support graphics for traffic and circulation princeton junction redevelopment area

30
1 Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area Township of West Windsor September 8, 2008 Urbitran | DMJM Harris

Upload: jabir

Post on 19-Jan-2016

21 views

Category:

Documents


0 download

DESCRIPTION

Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area Township of West Windsor September 8, 2008 Urbitran | DMJM Harris. ENG-WONG, TAUB TRAFFIC ASSESSMENT REPORT. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area

1

Support Graphics forTraffic and Circulation Princeton Junction Redevelopment Area

Township of West Windsor

September 8, 2008

Urbitran | DMJM Harris

Page 2: Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area

2

ENG-WONG, TAUBTRAFFIC ASSESSMENT REPORT

It is important to note that the results of this “pre-conceptual” analysis are based on …. Preliminary assumptions and would likely change based on changes in background regional traffic volumes associated with revisions to the NJDOT Penns Neck model (i.e., with the Vaughn Drive Connector included as a stand-alone improvement without any of the US-1 upgradws previously identified in the Penns Neck EIS).

Principal objectives– Confirm findings of my initial “sketch” analysis (3/31/08)

– More specific traffic data to guide sizing and layout of streets and intersections

Page 3: Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area

3

2030 No-BuildLevels of Service

LOS A-D

LOS E

LOS F

Page 4: Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area

4

2030 No-Build Assessment

This analysis indicates that at each of the three signalized intersections in the Study Area, traffic volumes will exceed capacity even with no further development action within the redevelopment area and if no further mitigation is applied. In considering alternatives for the Route 571 improvement, the Township clearly articulated its objective to limit roadway widening, even if congestion were to result. The findings of this analysis are consistent with that position.

- 3/31/08 memo re. Hillier- 9/08/08 memo re. InterCap

Page 5: Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area

5

2030 BuildLevels of Service

ImprovementsAssumed

LOS A-D

LOS E

LOS F

Page 6: Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area

6

On-SiteTraffic Volumes

2415

650

1170

680

1010

950

1480 Highest hourly2-directionalvolume

Page 7: Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area

7

INTERCAP REDEVELOPMENT PLAN REVIEW

Traffic Access (1-7)

West-Side Circulation (8-13)

East-Side Circulation (14)

Main Street (Route 571 Area) (15-17)

Parking (18-21)

Pedestrians and Bicycles (22-24)

Finance (25-29)

Page 8: Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area

8

Traffic Access:(1) 2 intersections needed on Alexander

Page 9: Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area

9

Traffic Access:(2) Old Bear Brook Road and on-site linkage

Page 10: Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area

10

Traffic Access:(3) Further improvements needed at Alexander / Vaughn

Page 11: Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area

11

Traffic Access:(4) 4 lanes needed on Vaughn Drive: Remove Parking

Page 12: Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area

12

Traffic Access:(5) Eliminate grade separations, 2 at-grade intersections

Page 13: Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area

13

Traffic Access:(6) Extend Vaughn Drive or Road B to Sarnoff Connector (Vaughn Drive preferable)

Page 14: Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area

14

Traffic Access:(7) NJDOT evaluating implications of changing Penns Neck EIS Record of Decision plan

Page 15: Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area

15

West Side Circulation:(8) Core Area: More detail needed, accomodation for drop-offs / pickups, BRT, etc.

Page 16: Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area

16

West Side Circulation:(9) Core Area: A plan can be worked out

Page 17: Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area

17

West Side Circulation:(10) Core Area: Additional pedestrian tunnel

Page 18: Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area

18

West Side Circulation:(11) “X” arrangement for primary streets Primary intersection at crossing

Page 19: Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area

19

West Side Circulation:(12) Seek appropriate volume and mix on Road B in town center

Page 20: Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area

20

West Side Circulation:(13) Reexamine use of Vaughn Drive and BRT line

Page 21: Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area

21

East Side Circulation:(14) Expand drop-off / pick-up area

Page 22: Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area

22

Main Street (Route 571) Area:(15) Consistency with adopted concept

Page 23: Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area

23

Main Street (Route 571) Area:(16) Wallace Road realignment

Page 24: Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area

24

Main Street (Route 571) Area:(17) Acme site access

Page 25: Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area

25

Parking:(18) Parking space supply

Existing Commuters(3,500 spaces)

New Commuters(2,500 spaces)

Site Uses(5,650 spaces)

Page 26: Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area

26

Parking:

(19) BRT impact on parking demand 1000-1200 space reduction in demand

(20) Accounting for shared parking in new non-commuter space calculations

(21) Garage layouts, sizes, access, general arrangement

Page 27: Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area

27

Pedestrians and Bicycles:(23) Pedestrian plan and links to Township System

Page 28: Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area

28

Pedestrians and Bicycles:(24) Pedestrian bridge at Route 571 / Amtrack

Page 29: Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area

29

Pedestrians and Bicycles:(25) Add pedestrian links, fill gaps

Page 30: Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area

30

Finance:

(25) Infrastructure financing not analyzed by me (26) Basis of initial cost estimate not presented

(27) Cost reductions being investigated- Eliminate grade separations- Effect on Penns Neck EIS being evaluated- Added cost items probable

(28) Vaughn Drive on Township Roadway Assessment program

(29) State funding implies need for flexibility in layout, phasing, financing