SVENSKA KRAFTNÄT SWEDISH NATIONAL GRID
February 13*, 2013 2009/481
Swedish Interconnectors COMP Case No 39351
Monitoring Report No 9
Introduction This report is submitted to comply with section 5 (Monitoring provisions) of Svenska Kraftnät's Commitments (26 January 2010) under Artide 9 of Council Regulation No. 1/2003 in connection with the European Commission investigation in Case COMP/39351 - Swedish Interconnectors. The Commitments were adopted and made binding by decision of the Commission on 14 April 2010.
The report is prepared in good faith and aims at providing any information the Commission may need in order to judge whether Svenska Kraftnät is proceeding in accordance with the Commitments. Additional information can be provided to the Commission upon request.
In accordance with what was stated in last (eight) monitoring report and the report requested additional information (11 July 2012) this ninth monitoring report has been submitted before 15 February 2013. Since the report as was sent to the Commission on 11 July 2012 covered the period 1 January to 30 June 2012 this report covers only the period 1 July to 31 December 2012.
In order to have sufficient time for proper assessments (in line with what is stated in the Commitment) and internal processes the next (tenth) monitoring report will be submitted by 14 February 2014 at latest, covering the whole year of 2013.
Svenska Kraftnät confirms that the report does not contain any confidential information and maybe freely distributed to third parties.
Sundbyberg, February 13"12013
Table of Contents
i Capacities and prices after introduction of bidding zones 7
1.1 Q32012 7 1.1.1 Allocation oftrading capacity 8 1.1.2 Comments on each interconnector and corridor between internal areas
12 1.2 Q4 2012 14
1.2.1 Allocation oftrading capacity 15 1.2.2 Comments on each interconnector and corridor between internal areas
18
Appendix A - Q3 2012 21
Appendix B - Q4 2012 27
7/32
1 Capacities and prices after introduction of bidding zones
As committed, Svenska Kraftnät has subdivided the Swedish part of the Nordic electricity market into several
bidding zones and the Swedish Transmission System is operated on this basis since November 1, 2011. Con-
gestion in the Swedish Transmission System, with exception of Congestion in the West Coast Corridor, is gen-
erally managed without limiting Trading Capacity on Interconnectors. This can be seen in subsequent chap-
ters, and is particularly evident in Table 3 and Table 9.
1.1 Q3 2012 This section describes operational experience and measures regarding allocation of trading capacity in the
period 1 July to 30 September, 2012.
In the period, totally 2 208 hours, the main direction of the power flow was southbound.
Table 1 below shows the average prices in Sweden and all neighbouring areas for the above mentioned period
(excluding Germany and Poland). Table 2 summarises the number of hours where price differences occurred
between the respective zones.
Table 1. Average, maximum, and minimum prices for areas within Nord Pool Spot.
Area Average Price Level
(EUR)
Maximum Price
(EUR)
Minimum Price
(EUR)
SE1 22,78 63,57 3,92
SE2 22,78 63,57 3,92
SE3 23,24 63,57 3,92
SE4 25,68 66,59 3,92
DK1 33,95 85,34 3,92
DK2 35,39 85,34 3,92
FI 30,85 143,17 3,92
NO1 17,21 31,12 3,92
NO3 21,94 63,57 3,92
NO4 21,64 47,11 3,92
8/32
No of hours where price for row area > column area
SE1 SE2 SE3 SE4 DK1 DK2 FI NO1 NO3 NO4
SE1 - 0 0 0 31 0 0 1283 344 439
SE2 0 - 0 0 31 0 0 1283 344 439
SE3 79 79 - 0 31 0 0 1283 350 445
SE4 328 328 250 - 100 0 207 1385 545 640
DK1 1416 1416 1362 1184 - 17 1084 1853 1484 1570
DK2 1474 1474 1420 1227 259 - 1145 1895 1522 1608
FI 1075 1075 1036 1013 613 580 - 1522 1182 1225
NO1 0 0 0 0 13 0 0 - 1 4
NO3 7 7 7 7 34 7 6 1290 - 108
NO4 2 2 2 2 30 2 2 1282 0 -
Table 2. Number of hours where the price for the area in the row was higher than for the area
in the column.
Summary of table 1 and 2:
DK2 had the highest average price, followed by DK1, FI, SE4, SE3, SE2, SE1, NO3, NO4 and NO1 re-spectively
SE1 and SE2 had a common price during all hours
The main direction of power flow has been southbound in Sweden, while it has been import from Norway and exports via the remaining interconnectors.
1.1.1 Allocation of trading capacity
Table 3 below summarises how often Svenska Kraftnät have allocated less trading capacity than maximum
NTC for interconnectors and corridors between internal areas in the period.
9/32
Interconnectors/
corridors between
internal areas
No of limited hours No of days with limi-
tation
Average reduction
Export/
South-
bound
Import/
North-
bound
Export/
South-
bound
Import/
North-
bound
Export/
South-
bound
Import/
North-
bound
SE1-SE2 1680 24 70 1 6 % 0 %
SE2-SE3 2064 0 86 0 12 % 0 %
SE3-SE4 2208 0 92 0 18 % 0 %
SE1-FI 1534 505 71 28 1 % -2 %
SE1-NO4 22 96 2 7 1 % 1 %
SE2-NO3 0 0 0 0 0 % 0 %
SE2-NO4 0 0 0 0 0 % 0 %
SE3-DK1 34 249 3 18 1 % 4 %
SE3-FI 2208 2208 92 92 22 % 41 %
SE3-NO1 255 68 18 4 3 % 1 %
SE4-DE 162 236 8 17 5 % 4 %
SE4-DK2 169 322 8 21 5 % 6 %
SE4-PL 179 365 9 24 8 % 9 %
Table 3. Limitations in trading capacity on interconnectors and corridors between internal
areas as enforced by Svenska Kraftnät. The columns with average reductions shows the aver-
age NTC divided by maximum NTC.
The majority of the limitations of export capacity on the interconnector SE1-FI, enforced by Svenska Kraftnät
during the period, are because of that the NTC depends on forecasted transfer between Kalix - Ossauskoski
and Ivalo - Varangerbotn. The forecasted transfer can both increase and decrease the NTC (which also ex-
plains the negative average reduction for SE1-FI in table 4).
Table 4 below summarises the time during which neighbouring TSOs have allocated less trading capacity than
maximum NTC to interconnectors in the period.
10/32
Interconnectors/
corridors between
internal areas
No of limited hours No of days with limi-
tation
Average reduction
Export/
South-
bound
Import/
North-
bound
Export/
South-
bound
Import/
North-
bound
Export/
South-
bound
Import/
North-
bound
SE1-SE2 - - - - - -
SE2-SE3 - - - - - -
SE3-SE4 - - - - - -
SE1-FI 1510 471 70 26 1 % -2 %
SE1-NO4 2208 2208 92 92 30 % 16 %
SE2-NO3 468 28 6 % 0 %
SE2-NO4 2208 2208 92 92 22 % 43 %
SE3-DK1 105 174 6 10 2 % 3 %
SE3-FI 2208 2208 92 92 22 % 25 %
SE3-NO1 1233 2056 56 87 18 % 33 %
SE4-DE 1163 1236 54 66 50 % 51 %
SE4-DK2 32 24 2 1 0 % 1 %
SE4-PL 976 2208 92 92 37 % 84 %
Table 4. Limitations in trading capacity on interconnectors as enforced by neighbouring TSOs.
The columns with average reductions shows the average NTC divided by maximum NTC.
Table 5 below summarises the time during which capacities on interconnectors and corridors between inter-
nal areas have been reduced, taking into account reductions by both Svenska Kraftnät and neighbouring
TSOs.
11/32
Interconnectors/
corridors between
internal areas
No of limited hours No of days with limi-
tation
Average reduction
Export/
South-
bound
Import/
North-
bound
Export/
South-
bound
Import/
North-
bound
Export/
South-
bound
Import/
North-
bound
SE1-SE2 1680 24 70 1 6 % 0 %
SE2-SE3 2064 0 86 0 12 % 0 %
SE3-SE4 2208 0 92 0 18 % 0 %
SE1-FI 1534 505 71 28 1 % -2 %
SE1-NO4 2208 2208 92 92 31 % 17 %
SE2-NO3 468 0 28 0 6 % 0 %
SE2-NO4 2208 2208 92 92 22 % 43 %
SE3-DK1 139 416 9 27 2 % 7 %
SE3-FI 2208 2208 92 92 22 % 41 %
SE3-NO1 1444 2056 71 87 21 % 33 %
SE4-DE 1163 1423 54 73 50 % 53 %
SE4-DK2 193 346 9 22 5 % 6 %
SE4-PL 1040 2208 92 92 40 % 84 %
Table 5. Final limitations in trading capacity on interconnectors and corridors between inter-
nal areas as enforced by both Svenska Kraftnät and neighbouring TSOs. The columns with
average reductions shows the average NTC divided by maximum NTC.
Detailed information for each limitation is provided in the attached tables A2 to A5 in appendix A and in the
attachment. This information includes the reason for each limitation.
12/32
1.1.2 Comments on each interconnector and corridor between internal areas
The attached spreadsheet shows, for each hour during 2012 Q3, if and why Svenska Kraftnät has reduced the
capacity on each individual interconnector. Table 6 below is a summary of the information which has been
given to the market participants via Urgent Market Messages (UMM) on Nord Pool Spot’s website. Links to all
these UMMs, describing the reductions, are accessible in the table.
13/32
Interconnector Event Start Event Stop NTC Ex-
port
NTC Im-
port
UMM
ID
Remark
SE1-FI - - - - - -
SE3-FI 2012-06-12 06:00 2012-08-17 17:00 800 1350 52603 (2)
2012-08-20 06:00 2013-01-13 02:00 0 - 800 0 - 800 59861 (1)
SE1-NO4 2012-09-18 06:00 2012-09-18 17:00 0 0 56205 (2)
2012-09-19 06:00 2012-09-19 17:00 0 0 56200 (2)
SE2-NO3 - - - - - -
SE2-NO4 - - - - - -
SE3-NO1 - - 809 - 2095 2145 45249 (3)
2012-08-02 06:00 2012-08-02 17:00 2 095 1 000 54057 (2)
2012-09-26 06:00 2012-09-26 21:00 2 095 1 100 56501 (2)
SE3-DK1 - - 680 243– 740 45249 (3)
2012-07-15 15:00 2012-07-15 17:00 370 340 54801 (1)
2012-09-10 08:00 2012-09-11 16:00 350 740 56134 (2)
2012-09-15 06:00 2012-09-15 16:00 680 370 55943 (2)
2012-09-26 06:00 2012-09-26 21:00 680 370 56500 (2)
SE4-DE - - 610 224 - 600 45249 (3)
2012-08-20 06:00 2012-08-24 17:00 200 600 55607 (2)
2012-09-10 06:00 2012-09-11 17:00 0 0 56264 (2)
2012-09-15 06:00 2012-09-15 16:00 100 600 55942 (2)
SE4-DK2 - - 1300 636 - 1700 45249 (3)
2012-08-20 06:00 2012-08-24 17:00 200 650 55606 (2)
2012-08-23 06:00 2012-08-23 17:00 0 650 55089 (1)
2012-09-04 00:00 2012-09-06 00:00 1 100 1 700 56175 (2)
2012-09-15 06:00 2012-09-15 16:00 200 650 56444 (2)
SE4-PL - - 600 238 - 600 45249 (3)
2012-08-21 00:00 2012-08-21 23:00 0 0 55736 (1)
2012-08-22 00:00 2012-08-23 00:00 0 0 55772 (1)
2012-09-10 07:00 2012-09-11 06:00 0 0 56281 (1)
2012-09-24 06:00 2012-09-28 19:00 0 0 56827 (1)
(1) Maintenance/failure on the interconnector (2) Maintenance/failure in the vicinity of the interconnector (3) Reduction because of the West Coast corridor
Table 6. Reduction of interconnectors enforced by Svenska Kraftnät.
14/32
1.2 Q4 2012 This section describes operational experience and measures regarding allocation of trading capacity in the
period 1 October to 31 December, 2012.
In the period, totally 2 209 hours, the main direction of the power flow was southbound.
Table 7 below shows the average prices in Sweden and all neighbouring areas for the above mentioned period
(excluding Germany and Poland). Table 8 summarises the number of hours where price differences occurred
between the respective zones.
Table 7. Average, maximum, and minimum prices for areas within Nord Pool Spot.
Area Average Price Level
(EUR)
Maximum Price
(EUR)
Minimum Price
(EUR)
SE1 37,40 198,01 15,38
SE2 37,40 198,01 15,38
SE3 37,46 198,01 15,38
SE4 37,56 198,01 15,38
DK1 36,65 139,67 -200,00
DK2 37,68 198,01 -200,00
FI 40,81 300,01 15,38
NO1 36,99 139,67 19,12
NO3 37,56 198,01 19,12
NO4 37,27 198,01 19,12
15/32
No of hours where price for row area > column area
SE1 SE2 SE3 SE4 DK1 DK2 FI NO1 NO3 NO4
SE1 - 0 0 0 418 166 0 193 23 264
SE2 0 - 0 0 418 166 0 193 23 264
SE3 4 4 - 0 418 166 4 193 27 268
SE4 29 29 25 - 422 166 26 202 52 290
DK1 435 435 431 412 - 46 343 525 439 528
DK2 424 424 420 398 310 - 348 522 428 517
FI 706 706 706 705 891 697 - 825 723 780
NO1 168 168 164 164 450 254 155 - 126 362
NO3 160 160 160 160 491 268 154 307 - 261
NO4 169 169 169 169 500 277 163 279 10 -
Table 8. Number of hours where the price for the area in the row was higher than for the area
in the column.
Summary of table 7 and 8:
FI had the highest average price, followed by DK2, SE4, NO3, SE3, SE1, SE2, NO4, NO1 and DK1 re-spectively
SE1 and SE2 had a common price during all hours
The main direction of power flow has been southbound in Sweden, while it has been import from Norway and exports via the remaining interconnectors.
1.2.1 Allocation of trading capacity
Table 9 below summarises how often Svenska Kraftnät have allocated less trading capacity than maximum
NTC for interconnectors and corridors between internal areas in the period.
16/32
Interconnectors/
corridors between
internal areas
No of limited hours No of days with limi-
tation
Average reduction
Export/
South-
bound
Import/
North-
bound
Export/
South-
bound
Import/
North-
bound
Export/
South-
bound
Import/
North-
bound
SE1-SE2 745 0 33 0 5 % 0 %
SE2-SE3 1901 0 80 0 6 % 0 %
SE3-SE4 1848 0 78 0 4 % 0 %
SE1-FI 2209 272 92 13 4 % -3 %
SE1-NO4 10 271 1 13 0 % 10 %
SE2-NO3 0 0 0 0 0 % 0 %
SE2-NO4 0 0 0 0 0 % 0 %
SE3-DK1 291 1010 14 75 7 % 20 %
SE3-FI 2209 2209 92 92 41 % 41 %
SE3-NO1 970 125 72 6 14 % 0 %
SE4-DE 0 829 0 72 0 % 13 %
SE4-DK2 0 854 0 72 0 % 13 %
SE4-PL 879 1368 39 79 11 % 17 %
Table 9. Limitations in trading capacity on interconnectors and corridors between internal
areas as enforced by Svenska Kraftnät. The columns with average reductions shows the aver-
age NTC divided by maximum NTC.
The majority of the limitations of export capacity on the interconnector SE1-FI, enforced by Svenska Kraftnät
during the period, are because of that the NTC depends on forecasted transfer between Kalix - Ossauskoski
and Ivalo - Varangerbotn. The forecasted transfer can both increase and decrease the NTC (which also ex-
plains the negative average reduction for SE1-FI in table 10).
Table 10 below summarises the time during which neighbouring TSOs have allocated less trading capacity
than maximum NTC to interconnectors in the period.
17/32
Interconnectors/
corridors between
internal areas
No of limited hours No of days with limi-
tation
Average reduction
Export/
South-
bound
Import/
North-
bound
Export/
South-
bound
Import/
North-
bound
Export/
South-
bound
Import/
North-
bound
SE1-SE2 - - - - - -
SE2-SE3 - - - - - -
SE3-SE4 - - - - - -
SE1-FI 2209 67 92 5 11 % -4 %
SE1-NO4 2209 2209 92 92 36 % 22 %
SE2-NO3 762 27 36 3 9 % 1 %
SE2-NO4 2209 2209 92 92 20 % 46 %
SE3-DK1 108 39 5 3 3 % 0 %
SE3-FI 2209 2209 92 92 41 % 41 %
SE3-NO1 1228 1101 56 52 10 % 14 %
SE4-DE 1274 1585 58 77 46 % 49 %
SE4-DK2 52 52 6 6 1 % 1 %
SE4-PL 847 2209 92 92 30 % 79 %
Table 10. Limitations in trading capacity on interconnectors as enforced by neighbouring
TSOs. The columns with average reductions shows the average NTC divided by maximum NTC.
Table 11 below summarises the time during which capacities on interconnectors and corridors between inter-
nal areas have been reduced, taking into account reductions by both Svenska Kraftnät and neighbouring
TSOs.
18/32
Interconnectors/
corridors between
internal areas
No of limited hours No of days with limi-
tation
Average reduction
Export/
South-
bound
Import/
North-
bound
Export/
South-
bound
Import/
North-
bound
Export/
South-
bound
Import/
North-
bound
SE1-SE2 745 0 33 0 5 % 0 %
SE2-SE3 1901 0 80 0 6% 0 %
SE3-SE4 1848 0 78 0 4 % 0 %
SE1-FI 2209 305 92 16 11 % -2 %
SE1-NO4 2209 2209 92 92 36 % 26 %
SE2-NO3 762 27 36 3 9 % 1 %
SE2-NO4 2209 2209 92 92 20 % 46 %
SE3-DK1 295 1049 14 75 7 % 20 %
SE3-FI 2209 2209 92 92 41 % 41 %
SE3-NO1 1599 1101 86 52 21 % 14 %
SE4-DE 1274 1920 58 92 46 % 54 %
SE4-DK2 52 906 6 72 1 % 15 %
SE4-PL 1461 2209 92 92 38 % 80 %
Table 11. Final limitations in trading capacity on interconnectors and corridors between inter-
nal areas as enforced by both Svenska Kraftnät and neighbouring TSOs. The columns with
average reductions shows the average NTC divided by maximum NTC.
Detailed information for each limitation is provided in the attached tables B2 to B5 in appendix B and in the
attachment. This information includes the reason for each limitation.
1.2.2 Comments on each interconnector and corridor between internal areas
The attached spreadsheet shows, for each hour during 2012 Q4, if and why Svenska Kraftnät has reduced the
capacity on each individual interconnector. Table 12 below is a summary of the information which has been
given to the market participants via Urgent Market Messages (UMM) on Nord Pool Spot’s website. Links to all
these UMMs, describing the reductions, are accessible in the table.
19/32
Interconnector Event Start Event Stop NTC Ex-
port
NTC Im-
port
UMM
ID
Remark
SE3-FI 2012-08-20 06:00 2013-01-13 02:00 0 – 1350 0 - 1350 59861 (1)
2012-10-12 06:00 2012-10-21 17:00 1500 900 57081 (2)
2012-11-14 00:00 2012-11-25 00 :00 1500 900 58480 (2)
2012-11-24 07:00 2012-11-24 17:00 1500 900 58682 (2)
2012-11-25 06:00 2012-11-25 17:00 800 600 58308 (2)
SE4-NO1 2012-10-12 06:00 2012-10-21 17:00 600 100 56664 (2)
2012-11-14 00:00 2012-11-25 00 :00 600 100 58481 (2)
2012-11-24 07:00 2012-11-24 17:00 600 300 58786 (2)
2012-12-15 07:00 2012-12-15 17:00 400 400 59557 (2)
SE3-NO1 - - 459 - 2095 2145 45249 (4)
2012-10-01 09:00 2012-10-01 18:00 2000 2145 - (3)
2012-11-05 06:00 2012-11-05 17:00 2000 2050 - (3)
2012-11-06 00:00 2012-11-10 18:00 2000 2050 - (3)
2012-11-21 07:00 2012-11-21 18:00 2000 2145 - (3)
SE3-DK1 - - 680 124– 740 45249 (4)
2012-10-01 08:00 2012-10-05 16:00 350 740 56716 (2)
2012-12-05 00:00 2012-12-12 00:00 340 370 59231 (1)
2012-12-18 07:00 2012-12-18 16:00 340 370 59627 (1)
2012-12-19 06:00 2012-12-19 16:00 340 0 59684 (1)
SE4-DK2 - - 1300 324 - 1700 45249 (4)
SE4-DE - - 610 114 - 600 45249 (4)
SE4-PL - - 600 121 - 600 45249 (4)
2012-10-15 17:00 2012-11-21 04:00 472 472 58686 (1)
20/32
2012-10-19 11:00 2012-10-19 20:00 0 – 300 0 - 300 57530 (1)
2012-10-31 08:00 2012-10-31 16:00 300 300 57901 (1)
2012-11-12 10:00 2012-11-12 17:00 0 0 58397 (1)
2012-11-13 10:00 2012-11-13 19:00 0 0 58398 (1)
2012-11-15 09:00 2012-11-15 19:00 0 0 58503 (1)
2012-11-16 10:00 2012-11-16 19:00 0 0 58541 (1)
2012-11-21 00:00 2012-11-21 04:00 0 0 58684 (1)
2012-11-28 09:00 2012-11-28 20:00 300 300 58906 (1)
2012-12-05 09:00 2012-12-05 16:00 300 300 59154 (1)
2012-12-18 07:00 2012-12-18 23:00 300 300 59544 (1)
(1) Maintenance/failure on the interconnector (2) Maintenance/failure in the vicinity of the interconnector (3) Maintenance/failure on the interconnector. No UMM published, because the reduction is less than
100 MW. (4) Reduction because of the West Coast corridor
Table 12. Reduction of interconnectors enforced by Svenska Kraftnät.
21/32
Appendix A – Q3 2012
The attached spreadsheet contains data for each hour during the period. Each value in the spreadsheet is ex-
plained in the table below.
Value Explanation
Maximum NTC export/southbound (MW)
Maximum NTC import/northbound (MW)
Maximum NTC for export/import, as
agreed by TSOs on both sides, and max-
imum NTC for corridors between inter-
nal areas in south/north direction.
These values normally only change after
the network has been reinforced.
SvK NTC export (MW)
SvK NTC import (MW)
Svenska Kraftnät’s view of NTC for ex-
port/import.
SvK Reduction export (Y/N)
SvK Reduction import (Y/N)
Yes (Y), if Svenska Kraftnät’s view of
NTC for export/import is lower than
maximum NTC, otherwise No (N).
SvK Reduction export (MW)
SvK Reduction import (MW)
Difference between maximum NTC and
Svenska Kraftnät’s view of NTC.
SvK Reason for export reduction
SvK Reason for import reduction
Reason codes for Svenska Kraftnät’s
reduction of capacities. Reduction codes
are according Nord Pool Spot’s instruc-
tions only reported when the reduction is
greater than 100 MW. Because of this
principle, there might be mismatches
between the figures shown in table 3 and
5 and tables A2 to A5. See separate sheet
in spreadsheet file for explanation of the
codes.
Neighbouring TSO NTC export (MW)
Neighbouring TSO NTC import (MW)
Neighbouring TSO’s view of NTC for
export/import.
Final NTC export/southbound (MW)
Final NTC import/northbound (MW)
Final NTC for corridors between internal
areas in south/north direction, and the
minimum of Svenska Kraftnät’s view and
the neighbouring TSO’s view of the ex-
port/import NTC on interconnectors.
22/32
Final Reduction export/southbound (Y/N)
Final Reduction import/northbound (Y/N)
Yes (Y), if the final NTC is lower than the
maximum NTC, otherwise No (N).
Final Reduction export/southbound (MW)
Final Reduction import/northbound (MW)
Difference between maximum NTC and
final NTC.
Final Reason for export/southbound reduction
Final Reason for import/northbound reduction
Reason codes for reduction of the final
capacities. Reduction codes are accord-
ing Nord Pool Spot’s instructions only
reported when the reduction is greater
than 100 MW. Because of this principle,
there might be mismatches between the
figures shown in table 3 and 5 and tables
A2 to A5. See separate sheet in spread-
sheet file for explanation of the codes.
Registered physical flow (positive for imports and
negative for exports/positive for southbound and nega-
tive for northbound)
Measured flow on interconnectors and
corridors between internal areas.
Electricity price level
SE1/SE2/SE3/SE4/DK1/DK2/NO1/NO3/NO4/FI
(EUR)
Price level in SE1, SE2, SE3, SE4, DK1,
DK2, NO1, NO3, NO4 and FI. Prices for
DE and PL are not available, since they
are not part of Nord Pool Spot. Red fig-
ures indicate a higher price than neigh-
bouring SE-area, and blue indicates a
lower price.
Price difference (Y/N) Yes (Y), if there is a price difference be-
tween neighbouring SE-area and current
area, otherwise No (N). Blank for DE and
PL.
Table A1. Explanation of data in the attached spreadsheet.
Tables A2 to A5 shows how of many hours the capacities have been reduced per type of reduction for each
interconnector and corridor between internal areas. The reason codes are explained in the attached spread-
sheet.
23/32
1010 1158 1162 1258 1263 1423 1425 1432 1433 1434 1455 1531 1562 1614 1621 1622 1623 1624 2223 2226 2234
SE1-SE2 576 24 1608
SE2-SE3 144 24 353 6 1681
SE3-SE4 7 58 388 1753 2
SE1-FI 2208
SE1-NO4 2186 22
SE2-NO3 2208
SE2-NO4 2208
SE3-DK1 2174 34
SE3-FI 1182 1002 24
SE3-NO1 2007 201
SE4-DE 2056 35 28 89
SE4-DK2 2039 28 137 3 1
SE4-PL 2029 132 47
Table A2. Number of hours per type of export reduction (for interconnectors) and per type of southbound reduction (for corridors
between internal areas) enforced by Svenska Kraftnät.
24/32
1010 1158 1162 1263 1414 1423 1433 1434 1455 1562 1624 2214 2226 2234
SE1-SE2 2208
SE2-SE3 2208
SE3-SE4 2208
SE1-FI 2208
SE1-NO4 2186 22
SE2-NO3 2208
SE2-NO4 2208
SE3-DK1 1987 25 196
SE3-FI 61 1002 1145
SE3-NO1 2178 11 15 4
SE4-DE 2029 35 144
SE4-DK2 1904 28 89 183 3 1
SE4-PL 1889 132 47 140
Table A3. Number of hours per type of import reduction (for interconnectors) and per type of northbound reduction (for corridors
between internal areas) enforced by Svenska Kraftnät.
25/32
1010 1158 1162 1226 1258 1263 1314 1413 1414 1417 1423 1425 1432 1433 1434 1442 1445 1446
SE1-SE2 576
SE2-SE3 144 24 353
SE3-SE4 7 58 388
SE1-FI 2208
SE1-NO4 1774
SE2-NO3 1882 32
SE2-NO4 1946
SE3-DK1 2069 34 105
SE3-FI 1182 1002 24
SE3-NO1 744 7 106 42 284 231
SE4-DE 1045 264
SE4-DK2 2033 24 28 120
SE4-PL 1228 18
1447 1450 1451 1455 1531 1562 1563 1614 1621 1622 1623 1624 2223 2226 2245 2246 9962 9999
SE1-SE2 24 1608
SE2-SE3 6 1681
SE3-SE4 1753 2
SE1-FI
SE1-NO4 115 297 22
SE2-NO3 135 159
SE2-NO4 103 159
SE3-DK1
SE3-FI
SE3-NO1 591 201 1 1
SE4-DE 24 875
SE4-DK2 3
SE4-PL 35 7 920
Table A4. Number of hours per type of export reduction as enforced by Svenska Kraftnät and neighbouring TSOs
(for interconnectors) and per type of northbound reduction (for corridors between internal areas) enforced by Svenska Kraftnät.
26/32
1010 1158 1162 1226 1263 1314 1413 1414 1423 1433 1434 1442 1445
SE1-SE2 2208
SE1-SE3 2208
SE1-SE4 2208
SE1-FI 2208
SE1-NO4 1754
SE2-NO3 2208
SE2-NO4 1946
SE3-DK1 1820 25 167
SE3-FI 61 1002 1145
SE3-NO1 350 578 107 53 284
SE4-DE 875 264
SE4-DK2 1898 24 28 72
SE4-PL 8
1446 1447 1450 1451 1455 1562 1563 1624 1914 2226 2245 9962 9999
SE1-SE2
SE1-SE3
SE1-SE4
SE1-FI
SE1-NO4 135 297 22
SE2-NO3
SE2-NO4 103 159
SE3-DK1 196
SE3-FI
SE3-NO1 232 571 32 1
SE4-DE 24 144 901
SE4-DK2 183 3
SE4-PL 17 13 24 2146
Table A5. Number of hours per type of import reduction as enforced by Svenska Kraftnät and neighbouring TSOs
(for interconnectors) and per type of southbound reduction (for corridors between internal areas) enforced by Svenska Kraftnät.
27/32
Appendix B – Q4 2012
The attached spreadsheet contains data for each hour during the period. Each value in the spreadsheet is ex-
plained in the table below.
Value Explanation
Maximum NTC export/southbound (MW)
Maximum NTC import/northbound (MW)
Maximum NTC for export/import, as
agreed by TSOs on both sides, and max-
imum NTC for corridors between inter-
nal areas in south/north direction.
These values normally only change after
the network has been reinforced.
SvK NTC export (MW)
SvK NTC import (MW)
Svenska Kraftnät’s view of NTC for ex-
port/import.
SvK Reduction export (Y/N)
SvK Reduction import (Y/N)
Yes (Y), if Svenska Kraftnät’s view of
NTC for export/import is lower than
maximum NTC, otherwise No (N).
SvK Reduction export (MW)
SvK Reduction import (MW)
Difference between maximum NTC and
Svenska Kraftnät’s view of NTC.
SvK Reason for export reduction
SvK Reason for import reduction
Reason codes for Svenska Kraftnät’s
reduction of capacities. Reduction codes
are according Nord Pool Spot’s instruc-
tions only reported when the reduction is
greater than 100 MW. Because of this
principle, there might be mismatches
between the figures shown in table 9 and
11 and tables B2 to B5. See separate sheet
in spreadsheet file for explanation of the
codes.
Neighbouring TSO NTC export (MW)
Neighbouring TSO NTC import (MW)
Neighbouring TSO’s view of NTC for
export/import.
Final NTC export/southbound (MW)
Final NTC import/northbound (MW)
Final NTC for corridors between internal
areas in south/north direction, and the
minimum of Svenska Kraftnät’s view and
the neighbouring TSO’s view of the ex-
port/import NTC on interconnectors.
28/32
Final Reduction export/southbound (Y/N)
Final Reduction import/northbound (Y/N)
Yes (Y), if the final NTC is lower than the
maximum NTC, otherwise No (N).
Final Reduction export/southbound (MW)
Final Reduction import/northbound (MW)
Difference between maximum NTC and
final NTC.
Final Reason for export/southbound reduction
Final Reason for import/northbound reduction
Reason codes for reduction of the final
capacities. Reduction codes are accord-
ing Nord Pool Spot’s instructions only
reported when the reduction is greater
than 100 MW. Because of this principle,
there might be mismatches between the
figures shown in table 9 and 11 and ta-
bles B2 to B5. See separate sheet in
spreadsheet file for explanation of the
codes.
Registered physical flow (positive for imports and
negative for exports/positive for southbound and nega-
tive for northbound)
Measured flow on interconnectors and
corridors between internal areas.
Electricity price level
SE1/SE2/SE3/SE4/DK1/DK2/NO1/NO3/NO4/FI
(EUR)
Price level in SE1, SE2, SE3, SE4, DK1,
DK2, NO1, NO3, NO4 and FI. Prices for
DE and PL are not available, since they
are not part of Nord Pool Spot. Red fig-
ures indicate a higher price than neigh-
bouring SE-area, and blue indicates a
lower price.
Price difference (Y/N) Yes (Y), if there is a price difference be-
tween neighbouring SE-area and current
area, otherwise No (N). Blank for DE and
PL.
Table B1. Explanation of data in the attached spreadsheet.
Tables B2 to B5 shows how of many hours the capacities have been reduced per type of reduction for each
interconnector and corridor between internal areas. The reason codes are explained in the attached spread-
sheet.
29/32
1010 1125 1158 1162 1222 1225 1258 1262 1421 1422 1431 1432 1433 1455 1462 1521 1525 1621 1622 1623 1624 1923 1934 2214 2221 2224
SE1-SE2 1680 239 10 6 24 222 24 4
SE2-SE3 387 20 11 27 1764
SE3-SE4 1052 10 9 1070 4 64
SE1-FI 2198 11
SE1-NO4 2199 10
SE2-NO3 2209
SE2-NO4 2209
SE3-DK1 1918 123 144 24
SE3-FI 240 1969
SE3-NO1 1349 836 23 1
SE4-DE 2209
SE4-DK2 2209
SE4-PL 1330 36 96 690 57
Table B2. Number of hours per type of export reduction (for interconnectors) and per type of southbound reduction (for corridors
between internal areas) enforced by Svenska Kraftnät.
30/32
1010 1125 1158 1162 1222 1225 1258 1262 1421 1431 1433 1455 1462 1525 1555 1557 1624 2226
SE1-SE2 2209
SE2-SE3 2209
SE3-SE4 2209
SE1-FI 1937
227 21
24
SE1-NO4 1938
227 10
10
24
SE2-NO3 2209
SE2-NO4 2209
SE3-DK1 1221 19
144
24
801
SE3-FI
240
1964
5
SE3-NO1 2209
SE4-DE 1506
703
SE4-DK2 1388
811 10
SE4-PL 934
29 66
492
57
631
Table B3. Number of hours per type of import reduction (for interconnectors) and per type of northbound reduction (for corridors
between internal areas) enforced by Svenska Kraftnät.
31/32
1010 1125 1126 1151 1158 1162 1222 1225 1258 1262 1326 1420 1421 1422 1431 1432 1433 1442 1443 1445 1447 1450 1455 1462
SE1-SE2 1680
239
10 6
SE2-SE3 387
20 11
27
SE3-SE4 1052
10
9
SE1-FI 1457
741
11
SE1-NO4 1538
613 10
SE2-NO3 1848
35 326
SE2-NO4 1828
381
SE3-DK1 1914 19
144
108
SE3-FI
240
1969
SE3-NO1 647
71
71 47 26
SE4-DE 971
SE4-DK2 2157
10
10
32
SE4-PL 779
36 68
466
53
1521 1525 1545 1546 1550 1621 1622 1623 1624 1923 1934 2214 2221 2224 2251 2345 9999
SE1-SE2 24
222 24 4
SE2-SE3
1764
SE3-SE4
1070 4 64
SE1-FI
SE1-NO4
48
SE2-NO3
SE2-NO4
SE3-DK1
24
SE3-FI
SE3-NO1
18 518
782 20 1 5 3
SE4-DE
1238
SE4-DK2
SE4-PL
807
Table B4. Number of hours per type of export reduction as enforced by Svenska Kraftnät and neighbouring TSOs
(for interconnectors) and per type of northbound reduction (for corridors between internal areas) enforced by Svenska Kraftnät.
32/32
1010 1125 1126 1151 1158 1225 1258 1326 1420 1421 1431 1433 1442 1443 1445 9999
SE1-SE2 2209
SE2-SE3 2209
SE3-SE4 2209
SE1-FI 1580 357 227 21
SE1-NO4 1405 227 10
SE2-NO3 2159
SE2-NO4 1828
SE3-DK1 1182 19 144 39
SE3-FI 240 1964 5
SE3-NO1 1267 71 96
SE4-DE 485 1380
SE4-DK2 1336 10 10 32
SE4-PL 2095
1447 1450 1455 1462 1525 1545 1546 1550 1555 1557 1624 1745 2210 2226 2251 2345
SE1-SE2
SE2-SE3
SE3-SE4
SE1-FI 24
SE1-NO4 12 449 10 72 24
SE2-NO3 27 23
SE2-NO4 381
SE3-DK1 24 801
SE3-FI
SE3-NO1 47 24 283 405 4 9 3
SE4-DE 344
SE4-DK2 811 10
SE4-PL 4 110
Table B5. Number of hours per type of import reduction as enforced by Svenska Kraftnät and neighbouring TSOs
(for interconnectors) and per type of southbound reduction (for corridors between internal areas) enforced by Svenska Kraftnät.