Page 1: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

SUSTAINABLE AGRICULTURE EDUCATION CENTER

OLYMPIA, WASHINGTON

TDR144: Construction Project Management Spring 2009Group Project

Page 2: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

A COMMUNITY BUILDING OF EARTH AND STRAW

Timber Frame with Strawbale Infill and Earthen Plaster

Page 3: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

Nathan Rust

Ann Newman

Helen Smith

Rumpaipin Laohaprasit

PRESENTED BY

Page 4: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

PROJECT IMFORMATION

Address: 4641 Steamboat Island Road

Olympia, Washington 98502

Field: Lot Number 13926440000

Lot size 39.14 Acres

House: Lot Number 13926440100

Lot size 1.55 Acres

Owner: Edward Makoviney

Asking Price: 3.5 Million

Page 5: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

ARIAL PHOTO

Page 6: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

PROPERTY LOCATION

Zoning: RRR 1/5 Residential Rural Source,

One Home per 5 Acres

Owner Expectation: One home per 5 acres allows 8 homes

to be developed on this land, keeping value high

Page 7: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

WETLAND AND BUFFER

Page 8: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

PROPERTY IMFORMATION

Assessed Value: $ 389,800 House $ 356,850 Field

Total $ 746,650 As of 2009

1 Million is a more realistic sales price Savings of 2.5 million

Page 9: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

OTHER SITE CONSIDERATIONS

No history of flooding High ground water manageable, but precludes basement

Page 10: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

HIGH GROUND WATER

Page 11: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

BROWN CONTOUR WITH HIGH GROUND WATER

Page 12: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

Project Name: Sustainable Agriculture Education Center

Category:Education & Recreation

Type: Community Center

Target Group: Students & Community

PROGRAMMING

Page 13: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

FUNCTIONS

• Great Rooms

(Including Stage)

• Classrooms

• Administration Office

• Kitchen

• Lockers / Bathrooms / Showers

• Storage

Page 14: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

CAPACITIES

Great Room

• Size 30’ X 50’

• 200 – 300 People

Classrooms

•Up to 20 People

Page 15: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

FIRST FLOOR

Page 16: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

SECOND FLOOR

Page 17: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

FIRST FLOOR

Page 18: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

SECOND FLOOR

Page 19: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

SOUTH ELEVATION

Page 20: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

BUILDING SECTIONS

Page 21: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

SOUTH WEST VIEW

Page 22: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

SOUTH EAST VIEW

Page 23: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

GREAT ROOM VIEW

Page 24: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

STAIRCASE VIEW

Page 25: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

OFFICE ROOM

Page 26: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

SOUTH WEST VIEW

Page 27: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

SOUTH EAST VIEW

Page 28: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

COST ESTIMATE

Approximately 5,270 ft2

Average cost of $ 184 / ft2

ROM cost $ 970,000

Page 29: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

COST ESTIMATE

• Potential high labor of strawbale will be minimized with use of educational workshop to provide labor

• Workshops will be held “at cost” to cover feeding and housing expenses

• Slower labor time offset by publicity and community enrichment

Page 30: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

SAFETY PLAN

Fire Protection:

• All bale treated with borate solution• Site swept hourly when loose straw

present• Separate “tool site” where all grinding and

spark potential tooling will be done• Predip method

Page 31: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

SAFETY PLAN

Pre-dip Method:• Wall surfaces of bale dipped in clay slurry

- Penetrates 3 inches

- Seals bale from fire and rain

• Eliminates weed-wacking of wall

- Save labor

- Reduces fire risk of loose

straw

Page 32: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

SAFETY PLAN

Falling Protection:

• Strawbale “crash pads” built up as scaffolding goes higher

• After construction this straw will be mulched on site

Page 33: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

QUALITY CONTROL

Full-time CM will co-ordinate workshops and subcontractors to facilitate proper quality control.

Awareness of unique codes and strawbale detailing is critical

Page 34: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

WINDOW DETAILS

Page 35: SUSTAINABLE AGRICULTURE EDUCATION CENTER OLYMPIA, WASHINGTON TDR144: Construction Project Management Spring 2009 Group Project OLYMPIA, WASHINGTON TDR144:

UNIQUE CODES