t 1 t 31 32 e r t s 2 s 30 33 3 34 21 29 24 d n o · power station fi r s t street e i g h t h ......

3
STREET bore bore day care no go area playground arts centre sports oval office & shop power station clinic & office basketball court power station FIRST STREET EIGHTH SEVENTH FIFTH THIRD FOURTH SIXTH SECOND STREET STREET STREET STREET STREET STREET 500 m bore 1 5 0 m i n d u s t r y 200 m po we r s t a t i o n 2 0 0 m p o w er stati o n 9 29 24 6 20 5 12 3 1 2 4 7 10 22 11 14 21 35 38 16 17 33 32 34 37 36 40 31 30 41 26 19 8 23 39 27 Dodnun Layout Plan 1 - Living Area Western Australian Planning Commission It is the responsibility of the developer to ensure that all relevant consents, approvals, licences and clearances are in place prior to commencing physical works on the site. Organisations responsible for such matters may include land owner, local government, incorporated community council, native title representative body, Department of Environment Regulation, Aboriginal Cultural Materials Committee, Environmental Protection Authority, Department of Commerce, and the Department of Water. This layout plan does not constitute development approval. N 0 20 40 60 80 100 metres Settlement layout not derived from calculated dimensions. Cadastral data supplied by the Western Australian Land Information Authority (Licence LI 782-2015-1). Extraction date of cadastre 31/03/2017. Proposed water reserve, drinking water source protection areas and wellhead protection zones derived from the Dodnun Drinking Water Source Protection Plan February 2017 commissioned by the Housing Authority. June 2011 aerial image provided by Landgate. Projection : MGA zone 52, GDA 94 Map document : Dodnun LP1 draft4 - Living Area.mxd Layout plan prepared by Department of Planning. © Western Australian Planning Commission Community Traditional Owners WAPC - Local Government Layout Plan 1 endorsement - - - WAPC - Amendment endorsement draft 4 for comment draft 4 for comment Perth Broome Karratha Geraldton Port Hedland Kalgoorlie Kununurra Newman S Esperance NT SA location map Dodnun SHIRE OF WYNDHAM - EAST KIMBERLEY 201,967 mE 8,180,627 mN 202,684 mE 8,180,030 mN drinking water source wellhead protection zone industry no go boundary power station Exclusion Boundary Land Administration cadastre recommended settlement zone settlement layout (SL) lot & SL-lot number 63 public utility recreation residential road reserve Land Use commercial community drinking water source protection area industrial open space

Upload: phamliem

Post on 09-May-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: T 1 T 31 32 E R T S 2 S 30 33 3 34 21 29 24 D N O · power station FI R S T STREET E I G H T H ... c o m m e n t dr aft 4 for co ment Perth Broome Karratha Geraldton Port Hedland

STREET

borebore

day care

no go areaplayground

artscentre

sportsoval

office& shop

powerstation

clinic& office

basketballcourt

powerstation

FIRST

STREETEIGHTH

SEVENTH

FIFTH

THIRD

FOURTH

SIXTH

SECO

ND

STREET

STRE

ET

STREET

STRE

ET

STRE

ET

STREET

500 m bore

150 m industry

200 m power station

200 m power station

9

29 24

6

20

5

12

3

1

2

4

7

10

22 11

14

21

35

38

1617

33

32

34

3736 40

31

30

41

26

19

8

23

39

27

DodnunLayout Plan 1- Living Area

WesternAustralianPlanningCommission

It is the responsibility of the developer to ensure that all relevantconsents, approvals, licences and clearances are in place prior tocommencing physical works on the site. Organisations responsible forsuch matters may include land owner, local government, incorporatedcommunity council, native title representative body, Department ofEnvironment Regulation, Aboriginal Cultural Materials Committee,Environmental Protection Authority, Department of Commerce, and theDepartment of Water.

This layout plan does not constitute development approval.

N0 20 40 60 80 100

metres

Settlement layout not derived from calculated dimensions.

Cadastral data supplied by the Western Australian Land InformationAuthority (Licence LI 782-2015-1).Extraction date of cadastre 31/03/2017.Proposed water reserve, drinking water source protection areas andwellhead protection zones derived from the Dodnun Drinking WaterSource Protection Plan February 2017 commissioned by theHousing Authority.June 2011 aerial image provided by Landgate.Projection : MGA zone 52, GDA 94Map document : Dodnun LP1 draft4 - Living Area.mxdLayout plan prepared by Department of Planning.© Western Australian Planning Commission

Community

Traditional OwnersWAPC

-Local Government

Layout Plan 1 endorsement

-

--

WAPC -Amendment endorsement

draft 4 for

comment

draft 4 forcomment

Perth

Broome

Karratha

Geraldton

Port Hedland

Kalgoorlie

Kununurra

NewmanAli ce

Sp rin gs

Esperance

NT

SA

location map

Dodnun

SHIRE OF WYNDHAM- EAST KIMBERLEY

201,967 mE

8,180,627 mN

202,684 mE

8,180,030 mN

drinking water source wellhead protection zoneindustryno go boundarypower station

Exclusion Boundary

Land Administrationcadastrerecommended settlement zonesettlement layout (SL) lot & SL-lot number63

public utilityrecreationresidentialroad reserve

Land Usecommercialcommunitydrinking water sourceprotection areaindustrialopen space

Page 2: T 1 T 31 32 E R T S 2 S 30 33 3 34 21 29 24 D N O · power station FI R S T STREET E I G H T H ... c o m m e n t dr aft 4 for co ment Perth Broome Karratha Geraldton Port Hedland

bore

no go area

rubbishtip

powerstation

powerstation

STREET

EIGHTH

SEVENTH

STREET

28

41

27

26

2000 m rubbish tip

500 m bore

DodnunLayout Plan 1

- Context

WesternAustralianPlanningCommission

It is the responsibility of the developer to ensure that all relevantconsents, approvals, licences and clearances are in place prior tocommencing physical works on the site. Organisations responsible forsuch matters may include land owner, local government, incorporatedcommunity council, native title representative body, Department ofEnvironment Regulation, Aboriginal Cultural Materials Committee,Environmental Protection Authority, Department of Commerce, and theDepartment of Water.

This layout plan does not constitute development approval.

N0 50 100 150 200 250 300

metres

Settlement layout not derived from calculated dimensions.

Cadastral data supplied by the Western Australian Land InformationAuthority (Licence LI 782-2015-1).Extraction date of cadastre 31/03/2017.Proposed water reserve, drinking water source protection areas andwellhead protection zones derived from the Dodnun Drinking WaterSource Protection Plan February 2017 commissioned by theHousing Authority.April 2009 & June 2011 aerial image provided by Landgate.Projection : MGA Zone 52, GDA 94Map document : Dodnun LP1 draft4 - Context.mxdLayout plan prepared by Department of Planning.© Western Australian Planning Commission

Community

Traditional OwnersWAPC

-Local Government

Layout Plan 1 endorsement

-

--

WAPC -Amendment endorsement

201,489 mE

8,181,512 mN

204,096 mE

8,179,344 mN

draft 4 for

comment

draft 4 forcomment

Perth

Broome

Karratha

Geraldton

Port Hedland

Kalgoorlie

Kununurra

NewmanAli ce

Sp rin gs

Esperance

NT

SA

location map

Dodnun

SHIRE OF WYNDHAM- EAST KIMBERLEY

Exclusion Boundarydrinking water source wellhead protection zoneno go boundaryutility

Land Administrationcadastrerecommended settlement zonesettlement layout (SL) lot & SL-lot number63

public utilityrecreationresidentialroad reserve

Land Usecommercialcommunitydrinking water sourceprotection areaindustrialopen space

Page 3: T 1 T 31 32 E R T S 2 S 30 33 3 34 21 29 24 D N O · power station FI R S T STREET E I G H T H ... c o m m e n t dr aft 4 for co ment Perth Broome Karratha Geraldton Port Hedland

Lot 34Crown reserve 42999

lot 2General lease

GE L593791

lot 23Pastoral lease PL N049426

Mt Elizabeth Station

lot 27Pastoral lease PL N049688

Gibb River

lot 17Pastoral lease PL N049688

Gibb River

lot 17Pastoral lease PL N049688

Gibb River

lot 17Pastoral lease PL N049688

Gibb River

Derby-G

ibb Rive

r Rd

DodnunLayout Plan 1- Land Tenure

WesternAustralianPlanningCommission

It is the responsibility of the developer to ensure that all relevantconsents, approvals, licences and clearances are in place prior tocommencing physical works on the site. Organisations responsible forsuch matters may include land owner, local government, incorporatedcommunity council, native title representative body, Department ofEnvironment Regulation, Aboriginal Cultural Materials Committee,Environmental Protection Authority, Department of Commerce, and theDepartment of Water.

This layout plan does not constitute development approval.

N0 1 2 3 4

kilometres

Community

Traditional OwnersWAPC

-Local Government

Layout Plan 1 endorsement

-

--

WAPC -Amendment endorsement

Settlement layout not derived from calculated dimensions.

Cadastral data supplied by the Western Australian Land InformationAuthority (Licence LI 782-2015-1).Extraction date of cadastre 31/03/2017.Projection : MGA zone 52Map document : Dodnun LP1 draft4 - Land Tenure.mxdLayout plan prepared by Department of Planning.© Western Australian Planning Commission

Dodnun

Ngallagunda

draft 4 forcomment

draft 4 for

comment

196,876 mE

8,198,635 mN

229,466 mE

8,171,531 mN

Perth

Broome

Karratha

Geraldton

Port Hedland

Kalgoorlie

Kununurra

NewmanAli ce

Sp rin gs

Esperance

NT

SA

location map

Dodnun

SHIRE OF WYNDHAM- EAST KIMBERLEY

Roadsmain roadtrack

Land Tenurecrown reserveleaseholdotherpastoral lease

Land Administrationcadastrerecommended settlement zonesettlement layout (SL) lot