Sustainable Slope Stabilization using Recycled Plastic Pin
October 23, 2019Asif Ahmed, Ph.D., P.E.
![Page 2: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/2.jpg)
China Plastic Ban
![Page 3: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/3.jpg)
China Plastic Ban
![Page 4: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/4.jpg)
21 to 25 years
Ohio, South Carolina
4
![Page 5: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/5.jpg)
5
• 50 Billion Water Bottle end up in US Landfill Each Year• It takes 700 year to decompose plastic bottles• Ecosystems and wildlife are negatively impacted by plastic
debris.
![Page 6: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/6.jpg)
• Recycled Plastic Pin (RPP)• Mainly Polymeric Materials• Fabricated from Recycled Plastics
• Advantages• Commercially Available• Use of RPP Reduces Waste Volume• Resistant to Biological Exposure
• Typical Composition• HDPE : 55-90%• LDPE : 5-10%• PP, PET, PS : 1% - 10%• Misc. : 0 – 5%
A 10’ long RPP can replace 500 Soda Bottles
![Page 7: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/7.jpg)
Shallow Landslides in Highway Slopes
Shallow Landslides in Clay Soil
![Page 8: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/8.jpg)
Traditional Repair
![Page 9: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/9.jpg)
Factor of Safety:Without ReinforcementFS = Mr/Md
Factor of Safety:With ReinforcementFS = (Mr+∆Mr)/Md
![Page 10: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/10.jpg)
Resistivity Profile: RI-1
Resistivity Profile: RI-2
0
10
20
30
40
50
60
70
80
20 40 60 80
Plas
ticity
Inde
x
Liquid Limit
Plasticity Chart
BH-1BH-2BH-3
Site Investigation
Displacement
Shea
rSt
ress
Peak O-C
FullySoftened
Peak N-C
Residual
![Page 11: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/11.jpg)
Reinforced Section 1: FS = 1.43
Reinforced Section 2: FS = 1.48
Reinforced Section 3: FS = 1.54
Soil Type
Friction Angle
CohesionUnit
WeightElastic
Modulus
φ c ϒ E- ◦ psf pcf psf1 10 100 125 1000002 23 100 125 1500003 15 250 130 2000004 35 3000 140 250000
Back Analysis of Unreinforced Slope: FS = 1.05
Soil 4Soil 3
Soil 2 Soil 1 Back Calculated Soil Parameters
Design of Slope Stabilization
![Page 12: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/12.jpg)
RPP Layout
![Page 13: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/13.jpg)
• Equipment: Klemm 802 Drill Rig• Hammer Type: KD 1101
![Page 14: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/14.jpg)
![Page 15: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/15.jpg)
![Page 16: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/16.jpg)
• Rain Gauge• Instrumented RPP• Surveying• Inclinometer• Moisture Sensor• Water Potential Probe
Instrumentation
![Page 17: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/17.jpg)
0.0
4.0
8.0
12.0
16.0
0 50 100 150 200 250
Sett
lem
ent (
in)
Distance along Roadway (ft)
6.6.12 10.6.12 12.13.12 7.1.13 5.15.14 12.24.14 6.18.15 12.15.2015 6.15.2016
Settlement at the crest of slope: US 287
R - 01 R - 02 R - 03
![Page 18: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/18.jpg)
R. Section 1
Control Section
Control Section 2
R. Section 3
Settlement: 15 in
Settlement: 9 in
![Page 19: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/19.jpg)
![Page 20: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/20.jpg)
-1
0
1
2
3
4
0
1
2
3
4
5
7/16
/11
9/16
/11
11/1
6/11
1/16
/12
3/16
/12
5/16
/12
7/16
/12
9/16
/12
11/1
6/12
1/16
/13
3/16
/13
5/16
/13
7/16
/13
Dis
plac
emen
t (in
ch)
Rai
nfal
l (in
ch)
Date
Comparison of Horzontal Movement at US 287 Slope
Rainfall 2.5 ft-Inc1 2.5 ft-Inc 3
![Page 21: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/21.jpg)
-0.5
0
0.5
1
1.5
2
2.5
3
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
Dis
plac
emen
t (in
ch)
Rai
nfal
l (in
ch)
Date
Inclinometer - 1 : Cum Displacement A-A with TimeRainfall 4.5 (ft) 6.5 (ft) 8.5 (ft) 10.5 (ft) 12.5 (ft)
14.5 (ft) 16.5 (ft) 18.5 (ft) 20.5 (ft) 22.5 (ft)
Movement during the failure of Northbound slope
Movement during the failure of Northbound slope
![Page 22: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/22.jpg)
Comparison of PerformanceNorthbound and Southbound (Reinforced) Slope
![Page 23: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/23.jpg)
Comparison of PerformanceNorthbound and Southbound (Reinforced) Slope
Failure Location 3
Failure Location 4
Failure Location Time
Failure Location-1 October 2013
Failure Location -2 October 2013
Failure Location-3 June 2015
Failure Location-4 June 2015
![Page 24: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/24.jpg)
Traditional Repair Northbound and Southbound (Reinforced) Slope
North Side
September 2015
October 2015
Shotcrete Wall
![Page 25: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/25.jpg)
0
2
4
6
10/1/2015 11/1/2015
Prec
ipita
tion
(inch
)
Date
Failure of Northbound Control Slope After Repair
![Page 26: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/26.jpg)
Comparison between RPP slope and Reconstructed Slope
Southbound slope (RPP stabilized)
Northbound slope
![Page 27: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/27.jpg)
0.02.04.06.08.0
10.012.014.016.0
0 50 100 150 200 250
Sett
lem
ent (
in)
Distance along Roadway (ft)
6.6.12 10.6.12 12.13.12 7.1.13 5.15.14 12.24.146.18.15 12.15.2015 6.15.2016 8.15.2016 9.15.2016 10.15.201611.15.2016 12.15.2016 01.15.2017 2.15.2017 3.15.2017 4.15.2017
Old Control Section
![Page 28: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/28.jpg)
![Page 29: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/29.jpg)
![Page 30: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/30.jpg)
I -2 I -1
I -3Location of Drilled Shaft
Inclinometer
Drilled Shaft
(1V :3H)
![Page 31: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/31.jpg)
I 35
Incremental Settlements (inches)
Year 01 Year 02 Year 03 Year 04
0.64 0.82 0.38 0.30
![Page 32: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/32.jpg)
Location of SH 183 (1V :2.5H)
![Page 33: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/33.jpg)
SH 183
Incremental Settlements (inches)
Reinforced Section Year 01 Year 02 Year 03 Year 04
0' - 15' 1.66 0.11 0.06 0.10
15'- 45' 1.16 0.09 0.05 0.41
45' - 60' 1.22 0.36 0.42 0.25
![Page 34: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/34.jpg)
![Page 35: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/35.jpg)
![Page 36: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/36.jpg)
• Time• Cost of Equipment• Labor• Traffic Control• Materials Cost
Several Weeks to Months 1 week
$900,000 $150,000
![Page 37: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/37.jpg)
Recently Published Book
![Page 38: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/38.jpg)
TxDOT Specification (01/18)
![Page 39: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/39.jpg)
AASHTO Sweet 16 (08/19)
![Page 40: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/40.jpg)
• RPP provided resistance against shallow slope failure• A Crawler-Mounted Rig, Equipped with a Mast-Mounted Pseudo Vibratory
Hammer, Worked Effectively to Install RPPs• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120
RPPs can be Installed in a Single Day.• Settlement at Control Section is 15 inch• Settlement at Reinforced Section 1 is 2.5 inch.• Closer RPP Spacing at Crest Provided Higher Resistance against Slope
Deformation• RPP can save the stabilization cost up to 60% - 80% of conventional technique,
and have potential to be a effective sustainable alternative to stabilize shallow slope failure.
![Page 41: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/41.jpg)
(1) One 10 ft. long single RPP can replace how many no. soda bottles?
(a) 10(b) 100(c) 150(d) 500
(d) 500
![Page 42: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/42.jpg)
(2) Cost of fixing highway slopes with RPP is______
(a) 10-12 USD/sq. ft.(b) 90-100 USD/sq. ft.(c) 5-6 USD/sq. ft.(d) 50-60 USD/sq. ft.
(c) 5-6 USD/sq. ft.
![Page 43: Sustainable Slope Stabilization using Recycled Plastic Pin...• On Average, a RPP Can be Installed within 4 Minutes, and a Total of 100 to 120 RPPs can be Installed in a Single Day](https://reader033.vdocument.in/reader033/viewer/2022041607/5e350dfea92c8e223f029408/html5/thumbnails/43.jpg)
(3) On average, one RPP can be installed in ______ minutes.
(a) 10 minutes(b) 4 minutes (c) 20 minutes(d) 15 minutes
(b) 4 minutes