Swimming Pool CalculationEnter Your Numbers In GreenCells Only: Swimming Pool e$ig
Surface Area of Swimming Pool 1.4 prepared * 'ng.>ah
Pool average depth = -.% m
Pool Volume = 10.1
!. "ater #nlet$ = -.%56So &et the o. !f inlet$ = 1 inlet$
'nter o. !f (urn !ver Period 3 time ) da*
&et Swimming Pool Pump Capacit* = Pool Volume ) + turn over period , 6-
= -.-/5111
o. !f pump will u$ed = 1 pump$
&et pump flow rate = -.-/5111
To calculate pipe sizing
Supply pipe maximum velocity will be 2 m/so. !f inlet = 1 #nlet
Pump flow rate = 5.0-6660
'ach inlet give flow rate = 5.0-6660
A$$uming that all inlet in $euence
ia 1 = 31.001%% (a2ing it 3 5- mm. Take just
Suction pipe maximum velocity will be 1.5 m/s
Pump flow rate = 5.0-6660
o. !f outlet = 1 !utlet
'ach outlet give flow rate = 5.0-6660ia 1 = 4-.61-60 (a2ing it 41 5- mm. Take just
Getting the flter area to be used
Pump flow rate = 5.0-6660
ilter area = -.163-4%
$eating Calculation for s%imming pools
Heater is required for heating purposes at winter seasons if required take inconsiderationit's not particle to heat the pool without covers at coldest winter months
For calculation purposes the following conditions to be considered:-
The recommended Pool water temperature is around 2 ! " deg#
$utdoor air condition : %& () deg ! " *+,+ summer condition. ma/ 022deg F 1
7 6) 1- deg 8 C )" 9winter condition
From 4P5T5 p. 4ec(. the 5verage *ail6 heat loss 1*H3 in 7,hr m2 of pool surface area
m
m3
m3)min
m3)min
m3)hr
m3)hr
m3)hr
m3
)hr
m3)hr
m at 15 gpm ) ft
-
8/17/2019 Swimming Pool Program
4/21
correction value to 1.5
8o# of hours per da6 available for heati 4% hour$
Heater required 4.6%15 w
cooling Calculation for s%imming pools To cool 0gpm and maintain at 2!"12#%!F3 will require the corresponding 0#2 "fm of a
"ooling capacit6 1%0.6/ C>/-4-0.3 tu)hr
0.533/4 (?
pump &ea! calculation for s%imming poolsheater pre$$ure drop = 1- ft
filter pre$$ure drop = 3- ft
chlorination auto pilot unit 5 ft
pipe$ and fitting$ lo$$e$ = 0 ft
Static head heat pump = 1%./3 ft
pump head = %5.116 ft
pump @P = -.3--01 hp
'esult of Calculation :(
Pump Capacit* = 5.150 with 1
Pump @ead = %5.116 t
Pump @P = -.3--01 @P
alance tan2 V. = B?'
ilter Area = -.163-4%@eater Capacit* = 4.6%15 w
Cooling Capacit* = 0.533/4 (? 1%0.6/ C>
m3)hr
m3
m
at 15 gpm ) ft
-
8/17/2019 Swimming Pool Program
5/21
-
8/17/2019 Swimming Pool Program
6/21
ir 9 #; +tumin to re
-
8/17/2019 Swimming Pool Program
7/21
Swimming Pool CalculationEnter Your Numbers In GreenCells Only: Swimming Pool e$ig
Surface Area of Swimming Pool / prepared * 'ng.>ah
Pool average depth = -.% m
Pool Volume = 3.
!. "ater #nlet$ = 1.16So &et the o. !f inlet$ = 1 inlet$
'nter o. !f (urn !ver Period 1 time ) da*
&et Swimming Pool Pump Capacit* = Pool Volume ) + turn over period , 6-
= -.3%6660
o. !f pump will u$ed = pump$
&et pump flow rate = -.1/3333
alance tan2 volume =
= 3.3%3333
alance tan2 volume = 3.4
To calculate pipe sizing
Supply pipe maximum velocity will be 2 m/s
o. !f inlet = 1 #nlet
Pump flow rate = 3.
'ach inlet give flow rate = 3.
A$$uming that all inlet in $euence
ia 1 = 64.-61% (a2ing it 64 65 mm. Take just
ia = /-.5/634 (a2ing it /1 1-- mm. for inletia 3 = 11-./504 (a2ing it 111 1-- mm.
ia 4 = 1%.16 (a2ing it 1% 15- mm.
ia 5 = 143.454 (a2ing it 143 15- mm.
ia 6 = 156./105 (a2ing it 150 15- mm.
ia 0 = 16/.4/- (a2ing it 16/ 15- mm.
ia % = 1%1.1/0 (a2ing it 1%1 15- mm.
ia / = 1/.1%3% (a2ing it 1/ 15- mm.
ia 1- = -.50/6 (a2ing it -3 15- mm.
ia 11 = 1.460 (a2ing it 1 15- mm.
ia 1 = 1./14% (a2ing it 15- mm.
Suction pipe maximum velocity will be 1.2 m/s
Pump flow rate = 3.
o. !f outlet = !utlet
'ach outlet give flow rate = 11.6
ia 1 = 50.%///1 (a2ing it 5% 65 mm. Take just
ia = %1.%%%4 (a2ing it % 05 mm. for " outle
ia 3 = 1--.%56 (a2ing it 1-- 1-- mm.
m
m3
m3)min
m3)min
4- :)m ; Pool Surface area < 1- min ; pump flow rate < -.-1 ;
m3
m3
m3)hr
m3)hr
m3)hr
m3)hr
-
8/17/2019 Swimming Pool Program
8/21
ia 4 = 115.0//% (a2ing it 116 1-- mm.
Over fow pipe Grille velocity will be 0.3m/s the o. !f grille = 0 &rille$
Pump flow rate = 3.
A$$uming that all grille$ in $euence
ia 1 = 33.60/5% (a2ing it 34 5- mm. Take justia = 40.63-1 (a2ing it 4% 5- mm. for # grille
ia 3 = 5%.33405 (a2ing it 5% 65 mm.
ia 4 = 60.35/10 (a2ing it 60 65 mm.
ia 5 = 05.3-/%4 (a2ing it 05 05 mm.
ia 6 = %.4/00/ (a2ing it % 05 mm.
ia 0 = %/.1-0% (a2ing it %/ 1-- mm.
ia % = /5.6-5 (a2ing it /5 1-- mm.
ia / = 1-1.-3%0 (a2ing it 1-1 1-- mm.
ia 1- = 1-6.5-4 (a2ing it 1-0 1-- mm.
Getting the flter area to be usedPump flow rate = 3.
ilter area = -.66%50
$eating Calculation for s%imming pools
Heater is required for heating purposes at winter seasons if required take inconsideration
it's not particle to heat the pool without covers at coldest winter months
For calculation purposes the following conditions to be considered:-
The recommended Pool water temperature is around 2 ! " deg#
$utdoor air condition : %& () deg ! " *+,+ summer condition. ma/ 022deg F 1
7 6) 1- deg 8 C )" 9winter condition
From 4P5T5 p. 4ec(. the 5verage *ail6 heat loss 1*H3 in 7,hr m2 of pool surface area
correction value to 1.5
8o# of hours per da6 available for heati 4% hour$
Heater required 6.34305 w
cooling Calculation for s%imming pools To cool 0gpm and maintain at 2!"12#%!F3 will require the corresponding 0#2 "fm of a
"ooling capacit6 535.-1 C>
360543.0 tu)hr
3-.6%64 (?
pump &ea! calculation for s%imming poolsheater pre$$ure drop = 1- ft
filter pre$$ure drop = 3- ft
chlorination auto pilot unit 5 ft
m3)hr
m3)hr
m at 15 gpm ) ft
-
8/17/2019 Swimming Pool Program
9/21
pipe$ and fitting$ lo$$e$ = 0 ft
Static head heat pump = 1%./3 ft
pump head = %5.116 ft
pump @P = -.61-364 hp
'esult of Calculation :(
Pump Capacit* = 51.-030 with
Pump @ead = %5.116 t
Pump @P = -.61-364 @P
alance tan2 V. = 3.4
ilter Area = -.66%50
@eater Capacit* = 6.34305 w
Cooling Capacit* = 3-.6%64 (? 535.-1 C>
m3)hr
m3
m at 15 gpm ) ft
-
8/17/2019 Swimming Pool Program
10/21
$heet ?ev9- +49119-1-
oud Selim
o. Of inlet for your calculation
take to !ia
o. Of outlet for your calculation
t take to !ia"
pool $urface area
-
8/17/2019 Swimming Pool Program
11/21
o. Of grille for your calculationtake to !ia #
that
) "3
ir 9 #; +tumin to re
-
8/17/2019 Swimming Pool Program
12/21
Pump$
-
8/17/2019 Swimming Pool Program
13/21
-
8/17/2019 Swimming Pool Program
14/21
Suction pipe maximum velocity will be 1.5 m/s
Pump flow rate = 44.06660
o. !f outlet = 3 !utlet
'ach outlet give flow rate = 14./
ia 1 = 65.66/% (a2ing it 66 65 mm.
ia = /.%011 (a2ing it /3 1-- mm.
ia 3 = 113.0434 (a2ing it 114 1-- mm.
ia 4 = 131.33/6 (a2ing it 131 15- mm.
Getting the flter area to be usedPump flow rate = 44.06660
ilter area = 1.0/-4%
$eating Calculation for s%imming pools
Heater is required for heating purposes at winter seasons if required take inconsi
's not particle to heat the pool without covers at coldest winter months
For calculation purposes the following conditions to be considered:-
The recommended Pool water temperature is around 2 ! " deg#
ondition : %& () deg ! " *+,+ summer condition. ma/ 022deg F 1) "3
7 6) 1- deg 8 C )" 9winter condition
T5 p. 4ec(. the 5verage *ail6 heat loss 1*H3 in 7,hr m2 of pool surface area
correction value to be -.%
8o# of hours per da6 available for heatin 1 hour$
Heater required %%.4% w
cooling Calculation for s%imming pools To cool 0gpm and maintain at 2!"12#%!F3 will require the corresponding 0#2
"ooling capacit6 1-1-1.46 C>
0-/11.5 tu)hr
5/.1--/6 (?
pump &ea! calculation for s%imming pools
heater pre$$ure drop = 1- ftfilter pre$$ure drop = 3- ft
chlorination auto pilot unit 5 ft
pipe$ and fitting$ lo$$e$ = 6 ft
Static head heat pump = 3 ft
pump head = 64.% ft
m3)hr
m3)hr
m3)hr
m at 15 gpm ) ft
-
8/17/2019 Swimming Pool Program
15/21
pump @P = %.-635/6 hp
'esult of Calculation :(
Pump Capacit* = 1/0.1-10 with
Pump @ead = 64.% t
Pump @P = %.-6353 @P
alance tan2 V. = 15.4
ilter Area = 1.0/-4%@eater Capacit* = %%.4% w
Cooling Capacit* = 5/.1--/6 (? 1-1-1.46
m3)hr
m3
m
at 15 gp
-
8/17/2019 Swimming Pool Program
16/21
Swimming Pool Calculation
'nter Dour umer$ #n &reenCell$ !nl*7 Swimming Pool e$ig
Surface Area of Swimming Pool 15% m prepared * 'ng.>ah
Pool average depth = 1.0 m
Pool Volume = 6%.6 m3
!. "ater #nlet$ = 6.3
So &et the o. !f inlet$ = 6 inlet$
'nter o. !f (urn !ver Period 6 time ) da*
&et Swimming Pool Pump Capacit* = Pool Volume ) + turn over period , 6-
= -.046111 m3)min
o. !f pump will u$ed = 1 pump$
&et pump flow rate = -.046111 m3)min
alance tan2 volume = 4- :)m ; Pool Surface area < 1- min ; pump flow rate < -.-1 ;
= 15.36111 m3
alance tan2 volume = 15.4 m3
(o calculate pipe $iEing
Suppl* pipe maFimum velocit* will e m)$
o. !f inlet = 6 #nlet
Pump flow rate = 44.06660 m3)hr
'ach inlet give flow rate = 0.461111 m3)hr
A$$uming that all inlet in $euence
ia 1 = 36.3/ (a2ing it 36 5- mm. (a2e Gu$t n
ia = 51.306/6 (a2ing it 51 5- mm. for 4 inlet t
ia 3 = 6./360 (a2ing it 63 65 mm.
ia 4 = 0.650// (a2ing it 03 05 mm.
ia 5 = %1.341 (a2ing it %1 05 mm.ia 6 = %%./%05 (a2ing it %/ 1-- mm.
ia 0 = /6.1104/ (a2ing it /6 1-- mm.
ia % = 1-.053/ (a2ing it 1-3 1-- mm.
ia / = 1-%./%0 (a2ing it 1-/ 1-- mm.
ia 1- = 114.%%4 (a2ing it 115 1-- mm.
ia 11 = 1-.4%/6 (a2ing it 1- 1-- mm.
ia 1 = 15.%403 (a2ing it 16 15- mm.
Suction pipe maFimum velocit* will e 1.5 m)$
Pump flow rate = 44.06660 m3)hr
o. !f outlet = !utlet
'ach outlet give flow rate = .3%333 m3)hr
ia 1 = %-.4%05 (a2ing it %- 05 mm. (a2e Gu$t n
ia = 113.0434 (a2ing it 114 1-- mm. for outlet
ia 3 = 13/.3-60 (a2ing it 13/ 15- mm.
ia 4 = 16-.%505 (a2ing it 161 15- mm.
!ver flow pipe &rille velocit* will e -.3m)$
the o. !f grille = 0 &rille$
-
8/17/2019 Swimming Pool Program
17/21
-
8/17/2019 Swimming Pool Program
18/21
Pump Capacit* = 1/0.1-10 m3)hr with 1
Pump @ead = 134.4 t
Pump @P = 16.030% @P
alance tan2 V. = 15.4 m3
ilter Area = 1.0/-4% m at 15 gpm ) f
@eater Capacit* = 44.4 w
Cooling Capacit* = 5/.1--/6 (? 1-1-1.46 C>
-
8/17/2019 Swimming Pool Program
19/21
$heet ?ev9- +49119-1-
oud Selim
pool $urface area
o. !f inlet for *our calculation
2e to dia4
o. !f outlet for *our calculation
ta2e to dia
-
8/17/2019 Swimming Pool Program
20/21
o. !f grille for *our calculation
a2e to dia 6
u)min to reGect the heat.
-
8/17/2019 Swimming Pool Program
21/21