SWaNI Project Update Report April 2003

Upload: isaac-price

Post on 28-Mar-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SWaNI Project Update Report April 2003. Project Outcomes Under review, might not all be possible in conjunction with Skillnet or SITS Interoperability

SWaNI Project Update Report

April 2003

Page 2: SWaNI Project Update Report April 2003. Project Outcomes Under review, might not all be possible in conjunction with Skillnet or SITS Interoperability
Page 3: SWaNI Project Update Report April 2003. Project Outcomes Under review, might not all be possible in conjunction with Skillnet or SITS Interoperability

Project Outcomes

Under review, might not all be possible in conjunction with Skillnet or SITS Interoperability between college

library/learning resources/catalogue system will not be achieved in the lifetime of the project (will be implemented later)

Page 4: SWaNI Project Update Report April 2003. Project Outcomes Under review, might not all be possible in conjunction with Skillnet or SITS Interoperability

Performance against project aims and objectives

Interoperability between VLE system (Skillnet) and SRS (SITS). Working with the VLE vendor to propagate

student enrolments across all of the necessary domains by creating a central staging point for student records (central database server). Looking at storing system user information as XML that conforms to LIP specification.

Page 5: SWaNI Project Update Report April 2003. Project Outcomes Under review, might not all be possible in conjunction with Skillnet or SITS Interoperability

Performance against project aims and objectives

Interoperability between VLE system and content repositories. Work underway on converting our existing Intranet

content repository to a system that is capable of handling learning objects that conform approximately to the Dublin Core spec for learning objects.

Working with the VLE vendor to ensure integration of locally hosted content into the VLE system whilst retaining the actual files on our own server

Page 6: SWaNI Project Update Report April 2003. Project Outcomes Under review, might not all be possible in conjunction with Skillnet or SITS Interoperability

Performance against project aims and objectives

Interoperability between Library/Learning Resources/Catalogue systems.Developing a method of entering learning

resource information in the central Intranet database, logging learning resource information within the VLE and presenting this information within the VLE as a link/query to resource definition on central database.

Page 7: SWaNI Project Update Report April 2003. Project Outcomes Under review, might not all be possible in conjunction with Skillnet or SITS Interoperability

Performance against project aims and objectives

Use IMS content management specification to achieve interoperability between content and VLE system. Working towards content that can be aggregated into

combined packages with auto-generated XML manifest document using indexing information already stored within the Intranet system allowing aggregated content to be passed to the VLE runtime environment. (Not yet achieved)

Page 8: SWaNI Project Update Report April 2003. Project Outcomes Under review, might not all be possible in conjunction with Skillnet or SITS Interoperability

Performance against project aims and objectives

Integration of off line registration into a VLE using IMS specifications. Attempting automatic propagation of VLE

access from student enrolment process.

Page 9: SWaNI Project Update Report April 2003. Project Outcomes Under review, might not all be possible in conjunction with Skillnet or SITS Interoperability

Specifications

Content Packaging 1.1.2 Learning Resource Meta-Data 1.2.1

(Dublin Core Subset) LIP 1.0

Page 10: SWaNI Project Update Report April 2003. Project Outcomes Under review, might not all be possible in conjunction with Skillnet or SITS Interoperability

Project Update

On target at this time, working on prototyping (user account propagation).

Work underway on content repository and related services.

Working towards defining a clear method for VLE access licensing management.

Final revision of use cases have been completed

Page 11: SWaNI Project Update Report April 2003. Project Outcomes Under review, might not all be possible in conjunction with Skillnet or SITS Interoperability

System Testing

The input of data into the MIS system must be carried across accurately and consistently to the central database

Changes made to the MIS data must be propagated accurately

Students must get a consistent allocation of online courses, determined by their allocated course code

User logging onto Skillnet from college intranet must have their user details carried across automatically and logged on

Page 12: SWaNI Project Update Report April 2003. Project Outcomes Under review, might not all be possible in conjunction with Skillnet or SITS Interoperability

System Testing contd.

Details of courses undertaken by a user must be propagated to the central database to allow interrogation by college systems

All data which updates or inserts into the central database must be accurate at all times, and logs of incomplete transactions must be recorded

Users which are enrolled using fast enrolment at an outreach centre must gain access to Skillnet and the Intranet instantly and the data should accurately tie up with the user record once it has been inserted into the MIS

Skillnet and the college intranet should be error free and consistent in use

Page 13: SWaNI Project Update Report April 2003. Project Outcomes Under review, might not all be possible in conjunction with Skillnet or SITS Interoperability

Project Deliverables

Final Project Report detailing development practice, specification feedback and product evaluation.

Working College Intranet system that integrates with VLE (to some extent).

Virtual Learning Environment. Disseminating web site.

Page 14: SWaNI Project Update Report April 2003. Project Outcomes Under review, might not all be possible in conjunction with Skillnet or SITS Interoperability

Project Problems/Setbacks

Late Intranet development. Late Skillnet demo delivery. Lack of resource allocation.

Page 15: SWaNI Project Update Report April 2003. Project Outcomes Under review, might not all be possible in conjunction with Skillnet or SITS Interoperability

Vendor Issues

Good support Distance Problems Lack of communication on our part, led to

an imbalance at the start of the project