Surface Teleremote Operation
Dion HurnHaulage Supervisor, MiningAugust 22, 2011
![Page 2: Surface Teleremote Operation Dion Hurn Haulage Supervisor, Mining August 22, 2011](https://reader036.vdocument.in/reader036/viewer/2022062517/56649edd5503460f94beda45/html5/thumbnails/2.jpg)
Background
Dion Hurn, Haulage Supervisor, Mining, August 22, 2011 Slide 2
![Page 3: Surface Teleremote Operation Dion Hurn Haulage Supervisor, Mining August 22, 2011](https://reader036.vdocument.in/reader036/viewer/2022062517/56649edd5503460f94beda45/html5/thumbnails/3.jpg)
Background
Dion Hurn, Haulage Supervisor, Mining, August 22, 2011 Slide 3
Underground Teleremote OperationPreviously in place at Cannington Mine. Operator was 200 – 300 metres from operating machinery. Operator was still underground and exposed to hazards.
![Page 4: Surface Teleremote Operation Dion Hurn Haulage Supervisor, Mining August 22, 2011](https://reader036.vdocument.in/reader036/viewer/2022062517/56649edd5503460f94beda45/html5/thumbnails/4.jpg)
The Initiative
Dion Hurn, Haulage Supervisor, Mining, August 22, 2011 Slide 4
The Projects Team began discussing the possibility of building on the existing site Teleremote Capabilities.
Major step in protecting employee health and increasing safety.
![Page 5: Surface Teleremote Operation Dion Hurn Haulage Supervisor, Mining August 22, 2011](https://reader036.vdocument.in/reader036/viewer/2022062517/56649edd5503460f94beda45/html5/thumbnails/5.jpg)
The Solution
Dion Hurn, Haulage Supervisor, Mining, August 22, 2011 Slide 5
Initial investigationsAn external organisation was consulted. The vendor was provided with concerns and requirements for
development of a Surface Teleremote Operation.
![Page 6: Surface Teleremote Operation Dion Hurn Haulage Supervisor, Mining August 22, 2011](https://reader036.vdocument.in/reader036/viewer/2022062517/56649edd5503460f94beda45/html5/thumbnails/6.jpg)
The Solution
Dion Hurn, Haulage Supervisor, Mining, August 22, 2011 Slide 6
ImplementationPhase 1 - underground loaders
were operated from the surface mining administration building.
Phase 2 - introduction of a guidance system.
![Page 7: Surface Teleremote Operation Dion Hurn Haulage Supervisor, Mining August 22, 2011](https://reader036.vdocument.in/reader036/viewer/2022062517/56649edd5503460f94beda45/html5/thumbnails/7.jpg)
The Solution
Dion Hurn, Haulage Supervisor, Mining, August 22, 2011 Slide 7
The Surface Teleremote Operator was developed with:a wireless control system distributed antenna infrastructure.
The system includes a power supply health monitoring circuit with a battery back up.
![Page 8: Surface Teleremote Operation Dion Hurn Haulage Supervisor, Mining August 22, 2011](https://reader036.vdocument.in/reader036/viewer/2022062517/56649edd5503460f94beda45/html5/thumbnails/8.jpg)
The Solution
Dion Hurn, Haulage Supervisor, Mining, August 22, 2011 Slide 8
![Page 9: Surface Teleremote Operation Dion Hurn Haulage Supervisor, Mining August 22, 2011](https://reader036.vdocument.in/reader036/viewer/2022062517/56649edd5503460f94beda45/html5/thumbnails/9.jpg)
The Solution
Dion Hurn, Haulage Supervisor, Mining, August 22, 2011 Slide 9
CostDevelopment and installation of the initial system and console:
$227,000. Additional consoles: $167,000. Benefit of increased productivity as operations can continue through
blasting.
![Page 10: Surface Teleremote Operation Dion Hurn Haulage Supervisor, Mining August 22, 2011](https://reader036.vdocument.in/reader036/viewer/2022062517/56649edd5503460f94beda45/html5/thumbnails/10.jpg)
The Solution
Dion Hurn, Haulage Supervisor, Mining, August 22, 2011 Slide 10
![Page 11: Surface Teleremote Operation Dion Hurn Haulage Supervisor, Mining August 22, 2011](https://reader036.vdocument.in/reader036/viewer/2022062517/56649edd5503460f94beda45/html5/thumbnails/11.jpg)
Benefits/ Effects
Dion Hurn, Haulage Supervisor, Mining, August 22, 2011 Slide 11
![Page 12: Surface Teleremote Operation Dion Hurn Haulage Supervisor, Mining August 22, 2011](https://reader036.vdocument.in/reader036/viewer/2022062517/56649edd5503460f94beda45/html5/thumbnails/12.jpg)
Benefits/ Effects
Dion Hurn, Haulage Supervisor, Mining, August 22, 2011 Slide 12
![Page 13: Surface Teleremote Operation Dion Hurn Haulage Supervisor, Mining August 22, 2011](https://reader036.vdocument.in/reader036/viewer/2022062517/56649edd5503460f94beda45/html5/thumbnails/13.jpg)
Transferability
Dion Hurn, Haulage Supervisor, Mining, August 22, 2011 Slide 13
Custom designed system.Potential to continue to revolutionise an inherently dangerous work
environment. The system can and has already been adopted in various surface mine
operations.
![Page 14: Surface Teleremote Operation Dion Hurn Haulage Supervisor, Mining August 22, 2011](https://reader036.vdocument.in/reader036/viewer/2022062517/56649edd5503460f94beda45/html5/thumbnails/14.jpg)
Innovation
Dion Hurn, Haulage Supervisor, Mining, August 22, 2011 Slide 14
The innovation sets a leading example of improving relationships with individuals, departments and external contractors.
System unique to Cannington.Best practice remote technology.
![Page 15: Surface Teleremote Operation Dion Hurn Haulage Supervisor, Mining August 22, 2011](https://reader036.vdocument.in/reader036/viewer/2022062517/56649edd5503460f94beda45/html5/thumbnails/15.jpg)
Innovation
Dion Hurn, Haulage Supervisor, Mining, August 22, 2011 Slide 15
First step in taking people out of underground mining environment.Efficient operation still functioning in underground environment. Inherent risk reduced dramatically.Modified an existing system to enable safe production. Improves and enhances our Teleremote fleet capabilities.
![Page 16: Surface Teleremote Operation Dion Hurn Haulage Supervisor, Mining August 22, 2011](https://reader036.vdocument.in/reader036/viewer/2022062517/56649edd5503460f94beda45/html5/thumbnails/16.jpg)
Discussion and Questions
Dion Hurn, Haulage Supervisor, Mining, August 22, 2011 Slide 16