    SNP: Optimizer: Feasible Solutionfor different Production Costs inNetwork

    Appl ies to:

    SCM 5.0 Supply Network Planning Optimizer. For more information, visit the Supply Chain Managementhomepage.

    Summary

    The SNP optimizer offers cost-based planning. This means that it searches through all feasible plans in anattempt to find the most cost-effective (in terms of total costs).

    Total costs refers to the following:

    - Production, procurement, storage, and transportation costs

    - Costs for increasing the production capacity, storage capacity, transportation capacity, and

    - handling capacity

    - Costs for violating (falling below) the safety stock level

    - Costs for late delivery

    - Stockout (Non-delivery) costs

    This Article covers deriving Feasible solution (Minimum Cost solution) for selected SNP Network duringOptimizer Run, when

    - Different Production Costs in MFG Locations- Same Procurement Costs for Raw Material at MFG Locations- Same Transportation Costs from MFG Locations to Distribution Center- High Non-Delivery Costs to fulfill Sales Order at DC.

    Author : J anakiram Katakam

    Company: Intelligroup Inc

    Created on: 19th December 2008

    Author Bio

    J anakiram Katakam has over 12 years of experience in Supply Chain Management. He is a Senior BusinessConsultant with 6+years of experience in PP/PP-PI/SNP Implementations / Upgrades and technical Support.

    He has delivered on many complex projects in Energy Sector, Pharmaceuticals and Consumer ProductsIndusties.

    SAP DEVELOPER NETWORK | sdn.sap.com BUSINESS PROCESS EXPERT COMMUNITY | bpx.sap.com

    2008 SAP AG 1

    https://www.sdn.sap.com/irj/sdn/bpx-scmhttps://www.sdn.sap.com/irj/sdn/bpx-scmhttps://www.sdn.sap.com/irj/sdn/bpx-scmhttps://www.sdn.sap.com/irj/sdn/bpx-scm
  • 7/30/2019 Supply Network Planning Optimizer Feasible Solution for Different Production Costs in Network

    2/17

    SNP: Optimizer: Feasible Solution for different Production Costs in Network

    Table of Contents

    SNP Distribution Network Used for Optimizer scenario: ....................................................................................3Scenario Details: Different Production Costs at Manufacturing Plant Locations............................................4High No Delivery Penalty Cost Maintenance:.................................................................................................4Production Costs Maintenance:......................................................................................................................5Transportation Costs Maintenance:................................................................................................................6Procurement Costs Maintenance:...................................................................................................................7

    Procurement Costs are maintained as 10 (per EA) for Product OPT_RAW_1 at Location 3200. .....................7Procurement Costs are maintained as 10 (per EA) for Product OPT_RAW_1 at Location 3300. .....................8

    Costs Summary:..............................................................................................................................................8Solution1:.....................................................................................................................................................................9Solution2:.....................................................................................................................................................................9Feasible Solution: ........................................................................................................................................................9

    Verification of Feasible Solution through Optimizer Run:.................................................................................10Verification of Created Receipt Elements for selected Path (network): ...........................................................12Conclusion:.......................................................................................................................................................15Related Content................................................................................................................................................16Disclaimer and Liability Notice..........................................................................................................................17

    SAP DEVELOPER NETWORK | sdn.sap.com BUSINESS PROCESS EXPERT COMMUNITY | bpx.sap.com

    2008 SAP AG 2

  • 7/30/2019 Supply Network Planning Optimizer Feasible Solution for Different Production Costs in Network

    3/17

    SNP: Optimizer: Feasible Solution for different Production Costs in Network

    SNP Distr ibution Network Used for Optimizer scenario:

    SNP Distribution Network has

    - One Distribution Center (3400)

    - Two Manufacturing Plants (3200, 3300)

    - Transportation Lanes (TLs) exist between 3200, 3400 and 3300, 3400.

    - Product OPT_FIN_1 exists in Locations 3200, 3300 and 3400

    - Product OPT_FIN_1 is externally procured at DC 3400 and In-House produced at Manufacturing Plants3200, 3300.

    - Product OPT_RAW_1 is externally Procured at Manufacturing Plants 3200 and 3300.

    - OPT_FIN_1 Product specific Transportation Lanes are created for Source Locations 3200, 3300 toDestination Location 3400.

    - High No delivery Penalty Cost maintained for product OPT_FIN_1 at DC 3400.

    - Production Costs are maintained in PPMs for Product OPT_FIN_1 for Manufacturing Locations 3200and 3300.

    - Transportation Costs are maintained in Means of Transport for Product OPT_FIN_1 between SourceLocations 3200, 3300 and Destination Location 3400.

    - Procurement Costs are maintained for product OPT_RAW_1 in Product Master at Manufacturing PlantLocations 3200 and 3300.

    SAP DEVELOPER NETWORK | sdn.sap.com BUSINESS PROCESS EXPERT COMMUNITY | bpx.sap.com

    2008 SAP AG 3

  • 7/30/2019 Supply Network Planning Optimizer Feasible Solution for Different Production Costs in Network

    4/17

    SNP: Optimizer: Feasible Solution for different Production Costs in Network

    Scenario Details: Different Production Costs at Manufacturing Plant Locations

    In this scenario,

    - High No delivery Penalty Cost maintained for product OPT_FIN_1 at DC 3400 so that Receipt elementwill be created for Sales Order for OPT_FIN_1 material at DC 3400.

    - Different Production Costs are maintained at Manufacturing Plants 3200, 3300 for Product OPT_FIN_1in PPMs.

    - Same Procurement Costs are maintained for Product OPT_RAW_1 at Manufacturing Plants 3200,3300 in Product Master.

    - Same Transportation Costs are maintained for Product OPT_FIN_1 between Source Locations 3200,3300 and Destination Location 3400 In the Means of Transport.

    High No Delivery Penalty Cost Maintenance:

    No Del. Penalty cost is maintained for Customer Demand so that During Optimizer runs, Receipt Elementsare created.

    Note: If No Delivery Penalty cost is NOT maintained for Customer Demand, then during Optimizer Run, No receiptelement get created against Sales Order as by non-delivering the sales Order, there is no penalty cost is incurred.

    SAP DEVELOPER NETWORK | sdn.sap.com BUSINESS PROCESS EXPERT COMMUNITY | bpx.sap.com

    2008 SAP AG 4

  • 7/30/2019 Supply Network Planning Optimizer Feasible Solution for Different Production Costs in Network

    5/17

    SNP: Optimizer: Feasible Solution for different Production Costs in Network

    Production Costs Maintenance:

    PPM details for OPT_FIN_1 material and Plant 3200

    Production Cost is maintained as 100 per each. This cost is maintained against Variable as shown above.

    So, Production Cost for Material OPT_FIN_1 in Plant 3200 =100 (per EA)

    PPM details for OPT_FIN_1 material and Plant 3300

    Production Cost is maintained as 1000 per each. This cost is maintained against Variable as shown above.

    So, Production Cost for Material OPT_FIN_1 in Plant 3300 =1000 (per EA)

    SAP DEVELOPER NETWORK | sdn.sap.com BUSINESS PROCESS EXPERT COMMUNITY | bpx.sap.com

    2008 SAP AG 5

  • 7/30/2019 Supply Network Planning Optimizer Feasible Solution for Different Production Costs in Network

    6/17

    SNP: Optimizer: Feasible Solution for different Production Costs in Network

    Transportation Costs Maintenance:

    Transportation Lane details between Source Location 3200 (Mfg Location) and Destination Location 3400(DC)

    Transportation Costs are maintained as 10 per EA for Means of Transport 0001 as shown above.OPT_FIN_1 Product is added to this Transport Lane as displayed above.

    Note: FTL TRUCK Transport Lane is maintained with High Transport Cost so that our scenario will not consider FTLTruck Means of Transport during Optimizer Run.

    So, Transportation Costs from 3200 to 3400 =10 (per EA).

    Transportation Lane details between Source Location 3300 (Mfg Location) and Destination Location 3400(DC)

    SAP DEVELOPER NETWORK | sdn.sap.com BUSINESS PROCESS EXPERT COMMUNITY | bpx.sap.com

    2008 SAP AG 6

  • 7/30/2019 Supply Network Planning Optimizer Feasible Solution for Different Production Costs in Network

    7/17

    SNP: Optimizer: Feasible Solution for different Production Costs in Network

    Transportation Costs are maintained as 10 per EA for Means of Transport FTL_TRUCK as shown above.OPT_FIN_1 Product is added to this Transport Lane as displayed above.

    So, Transportation Costs from 3300 to 3400 =10 (per EA).

    Procurement Costs Maintenance:

    Procurement Costs details for Product OPT_RAW_1 at Location 3200

    Procurement Costs are maintained as 10 (per EA) for Product OPT_RAW_1 at Location 3200.

    Procurement Costs details for Product OPT_RAW_1 at Location 3300

    SAP DEVELOPER NETWORK | sdn.sap.com BUSINESS PROCESS EXPERT COMMUNITY | bpx.sap.com

    2008 SAP AG 7

  • 7/30/2019 Supply Network Planning Optimizer Feasible Solution for Different Production Costs in Network

    8/17

    SNP: Optimizer: Feasible Solution for different Production Costs in Network

    Procurement Costs are maintained as 10 (per EA) for Product OPT_RAW_1 at Location 3300.

    Costs Summary:

    During Optimizer Run, system needs to choose Minimized Cost Solution. In this Scenario, There is SalesOrder 100 EA for Product OPT_FIN_1 at DC Location 3400.

    SAP DEVELOPER NETWORK | sdn.sap.com BUSINESS PROCESS EXPERT COMMUNITY | bpx.sap.com

    2008 SAP AG 8

  • 7/30/2019 Supply Network Planning Optimizer Feasible Solution for Different Production Costs in Network

    9/17

    SNP: Optimizer: Feasible Solution for different Production Costs in Network

    As there are Two Paths of fulfilling this Sales Order requirement, there are TWO possible Solutions.

    Solution1:

    Total Cost Incurred for supply Network chosen between 3200 and 3400 to fulfill Sales Order of 100quantity at DC 3400

    =Transportation Costs from source Location 3200 to Destination Location 3400 for Product OPT_FIN_1 +Production Costs Incurred for Product OPT_FIN_1 at MFG Location 3200 +Procurement Costs Incurred forProduct OPT_RAW_1 at MFG Location 3200

    =10 (Transportation Cost per EA) * 100 (sales Order Quantity) +100 (Production Costs per EA) * 100 (salesOrder Quantity) +10 (Procurement Costs per EA) * 100 (sales Order Quantity)

    =1000 +10000 +1000

    =12000

    Note: OPT_FIN_1 has a BOM Structure such that to produce one quantity of OPT_FIN_1, it needs one quantity ofOPT_RAW_1 and hence The requirement quantity of Product OPT_RAW_1 will be equal to Sales Order quantityfor Product OPT_FIN_1.

    Solution2:

    Total Cost Incurred for supply Network chosen between 3300 and 3400 to fulfill Sales Order of 100quantity at DC 3400

    =Transportation Costs from source Location 3300 to Destination Location 3400 for Product OPT_FIN_1 +Production Costs Incurred for Product OPT_FIN_1 at MFG Location 3300 +Procurement Costs Incurred forProduct OPT_RAW_1 at MFG Location 3300

    =10 (Transportation Cost per EA) * 100 (sales Order Quantity) +1000 (Production Costs per EA) * 100(sales Order Quantity) +10 (Procurement Costs per EA) * 100 (sales Order Quantity)

    =1000 +100000 +1000

    =102000

    Feasible Solution:

    Comparing the Solutions 1 and 2, The Solution 1 has lowest cost incurred and hence becomes the FeasibleSolution.

    SAP DEVELOPER NETWORK | sdn.sap.com BUSINESS PROCESS EXPERT COMMUNITY | bpx.sap.com

    2008 SAP AG 9

  • 7/30/2019 Supply Network Planning Optimizer Feasible Solution for Different Production Costs in Network

    10/17

    SNP: Optimizer: Feasible Solution for different Production Costs in Network

    Verification of Feasible Solution through Optimizer Run:

    SNP Planning Book displayed with Sales Order of 100 Quantity is displayed with its details for ProductOPT_FIN_1 at Location 3400 (DC). Now, Optimizer needs to fulfill this Sales Order requirement.

    Now select all Location Products in the Network and Click on Optimizer run button.

    SAP DEVELOPER NETWORK | sdn.sap.com BUSINESS PROCESS EXPERT COMMUNITY | bpx.sap.com

    2008 SAP AG 10

  • 7/30/2019 Supply Network Planning Optimizer Feasible Solution for Different Production Costs in Network

    11/17

    SNP: Optimizer: Feasible Solution for different Production Costs in Network

    Now, On the SNP Optimizer screen, Parameters are chosen for Optimization Profile and Cost Profile asshown below and click on Start Optimization run button

    Optimizer Statuses sequence are displayed on Left side and generated Messages are displayed on the rightside. We can see the various Master data selected during Optimization run through Messages.

    SAP DEVELOPER NETWORK | sdn.sap.com BUSINESS PROCESS EXPERT COMMUNITY | bpx.sap.com

    2008 SAP AG 11

  • 7/30/2019 Supply Network Planning Optimizer Feasible Solution for Different Production Costs in Network

    12/17

    SNP: Optimizer: Feasible Solution for different Production Costs in Network

    Total Costs Incurred is displayed as 12000 as shown above which matches with Solution 1 result noted inpage no: 9

    Now, Click on Solutions tab,

    The Above screenshot displays the various costs incurred to arrive at feasible solution (Minimized CostSolution.). Total Cost Incurred is displayed as 12000 to fulfill the Sales Order 100 quantity at DC3400.

    Click on Back Icon and Click on Save Icon to save the Optimizer run results.

    Verification of Created Receipt Elements for selected Path (network):

    Based on Minimized Cost Solution, System chosen Transportation Lane 3200 to 3400 and created one stocktransfer requisition. Below screen shot displayed demand and supply situation at DC 3400.

    SAP DEVELOPER NETWORK | sdn.sap.com BUSINESS PROCESS EXPERT COMMUNITY | bpx.sap.com

    2008 SAP AG 12

  • 7/30/2019 Supply Network Planning Optimizer Feasible Solution for Different Production Costs in Network

    13/17

    SNP: Optimizer: Feasible Solution for different Production Costs in Network

    Now, below screen shows the created SNP Planned Order for Product OPT_FIN_1 at MFG Location 3200.

    Now, below screen displays the Purchase Requisition of 100 Quantity is created for Product OPT_RAW_1 at

    Location 3200.

    SAP DEVELOPER NETWORK | sdn.sap.com BUSINESS PROCESS EXPERT COMMUNITY | bpx.sap.com

    2008 SAP AG 13

  • 7/30/2019 Supply Network Planning Optimizer Feasible Solution for Different Production Costs in Network

    14/17

    SNP: Optimizer: Feasible Solution for different Production Costs in Network

    SAP DEVELOPER NETWORK | sdn.sap.com BUSINESS PROCESS EXPERT COMMUNITY | bpx.sap.com

    2008 SAP AG 14

  • 7/30/2019 Supply Network Planning Optimizer Feasible Solution for Different Production Costs in Network

    15/17

    SNP: Optimizer: Feasible Solution for different Production Costs in Network

    Conclusion:

    During Optimizer run, Feasible Cost Solution (Total Costs as 12000) is chosen and Path from MFG Location3200 to DC 3400 is chosen to fulfill the Sales Order 100 quantity at DC 3400. During the Optimizer Run,system created following receipt elements to fulfill sales Order of 100 quantities

    - Stock Transfer requisition of 100 Quantity with Source Location as 3200 and Destination Location as3400 for Product OPT_FIN_1

    - SNP P lanned Order is created of 100 quantity at Location 3200 for Product OPT_FIN_1.- Purchase Requisition of 100 quantity is created at Location 3200 for Product OPT_RAW_1.

    Similarly, Change production Costs in opposite manner i.e., Production Costs for OPT_FIN_1 Product PPMat Location 3200 as 1000 per Ea and Production Costs for OPT_FIN_1 Product PPM at Location 3300 as100 per Ea, then Optimizer would choose the Network/Path from 3300 to 3400 as feasible solution andcreates receipt elements accordingly.

    SAP DEVELOPER NETWORK | sdn.sap.com BUSINESS PROCESS EXPERT COMMUNITY | bpx.sap.com

    2008 SAP AG 15

  • 7/30/2019 Supply Network Planning Optimizer Feasible Solution for Different Production Costs in Network

    16/17

    SNP: Optimizer: Feasible Solution for different Production Costs in Network

    Related Content

    SAP Help: www.help.sap.com

    http://help.sap.com/saphelp_scm50/helpdata/en/1c/4d7a375f0dbc7fe10000009b38f8cf/frameset.htm formore information on Optimizer Based Planning.

    http://help.sap.com/saphelp_scm50/helpdata/en/1c/4d7a375f0dbc7fe10000009b38f8cf/frameset.htmforexecution of Optimizer run

    http://www50.sap.com/businessmaps/17BF49706CFF4156805807B25C8528F4.htm for Supply NetworkPlanning Main Process.

    For more information, visit the Supply Chain Management homepage.

    SAP DEVELOPER NETWORK | sdn.sap.com BUSINESS PROCESS EXPERT COMMUNITY | bpx.sap.com

    2008 SAP AG 16

    http://www.help.sap.com/http://help.sap.com/saphelp_scm50/helpdata/en/1c/4d7a375f0dbc7fe10000009b38f8cf/frameset.htmhttp://help.sap.com/saphelp_scm50/helpdata/en/1c/4d7a375f0dbc7fe10000009b38f8cf/frameset.htmhttp://www50.sap.com/businessmaps/17BF49706CFF4156805807B25C8528F4.htmhttps://www.sdn.sap.com/irj/sdn/bpx-scmhttps://www.sdn.sap.com/irj/sdn/bpx-scmhttp://www50.sap.com/businessmaps/17BF49706CFF4156805807B25C8528F4.htmhttp://help.sap.com/saphelp_scm50/helpdata/en/1c/4d7a375f0dbc7fe10000009b38f8cf/frameset.htmhttp://help.sap.com/saphelp_scm50/helpdata/en/1c/4d7a375f0dbc7fe10000009b38f8cf/frameset.htmhttp://www.help.sap.com/
  • 7/30/2019 Supply Network Planning Optimizer Feasible Solution for Different Production Costs in Network

    17/17

    SNP: Optimizer: Feasible Solution for different Production Costs in Network

    Disclaimer and Liabili ty Notice

    This document may discuss sample coding or other information that does not include SAP official interfaces and therefore is notsupported by SAP. Changes made based on this information are not supported and can be overwritten during an upgrade.

    SAP will not be held liable for any damages caused by using or misusing the information, code or methods suggested in this document,and anyone using these methods does so at his/her own risk.

    SAP offers no guarantees and assumes no responsibility or liability of any type with respect to the content of this technical article orcode sample, including any liability resulting from incompatibility between the content within this document and the materials andservices offered by SAP . You agree that you will not hold, or seek to hold, SAP responsible or liable with respect to the content of thisdocument.