MANUAL FOR AGROHYDROLOGY

AND

ENGINEERING DESIGN

FOR SMALL WATER IMPOUNDINGPROJECT (SWIP)

Department of Agriculture BUREAU OF SOILS AND WATER MANAGEMENT

Diliman, Quezon City March 1997

Page 2: SWIP Manual Part 1

TABLE OF CONTENTS

DESCRIPTION PAGE NO.

1. ESTIMATION OF RUN-OFF and DERIVATION OF INFLOW HYDROGRAPH1

1.1 Establishment of Project Data 11.2 Estimation of Basin Lag Time and Time Concentration 11.3 Computation for Rainfall Depth 21.4 Rainfall Increments Determination 21.5 Rearrangement of Rainfall Pattern 31.6 Derivation of Synthetic Unit Hydrograph 81.7 Convolution of Equation for Flood Hydrograph 9

2. FIELD WATER BALANCE COMPUTATION 10

2.1 Establishment of Cropping Pattern and Cropping Calendar 102.2 Computation of 80% Dependable Rainfall 102.3 Crop Coefficient and Crop Rooting Depth 112.4 Percolation Loss 112.5 Soil Water Holding Capacity 142.6 Actual Evapotranspiration 142.7 Change in Storage 142.8 Initial Storage 142.9 Estimation of Water Storage at End of Decade 142.10 Irrigation Efficiency 15

3. ESTIMATION OF 10-DAY RESERVOIR INFLOW 16

3.1 Estimation of 10-Day Inflow for Region I, II, & IV 163.2 Estimation of 10-Day Inflow for Other Regions 16

4. ANNEXES

A. Philippine Water Resources Region 24B. Climate Map of the Philippines 25C. Monthly Distribution of Potential Evapotranspiration

of Selected Places in the Philippines 27D. Planting Calendar 28

Page 3: SWIP Manual Part 1

LIST OF TABLES

TABLE NO. PAGE NO.

1 Regression Coefficients of the Rainfall Intensity-Duration Frequency Curve for Different Locations 4

2 Soil Groups for Estimation of Watershed Index W. 6

3 Antecedent Moisture Condition for Estimation of Water Index W. 6

4 Values of Watershed Index W. 6

5 Adjustment of Watershed Index W for Antecedent Moisture Condition7

6 Recommended Retention Rate for Hydrologic Soil Groups 8

7 T/Tp versus q/qp for Dimensionless Hydrograph 9

8 Percolation for Different Soil Types 12

9 S W H C of Different Soil Textural Class 15

10 Regional Run-off Coefficient and % Monthly Baseflow Distribution 17

Page 4: SWIP Manual Part 1

LIST OF FIGURES

FIGURE NO. TITLE PAGE NO.

1 Rearrangement of Rainfall Increments 5

2 Water Management Scheme and Crop Depending Variables for Field Water Balance for Irrigated Wetland Rice. 12

3 Crop Depending Variables for Field Water balance of Irrigated Corn. 12

4 Crop Depending Variables for Field Water balance of Irrigated Mungo. 13

5 Crop Depending Variables for Field Water balance of Irrigated Tomato. 13

6 Crop Depending Variables for Field Water balance of Irrigated Peanut. 14

Page 5: SWIP Manual Part 1

AGROHYDROLOGIC STUDIES AND ANALYSES

There are 3 general computations to be considered in the study. These are as follows:

1. Estimation of Run-off and Derivation of Inflow Hydrograph (25 yrs.)2. Field Water Balance Computation3. Reservoir Inflow Computation

1. ESTIMATION OF RUN-OFF AND DERIVATION OF INFLOW HYDROGRAPH

This would require the following data and inputs to be taken from the project site. These are topographic map soil and land capability mp or report, land use/vegetation map or report and rainfall intensities. The following arranged procedures would be helpful in deriving the inflow hydrograph.

1.1 Establishment of the Project Data

a. Drainage Area, A, in sq. km.b. Mainstream length from outlet to highest ridge, L.c. Mainstream from outlet to point nearest basin centroid, Lc.d. Total fall (elevation difference) from highest ridge to outlet, H, in meter.e. Watershed gradient,

f. Soil type of watershed (dominant) to determine the soil group the identified soil type in the watershed belong to.

g. Watershed cover/land use.

1.2. Estimation of Basin Lag Time, TL and time of Concentration TC using Method, and Snyder’s Method (revised), Time to peak, Tp and peak runoff, qp.

a. Compute for unadjusted TL

(TL in hours)

Where: L = mainstream length from outlet to highest ridge, in miles LC = mainstream length from outlet to the nearest basin centroid. Y = watershed gradient a = 0.38 Ct = coefficient with values (Linsley’s):

1.2 for mountatins drainage area 0.72 for foothill drainage area 0.35 for valley drainage area

b. Adjust estimate of TL Adjusted TL (for ∆D = 0.4 ≠ )

Adjusted TL = TL + ¼ (∆D - )

1c. Compute time of concentration, TC, in hours.

Page 6: SWIP Manual Part 1

TC = TL / 0.70

d. Compute the time to peak, Tp usingTp = ½ ∆D + TL (adjusted)

Where: ∆D = time duration of one inch of excess rainfall (USDA SCS) suggested values of ∆D as 0.5 hr. (or 0.40 hr.) where Tc < 3; 1 hr. where 3<Tc<6:1/5 Tc where Tc>6.

e. Compute the Peak rate of Runoff, qp, in cms/mm excess rainfall:

qp =

Where:A = drainage area, sq. km.TL = time lag (adjusted), hr.qp = cms/mm

1.3 Compute for rainfall Depth P for different duration D, utilizing equation:P = iD wherei = rainfall intensity computed using Rainfall Intensity Duration, Frequency

Curve for different location in the Philippines (Table 1). Gen. Equation :

D = Duration

The tabulation of rainfall depth Pi versus Duration Di is thus:

Duration, Rainfall Intensity Rainfall Depth Seq. No. D, Hr I, min/hr. P, mm 1 D1 = ∆D 1 P1 2 D2 = 2D1 2 P2 4 D3 = 3D1 3 P3 n Dn = 2Dn n Pn

1.4 Obtain rainfall increments ∆Pi and rearranged them according to three maximization patterns:

1. Peak ∆P1 at middle time position, i = n/2

2. Peak ∆P1 at 1/3 time position, i = n/33. Peak ∆P1 at 2/3 time position, i= 2n/3 + 1

The sequences for peak at the different positions mentioned are shown in figure I. Considering that the highest qp is usually computed or obtained from the 2/3 time position pattern,

the hydrograph to be derived will utilize this pattern without anymore working the other 2 patterns for comparison, thus tabulation would only be as follows:

2 Rainfall Increments Rearranged Rainfall Increments APi, mm in 2/3 Position of peak pi

Page 7: SWIP Manual Part 1

________________________________________________________________________Seq. No.1. ∆P1 = P1 ∆P142. ∆P2 = P2 - P1 ∆P133. ∆P3 = P3 – P2 ∆P124. ∆P4 = P4 – P3 ∆P105. ∆P5 = P5 – P4 ∆P96. ∆P6 = P6 – P5 ∆P77. ∆P7 = P7 – P6 ∆P68. ∆P8 = P8 – P7 ∆P59. ∆P9 = P9 – P8 ∆P310. ∆P10 = P10 – P9 ∆P211. ∆P11 = P11 – P10 ∆P112. ∆P12 = P12 – P11 ∆P413. ∆P13 = P13 – P12 ∆P814. ∆P14 = P14 – P13 ∆P1115. ∆P15 = P15 – P14 ∆P15

This rainfall-increment pattern is subjected to estimation of losses in the next step for the determination of rainfall excess amounts.

1.5 For the rearranged rainfall pattern considered,

-Apply the Soil Conservation Service (SCS) Method to obtain Initial Abstraction, Ia: Ia = 0.2s Where: Ia = initial abstraction, in inches s = 1000 – 10 W = maximum potential difference between rainfall and runoff, in inches W = watershed index, also called the runoff curve number N or CN = function of soil group, antecedent moisture condition (AMC), and land use

cover in the watershed

- Refer to Table 2 (Soil Group), Table 3 (Antecedent Moisture Conditions, Table 4 Value of W for different land uses/covers, assuming AMC II) and Table 5 (Adjustments of W for AMC I and AMC III).

- The computed initial abstraction Ia is subtracted from the rainfall over the necessary initial number of time increment until Ia is satisfied.

- After subtracting Ia, a uniform retention rate f is applied in succeeding time increments so that retention depth subtracted each time from a rainfall increments is at most equal to f AP, Applicable values are given in Table 6.

3

TABLE 1 Regression Coefficients if the Rainfall intensity, f (mm/hr) – Duration, t (hr) Frequency, T Curve for Different Locations: General Equation: i = aT C

Page 8: SWIP Manual Part 1

(t+b)d

Note:

If b - Ø the resulting rainfall intensity-duration-frequency curves are straight lines (plotted on log, log chart).

4

REGION STATION/LOCATION a b c d R             

1 Vigan, Ilocos Sur 47.295 0.20 0.2710 0.577 0.9882   Baguio City 51.414 - 0.2337 0.343 0.9800

  Laoag City 60.676 0.30 0.2370 0.554 0.9944

2 Tuguegarao, Cagayan 47.263 0.40 0.2290 0.598 0.9949

  Aparri, Cagayan 53.503 0.20 0.2780 0.610 0.9916 3 San Agustin, Arayat,        

  Pampanga 48.749 0.40 0.2330 0.690 0.9973   Sta. Cruz, Pampanga 41.687 0.85 0.2220 0.611 0.9976   Dagupan, Pangasinan 53.665 0.10 0.1340 0.575 0.9959   Matalava, Lingayen 0.890 0.10 0.2220 0.611 0.9973   Iba, Zamabales 51.960 0.80 0.2020 0.448 0.9951   Cabanatuan City 62.961 0.20 0.1395 0.754 0.9950   Cansinala, Apalit,          Pampanga 36.597 - 0.2280 0.568 0.9962

  Gabaldon, Nueva Ecija 43.209 0.10 0.2150 0.487 0.9942 4 Infanta, Quezon 67.327 0.30 0.2010 0.617 0.9867   Calapan, Mondoro Or. 54.846 0.30 0.2460 0.768 0.9969   MIA 46.863 0.10 0.1940 0.609 0.9979   Pot Area, Manila 58.798 0.20 0.1980 0.679 0.9981   Tayabas, Quezon 39.710 - 0.1320 0.461 0.9912   Casiguran, Quezon 77.587 0.70 0.2380 0.717 0.9849   Alabat, Quezon 55.424 0.20 0.2310 0.491 0.9880   Ambalong, Tanauan,          Batangas 41.351 - 0.2310 0.511 0.9620   Angono, Rizal 62.314 0.70 0.1910 0.630 0.9934 5 Daet, Camarines Norte 44.553 - 0.2240 0.570 0.9971   Legaspi, City 55.836 0.20 0.2480 0.591 0.9958   Virac, Catanduanes 49.052 0.20 0.2480 0.591 0.9958 6 Iloilo City 44.390 0.15 0.2040 0.670 0.9970 7 Cebu Airport 59.330 0.40 0.2400 0.812 0.9956   Dumaguete City 100.821 1.00 0.2370 1.057 0.9963 8 Borongan, Eastern          Samar 51.622 0.10 0.1680 0.581 0.9972   UEP, Catarman, Samar 61.889 0.40 0.2300 0.681 0.9905   Catbalogan, Samar 51.105 0.10 0.2020 0.620 0.9948   Tacloban, Leyte 39.661 0.10 0.1660 0.629 0.9968 9 Zamboanga City 48.571 0.30 0.2090 0.803 0.9973 10 Cagayan de Oro 78.621 0.50 0.1950 0.954 0.9992   Surigao City 61.486 0.60 0.2520 0.602 0.9901   Binatuan, Surigao          del Sur 57.433 0.10 0.1340 0.577 0.9932

11 Davao City 81.959 0.50 0.1740 0.945 0.9986

Page 9: SWIP Manual Part 1

5

Page 10: SWIP Manual Part 1

TABLE 2: Soil Groups for Estimation of Watershed Index W

Soil Group Description of Soil Characteristics

A Soils having very low runoff potential, For Example, deep sands with little silt or clay. B Light soils under/or well structured soils having above Average infiltration when thoroughly melted. For example, light sandy loams, silty loams. C Medium soils and shallow soils having below-average Infiltration when thoroughly melted. For example, clay loams. D Soils having high runoff potential. For example, heavy soils, particularly days of high swelling capacity, and very shallow soils underlain by dense clay horizons.

TABLE 3: Antecedent Moisture Conditions for Estimation of Watershed Index W

Antecedent Moisture Condition Rain in pervious 5 days (AMC) Dormant Season Growing Season

I less than 0.5 in. lass than 1.4 in. II 0.5 – 1.1 in. 1.4 to 2.1 in. III more than 1.1 in. more than 2.1 in.

TABLE 4: Values of Watershed Index W (Assuming Antecedent Moisture Condition II)

Land Use or CoverFarming Hydrologic SOIL GROUP

Treatment Condition A B C D Native pasture - Poor 70 80 85 90 or grassland - Fair 50 70 80 85    Good 40 60 75 80Timbered Areas - Poor 45 65 75 85    Fair 35 60 75 80    Good 25 55 70 75Improved Permanent  

Good 30 60 70 80 pastures  Rotation pastures Straightrow Poor 65 75 85 90    Good 60 70 80 85  Contoured Poor 65 75 80 85    Good 55 70 80 85Crop Straightrow Poor 65 75 85 90    Good 70 80 85 90  Contoured Poor 70 80 85 90    Good 65 75 80 85Fallow - - 80 85 90 95

6(Table 4 Con’t)

Page 11: SWIP Manual Part 1

The meaning of the terms listed under the heading “Hydrologic Condition” are as follow:

a. Native pastures: Pastures in poor condition is sparse, heavily grazed pastures with less than half the total watershed area under plant cover. Pasture in fair condition is moderately grazed and with between half and three-quarters of the catchment under plant cover. Pasture in good condition is lightly grazed and with more than three-quarters of the catchment area under plant cover.

b. Timbered areas: Poor areas are sparsely timbered and heavily grazed with no undergrowth. Fair areas are moderately grazed, with some undergrowth. Good areas are densely timbered and ungrazed, with considerable undergrowth.

c. Improved permanent pastures: Densely sown permanent legume pastures subject to careful grazing management are considered to be in good hydrologic condition.

d. Rotation pastures: Dense, moderately grazed pastures used as part of a well planned, crop-pasture-fallow rotation are considered to be in good hydrologic condition. Sparse, overgrazed or “opportunity” pastures are considered to be poor condition.

e. Crops: Good hydrologic condition refers to crops which form a part of a well planned and managed crop-pasture-follow rotation. Poor hydrologic condition refers to crops managed according to a simple crop-follow-rotation.

TABLE 5: Adjustment of Watershed index W for Antecedent moisture Condition

Corresponding Value of W for:AMC = II AMC = I AMC = III

100 100 10095 87 9990 80 9885 70 9780 65 9575 60 9070 50 9065 45 8560 40 8055 35 7550 30 7045 25 6540 20 6035 20 5530 15 5025 10 45

7

Page 12: SWIP Manual Part 1

TABLE 6: Recommended Retention Rate for Hydrologic Soil Group (USBR)

Hydrologic Soil Group Retention Rate, inches/hour

A 0.4B 0.24C 0.12D 0.04

1.6 Derive the synthetic unit hydrograph, using T/Tp versus q/qp for dimensionless hydrograph (Table 7)

-interpolate from the values of Table 7 the selected values of discharge ratios q/qp for values of time ratio equal to

T/Tp = ∆D , 2∆D , 3∆D etc. TP TP TP Until q/qp is less than 0.001

-Compute the ordinate of Synthetic Unit hydrograph as follows: Ui = (q/qp) i qp Where: Ui = ordinate of synthetic unit hydrograph in cms/mm (i= 1, 2, 3 . . . ) q/qp I = interpolated value of q/qp from smooth dimensionless hydrograph. qp = Computed peak rate of runoff in cms/mm

-Obtain correction factor k for synthetic unit hydrograph K = 3.6 Σ U 1 ∆D A

-Correct to ordinate Ui ( i = 1, 2, 3 . . . ) Uu (Corrected Ui) = original Ui K

-To check, K should be equal to one when using the same formula: K = 3.6 Σ U 1 ∆D A

-In tabulated form we will have:

Seq. No. Time Dimensionless Hydrograph Unit Hydrograph Cms/mmi T, hr T/Tp q/qp Ui = (q/qp) i qp Uu = Ui/ki

1 ∆D ∆D/Tp Values (q/qp)1 qp Uu1

2 2∆D 2∆DTp interpolated (q/qp)2 qp Uu2

3 3∆D 3∆D/Tp From (q/qp)3 qp

4 4∆D 4∆D/Tp Table 7 (q/qp)4 qp

n n∆D n∆D/Tp (q/qp)n qp Uu n        Σ Ui Σ Uu

8

(Dimensionless and ideally close to 1: D in hours; A in sq. km.)

Page 13: SWIP Manual Part 1

TABLE 7: T/Tp versus q/qp for dimensionless hydrograph

Time Ratio Disch. Ratio   Time Ratio Disch. RatioT/Tp q/qp   T/Tp q/qp

0 0 1.5 0.66

0.1 0.015 1.6 0.56

0.2 0.175 1.8 0.42

0.3 0.16 2 0.32

0.4 0.28 2.2 0.240.5 0.43 2.4 0.180.6 0.6 2.6 0.130.7 0.77 2.8 0.0980.8 0.89 3 0.0750.9 0.97 3.5 0.0361 1 4 0.018

1.1 0.98 4.5 0.0091.2 0.92 5 0.0041.3 0.84 Infinity 01.4 0.75      

1.7 To the rearrange pattern of excess rainfall, apply the synthetic unit hydrograph Qi ( i = 1, 2, 3 . . . ) according to the convolution equations:

Q1 = U1 E1

Q2 = U1 E2 + U2 E1

Q3 = U1 E3 + U2 E2 + U3 E1

Q4 = U1 E4 + U2 E3 + U3 E2 + U4 E1

etc.

\

9

Page 14: SWIP Manual Part 1

2. FIELD WATER BALANCE COMPUTATION

Establish the best cropping pattern and cropping calendar with the following objectives: a) minimum irrigation requirements; b) maximum annual production; c) optimum growing conditions for the given crop and growing stages: d) grow paddy rice during wet season when water

abundant and irrigation is minimal.

Fill the column for the rainfall (rain) with 80% dependability computed using the two parameter log-normal distribution and the average potential evapotranspiration (PET). To compute for 80% dependable for a given site the following procedures are to be considered:

a. Collect 10-day rainfall data, defined as the sums of daily rainfall over each defined 10-day period and arrange them as follows:

    Y e a r      

Month Decade 1 2 3 . . . N MeanStd. Dev.

Jan. 1 - - - . . . - - -  2 - - - . . . - - -  3 - - - . . . - - -

Feb. 4 - - - . . . - - -  5 - - - . . . - - -  6 - - - . . . - - -

Dec. 34 - - - . . . - - -  35 - - - . . . - - -  36 - - - . . . - - -

b. Compute the mean of 10 – day rainfall for all decades

K = 1, 2, 3 . . . . . . . . . . . . . . . 36 N XK = 1 Σ XKi N i =1 Where XK = mean of 10 – day rainfall in decade K XKi = 10 – day rainfall data in decade K and year 1

N = number of recorded observation in decade K in years.

c. Compute the standard deviation of 10 – day rainfall for decades K = 1, 2, 3 . . . . . . . . . . . . . . . 36

__ SK = 1 Σ (XKi - X )2

N-1 i=1

Where SK = standard deviation of 10 – day rainfall in decade K

d. Compute the coefficient of variation of 10 – day rainfall for all decades K = 1, 2, 3, ….36

10

e. Compute the standard normal deviation corresponding to an axceedance probability, p of 80 %, tp, for p = 80% tp = -0.831

Where ZK = coefficient variation

Page 15: SWIP Manual Part 1

f. Compute the frequency factor for all decades K 1, 2, 3. . . . 36

Where: B = Ln ( 1 + Z2 ) KK = frequency factor in decade K

g. Compute the 10 – day rainfall at 80% dependability for all decades _ RK = XK + SK KK

Where: RK = 10 – day rainfall at 80% dependability

h. Tabulate the results as follows:

Month Decade XK SK ZK KK RK

             Jan. 1 - - - - -

  2 - - - - -  3 - - - - -  . . . . . .  . . . . . .  . . . . . .

Dec. 34 - - - - -  35 - - - - -  36 - - - - -

Mean 80% dep or 10 – day rainfall at project site =

Fill- up the crop-coefficients (kc) and crop-rooting depth columns according to the establishment of cropping calendar and crop growing stages. Refer to Figures 2 to 6. For wetland rice, the crop coefficient at all stages can be assumed equal to one (1).

Make a reasonable assumption for probable percolation losses (mm/day) or refer to Table 8.

11TABLE 8: Percolation For Different Soil Types

Clay --------------------------------------------------------------------------------- 1.25 mm / day

Page 16: SWIP Manual Part 1

Silty Clay --------------------------------------------------------------------------- 1.50 mm / day Clay Loam-------------------------------------------------------------------------- 1.75 mm / day Silty Clay Loam-------------------------------------------------------------------- 1.75 mm / day Sandy Clay Loam------------------------------------------------------------------ 2.0 mm / day Sandy Loam------------------------------------------------------------------------ 4.0 mm / day

Figure 2: Water Management Scheme & Crop Depending Variables Used In Field Balance Computation For Irrigated Wetland Rice

Rainfall Land Land Crop in the FieldCollecting Period Soaking Preparation (100 Days)

  1 2 3 4 5 6 7 8 9 10 11 12 13

1 2 3 4 5 6 7 8 9 10 11 12 13

Maximum water200 80 80 80 80 80 80 80 80 80 80 10 0depth in paddy,

mmMinimum water

10 20 20 20 20 20 20 20 20 20 20 0 0depth, mm

Optimum water 100 65 65 50 50 50 50 50 45 45 45 0 0

depth, mm

FIGURE 3 Crop Depending Variables For Field Water Balance For Irrigated Corn

Rainfall Collection

Crop in the Field

& (110 Days)

Land Preparation  

LP 1 2 3 4 5 6 7 8 9 10 11

LP 1 2 3 4 5 6 7 8 9 10 11Crop Coefficient 0.65 0.65 0.75 0.8 0.85 0.9 0.9 0.9 0.9 0.75 0.5Rooting Depth

(mm) 100 200 300 450 600 700 775 825 875 900 900

12FIGURE 4 Crop Depending Variables Used in the Field Water Balance For Irrigated Mungo

Rainfall Collection  

Page 17: SWIP Manual Part 1

& Crop in the FieldLand Preparation (80 Days)

  LP 1 2 3 4 5 6 7 8

LP 1 2 3 4 5 6 7 8Crop Coefficient 0.35 0.5 0.7 0.9 0.9 0.85 0.77 0.7Rooting Depth 80 150 230 300 300 300 300 300

FIGURE 5 Crop Depending Variables Used in the Field Water Balance for Irrigated Tomato

Rainfall Collection  & Crop in the Field

Land Preparation (80 Days)LP 1 2 3 4 5 6 7 8

LP 1 2 3 4 5 6 7 8Crop Coefficient 0.35 0.5 0.7 0.9 0.9 0.85 0.77 0.7Rooting Depth (mm) 80 100 300 400 500 600 700 700

13FIGURE 6 Crop Depending Variables for the Field Water Balance for Irrigated Peanut

Rainfall Collection      & Crop in the Field  

Page 18: SWIP Manual Part 1

Land Preparation (100 Days)    LP 1 2 3 4 5 6 7 8 9 10

LP 1 2 3 4 5 6 7 8 9 10

Crop Coefficient 0.40

0.70

0.70

0.95

0.95

0.95

0.75

0.75

0.75

0.55

Rooting Depth (mm) 80 150 200 250 300 350 400 500 600 600

2.5 Make a reasonable assumption of soil water capacities WHC in volume percentage of soils used for upland crops. (10% - 20%).Refer to Table 9.

2.6 Actual evapotranspiration (AET) is equal toAET = PET x KC

2.7 Change in storage (ΔSTOR) is equal toSTOR = RAIN - AET - PERCO - for paddy riceSTOR = RAIN - AET for upland crops.

2.8 Initial Storage (INIT) is estimated using the following formulaINIT = (Raini + Raini – 1) (0.70) for paddy riceINIT = (Raini + Raini – 1) (0.50) for upland crops

2.9 Estimate the water storage (STOR) at the end of a given decade:STORi = STORi – 1 + ΔSTOR

If STORi > allowable max storageThen DRAINAGE = STORi – allowable max storage

STORi = allowable max storage IRRIGATION = Ø. Ø

If STORi < allowable minimum storage Then IRRIGATION = Optimum Storage – STORi

STORi = Optimum Storage Drainage = Ø. Ø

ELSE IRRIGATION = Ø. Ø

DRAINAGE = Ø. Ø

14

Note: For upland crops, allowable min. soil moisture storage is usually assumed to 50% of soil water holding capacities in the root zone, that is 0.54 (WHC) (ROODEP). Do not irrigate during the last two decade of a given period.

Page 19: SWIP Manual Part 1

2.10 Use an irrigation efficiency if 51% for paddy rice (lowland) and 54% for upland crops to the estimated net crop irrigation to get an estimate of system irrigation requirements.

TABLE 9 Soil Water Holding Capacities of Different Soil Textural Classes:

Soil Texture  Total Available Moisture

Pv =Pw As  Volume%

Sandy   8(6-10)

Sandy Loam 12(9-15)

Loam 17(14-20)

Clay Loam 19(16-22)

Silty Clay 21(18-23)

Clay 23      (20-25)

153. ESTIMATION OF 10 – DAY RESERVOIR INFLOW

3.1 For Regions I, III, IV, characterized by distinct wet and dry seasons, 10 – day reservoir inflow are estimated as follows:a. DQj = RCj . Pj

Page 20: SWIP Manual Part 1

Where: DQj = direct runoff in decade j (mm)

RCj = runoff coefficient in decade j, equal to estimated mean monthly runoff coefficient Pj = 80% dependable rainfall

b. 10 – day Baseflow BFj = F .Qj – 1

Where: BFj = baseflow in decade j (mm)

F = 10 – day reservoir factor = 0.002 + 0.026 (D.A.) where DA is drainage area in sq. km. (This

regression equation analysis of several small watersheds <100 km2 In the country).

Qj – 1 = Total runoff (or inflow) in the previous decade (j-j), mm

c. 10 – day Reservoir Inflow Qj = DQj + BFj

Where: Qj = reservoir inflow in decade j (mm)

DQj = direct runoff in decade j (mm) BFj = baseflow in decade j (mm)

3.2 For the other regions in the country which are predominantly characterized by indistinct, short, or no dry season with more or less continuous rainfall, 10 – day reservoir inflow are estimated as follows:a. 10 – day Direct Runoff

DQj = RCj . Pj Where:

DQj = direct runoff in decade j (mm) RCj = runoff coefficient in decade j, equal to estimated monthly runoff

coefficients Pj = mean 10 – day rainfall in decade j (mm)

b. Annual Baseflow

BF = a + b . DA Where:

BF = annual baseflow a.b. = regression factor for the region where the project is located

(Table 10) D.A . = Drainage Area, (sq. km.)

c. 10 – day Baseflow Qj = DQj + BFj

Where: Qj = reservoir inflow in decade j (mm) DQj = direct runoff in decade j (mm) BFj = baseflow in decade j (mm)

16TABLE 10 Regional Run – off Coefficient and % Monthly Baseflow Distribution:

Region 1

  Month     Run - off Coefficient, RC

Page 21: SWIP Manual Part 1

             Jan. 0.25Feb. 0.05Mar. 0.03Apr. 0.03May 0.17June 0.37July 0.64Aug. 0.67Sept. 0.75Oct. 0.75Nov. 0.61

  Dec.       0.25  

Region 2

  Month   %Baseflow   Run - off Coefficient, RC                 

Jan. 8.76 0.17Feb. 7.91 0.17Mar. 7.22 0.08Apr. 7.05 0.08May 6.7 0June 6.42 0.17July 7.39 0.2Aug. 8.18 0.34Sept. 9.37 0.4Oct. 10.43 0.41Nov. 10.84 0.44

  Dec.   9.72     0.37  

Linear Curve Fit : BF = a + b (D.A)

a = 286.021 b = -9.72 x 10-1 R = 0.74

17Region 3

  Month     Run - off Coefficient, RCJan. 0.45

Page 22: SWIP Manual Part 1

Feb. 0.08Mar. 0Apr. 0May 0.24June 0.34July 0.58Aug. 0.7Sept. 0.75Oct. 0.7Nov. 0.4

  Dec.       0.5  

Region 4

  Month     Run - off Coefficient, RCJan. 0.45Feb. 0.44Mar. 0.19Apr. 0May 0June 0.19July 0.19Aug. 0.26Sept. 0.33Oct. 0.47Nov. 0.57

  Dec.       0.5  

Region 5

  Month   %Baseflow   Run - off Coefficient, RCJan. 9.17 0.5Feb. 8.69 0.38Mar. 8.28 0.3Apr. 7.91 0.25May 7.64 0.1June 7.66 0.08July 7.86 0.15Aug. 8.08 0.15Sept. 8.31 0.15Oct. 8.53 0.35Nov. 8.79 0.39

  Dec.   9.07     0.47  

Linear Curve Fit : BF = a + b (D.A) a = 2, 057.31 b = 18.28 R = 0.87

18Region 6

  Month   %Baseflow   Run - off Coefficient, RC                 

Page 23: SWIP Manual Part 1

Jan. 8.06 0.39Feb. 8.1 0.19Mar. 7.96 0.16Apr. 8.1 0.16May 8.26 0.16June 8.45 0.18July 8.66 0.44Aug. 8.73 0.44Sept. 8.6 0.33Oct. 8.47 0.49Nov. 8.37 0.39

  Dec.   8.21     0.39  

Linear Curve Fit : BF = a + b (D.A) a = 1, 043.65 b = 8.221 R = 0.695

Region 7

  Month   %Baseflow   Run - off Coefficient, RC                 

Jan. 8.23 0.26Feb. 8.07 0.15Mar. 8.09 0.1Apr. 8.22 0May 8.23 0.09June 8.35 0.15July 8.47 0.3Aug. 8.66 0.3Sept. 8.57 0.3Oct. 8.45 0.3Nov. 8.37 0.3

  Dec.   8.29     0.26  

Linear Curve Fit : BF = a + b (D.A) a = 1, 055.85 b = 11.80 R = 0.766

19Region 8

  Month   %Baseflow   Run - off Coefficient, RC                 

Page 24: SWIP Manual Part 1

Jan. 9.1 0.38Feb. 8.8 0.28Mar. 8.6 0.25Apr. 8.3 0May 8.1 0.14June 7.9 0.22July 7.7 0.3Aug. 7.6 0.34Sept. 7.7 0.34Oct. 7.9 0.51Nov. 8.4 0.7

  Dec.   9     0.7  

Linear Curve Fit : BF = a + b (D.A) a = 12.52 b = 14.051 R = 0.872

Region 9

  Month   %Baseflow   Run - off Coefficient, RC                 

Jan. 8.53 0.3Feb. 8.33 0.22Mar. 8.16 0.08Apr. 7.94 0May 8 0June 8.13 0.07July 8.19 0.14Aug. 8.32 0.14Sept. 8.42 0.14Oct. 8.53 0.24Nov. 8.66 0.24

  Dec.   8.76     0.3  

Linear Curve Fit : BF = a + b (D.A) a = 1, 164.37 b = 30.36 R = 0.999

20Region 10

  Month   %Baseflow   Run - off Coefficient, RC                 

Page 25: SWIP Manual Part 1

Jan. 8.51 0.49Feb. 8.43 0.4Mar. 8.36 0.37Apr. 8.29 0.32May 8.21 0.15June 8.16 0.15July 8.21 0.15Aug. 8.27 0.24Sept. 8.3 0.24Oct. 8.34 0.28Nov. 8.4 0.25

  Dec.   8.49     0.52  

Linear Curve Fit : BF = a + b (D.A) a = 2, 119.90 b = 6.09 R = 0.562

Region 11

  Month   %Baseflow   Run - off Coefficient, RC                 

Jan. 8.42 0.17Feb. 8.38 0Mar. 8.35 0Apr. 8.31 0May 8.3 0.12June 8.25 0.12July 8.27 0.29Aug. 8.3 0.29Sept. 8.32 0.26Oct. 8.34 0.26Nov. 8.37 0.23

  Dec.   8.39     0.22  

Linear Curve Fit : BF = a + b (D.A) a = 152.608 b = 7.53 R = 0.751

21Region 12

  Month   %Baseflow   Run - off Coefficient, RC                 

Page 26: SWIP Manual Part 1

Jan. 8.13 0.21Feb. 7.99 0.12Mar. 8.03 0Apr. 8.13 0.13May 8.24 0.25June 8.39 0.35July 8.54 0.44Aug. 8.69 0.45Sept. 8.66 0.45Oct. 8.53 0.45Nov. 8.4 0.21

  Dec.   8.26     0.21  

Linear Curve Fit : BF = a + b (D.A) a = 1, 751.61 b = -4.018 R = 0.915

22

Page 27: SWIP Manual Part 1

23

Page 28: SWIP Manual Part 1

ANNEX A – I PHILIPPINE WATER RESOURCE REGIONS

Water Resources Region No. 1 – ILOCOSIlocos Norte, Ilocos Sur, Abra, Benguet, La Union and part of Mt. Province.Predominant Climate : Type I

Water Resources Region No. 2 – CAGAYAN VALLEYCagayan, Isabela, Nueva Viscaya, Quirino and parts of Mt. Province, Kalinga-Apayao, Ifugao and Quezon.Predominant Climate : Type III

Water Resources Region No. 3 – CETRAL LUZONNueva Ecija, Pamapanga, Pangasinan, Tarlac, Bulacan, ZamabaleS, Bataan and portions of Benguet and Aurora

Province.Predominant Climate : Type I

Water Resources Region No. 4 – SOUTHERN TAGALOGRizal, Cavite, Laguna, Batangas, Quezon and Metropolitan Manila in Luzon, and the island provinces of Marinduque, Mindoro, Romblon, and Palawan.Predominant Climate : Type I

Water Resources Region No. 5 – BICOLCamarines Norte, Camarines Sur, Albay, Sorsogon in the South-eastern Peninsula of Luzon and the inslands

of Catanduanes and Masbate.Predominant Climate : Type II and Type III and Type IV

Water Resources Region No. 6 – WESTERN VISAYASNegros Occidental, the sub-province of Guimaras, and the island of Panay which consist of the provinces of Aklan,

Antique, Capiz and Iloilo.Predominant Climate : Type I and Type III

Water Resources Region No. 7 – CENTRAL VISAYASCebu, Bohol, Siquijor, Negros OrientalPredominant Cliamate : Type III

Water Resources Region No. 8 – EASTERN VISAYASSamar and Leyte Islands.Predominant Climate : Type IV

Water Resources Region No. 9 – SOUTHWESTERN MINDANAOMisamis Occidental, Zamboanga del Sur and Zamboanga del Norte together with Sulu Archipelago.Predominant Climate : Type III and Type IV

Water Resources Region No. 10 – NORTHERN MINDANAOAgusan del Norte, Misamis Oriental and part of Agusan del Sur, Bukidnon and Lanao del Norte.Predominant Climate : Type II

Water Resources Region No. 11 – SOUTHEASTERN MINDANAODavao del Sur, Davao Oriental and Surigao del Sur and South Cotabato provinces.Predominant Climate : Type II and Type IV

Water Resources Region No. 12 – SOUTHERN MINDANAOLanao del Norte, Lanao del Sur, Bikidnon, North Cotabato, Maguindanao, Sultan Kudarat and South Cotabato.Predominant Climate : Type III and Type IV

24

Page 29: SWIP Manual Part 1

25

Page 30: SWIP Manual Part 1

26

Page 31: SWIP Manual Part 1

27

Page 32: SWIP Manual Part 1

PLANTING CALENDAR

PLANTING CALENDAR FOR TYPE I CLIMATE TWO PRONOUNCED SEASONS : DRY from November to April WET during the rest of the year

All the provinces of the western part of the islands of Luzon, Mindoro, Negros,and Palawan are covered in Type I.

CROP PERIOD CROP PERIODRice:      Lowland June - September Muskmelon November - January  October - December Okra May - JunePalagad January - February   October - DecemberUpand April - June Patola May - June      October - JanuaryCorn:   Squash May - JuneDry season Ocrober - January   October - DecemberRainy season May - June Tomato October - January    Upo October - JanuaryPeanut:   Watermelon November - JanuaryDry season November - January    Rainy season May - June Root:      Camote(Sweet May - JuneBeans:   Potato) December - FebruaryBatao May - June Gabi May - JuneBountiful Bean May - June Ginger May - June  October - December Raddish October - DecemberCowpea May - June Sinkamas October - December  October - November Tugue May - JuneCadios May - June Ubi May - JuneMungo July - September Cassava May - June  November - February   October - DecemberPatani May - June      October - January Others:  Seguidillas May - June Garlic October - DecemberSitao May - June Onion October - December  November - February Sweet Pepper May - JuneSoybean May - June   September - December    Condol May - JuneVegetables:     October - DecemberLeafy:   Chayote May - JuneCabbage October - December   October - DecemberCauliflower October - February Spinach October - NovemberCelery October - February Sweet Peas October - DecemberLettuce August - January Carrot October - DecemberMustard August - January Potato(Irish) October - DecemberPechay October - December Talinum May - June      October - DecemberFruit:   Kutchai October - DecemberAmpalaya May - July Arrowroot May - June  October - January Tapilan May - JuneCucumber May - June   September - October  September - December Beets October - JanuaryEggplant May - June Jute May - June  September - February Endive September - OctoberMelon October - January Snap Bean October - December

28

Page 33: SWIP Manual Part 1

PLANTING CALENDARPLANTING CALENDAR FOR TYPE 2 CLIMATENO DRY SEASON with a very PRONOUNCED MAXIMUM RAINFALL from November toJanuary. The areas covered are Catanduanes, Sorsogon, Eastern part of Albay, the Eastern andNorthern parts of Camarines Norte and Camarines Sur, a great portion of the Eastern part of Quezon,the Eastern part of Leyte and a large portion of Eastern Mindanao.

CROP PERIOD CROP PERIOD           Rice:     Fruit:    Lowland October - December Ampalaya June - AugustPalagad May - July   November - FebrauryUpand June - August Condol January - March  September - November Cucumber March - April      Eggplant January - AprilCorn:       August - SeptemberDry season March - May Melon(ordinary) March - JuneRainy season January - February Muskmelon March - June  August - September Okra Whole year        Patola March - SeptemberPeanut:     Squash Whole year  Dry season Janury - Febraury Tomato January - April  August - September   August - SeptemberRainy season May - June Upo November - March      Watermelon January - MarchBeans:     Root:    Batao Febraury - April Camote Year Round  Cowpea or Kibal January March Carrot March - April  May - July Cassava Year Round    November - December Gabi Year Round  Cadios Febraury - March Ginger Year Round  Bountiful Bean January - May Raddish November - DecemberMungo Febraury - June   March - MayPatani(climbing) January - May Ubi Year Round  Seguidillas Febraury - April      Sitao May - June Others:    Soybean January - March Irish Potato February - MarchTapilan January - March Endive December - March  August October Onion December - March      Garlic November - DecemberVegetables:     Sinkamas October - NovemberLeafy:     Sweet Pepper February - MarchCabbage January - March   August - SeptemberCelery January - March Chayote February - MarchKutchai March - July Arrowroot June - SeptemberLettuce March - June Beet January - MarchPechay January - March Peas February - MarchCauliflower January - March Jute January - MarchMustard January - March Talinum June - JulySpinach January - March   November - December

29

Page 34: SWIP Manual Part 1

PLANTING CALENDARPLANTING CALENDAR FOR TYPE 3 CLIMATESeasons are not pronounced, relatively DRY from November to April and WET during the rest ofthe year. This type of climate covers the Western part of Cagayan(Luzon), Isabela, Nueva Vizcaya,the Eastern portion of the Mountain Province, Southern Quezon, the Bondoc Peninsula, Masbate,Romblon, Northeast Panay, Eastern Negros, Central and Southern Cebu, part of Northern Mindanao,and most of Eastern Palawan.

CROP PERIOD CROP PERIODRice:          Lowland June - August Mustard May - JulyPalagad November - January   October - DecemberUpand April - June Pechay May - June

        October - DecemberCorn:     Spinach May - JuneDry season October - December   October - DecemberRainy season April - June      Third Crop December - February Fruit:    

      Ampalaya May - June Peanut:       November - DecemberDry season September October Chayote May - June Rainy season April - June   November - JanuaryThird Crop December - January Cucumber May - June         October - JanuaryBeans:     Eggplant May - June Batao May - June   November - JanuaryBountiful Bean May - June Melon(ordinary) May - June   November - January   October - JanuaryCowpea or Kibal May - June Muskmelon November - January  November - December Okra May - JulyKadios May - June   October - December  October - November Patola May - JulyMungo December - January   October - January  September - October Squash May - June Patani May - June   October - December(climbing) November - December Sweet Pepper May - June Seguidillas May - June   October - DecemberSitao May - June Tomato October - January  November - January Upo April - MaySoybean May - June   October - January  October - December Condol June - JulyTapilan May - June   November - January  November - December Watermelon October - JanuaryPeas April June        November - January Root:    Vegetables:     Sweet Potato April - JuneLeafy:       November - JanuaryCabbage April - June Carrot October - December  October - December Gabi May - JulyCauliflower October - December   October DecemberCelery May - July Garlic October December  October - December Ginger October DecemberLettuce April - May   November - December  October - December Irish Potato October - December

PLANTING CALENDAR

Page 35: SWIP Manual Part 1

PLANTING CALENDAR FOR TYPE 4 CLIMATERAINFALL more or less evenly distributed throughout the year.The areas covered by Type 4 climate are Batanes Province, Northeastern Luzon, Western CamarinesNorte and Camarines Sur, Albay, Eastern Mindoro, Marinduque, Western Leyte, Northern Negros,and most of Central, Eastern, and Southern Mindanao.

CROP PERIOD CROP PERIODRice:          Lowland May - July Lettuce May - June  August - October   January - FebruaryPalagad November - January Mustard June - JulyUpand April - June   September - January

Corn:     Pechay May - July

Dry season September - November   November - January

Rainy season April - June Spinach April - May

Third Crop November - February Fruit:    

      Ampalaya May - June

Peanut:       September - January

Dry season September - November Chayote May - June

Rainy season May - June   November - December

Third Crop November - February   May - June

Beans:       October - December

Batao May - June Cucumber June - July

Bountiful Bean May - June   October - December

  October - December Eggplant June - July

Cowpea or Kibal May - June   November - January

  October - December Melon November - January

Kadios May - July Muskmelon November - JanuaryMungo May - June Okra June - July  November - January   September - OctoberPatani May - June   January - February  November - January Patola May - JuneSeguidillas May - June   December - JanuarySitao May - June Squash May - June  October - January   November - JanuarySoybean May - June Sweet Pepper May - June  November - January   September - JanuaryTapilan May - June Tomato May - June  November - December   October - JanuaryPeas June - July Upo May - June  December - January   October - JanuaryVegetables:     Watermelon April - MayLeafy:       November - JanuaryCabbage June - September Root:      October - January Camote May - JuneCauliflower April - July   September - November  September - January Carrot May - JuneCelery June - July   November - January  January - Febraury Gabi June - SeptemberKutchai June - July   January - February

Page 36: SWIP Manual Part 1

TABLE OF CONTENTS

Section Title Page

1.0 GENERAL 1

2.0 DAM 12.1 Determination of Dam Height 12.1.1 Dead or Inactive Storage 12.1.2 Active Storage 32.1.3 Flood Surcharge 32.1.4 Freeboard 62.1.5 Outline of Dam Height Computation 72.2 Dam Crest Width 72.3 Selection of Type of Earth Dam 72.3.1 Homogeneous/ Modified Homogeneous Type 72.3.2 Zoned Embankment Type 92.4 Embankment Slopes 112.5 Seepage Through Earth Embankment 132.5.1 Seepage Line 132.5.2 Position of Seepage Line 132.5.3 Quantity of Seepage 132.5.4 Filter Design 212.6 Embankment Slope Protection 222.6.1 Upstream Slope 222.6.2 Downstream Slope 23

Page 37: SWIP Manual Part 1

Section Title Page

3.0 SPILLWAY 243.1 General 243.2 Spillway Type and Alignment 243.3 Spillway Hydraulics 243.3.1 Control Section 253.3.2 Discharge Channel 253.3.3 Terminal Section 313.4 Structural Requirements 40

4.0 OUTLET WORKS 434.1 General 434.2 Specific Type and Physical Arrangement 434.3 Outlet Works Hydraulics 444.3.1 Section of Design Discharge Head Combination 444.3.2 Sizing of Discharge Pipe 444.3.3 Sizing of Impact Type Dissipator 484.4 Structural Design Considerations 48

5.0 IRRIGATION WORKS 515.1 General 515.2 Canal Layout and Profile 515.3 Canal Hydraulics 515.3.1 Slide Slopes 515.3.2 Permissible Velocity 525.3.3 Applicable Formula for Sizing of Canal 525.3.4 Freeboard 535.4 Design of Canal Structures 53

Appendix I General Design Criteria for Canal Structures 55

Page 38: SWIP Manual Part 1

LIST OF TABLES

Table No. Title Page

1 Outline of Dam Height and Dam Crest 8

2 Embankment Slopes for Homogeneous Dams 14

3 Embankment Slopes for Zoned Dams 15

4 Permissible Velocities for Non-Cohesive Soils 27

5 Permissible Velocities for Grassed Channel 28

6 Outline of USBR Basin Computations Format 46

7 Cantilever Retaining Wall Parameters 41

8 Discharge Pipe Computations Format 46

9 Impact Type Stilling Basin Computations Format 50

Page 39: SWIP Manual Part 1

LIST OF FIGURES

Figure No. Title Page

1 Reservoir Storage Allocations 22 Reservoir Operation Studies Format and Flow Chart 43 Flood Routing Format and Flow Chart 54 Modified Homogeneous Dam Sections 105 Size of Impervious Core of Zoned Dam 126 Slope Stability Chart No. 1 167 Slope Stability Chart No. 2 178 Slope Stability Chart No. 3 189a Elements of Seepage Line 199b Diagrams for Determining ∆a and a 2010 Flow Profile Along Spillway 3011 Unsubmerged Deflector Bucket 3212 Type IV USBR Basin 3313 Type III USBR Basin 3414 Type II USBR Basin 3515 Hydraulic Jump Nomograph

(Stilling basin Depth Vs Hydraulic Head for Various Channel Losses) 39

16 Typical Chute and Stilling Basin Section 4217 Typical Outlet Works System 4518 Impact Type Energy Dissipator 4919 Types of Irrigation Canal Layout 54

Page 40: SWIP Manual Part 1

ENGINNERING DESIGN

1.0 GENERAL

For the Water Impounding Component of the Rainfed Project, the earth embankment dam type (homogeneous or zoned type) is considered to be more cost effective over concrete or other types of dam. The dam embankment volumes, consisting of natural earth materials, are relatively small and are available at or in the vicinity of the project site. These materials are soil and rock in their many varied forms.

Included in this section are the procedures, criteria and assumptions used in the design of a small earth dam and its appurtenances.

Also included in the later part of this section are the procedures, criteria and assumptions in the design of irrigation works consisting of canals and canal structures as well as access roads to complete the coverage on the physical structural component of the project.

In the procedures and assumptions that follow, it is assumed that dam location, necessary site investigations as well as prerequisites studies on geology, hydrology, etc., have already been undertaken.

2.0 DAM

2.1 Determination of dam Height

In general, the height of the dam is determined on the basis of the following vertical space requirements in the reservoir.

a. Dead or Inactive Storage Spaceb. Active Storage Spacec. Flood Surcharged. Freeboarde. Settlement

Space allocations of each of the above items are illustrated in Figure 1.

2.1.1 Dead or Inactive Storage

The number of years for sediment to fill up the dead storage space plus about 20% of the live storage is termed as the expected “economic life” of the project. This time magnitude is an agency policy decision.

1

Page 41: SWIP Manual Part 1

2

Page 42: SWIP Manual Part 1

Unless amended later, sediment volume shall be computed on the basis of 25 years of accumulation in the reservoir. This volume shall be allocated in the dead storage space as shown in Figure 1.

2.1.2 Active Storage

The active storage is allocated primarily for irrigation purposes. This space is determined from reservoir operation studies.

Reservoir operation study basically “water accounting”. No clear-cut formula is involved but the basic principle is to optimize reservoir to meet water requirement.

The study involves trial runs for different hectareage of service area until maximum area is attained with minimum reservoir spill or shortage.

Among the data and assumptions needed to undertake the reservoir operation study are the following:

a. Reservoir inflowb. Reservoir evaporation lossc. Water requirementsd. Reservoir area-capacity-elevation curves.e. Reservoir elevation at the end of the operation must be equal to the starting elevation.

Items a, b and c are obtained from the results of Hydrologic Studies. Item d is derived from a reservoir topographic map.

Shown in Figure 2 are the typical format and detailed flow chart for reservoir operation studies.

2.1.3 Flood Surcharge

Flood surcharge space is allocated for the design flood.

Maximum surcharge height is the difference between maximum and normal water surface. It is dependent on three factors namely;

a. Spillway size opening.b. Reservoir capacity-elevation relationship.c. Magnitude and shape of the inflow hydrograph.

Flood surcharge height is estimated by flood routing.

3

Page 43: SWIP Manual Part 1

4

5

Page 44: SWIP Manual Part 1

There are a number of methods for flood routing but the basic formula is:

I = O + S ----------------------------------------- 1

Where; I = inflow volume O = outflow volume S = change in storage

A simple and expedient method of flood routing is by arithmetic trial and error.Shown in Figure 3 are format and detailed flowchart for such method.

In this all other methods of flood routing, it is assumed that all outlets are fully closed and all discharges are allowed to pass only over the spillway. Moreover, water surface in the reservoir is at normal level at the start of the flood.

The data required to undertake flood routing computations are the following:

a. Hydrograph of inflow design flood.b. Reservoir capacity-elevation curve.c. Spillway rating curve or equation given by the following formula for a broad-

crested weir:

Q = CLH3/2 ------------------------------------------ 2

Where: Q = discharge over the spillway C = weir coefficient; 1.704 metric H = surcharge height L = spillway width

2.1.4 Freeboard

Freeboard space is provided against wave splash along the upstream face of the dam, which may coincide with occurrence of the design flood as well as embankment settlement. It is estimated by the following formula:

For vertical wallFb1 = --------------------3Fb2 = 2% to 5 % of dam height ------------------------------------------- 4Fb = Fb1 + Fb2 ------------------------------------------------------------------5

Where: F b1= freeboard due to wave run-up, m F = reservoir effective fetch, km V = wind velocity, km/hr Fb2 = freeboard due to embankment settlement, m Fb = total freeboard, m

6