![Page 1: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/1.jpg)
Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910
9-13 Stewart Street, Richmond
Hines Australia Pty Ltd
04-Mar-2020
Doc No. 60613433-RPES-002
Commercial-in-Confidence
Sustainable Management Plan
![Page 2: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/2.jpg)
9-13 Stewart Street, Richmond
Sustainable Management Plan
Commercial-in-Confidence
Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910
AECOM
Sustainable Management Plan
Client: Hines Australia Pty Ltd
ABN: 54 157 826 910
Prepared by
AECOM Australia Pty Ltd
Level 10, Tower Two, 727 Collins Street, Melbourne VIC 3008, Australia
T +61 3 9653 1234 F +61 3 9654 7117 www.aecom.com
ABN 20 093 846 925
04-Mar-2020
Job No.: 60613433
AECOM in Australia and New Zealand is certified to ISO9001, ISO14001 AS/NZS4801 and OHSAS18001.
Printed on environmentally responsible paper.
© AECOM Australia Pty Ltd (AECOM). All rights reserved.
AECOM has prepared this document for the sole use of the Client and for a specific purpose, each as expressly stated in the document. No other
party should rely on this document without the prior written consent of AECOM. AECOM undertakes no duty, nor accepts any responsibility, to any
third party who may rely upon or use this document. This document has been prepared based on the Client’s description of its requirements and
AECOM’s experience, having regard to assumptions that AECOM can reasonably be expected to make in accordance with sound professional
principles. AECOM may also have relied upon information provided by the Client and other third parties to prepare this document, some of which
may not have been verified. Subject to the above conditions, this document may be transmitted, reproduced or disseminated only in its entirety.
![Page 3: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/3.jpg)
9-13 Stewart Street, Richmond
Sustainable Management Plan
Commercial-in-Confidence
Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910
AECOM
Quality Information
Document Sustainable Management Plan
Ref 60613433
Date 04-Mar-2020
Prepared by Anjali Thirumalavan
Reviewed by Sian Willmott
Revision History
Rev Revision Date Details Authorised
Name/Position Signature
A 06-Dec-2019 Town Planning - Draft Angelo Varvaras Principal Electrical Engineer
B 13-Dec-2019 Town Planning Angelo Varvaras Principal Electrical Engineer
C 04-Mar-2020 Town Planning Angelo Varvaras Principal Electrical Engineer
![Page 4: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/4.jpg)
9-13 Stewart Street, Richmond
Sustainable Management Plan
Commercial-in-Confidence
Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910
1 AECOM
Table of Contents
1.0 Introduction 2 2.0 Indoor Environment Quality (IEQ) 3
2.1 Quality of Internal Air 3 2.2 Acoustic comfort 3 2.3 Lighting comfort 3 2.4 Visual comfort 4 2.5 Reduced exposure to pollutants 4 2.6 Thermal comfort 5
3.0 Energy Efficiency 6 3.1 Operating Energy 6
3.1.1 Passive Design 6 3.1.2 Active Design 6
3.2 Renewable Energy 6 3.3 Energy Metering 7
4.0 Water Efficiency 8 4.1 Minimising Amenity Water Demand 8 4.2 Water Metering 8 4.3 Landscape Irrigation 8 4.4 Rainwater Harvesting 8 4.5 Fire System Water 8
5.0 Stormwater Management 9 5.1 Peak-Discharge 9 5.2 Pollution Reduction 9
6.0 Building Materials 10 6.1 Concrete 10 6.2 Structural and Reinforcing Steel 10 6.3 Timber Products 10 6.4 Permanent Formwork, Pipes, Flooring, Blinds and Cables 10
7.0 Transport 11 7.1 Transport Design Provisions 11
8.0 Waste Management 12 8.1 Environmental Management 12 8.2 Operational Waste 12 8.3 Construction and Demolition Waste 12
9.0 Urban Ecology 13 9.1 Communal Spaces 13
10.0 Construction and Building Management 14 10.1 Commissioning and Tuning 14 10.2 Building Information 14
Appendix A MUSIC Assessment A
Appendix B BESS Assessment B
![Page 5: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/5.jpg)
9-13 Stewart Street, Richmond
Sustainable Management Plan
Commercial-in-Confidence
Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910
2 AECOM
1.0 Introduction
The proposed development at 9-13 Stewart street, Richmond is a 10-storey mixed retail, food & beverage and commercial office building located within the City of Yarra. It aims to bring innovation and creative quality to the area in the use of mass timber framing as the primary structure for the upper podium levels 4-9, with a foundation of concrete framing to the basement levels, ground retail level and podium levels of 1-3. The façade has been optimised to consider solar insolation across all orientations, including the effects of overshadowing from the neighbouring buildings. This presents an opportunity for an integrated sustainable design for the façade due to the varying sunlight exposure across different levels of the commercial office floors.
The proposed sustainability principles, priorities, and benchmarks for the project have been developed based on the City of Yarra Town Planning requirements as influenced by the Built Environment Sustainability Scorecard (BESS) assessment and current best industry practice.
Sustainability initiatives have been proposed that will reduce ongoing emissions, whilst providing a working environment with a focus on high indoor environmental quality that will attract and retain tenants.
The functional Net Lettable Area (NLA) of the proposed development can be broken down in Table 1 below.
Table 1: NLA of proposed development
Space Type Floors Approximate NLA (m2)
Food & Beverage Ground 98
Retail Ground 242
Office L1-9 4,835
![Page 6: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/6.jpg)
9-13 Stewart Street, Richmond
Sustainable Management Plan
Commercial-in-Confidence
Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910
3 AECOM
2.0 Indoor Environment Quality (IEQ)
To achieve a healthy indoor environment quality for the wellbeing of building occupants.
To provide a naturally comfortable indoor environment will lower the need for building services, such as artificial lighting, mechanical ventilation and cooling and heating devices.
The proposed development has a strong focus on achieving a healthy indoor environmental quality for the wellbeing of the building occupants.
2.1 Quality of Internal Air
To ensure that the building occupants are provided with a healthy indoor environment, the following initiatives have been included within the design of the mechanical system.
• Ventilation System Attributes
• The ventilation system is designed such that the outdoor air pollutants are minimised (designed to comply with ASHRAE Standard 62.1:2013 in regard to minimum separation distances between pollution sources and outdoor air intakes), adequate access to maintain both of all moisture and debris-catching components is provided. In addition, all new and existing ductwork will be cleaned prior to occupation (or sealed during construction works to avoid contamination).
• Exhaust or Elimination of Pollutants
- Printing and Photocopy Equipment
- All printing and photocopy equipment will be compliant with minimum emissions standard and certified in accordance with CMA-328, RAL-UZ 122 or GGPS.003 by a NATA accredited or ISO 17025 accredited laboratory.
- Kitchen Area
- Each kitchen area with stove or exhaust will have provisions for a dedicated separate exhaust and ventilated in accordance with AS1668.2.
2.2 Acoustic comfort
The development has been designed such that internal ambient noise levels in the nominated area are suitable and relevant to the activity type in the room per AS/NZS2107:2016. This includes all sound generated by the building systems and any external noise ingress.
2.3 Lighting comfort
All lighting in the development is designed to maintain illuminance that meets the levels recommended in the relevant standard for different space types within the building. The lighting system is designed to comply with the Luminaire selection system as detailed in Section 8.3.4 of AS 1680.1-2006.
![Page 7: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/7.jpg)
9-13 Stewart Street, Richmond
Sustainable Management Plan
Commercial-in-Confidence
Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910
4 AECOM
2.4 Visual comfort
The proposed development has a strong focus on the use of natural light and light uniformity, along with access to excellent views from all levels. The architectural aesthetic aligns with the need to emphasise the natural environment where ever possible within the building design.
• Daylight
The preliminary modelling of the development indicates that >60% of the internal office spaces shall have a daylight factor of 2% or greater.
• Views
The layout and façade design of the proposed development includes high exposure to the outside
2.5 Reduced exposure to pollutants
The development is designed such that:
• At least 95% of all internally applied paints, adhesives, sealants and carpets to meet stipulated ‘Total Volatile Organic Compound Limits’ (TVOC) specified in Table 2 and Table 3.
Table 2: TVOC Limits for Paints, Adhesives and Sealants
Product Category Max TVOC (g/L)
General purpose adhesives and sealants 50
Interior wall and ceiling paint, all sheen levels Target 5, Maximum 16
Trim, varnishes and wood stains 75
Primers, sealers and prep coats 65
One and two pack performance coatings for floors 140
Acoustic sealants, architectural sealant, waterproofing membranes and sealant, fire retardant sealants and adhesives
250
Structural glazing adhesive, wood flooring and laminate adhesives and sealants
100
Table 3: Carpet Test Standards and TVOC Emission Limits
Test Protocol Limit
ASTM D5116 –Total VOC limit 0.5mg/m2
ASTM D5116 – 4-PC (4‑Phenylcyclohexene) 0.05mg/m2
ISO 16000 / EN 13419 - TVOC at three days 0.5mg/m2
ISO 10580 / ISO/TC 219 (Document N238) - TVOC at 24 hours
0.5mg/m2
• At least 95% of all engineered wood products meet stipulated formaldehyde limits specified in Table 4.
![Page 8: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/8.jpg)
9-13 Stewart Street, Richmond
Sustainable Management Plan
Commercial-in-Confidence
Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910
5 AECOM
Table 4: Formaldehyde Emission Limit Values for Engineered Wood Products
Test Protocol Emission Limit
AS/NZS 2269:2004, testing procedure AS/NZS 2098.11:2005 method 10 for Plywood
≤1mg/ L
AS/NZS 1859.1:2004 - Particle Board, with use of testing procedure AS/NZS 4266.16:2004 method 16
≤1.5 mg/L
AS/NZS 1859.2:2004 - MDF, with use of testing procedure AS/NZS 4266.16:2004 method 16
≤1mg/ L
AS/NZS 4357.4 - Laminated Veneer Lumber (LVL) ≤1mg/ L
Japanese Agricultural Standard MAFF Notification No.701 Appendix Clause 3 (11) - LVL
≤1mg/ L
JIS A 5908:2003- Particle Board and Plywood, with use of testing procedure JIS A 1460
≤1mg/ L
JIS A 5905:2003 - MDF, with use of testing procedure JIS A 1460 ≤1mg/ L
JIS A1901 (not applicable to Plywood, applicable to high pressure laminates and compact laminates)
≤0.1 mg/m²/hr
ASTM D5116 (applicable to high pressure laminates and compact laminates)
≤0.1 mg/m²/hr
ISO 16000 part 9, 10 and 11 (also known as EN 13419), applicable to high pressure laminates and compact laminates
≤0.1 mg/m²/hr (at 3 days)
ASTM D6007 ≤0.12mg/m³*
ASTM E1333 ≤0.12mg/m³**
EN 717-1 (also known as DIN EN 717-1) ≤0.12mg/m³
EN 717-2 (also known as DIN EN 717-2) ≤3.5mg/m²hr*
2.6 Thermal comfort
The development has been designed to provide a high degree of thermal comfort, delivering a Predicted Mean Vote (PMV) between -1 and +1 for 95% of the nominated area for 98% of the year.
![Page 9: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/9.jpg)
9-13 Stewart Street, Richmond
Sustainable Management Plan
Commercial-in-Confidence
Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910
6 AECOM
3.0 Energy Efficiency
To ensure the efficient use of energy.
To reduce total operating greenhouse emissions.
To reduce energy peak demand.
To reduce associated energy costs.
The proposed development at 9-13 Stewart Street, Richmond has a strong emphasis on reducing operational energy consumption, peak energy demand on the local electrical grid, and encouraging current best practice standards. The sustainability principle and policy for energy efficiency is taken from a target to meet best practice requirements set by BESS tool of the City of Yarra and a 5.5 Star NABERS Energy rating. The following provides a high-level description of the proposed mechanical system and passive architectural features included within the design to achieve the set targets.
3.1 Operating Energy
Energy efficiency measures for the development have been included via both active and passive strategies outlined below.
3.1.1 Passive Design
The passive design focus for the proposed development is centred around the façade orientations solar insolation levels due to the surrounding context. The upper podium levels receive a high amount of solar insolation incident on the façade on the north, east and west facades. The top six levels and top seven levels receive no overshadowing on the northern façade and eastern façade respectively, however the lower levels are affected by overshadowing from the three-storey apartment buildings on Margaret Street and Stewart Street. The western façade is largely exposed to the sun throughout the year from level 5 upwards, however due to the design of the development, the core elements (lifts, services, bathrooms and stairs) cover more than half of the façade. Due to varying exposure to the sun, the design of the building integrates 300mm horizontal and 300mm vertical shading on north, east and west facades.
3.1.2 Active Design
High efficiency air-cooled roof mounted chillers will be provided to the development. The selected chillers will have a full load Energy Efficiency Ratio (EER) of no less than 3.88; and part load operating efficiencies around 6-7. This is a significant improvement on National Construction Code (NCC) 2019 requirements.
Condensing boilers are proposed for heating hot water (HHW) with a full load efficiency of 95%.
The HVAC service strategy is proposed to include Air Handling Units (AHUs) which will serve the office floors with supply air via a low temperature Variable Air Volume (VAV) system.
Lighting will be LED throughout.
Carbon Monoxide monitoring is included within the car park ventilation system to control the operation and speed of ventilation fans.
3.2 Renewable Energy
The development is designed to incorporate 96 photovoltaic (PV) panels at roof levels to offset some operational energy. The PV panels are sized at 28.8kWp and are estimated to generate 32,346kWh per annum. These will be located on the roof and integrated around any required plant and services penetrations.
![Page 10: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/10.jpg)
9-13 Stewart Street, Richmond
Sustainable Management Plan
Commercial-in-Confidence
Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910
7 AECOM
3.3 Energy Metering
The development is designed to ensure accessible metering is provided to monitor energy consumption and that the utility meters meet metering guidelines under the weights and measures legislation, as outlines under the current National Measurement Regulations. A monitoring system capable of capturing and processing the data produced by installed energy meters is also provided.
![Page 11: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/11.jpg)
9-13 Stewart Street, Richmond
Sustainable Management Plan
Commercial-in-Confidence
Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910
8 AECOM
4.0 Water Efficiency
To ensure the efficient use of water.
To reduce total operating potable water use.
To encourage the collection and reuse of stormwater.
To encourage the appropriate use of alternative water sources (e.g. grey water).
To minimize associated water costs.
The proposed development is committed to reducing the amount of potable water consumption throughout the operation of the building by 48% when compared to standard practice. This includes the design of a landscape that uses subsurface drip irrigation system, and the selection of water efficient fixtures across the entire building.
4.1 Minimising Amenity Water Demand
The fixtures and fittings for the proposed development will meet (as a minimum) the requirements as listed in 5 below.
Table 5: Minimum WELS requirements
Fixture/Fitting WELS Rating Water Flow Rate
Toilets 3.5 Star 3.5L average flush
Urinals 6 Star 0.8 L/flush
Taps 4.5 Star 4.5 L/min
Showers 6.5 Star 6.5 L/min
4.2 Water Metering
The development is designed to ensure accessible metering is provided to monitor water consumption. A monitoring system capable of detecting leaks and capturing and processing the data produced by installed water meters is also provided.
4.3 Landscape Irrigation
The landscaping is also designed to reduce the consumption of potable water required for irrigating through the installation of subsurface drip irrigation system. The proposed plants for the development will be predominantly native.
4.4 Rainwater Harvesting
Rainwater will be harvested from the development rooftop and reticulated to a 15kL tank located in the basement. The rainwater will be reticulated to ground floor and Level 1 amenities as a minimum.
4.5 Fire System Water
The fire system is designed to capture and reuse 80% of test water.
![Page 12: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/12.jpg)
9-13 Stewart Street, Richmond
Sustainable Management Plan
Commercial-in-Confidence
Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910
9 AECOM
5.0 Stormwater Management
To reduce the impact of stormwater run-off.
To improve the water quality of stormwater run-off.
To achieve best practice stormwater quality outcomes.
To incorporate water sensitive urban design principles.
The following initiatives are integrated within the hydraulic and civil engineering design to reduce the impact of stormwater run-off. MUSIC modelling has been completed for the site, demonstrating that the below targets can be met with a 20kL on-site detention tank and a 15kL rainwater harvesting tank, reticulating to Ground Floor and Level 1 amenities as minimum.
5.1 Peak-Discharge
The peak flow generated from the site will not be increased post development based on a 5-year Average Recurrence Interval (ARI).
5.2 Pollution Reduction
Table 6: Pollution reduction based on MUSIC assessment
Pollutant Reduction (% of typical urban annual load)
Total Suspended Soils (TSS) 98.4%
Gross Pollutants 100%
Total Nitrogen (TN) 63.4%
Total Phosphorus (TP) 88.3%
Note the approach to maintenance of systems will be defined upon equipment selections.
![Page 13: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/13.jpg)
9-13 Stewart Street, Richmond
Sustainable Management Plan
Commercial-in-Confidence
Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910
10 AECOM
6.0 Building Materials
To minimise the environmental impacts materials used by encouraging the use of materials with a favourable lifecycle assessment based on the following factors:
Fate of material
Recycling/Reuse
Embodied energy
Biodiversity
Human health
Environmental toxicity
Environmental responsibility.
The proposed development aims to use low impact products and materials, and to reduce waste to landfill.
6.1 Concrete
The impact of concrete in the project will be reduced by using concrete that ensure the following:
• At least 50% of concrete mix water used will be captured or reclaimed water
• At least 25% of fine aggregate (sand) inputs in the concrete are manufactured sand or other alternative materials, measured by mass across all concrete mixes in the project.
6.2 Structural and Reinforcing Steel
95% of the buildings steel (by mass) will be sourced from a responsible steel maker.
6.3 Timber Products
A minimum of 95% of all timber (by cost) used in the building and construction works will be from a reused source or be FSC or PEFC certified.
6.4 Permanent Formwork, Pipes, Flooring, Blinds and Cables
A minimum of 90% (by cost) of all permanent formwork, pipes, flooring, blinds and cables either:
• Will not contain PVC and have an Environmental Product Declaration (EPD); OR
• Will meet best practice guidelines for PVC
![Page 14: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/14.jpg)
9-13 Stewart Street, Richmond
Sustainable Management Plan
Commercial-in-Confidence
Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910
11 AECOM
7.0 Transport
To minimise car dependency.
To ensure that the built environment is designed to promote the use of public transport, walking and cycling.
The development is located 70m away from Richmond train station, 240m from Swan Street bus stop and 350m from Swan Street Tram stop. Design initiatives in relation to transport include the facilitation of sustainable transport as described below.
7.1 Transport Design Provisions
Table 7 tabulates the requirements for the BESS tool and the actual design provision.
Table 7: Sustainable transport requirements and provision.
BESS Tool Requirement Actual Design Provision
Car Parking (max) N/A 10
Bicycle Storage Space 25 Staff
1 Visitors
45 Staff
7 visitors
Showers 1 10
Lockers 45 57
Electric Vehicle 1 1
![Page 15: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/15.jpg)
9-13 Stewart Street, Richmond
Sustainable Management Plan
Commercial-in-Confidence
Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910
12 AECOM
8.0 Waste Management
To ensure waste avoidance, reuse and recycling during the design, construction and operation stages of development.
To ensure long term reusability of building materials.
The proposed development is committed to implementing waste management plans that facilitate the re-use, upcycling, and stewardship of items to reduce the quantity of outgoing waste, where practical.
8.1 Environmental Management
The Head Contractor will develop and administer a site-specific Environmental Management Plan (EMP) to be implemented before the start of construction. The EMP will be complaint with the requirements of Best Practice EMPs outlined within the NSW Environmental Management Systems Guideline.
8.2 Operational Waste
A project-specific Waste Management Plan (WMP) has been developed by AECOM for the base building in accordance with best practice approaches to recycling and appropriate storage. This is in line with BESS requirements.
8.3 Construction and Demolition Waste
The proposed development will ensure that at least 90% of the waste generated during construction and demolition will be diverted from landfill.
![Page 16: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/16.jpg)
9-13 Stewart Street, Richmond
Sustainable Management Plan
Commercial-in-Confidence
Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910
13 AECOM
9.0 Urban Ecology
To protect and enhance biodiversity.
To provide sustainable landscaping.
To protect and manage all remnant indigenous plant communities.
To encourage the planting of indigenous vegetation.
The proposed development is not built on land with high ecological significance and will retain existing fabric and maintain the heritage street wall. Given the proposed development location, there is minimal opportunity for increasing vegetation cover or providing a sustainable landscape.
9.1 Communal Spaces
186sqm of communal space is provided as a shared roof terrace between occupants. Landscaping and shading is provided via the overhead solar pergola.
![Page 17: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/17.jpg)
9-13 Stewart Street, Richmond
Sustainable Management Plan
Commercial-in-Confidence
Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910
14 AECOM
10.0 Construction and Building Management
To encourage a holistic and integrated design and construction process and ongoing high performance.
The following initiatives will ensure all building services operate to their full potential and as designed.
10.1 Commissioning and Tuning
A comprehensive services and maintainability review shall be conducted as part of the projects review process during the design phase of the building.
10.2 Building Information
Proper building handover to the building owner is essential to ensure the building is operated as designed. The building information will facilitate operator and user understanding of a building’s systems, the operation and maintenance requirements and the environmental targets, to enable optimised performance.
• Owners Project Requirements
- An owner’s project requirements (OPR) document will be prepared by the design team which lists a description of the basic functions, operations and maintenance of the nominated building systems including, environmental performance targets, as well as a description of the metering and monitoring in place.
• Operations and Maintenance Information
- Comprehensive Operations and Maintenance (O&M) information will be developed and made available to the facilities management team. A building log book will also be developed in line with CIBSE TM31.
• Building User Information
- Building user information will be provided in a digital format and made available to building users. This will include descriptions on the initiatives used to enhance the environmentally sustainable design of the development.
![Page 18: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/18.jpg)
9-13 Stewart Street, Richmond
Sustainable Management Plan
Commercial-in-Confidence
Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910
AECOM
Appendix A
MUSIC Assessment
![Page 19: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/19.jpg)
9-13 Stewart Street, Richmond
Sustainable Management Plan
Commercial-in-Confidence
Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910
A-1 AECOM
Appendix A MUSIC Assessment
![Page 20: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/20.jpg)
9-13 Stewart Street, Richmond
Sustainable Management Plan
Commercial-in-Confidence
Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910
AECOM
B
Appendix B
BESS Assessment
![Page 21: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/21.jpg)
12/6/2019 BESS - 9-13 Stewart St, Richmond VIC 3121, Australia
/
This BESS report outlines the sustainable design commitments of the proposed development at 9-13
Stewart St Richmond VIC 3121. The BESS report and accompanying documents and evidence are
submitted in response to the requirement for a Sustainable Design Assessment or Sustainability
Management Plan at Yarra City Council.
Note that where a Sustainability Management Plan is required, the BESS report must be accompanied by
a report that further demonstrates the development's potential to achieve the relevant environmental
performance outcomes and documents the means by which the performance outcomes can be
achieved.
9-13 Stewart St, Richmond 3121 Richmond
Site area: 899 m ·
Site type: Non-residential development m ·
Building Floor Area: 5255 m ·
Date of Assessment: 06 Dec 2019 ·
Version: V4, 1.6.0-B.254 ·
Applicant: [email protected]
Project Identifier
16B728E7Draft
Not suitable for submission to Council
http://bess.net.au/projects/16B728E7
Your BESS score is
66%
% of Total Category Score Pass
3 % Management 62 %
6 % Water 71 %
21
%Energy 77 %
14
%Stormwater 100 %
11
%IEQ 67 %
7 % Transport 75 %
4 % Waste 67 %
1 % Urban Ecology25 %
0 % Innovation 0 %
How did this Development Perform in each EnvironmentalCategory?
BESS Report
2
2
2
+
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
50% +
Best Practice
70% +
Excellence
DRAFTNOT SUITABLE FOR
SUBMISSION TO COUNCIL
![Page 22: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/22.jpg)
12/6/2019 BESS - 9-13 Stewart St, Richmond VIC 3121, Australia
/
Sustainable design commitments by category
The sustainable design commitments for this project are listed below. These are to be incorporated into
the design documentation and subsequently implemented.
Management
Credit Disabled Scoped out Score
Management 2.3 Thermal Performance Modelling - Non-Residential 100 %
Management 3.2 Metering 100 %
Management 3.3 Metering 100 %
Management 4.1 Building Users Guide 100 %
Management 2.3 Thermal Performance Modelling - Non-Residential
Score Contribution This credit contributes 25.0% towards this section's score.
AimTo encourage and recognise developments that have used modelling
to inform passive design at the early design stage
Questions
Has preliminary modelling been undertaken in accordance with either BCA Section J (Energy
Efficiency), NABERS or Green Star?
Yes
Maximum Available Your Building
Management Water Energy Stormwater IEQ Transport Waste Urban Ecology Innovation0%
10%
20%
30%
40%
62% - contributing 3% to overall score
100%DRAFT
NOT SUITABLE FORSUBMISSION TO COUNCIL
![Page 23: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/23.jpg)
12/6/2019 BESS - 9-13 Stewart St, Richmond VIC 3121, Australia
/
Management 3.2 Metering
Score Contribution This credit contributes 12.5% towards this section's score.
AimTo provide building users with information that allows monitoring of
energy and water consumption
Questions
Have utility meters been provided for all individual commercial tenants?
Yes
Management 3.3 Metering
Score Contribution This credit contributes 12.5% towards this section's score.
AimTo provide building users with information that allows monitoring of
energy and water consumption
Questions
Have all major common area services been separately submetered?
Yes
Management 4.1 Building Users Guide
Score Contribution This credit contributes 12.5% towards this section's score.
AimTo encourage and recognise initiatives that will help building users to
use the building efficiently
Questions
Will a building users guide be produced and issued to occupants?
Yes
Water
Credit Disabled Scoped out Score
Water 1.1 Potable water use reduction 60 %
100%
100%
100%
71% - contributing 6% to overall score
DRAFTNOT SUITABLE FOR
SUBMISSION TO COUNCIL
![Page 24: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/24.jpg)
12/6/2019 BESS - 9-13 Stewart St, Richmond VIC 3121, Australia
/
Water 3.1 Water Efficient Landscaping 100 %
Water 4.1 Building Systems Water Use Reduction 100 %
Water Approachs
What approach do you want to use Water? Provide our own calculations
Water 1.1 Potable water use reduction
Score Contribution This credit contributes 71.4% towards this section's score.
Aim
Water 1.1 Potable water use reduction (interior uses) What is the
reduction in total water use due to efficient fixtures, appliances, and
rainwater use? To achieve points in this credit there must be >25%
potable water reduction. You are using the built in calculation tools.
This credit is calculated from information you have entered above.
Criteria
What is the reduction in total potable water use due to efficient
fixtures, appliances, rainwater use and recycled water use? To achieve
points in this credit there must be >25% potable water reduction.
Questions
Percentage Achieved ?
48 %
Calculations
Reference (kL)
8332
Proposed (excluding rainwater and recycled water use) (kL)
6398
Rainwater or recycled water supplied (Internal + External) (kL)
-
Proposed (including rainwater and recycled water use) (kL)
6398
% Reduction in Potable Water Consumption
23 %
Water 3.1 Water Efficient Landscaping
Score Contribution This credit contributes 14.3% towards this section's score.
60%
Percentage %
Percentage %
100%
DRAFTNOT SUITABLE FOR
SUBMISSION TO COUNCIL
![Page 25: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/25.jpg)
12/6/2019 BESS - 9-13 Stewart St, Richmond VIC 3121, Australia
/
Aim
Are water efficiency principles used for landscaped areas? This
includes low water use plant selection (e.g. xeriscaping). Note: food
producing landscape areas and irrigation areas connected to
rainwater or an alternative water source are excluded from this
section.
Questions
Will water efficient landscaping be installed?
Yes
Water 4.1 Building Systems Water Use Reduction
Score Contribution This credit contributes 14.3% towards this section's score.
AimWill the project minimise water use for building systems such as
evaporative cooling and fire testing systems?
Questions
Where applicable, have measures been taken to reduce potable water consumption by >80% in
the buildings air-conditioning chillers and when testing fire safety systems?
Yes
Energy
Credit Disabled Scoped out Score
Energy 1.1 Thermal Performance Rating - Non-Residential 75 %
Energy 2.1 Greenhouse Gas Emissions 100 %
Energy 2.3 Electricity Consumption 100 %
Energy 2.4 Gas Consumption 100 %
Energy 3.1 Carpark Ventilation 100 %
Energy 3.7 Internal Lighting - Non-Residential 100 %
Energy 4.1 Combined Heat and Power (cogeneration / trigeneration) N/A
Energy 4.2 Renewable Energy Systems - Solar 100 %
Energy 1.1 Thermal Performance Rating - Non-Residential
Score Contribution This credit contributes 36.4% towards this section's score.
100%
77% - contributing 21% to overall score
75%
DRAFTNOT SUITABLE FOR
SUBMISSION TO COUNCIL
![Page 26: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/26.jpg)
12/6/2019 BESS - 9-13 Stewart St, Richmond VIC 3121, Australia
/
Aim
Reduce reliance on mechanical systems to achieve thermal comfort in
summer and winter - improving comfort, reducing greenhouse gas
emissions, energy consumption, and maintenance costs.
CriteriaWhat is the % reduction in heating and cooling energy consumption
against the reference case (NCC 2016 BCA Volume 1 Section J)
Questions
Criteria Achieved ?
-
Calculations
Total Improvement
58 %
Energy 2.1 Greenhouse Gas Emissions
Score Contribution This credit contributes 9.1% towards this section's score.
Aim Reduce the building's greenhouse gas emissions
Criteria Are greenhouse gas emissions >10% below the benchmark
Questions
Criteria Achieved ?
-
Calculations
Reference Building with Reference Services (BCA only)
457584.0
Proposed Building with Proposed Services (Actual Building)
196689.1
% Reduction in GHG Emissions
57 %
Energy 2.3 Electricity Consumption
Score Contribution This credit contributes 9.1% towards this section's score.
Aim Reduce consumption of electricity
Criteria Is the annual electricity consumption >10% below the benchmark
Percentage %
100%
kg CO2
kg CO2
Percentage %
100%
DRAFTNOT SUITABLE FOR
SUBMISSION TO COUNCIL
![Page 27: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/27.jpg)
12/6/2019 BESS - 9-13 Stewart St, Richmond VIC 3121, Australia
/
Questions
Criteria Achieved ?
-
Calculations
Reference
409926.0
Proposed
176205.0
Improvement
57 %
Energy 2.4 Gas Consumption
Score Contribution This credit contributes 9.1% towards this section's score.
Aim Reduce consumption of electricity
Criteria Is the annual gas consumption >10% below the benchmark?
Questions
Criteria Achieved ?
-
Calculations
Reference
368933.0
Proposed
158555.4
Improvement
57 %
Energy 3.1 Carpark Ventilation
Score Contribution This credit contributes 9.1% towards this section's score.
Questions
kWh
kWh
Percentage %
100%
MJ
MJ
Percentage %
100%
DRAFTNOT SUITABLE FOR
SUBMISSION TO COUNCIL
![Page 28: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/28.jpg)
12/6/2019 BESS - 9-13 Stewart St, Richmond VIC 3121, Australia
/
If you have a basement carpark, is it either: (a) fully naturally ventilated (no mechanical ventilation
system), or (b) use Carbon Monoxide monitoring to control the operation and speed of the
ventilation fans
Yes
Energy 3.7 Internal Lighting - Non-Residential
Score Contribution This credit contributes 9.1% towards this section's score.
Aim Reduce energy consumption associated with internal lighting
Questions
Is the maximum illumination power density (W/m2) in at least 90% of the relevant building class
at least 20% lower than required by Table J6.2a of the NCC 2016 BCA Volume 1 Section J
(Class 2 to 9)
Yes
Energy 4.1 Combined Heat and Power (cogeneration / trigeneration)
This credit was scoped out: No cogeneration or trigeneration system in use.
This credit was disabled: No cogeneration or trigeneration system in use.
Aim Reduce energy consumption
CriteriaDoes the CHP system reduce the class of buildings GHG emissions
by more than 25%?
Energy 4.2 Renewable Energy Systems - Solar
Score Contribution This credit contributes 4.5% towards this section's score.
Aim To encourage the installation of on-site renewable energy generation
CriteriaDoes the solar power system provide 5% of the estimated energy
consumption of the building class it supplies?
Questions
Calculations
Solar Power - Energy Generation per year
37527.8
% of Building's Energy
17 %
100%
N/A
100%
kWh
Percentage %
DRAFTNOT SUITABLE FOR
SUBMISSION TO COUNCIL
![Page 29: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/29.jpg)
12/6/2019 BESS - 9-13 Stewart St, Richmond VIC 3121, Australia
/
Stormwater
Credit Disabled Scoped out Score
Stormwater 1.1 Stormwater Treatment 100 %
Which stormwater modelling are you using? MUSIC or other modelling software
Stormwater 1.1 Stormwater Treatment
Score Contribution This credit contributes 100.0% towards this section's score.
Aim
To achieve best practice stormwater quality objectives through
reduction of pollutant load (suspended solids, nitrogen and
phosphorus)
Criteria Has best practice stormwater management been demonstrated?
Questions
STORM score achieved
100
Flow (ML/year)
51.7
Total Suspended Solids (kg/year)
98.4
Total Phosphorus (kg/year)
88.3
Total Nitrogen (kg/year)
63.4
IEQ
Credit Disabled Scoped out Score
IEQ 1.4 Daylight Access - Non-Residential 67 %
100% - contributing 14% to overall score
100%
% Reduction
% Reduction
% Reduction
% Reduction
67% - contributing 11% to overall score
DRAFTNOT SUITABLE FOR
SUBMISSION TO COUNCIL
![Page 30: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/30.jpg)
12/6/2019 BESS - 9-13 Stewart St, Richmond VIC 3121, Australia
/
IEQ 1.4 Daylight Access - Non-Residential
Score Contribution This credit contributes 100.0% towards this section's score.
AimTo provide a high level of amenity and energy efficiency through
design for natural light.
Criteria What % of the nominated floor area has at least 2% daylight factor?
Questions
% Achieved ?
60 %
Transport
Credit Disabled Scoped out Score
Transport 1.4 Bicycle Parking - Non-Residential 100 %
Transport 1.5 Bicycle Parking - Non-Residential Visitor 100 %
Transport 1.6 End of Trip Facilities - Non-Residential 100 %
Transport 2.1 Electric Vehicle Infrastructure 100 %
Transport 1.4 Bicycle Parking - Non-Residential
Score Contribution This credit contributes 25.0% towards this section's score.
Aim To encourage and recognise initiatives that facilitate cycling
Criteria
Have the planning scheme requirements for employee bicycle parking
been exceeded by at least 50% (or a minimum of 2 where there is no
planning scheme requirement)?
Questions
Have the planning scheme requirements for employee bicycle parking been exceeded by at
least 50% (or a minimum of 2 where there is no planning scheme requirement)?
Yes
Bicycle Spaces Provided ?
52
Transport 1.5 Bicycle Parking - Non-Residential Visitor
67%
75% - contributing 7% to overall score
100%
100%
DRAFTNOT SUITABLE FOR
SUBMISSION TO COUNCIL
![Page 31: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/31.jpg)
12/6/2019 BESS - 9-13 Stewart St, Richmond VIC 3121, Australia
/
Score Contribution This credit contributes 12.5% towards this section's score.
Aim To encourage and recognise initiatives that facilitate cycling
Criteria
Have the planning scheme requirements for visitor bicycle parking
been exceeded by at least 50% (or a minimum of 1 where there is no
planning scheme requirement)?
Questions
Have the planning scheme requirements for visitor bicycle parking been exceeded by at least
50% (or a minimum of 1 where there is no planning scheme requirement)?
Yes
Bicycle Spaces Provided ?
10
Transport 1.6 End of Trip Facilities - Non-Residential
Score Contribution This credit contributes 12.5% towards this section's score.
Aim To encourage and recognise initiatives that facilitate cycling
Criteria
Where adequate bicycle parking has been provided. Is there also: * 1
shower for the first 5 employee bicycle spaces plus 1 to each 10
employee bicycles spaces thereafter, * changing facilities adjacent to
showers, and * one secure locker per employee bicycle space in the
vicinity of the changing / shower facilities?
Questions
Number of showers provided ?
10
Number of lockers provided ?
58
Calculations
Min Showers Required
1
Min Lockers Required
52
Transport 2.1 Electric Vehicle Infrastructure
Score Contribution This credit contributes 25.0% towards this section's score.
100%
100%
DRAFTNOT SUITABLE FOR
SUBMISSION TO COUNCIL
![Page 32: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/32.jpg)
12/6/2019 BESS - 9-13 Stewart St, Richmond VIC 3121, Australia
/
AimTo facilitate the expansion of infrastructure to support electric vehicle
charging
Questions
Are facilities are provided for the charging of electric vehicles?
Yes
Waste
Credit Disabled Scoped out Score
Waste 2.1 - Operational Waste - Food & Garden Waste 100 %
Waste 2.2 - Operational Waste - Convenience of Recycling 100 %
Waste 2.1 - Operational Waste - Food & Garden Waste
Score Contribution This credit contributes 33.3% towards this section's score.
Aim To minimise organic waste going to landfill
Questions
Are facilities provided for on-site management of food and garden waste?
Yes
Waste 2.2 - Operational Waste - Convenience of Recycling
Score Contribution This credit contributes 33.3% towards this section's score.
Aim To minimise recyclable material going to landfill
Questions
Are the recycling facilities at least as convenient for occupants as facilities for general waste?
Yes
Urban Ecology
67% - contributing 4% to overall score
100%
100%
25% - contributing 1% to overall score
DRAFTNOT SUITABLE FOR
SUBMISSION TO COUNCIL
![Page 33: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/33.jpg)
12/6/2019 BESS - 9-13 Stewart St, Richmond VIC 3121, Australia
/
Credit Disabled Scoped out Score
Urban Ecology 1.1 Communal Spaces 100 %
Urban Ecology 2.1 Vegetation 25 %
Urban Ecology 1.1 Communal Spaces
Score Contribution This credit contributes 12.5% towards this section's score.
AimTo encourage and recognise initiatives that facilitate interaction
between building occupants
Criteria
Is there at least the following amount of common space measured in
square meters : * 1m² for each of the first 50 occupants * Additional
0.5m² for each occupant between 51 and 250 * Additional 0.25m² for
each occupant above 251
Questions
Common space provided
267.0
Calculations
Minimum Common Space Required
242
Urban Ecology 2.1 Vegetation
Score Contribution This credit contributes 50.0% towards this section's score.
AimTo encourage and recognise the use of vegetation and landscaping
within and around developments
CriteriaHow much of the site is covered with vegetation, expressed as a
percentage of the total site area.
Questions
Percentage Achieved ?
5 %
Innovation
100%
Square Metres
Square Metres
25%
Percentage %
0% - contributing 0% to overall score
DRAFTNOT SUITABLE FOR
SUBMISSION TO COUNCIL
![Page 34: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/34.jpg)
12/6/2019 BESS - 9-13 Stewart St, Richmond VIC 3121, Australia
/
Incomplete
Incomplete
Incomplete
Incomplete
Incomplete
Incomplete
Incomplete
Incomplete
Incomplete
Incomplete
Incomplete
Incomplete
Incomplete
Incomplete
Incomplete
Incomplete
Incomplete
Incomplete
Incomplete
Incomplete
Incomplete
Items to be marked on floorplans
Urban Ecology 1.1: Size and location of communal spaces
Urban Ecology 2.1: Vegetated areas
Waste 2.1: Location of food and garden waste facilities
Waste 2.2: Location of recycling facilities
Transport 1.4: All nominated non-residential bicycle parking spaces
Transport 1.5: All nominated non-residential visitor bicycle parking spaces
Transport 1.6: Showers, change rooms and lockers as nominated
Transport 2.1: Location of electric vehicle charging infrastructure
Stormwater 1.1: Location of any stormwater management systems used
in STORM or MUSIC modelling (e.g. Rainwater tanks, raingarden, buffer
strips)
Energy 3.1: Carpark with natural ventilation or CO monitoring system
Energy 4.2: Floor plans showing location of photovoltaic panels as
described.
Water 3.1: Water efficient garden annotated
Management 3.2: Individual utility meters annotated
Management 3.3: Common area submeters annotated
Documents and evidence
IEQ 1.4: A short report detailing assumptions used and results achieved.
Stormwater 1.1: STORM report or MUSIC model
Energy 1.1: Energy Report showing calculations of reference case and
proposed buildings
Energy 3.1: Provide a written explanation of either the fully natural carpark
ventilation or carbon monxide monitoring, describing how these systems
will work, what systems are required for them to be fully integrated and
who will be responsible for their implementation throughout the design,
procurement and operational phases of the building life.
Energy 3.7: Provide a written description of the average lighting power
density to be installed in the development and specify the lighting type(s)
to be used.
Energy 4.2: Specifications of the solar photovoltaic system(s).
Management 2.3: Preliminary modelling report
0 / 14 floorplans & elevation notes complete.
0 / 7 supporting evidence documentation complete.DRAFTNOT SUITABLE FOR
SUBMISSION TO COUNCIL
![Page 35: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed](https://reader036.vdocument.in/reader036/viewer/2022071017/5fd11a449965e2757b43cfa9/html5/thumbnails/35.jpg)
12/6/2019 BESS - 9-13 Stewart St, Richmond VIC 3121, Australia
/
The Built Environment Sustainability Scorecard (BESS) has been provided for the purpose of information
and communication. While we make every effort to ensure that material is accurate and up to date
(except where denoted as ‘archival’), this material does in no way constitute the provision of professional
or specific advice. You should seek appropriate, independent, professional advice before acting on any of
the areas covered by BESS.
The Municipal Association of Victoria (MAV) and CASBE (Council Alliance for a Sustainable Built
Environment) member councils do not guarantee, and accept no legal liability whatsoever arising from or
connected to, the accuracy, reliability, currency or completeness of BESS, any material contained on this
website or any linked sites.
DRAFTNOT SUITABLE FOR
SUBMISSION TO COUNCIL