24FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Proposed labor hours are generally a combination of direct and support laborhours

bull Direct Labor Hours ndash Hours that can be identified specifically to a final end itembull Support Labor Hours ndash Hours that cannot be specifically identified to one end item For

example a production manager may be in charge of overseeing the manufacturing ofmultiple parts

25FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull You need to provide a breakdown of the labor hours by labor category and

function along with a basis of estimate for the proposed labor hours

bull For example if you propose 500 hours for an end item you would need to providea breakdown by categoryfunction (assembly inspection supervisor engineeretc) You also will need to provide a detailed basis of estimate for eachcategoryfunction showing how your arrived at the hours for the proposed laborcategory

bull Generally the basis should be actual production history An alternative approach isthe use of engineering estimates if the item has not been manufactured before

bull Cost Accounting Standards (CAS) 401 requires that a company isconsistent between proposals and accounting practices The way acompany estimates its labor hours needs to also be the way it accumulatesits production history

26FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours ExampleProposal No HLQxxxxxDate January 1 20xx ABC Corporation

Labor HoursProposed Labor Hours ndash 8279 hrsunit for Part ABC

27

Direct Labor HrsUnitAssembly 3800 Machinist 350 QA 762 Engineer 1 238

Subtotal 5151

Production Support HrsUnitMfg Supervisor 920Eng Supervisor 368QA supervisor 920Production Mgr 920

Subtotal 3128

Total Hrs 8279

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Example ndash Actual Production History

28

ProposedDuration - Months 7 9 24 12 Qty 30 39 110 50 End Date 11152006 982007 912009

Direct Labor Total Hrs HrsUnit Total Hours HrsUnit Total Hrs HrsUnit Total Hrs HrsUnitAssembly 1836 6120 1675 4295 4338 3944 1900 3800 Machinist 169 564 154 396 400 363 175 350 QA 368 1238 336 862 870 791 381 762 Engineer 1 115 383 105 269 272 247 119 238

Production Support Total Hrs Total Hrs Total Hrs Total Hrs HrsUnitMFG Supervisor 268 345 920 460 920 Eng Supervisor 107 138 184 184 368 QA Supervisor 268 345 920 460 920 Production Mgr 268 345 920 460 920

HrsUnit 8279

Acutal Production History - Part ABC

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Examples ndash Basis of Estimatebull Basis of estimate for direct labor

bull Proposed direct labor hours were developed by apply a 90 percent learningcurve to the production labor history for part BBC You need to provide abasis for the 90 percent curve

bull Basis of estimate for the manufacturing supervisorbull The manufacturing supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 920 hours were used over a 24-month periodSince the current proposal has been estimated to cover 12 months 460hours were applied to the manufacturing supervisor (920 divided by 2)

bull Basis of estimate for engineering supervisorbull The engineering supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 184 hours were necessary to complete the taskThis task is similar and so we estimate 184 hours

29

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Direct Costs (ODC)bull List other expenses not otherwise included under material and labor (eg

travel freight) and provide basis for pricing

bull For example the basis for travel would include the location number of tripsnumber of people attending and the estimated expenses for the travel

30FAR 15408 Table 15-2 II D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 25: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull Labor Hours

bull Proposed labor hours are generally a combination of direct and support laborhours

bull Direct Labor Hours ndash Hours that can be identified specifically to a final end itembull Support Labor Hours ndash Hours that cannot be specifically identified to one end item For

example a production manager may be in charge of overseeing the manufacturing ofmultiple parts

25FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull You need to provide a breakdown of the labor hours by labor category and

function along with a basis of estimate for the proposed labor hours

bull For example if you propose 500 hours for an end item you would need to providea breakdown by categoryfunction (assembly inspection supervisor engineeretc) You also will need to provide a detailed basis of estimate for eachcategoryfunction showing how your arrived at the hours for the proposed laborcategory

bull Generally the basis should be actual production history An alternative approach isthe use of engineering estimates if the item has not been manufactured before

bull Cost Accounting Standards (CAS) 401 requires that a company isconsistent between proposals and accounting practices The way acompany estimates its labor hours needs to also be the way it accumulatesits production history

26FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours ExampleProposal No HLQxxxxxDate January 1 20xx ABC Corporation

Labor HoursProposed Labor Hours ndash 8279 hrsunit for Part ABC

27

Direct Labor HrsUnitAssembly 3800 Machinist 350 QA 762 Engineer 1 238

Subtotal 5151

Production Support HrsUnitMfg Supervisor 920Eng Supervisor 368QA supervisor 920Production Mgr 920

Subtotal 3128

Total Hrs 8279

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Example ndash Actual Production History

28

ProposedDuration - Months 7 9 24 12 Qty 30 39 110 50 End Date 11152006 982007 912009

Direct Labor Total Hrs HrsUnit Total Hours HrsUnit Total Hrs HrsUnit Total Hrs HrsUnitAssembly 1836 6120 1675 4295 4338 3944 1900 3800 Machinist 169 564 154 396 400 363 175 350 QA 368 1238 336 862 870 791 381 762 Engineer 1 115 383 105 269 272 247 119 238

Production Support Total Hrs Total Hrs Total Hrs Total Hrs HrsUnitMFG Supervisor 268 345 920 460 920 Eng Supervisor 107 138 184 184 368 QA Supervisor 268 345 920 460 920 Production Mgr 268 345 920 460 920

HrsUnit 8279

Acutal Production History - Part ABC

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Examples ndash Basis of Estimatebull Basis of estimate for direct labor

bull Proposed direct labor hours were developed by apply a 90 percent learningcurve to the production labor history for part BBC You need to provide abasis for the 90 percent curve

bull Basis of estimate for the manufacturing supervisorbull The manufacturing supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 920 hours were used over a 24-month periodSince the current proposal has been estimated to cover 12 months 460hours were applied to the manufacturing supervisor (920 divided by 2)

bull Basis of estimate for engineering supervisorbull The engineering supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 184 hours were necessary to complete the taskThis task is similar and so we estimate 184 hours

29

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Direct Costs (ODC)bull List other expenses not otherwise included under material and labor (eg

travel freight) and provide basis for pricing

bull For example the basis for travel would include the location number of tripsnumber of people attending and the estimated expenses for the travel

30FAR 15408 Table 15-2 II D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 26: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Laborbull You need to provide a breakdown of the labor hours by labor category and

function along with a basis of estimate for the proposed labor hours

bull For example if you propose 500 hours for an end item you would need to providea breakdown by categoryfunction (assembly inspection supervisor engineeretc) You also will need to provide a detailed basis of estimate for eachcategoryfunction showing how your arrived at the hours for the proposed laborcategory

bull Generally the basis should be actual production history An alternative approach isthe use of engineering estimates if the item has not been manufactured before

bull Cost Accounting Standards (CAS) 401 requires that a company isconsistent between proposals and accounting practices The way acompany estimates its labor hours needs to also be the way it accumulatesits production history

26FAR 15408 Table 15-2 II B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours ExampleProposal No HLQxxxxxDate January 1 20xx ABC Corporation

Labor HoursProposed Labor Hours ndash 8279 hrsunit for Part ABC

27

Direct Labor HrsUnitAssembly 3800 Machinist 350 QA 762 Engineer 1 238

Subtotal 5151

Production Support HrsUnitMfg Supervisor 920Eng Supervisor 368QA supervisor 920Production Mgr 920

Subtotal 3128

Total Hrs 8279

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Example ndash Actual Production History

28

ProposedDuration - Months 7 9 24 12 Qty 30 39 110 50 End Date 11152006 982007 912009

Direct Labor Total Hrs HrsUnit Total Hours HrsUnit Total Hrs HrsUnit Total Hrs HrsUnitAssembly 1836 6120 1675 4295 4338 3944 1900 3800 Machinist 169 564 154 396 400 363 175 350 QA 368 1238 336 862 870 791 381 762 Engineer 1 115 383 105 269 272 247 119 238

Production Support Total Hrs Total Hrs Total Hrs Total Hrs HrsUnitMFG Supervisor 268 345 920 460 920 Eng Supervisor 107 138 184 184 368 QA Supervisor 268 345 920 460 920 Production Mgr 268 345 920 460 920

HrsUnit 8279

Acutal Production History - Part ABC

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Examples ndash Basis of Estimatebull Basis of estimate for direct labor

bull Proposed direct labor hours were developed by apply a 90 percent learningcurve to the production labor history for part BBC You need to provide abasis for the 90 percent curve

bull Basis of estimate for the manufacturing supervisorbull The manufacturing supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 920 hours were used over a 24-month periodSince the current proposal has been estimated to cover 12 months 460hours were applied to the manufacturing supervisor (920 divided by 2)

bull Basis of estimate for engineering supervisorbull The engineering supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 184 hours were necessary to complete the taskThis task is similar and so we estimate 184 hours

29

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Direct Costs (ODC)bull List other expenses not otherwise included under material and labor (eg

travel freight) and provide basis for pricing

bull For example the basis for travel would include the location number of tripsnumber of people attending and the estimated expenses for the travel

30FAR 15408 Table 15-2 II D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 27: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours ExampleProposal No HLQxxxxxDate January 1 20xx ABC Corporation

Labor HoursProposed Labor Hours ndash 8279 hrsunit for Part ABC

27

Direct Labor HrsUnitAssembly 3800 Machinist 350 QA 762 Engineer 1 238

Subtotal 5151

Production Support HrsUnitMfg Supervisor 920Eng Supervisor 368QA supervisor 920Production Mgr 920

Subtotal 3128

Total Hrs 8279

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Example ndash Actual Production History

28

ProposedDuration - Months 7 9 24 12 Qty 30 39 110 50 End Date 11152006 982007 912009

Direct Labor Total Hrs HrsUnit Total Hours HrsUnit Total Hrs HrsUnit Total Hrs HrsUnitAssembly 1836 6120 1675 4295 4338 3944 1900 3800 Machinist 169 564 154 396 400 363 175 350 QA 368 1238 336 862 870 791 381 762 Engineer 1 115 383 105 269 272 247 119 238

Production Support Total Hrs Total Hrs Total Hrs Total Hrs HrsUnitMFG Supervisor 268 345 920 460 920 Eng Supervisor 107 138 184 184 368 QA Supervisor 268 345 920 460 920 Production Mgr 268 345 920 460 920

HrsUnit 8279

Acutal Production History - Part ABC

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Examples ndash Basis of Estimatebull Basis of estimate for direct labor

bull Proposed direct labor hours were developed by apply a 90 percent learningcurve to the production labor history for part BBC You need to provide abasis for the 90 percent curve

bull Basis of estimate for the manufacturing supervisorbull The manufacturing supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 920 hours were used over a 24-month periodSince the current proposal has been estimated to cover 12 months 460hours were applied to the manufacturing supervisor (920 divided by 2)

bull Basis of estimate for engineering supervisorbull The engineering supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 184 hours were necessary to complete the taskThis task is similar and so we estimate 184 hours

29

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Direct Costs (ODC)bull List other expenses not otherwise included under material and labor (eg

travel freight) and provide basis for pricing

bull For example the basis for travel would include the location number of tripsnumber of people attending and the estimated expenses for the travel

30FAR 15408 Table 15-2 II D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 28: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Example ndash Actual Production History

28

ProposedDuration - Months 7 9 24 12 Qty 30 39 110 50 End Date 11152006 982007 912009

Direct Labor Total Hrs HrsUnit Total Hours HrsUnit Total Hrs HrsUnit Total Hrs HrsUnitAssembly 1836 6120 1675 4295 4338 3944 1900 3800 Machinist 169 564 154 396 400 363 175 350 QA 368 1238 336 862 870 791 381 762 Engineer 1 115 383 105 269 272 247 119 238

Production Support Total Hrs Total Hrs Total Hrs Total Hrs HrsUnitMFG Supervisor 268 345 920 460 920 Eng Supervisor 107 138 184 184 368 QA Supervisor 268 345 920 460 920 Production Mgr 268 345 920 460 920

HrsUnit 8279

Acutal Production History - Part ABC

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Examples ndash Basis of Estimatebull Basis of estimate for direct labor

bull Proposed direct labor hours were developed by apply a 90 percent learningcurve to the production labor history for part BBC You need to provide abasis for the 90 percent curve

bull Basis of estimate for the manufacturing supervisorbull The manufacturing supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 920 hours were used over a 24-month periodSince the current proposal has been estimated to cover 12 months 460hours were applied to the manufacturing supervisor (920 divided by 2)

bull Basis of estimate for engineering supervisorbull The engineering supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 184 hours were necessary to complete the taskThis task is similar and so we estimate 184 hours

29

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Direct Costs (ODC)bull List other expenses not otherwise included under material and labor (eg

travel freight) and provide basis for pricing

bull For example the basis for travel would include the location number of tripsnumber of people attending and the estimated expenses for the travel

30FAR 15408 Table 15-2 II D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 29: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Labor Hours Examples ndash Basis of Estimatebull Basis of estimate for direct labor

bull Proposed direct labor hours were developed by apply a 90 percent learningcurve to the production labor history for part BBC You need to provide abasis for the 90 percent curve

bull Basis of estimate for the manufacturing supervisorbull The manufacturing supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 920 hours were used over a 24-month periodSince the current proposal has been estimated to cover 12 months 460hours were applied to the manufacturing supervisor (920 divided by 2)

bull Basis of estimate for engineering supervisorbull The engineering supervisorrsquos time is based on the latest production history

for Part ABC The latest production history for Part ABC (shown on theprevious page) shows that 184 hours were necessary to complete the taskThis task is similar and so we estimate 184 hours

29

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Direct Costs (ODC)bull List other expenses not otherwise included under material and labor (eg

travel freight) and provide basis for pricing

bull For example the basis for travel would include the location number of tripsnumber of people attending and the estimated expenses for the travel

30FAR 15408 Table 15-2 II D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 30: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Direct Costs (ODC)bull List other expenses not otherwise included under material and labor (eg

travel freight) and provide basis for pricing

bull For example the basis for travel would include the location number of tripsnumber of people attending and the estimated expenses for the travel

30FAR 15408 Table 15-2 II D

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 31: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Nonrecurring Expenses (NRE)bull NRE refers to one-time costs that you would not normally see from proposal

to proposal

bull Examples of NRE are as follows

bull Special Toolingbull New Equipmentbull Equipment Refurbishmentbull Hours and materials associated with increase throughput capacitybull Hours and materials to research develop design and test new processesbull One-Time review events

31FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 32: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

NREbull As mentioned earlier NRE charges must be broken out by cost element

This means the material and labor components associated with the NREare clearly broken out

bull Material ndash any material associated with NRE should be supported by supplierquotes or purchase orders

bull Labor ndash labor hours associated with NRE should have basis of estimates(BOE) that are broken down by labor category and include detaileddescriptions of the tasks that will be performed

32FAR 15408 Table 15-2 II

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 33: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Rates include direct labor overhead general and administrative expenses

(GampA) and cost of money (COM)

bull PSEMC has the capability to perform rate audits on suppliers in lieu ofhaving the DCAA do this

bull If you allow PSEMC to perform this rate audit you need to provide thefollowing information

bull Explanation as to how the rates were calculatedbull Detailed documentation (financial statements labor pools listing of unallowable

expenses etc) that support the rate calculationsbull If the detailed documentation is based on budgetary numbers you will also need

to provide three years of your most current actuals to support you budgetarynumbers

bull If budgetary numbers differ significantly from the most recent actuals providedetailed explanations for these differences

33FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 34: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Ratesbull Facilities Capital COM

bull When you elect to claim COM submit a completed form CASB-CFM (FacilitiesCapital Cost of Money Factors Computation) in accordance with FAR 31205-10Also complete DD Form 1861 and include a copy in your proposal submissionBoth forms can be found on-line at various locations

34FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 35: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull In summary all noncompetitive noncommercial proposals valued at more

than the cost and pricing threshold (TINA) are required to include thefollowing information

35

Required Items Page FAR Reference

Supplier Proposal Adequacy Checklist Pg 5-6 PSEMC Policy

Cover Sheet - SF1411 or equivalent Pg 7-8 FAR 15408 Table 15-2 I A

Index Pg 9-10 FAR 15408 Table 15-2 I B

Cost Element Breakdown Pg 11-12 FAR 15408 Table 15-2 I D

Summary Cost Element Breakdown Pg 13-15 FAR 15408 Table 15-2 I E

Material (Including Consolidated BOM) Pg 16-23 FAR 15408 Table 15-2 II A

Labor Pg 24-29 FAR 15408 Table 15-2 II B

ODC Pg 30 FAR 15408 Table 15-2 II D

NRE Pg 31-32 FAR 15408 Table 15-2 II

Rates Pg 33-34 FAR 15408 Table 15-2 II C

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 36: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Summarybull Sufficient rationale and supporting documentation to support each of the

proposed cost elements is also required

bull Obtaining adequate supplier proposals is always on the critical path sincePSEMC cannot submit its proposal to the government until it has receivedadequate proposals from its subcontractors Therefore it is critical thatadequate supplier proposals are obtained as quickly as possible

36

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 37: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Other Types of Proposalsbull Commercial item proposals

bull Change proposals

bull The following slides are only applicable in certain situations

37

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 38: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you or one of your suppliers is providing a commercial part cost or pricing

data and a cost analysis is not required However you must demonstrate that the part is commercial and that the price is reasonable

bull A commercial item is any item other than real property that is a type customarily used by the general public or by a nongovernment entity

bull Has also been sold leased or licensed to the general public or has been offered for sale lease or license to the general public

bull A final commercial determination is made by the government contracting officer If the items is deemed to not be commercial the supplier is required to submit a complete proposal that includes cost and pricing data

38FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 39: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull If you claim one or more of your parts are commercial you need to support

your position by providing the following information

bull Copies of applicable portions of a company catalogue or website address that shows the item with a description and unit price

bull Show that these items can be purchased by the general public or nongovernmentalagency

bull If a website or catalogue is not available copies of invoices showing the sale of these items to nongovernment entities is sufficient

39FAR 2101 and FAR 15403

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 40: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Commercial Items (if applicable)bull PSEMC policy requires suppliers to complete a PSEMC Supplier Proposal

Adequacy Checklist (sent with the RFP) for all proposals where the supplierclaims its parts are commercial

bull An example of the Supplier Proposal Adequacy Checklist for commercialitems is attached reference form DI-SUP-310F01

40PSEMC Policy

Pacific Scientific EMC ndash Commercial Item Status

If claiming an exemption offeror must provide the appropriate information to determine commerciality Refusal to provide the required information can result in an assist audit being requested from the Defense Contract Audit Agency or other cognizant Government Audit Agencies and or a determination that goods andor services offered do not constitute a ldquocommercial itemrdquo

Offeror hereby represents that to the best of its knowledge information and belief goods andor services offered constitute a ldquocommercial itemrdquo as defined by FAR 2101 because it constitutes

A Commercial Item or Component Justification (required for any claim)

Key Inquiries and Summary of your Supporting Information

What is the relevant ldquotyperdquo of item enspenspenspenspensp

What are the types of items uses by the general public or by non-governmental entities for other than governmental purposes enspenspenspenspensp

What indicates the type of itemrsquos use described above is customary enspenspenspenspensp

Has the offered item itself (as opposed to the type of item) been sold or offered for sale

|_| Yes|_| NO

Are the offered itemrsquos sales (or offers to sale) to the general public

|_| Yes|_| NO

Please provide data regarding sales leases or licenses of this item and identification of the non-government use entities

ValueNon-Government Use Entities

(date)(date)

In addition as an appendix to this commercial item determination provide supporting documentation in the form of

1that have not materialized into sales

2that have not materialized into leases

3that have not materialized into licenses

1 Verification of sales history to source documents

2 Identification of customarily offered discounts for the item

3 Verification of the item to an existing catalog or price list and

4 Verification of historical data for an item previously not determined commercial that the offeror is now trying to qualify as a commercial item

(check box(es) as appropriate)

|_| I Unmodified Commercial Items or Components (Complete Section A)

Any item other than real property that is a of a type customarily used by the general public or by nongovernmental entities for purposes other than governmental purposes and

(i) Has been sold leased or licensed to the general public or

(ii) Has been offered for sale lease or license to the general public

|_| II Item Evolved from Commercial Items or Components

Any item that evolved from an item described in Part I (which is required if claiming this exemption) of this definition through advances in technology or performance and that is not yet available in the commercial marketplace but will be available in the commercial marketplace in time to satisfy the delivery requirements under a United States Government solicitation

If claiming the item Evolved from Commercial Items or Components exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use Part I)

|_| Yes|_| NO

If yes describe the relationship of the modifications to the Federal Government requirement enspenspenspenspensp

What are the advances in technology or performance between the offered item and the commercial item on which it is based enspenspenspenspensp

What is your support for such advances enspenspenspenspensp

What is your support for availability of the item in time to meet requirements Is the claim availability reasonable enspenspenspenspensp

Please provide data regarding

(a) Currently pending offers including

(b) Planned Offers Including

In all instances scheduled for delivery no later than the delivery requirements under the

(c) Data in the format of Part I for completed sales of the item from which the ldquocommercial itemrdquo evolved

|_| III Modified Commercial Items or Components

Any item that would satisfy a criterion expressed in Part I or II hereof but for -

|_| (i) Modifications of a type customarily available in the commercial marketplace

If claiming Modified Commercial Item or Components that are of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Key Inquiries and Summary of Your Supporting Information

Does the item on which the offered item is based qualify as a commercial item (use part I or parts II and II)

|_| Yes|_| NO

What are the modifications that would be made to the commercial item enspenspenspenspensp

Are the modifications of a type customarily available in the commercial marketplace

|_| Yes|_| NO

Summarize your support for customary availability of the modification in the commercial marketplace enspenspenspenspensp

|_| (ii) Minor modifications of a type not customarily available in the commercial marketplace made to meet federal government requirements ldquoMinor modificationsrdquo means modifications that do not significantly alter the nongovernmental function or essential physical characteristics of an item or component or change the purpose of a process Factors to be considered in determining whether a modification is minor include the value and size of the modification and the comparative value and size of the final product Dollar values and percentages may be used as guideposts but are not conclusive evidence that a modification is minor

If claiming Modified Commercial Items or Components that are not of a type customarily available in the commercial marketplace then the following information (in addition to Section A) must be provided

Are the modifications made to satisfy Federal Government requirements

|_| Yes|_| NO

Do the modifications alter the nongovernmental function or essential physical characteristics of the item

|_| Yes|_| NO

If yes what are the alterations enspenspenspenspensp

Does the modified item retain a predominance of nongovernmental functions or physical characteristics

|_| Yes|_| NO

Summarize your support describing the value of the modifications in comparison to the value of the final product enspenspenspenspensp

Summarize your support for the magnitude or size of the modifications in relation to the magnitude or size of the final product enspenspenspenspensp

Are there any other factors which would allow you to conclude that the modifications are minor

|_| Yes|_| NO

If yes what are they enspenspenspenspensp

Based on the above does the modification qualify as a minor modification

|_| Yes|_| NO

Please provide data regarding the minor modification and the total price to PSEMC of Minor Modifications

Price to PSEMC of all Minor Modifications at quantities proposed in this pricing action enspenspenspenspensp

Minor modifications that exceed the thresholds in FAR 15403-1(c)(3)(iii)(B) are subject to the Certified Cost or Pricing Data requirements and must be proposed as described by FAR 15408 Table 152

|_| IV Commercial Items Support Services

Installation services maintenance services repair services training services and other services if -

(i) Such services are procured for support of an item referred to in Parts I II III or IV hereof regardless of whether such services are provided by the same source or at the same time as the item and

(ii) The source of such services provided similar services contemporaneously to the general public under terms and conditions similar to those offered to the Federal Government

If claiming Commercial Item Support Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services procured for the support of a commercial item which qualifies under a preceding part

|_| Yes|_| NO

Describe the nature of the services and how they support the commercial item enspenspenspenspensp

Are the services provided at the same time to the general public and the Federal Government

|_| Yes|_| NO

Are the terms and conditions for the services similar to those offered to the general public

|_| Yes|_| NO

Describe differences enspenspenspenspensp

Please provide data regarding

a Open and completed contracts including

b Pending offers including

|_| V Any Combination of Items

Meeting the requirements of Parts I II III or IV hereof that are of a type customarily combined and sold in combination to the general public

If you have checked the above box and are claiming the Any Combination of Items exemption please attach hereto information as requ3sted for Parts I II III and IV

|_| VI Other Commercial Services

Services of a type offered and sold competitively in substantial quantities in the commercial marketplace based on established catalog or market prices for specific tasks performed or specific outcomes to be achieved and under standard commercial terms and conditions For purposes of these services -

(i) Catalog price means a price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor is either published or otherwise available for inspection by customers and states prices at which sales are currently or were last made to a significant number of buyers constituting the general public and

(ii) Market prices means current prices that are established in the course of ordinary trade between buyers and sellers free to bargain and that can be substantiated through competition or from source independent of the offerors

If claiming the Other Commercial Services exemption then the following information must be provided

Key Inquiries and Summary of Your Supporting Information

Are the services sold competitively in substantial quantities in the commercial marketplace

|_| Yes|_| NO

If no are the services of a type sold in substantial quantities in the commercial marketplace

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If yes what is the ldquotyperdquo of service enspenspenspenspensp

Summarize your support for same enspenspenspenspensp

Are the prices quoted for specific tasks performed or specific outcomes to be achieved

|_| Yes|_| NO

Are the services offered consistent with your standard terms and conditions

|_| Yes|_| NO

Are the services of a type sold at catalog or market prices

|_| Yes|_| NO

If sold at catalog price is the price included in a catalog price list schedule or other form that is regularly maintained by the manufacturer or vendor

|_| Yes|_| NO

If sold at catalog price is the catalog or its equivalent either published or otherwise available for inspection by customers

|_| Yes|_| NO

Summarize your support for same (include a copy of the catalog or provide location) enspenspenspenspensp

If sold at a catalog price are the listed prices those at which sales are currently or were last made to a significant number of buyers in the general public

|_| Yes|_| NO

Summarize your support for same enspenspenspenspensp

If sold at a market price are the prices established in the course of ordinary trade between buyers and sellers free to bargain

|_| Yes|_| NO

Summarize you support for same enspenspenspenspensp

If sold at market price can the price be substantiated through competition or from sources independent of the offeror

|_| Yes|_| NO

Summarize your support for same

Please provide data regarding

(a) Open and completed contracts including

(b) Pending Offers including

|_| VII Any Item Combination of Items or Service

Referred to in Parts I through VI hereof notwithstanding the fact that the item combination of items or service is transferred between or among separate divisions subsidiaries or affiliates of the Offeror

If you have checked the above box and are claiming the ldquoAny item combination of items or Servicerdquo exemption please provide data regarding

|_| VIII Non-developmental Items

A non-developmental item as defined in FAR 2101 which has been developed exclusively at private expense and sold in substantial quantities on a competitive basis to multiple State and local governments

If claiming the Non-developmental Items exemption then the following must be provided

Key Inquiries and Summary of Supplierrsquos Supporting Information

Was the item previously developed

|_| Yes|_| NO

Was the item used exclusively for governmental purposes by a Federal agency a State or local government or a foreign government with which the United States has mutual defense cooperation agreement

|_| Yes|_| NO

If the item is to be modified do the modifications comply with Part III guidance on modifications

|_| Yes|_| NO

If the item is not yet in use does it otherwise qualify as a non-developmental item

|_| Yes|_| NO

Was the item developed exclusively at private expense

|_| Yes|_| NO

Is the item sold in substantial quantities on a competitive basis to multiple State and local governments

|_| Yes|_| NO

Please provide data regarding

|_| IX General Inquiries

Does the item qualify as a combination of items under Parts I II III and IV above

|_| Yes|_| NO

Has the item or services previously been determined to be commercial

|_| Yes|_| NO

If so by whom enspenspenspenspensp

|_| X Other Information

Is there other information of which you are aware that would supplement the information provided and would help substantiate whether the item or service is commercial

|_| Yes|_| NO

Have you provided such information

|_| Yes|_| NO

List such information enspenspenspenspensp

|_| XI Supplier Determination

Offeror hereby represents that the foregoing information is accurate and complete and that to the best of its knowledge information and belief goods and or services offered currently constitute ldquoa commercial itemrdquo as defined by FAR 2101

For PSEMC Internal Use Only

XII Supplier Determination

Supplier has claimed that the item component or service identified above is a commercial item under the definition at FAR 2101 I have reviewed and summarized the supplierrsquos support for that claim in the appropriate sections above Based on such review of such support information and any other information identified elsewhere herein I conclude that the supplier

|_| HAS |_| HAS NOT Supported its claim of commercial item status under the definition at FAR 2101

If the supplier HAS NOT supported its claim list reasons enspenspenspenspensp

Describe action plat to resolve enspenspenspenspensp

Comments enspenspenspenspensp

image1jpeg

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist

Buyer (Type or Print Name)

Date

Offeror

By

Title

Date

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(iii) Total number of customers involved in such sales

enspenspenspenspensp

(a) Transfer price(s) of such goods

$ enspenspenspenspensp

(b) Total units of such goods and or

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total for such services

enspenspenspenspensp

(i) Prices

$ enspenspenspenspensp

(ii) Total Units

enspenspenspenspensp

Unmodified Items Identified in Part 1

Modified Items Proposed to PSMEC

Unit Value of Modification

Unmodified Item

Unmodified Price

Modified Item

Modified Price to PSEMC

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

i Unit Prices

$ enspenspenspenspensp

ii Total Units

$ enspenspenspenspensp

To the general public in the time-frame beginning

enspenspenspenspensp

enspenspenspenspensp

and ending

enspenspenspenspensp

(a) Sales

(b) Leases

(c) Licenses

(d) Offers to Sell 1

(e) Offers to Lease 2

(f) Offers to License 3

Part Number

Description

Offeror

Page 41: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull This section of Table 15-2 describes the format an estimating approach we

are required to use when developing a proposal to modify an existingcontract In addition to the cost element breakdowns required as describedin the previous slides when there is a modification or change proposal FARalso requires the following table to be inserted into your proposal

41

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist
Page 42: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals

42FAR 15408 Table 15-2 III B

B Change Orders modifications and claims

Cost ElementsEstimated Cost of all

Work Deleted

Cost of Deleted Work

Already Performed

Net Cost to be Deleted

Cost of Work Added

Net cost of Change

Reference

(1) (2) (3) (4) (5) (6) (7)

Column 2 includes the cost of all work deleted This

includes cost of work deleted already performed (amount in Column 3) and

cost of work deleted not yet performed (Column 4)

Column 3 includes the cost of deleted work already

performed This amount will not be included in the credit (delete) adjustment amount (eg we will not give back costs already

incurred)

Column 4 includes cost for deleted work not yet performed ndash must be priced using current

estimates (but the current estimate may be the same as

the original estimate) ndash it is develed similar to a normal ldquoaddrdquo proposal with a few

exceptions

Column 5 includes the cost of the

new work and is developed as we do any

other proposal

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist
Page 43: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull Detail for columns listed on previous page

1 Enter appropriate cost element2 Enter current estimates of what it would take to complete the deleted work that

has not yet been performed3 Enter current cost of deleted work already performed This should be based on

actuals and copies to support these actuals should be included in the proposal4 Enter the net cost to be deleted (Column 2 minus Column 3)5 Enter your estimate for cost of work added by the change6 Enter the net cost of change (Column 5 minus Column 4)7 Identify where in your proposal the supporting documentation and basis of

estimate can be found for each of these sections

43FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist
Page 44: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull For purposes of determining if a proposal an cost or pricing data are

required from individual suppliers on a change proposal the absolute valueof the ldquodeleterdquo amount plus the ldquoaddrdquo amount is computed for each supplierthat exceeds the cost and pricing threshold (TINA)

bull Remember from FAR 15403-4(b) ndash if the absolute value for an individualsupplier exceeds the cost and pricing threshold (TINA) and the supplier iseither an actual supplier (will continue to provide partsservices on thiscontract) the supplier is required to provide a proposal and cost or pricingdata in support of the change proposal

bull Deleted amount is our current estimate (generally no the original contractvalue unless it is our current estimate)

44FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist
Page 45: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposalsbull If a supplierrsquos quantities are changing due to a modification the net delete

or add amount is used to determine if the supplier exceeds the cost andpricing threshold (TINA)

bull The estimator should not consider the old quantity as the delete and thenew quantity as the add (eg in computing absolute value) whendetermining if the supplier exceeds the threshold in cases where quantitiesare changing

bull The development of the appropriate deletion is not simply the estimatedcost of the deleted quantity ndash this will overstate the credit

45FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist
Page 46: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Change Proposals Cost of WorkDeleted for a Partial Deleted Quantitybull In cases where part of a material quantity is being deleted (eg original

contract requires 100 widgets and the contract is modified to delete 30 ofthem) one method of estimating the amount of the delete is

1 Develop a current estimate of the extended cost for the item(s) given the originalquantity

2 Develop a current estimate of the extended cost for the items at the lower(remaining) quantity

3 The delta between these two values represents the amount of the delete

bull The same method can be used if the contract is modified to increase aquantity for a part

46FAR 15408 Table 15-2 III B

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist
Page 47: Supplier Proposal Adequacy Guidelines - PacSci EMC · ABB and the NRE. See the next slide for an example. * Slight differences due to rounding. 11 Part Number Quantity. Unit Price

PacSci EMC Proprietary Rights are included in the information disclosed herein Information is furnished for evaluation purposes only and shall no be used disclosed or reproduced for any purposes without the expressed written consent of PacSci EMC

Supplier Proposal Adequacy Checklist

47

bull The Supplier Proposal Adequacy Checklist is accessed from the externalPSEMC supplier website

bull Additional supplier proposal guidance and resources are available(information templates and tools to assist in building a FAR compliantproposal

bull Supplier proposal guidance

bull Supplier Proposal Adequacy Guidelines

bull PSEMC document templates

bull Supplier proposal adequacy checklistbull Contract pricing proposal cover sheet

httpspsemccomsuppliers

  • Strategic Affordability Analysis
  • Purpose of this Guideline
  • Table of Contents
  • Table of Contents
  • Supplier Proposal Adequacy Checklist
  • Supplier Proposal AdequacyChecklist Example ndash Reference DI-SUP-105F03
  • Cover Sheet
  • Cover Sheet Example ndash Reference Form DI-SUP-105F02
  • Index
  • Index Example
  • Cost Element Breakdown by Line Item
  • Cost Element Breakdown by Line Item Example
  • Summary Cost Element Breakdown
  • Summary Cost Element Breakdown - Example
  • Summary Cost Element Breakdown - Example
  • Material
  • Material
  • Individual Bills of Material Example
  • Consolidated Bill of Material Example
  • Consolidated Bill of Material
  • Material
  • Material
  • Material
  • Labor
  • Labor
  • Labor
  • Labor Hours Example
  • Labor Hours Example ndash Actual Production History
  • Labor Hours Examples ndash Basis of Estimate
  • Other Direct Costs (ODC)
  • Nonrecurring Expenses (NRE)
  • NRE
  • Rates
  • Rates
  • Summary
  • Summary
  • Other Types of Proposals
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Commercial Items (if applicable)
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals
  • Change Proposals Cost of WorkDeleted for a Partial Deleted Quantity
  • Supplier Proposal Adequacy Checklist