swi procedure post

5
www.swivalve.com Copyright © 2008 SWI Valve Co., Ltd. All rights reserved. Post Weld Heat Treatment PROCEDURE MANUAL

Upload: preceptiveinquirer

Post on 22-Nov-2015

10 views

Category:

Documents


0 download

DESCRIPTION

heat treat notes

TRANSCRIPT

  • www.swivalve.comCopyright 2008 SWI Valve Co., Ltd. All rights reserved.

    Post WeldHeat Treatment

    PROCEDURE MANUAL

  • ISO 9001 : 2000 EDITION

    HEAT TREATMENT PROCEDURE HEAT TREATMENT PROCEDURE

    ISSUE JUN 13, 2003

    REVISION DEC 20, 2003

    REV. NO. A

    PERFORM DEC 20, 2003

    DOC. NO. SW-HTP-01

    PREPARED BY T. M. LEE

    REVIEWED & APPROVED BY

    Y. P. CHO

    SWI Valve Co.,Ltd.

    HEAD OFFICE & PLANT 1023-2, Kwanyang-dong, Anyang, Kyungki-do, Korea Tel : 82-31-422-7495 7 Fax : 82-31-422-7498 Home page : www.swivalve.com

  • QUALITY ASSURANCE DOC NO. SW-HTP-01 HEAT TREATMENT PROCEDURE PAGE 1 3

    1.0 SCOPE 1.1 This procedure defines the heat treatment required by the material specification and

    postweld heat treatment(PWHT) of pressure rating parts of the valve of SWI Valve Co.,Ltd.(SWI)

    1.2 This procedure shall be applied to the manufacturing process. 2.0 APPLICABLE SPECIFICATIONS STANDARDS & CODES 2.1 ASME B31.3 "CHEMICAL PLANT AND PETROLEUM REFINERY PIPING" 2.2 Applicable material Specification. (ASTM) 3.0 HEAT TREATMENT & POSTWELDED HEAT TREATMENT(PWHT) PROCEDURE 3.1 Preparation 1) The forging & Cast steel shall be free of the scales, oil, grease, rust and other foreign adherents. 2) Loading 3.2 Heating After loading, temperature and time shall be prepared in according to the rules. 3.3 Holding 3.4 Cooling 4.0 INSPECTION The inspection after heat treatment and PWHT shall be performed on below test. 1) Visual 2) Heating Rate 3) Holding Time

    4) Cooling Rate 5) Hardness Test

  • QUALITY ASSURANCE DOC NO. SW-HTP-01 HEAT TREATMENT PROCEDURE PAGE 2 3

    5.0 GENERAL SKETCH OF HEAT TREATMENT CURVE

    FORGING STEEL HEAT TREATMRNT TEMPERATURE STANDARD Method

    Material NORMALIZING STRESS RELIEVING / PWHT

    ASTM A105 A350-LF2

    Temp. 88025

    Air Max. Cooling 150/Hr 300 Holding Time : 1 Hr/in

    Temp. 65025

    Max. Max. 100/Hr 150/Hr 300

    Holding Time : 1 Hr/inch

    Method Material NORMALIZING TEMPERING / P.W.H.T

    ASTM A182-F5 A182-F9

    Temp. 98025

    Air Max. Cooling 150/Hr 300 Holding Time : 1 Hr/inch

    Temp. 73025

    Max. Max. 100/Hr 150/Hr 300

    Holding Time : 1 Hr/in P.W.H.T Holding Time : 2 Hr

    Method Material NORMALIZING TEMPERING / P.W.H.T

    ASTM A182-F11 A182-F22

    Temp. 93025

    Air Max. Cooling 150/Hr 300 Holding Time : 1 Hr/inch

    Temp. 73025

    Max. Max. 100/Hr 150/Hr 300

    Holding Time : 1 Hr/in P.W.H.T Holding Time : 2 Hr

  • QUALITY ASSURANCE DOC NO. SW-HTP-01 HEAT TREATMENT PROCEDURE PAGE 3 3

    FORGING STEEL HEAT TREATMRNT TEMPERATURE STANDARD Method

    Material SOLUTION STRESS RELIEVING / PWHT

    ASTM A182-F304 A182-F304L A182-F316 A182-F316L A182-F347 A351-CF3 A351-CF3M A351-CF8 A351-CF8C A351-CF8M

    Temp. Min. 1040

    Water Max. Cooling 150/Hr 300 Holding Time : 1 Hr/inch

    Temp. Min. 1040

    Water Max. Cooling 150/Hr 300 Holding Time : 1 Hr/inch

    Method Material

    NORMALIZING STRESS RELIEVING

    ASTM A216-WCB A352-LCB

    Temp. 91025

    Air Max. Cooling 150/Hr 300 Holding Time : 1 Hr/in

    Temp. 65025

    Max. Max. 100/Hr 150/Hr 300

    Holding Time : 1 Hr/inch

    Method Material

    NORMALIZING TEMPERING/STRESS RELIEVING

    ASTM A217-C5 A217-C12 A217-WC6 A217-WC9

    Temp. 95025

    Air Max. Cooling 150/Hr 300 Holding Time : 1 Hr/inch

    Temp. 73025

    Max. Max. 100/Hr 150/Hr 300

    Holding Time : 1 Hr/in