Page 1: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910

9-13 Stewart Street, Richmond

Hines Australia Pty Ltd

04-Mar-2020

Doc No. 60613433-RPES-002

Commercial-in-Confidence

Sustainable Management Plan

Page 2: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

9-13 Stewart Street, Richmond

Sustainable Management Plan

Commercial-in-Confidence

Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910

AECOM

Sustainable Management Plan

Client: Hines Australia Pty Ltd

ABN: 54 157 826 910

Prepared by

AECOM Australia Pty Ltd

Level 10, Tower Two, 727 Collins Street, Melbourne VIC 3008, Australia

T +61 3 9653 1234 F +61 3 9654 7117 www.aecom.com

ABN 20 093 846 925

04-Mar-2020

Job No.: 60613433

AECOM in Australia and New Zealand is certified to ISO9001, ISO14001 AS/NZS4801 and OHSAS18001.

Printed on environmentally responsible paper.

© AECOM Australia Pty Ltd (AECOM). All rights reserved.

AECOM has prepared this document for the sole use of the Client and for a specific purpose, each as expressly stated in the document. No other

party should rely on this document without the prior written consent of AECOM. AECOM undertakes no duty, nor accepts any responsibility, to any

third party who may rely upon or use this document. This document has been prepared based on the Client’s description of its requirements and

AECOM’s experience, having regard to assumptions that AECOM can reasonably be expected to make in accordance with sound professional

principles. AECOM may also have relied upon information provided by the Client and other third parties to prepare this document, some of which

may not have been verified. Subject to the above conditions, this document may be transmitted, reproduced or disseminated only in its entirety.

Page 3: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

9-13 Stewart Street, Richmond

Sustainable Management Plan

Commercial-in-Confidence

Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910

AECOM

Quality Information

Document Sustainable Management Plan

Ref 60613433

Date 04-Mar-2020

Prepared by Anjali Thirumalavan

Reviewed by Sian Willmott

Revision History

Rev Revision Date Details Authorised

Name/Position Signature

A 06-Dec-2019 Town Planning - Draft Angelo Varvaras Principal Electrical Engineer

B 13-Dec-2019 Town Planning Angelo Varvaras Principal Electrical Engineer

C 04-Mar-2020 Town Planning Angelo Varvaras Principal Electrical Engineer

Page 4: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

9-13 Stewart Street, Richmond

Sustainable Management Plan

Commercial-in-Confidence

Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910

1 AECOM

Table of Contents

1.0 Introduction 2 2.0 Indoor Environment Quality (IEQ) 3

2.1 Quality of Internal Air 3 2.2 Acoustic comfort 3 2.3 Lighting comfort 3 2.4 Visual comfort 4 2.5 Reduced exposure to pollutants 4 2.6 Thermal comfort 5

3.0 Energy Efficiency 6 3.1 Operating Energy 6

3.1.1 Passive Design 6 3.1.2 Active Design 6

3.2 Renewable Energy 6 3.3 Energy Metering 7

4.0 Water Efficiency 8 4.1 Minimising Amenity Water Demand 8 4.2 Water Metering 8 4.3 Landscape Irrigation 8 4.4 Rainwater Harvesting 8 4.5 Fire System Water 8

5.0 Stormwater Management 9 5.1 Peak-Discharge 9 5.2 Pollution Reduction 9

6.0 Building Materials 10 6.1 Concrete 10 6.2 Structural and Reinforcing Steel 10 6.3 Timber Products 10 6.4 Permanent Formwork, Pipes, Flooring, Blinds and Cables 10

7.0 Transport 11 7.1 Transport Design Provisions 11

8.0 Waste Management 12 8.1 Environmental Management 12 8.2 Operational Waste 12 8.3 Construction and Demolition Waste 12

9.0 Urban Ecology 13 9.1 Communal Spaces 13

10.0 Construction and Building Management 14 10.1 Commissioning and Tuning 14 10.2 Building Information 14

Appendix A MUSIC Assessment A

Appendix B BESS Assessment B

Page 5: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

9-13 Stewart Street, Richmond

Sustainable Management Plan

Commercial-in-Confidence

Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910

2 AECOM

1.0 Introduction

The proposed development at 9-13 Stewart street, Richmond is a 10-storey mixed retail, food & beverage and commercial office building located within the City of Yarra. It aims to bring innovation and creative quality to the area in the use of mass timber framing as the primary structure for the upper podium levels 4-9, with a foundation of concrete framing to the basement levels, ground retail level and podium levels of 1-3. The façade has been optimised to consider solar insolation across all orientations, including the effects of overshadowing from the neighbouring buildings. This presents an opportunity for an integrated sustainable design for the façade due to the varying sunlight exposure across different levels of the commercial office floors.

The proposed sustainability principles, priorities, and benchmarks for the project have been developed based on the City of Yarra Town Planning requirements as influenced by the Built Environment Sustainability Scorecard (BESS) assessment and current best industry practice.

Sustainability initiatives have been proposed that will reduce ongoing emissions, whilst providing a working environment with a focus on high indoor environmental quality that will attract and retain tenants.

The functional Net Lettable Area (NLA) of the proposed development can be broken down in Table 1 below.

Table 1: NLA of proposed development

Space Type Floors Approximate NLA (m2)

Food & Beverage Ground 98

Retail Ground 242

Office L1-9 4,835

Page 6: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

9-13 Stewart Street, Richmond

Sustainable Management Plan

Commercial-in-Confidence

Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910

3 AECOM

2.0 Indoor Environment Quality (IEQ)

To achieve a healthy indoor environment quality for the wellbeing of building occupants.

To provide a naturally comfortable indoor environment will lower the need for building services, such as artificial lighting, mechanical ventilation and cooling and heating devices.

The proposed development has a strong focus on achieving a healthy indoor environmental quality for the wellbeing of the building occupants.

2.1 Quality of Internal Air

To ensure that the building occupants are provided with a healthy indoor environment, the following initiatives have been included within the design of the mechanical system.

• Ventilation System Attributes

• The ventilation system is designed such that the outdoor air pollutants are minimised (designed to comply with ASHRAE Standard 62.1:2013 in regard to minimum separation distances between pollution sources and outdoor air intakes), adequate access to maintain both of all moisture and debris-catching components is provided. In addition, all new and existing ductwork will be cleaned prior to occupation (or sealed during construction works to avoid contamination).

• Exhaust or Elimination of Pollutants

- Printing and Photocopy Equipment

- All printing and photocopy equipment will be compliant with minimum emissions standard and certified in accordance with CMA-328, RAL-UZ 122 or GGPS.003 by a NATA accredited or ISO 17025 accredited laboratory.

- Kitchen Area

- Each kitchen area with stove or exhaust will have provisions for a dedicated separate exhaust and ventilated in accordance with AS1668.2.

2.2 Acoustic comfort

The development has been designed such that internal ambient noise levels in the nominated area are suitable and relevant to the activity type in the room per AS/NZS2107:2016. This includes all sound generated by the building systems and any external noise ingress.

2.3 Lighting comfort

All lighting in the development is designed to maintain illuminance that meets the levels recommended in the relevant standard for different space types within the building. The lighting system is designed to comply with the Luminaire selection system as detailed in Section 8.3.4 of AS 1680.1-2006.

Page 7: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

9-13 Stewart Street, Richmond

Sustainable Management Plan

Commercial-in-Confidence

Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910

4 AECOM

2.4 Visual comfort

The proposed development has a strong focus on the use of natural light and light uniformity, along with access to excellent views from all levels. The architectural aesthetic aligns with the need to emphasise the natural environment where ever possible within the building design.

• Daylight

The preliminary modelling of the development indicates that >60% of the internal office spaces shall have a daylight factor of 2% or greater.

• Views

The layout and façade design of the proposed development includes high exposure to the outside

2.5 Reduced exposure to pollutants

The development is designed such that:

• At least 95% of all internally applied paints, adhesives, sealants and carpets to meet stipulated ‘Total Volatile Organic Compound Limits’ (TVOC) specified in Table 2 and Table 3.

Table 2: TVOC Limits for Paints, Adhesives and Sealants

Product Category Max TVOC (g/L)

General purpose adhesives and sealants 50

Interior wall and ceiling paint, all sheen levels Target 5, Maximum 16

Trim, varnishes and wood stains 75

Primers, sealers and prep coats 65

One and two pack performance coatings for floors 140

Acoustic sealants, architectural sealant, waterproofing membranes and sealant, fire retardant sealants and adhesives

250

Structural glazing adhesive, wood flooring and laminate adhesives and sealants

100

Table 3: Carpet Test Standards and TVOC Emission Limits

Test Protocol Limit

ASTM D5116 –Total VOC limit 0.5mg/m2

ASTM D5116 – 4-PC (4‑Phenylcyclohexene) 0.05mg/m2

ISO 16000 / EN 13419 - TVOC at three days 0.5mg/m2

ISO 10580 / ISO/TC 219 (Document N238) - TVOC at 24 hours

0.5mg/m2

• At least 95% of all engineered wood products meet stipulated formaldehyde limits specified in Table 4.

Page 8: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

9-13 Stewart Street, Richmond

Sustainable Management Plan

Commercial-in-Confidence

Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910

5 AECOM

Table 4: Formaldehyde Emission Limit Values for Engineered Wood Products

Test Protocol Emission Limit

AS/NZS 2269:2004, testing procedure AS/NZS 2098.11:2005 method 10 for Plywood

≤1mg/ L

AS/NZS 1859.1:2004 - Particle Board, with use of testing procedure AS/NZS 4266.16:2004 method 16

≤1.5 mg/L

AS/NZS 1859.2:2004 - MDF, with use of testing procedure AS/NZS 4266.16:2004 method 16

≤1mg/ L

AS/NZS 4357.4 - Laminated Veneer Lumber (LVL) ≤1mg/ L

Japanese Agricultural Standard MAFF Notification No.701 Appendix Clause 3 (11) - LVL

≤1mg/ L

JIS A 5908:2003- Particle Board and Plywood, with use of testing procedure JIS A 1460

≤1mg/ L

JIS A 5905:2003 - MDF, with use of testing procedure JIS A 1460 ≤1mg/ L

JIS A1901 (not applicable to Plywood, applicable to high pressure laminates and compact laminates)

≤0.1 mg/m²/hr

ASTM D5116 (applicable to high pressure laminates and compact laminates)

≤0.1 mg/m²/hr

ISO 16000 part 9, 10 and 11 (also known as EN 13419), applicable to high pressure laminates and compact laminates

≤0.1 mg/m²/hr (at 3 days)

ASTM D6007 ≤0.12mg/m³*

ASTM E1333 ≤0.12mg/m³**

EN 717-1 (also known as DIN EN 717-1) ≤0.12mg/m³

EN 717-2 (also known as DIN EN 717-2) ≤3.5mg/m²hr*

2.6 Thermal comfort

The development has been designed to provide a high degree of thermal comfort, delivering a Predicted Mean Vote (PMV) between -1 and +1 for 95% of the nominated area for 98% of the year.

Page 9: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

9-13 Stewart Street, Richmond

Sustainable Management Plan

Commercial-in-Confidence

Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910

6 AECOM

3.0 Energy Efficiency

To ensure the efficient use of energy.

To reduce total operating greenhouse emissions.

To reduce energy peak demand.

To reduce associated energy costs.

The proposed development at 9-13 Stewart Street, Richmond has a strong emphasis on reducing operational energy consumption, peak energy demand on the local electrical grid, and encouraging current best practice standards. The sustainability principle and policy for energy efficiency is taken from a target to meet best practice requirements set by BESS tool of the City of Yarra and a 5.5 Star NABERS Energy rating. The following provides a high-level description of the proposed mechanical system and passive architectural features included within the design to achieve the set targets.

3.1 Operating Energy

Energy efficiency measures for the development have been included via both active and passive strategies outlined below.

3.1.1 Passive Design

The passive design focus for the proposed development is centred around the façade orientations solar insolation levels due to the surrounding context. The upper podium levels receive a high amount of solar insolation incident on the façade on the north, east and west facades. The top six levels and top seven levels receive no overshadowing on the northern façade and eastern façade respectively, however the lower levels are affected by overshadowing from the three-storey apartment buildings on Margaret Street and Stewart Street. The western façade is largely exposed to the sun throughout the year from level 5 upwards, however due to the design of the development, the core elements (lifts, services, bathrooms and stairs) cover more than half of the façade. Due to varying exposure to the sun, the design of the building integrates 300mm horizontal and 300mm vertical shading on north, east and west facades.

3.1.2 Active Design

High efficiency air-cooled roof mounted chillers will be provided to the development. The selected chillers will have a full load Energy Efficiency Ratio (EER) of no less than 3.88; and part load operating efficiencies around 6-7. This is a significant improvement on National Construction Code (NCC) 2019 requirements.

Condensing boilers are proposed for heating hot water (HHW) with a full load efficiency of 95%.

The HVAC service strategy is proposed to include Air Handling Units (AHUs) which will serve the office floors with supply air via a low temperature Variable Air Volume (VAV) system.

Lighting will be LED throughout.

Carbon Monoxide monitoring is included within the car park ventilation system to control the operation and speed of ventilation fans.

3.2 Renewable Energy

The development is designed to incorporate 96 photovoltaic (PV) panels at roof levels to offset some operational energy. The PV panels are sized at 28.8kWp and are estimated to generate 32,346kWh per annum. These will be located on the roof and integrated around any required plant and services penetrations.

Page 10: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

9-13 Stewart Street, Richmond

Sustainable Management Plan

Commercial-in-Confidence

Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910

7 AECOM

3.3 Energy Metering

The development is designed to ensure accessible metering is provided to monitor energy consumption and that the utility meters meet metering guidelines under the weights and measures legislation, as outlines under the current National Measurement Regulations. A monitoring system capable of capturing and processing the data produced by installed energy meters is also provided.

Page 11: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

9-13 Stewart Street, Richmond

Sustainable Management Plan

Commercial-in-Confidence

Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910

8 AECOM

4.0 Water Efficiency

To ensure the efficient use of water.

To reduce total operating potable water use.

To encourage the collection and reuse of stormwater.

To encourage the appropriate use of alternative water sources (e.g. grey water).

To minimize associated water costs.

The proposed development is committed to reducing the amount of potable water consumption throughout the operation of the building by 48% when compared to standard practice. This includes the design of a landscape that uses subsurface drip irrigation system, and the selection of water efficient fixtures across the entire building.

4.1 Minimising Amenity Water Demand

The fixtures and fittings for the proposed development will meet (as a minimum) the requirements as listed in 5 below.

Table 5: Minimum WELS requirements

Fixture/Fitting WELS Rating Water Flow Rate

Toilets 3.5 Star 3.5L average flush

Urinals 6 Star 0.8 L/flush

Taps 4.5 Star 4.5 L/min

Showers 6.5 Star 6.5 L/min

4.2 Water Metering

The development is designed to ensure accessible metering is provided to monitor water consumption. A monitoring system capable of detecting leaks and capturing and processing the data produced by installed water meters is also provided.

4.3 Landscape Irrigation

The landscaping is also designed to reduce the consumption of potable water required for irrigating through the installation of subsurface drip irrigation system. The proposed plants for the development will be predominantly native.

4.4 Rainwater Harvesting

Rainwater will be harvested from the development rooftop and reticulated to a 15kL tank located in the basement. The rainwater will be reticulated to ground floor and Level 1 amenities as a minimum.

4.5 Fire System Water

The fire system is designed to capture and reuse 80% of test water.

Page 12: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

9-13 Stewart Street, Richmond

Sustainable Management Plan

Commercial-in-Confidence

Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910

9 AECOM

5.0 Stormwater Management

To reduce the impact of stormwater run-off.

To improve the water quality of stormwater run-off.

To achieve best practice stormwater quality outcomes.

To incorporate water sensitive urban design principles.

The following initiatives are integrated within the hydraulic and civil engineering design to reduce the impact of stormwater run-off. MUSIC modelling has been completed for the site, demonstrating that the below targets can be met with a 20kL on-site detention tank and a 15kL rainwater harvesting tank, reticulating to Ground Floor and Level 1 amenities as minimum.

5.1 Peak-Discharge

The peak flow generated from the site will not be increased post development based on a 5-year Average Recurrence Interval (ARI).

5.2 Pollution Reduction

Table 6: Pollution reduction based on MUSIC assessment

Pollutant Reduction (% of typical urban annual load)

Total Suspended Soils (TSS) 98.4%

Gross Pollutants 100%

Total Nitrogen (TN) 63.4%

Total Phosphorus (TP) 88.3%

Note the approach to maintenance of systems will be defined upon equipment selections.

Page 13: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

9-13 Stewart Street, Richmond

Sustainable Management Plan

Commercial-in-Confidence

Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910

10 AECOM

6.0 Building Materials

To minimise the environmental impacts materials used by encouraging the use of materials with a favourable lifecycle assessment based on the following factors:

Fate of material

Recycling/Reuse

Embodied energy

Biodiversity

Human health

Environmental toxicity

Environmental responsibility.

The proposed development aims to use low impact products and materials, and to reduce waste to landfill.

6.1 Concrete

The impact of concrete in the project will be reduced by using concrete that ensure the following:

• At least 50% of concrete mix water used will be captured or reclaimed water

• At least 25% of fine aggregate (sand) inputs in the concrete are manufactured sand or other alternative materials, measured by mass across all concrete mixes in the project.

6.2 Structural and Reinforcing Steel

95% of the buildings steel (by mass) will be sourced from a responsible steel maker.

6.3 Timber Products

A minimum of 95% of all timber (by cost) used in the building and construction works will be from a reused source or be FSC or PEFC certified.

6.4 Permanent Formwork, Pipes, Flooring, Blinds and Cables

A minimum of 90% (by cost) of all permanent formwork, pipes, flooring, blinds and cables either:

• Will not contain PVC and have an Environmental Product Declaration (EPD); OR

• Will meet best practice guidelines for PVC

Page 14: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

9-13 Stewart Street, Richmond

Sustainable Management Plan

Commercial-in-Confidence

Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910

11 AECOM

7.0 Transport

To minimise car dependency.

To ensure that the built environment is designed to promote the use of public transport, walking and cycling.

The development is located 70m away from Richmond train station, 240m from Swan Street bus stop and 350m from Swan Street Tram stop. Design initiatives in relation to transport include the facilitation of sustainable transport as described below.

7.1 Transport Design Provisions

Table 7 tabulates the requirements for the BESS tool and the actual design provision.

Table 7: Sustainable transport requirements and provision.

BESS Tool Requirement Actual Design Provision

Car Parking (max) N/A 10

Bicycle Storage Space 25 Staff

1 Visitors

45 Staff

7 visitors

Showers 1 10

Lockers 45 57

Electric Vehicle 1 1

Page 15: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

9-13 Stewart Street, Richmond

Sustainable Management Plan

Commercial-in-Confidence

Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910

12 AECOM

8.0 Waste Management

To ensure waste avoidance, reuse and recycling during the design, construction and operation stages of development.

To ensure long term reusability of building materials.

The proposed development is committed to implementing waste management plans that facilitate the re-use, upcycling, and stewardship of items to reduce the quantity of outgoing waste, where practical.

8.1 Environmental Management

The Head Contractor will develop and administer a site-specific Environmental Management Plan (EMP) to be implemented before the start of construction. The EMP will be complaint with the requirements of Best Practice EMPs outlined within the NSW Environmental Management Systems Guideline.

8.2 Operational Waste

A project-specific Waste Management Plan (WMP) has been developed by AECOM for the base building in accordance with best practice approaches to recycling and appropriate storage. This is in line with BESS requirements.

8.3 Construction and Demolition Waste

The proposed development will ensure that at least 90% of the waste generated during construction and demolition will be diverted from landfill.

Page 16: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

9-13 Stewart Street, Richmond

Sustainable Management Plan

Commercial-in-Confidence

Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910

13 AECOM

9.0 Urban Ecology

To protect and enhance biodiversity.

To provide sustainable landscaping.

To protect and manage all remnant indigenous plant communities.

To encourage the planting of indigenous vegetation.

The proposed development is not built on land with high ecological significance and will retain existing fabric and maintain the heritage street wall. Given the proposed development location, there is minimal opportunity for increasing vegetation cover or providing a sustainable landscape.

9.1 Communal Spaces

186sqm of communal space is provided as a shared roof terrace between occupants. Landscaping and shading is provided via the overhead solar pergola.

Page 17: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

9-13 Stewart Street, Richmond

Sustainable Management Plan

Commercial-in-Confidence

Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910

14 AECOM

10.0 Construction and Building Management

To encourage a holistic and integrated design and construction process and ongoing high performance.

The following initiatives will ensure all building services operate to their full potential and as designed.

10.1 Commissioning and Tuning

A comprehensive services and maintainability review shall be conducted as part of the projects review process during the design phase of the building.

10.2 Building Information

Proper building handover to the building owner is essential to ensure the building is operated as designed. The building information will facilitate operator and user understanding of a building’s systems, the operation and maintenance requirements and the environmental targets, to enable optimised performance.

• Owners Project Requirements

- An owner’s project requirements (OPR) document will be prepared by the design team which lists a description of the basic functions, operations and maintenance of the nominated building systems including, environmental performance targets, as well as a description of the metering and monitoring in place.

• Operations and Maintenance Information

- Comprehensive Operations and Maintenance (O&M) information will be developed and made available to the facilities management team. A building log book will also be developed in line with CIBSE TM31.

• Building User Information

- Building user information will be provided in a digital format and made available to building users. This will include descriptions on the initiatives used to enhance the environmentally sustainable design of the development.

Page 18: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

9-13 Stewart Street, Richmond

Sustainable Management Plan

Commercial-in-Confidence

Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910

AECOM

Appendix A

MUSIC Assessment

Page 19: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

9-13 Stewart Street, Richmond

Sustainable Management Plan

Commercial-in-Confidence

Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910

A-1 AECOM

Appendix A MUSIC Assessment

Page 20: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

9-13 Stewart Street, Richmond

Sustainable Management Plan

Commercial-in-Confidence

Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910

AECOM

B

Appendix B

BESS Assessment

Page 21: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

12/6/2019 BESS - 9-13 Stewart St, Richmond VIC 3121, Australia

/

This BESS report outlines the sustainable design commitments of the proposed development at 9-13

Stewart St Richmond VIC 3121. The BESS report and accompanying documents and evidence are

submitted in response to the requirement for a Sustainable Design Assessment or Sustainability

Management Plan at Yarra City Council.

Note that where a Sustainability Management Plan is required, the BESS report must be accompanied by

a report that further demonstrates the development's potential to achieve the relevant environmental

performance outcomes and documents the means by which the performance outcomes can be

achieved.

9-13 Stewart St, Richmond 3121 Richmond

Site area: 899 m ·

Site type: Non-residential development m ·

Building Floor Area: 5255 m ·

Date of Assessment: 06 Dec 2019 ·

Version: V4, 1.6.0-B.254 ·

Applicant: [email protected]

Project Identifier

16B728E7Draft

Not suitable for submission to Council

http://bess.net.au/projects/16B728E7

Your BESS score is

66%

% of Total Category Score Pass

3 % Management 62 %

6 % Water 71 %

21

%Energy 77 %

14

%Stormwater 100 %

11

%IEQ 67 %

7 % Transport 75 %

4 % Waste 67 %

1 % Urban Ecology25 %

0 % Innovation 0 %

How did this Development Perform in each EnvironmentalCategory?

BESS Report

2

2

2

+

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

50% +

Best Practice

70% +

Excellence

DRAFTNOT SUITABLE FOR

SUBMISSION TO COUNCIL

Page 22: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

12/6/2019 BESS - 9-13 Stewart St, Richmond VIC 3121, Australia

/

Sustainable design commitments by category

The sustainable design commitments for this project are listed below. These are to be incorporated into

the design documentation and subsequently implemented.

Management

Credit Disabled Scoped out Score

Management 2.3 Thermal Performance Modelling - Non-Residential 100 %

Management 3.2 Metering 100 %

Management 3.3 Metering 100 %

Management 4.1 Building Users Guide 100 %

Management 2.3 Thermal Performance Modelling - Non-Residential

Score Contribution This credit contributes 25.0% towards this section's score.

AimTo encourage and recognise developments that have used modelling

to inform passive design at the early design stage

Questions

Has preliminary modelling been undertaken in accordance with either BCA Section J (Energy

Efficiency), NABERS or Green Star?

Yes

Maximum Available Your Building

Management Water Energy Stormwater IEQ Transport Waste Urban Ecology Innovation0%

10%

20%

30%

40%

62% - contributing 3% to overall score

100%DRAFT

NOT SUITABLE FORSUBMISSION TO COUNCIL

Page 23: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

12/6/2019 BESS - 9-13 Stewart St, Richmond VIC 3121, Australia

/

Management 3.2 Metering

Score Contribution This credit contributes 12.5% towards this section's score.

AimTo provide building users with information that allows monitoring of

energy and water consumption

Questions

Have utility meters been provided for all individual commercial tenants?

Yes

Management 3.3 Metering

Score Contribution This credit contributes 12.5% towards this section's score.

AimTo provide building users with information that allows monitoring of

energy and water consumption

Questions

Have all major common area services been separately submetered?

Yes

Management 4.1 Building Users Guide

Score Contribution This credit contributes 12.5% towards this section's score.

AimTo encourage and recognise initiatives that will help building users to

use the building efficiently

Questions

Will a building users guide be produced and issued to occupants?

Yes

Water

Credit Disabled Scoped out Score

Water 1.1 Potable water use reduction 60 %

100%

100%

100%

71% - contributing 6% to overall score

DRAFTNOT SUITABLE FOR

SUBMISSION TO COUNCIL

Page 24: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

12/6/2019 BESS - 9-13 Stewart St, Richmond VIC 3121, Australia

/

Water 3.1 Water Efficient Landscaping 100 %

Water 4.1 Building Systems Water Use Reduction 100 %

Water Approachs

What approach do you want to use Water? Provide our own calculations

Water 1.1 Potable water use reduction

Score Contribution This credit contributes 71.4% towards this section's score.

Aim

Water 1.1 Potable water use reduction (interior uses) What is the

reduction in total water use due to efficient fixtures, appliances, and

rainwater use? To achieve points in this credit there must be >25%

potable water reduction. You are using the built in calculation tools.

This credit is calculated from information you have entered above.

Criteria

What is the reduction in total potable water use due to efficient

fixtures, appliances, rainwater use and recycled water use? To achieve

points in this credit there must be >25% potable water reduction.

Questions

Percentage Achieved ?

48 %

Calculations

Reference (kL)

8332

Proposed (excluding rainwater and recycled water use) (kL)

6398

Rainwater or recycled water supplied (Internal + External) (kL)

-

Proposed (including rainwater and recycled water use) (kL)

6398

% Reduction in Potable Water Consumption

23 %

Water 3.1 Water Efficient Landscaping

Score Contribution This credit contributes 14.3% towards this section's score.

60%

Percentage %

Percentage %

100%

DRAFTNOT SUITABLE FOR

SUBMISSION TO COUNCIL

Page 25: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

12/6/2019 BESS - 9-13 Stewart St, Richmond VIC 3121, Australia

/

Aim

Are water efficiency principles used for landscaped areas? This

includes low water use plant selection (e.g. xeriscaping). Note: food

producing landscape areas and irrigation areas connected to

rainwater or an alternative water source are excluded from this

section.

Questions

Will water efficient landscaping be installed?

Yes

Water 4.1 Building Systems Water Use Reduction

Score Contribution This credit contributes 14.3% towards this section's score.

AimWill the project minimise water use for building systems such as

evaporative cooling and fire testing systems?

Questions

Where applicable, have measures been taken to reduce potable water consumption by >80% in

the buildings air-conditioning chillers and when testing fire safety systems?

Yes

Energy

Credit Disabled Scoped out Score

Energy 1.1 Thermal Performance Rating - Non-Residential 75 %

Energy 2.1 Greenhouse Gas Emissions 100 %

Energy 2.3 Electricity Consumption 100 %

Energy 2.4 Gas Consumption 100 %

Energy 3.1 Carpark Ventilation 100 %

Energy 3.7 Internal Lighting - Non-Residential 100 %

Energy 4.1 Combined Heat and Power (cogeneration / trigeneration)     N/A

Energy 4.2 Renewable Energy Systems - Solar 100 %

Energy 1.1 Thermal Performance Rating - Non-Residential

Score Contribution This credit contributes 36.4% towards this section's score.

100%

77% - contributing 21% to overall score

75%

DRAFTNOT SUITABLE FOR

SUBMISSION TO COUNCIL

Page 26: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

12/6/2019 BESS - 9-13 Stewart St, Richmond VIC 3121, Australia

/

Aim

Reduce reliance on mechanical systems to achieve thermal comfort in

summer and winter - improving comfort, reducing greenhouse gas

emissions, energy consumption, and maintenance costs.

CriteriaWhat is the % reduction in heating and cooling energy consumption

against the reference case (NCC 2016 BCA Volume 1 Section J)

Questions

Criteria Achieved ?

-

Calculations

Total Improvement

58 %

Energy 2.1 Greenhouse Gas Emissions

Score Contribution This credit contributes 9.1% towards this section's score.

Aim Reduce the building's greenhouse gas emissions

Criteria Are greenhouse gas emissions >10% below the benchmark

Questions

Criteria Achieved ?

-

Calculations

Reference Building with Reference Services (BCA only)

457584.0

Proposed Building with Proposed Services (Actual Building)

196689.1

% Reduction in GHG Emissions

57 %

Energy 2.3 Electricity Consumption

Score Contribution This credit contributes 9.1% towards this section's score.

Aim Reduce consumption of electricity

Criteria Is the annual electricity consumption >10% below the benchmark

Percentage %

100%

kg CO2

kg CO2

Percentage %

100%

DRAFTNOT SUITABLE FOR

SUBMISSION TO COUNCIL

Page 27: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

12/6/2019 BESS - 9-13 Stewart St, Richmond VIC 3121, Australia

/

Questions

Criteria Achieved ?

-

Calculations

Reference

409926.0

Proposed

176205.0

Improvement

57 %

Energy 2.4 Gas Consumption

Score Contribution This credit contributes 9.1% towards this section's score.

Aim Reduce consumption of electricity

Criteria Is the annual gas consumption >10% below the benchmark?

Questions

Criteria Achieved ?

-

Calculations

Reference

368933.0

Proposed

158555.4

Improvement

57 %

Energy 3.1 Carpark Ventilation

Score Contribution This credit contributes 9.1% towards this section's score.

Questions

kWh

kWh

Percentage %

100%

MJ

MJ

Percentage %

100%

DRAFTNOT SUITABLE FOR

SUBMISSION TO COUNCIL

Page 28: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

12/6/2019 BESS - 9-13 Stewart St, Richmond VIC 3121, Australia

/

If you have a basement carpark, is it either: (a) fully naturally ventilated (no mechanical ventilation

system), or (b) use Carbon Monoxide monitoring to control the operation and speed of the

ventilation fans

Yes

Energy 3.7 Internal Lighting - Non-Residential

Score Contribution This credit contributes 9.1% towards this section's score.

Aim Reduce energy consumption associated with internal lighting

Questions

Is the maximum illumination power density (W/m2) in at least 90% of the relevant building class

at least 20% lower than required by Table J6.2a of the NCC 2016 BCA Volume 1 Section J

(Class 2 to 9)

Yes

Energy 4.1 Combined Heat and Power (cogeneration / trigeneration)

This credit was scoped out:  No cogeneration or trigeneration system in use.

This credit was disabled: No cogeneration or trigeneration system in use.

Aim Reduce energy consumption

CriteriaDoes the CHP system reduce the class of buildings GHG emissions

by more than 25%?

Energy 4.2 Renewable Energy Systems - Solar

Score Contribution This credit contributes 4.5% towards this section's score.

Aim To encourage the installation of on-site renewable energy generation

CriteriaDoes the solar power system provide 5% of the estimated energy

consumption of the building class it supplies?

Questions

Calculations

Solar Power - Energy Generation per year

37527.8

% of Building's Energy

17 %

100%

N/A

100%

kWh

Percentage %

DRAFTNOT SUITABLE FOR

SUBMISSION TO COUNCIL

Page 29: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

12/6/2019 BESS - 9-13 Stewart St, Richmond VIC 3121, Australia

/

Stormwater

Credit Disabled Scoped out Score

Stormwater 1.1 Stormwater Treatment 100 %

Which stormwater modelling are you using? MUSIC or other modelling software

Stormwater 1.1 Stormwater Treatment

Score Contribution This credit contributes 100.0% towards this section's score.

Aim

To achieve best practice stormwater quality objectives through

reduction of pollutant load (suspended solids, nitrogen and

phosphorus)

Criteria Has best practice stormwater management been demonstrated?

Questions

STORM score achieved

100

Flow (ML/year)

51.7

Total Suspended Solids (kg/year)

98.4

Total Phosphorus (kg/year)

88.3

Total Nitrogen (kg/year)

63.4

IEQ

Credit Disabled Scoped out Score

IEQ 1.4 Daylight Access - Non-Residential 67 %

100% - contributing 14% to overall score

100%

% Reduction

% Reduction

% Reduction

% Reduction

67% - contributing 11% to overall score

DRAFTNOT SUITABLE FOR

SUBMISSION TO COUNCIL

Page 30: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

12/6/2019 BESS - 9-13 Stewart St, Richmond VIC 3121, Australia

/

IEQ 1.4 Daylight Access - Non-Residential

Score Contribution This credit contributes 100.0% towards this section's score.

AimTo provide a high level of amenity and energy efficiency through

design for natural light.

Criteria What % of the nominated floor area has at least 2% daylight factor?

Questions

% Achieved ?

60 %

Transport

Credit Disabled Scoped out Score

Transport 1.4 Bicycle Parking - Non-Residential 100 %

Transport 1.5 Bicycle Parking - Non-Residential Visitor 100 %

Transport 1.6 End of Trip Facilities - Non-Residential 100 %

Transport 2.1 Electric Vehicle Infrastructure 100 %

Transport 1.4 Bicycle Parking - Non-Residential

Score Contribution This credit contributes 25.0% towards this section's score.

Aim To encourage and recognise initiatives that facilitate cycling

Criteria

Have the planning scheme requirements for employee bicycle parking

been exceeded by at least 50% (or a minimum of 2 where there is no

planning scheme requirement)?

Questions

Have the planning scheme requirements for employee bicycle parking been exceeded by at

least 50% (or a minimum of 2 where there is no planning scheme requirement)?

Yes

Bicycle Spaces Provided ?

52

Transport 1.5 Bicycle Parking - Non-Residential Visitor

67%

75% - contributing 7% to overall score

100%

100%

DRAFTNOT SUITABLE FOR

SUBMISSION TO COUNCIL

Page 31: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

12/6/2019 BESS - 9-13 Stewart St, Richmond VIC 3121, Australia

/

Score Contribution This credit contributes 12.5% towards this section's score.

Aim To encourage and recognise initiatives that facilitate cycling

Criteria

Have the planning scheme requirements for visitor bicycle parking

been exceeded by at least 50% (or a minimum of 1 where there is no

planning scheme requirement)?

Questions

Have the planning scheme requirements for visitor bicycle parking been exceeded by at least

50% (or a minimum of 1 where there is no planning scheme requirement)?

Yes

Bicycle Spaces Provided ?

10

Transport 1.6 End of Trip Facilities - Non-Residential

Score Contribution This credit contributes 12.5% towards this section's score.

Aim To encourage and recognise initiatives that facilitate cycling

Criteria

Where adequate bicycle parking has been provided. Is there also: * 1

shower for the first 5 employee bicycle spaces plus 1 to each 10

employee bicycles spaces thereafter, * changing facilities adjacent to

showers, and * one secure locker per employee bicycle space in the

vicinity of the changing / shower facilities?

Questions

Number of showers provided ?

10

Number of lockers provided ?

58

Calculations

Min Showers Required

1

Min Lockers Required

52

Transport 2.1 Electric Vehicle Infrastructure

Score Contribution This credit contributes 25.0% towards this section's score.

100%

100%

DRAFTNOT SUITABLE FOR

SUBMISSION TO COUNCIL

Page 32: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

12/6/2019 BESS - 9-13 Stewart St, Richmond VIC 3121, Australia

/

AimTo facilitate the expansion of infrastructure to support electric vehicle

charging

Questions

Are facilities are provided for the charging of electric vehicles?

Yes

Waste

Credit Disabled Scoped out Score

Waste 2.1 - Operational Waste - Food & Garden Waste 100 %

Waste 2.2 - Operational Waste - Convenience of Recycling 100 %

Waste 2.1 - Operational Waste - Food & Garden Waste

Score Contribution This credit contributes 33.3% towards this section's score.

Aim To minimise organic waste going to landfill

Questions

Are facilities provided for on-site management of food and garden waste?

Yes

Waste 2.2 - Operational Waste - Convenience of Recycling

Score Contribution This credit contributes 33.3% towards this section's score.

Aim To minimise recyclable material going to landfill

Questions

Are the recycling facilities at least as convenient for occupants as facilities for general waste?

Yes

Urban Ecology

67% - contributing 4% to overall score

100%

100%

25% - contributing 1% to overall score

DRAFTNOT SUITABLE FOR

SUBMISSION TO COUNCIL

Page 33: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

12/6/2019 BESS - 9-13 Stewart St, Richmond VIC 3121, Australia

/

Credit Disabled Scoped out Score

Urban Ecology 1.1 Communal Spaces 100 %

Urban Ecology 2.1 Vegetation 25 %

Urban Ecology 1.1 Communal Spaces

Score Contribution This credit contributes 12.5% towards this section's score.

AimTo encourage and recognise initiatives that facilitate interaction

between building occupants

Criteria

Is there at least the following amount of common space measured in

square meters : * 1m² for each of the first 50 occupants * Additional

0.5m² for each occupant between 51 and 250 * Additional 0.25m² for

each occupant above 251

Questions

Common space provided

267.0

Calculations

Minimum Common Space Required

242

Urban Ecology 2.1 Vegetation

Score Contribution This credit contributes 50.0% towards this section's score.

AimTo encourage and recognise the use of vegetation and landscaping

within and around developments

CriteriaHow much of the site is covered with vegetation, expressed as a

percentage of the total site area.

Questions

Percentage Achieved ?

5 %

Innovation

100%

Square Metres

Square Metres

25%

Percentage %

0% - contributing 0% to overall score

DRAFTNOT SUITABLE FOR

SUBMISSION TO COUNCIL

Page 34: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

12/6/2019 BESS - 9-13 Stewart St, Richmond VIC 3121, Australia

/

Incomplete

Incomplete

Incomplete

Incomplete

Incomplete

Incomplete

Incomplete

Incomplete

Incomplete

Incomplete

Incomplete

Incomplete

Incomplete

Incomplete

Incomplete

Incomplete

Incomplete

Incomplete

Incomplete

Incomplete

Incomplete

Items to be marked on floorplans

Urban Ecology 1.1: Size and location of communal spaces 

Urban Ecology 2.1: Vegetated areas

Waste 2.1: Location of food and garden waste facilities

Waste 2.2: Location of recycling facilities 

Transport 1.4: All nominated non-residential bicycle parking spaces

Transport 1.5: All nominated non-residential visitor bicycle parking spaces

Transport 1.6: Showers, change rooms and lockers as nominated

Transport 2.1: Location of electric vehicle charging infrastructure

Stormwater 1.1: Location of any stormwater management systems used

in STORM or MUSIC modelling (e.g. Rainwater tanks, raingarden, buffer

strips)

Energy 3.1: Carpark with natural ventilation or CO monitoring system

Energy 4.2: Floor plans showing location of photovoltaic panels as

described.

Water 3.1: Water efficient garden annotated

Management 3.2: Individual utility meters annotated

Management 3.3: Common area submeters annotated

Documents and evidence

IEQ 1.4: A short report detailing assumptions used and results achieved.

Stormwater 1.1: STORM report or MUSIC model

Energy 1.1: Energy Report showing calculations of reference case and

proposed buildings

Energy 3.1: Provide a written explanation of either the fully natural carpark

ventilation or carbon monxide monitoring, describing how these systems

will work, what systems are required for them to be fully integrated and

who will be responsible for their implementation throughout the design,

procurement and operational phases of the building life.

Energy 3.7: Provide a written description of the average lighting power

density to be installed in the development and specify the lighting type(s)

to be used.

Energy 4.2: Specifications of the solar photovoltaic system(s).

Management 2.3: Preliminary modelling report

0 / 14 floorplans & elevation notes complete.

0 / 7 supporting evidence documentation complete.DRAFTNOT SUITABLE FOR

SUBMISSION TO COUNCIL

Page 35: Sustainable Management Plan · Commercial-in-Confidence Revision C – 04-Mar-2020 Prepared for – Hines Australia Pty Ltd – ABN: 54 157 826 910 AECOM 1.0 Introduction The proposed

12/6/2019 BESS - 9-13 Stewart St, Richmond VIC 3121, Australia

/

The Built Environment Sustainability Scorecard (BESS) has been provided for the purpose of information

and communication. While we make every effort to ensure that material is accurate and up to date

(except where denoted as ‘archival’), this material does in no way constitute the provision of professional

or specific advice. You should seek appropriate, independent, professional advice before acting on any of

the areas covered by BESS.

The Municipal Association of Victoria (MAV) and CASBE (Council Alliance for a Sustainable Built

Environment) member councils do not guarantee, and accept no legal liability whatsoever arising from or

connected to, the accuracy, reliability, currency or completeness of BESS, any material contained on this

website or any linked sites.