    Yevhenii Usenko, Faculty of Economics-4, group 1

    System Dynamics

    Home Assignment 2

    Task 1

    Increases in Backlog, as well as in Service time (which are undoubtedly connected),

    seem to pose a big problem for Mr. Wang because such delays in customer service may

    cause dissatisfaction of Mr. Wangs customers, who, in turn, will prefer another bicycle

    repair shop. As a consequence, Mr. Wang may experience a decline of his business or, at

    least, deterioration of its financial position.

    Task 2

    a) It seems that Mr. Wang reacts to changes in Order rate with some lag: he needs time

    to perceive new demand. Moreover, Mr. Wang has no opportunity to tune his production

    line immediately; he needs some more time to adjust his capacity to new order rate.

    Therefore, after each rise in repair demand both backlog and service time increase at first,

    then fluctuate and stabilize only in the long run.

    b) No, the backlog stabilizes at slightly higher level after each increase in order rate.

    We even can infer from the graphs given that after the first event equilibrium backlog rose

    from 1000 to 1100, and after the last one to 1331. These values are exactly the same as

    the respective order rates, so we can conclude that a directly proportionate relationship

    exists between the equilibrium backlog and the order rate.

    c) There is a cumulative relationship between Order rate and Backlog because

    immediately after each increase in the former (when production rate is not adjusted)

    Backlog rises linearly, while Order rate is a constant. However, Service time and Backlog

    are connected by a directly proportionate relationship: the bigger is Backlog, the higher is

    Service time.

    Moreover, Service time equilibrates each time on the same level 1.0, because Service

    time is defined as Backlog divided by Repair rate; and for Backlog to stabilize Repair rate

    should be exactly the same as the Order rate, and, therefore, the same as the Backlog itself.

    So under equilibrium conditions, Service time could be expressed as:

  • 7/25/2019 System Dynamics, Home task Mr. Wang

    2/21

    2

    Task 3

    a) The following model was built using iThink software in accordance with equations

    given.

    The documentation is as such:

    a stock; initial value is set to 1000; unit of measurement (UoM): bicycles;

    an inflow into the stock ; UoM: bicycles per day;

    an outflow of the stock ; UoM: bicycles per day;

    a stock; initial value is set to be equal the ; UoM:

    bicycles per day;

    a biflow of ; UoM: (bicycles

    per day) per day;

    a variable (an auxiliary); UoM: days;

    a constant; UoM: days.

    b) No, in my view, determining Expected Order Rate as a stock is correct because

    adjustments in it (Change in Expected Order Rate) are accumulated over time. This

    accumulative relationship is enabled by using a stock and flow structure.

    Moreover, it seems infeasible to create such a structure with auxiliaries, because a

    circular connection would arise.

    Backlog

    Expected Order Rate

    Change in Expected OR

    Order RateProdution Rate

    Time Corr Expected Order Rate

    Service Time

  • 7/25/2019 System Dynamics, Home task Mr. Wang

    3/21

    3

    c)

    17:21 06 Nov , 2015

    Untitled

    Page 1

    1.00 70.75 140.50 210.25 280.00

    Days

    1:

    1:

    1:

    2:

    2:

    2:

    1000

    1050

    1100

    1: Order Rate 2: Expected Order Rate

    1

    1 1 1

    2

    2 2 2

    17:23 06 Nov , 2015

    Untitled

    Page 1

    1.00 70.75 140.50 210.25 280.00

    Days

    1:

    1:

    1:

    1000

    2000

    3000

    1: Backlog

    1

    1 1 1

    17:23 06 Nov , 2015

    Untitled

    Page 1

    1.00 70.75 140.50 210.25 280.00

    Days

    1:

    1:

    1:

    1

    2

    3

    1: Service Time

    1

    1 1 1

  • 7/25/2019 System Dynamics, Home task Mr. Wang

    4/21

    4

    After simulation of the model, it can be seen that it takes approximately 85 days for

    Mr. Wang to fully acknowledge his new demand for repairs. Therefore, the backlog rises in

    logarithmic growth mode up to 2600 bicycles, as well as service time do up to 2.36 days.

    Such behavior arises due to the underlying model structure. It involves negative

    balancing loop which includes expected order rate, its change and adjustment time. Such a

    structure leads to stabilization of the stock Backlog, but only in the long run.

    d) No, the model does not adequately resemble reality because Mr. Wangs company

    does not try to increase production in order to reduce the backlog.

    To illustrate, let us change the order rate step in time 10 to 200 bicycles per day. As a

    consequence, the backlog equilibrium value rises to 4200. So, Mr. Wang has no

    mechanisms of control over his backlog in such a model.

    Task 4

    a) New model structure is presented below. Documentation added:

    a constant; UoM: days;

    a variable; UoM: bicycles;

    a constant; UoM: days;

    a variable; UoM: bicycles per day;

    , described previously, changed its initial value to .

    17:43 06 Nov , 2015

    Untitled

    Page 1

    1.00 70.75 140.50 210.25 280.00

    Days

    1:

    1:

    1:

    1000

    3000

    5000

    1: Backlog

    1

    1 1 1

  • 7/25/2019 System Dynamics, Home task Mr. Wang

    5/21

    5

    b) I have identified two negative balancing loops in the model: one for expected order

    rate adjustment and the other for backlog adjustment. The causal loop diagram is given

    below:

    In both cases, the bigger the main stock (Expected Order Rate and Backlog

    respectively), the higher would be the negative change to them. First of this balancing

    loops reproduce the behavior of Mr. Wang with respect to perception of the real order rate

    that he needs time to adjust his expectations to new demand. The second one resembles

    adjustment of production to changes in demand the need to increase repairs to

    compensate for imperfection of Mr. Wangs expectations.

    Backlog

    Expected Order Rat e

    Change i n Expected OR

    Order RateProdution Rate

    Time Corr Expected Order Rate

    Service Time

    Target Backlog

    Target Service Time

    Desired Backlog Adjus tment

    Time to Adjust Backlog

    BacklogOrder RateProduction Rate

    Expected Order Rate

    Change in Expected Order Rate

    Target Service Time

    Target Backlog

    Target Backlog Adjustment

    +

    -

    -

    +

    +

    +

    +

    -

    +

    +

    +

  • 7/25/2019 System Dynamics, Home task Mr. Wang

    6/21

    6

    From my point of view, the goal of the first loop (for Expected Order Rate) is explicit

    the actual Order Rate, but the goal of the second loop is actually stated in Target Service

    Time, which does not directly participate in this loop, so it might be considered as implicit

    goal.

    The mechanisms here operate without delays.

    c) As we see from the following graphs, Backlog and Service Time initially increase to

    the level of 1428 bicycles and 1.3 days respectively, and fall to the equilibrium values of

    1100 and 1 since.

    The reason for such behavior lies in the structure of the model. Expected Order Rate

    balancing loop provides us with some means of stabilization, but at much higher levels, as

    we have seen in the previous model. Here, the Backlog balancing loop rules. For

    20:31 06 Nov , 2015

    Untitled

    Page 1

    1.00 70.75 140.50 210.25 280.00

    Days

    1:

    1:

    1:

    1000

    1250

    1500

    1: Backlog

    1

    11 1

    20:31 06 Nov , 2015

    Untitled

    Page 1

    1.00 70.75 140.50 210.25 280.00

    Days

    1:

    1:

    1:

    1.00

    1.20

    1.40

    1: Service Time

    11

    1 1

  • 7/25/2019 System Dynamics, Home task Mr. Wang

    7/21

    7

    approximately 12 days after increase of demand, Desired Backlog Adjustment, given our

    time for adjustment, is insufficient to totally offset the effects of this rise. But then, when

    Backlog becomes very high, this adjustment also becomes high and drives the system back

    to the equilibrium of 1100 bicycles.

    d) For Time to Adjust Backlog = 16:

    For Time to Adjust Backlog = 4:

    20:48 06 Nov , 2015

    Untitled

    Page 1

    1.00 70.75 140.50 210.25 280.00

    Days

    1:

    1:

    1:

    1000

    1350

    1700

    1: Backlog

    1

    1

    1 1

    20:48 06 Nov , 2015

    Untitled

    Page 1

    1.00 70.75 140.50 210.25 280.00

    Days

    1:

    1:

    1:

    1.00

    1.25

    1.50

    1: Service Time

    1

    1

    1 1

  • 7/25/2019 System Dynamics, Home task Mr. Wang

    8/21

    8

    The result is that with higher adjustment time equilibrium values are attained much

    later than with lower one: approximately 166 against 108 days after the initial growth of

    demand for repairs. Moreover, the highest backlog and service time are bigger for AT=16:1617 bicycles and 1.47 days respectively against 1276 and 1.16. The reason is that higher

    adjustment time means lower desired backlog adjustments, as seen from the formula.

    Therefore, backlog needs to get much higher values for backlog adjustment to become

    sufficiently huge to offset Order Rate inflow, which also requires more time.

    e) No, the model does not fully reproduce the real behavior of Mr. Wangs production

    due to the absence of oscillations in Backlog and Service Time. To see the reason, lets

    assume that the model built can oscillate. Oscillations in Backlog can be caused only by

    oscillations in Production Rate, because Order Rate is stable after the increase on 10thday.

    20:51 06 Nov , 2015

    Untitled

    Page 1

    1.00 70.75 140.50 210.25 280.00

    Days

    1:

    1:

    1:

    1000

    1150

    1300

    1: Backlog

    1

    1 1 1

    20:51 06 Nov , 2015

    Untitled

    Page 1

    1.00 70.75 140.50 210.25 280.00

    Days

    1:

    1:

    1:

    1.00

    1.10

    1.20

    1: Service Time

    11

    1 1

  • 7/25/2019 System Dynamics, Home task Mr. Wang

    9/21

    9

    However, the structure does not allow for Production Rate to oscillate. We have only

    negative balancing loops, which work in a very direct manner they decrease the stock

    until it reaches equilibrium level, and then nothing changes.

    f) The model definitely behaves more favorably for Mr. Wang than reality does,

    because there are no unwanted oscillations.

    g) iBelieves efforts are unsuccessful, because they have not reproduced key part of the

    reality, which constitutes a major problem for Mr. Wang these oscillations, which he

    wants to be reduced.

    Task 5

    a) So we have introduced all the structures asked for. Specifically, workforce and its

    recruitment/attrition were introduced as a stock, named Workforce, with initial value of

    50 workers, and a biflow Net Hiring (units: workers/day). The latter is dependent upon

    time to train or to fire employees, which is set to be 25 days, Workforce itself, and Desired

    Workforce (unit of measurement (UoM): workers):

    Backlog

    Expected Order Rate

    Change in Expected OR

    Order RateProdution Rate

    Time Corr Expected Order Rate

    Service Time

    Target Backlog

    Target Service Time

    Desired Backlog Adjustment

    Time to Adjust Backlog

    Workforce

    Net Hiring

    Time to Train or Dismi ssDesired Workforce

    Productivity

    Desired Production

  • 7/25/2019 System Dynamics, Home task Mr. Wang

    10/21

    10

    b) To define Desired Workforce, we initially define Desired Production, which is to be

    equal to:

    Then, with Productivity given as 20 (bicycles per worker per day), we are able to write

    that:

    c) Finally, Production Rate is equal to the quantity of bicycles each worker repairs a

    day times the number of workers:

    d) The following graphs were obtained after the simulation of the last model:

    22:17 07 Nov , 2015

    Untitled

    Page 1

    1.00 100.75 200.50 300.25 400.00

    Days

    1:

    1:

    1:

    500

    1500

    2500

    1: Backlog

    1

    1 1 1

    22:17 07 Nov , 2015

    Untitled

    Page 1

    1.00 100.75 200.50 300.25 400.00

    Days

    1:

    1:

    1:

    0.50

    1.50

    2.50

    1: Servic e Time

    1 1 1 1

  • 7/25/2019 System Dynamics, Home task Mr. Wang

    11/21

    11

    e) The model fully replicates all movements in backlog and service time as given by the

    data.

    f) There are two negative feedback loops, affecting Expected Order Rate (discussed

    previously), and Workforce. The second one replicates the way in which Mr. Wang adjusts

    his labor supply: he needs time to hire employees when there is a need for them, and

    dismiss them when labor is redundant. Its goal is implicit it is defined a long sequence of

    actions, but the actual goal is Target Service Time. There are no delays in this mechanism.

    But a very new type of loop introduced a major feedback loop (marked by green

    lines). It allows for oscillations in the model because material delays are present here.

    22:42 07 Nov , 2015

    Untitled

    Page 1

    1.00 100.75 200.50 300.25 400.00

    Days

    1:

    1:

    1:

    2:

    2:

    2:

    50

    58

    65

    1: Workf orce 2: Desired Workforce

    1

    1

    1 1

    2

    2

    2 2

    22:43 07 Nov , 2015

    Untitled

    Page 1

    1.00 100.75 200.50 300.25 400.00

    Days

    1:

    1:

    1:

    2:

    2:

    2:

    1000

    1125

    1250

    1: D esired Production 2: Prodution Rate

    1

    1 1 1

    2

    2 2 2

  • 7/25/2019 System Dynamics, Home task Mr. Wang

    12/21

    12

    g) A major feedback loop with material delays is introduced in our model. Due to this

    structure, the behavior is as follows: after the demand shock in time 10, Mr. Wang firstly

    perceives new order rate, then adjusts his desired overproduction to offset already

    accumulated backlog, and finally decides how many students to hire. All of these actions

    need time, as expressed by time to correct variables. So backlog rises up to approximately

    24th day after the shock, and then begins to decline. When the backlog reaches the

    potential point of equilibrium, Mr. Wangs reaction is to fire students. But once again,

    there is a delay between such necessity and Mr. Wangs ability to do so. As a consequence,

    backlog falls under the equilibrium level up to time 81. Then the process begins from the

    beginning and repeats for a few times, causing oscillations in Backlog and Service Time.

    h) Time to Correct Expected Order Rate is doubled (=32):

    Backlog

    Order Rate

    Production Rate

    Expected Order Rate

    Chang e in Expected Order Rate

    Target Service Time

    Target Backlog

    Target Backlog Adjustment

    Desired Production

    Desired Workforce

    Workforce

    Net Hiring

    Module 1

    +

    -

    -

    +

    +

    ++

    -

    +

    +

    +

    +

    ++

    +

    -

  • 7/25/2019 System Dynamics, Home task Mr. Wang

    13/21

    13

    Time to Correct Expected Order Rate is halved (=8):

    Time to Adjust Backlog is doubled (=16):

    Time to Adjust Backlog is halved (=4):

    11:03 08 Nov , 2015

    Untitled

    Page 1

    1.00 100.75 200.50 300.25 400.00

    Days

    1:

    1:

    1:

    500

    1500

    2500

    1: Backlog

    1

    1 1 1

    11:05 08 Nov , 2015

    Untitled

    Page 1

    1.00 100.75 200.50 300.25 400.00

    Days

    1:

    1:

    1:

    500

    1500

    2500

    1: Backlog

    1

    1 1 1

    11:08 08 Nov , 2015

    Untitled

    Page 1

    1.00 100.75 200.50 300.25 400.00

    Days

    1:

    1:

    1:

    500

    2000

    3500

    1: Backlog

    1

    1

    1 1

  • 7/25/2019 System Dynamics, Home task Mr. Wang

    14/21

    14

    Time to Train is doubled (=50):

    Time to Train is halved (=12.5):

    Time to Correct Expected Order Rate and Time to Train are doubled, and Time to

    Adjust Backlog is halved:

    11:11 08 Nov , 2015

    Untitled

    Page 1

    1.00 100.75 200.50 300.25 400.00

    Days

    1:

    1:

    1:

    500

    1500

    2500

    1: Backlog

    1

    1 1 1

    11:13 08 Nov , 2015

    Untitled

    Page 1

    1.00 100.75 200.50 300.25 400.00

    Days

    1:

    1:

    1:

    0

    1500

    3000

    1: Backlog

    1

    1

    1

    1

    11:15 08 Nov , 2015

    Untitled

    Page 1

    1.00 100.75 200.50 300.25 400.00

    Days

    1:

    1:

    1:

    500

    1500

    2500

    1: Backlog

    1

    1 1 1

  • 7/25/2019 System Dynamics, Home task Mr. Wang

    15/21

    15

    Time to Correct Expected Order Rate and Time to Adjust Backlog are doubled, and

    Time to Train is halved:

    Conclusions from sensitivity analysis:

    Changes in Time to Correct Expected Order Rate affect Backlog only on the first

    stage, rising or decreasing its peak value, because if Mr. Wang perceives new demand,

    e.g., faster, desired production and workforce will adjust more rapidly, so backlog will takeon lower values after the shock. Once Mr. Wang fully acknowledges his new demand,

    nothing is changed.

    Changes in Time to Adjust Backlog cause Backlog fluctuations to change frequency

    and amplitude. If Mr. Wang adjusts Backlog by a small amount every day (Time to Adjust

    Backlog is high), Backlog must become sufficiently large in order to Production Rate to

    offset its increase, and vice versa. Naturally, it takes more time, which means lower

    frequency of oscillations.

    11:22 08 Nov , 2015

    Untitled

    Page 1

    1.00 100.75 200.50 300.25 400.00

    Days

    1:

    1:

    1:

    0

    1500

    3000

    1: Backlog

    1

    1 1

    1

    11:29 08 Nov , 2015

    Untitled

    Page 1

    1.00 100.75 200.50 300.25 400.00

    Days

    1:

    1:

    1:

    1000

    2000

    3000

    1: Backlog

    1

    11 1

  • 7/25/2019 System Dynamics, Home task Mr. Wang

    16/21

    16

    Changes in Time to Train and Dismiss affect oscillations. If Time to Train is high,

    Mr. Wang is unable to vary his workforce timely, so there will be over- and under-

    production multiple times.

    From combined simulations we can conclude that Time to Train is the most

    important time variable, because halving it and doubling Time to Correct Expected Order

    Rate and Time to Adjust Backlog leads to comparatively fast equilibrium.

    Task 6

    a) The maximum schedule pressure is found to be 1.14 in time 26.

    b) The table given shows how much more (less) will be produced is workers worked

    more (less) by some margin.

    22:56 13 Nov , 2015Untitled

    Page 1

    1.00 100.75 200.50 300.25 400.00

    Days

    1:

    1:

    1:

    0.90

    1.05

    1.20

    1: Schedule Pressure

    1

    11 1

  • 7/25/2019 System Dynamics, Home task Mr. Wang

    17/21

    17

    c) The previously introduced loops are unchanged, but a new one is introduced (partly

    drawn in turquoise color). This loop says that increased backlog increases desired

    production, which, in turn, increases desired productivity level, which leads to higher

    schedule pressure, higher effects on it, higher production rates, and, finally, lower backlog.

    Its main difference from the major negative feedback loops lies in the absence of a stock in

    it, and, therefore, the absence of material delays.

    The major feedback loop and newly introduced one interplay in the following way:

    1. The second one reduces the initial need to hire a lot of employees after a shock

    (immediate increase in production when backlog increases).

    2. The first one allows hiring some additional workers to return pressure schedule to

    the normal level of 1.

    d) The model:

    Backlog

    Order Rate

    Production Rate

    Expected Order Rate

    Change in Expected Order Rate

    Target Service Time

    Target Backlog

    Target Backlog Adjustment

    Desired Production

    Desired Workforce

    Workforce

    Net Hiring

    Module 1

    Desired Productivity Schedule Pressure

    Effect on Schedule Pressu re

    +

    -

    +

    ++

    +

    +

    +

    -

    +

    +

    +

    +

    -

    +

    -

    +

    - +

    +

    +

  • 7/25/2019 System Dynamics, Home task Mr. Wang

    18/21

    18

    The results of simulation show that the problem of oscillations is solved by the

    willingness of employees to work overtime. Maximum values for backlog and service time

    are 1428 bicycles and 1.30 days respectively.

    Backlog

    Expected Order Rate

    Change in Expected OR

    Order RateProdution Rate

    Time Corr Expected Order Rate

    Service Time

    Target Backlog

    Target Service Time

    Desired Backlog Adjus tment

    Time to Adjust Backlog

    Workforce

    Net Hiring

    Tim e to Train or Dism iss

    Desired Workforce

    Productivity

    Desired Production

    Schedule Pres sure

    Effect of Schedule Pressure

    ~

    Desired Productivity

    23:28 13 Nov , 2015

    Untitled

    Page 1

    1.00 100.75 200.50 300.25 400.00

    Days

    1:

    1:

    1:

    1000

    1250

    1500

    1: Backlog

    1

    1 1 1

  • 7/25/2019 System Dynamics, Home task Mr. Wang

    19/21

    19

    e) The workforce increases to 55 people in the long run (approximately on 160 thday).

    Overtime is a short-term solution and hiring a long-term one because, first of all,

    hiring policy, as we have seen, is unable to tackle the problem effectively in the short-term

    (resulting oscillations), so overtime provide some kind of support for hiring to offset

    material delay problem. On the other hand, overtime cannot be a permanent solution in

    THIS model, because after a demand shock not only overtime need is adjusted, but also

    desired workforce (and real workforce, consequently) grows, offsetting the need of high

    schedule pressure and leading to a stable long-term equilibrium.

    f) Maximum schedule pressure is 1.07. It is lower because we introduced the effect of

    schedule pressure, thus making backlog adjustment faster.

    23:28 13 Nov , 2015

    Untitled

    Page 1

    1.00 100.75 200.50 300.25 400.00

    Days

    1:

    1:

    1:

    1.00

    1.20

    1.40

    1: Service Time

    1 1 1 1

    23:28 13 Nov , 2015

    Untitled

    Page 1

    1.00 100.75 200.50 300.25 400.00

    Days

    1:

    1:

    1:

    50

    54

    58

    1: Workforce

    1

    1 1 1

  • 7/25/2019 System Dynamics, Home task Mr. Wang

    20/21

    20

    Task 7

    We modify the causal loop diagram to include the structure Mr. Wang is concerned

    about (marked in blue). This is a positive (self-reinforcing) loop. That is, the higher is the

    backlog, the higher would be target backlog adjustment, desired production and

    productivity, and schedule pressure, which, in turn, increases the inflow of workers

    fatigue. Higher levels of exhaustion lead to lower production rates, and, consequently, to

    higher values of backlog.

    Note that accordingly with Mr. Wangs concerns, possibility to hire additional workers

    is eliminated from the model. So, workers will inevitably experience high and persistent

    levels of schedule pressure (1.1 in the long term), which will cause great fatigue, and

    backlog will eventually rise.

    23:28 13 Nov , 2015

    Untitled

    Page 1

    1.00 100.75 200.50 300.25 400.00

    Days

    1:

    1:

    1:

    1.00

    1.04

    1.08

    1: Schedule Pressure

    1 1 1 1

  • 7/25/2019 System Dynamics, Home task Mr. Wang

    21/21

    21

    Backlog

    Order Rate

    Production Rate

    Expected Order Rate

    Change in Expected Order Rate

    Target Service Time

    Target Backlog

    Target Backlog Adjustment

    Desired Production

    Fatigue Change in Fatigue

    Module 1

    Desired Productivity Schedule Pres sure

    Effect on Schedule Pressure

    +

    +

    -

    +

    -

    +

    +

    +

    +

    +

    -

    +

    +

    -

    +

    +

    +

    +