PROCEDURE TITLE: SYSTEM MODIFICATION PROCEDURE PROCEDURE NO: TRN/MOD/0001 REV 01
SYSTEM MODIFICATION PROCEDURE FORMS 1) Trains Risk Matrix 2) Hazard Log – Technical / Operations Risk 3) Hazard Log Summary 4) Request For Modification (RFM) 5) Application For Modification (AFM) 6) Completion Of Modification (COM) 7) AFM Review Form
This is an editable copy of SYSTEM MODIFICATION PROCEDURE FORMS and is electronically CONTROLLED on SMRT Intranet. Any copy of this Document obtained from other sources is uncontrolled and should be checked against the latest version on SMRT Intranet prior to use.
PROCEDURE TITLE: SYSTEM MODIFICATION PROCEDURE PROCEDURE NO: TRN/MOD/0001 REV 01
This Document is electronically CONTROLLED on SMRT Intranet. Any copy of this Document obtained from other sources is uncontrolled and should be checked against the latest version on SMRT Intranet prior to use.
Trains Risk Matrix
Table 1 Mishap Severity Level
Level Personnel & Environment
Service / Asset Reliability Financial
Severe 5
Fatalities and/or multiple severe injuries and/or major damage to the environment.
30 minutes delay to train
service.
Extended failure resulting in
major interruption to
service.
Exposure ≥ S$15M
Critical 4
Single fatality and/or significant damage to the environment.
20 minutes ≤ 30 minutes delay to train service
Interruption to service for an entire line.
S$15M > Exposure > S$10M
Significant 3 Severe injury and/or minor damage to the environment.
15 minutes ≤ 20 minutes
delay to train service.
Interruption to service in
affected area within a line.
S$10M > Exposure > S$5M
Moderate 2
Minor injury and/or significant threat to the environment.
2 minutes ≤ 15 minutes delay to train service.
Reduced or disrupted service.
S$5M > Exposure > S$1M
Minor 1
Possible minor injury / no injury.
≤ 2 minutes delay to train service.
Brief delay to normal service.
Exposure < S$1M
Reference: SMRT Trains Risk Management Procedure, Section 6.3
Table 2 Mishap Likelihood Level
Level Qualitative Description Accident Frequency
Expected 5 Likely to occur frequently. The hazard will be
continually experienced. ≥ 1 accident per 100
hours
Likely 4 Will occur several times. The hazard can be expected to
occur often. 1x10² hours < 1 accident ≤
1x10⁴ hours
Maybe 3 Likely to occur several times. The hazard can be
expected to occur several times. 1x10⁴ hours < 1 accident ≤
1X10⁵ hours
Less Likely 2 Likely to occur sometime in the system’s life cycle. The
hazard can reasonably be expected to occur. 1x10⁵ hours < 1 accident ≤
1X10⁶ hours
Almost Remote
1 Unlikely to occur but possible. It can be assumed that
the hazard may exceptionally occur. 1x10⁶ hours < 1 accident ≤
1X10⁸ hours
Reference: SMRT Trains Risk Management Procedure, Section 6.3
PROCEDURE TITLE: SYSTEM MODIFICATION PROCEDURE PROCEDURE NO: TRN/MOD/0001 REV 01
This Document is electronically CONTROLLED on SMRT Intranet. Any copy of this Document obtained from other sources is uncontrolled and should be checked against the latest version on SMRT Intranet prior to use.
Table 3 SMRT Risk Matrix
Severity / Likelihood
Almost remote
Less Likely
Maybe Likely Expected
1 2 3 4 5
Severe 5 5 10 15 20 25
Critical 4 4 8 12 16 20
Significant 3 3 6 9 12 15
Moderate 2 2 4 6 8 10
Minor 1 1 2 3 4 5 (Mishap Risk Assessment Value = Severity x Likelihood)
Table 4 Mishap Risk Categories and Acceptance Levels
Mishap Risk
Assessment Value Category Description Acceptance Level
15 – 25 A Intolerable
(High Risk)
Unacceptable
8 – 12 B Undesirable
(Serious Risk)
SSB (Trains) Approval –
FTA/FMECA* to be performed
3 – 6 C Tolerable
(Medium Risk)
SSB (Trains) Approval
1 – 2 D Negligible
(Low Risk)
CMO Approval
*FTA – Fault Tree Analysis *FMECA – Failure Mode, Effects and Criticality Analysis
PROCEDURE TITLE: SYSTEM MODIFICATION PROCEDURE PROCEDURE NO: TRN/MOD/0001 REV 01
This Document is electronically CONTROLLED on SMRT Intranet. Any copy of this Document obtained from other sources is uncontrolled and should be checked against the latest version on SMRT Intranet prior to use.
MS: Mishap Severity ML: Mishap Likelihood RV: Risk Value (MS x ML)
Prepared by: Signature: ________________ Date: ________________ (Name of Applicant / Department)
Accepted by: Signature: ________________ Date: ________________
(Name of HOD of Applicant / Department)
* Refer to SMRT Work Safety Manual, CORP Manual01_WSM, Section C
Hazard Log – Technical/Operations Risk (To submit workplace safety risk assessment* separately)
Revision No.:
____
Ref No
Operation Mode
System Associated Subsystem
Hazard Description
Hazard Cause Hazard Effect
Initial Risk Evaluation Mitigation
Measures
Residual Risk Evaluation
Additional Recommendation /
Remarks MS ML RV MS ML RV
PROCEDURE TITLE: SYSTEM MODIFICATION PROCEDURE PROCEDURE NO: TRN/MOD/0001 REV 01
This Document is electronically CONTROLLED on SMRT Intranet. Any copy of this Document obtained from other sources is uncontrolled and should be checked against the latest version on SMRT Intranet prior to use.
Hazard Log Summary
Mishap Risk Level Hazard Count
Intolerable
Undesirable
Tolerable
Negligible
Total
Severity Category Likelihood Level
Almost remote Less Likely Maybe Likely Expected
1 2 3 4 5
Severe 5
Critical 4
Significant 3
Moderate 2
Minor 1
NOTE: Fill the hazards count into the respective boxes
PROCEDURE TITLE: SYSTEM MODIFICATION PROCEDURE PROCEDURE NO: TRN/MOD/0001 REV 01
This Document is electronically CONTROLLED on SMRT Intranet. Any copy of this Document obtained from other sources is uncontrolled and should be checked against the latest version on SMRT Intranet prior to use.
REQUEST FOR MODIFICATION
RFM NO:
PART 1 MOD REQUEST (TO BE FILLED BY ORIGINATOR)
Name:
Designation: Signature/Date: (Executive Engineer & Above)
Department:
MOD Title:
Funds for MOD Approved: Yes No Cost Center / Authority:
Target Starting Date:
/ /
(DD/MM/YYYY)
Target Completion Date:
/ /
(DD/MM/YYYY)
PART 2 MOD CO-ORDINATION (TO BE FILLED BY CO-APPLICANT)
Name:
Designation: Signature/Date: (Executive Engineer & Above)
Department:
Consideration given to effects on all system
Acceptance of modification(s) by user and affected parties
Agreement from affected parties to raise AFM(s) for all changes arising from this modification
Yes No
Yes No
Yes No
Details of Co-ordination:
PROCEDURE TITLE: SYSTEM MODIFICATION PROCEDURE PROCEDURE NO: TRN/MOD/0001 REV 01
This Document is electronically CONTROLLED on SMRT Intranet. Any copy of this Document obtained from other sources is uncontrolled and should be checked against the latest version on SMRT Intranet prior to use.
APPLICATION FOR MODIFICATION
AFM NO:
PART 3 MOD PROPOSAL (TO BE FILLED BY APPLICANT)
Name: Designation: Signature/Date: (Executive Engineer & Above)
Department:
Hazard Log Risk Category:
Category B Category C Category D
Modification Proposal:
Reason(s) and Justification(s):
Is MOD a trial scheme Yes No
Is MOD on LTA Asset / Infrastructure Yes No
Tick box(es) below to indicate updates required after modification completion: (Submission of relevant document is required as part of MOD completion)
Operation Manuals Specifications (for spares, equipment)
Maintenance Manuals Endorsement by relevant Authority, PE
Training Manuals *Work Instructions (method, frequency, working tool & maintenance period)
As-Built Drawings Others : _______________________
*Remarks: require the submission of Trains Maintenance Review Board (TMRB) request
SMRT Coordinator (Mandatory to be completed for AFM raised by LTA, Private Developer, SMRT Experience and Services)
Name: Designation: Signature/Date: (Executive Engineer & Above)
Remarks:
PROCEDURE TITLE: SYSTEM MODIFICATION PROCEDURE PROCEDURE NO: TRN/MOD/0001 REV 01
This Document is electronically CONTROLLED on SMRT Intranet. Any copy of this Document obtained from other sources is uncontrolled and should be checked against the latest version on SMRT Intranet prior to use.
APPLICATION FOR MODIFICATION
AFM NO:
PART 4 TECHNICAL ENDORSEMENT (FOR SMRT & LTA ONLY)
SMRT TECHNICAL ENDORSEMENT
By Head of Division / Business Unit
Approved Rejected
Name:
Designation:
(VP / PF)
Remarks:
Signature/Date:
SMRT SAFETY & INSPECTORATE (SSI) ENDORSEMENT
Approved Rejected
Name:
Designation:
(Deputy Director & Above)
Remarks:
Signature/Date:
LTA TECHNICAL ENDORSEMENT and Approval on Acceptance of Safety Analysis
By RAOM / ASI
Approved Rejected
Name:
Designation:
(Deputy Director & Above)
Remarks:
Signature/Date:
PROCEDURE TITLE: SYSTEM MODIFICATION PROCEDURE PROCEDURE NO: TRN/MOD/0001 REV 01
This Document is electronically CONTROLLED on SMRT Intranet. Any copy of this Document obtained from other sources is uncontrolled and should be checked against the latest version on SMRT Intranet prior to use.
APPLICATION FOR MODIFICATION
AFM NO:
PART 5 SMRT CMO APPROVAL (FOR CAT D MOD ONLY)
Approved Rejected
Name:
Designation:
Remarks:
Signature/Date:
PART 6 SSB(Trains) CHAIRMAN APPROVAL (FOR CAT B & C MOD ONLY)
Change in Risk Category: Yes No (If Yes, will require to update hazard log for AFM Submission)
Final Risk Category:
Category B Category C Category D
SMRT Safety Board (Trains) Approval – Meeting # & Date:
Approved Rejected
Name:
Designation:
Remarks:
Signature/Date:
PROCEDURE TITLE: SYSTEM MODIFICATION PROCEDURE PROCEDURE NO: TRN/MOD/0001 REV 01
This Document is electronically CONTROLLED on SMRT Intranet. Any copy of this Document obtained from other sources is uncontrolled and should be checked against the latest version on SMRT Intranet prior to use.
COMPLETION OF MODIFICATION
COM NO:
PART 7 MOD COMPLETION (TO BE FILLED BY APPLICANT)
Date MOD Started:
/ /
(DD/MM/YYYY)
Date MOD Completed:
/ /
(DD/MM/YYYY)
Confirmation on updating of documents, drawings, specifications & etc. (Modification Leaflet – to be completed and attached)
Yes No
MOD Checked by (Qualified SMRT Staff Only): Name: Designation:
(Executive Engineer & Above)
Date:
Results/Recommendations:
PART 8 MOD ACCEPTANCE (COMPLETE EITHER PART A OR PART B)
PART A
MOD Accepted & Completed
MOD Rejected & System Normalised
MOD Aborted & System Normalised
Others: _______________________
PART B (for AFM on trial Mod only)
Trial Accepted (New AFM required for full scale MOD)
Trial Aborted & System Normalised If Trial Accepted, is full scale MOD required?
Yes No
Name: Designation: Signature/Date:
(Applicant’s or SMRT Coordinator’s Branch Manager & Above)
PART 9 SSB(Trains) SECRETARY ACKNOWLEDGMENT
MOD Approved MOD Rejected
Name: Secretary: Signature/Date:
Reason for Rejection:
(Use AFM No.)
PROCEDURE TITLE: SYSTEM MODIFICATION PROCEDURE PROCEDURE NO: TRN/MOD/0001 REV 01
This Document is electronically CONTROLLED on SMRT Intranet. Any copy of this Document obtained from other sources is uncontrolled and should be checked against the latest version on SMRT Intranet prior to use.
COMPLETION OF MODIFICATION
Page _____ of _____
AFM No:
MODIFICATION LEAFLET (TO BE FILLED BY APPLICANT)
Name:
Designation: Signature/Date:
(Executive Engineer & Above)
Department:
Item No.
ADVICE FOR UPDATING (Changes and Updates for Material, Specifications,
Drawings & Documents, etc.)
Date Issued
Name of Receiving
Party
Signature of
Receiving Party / Date
Received
Completion Date
Proposed Actual
*Insert multiple modification leaflets if necessary.
PROCEDURE TITLE: SYSTEM MODIFICATION PROCEDURE PROCEDURE NO: TRN/MOD/0001 REV 01
This Document is electronically CONTROLLED on SMRT Intranet. Any copy of this Document obtained from other sources is uncontrolled and should be checked against the latest version on SMRT Intranet prior to use.
AFM REVIEW FORM
AFM NO. Date :
Modification Title :
Department / Branch :
Reviewed By : Name / Signature Date :
S/N Document / Drawing No.
Comments
Conclusion Is there any objection to the modification? Yes / No