susquehanna river hydroelectric projects 1 shawn a. seaman september 27, 2010 image or graphic
TRANSCRIPT
![Page 1: Susquehanna River Hydroelectric Projects 1 Shawn A. Seaman September 27, 2010 Image or Graphic](https://reader036.vdocument.in/reader036/viewer/2022070407/56649e4d5503460f94b43c53/html5/thumbnails/1.jpg)
1
Susquehanna River Hydroelectric Projects
Shawn A. SeamanSeptember 27, 2010
Image or Graphic
![Page 2: Susquehanna River Hydroelectric Projects 1 Shawn A. Seaman September 27, 2010 Image or Graphic](https://reader036.vdocument.in/reader036/viewer/2022070407/56649e4d5503460f94b43c53/html5/thumbnails/2.jpg)
2
Susquehanna River Hydroelectric Projects
Five Major Hydroelectric Facilities on the Lower Susquehanna River:
• York Haven (Olympus Power) – FERC License Exp. 2014
• Safe Harbor (PPL/Constellation)– FERC License Exp. 2030
• Holtwood (PPL)– FERC License amended to 2030
• Muddy Run Pump/Storage (Exelon) – FERC License Exp. 2014
• Conowingo (Exelon)- FERC License Exp. 2014
![Page 3: Susquehanna River Hydroelectric Projects 1 Shawn A. Seaman September 27, 2010 Image or Graphic](https://reader036.vdocument.in/reader036/viewer/2022070407/56649e4d5503460f94b43c53/html5/thumbnails/3.jpg)
3
Susquehanna River Hydroelectric Projects
![Page 4: Susquehanna River Hydroelectric Projects 1 Shawn A. Seaman September 27, 2010 Image or Graphic](https://reader036.vdocument.in/reader036/viewer/2022070407/56649e4d5503460f94b43c53/html5/thumbnails/4.jpg)
4
Susquehanna River Hydroelectric Projects
![Page 5: Susquehanna River Hydroelectric Projects 1 Shawn A. Seaman September 27, 2010 Image or Graphic](https://reader036.vdocument.in/reader036/viewer/2022070407/56649e4d5503460f94b43c53/html5/thumbnails/5.jpg)
5
Susquehanna River Hydroelectric Projects
Consequences of Dams
• Blocked migration of American shad, River Herring, Sturgeon, American Eel, etc.
• Project operations affect habitat within the watershed
![Page 6: Susquehanna River Hydroelectric Projects 1 Shawn A. Seaman September 27, 2010 Image or Graphic](https://reader036.vdocument.in/reader036/viewer/2022070407/56649e4d5503460f94b43c53/html5/thumbnails/6.jpg)
6
Susquehanna River Hydroelectric Projects
History of Upstream Passage
1972 - Conowingo West Fish Lift
1991 - Conowingo East Fish Lift
1997 - Fish Lifts at Holtwood and Safe Harbor
2000 - Vertical-slot ladder in operation at York Haven
![Page 7: Susquehanna River Hydroelectric Projects 1 Shawn A. Seaman September 27, 2010 Image or Graphic](https://reader036.vdocument.in/reader036/viewer/2022070407/56649e4d5503460f94b43c53/html5/thumbnails/7.jpg)
7
Susquehanna River Hydroelectric Projects
0
50,000
100,000
150,000
200,000
1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
ConowingoHoltwoodSafe HarborYork Haven
![Page 8: Susquehanna River Hydroelectric Projects 1 Shawn A. Seaman September 27, 2010 Image or Graphic](https://reader036.vdocument.in/reader036/viewer/2022070407/56649e4d5503460f94b43c53/html5/thumbnails/8.jpg)
8
Susquehanna River Hydroelectric Projects
FERC Relicensing
• Holtwood received license amendment, to make major modifications, increase generation and improve fish passage
• York Haven, Muddy Run, and Conowingo started re-licensing in 2009 (2014)
![Page 9: Susquehanna River Hydroelectric Projects 1 Shawn A. Seaman September 27, 2010 Image or Graphic](https://reader036.vdocument.in/reader036/viewer/2022070407/56649e4d5503460f94b43c53/html5/thumbnails/9.jpg)
9
Susquehanna River Hydroelectric Projects
Study Requests• Cooperative effort of:
– Maryland DNR, – Pennsylvania Fish and Boat Commission,– Pennsylvania DEP– Susquehanna River Basin Commission– US Fish & Wildlife Service
• Concerns– Environmental, – Fisheries / biological, and – Recreation
![Page 10: Susquehanna River Hydroelectric Projects 1 Shawn A. Seaman September 27, 2010 Image or Graphic](https://reader036.vdocument.in/reader036/viewer/2022070407/56649e4d5503460f94b43c53/html5/thumbnails/10.jpg)
10
Susquehanna River Hydroelectric Projects
Conowingo/Muddy Run Studies
• 32 Pre-licensing studies: Ongoing (2010-2011)– Fish passage (including eels): efficiency &
capacity– Flow management: minimum flows & pond levels– Recreation and land management– Water quality: D.O. / sediments / nutrients– Biological surveys: mussels, sturgeon, eagles, etc.
![Page 11: Susquehanna River Hydroelectric Projects 1 Shawn A. Seaman September 27, 2010 Image or Graphic](https://reader036.vdocument.in/reader036/viewer/2022070407/56649e4d5503460f94b43c53/html5/thumbnails/11.jpg)
11
Susquehanna River Hydroelectric Projects
The Challenge?• To gather all necessary data / information
during the study period in order to develop well-informed, adaptive, licensing conditions
This process will ultimately establish the fate of Susquehanna River fish stocks at least through the year 2044!! (Maybe 2064??)