sustainable arq

Upload: pablinv2

Post on 06-Apr-2018

225 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/3/2019 Sustainable Arq

    1/6

    Pablo Cabrejas Benito

    SUSTAINABLE ARQUITECTURE

    NATIONAL ASSEMBLY FOR WALES Richard Rogers

  • 8/3/2019 Sustainable Arq

    2/6

    THE PROJECT

    In 1998 a design competition wasopenness and democracy itself; ope

    is situated in the Cardiff Bay areaMillennium Centre. This area wascomplete the puzzle of developmeto meet the following stipulations.

    Complete accessibility. Sustainability and renewable sour A minimum 100-year life span. Using Welsh materials.

    The architect developed an idea for

    had to be a transparent envelope,Assembly and encouraging the pudemocracy: Openness, transparenc

    Pa

    held for building the National Assembly for Wales. The bnness for the surroundings and citizens themselves. It was

    , close to the Victorian Grade I listed Pier head Buildinone the center of the coal exporting trade and the net in the immediate vicinity. According to the competition,

    ces of energy.

    a building that would connect with Cardiff Bay, Wales and

    looking outwards to Cardiff Bay, providing visibility to theblic to engage with it. Again the main issue was to hiand participation.

    Architecturally this is achieved byassembly members under the public,public part is elevated on a slate-clareinforces their importance in the demoDebating Chamber its not only situated

    public, but its also in the physical andthe building. The roof, undulated, fallsDebating Chamber, creating a special snatural way of ventilation. The opennefor is represented in the transparencythat surrounds all the building. Theyissues, but without forgetting moreproject, as a public project, needed to h

    This is the reason prefabricationoptimized. In addition, they used manarea, such us timber and slate sandston

    challenging marine environment for a rleast 100 years.

    lo Cabrejas Benito

    ilding had to expressfinished in 2006 and

    and the new Walesconstruction had tothe building also had

    beyond. The building

    inner workings of theghlight the values of

    placing the electedthe electorate. Thisplinth. This way it

    cratic system. But thein a level below the

    etaphorical center oflike a bell over theource of light and ass they were lookingrovided by the glasstook care of designphysical things. Theve a controlled price.as maximized and

    materials from the, that could resist the

    asonable price for at

  • 8/3/2019 Sustainable Arq

    3/6

    The design studied sustainabilityreasonable design answers to prconditioning is supplied in the debaare naturally ventilated. Heat exch

    while the thermal mass of the plint

    The Assembly program is quite cooffices for the principal officers of t

    Pa

    part from the installation of technological devices. Itblems that do not imply higher costs, the design itsing chamber by the wind cowl over it, and all the other spngers use the potential of the ground to save energy in thtempers fluctuations in the internal environment.

    mplex, and includes education spaces, a caf, meeting re Assembly, a members lounge and much more we can c

    lo Cabrejas Benito

    orks because It haslf solves them. Air-

    aces (the public ones)e cooling mechanism,

    ooms, press facilities,eck in the sections.

  • 8/3/2019 Sustainable Arq

    4/6

    SUSTAINABILITY

    The building was awarded the BRenergy demand; applying renewa

    residual energy demand. So that,light and ventilation among other r

    ILLUMINATION

    The same philosophy for the whole

    1. Maximum use of natural light2. Use energy saving light sources3. Using control systems to the inte

    Roof lights and customized roof veinto the space, assisting daylightlantern has been installed on the da series of concentric aluminum rin

    A conical mirror suspended under tinto the chamber. The mirrored conto the need of daylight levels and r

    Pa

    EAM excellent rating for its environmental strategy bble energy sources and using energy efficient sources

    he Assembly includes boreholes, greywater recycling, extsources we will classify and study in detail.

    building was applied to enlightenment, based on three prin

    ration of natural and artificial lighting.

    ntilators serving the committee rooms / offices reflect lopenetration. To permit natural daylight into the debatinomed roof beneath the wind cowl. Daylight is reflected ints which make up the debating chamber funnel.

    e wind cowl has been installed to reflect daylight from lowcan be manually raised and lowered into the throat of th

    duce the possibility of glare.

    lo Cabrejas Benito

    ased on reducing thend systems to cover

    ensive use of natural

    ciples:

    -level winter daylightg chamber, a glazedo the space below via

    altitude winter sunfunnel to respond

  • 8/3/2019 Sustainable Arq

    5/6

    Regarding the artificial lighting, e

    Therefore, and as close as possible

    chosen CDM metal halide lamps wit

    4200 K. the result is a chamber il

    projectors introduced at the base oring immediately above. Also oth

    above, between the tubes to illumi

    In addition, in the perimeter of

    fluorescent lamps. We can observe

    rings of lamps in the image.

    With this combination of natura

    workspace is enhanced, while it gi

    broadcasting.

    VENTILATION

    The whole building is naturally vendebating chamber, committee roomventilation to the debating chamballowing air to be drawn out of thSHUNT. The inspiration comes frothrough the hop-drying kilns. With

    from all offices and functional area

    Pa

    bedding luminaries were chosen.

    to the color of natural light, have

    h a color temperature higher than

    luminated by a single ring of 80

    the vent pipe; with an aluminumr projectors have been installed

    nate the surface of the vent pipe.

    he chamber have been installed

    his zenithal light and the different

    l and artificial light, the public

    ves facilities for TV recording and

    tilated, although a mixed mode system can be used to as and public galleries its required. A six-meters-high rotatir. It rotates to produce a negative pressure on the leechamber, as it is explained in the drawing, working astraditional oast houses, which used self-orientating wi

    this design complementing the global one, air conditionin

    .

    lo Cabrejas Benito

    sist ventilation in theng wind cowl providesard side of the cowl,some kind of perfectnd cowls to draw air

    has been eliminated

  • 8/3/2019 Sustainable Arq

    6/6

    HEATING / COOLING SYSTEM

    There are two remarkable heatingcolor, absorbs solar radiation andallows the entrance of solar light

    entrance of light if necessary.

    Furthermore, the Assembly countsstability to reduce primary energconventional chillers. This system isand low grade heat, which is requir

    To reduce CO2 emissions even mo

    green energy can maintain high grwithin air-handling units.

    WATER

    Potable water usage is minimized tis storage in a tank. This amount oand maintenance. Other adjustmeand fittings in the everyday consum

    Pa

    -design points in this building. The clad plinth, with its mregulates thermal fluctuations in the inner space. In addiallowing some greenhouse effect. Nevertheless, this fa

    with a ground source heat pump (GSHP) system, that uconsumption The GSHP system increases operation ef

    enough to provide cooling for mixed mode spaces and tecd for the under-floor heating system.

    re, there is also a biomass boiler processing both wood c

    ade heating to heat emitters (low-level natural ventilators

    hrough utilization of rainwater. Rainwater collected fromwater is enough for lavatories, irrigation for landscapingts and water reducing are achieved by the application oe.

    lo Cabrejas Benito

    assivity and its blackion, the glass faade

    ade can regulate the

    ses grounds thermalficiency compared tonical computer suites

    hips and pellets. This

    and heater batteries

    he large roof canopyand general cleaningappropriate fixtures