  • 8/18/2019 SWP Fire Pump.docx

    1/6

    AWPP

     

    AWPP

     SAFE WORKING PROCEDURE

    Douglas Breakwater Fire Pump Water Tests REF...*

    SAFE WORKING PROCEDURE

     

    Page 1 of 6

    INFOR!TION "#PP$IED IN T%I" PRO&ED#RE

    1 Date t'is pro(e)ure was issue)

    Date t'is pro(e)ure s'oul) +e re,iewe)

    - W'o )e,elope) t'e pro(e)ure

    W'o was (o/sulte) )uri/g t'e )e,elopme/t

    0 W'et'er a Permit to Work is reuire)6 Risk !ssessme/t /um+er 

    2 %a3ar)s t'at are i)e/tifie)

    4 Perso/al Prote(ti,e Euipme/t /ee)e) 5PPE

    7 W'at trai/i/g is reuire) to (arr8 out t'e work

    19 &urre/t &o/trol easures i/ pla(e

    11 T'e "afe Worki/g Pro(e)ure

    1 First !i) Pre(autio/s

    1- $ist of First !i)ers

    1 !))itio/al I/formatio/

    Date First Issue): 19.9.1 B8: B "8//ott !ut'orise) +8:

    Re, Date Des(riptio/ Re,iewe) B8 !ut'orise)

    1 19.9.1 "WP for Fire Pump Water Tests B"

    -

    0

    6

    2

    4

    7

    19

  • 8/18/2019 SWP Fire Pump.docx

    2/6

    AWPP

     

    AWPP

     SAFE WORKING PROCEDURE

    Douglas Breakwater Fire Pump Water Tests REF...*

    Page of 6

  • 8/18/2019 SWP Fire Pump.docx

    3/6

    AWPP

     

    AWPP

     SAFE WORKING PROCEDURE

    Douglas Breakwater Fire Pump Water Tests REF...*

    1. Date Issued 19.9.1 2. Next Review Date 19.9-.1

    3. Devel!ed "# B "8//ott $. C%sulted

    &. N'W Re(ui)ed*  ;es +. Ris, Assess N. 19.9.1

  • 8/18/2019 SWP Fire Pump.docx

    4/6

  • 8/18/2019 SWP Fire Pump.docx

    5/6

    AWPP

     

    AWPP

     SAFE WORKING PROCEDURE

    Douglas Breakwater Fire Pump Water Tests REF...*

    Press o/li/e operatio/s

    Bot' presses /ee) to +e mo/itore) at all times )uri/g pro(essi/g to get t'e (orre(t flow. T'e (o/trol

    room will +e a+le to make a)ustme/ts to t'e gate a/) t'e fee) s(rew spee)s u/til )esire) flow is

    a('ie,e) o/ ea(' press. 5 aterial ualit8 (a/ ('a/ge i/ mi/utes (ausi/g press pro+lems

    o/itori/g of t'e press outlet ('ute is esse/tial so t'at t'e )esire) ualit8 material goes to t'e

    B room. If t'e B 'as too mu(' tallow still i/ t'e material tell t'e (o/trol room t'e8 will ('a/ge

    )i,ersio/ flap a/) re(8(le t'e material to +e re presse).

    - I;  i/ ('ute or slow fee)i/g i/to t'e press stop t'e fee) s(rew= +utto/..5If 8ou are left 'a/)e) sta/) to t'e left of t'e press a/) use t'e woo)e/ po)gi/g sti(k wit'

    8our glo,e) rig't 'a/) keep +ot' feet o/ t'e platform a/) )o/t rea(' )ow/ i/ t'e press ('ute.

    "lowl8 pus' material i/to pressi/g s(rew i/ top rig't (or/er . 5 It will o/l8 take t'e material as

    fast a/) as soo/ as it wa/ts to= so sta8 (alm a/) +e patie/t if after a few mi/utes /o progress 'as

    +ee/ ma)e ro(ks . .(a/ +e slowl8 a))e) to 'elp material fee) i/. W'e/ 8ou 'a,e ma)e a 'ole i/

    t'e +lo(kage slowl8 work outwar)s to i/(rease t'e 'ole si3e. O/(e (leare) tur/ o/ t'e fee) s(rew

    agai/.$6 I;

  • 8/18/2019 SWP Fire Pump.docx

    6/6