Design & build of a three storey office and professional centre, including civil and
site service to a 40 acre property in Headingley MB. Master planning for the 40
acre property allowed the civil and site services to be installed to fully service all
future development on the 40 acre property.
CLIENT:
SWAN LAKE
FIRST NATION
DESCRIPTION:
DESIGN & BUILD
3 STOREY OFFICE AND
PROFESSIONAL CENTRE
CIVIL WORKS AND
SITE SERVICES TO THE
40 ACRE PROPERTY
SWAN LAKE FIRST NATION 3 STOREY OFFICE & PROFESSIONAL CENTRE4820 PORTAGE AVENUE, HEADINGLEY MB
The green field site in Headingley had new water main and RM of Headingley water
main metering chamber installed to the property. A low pressure sewer system
and below ground septic tank to service the office building. The land drainage
system and retention pond was design with flow restriction to an existing creek to
meet Manitoba Water Stewardship and Department of Fisheries and Oceans strict
requirements. The land drainage system provides drainage capacity for the 40
acre property’s future developments. New utilities have been installed into the
development, including a new MTS fibre optic hub, Manitoba Hydro gas and electrical
transformer and CSTE for the future development. The parking lot is illuminated with
a combination of pole mounted LED lighting, high level & low level LED light fixtures
and accommodates 215
spaces of light duty asphalt
parking with heavy duty
asphalt fire truck access
and egress to the building
front entrance to meet
RM of Headingley by-law
requirements.
DBCOMM 13
Page 2 of 4
www.ehansch.com
14
CLIENT:
SWAN LAKE
FIRST NATION
SWAN LAKE FIRST NATION 3 STOREY OFFICE & PROFESSIONAL CENTRE4820 PORTAGE AVENUE, HEADINGLEY MB
DESCRIPTION:
DESIGN & BUILD
3 STOREY OFFICE AND
PROFESSIONAL CENTRE
CIVIL WORKS AND
SITE SERVICES TO THE
40 ACRE PROPERTY
The three storey office and professional centre is 53,899 square feet of non-
combustible building. Precast concrete piled foundation, cast in place grade beams
and pile caps provide the support for the structural slab and structural steel
framing. Upper floors are metal deck and reinforced concrete slabs, with a R40
modified bitumen roofing system with full latch line life safety system for building
maintenance. Exterior walls provide an R34 wall system, utilizing insulated structural
gauge steel studs with exterior finishing system of acrylic stucco, the windows are
large aluminum framed storefront windows and aluminum main entry doors. The
building heating and ventilation system is provided by 29 roof top units and 1 large
heat recovery ventilation unit providing a very efficient mechanical system, which
is fully monitored with a computerized building management system. The building
is fully sprinklered with each floor its own specific zone. A public central core
incorporating 2500lb hydraulic elevator, high end finishes with ceramic floor tiles,
drywall bulkheads, LED light fixtures, custom millwork and automatic plumbing
fixtures to the public washrooms and universal toilet room, to meet full accessibility
code requirements.
DBCOMM 14
Page 3 of 4
www.ehansch.com
15
CLIENT:
SWAN LAKE
FIRST NATION
SWAN LAKE FIRST NATION 3 STOREY OFFICE & PROFESSIONAL CENTRE4820 PORTAGE AVENUE, HEADINGLEY MB
DESCRIPTION:
DESIGN & BUILD
3 STOREY OFFICE AND
PROFESSIONAL CENTRE
CIVIL WORKS AND
SITE SERVICES TO THE
40 ACRE PROPERTY
An integrated design process was utilized through-out the project and proved to be
essential during the tenant improvements phase of the design facilitating smooth and
seamless coordination between the 23 tenants, our client Swan Lake First Nation
and the Ernst Hansch Construction Ltd design team over the 3 phases of the tenant
improvements to meet the client’s allowance and tenant’s requirements. Specialist
tenant requirements incorporated into the design included a 2nd floor data centre which
required a 40KW 72 hour running standby generator complete with transfer switch
and pre-action dry sprinkler system and fire alarm monitoring. The tenant improvements
consisted of large boardroom, large class rooms, computer labs, cafeterias, kitchens,
coffee stations, large reception areas,
printing, storage and data rooms, both
open plan and enclosed office spaces.
The building is fully monitored with
internal & external CCTV security
cameras, card access systems and
automated system to lock and unlock
the building entry doors for business
hours.
CLIENT:
SWAN LAKE
FIRST NATION
SWAN LAKE FIRST NATION 3 STOREY OFFICE & PROFESSIONAL CENTRE4820 PORTAGE AVENUE, HEADINGLEY MB
DBCOMM 15
Page 4 of 4
www.ehansch.com
16
DESCRIPTION:
DESIGN & BUILD
3 STOREY OFFICE AND
PROFESSIONAL CENTRE
CIVIL WORKS AND
SITE SERVICES TO THE
40 ACRE PROPERTY