The Manual of BGD50m2/3 ESP
Henan Zhengzhou Boiler Environmental Protection Co., Ltd.
2010.12.10
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
2/54
2
CONTENTS1. The principle and structure of ESP Function ............................................................. 3
2. Introduce the key components of electrostatic precipitator ....................................... 4
3. Performance parameters ........................................................................................... 22
4. The information provided drawings ......................................................................... 24
5. Quality assurance system ......................................................................................... 28
6. Installation and use instructions ............................................................................... 397. Packing and shipping solutions ................................................................................ 52
8. After-sales service and personnel ............................................................................. 53
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
3/54
3
1. The principle and structure of ESP Function
ESP mainly includes the corona electrode (cathode), collecting pole (anode) and the
vibration system.. When the electrostatic precipitator power, the corona electrode and the
very composition of dust in the nonuniform electric field,discharge electrode (corona pole) isnegative, the dust is extremely positive, and 72kV high-voltage DC power supply for
charging. When the electric field strength increased to a value, a very the corona formed
around negative corona, the ionization of gas molecules to strengthen, resulting in a large
number of positive and negative ions. Positive ions in the coronaareneutralizedby corona
electrode and polar, negative ions and free electrons are transferred to the collecting pole.
When the gas with the passage of dust, these negatively charged particles will continue to
encounter in the campaign and was adsorbed on the particles, so that charged dust particles,
Through the electric field force, the dust will soon reach the dust very gas campaign anode
plate, release negative charge, the dust deposited in the board itself. Operation in the positive
ion, corona district positively charged dust, moving corona electrode, the corona electrode
will keep fouling, but the amount small. Collected dust to fall through the vibration device,
gathered in the lower part of the discharge hopper, the gas purification.
Electrostatic precipitator is composed of the body, supply unit which result in high-voltage
direct current power and low voltage control components. Figure:
Smoke through the air intake box to complete the smoke box from the
inlet pipe section to a small section of the proliferation of large electric field.At this time, to
maintain gas flow rate, flow field uniformity is particularly important to the balance of the
transition. Therefore, in order to achieve the field uniformity of air distribution on a cross-
section, into the smoke box with flared gas, and in which more than two layers of air with
uniform plates, while the smoke chamber on the inlet should be on the humidity, temperature,
flow rate , static pressure and the monitoring of dust concentration monitoring holes.
Vibration anode side row, the top row of the cathode rapping, cleaning effect, easy
1 RectifierTransformer
2 Case
3A rdistribution
plate
4 Insulation
5Cathodevibrationdevice
6 Outer shield
7 Cathode ray8 Anode plate
9 Vibrationdevice anode
10 Hopper
http://dict.cnki.net/dict_result.aspx?searchword=%e4%b8%ad%e5%92%8c&tjType=sentence&style=&t=neutralizedhttp://dict.cnki.net/dict_result.aspx?searchword=%e4%b8%ad%e5%92%8c&tjType=sentence&style=&t=neutralized -
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
4/54
4
maintenance. Used in automatic control of high-voltage thyristor rectifier units, high voltage
silicon rectifier and the SCR by the automatic control system. It can be converted into high
frequency alternating current to direct current and spark frequency control, according to the
nature of smoke and dust at any time adjust the maximum supply voltage of electrostatic
precipitator, to enable it to maintain the average voltage is slightly lower than the impending
spark discharge voltage ( associated with a certain spark discharge voltage) to run.
Low temperature measurement and control devices including thermostatic heating control,vibration cycle control, ash-bit instructions, high and low level alarm and automatic
discharging control, access doors, security holes and chain of control cabinets to ensure the
long-term safe and reliable operation of ESP .
2Introduce the key components of electrostatic precipitator
Design Range.
Body equipmentElectrostatic precipitator before the imports from the flange head, then
head to the ESP exit flange, from the roof down to the full hopper flange within the
equipment (including supporting bearing and the ESP platform ladder away from the stormontology shed and other accessories, including the first level of zero meters to the body
between the platforms platform and take the ladder). Trapezoidal enclosure with insulation
outside the guard and metal components.
Electrical Scope of supply: full set of high voltage and high voltage control cabinet, the entire
low-voltage program-controlled cabinet; the supplier is responsible for the design of wire and
cable equipment needed to provide wire and cable inventory (including the bridge), to be
responsible for procurement, installation of wire and cable laying by the supplier is
responsible."
Ash Scope of supply: a screw conveyor, a humidifier.
Body structure design.Inlet mode and outlet mode.
Horizontal into the wind, the way the level of the wind, reducing drag and thus the operation
of electrostatic precipitator power consumption savings.
Are the wind in the form.Porous plate plus vane design, to ensure the uniformity of air distribution, slowing the
unstable state of alternating pressure.
Cathode and anode configuration.C480 anode plate with beam line with the electrode needle prick. Anode material for the plate
material 1.2mm SPCC. This configuration is not only collecting good effect, strongvibration force transmission.
The distance between the anode and cathode.An electric field using the same polar distance 440mm, two electric field and three electric
field using the same polar distance 400mm. This design can effectively prevent the boiler flue
gas generated by the alternating pressure gas and alternating array of smoke caused by
unstable flow caused by frequent closed corona, and not because of the high voltage caused
by anti-corona phenomenon.
The form of vibration.Cathode and anode for the electromagnetic vibration hammer are placed at the top. This form
of vibration effect is not only a good rapper, but not easy to hammer out there.
Hopper design.Hopper design with 60 angle, the installation position and the High Level Wall vibrator
alarm device can effectively prevent the ash bucket Fouling.
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
5/54
5
Insulation installation.
Insulation layer with a thickness of 100mm of mineral woolKeel with models of 30 * 30 *
3 AngleOutside the guard with the color plate thickness of 0.5mm. The insulation effect,
can effectively prevent condensation, and are not easily fall off.
Electrical control.
ESP using computer control, with a variety of control functions, and multiple automaticprotection from man-made factors that lead to the abnormal operation occurs, user-friendly to
use, to ensure the stable operation of highly efficient dust collector.
Outer casing.ESP outer casing steel structure to withstand the internal components, insulation weight, ash
load, wind load, snow load, roof live load and negative pressure. Such as Figure 1:
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
6/54
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
7/54
7
Anode and the anode plateAnode plate for the C480 board, hanging on the anode vibration marked. Such as Figure 2:
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
8/54
8
1 : 40
F-F
1:2
C
F F
B
B
A
A
1
2
3
1:3
B-B
M
The direction of C
1:10
1:10
65
1:10
The direction of N
N
The direction of M
1:10
1:10
The direction of L
4 5
16
17 18
1:4A-A
15
1:5
P 12
The direction of P
1:5
B
1:3
13 14
C
1:3
1 : 40
(show only limit rake, cover p late)
L
41.5
76
Anode system
NO. Code Name Quantity MaterialSingle Total
WeightRemarks
Weight Scale
1 G22.3.1 Anode vibration system 1 4100.1 4100.10
2 G22.3.2 Anode plate row 90 234.94 21144.60
3 G22.3-1W Ground Round L=250 30 6/Q235-A 0.1 3.00
4 GB/T41-1986 Nuts M16 720 0
5 GB/T5781-1986 Bolt M1630 720 0
6 G22.3.3 Limit Rake 12 6.01 72.12
7 T3-8 Closure plate 6 1.5/Q235-A 0.16 0.96
8 G22.3-2 Positioning channel 6 [100485.3/Q235-A 64.04 384.24
9 G22.3-3W Pin L=60 90 10/Q235-A 0.04 3.60
10 G22.3-4 Limit board 12 6/Q235-A 1.05 12.60
11 G22.3-5 Limit board 6 6/Q235-A 1.16 6.96
12 G22.3-6W Limit bar L=130 18 16/Q235-A 0.2 3.60
13 G14.3.4 The lower plate connection lever 45 8.43 379.35
14 G14.3.5 The lower plate connection lever 45 8.3 373.50
15 G22.3-7 Anti-rocker cubicle 6 8.38 50.28
16 T3-9 Plate limit card 90 0.16 14.40
17 GB/T5781-1986 Bolt M615 180 0
18 GB/T41-1986 Nuts M6 180 0
All / See Technical Requirements 25
(onlydisplay board placed between the anti-board)
grounding bar and roof beam conn ections,to ensure good grounding anode;
implementation of the installati on.
Spot / All
Head and tail and the interval of 3 row spot3
The direction ofB(onlydisplayboard placed between the anti-board)
The direction ofC
Bottom plate All5
All5
Anode plate rowAnode plate row
All 3
Spot / All
All / See Technical Requirements 35
Head and tail and the interval of 3 row spot
G22.3
Lower pressure parts
Side spoiler
Limit Rake
G22.326549.311:120
1:3
Technical Requirements
1. All bolts, nuts tightened after the installation of spot welding;
2.Pin and the lower connection p late welding rod after the insta llation, sales channel and location not welding,
And positioning the lower plate channel connection rod end to en d and the middle spot after installation;
3. Each row that connect with anvil beam vibration should have a dust collection plate will be h anging panels A
4. Seal plate and side spoiler not welding, you must first insta ll limit rake closure plate in place, then the8 9 11
10
35
Figure 2.2 Anode Components
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
9/54
9
Cheng pot of Henan Province
Environmental Protection Co., Ltd.
Weight Scale
Code Name Quantity Material
Single Total
WeightNO.
7
8
6
The direction of B
1:8
5
8 5 50(100)
A-A
1:2
I
B
A
A
Technical Requirements
1. Welds should be removed, may not have bumps or welding scars, removal of flash;
2. Tolerance: After installation, the plate plane is 5, the diagonal deviation is
3. Dislocation of the error between the plates is less than%% P1.5;
4. GB/T6170-1986 high strength nuts and bolts GB/T5783-1986,On-site installation,
the anode plate and the plate lifting beam connection must use torque wrench
1:2
1
3
4
2
G22.3.2234.941:20
1 T 3- 9 Plate limit card 6 0.16 0.96
2 G22.3.2.1 Anode plate 4 52.2 208.80
3 GB/T41-1986 Nuts M6 12 0
4 GB/T5781-1986 Bolt M615 12 0
5 T 3. 4 Pin Component 2 0.6 1.20
6 G10.3.6.2 Plate lifting beam 1 23.98 23.98
7 GB/T6170-1986 Nuts M16 8 0
8 GB/T5783-1986 Bolt M1640 8 0
G22.3.2
Edge BeamEdge Beam
Spot / All
Spot / All
All5
The lower plate connection lever
less than 5;
to tighten, tighten the nut edge of 135N.m,after the spot firmly tighten. Anode plate row
Edge Beam
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
10/54
10
Figure 2.3 Anode plate
The direction of A
1:33 C
D
5
3 D
Technical Requirements
1. Windproof trench line is 8;
2. Anode plate by rolling, the surface should be smooth, not a tear and severe scratches,
transition should be smooth rounded corners, end cut to flat and smooth, no glitches;
3. Anode plate manufacturing machinery industry standards JB/T5906-1997 should meet the
4. Anode plate peg board shall meet JB/T5911 weld quality requirements.
2
1.5
1
1.5
A
BB
3
C
G22.3.2.152.20 1:6
G22.3.2.1
NO. Code Name Quantity MaterialSingle Total
Weight
Weight Scale
2 480C Template L=8000 1 1.2/SPCC 48.76 48.76
3 T3-14A A lower connection plate 1 4/Q235-A 0.94 0.94
1 T 3- 6 Hanging board 1 4/Q235-A 2.5 2.50
Remark
Show only the anode plate
The direction of B
Show only the anode plate
requirements;
Anode plate
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
11/54
11
Cathode and cathode ray.Cathode line is rounded thorns, hanging on the cathode oscillator cathode marked. Such as Figure 3:
Cathode v dy cathode.
Figure 3.1 Cathode parts diagram
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
12/54
12
Technical Requirements
1. All insulators need to be properly protected from welding slag splashing on it;
2. Cathode frame must be inspected by the hoisted to meet the requirements of its
3. Outermost two rows of the cathode frame and the connection will prevent the
4. A total of 13 connecting sleeves: one each in the head and tail, one every 3
5. Cathode frame painted yellow paint on the main mast to the top.
124
1:2
11
10
9
8
1:10
F-F
H-H13
H H
1:10
1:10
I
14
15
16
17
18
19
20
21
221:2
12
12
A-A
1:10(Show only electric heater)
E
4
AA
1
2
3
4
6
The direction of E
1:107
5
FF
G22.41:100
G22.4
Weight Scale
RemarksSingle Total
WeightMaterialQuantityNameCodeNO.
BC50-3
Cathode system
1 G22.4.1 Cathode rapping 12 51.75 621.00
2 G22.4.2 Incubator 1 7533.6 7533.60
3 T 4. 8 Temporary Hanging 4 3.3 13.20
4 G22.4.3 Cathode lifting beam assembly6 250.91 1505.46
5 G22.4.4 Cathode framework 84 86.22 7242.48
6 T4-29 Electric heater 12 0
7 T 4. 5 Heater bracket 36 0.54 19.44
8 G22.4-1 Anti-pendulum 6 [100485.3/Q235-A 59.54 357.24
9 G1.4-1 Anti-swing frame stiffener 9 [100485.3/Q235-A 20.7 186.30
10 GB/T5781-1986 Blot M1040 18 0
11 GB/T41-1986 Nuts M10 18 0
12 G22.4-2W Pin L=100 1688/Q235-A 0.04 6.72
13 G22.4-3W Connection sleeve L=270 12 Pipe DN202.75/Q235-A 0.4 4.80
14 T4.11.1 Support Block 12 23.7 284.40
15 T4-18 Insulator under the washer 12 2.5 30.00
16 JC222-79 Filler L=5000 12 16/Linear Asbestos 1.25 15.00
17 3358 Pressure Insulator 12 0
18 T4-17 Insulator washer upper 12 1.3 15.60
19 T4.12 Bearing flange 12 17 204.00
20 T4-16 Washer 12 5/Asbestos rubber sheet 0.1 1.20
21 T4-31 Nuts I 12 125/Q235-A 2.3 27.60
22 T4-7 Rapping closures 12 90/Q235-A 0.9 10.80
5/Asbestos rubber sheet
5/Asbestos rubber sheet
All5
Flue gas flow
All
5
See Technical Requirements 35
All
All 5
All 3
flatness and cathode hanging beam welding;
pendulum pin spot,and then every two rows of the pin spot, but should pay
attention not to sell anti-pendulum welded together with the rest frame and
the cathode off the cathode beam hanging all removed after welding;
rows of welding;
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
13/54
13
Figure 3.2 Framework cathode
1:3
1:3
16 3
323
32
A-A
1:3
23
1:3
1:3
43
2
AA 83
1
3
4
5
6
7
Technical Requirements
1. Cathode frame combination, the plane is 10 degrees;
2. To ensure the straightness of the corona wire, welded front line should also be
applied in all corona 180 ~ 360N preload,welded wire straightness of the corona is 4.5;
3. Strengthen the pipe and horizontal pipe, the main mast welding, repair welding at the intersection;
4. All welding should be the order of welding technology welding, acupuncture needle and horizontal
5. Acupuncture line reserved for the length L = 50, reserved length of the amputated after welding;
6. Welding firm, to remove welding slag;
7. Cathode frame painted yellow and paint the top of the main mast to show marks.
G22.4.486.22 1:50
1 G22.4.4-1Mainmast tube
1 Pipe DN403.5/Q235-A
36.84 36.84
2 T4-45 C Strengthen the management I 2 Pipe DN253.25/Q235-A 0.8 1.60
3 G22.4.4.1 Acupuncture Line 8 0.69 5.52
4 T4-47 C Horizontal tube I 2 Pipe DN253.25/Q235-A 4.2 8.40
5 T4-48 C Horizontal tube 3 Pipe DN202.75/Q235-A 2.9 8.70
6 T4.22 Acupuncture Line 24 0.89 21.36
7 T4-46 C Strengthen the management2 Pipe DN253.25/Q235-A 1.9 3.80
G22.4.4
RemarkTotalSingle
WeightMaterial
ScaleWeight
QuantityNameCodeNO.
Top
This range may not havewelding slag splashing
16/Weld length not less than 63
lines of parallel lines, as shown in enlarged Figure ;
Cathode framework
welding slag splashingThis range may not have
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
14/54
14
Figure 3.2 cathode ray
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
15/54
15
1
A-A
Technical Requirements
1. In the cathode without any hard and fast line bend and crack the gap;
2. Acupuncture thorn in the full assurance are located on a straight line.
A A
2
2x45
G22.4.4.1
G22.4.4.11:10.69
2 G22.4.4.1-2W Cable needle 56 2/1Cr18Ni9Ti 0.0011 0.06
1 G22.4.4.1-1W Bar 1 Cold drawn bar8/Q235-A 0.63 0.63
RemarkTotalSingleWeightMaterial
QuantityNameCodeNO.
Weight ScaleAcupuncture Line
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
16/54
16
Vibration system.Anode and cathode are used at the top of the electromagnetic vibration hammer rapping, such as Figure 4:
Figure 4.1 Anode rapping
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
17/54
17
10
1:10
1:8
1:3 A-A
1:3
Technical Requirements
1. All of vibration of the vertical bar is 2;
2. Electromagnetic vibration hammer rod center line and center line of coaxial 2;3. Electromagnetic hammer rod center line center line of coaxial and magnetic
4. Magnetic hammer vertical bar is not more than 1mm;
5. All the anvil beam welding and cutting boards must be firmly; welds should be3
13
12
11
7
2
5
4
7
6
89
10
1
AA
G22.3.14100.101:100
1 G22.3.1.1 Three head of the anvil beam 30 96.77 2903.10
2 T3-12 Uniform plate vibration 90 4.0 360.00
3 T3-13 Uniform plate vibration 90 1.1 99.00
4 T200A Electromagnetic Hammer 30 14.6 438.00
5 T200-3 Magnetic hammer stick 30 6.2 186.00
6 T3-7A Support screw 90 16/Q235-A 0.5 45.00
7 GB/T41-1986 Galvanized nuts M16 450 0
8 Hoop 6476 30 0
9 T 3- 1 Hyperion round anode 30 0.2 6.00
10 T3-2 Anode plate vibration 30 4.5/Q235-A 2.1 63.00
11 GB/T5781-1986 Galvanized bolts M1640 90 0
12 GB/T95-1985 Galvanized flat pad 16 450 0
13 GB/T93-1987 Galvanized flexible pad 16450 0
NO. Code Name Quantity MaterialSingle
TotalWeight Remarks
Weight ScaleAnode vibration system
hammer of not greater than 0.5mm;
removed, not a bump.Row of the center line of anode plate
Both ends of the continuous welding of 100 / All
10 50(100)
Anvil beam vibration
Uniform plate vibration
Cutting board
Anode plate rowAll 5
All8
G22.3.1
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
18/54
18
Figure 4.2 Cathode rapping
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
19/54
19
G22.4.151.75 1:25
9
8
6
7
5
4
10
14
13
12
11
A-A
1:3
2
1
I
AA
1:2
I
19
12
18
17
16
15
3
1 T200A Electromagnetic Hammer 1 14.6 14.602 T200-3 Magnetic hammer stick 1 6.2 6.20
3 Hoop 5170 1 0
4 T 4-8 Hyperion round cathode 1 Rubber 0.2 0.20
5 T 4-9 Cathode plate vibration 1 4.5/Q235-A 2.2 2.20
6 G22.4.1.1 Functional Block cathode rapping 1 5.01 5.01
7 JC222-79 16 Asbestos L=3000 1 0.75 0.75
8 G22.4.1-1 Cathode rod vibration 1 50/Q235-A 12.29 12.29
9 YJF520-70 Shaft vibration insulating polymer 1 0
10 T4-10 Biconical coupling sleeve2 90/Q235-A 4.5 9.00
11 GB/T5781-1986 3 0
12 GB/T41-1986 15 0
13 GB/T95-1985 15 0
14 GB/T93-1987 15 0
15 GB/T5781-1986 Galvanized bolts M615 1 0
16 GB/T95-1985 1 0
17 GB/T93-1987 1 0
18 T3-7A Support screw 3 16/Q235-A 0.5 1.50
19 Cathode ground vibration L=250 1 BVR-300/500V1x2.5 2 0
CodeNO. Name Quantity MaterialSingle
Weight
TotalRemarks
ScaleWeightCathode rapping
G22.4.1
Galvanized flexible pad 16
Galvanized flat pad 16
Galvanized bolts M1640
Galvanized nuts M16
Galvanized flexible pad 6
Galvanized flat pad 6
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
20/54
20
Automatic control system.
Top of the electromagnetic rapper works:Top of the electromagnetic vibration is a more common use of ESP's cleaning methods. It is an electromagnetic coil rapper pulsating DC input
rated voltage, through the power of the input coil of the precise control of pulse number, so that the coil below the rapping hammer under the
action of gravity in the electromagnetic, instantly elevated to a high degree of reservation, and then showed a free fall drop, hit the bottom of the
rapper vibration rod, along the vibration rod, the vibration force transmission to the electric field inside the anode plate (also known as dust
collection plate), or cathode line, the absorption lines in the anode and cathode plates loose dust falls to the hopper, to complete a vibration play
cleaning process.
Top of the electromagnetic vibration control cabinet control principle.
Top of the electromagnetic vibration control cabinet is to control the cleaning power of ESP to play hammer MRI equipment. ESP field will be
all of the anode and cathode rapper connected to the output by a certain order of the ranks of online matrix. AC frequency conversion by the
isolation transformer, the output of dual-phase AC power to the control board, control board in the phase rectifier, the output of a pulse of current.
The positive DC line connected to the matrix palette, negative pole to the column matrix palette. The timing by the PLC program control within
the ranks of the matrix rows palette selection, column selection switch, make the connection in the matrix of the rapper have a certain order eachelectric work. Man-machine interface, users can program the vibration of the PLC cycle, cycles, vibration intensity, vibration and other
parameters change intervals to achieve the best cleaning results.
Picture 5.1 Top of the system matrix of electromagnetic vibration control block diagram.
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
21/54
21
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
22/54
22
3. Performance parameters.
No. Item Unit Contents
1ESP models
BGD50m2/3
2The effective area of ESP
m2 50
3Processing gas flow
Nm3/h 110000
4The temperature of flue gas 0C 160
5The total number of channels ESP
14
6The distance of same polar
mm 450
7High of the electric field
m 8
8Effective field length / width
m/m 12/
9Room number / field number
1/3
10 Flue gas flow rate / residence time m/s/s 0.61/19.67
11Dust area
m2 2580
12The resistance of ESP
Pa 300
13The air leakage rate of ESP
% 3
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
23/54
23
No. Item Unit Contents
14ESP inlet dust concentration
g/m3 25
15 Design efficiency 99.8
16Design exit dust concentration
mg/Nm3 50
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
24/54
24
4. The information provided drawings
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
25/54
25
Field Length m
Number of rooms
Tubular
298
400
14
2450Collecting area m
Electrode spacing mm
Corona electrode type
Style of anode plate
Number of channels
2
ESP pressure loss Pa
Height field m 6.5
Fish Bone Cable +
Single Room
91211
18
14
16
15
17
13
150
Max temp(duration of 30min)
10
INDICATORS
30
150
350
99.75
0.84
402
3
3
3 110000
Technical characteristics
6.0
NO.
5
7
6
4
3
2
1
9
8
Outlet of dust concentration mg/ Nm
Inlet dust concentration g/Nm
Design efficiency %
Design pressure K Pa
Wind farm m/s
Normal operating temp
Flue gas volume handled m/h
Nominal cross-sectional area
TITLE
auxiliary electrode
Number of farms 3 field
of the electric field m
GN-72/3-2S-X
GGAJ02-0.4A/72Kv
Star unloader 523 YJD-CX-16-1.1-24
TG0123
TG0122
TG0121
TG0120
GB41-86
GB5781-86
BGD40.14
End of the incubatorBGD40.12
11
BGD40.5
18
17
16
13
14
15
BGD40.10
BGD40.11
BGD40.13
Central i ncubator 2
2
3
Manhole 4
1
1
Bearing
End into the line of incubators
9
8
7
10
12
6
5
4
Cathode vibration transmission
3
3
3Anode rapping
Hopper 3
1
1
Ladder platform
Outlet
Cathode
Anode1
1
3Cathode rapping
BGD40.9
BGD40.8
BGD40.7
BGD40.6
BGD40.4
BGD40.3
BGD40.2
Inlet
TITLE
1
CODENO.
2
1
AMOUNT
12
RRMARKWEIGHT
MATERIAL
3 Welding parts1
BGD40.1
Cathode hanging
Case
2009.5
BGD40.0
1
ASSEMBLY PARTS
TOTAL DIAGRAM
ESP BGD40-
DWG.NO.
MATERIAL PRO.NO.
QUANTITY PROPORTIONGR.WTSI.WT
GRANTED
CHECKED
DATERRMARK
DATE
GRAPHICS
DRAWN
Q235
High-voltage isolation switch cabinet
Rectifier transformer
Bolt M16*50
3
3
72
19
20
21
22 72Nuts M16 Q235
BGD40/3-TZ-1
FerroconcreteConcrete Support 12 4 B GD 40 .1 5
25 1Ladder to go lower Assembly Users themselves
Design Institute
BGD40.16
GR.WTSI.WT
Anode vibration transmission
Central line incubators
Assembly
Assembly
Assembly
Assembly
Assembly
Assembly
Assembly
Assembly
Assembly
Assembly
Assembly
Assembly
Assembly
Assembly
Assembly
Welding parts
Welding parts
Welding parts
Welding parts
Welding parts
26
27
Imports of flue 1BGD40.17
1Inclined multi-tube dust collectorBGD40.18 AssemblyWelding parts
TITLE
ash gate valveStar unloader
Dust wettingEnmasse conveyor
1234
Conveying system device configuration table
YJD-16300*300
MS32-17.5m
TS
DZ-60
AMOUNT
55
11
NO.
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
26/54
26
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
27/54
27
t30 embedded steel produced by the relevant specifications
Welding with solid concrete beam reinforcement
3. Peripherals platform width determined by the civil engineering design.
REMARKS
1. Embedded steel hook steel nails should be welded with the construction beam.
the embedded graph does not allow precise tolerance.
2. Graph embedded bolts should be given strictly according to the spacing of
2. Dynamic load factor of 1.1.
124
96.3
49.648.365.063.1
233467
27.8
233
B 1A 21A
467467
99.2
233
41.4
233
40.5
46.6
467
Load(KN)
Vertical load
NO.
The horizontal load
Load form the basis of ESP
1. Load unit is kN, load, including body weight, insulation weight,
of X direction
The horizontal load
of Y direction
wind load,ash weight, snow load and seismic loads.
1:80
Environmental
1.0Construction
Specifications
Design stage
PROPORTION
Professional
BGD40/3-TZ-2
ESP BGD40-Provide funding information 2
Equipment financing plansprovide the basis
Protection
of drawing
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
28/54
28
Description of the conditions of electrical
DWG.
Phase marker
Power(kw)
Electrical condition table
NO. TITLE TS AMOUNT DC output current(mA)AC input current(A)AC input voltage(V)Drive ratio(i) DC output voltage(kV)
1. All the requirements of operating in the motor control switch and divided into on-site control room switches.
Control room set up manual and automatic adjustment of two ways.
2.Each electric heater requires the ability to open and stop individual
3.Distribution of the cathode plate vibration is continuous rapping rapping, rapping anode time control range of 0
to 0.5 hours until the equipment running, the equipment of professional practice at the scene determined in the
corresponding period of vibration (press recommended design cycle , each motor is run intermittently, 40 seconds
after the motor is running, stop the motor 60 to 150 seconds.
4.All low voltage distribution electrical wiring and switches are the identification and preparation of
professional materials.
5.ESP need to set up a separate grounding, grounding resistance in a variety of climatic conditions should be less
than 2, Manhole cover need to be flat with 4 50 connected to the grounding grid.6.Require the inspection door on the electrostatic precipitator, and the high-pressure rectification Manhole room
door, high voltage power supply control cabinet to set safety interlock, the housing should be provided around the
access door \"security maintenance light\" power to prepare for maintenance purposes.
7Number of devices over a single TPC Filter configurations.
8The total power 194.72KW. NO.
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
29/54
29
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
30/54
30
1.The top of the incubator and cathode vibration transmission incubator temperature control on the
Description of instrument conditions
2.The specific location of the meter into the line of professional positions by the total layout of
Equipment condition table
3.the instrument flange interface according to GB9116-88 Dg40/Pg2.5.
TSAMOUNTTITLE
ESP BGD40/3
Provide funding information 4
DWG.
The length of insertiontemperature range ( )TL(mm)
Equipment condition table
4.The number of instruments to single TPC Filter configurations.
5 WZP-120 500 0-500 150
BGD40/3-TZ-4
devices(mm)
establishment of two points selected in the filter and out-side installation of two point
temperature controller.
the figure, the temperature control of the display screen in the control room instrumentation.
Control requirements: When the incubator gas temperature 220 , all the electric heater power.
NO.
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
31/54
31
ConstructionDesign stageOverlooks the SketchSpecificationsof drawing
Professional
PROPORTION
EnvironmentalProtection
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
32/54
32
ConstructionDesign stage
Specificationsof drawing
Professional
PROPORTION
EnvironmentalProtection
High-
voltagecontrol
cabinet
High-
voltagecontrol
cabinet
High-
voltagecontrol
cabinet
Low-
voltagecontrol
cabinet
Incoming
Cabinet
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
33/54
33
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
34/54
34
5. Quality assurance system.
1Quality assurance system introduced.
Our company has passed ISO9001 international quality guarantee system, the company
provides equipment to ensure product quality, specially formulated .
The system shows the company through the quality assurance system of the composition, the
quality of the various functional departments of the responsibility, justifies the means, the
formation of functioning and effective quality assurance system. The system set forth in the
request, primarily to detect and prevent equipment in the manufacturing process of actual or
potential quality issues to the principles and objectives described system to control the impact
of equipment manufacturers and service quality, reliability and quality of equipment
implementation of all activities and quality assurance process to ensure the system's effective
implementation.
1.1 Scope
GB/T9001-ISO9001 Management, design, procurement, fabrication, inspection process
design, financial, file, integrated management of quality systems.
1.2 Management responsibilities
1.2.1 Management policy and quality objectives
1.2.1.1 Quality Policy
1.2.1.1.1 Our company strictly enforce quality assurance system
standards, improve product quality, strengthen quality supervision, so that transformation of
production equipment, the transfer to the "double standard" to meet the ESP project, the first
class level of need.
1.2.1.1.2 Establish the idea of serving for the owners, high-quality products with competitive
markets.1.2.1.2 Quality objectives
1.2.1.2.1 Product qualification rate reached 100%, the whole quality of products to the first
grade.
1.2.1.2.2 Equipment arrives, inspection, installation, operation a success.
1.2.1.2.3 Equipment arrival information is available, accurate, and timely transfer of the
owners.
1.2.2 Responsibilities
1.2.2.1 Corporate leadership
A The general manager of corporate quality policy and quality system of designated
establishment, improvement and implementation of the bear full responsibility;
B Corporate vice president, general manager to help implement the quality policy and qualityassurance system implementation;
C Enterprise chief engineer in the implementation of quality policy and quality assurance
system in operation, fully responsible for technically.
1.2.2.2 Responsibility for the quality of the various functional departments
Production enterprises, responsibilities, and information activities carried out by all the
information related to the functions given to the relevant departments and personnel
responsibilities and privileges GB/T9001-ISO9001 quality assurance system
accountability.
1.3 File management
1.3.1 Purpose and Scope
1.3.1.1 For information on receiving documents relating to the activities, collection,preparation, review, approve, publish, distribute, modify, archive to make provisions to
ensure that all departments and personnel with timely, accurate and correct use of the latest
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
35/54
35
version of the file.
1.3.1.2 Used in the production of quality products, document management, the management
of the file should have at least the following:
ADesign documents: such as design drawings, technical specifications, design changes,
general assembly drawings, and materials.
BContracts and procurement documents.
CQuality assurance documents.
DInspection records and inspection of all parts visa.
EMajor equipment and raw materials, documents and the material proof of the factory.
FThe process plan, production plan, report.
GOther key documents.
1.3.1.3 Theestablishment,approval publication of documentation, ,
Quality used in the production of various documents, after preparation of staffing generally
superior leadership or the relevant department for approval, and unified registration,
numbering and promulgation.
1.3.1.3.1 Document must be approved by the original examination and approval to change the
rear prospective effect, and promptly notify the relevant departments and personnel, toprevent the use of inappropriate files.
1.3.3.2 By the Reference Room of the documents, strict implementation of document records
management system, delivery of the documents requested by property owners to surrender.
1.4 Procurement Management
The scope of the Company's equipment and materials procurement, the Supply Department is
responsible for procurement, purchasing and implementing of foreign policy of quality and
cheap, to ensure that the procurement of material to meet the requirements to safeguard the
interests of users and enterprises.
1.4.1 Selection of qualified sub-suppliers
Ministry of Supply with the supplier to establish a close working relationship and feedback
system, and supply units from the production, technology, quality, and other aspects of study,objective evaluation and selection of suppliers, the Supply Section to establish and save the
selected qualified sub-supplier of the file.
1.4.2 Procurement documents
Ministry of Supply's purchase of the various sector plans, the use made of the quality system
standard units in order to sub-order with the supplier, the procurement documents for
examination and approval before being implemented.
1.4.3 Verification of material procurement
Procurement of material for verification, or in the source at the factory when, all purchases
must be marked with the manufacturer matter the name of the factory inspection certificate
and the certificate shall not be used.
1.5 Process Control
1.1 The general plan of the electrostatic precipitator by Zhengzhou boiler environmental
design, sub-part drawing of the General Plan and the technical requirements for
manufacturing, and quality in order to achieve predetermined objectives, in all parts of the
preparation of various types of technology before processing program file, the quality of
products be controlled.
1.1.2 Strict implementation of standards do a good job GB/T19001-ISO9001 review the
contract and other work permits.
1.1.3 Purchase equipment, materials, processing, testing and inspection standards than
specifically stated, have adopted national standard and metallurgical industry standards.
1.6 Inspection and Testing Control.
http://showjdsw%28%27jd_t%27%2C%27j_%27%29/http://showjdsw%28%27jd_t%27%2C%27j_%27%29/ -
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
36/54
36
1.6.1 Incoming Inspection and test procedures according to Manager of Industrial Materials
1.6.2 Inspection and test piece prepared by pre-test quality plan and outline of the results of
careful inspection and testing for the record, collate and prepare the transfer of project files.
1.6.3 During the course of the process, the quality control personnel to monitor and control
the process so that process quality to meet the requirements.
1.6.4 Inspection and test equipment according to factory inspection, test equipment
management and measurement management system to ensure the reliability of measurementand test results.
1.7 Quality Records.
1.7.1 Quality records as objective evidence of quality activities, records must be true, timely,
legible, fully annotated with the date of signature, and traceable.
1.7.2 Standardization of quality records required by hand custody transfer request by the
owners.
The outline of the purpose: According to GB, T19001-ISO9001 quality assurance
requirements, establish and perfect product quality system and continuously optimize
processes, improve the process, to take the principle of prevention to ensure the electrostatic
precipitator equipment to provide quality products and best services.
1.8 Specific quality assurance measures1.8.1 Procurement of materials, quality control
a) For the production of raw materials from qualified sub-contractors, and provide
material certificates.
b) Raw materials into the production process must have passed the test, the failure to
eliminate production of raw materials.
c) Profiles, sheet metal surface should be no rust, no cracks, no significant effect on
material properties and interlayer defects, physical and chemical special materials should be
reviewed, and save records.
d) Welding rod, wire and inspection certificate should be recorded. Testing personnel
should be verified.
1.8.2 Production Process Control
a) In strict accordance with the drawings of the process of order execution, the main
components of the implementation of the first seizure, inspection and final inspection, and
make a record.
b) Processes occur on a substandard products may not be transferred to the next process.
c) As the operation of the welder, welder must hold a certificate, all butt welds must be
welded completely.
d) The main components before welding groove should the weld volume and the wrong
side of the gap to check the connection should be in the welding grease, rust cleaned, weld
dimensions and specifications should be strictly according to pattern and process regulations.
The operator should be prepared to self-test, the examiner to do special inspection, and makea record.
e) Workshop on the use of the electrode type, welding equipment, welding process
parameters by strictly controlled to ensure the effectiveness of the welding process.
f) Profile after cutting the leakage to go to hair removal in the outside section of the
assassination. On the steel plate cutting should ensure straightness, squareness.
1.8.3 Welding Inspection Control
a) Press to test control."
b) Important bearing on the splicing components to ensure thorough and fusion welding
state.
c) Detection of the weld include: appearance, crack, welding slag, splatter and scale
appearance.1.8.4 Assembly test control
a) Important parts of sub-parts factory before shipment to the assembled group of tests.
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
37/54
37
Straightness measurement, the size of population size, installation and assembly of pitch
relationships, and make a record.
b) Board assembly test chip hopper.
Measuring height, the upper and lower mouth size, installation pitch, and make a record.
c)Workshops according to process requirements do a good job matching parts and pieces
of identification test group.
1.9 Rust, paint quality control
a)Rust and paint removal procedures in strict accordance with the implementation
process. Check the certificate should include the paint, specifications, quality and paint
removal rust thickness.
b) Packaging according to the process control requirements.
c) Processing in the process, should strengthen the process discipline, self-test, the first
seizure, inspection and final inspection, the quality of accident prevention, fail to meet the
strong isolation procedures should be required to prevent the mix.
d) Inspection records should be the main components.
1.10 The four aspects of product quality management.
a) Product design quality: I produced drawings of the equipment in strict accordancewith the relevant information provided by the user design.
b) Manufacturing quality (slightly simple: control of product quality assurance by the
manufacturer)
c) Installation quality: I may take bids for equipment installation, commissioning
(through the installation to ensure the quality of the whole machine), installed and running
JCJ03-90 standard.
d) Management and use of quality: the tender equipment in the contract itself, the
quality of the warranty period for equipment failures, the company responsible for the free
repair and replacement parts, out of contract, warranty, or improper use of lost, damage and
failure, the company continues to provide good services and benefits to provide a variety of
accessories.
1.11 Process Assurance Plan
Our company produces electric dust collector 10 years of history, through the
introduction, digestion of domestic and foreign advanced technology and constantly
strengthen the process management, the company's products have reached the electrostatic
precipitator of the current international advanced level. Our company attaches great
importance to the production process, the process set up special department with overall
responsibility for: preparation of product technology, design, management, discipline
inspection, process of production of major technical problems in the work. Ensure the
production of each piece of equipment is customer satisfaction, quality brand-name products.
a) Designed to ensure that the materialFor the general structure of materials using electrostatic precipitator quality carbon
structural steel; high-temperature electrostatic precipitator for the main force, heating the
structural materials used 16MN steel, special requirements, the corona wire of stainless steel.
b) The main force of ESP components commonly used in welding welding standards
DIN8563 main seam to B, to C-level general weld, in accordance with the relevant
requirements, the necessary magnetic particle testing, ultrasonic testing, "X" ray detection.
c) Design and evaluation of welding
Welding technology is the main force for the force weld parts, welded to the preparation
of a detailed process card, its content includes process welding method, welding material,
welding process parameters, treatment before welding, after welding, technical requirements.
Welding Welding procedure qualification refers to the organization management, qualitymanagement, production management and other experts in the preparation of a good process
documentation review, and to make corresponding welding specimens, state certified welding
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
38/54
38
testing agencies to test, test qualified, and through the assessment process can be used to
guide the welding.
d) The main components of operating instructions.
We are the main components of electrostatic precipitator (such as plate, polar, roof
beams, columns, end wall, side panels, etc.) of the production process to write operating
instructions. It includes components for processing the sizes of materials, allowance, margin
deformation, work order, use of equipment, control parameters, measurement methods.Specific guidance for each component of the production process.
e) Point control key processes
The production process of the key processes (such as the production of plate rolling mill
production line, pole line production line, corona wire frame production line, etc.) the
implementation of key process controls. In accordance with the ISO9001 quality system
requirements, statutory person to person, setting parameters, regular assessment, on a regular
basis assessment, so that each moment of quality parameters under control to ensure product
quality and stability.
2The main production equipment and testing methods
Henan Province Environmental Protection Co., Ltd.whose production base is located in
Industrial Park of Zheng zhou boiler Co., Ltd in Zhengzhou, sub-urban areas, thedevelopment zone two bases, covering 500 mu, with a comprehensive range of modern
production workshop. Boiler Co., Ltd. Zhengzhou is the former Ministry of Machinery of key
enterprises, strong technical force, advanced equipment, anode plate production line with a
C480, RS prick line production line, bag cage production line, submerged arc welding
machine, membrane wall welding machine, large full cutting machine tools, 60mm large
rolling machine, CNC plasma cutting machine, 1200T hydraulic press and other types of
more than 200 sets of advanced equipment.
2.1 The main production equipment table
The following section steel for 200mm G4035 Saw Cutting Machine
150-600mm of the section steel with a
straight
315T Straightening Machine
2-6mm steel plate for unloading 6*2500 Cutting Machine
7-13mm steel plate for unloading 13*3100 Cutting Machine
13-25mm steel plate for unloading 25*3150 Cutting Machine
the complex shape of the plate material
for unloading.
GSJ-5000 CNC cutting machine
For 3-16mm flat steel plate 16 * 2500 Flat Plane
The major mechanical parts for long weld CO2+Ar
The framework of the corona electrode
for drilling holes
BFZ314 porous diamond drilling
Rolled plate with Plate mill
Polar production Epipolar line
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
39/54
39
2.2 The main means of detection.
And column alignment
Wall permeability leak
Correction connected with the construction based on the level of detection
Pole spacing error control
6. Installation and use instructions
1. Scope
1.1 This guide is intended to install their own ESP. Technological improvements and
repairs can also refer to the manual implementation.
1.2 The same type of ESP and special provisions for certain products is inconsistent
with the instructions, special provisions should be implemented.
1.3 Standard reference
JB/T5910-1997 ESPJB/T8536-1997 ESP technical conditions of mechanical installation
JB5908-1991 The main components of ESP sampling and storage of packing and
shipping specifications
JB/T5906-1997 Anode plate electrostatic precipitator
JB/T5909.1-4 ESP with porcelain insulators
2. Equipment custody and out of the box device
2.1 Equipment arrived at the scene, keep the following requirements:
2.1.1 A solid foundation to rational distribution of stacking space, easy shipping,
operations, and prepare facilities for flood control waterlogging.
2.1.2 Product stacking process to comply with pre-installed and installation requirements,
avoid multiple out of luck to prevent deformation.2.1.3 ESP part of packing and shipping, marking, storage compliance JB/5908-1991
requirements.
2.2 Acceptance of equipment out of the box
2.2.1 Equipment out of the box, inventory, factory inspection should be the user, the
construction unit must be present.
2.2.2 Acceptance conditions
a. Supply inventory, packing list and other technical documents are complete.
b. Equipment nameplate models, specifications, quantities consistent with the
engineering design.
c. Check product quality, as a result of transport, handling, storage, changes in the
process of deformation and size, should be corrected, which can not repair and replacement
of retirement should be given.
d. Equipment manufacturers design acceptance criteria based on the drawings, the
provisions of the relevant technical documents and JB/T5910-1997.
3. Preparation before construction
3.1 Installation company should be familiar with the device structure, performance,
design drawings and technical documents related to the preparation of construction design
documents and construction quality cards, make the construction process must be strictly
quality inspection records.
3.2 By construction design requirements for site preparation, platform installation,
hoisting machinery facilities, special equipment configuration and so on.3.3 Porcelain products should meet the JB/T5909.1-4 pressure test requirements.
3.4 Equipment manufacturer for technical tests, if necessary, send representatives to
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
40/54
40
attend the technical guidance during construction.
4. Installation of ESP casing
4.1 ESP installation sequence: Since ESP is a large outdoor equipment, the installation
site of the circumstances and conditions vary, the construction company of AI members and
equipment conditions are not the same, so the construction company can provide us with the
following installation sequence common with ESP selected for construction. ESP bracket has
two forms of steel and reinforced concrete, installed to provide design drawings shall prevail.Installation sequence is as follows:
Preparation and pre-installed Installing areas Be installed
Basis
Steel bracket
Support bearing
The bottom of the beam
Check the hopper
Column on the case
Case plates on the shell side
Ladders and platforms
Check the cathode frame Cathode frame assembly
Framework in place and the cathode ray cathode assembly
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
41/54
41
Installation of cathodic rapping
Cathode hanging installation
Check the cathode hanging Insulator check
Anode installation hanging
Anode plate correction, pre-installed Anode plate, the anode rod assembly vibration
Anode plate in place
Anode vibration installed
Inlet speakers pre-installed The wind deflector of hopper in place
Inlet speaker installation Install inlet gas distribution plate
Outlet speakers pre-installed
Outlet speaker installation Outlet groove boards installed
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
42/54
42
Cathode drive installed
Anode drive installed
Within the roof installed
Cathode insulator incubator installed
The roof insulation
Outside the roof installed
Access to high-pressure Electrical Wiring
ESP External insulation
Final inspection
4.2 Base acceptance: include concrete pillars and steel stent pre-bolt inspection, must
meet the basic requirements of design drawings. The basis of tolerance ( Table 1):
Table 1
Name Lengthm Deviationmm
Column spacing 1010
3
5
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
43/54
43
Diagonal 2020
6
8
Elevation3
4.3 Steel frame
4.3.1 Draw the support of the plane and the contour lines cross the center line, as themeasuring benchmarks.
4.3.2 Steel frame of the bearing surface elevation of the level of tolerance 3mm, thevertical degree of tolerance 5mm.
4.4 Support
4.4.1 In supporting the roof and floor, respectively, cross the center line to draw, as the
measuring benchmarks.
4.4.2 Bearing in strict accordance with drawings to be seated, pay attention to one-way,
two-way support the displacement direction. Prepare the provisional positioning roof
supports, temporary fixed to be reliable, to be put into operation prior to the removal of the
temporary location.
4.4.3 Elevation on the surface of the bearing deviation 3mm.4.5 Bottom beam, ash bucket.
4.5.1 The end of the beam to draw all the vertical and horizontal center line, hoisting
make temporary support. Variable resistance welding to take measures to end after the
installation and support beams to allow contact of cushion, the gap 1mm.
4.5.2 Deviation of the end of the diagonal beams meet the requirements in Figure 1, the
column bearing point elevation deviation 3mm.1 Electric field 2 Electric field 3 Electric field 4 Electric field
8mm 10 mm 15 mm 18mm
4.5.3 hopper wall to seal welding.
4.5.4 wind boards on the gray half-board installation and adjustment after installation ofthe anode, the anode rod arranged for the Department of vibration on the windshield under
the plane and the gap should be strictly according to the drawings, to ensure freedom of
thermal expansion plates, wind deflector on the hopper gap to allow on-site correction.
4.6 Aisle in the Dust.
4.6.1 installed in place when the dust in the hallway, the inflated side not welded shut,
the dust in the hallway for the most part positioning row, row to be installed to adjust the
anode and then welded in place.
4.7 Shell, the roof, take the stairs.
4.7.1 before installing the actual measurement of the length of each column, the
preparation of the corresponding thickness of the plate, draw the center line of the measuring
plane and contour.4.7.2 Deviation of the vertical column to allow 5mm, column level tolerance 3mm,
between columns size 5mm.
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
44/54
44
4.7.3 the end of the flat top beam is not allowed under the curve, but the torsion
tolerance5mm.
4.7.4 After installation, the shell roof ladder and platform installation part of the walk,
the next one to facilitate the installation, walkway installation must be solid and reliable, and
pay attention to thermal expansion.
4.8 cathode and large frame hanging
4.8.1 insulators before installation to make pressure test, required by the relevantstandards, carefully installed to prevent broken pillars on the plane with the group type to
allow elevation 1mm, suspenders and dust cover, porcelain center deviation 3mm.
4.8.2 Cathode framework installation, as shown in Figure 2, the electric field can be
assembled or partly assembled the ground, upper, middle and lower classes are generally
small frame house in the field combined. Framework of the combined requirements:
a. the framework of the same small rectangular control center outperform the two
difference 3mm.b. vertical beam straightness tolerance 3mm.
4.9 Anode
4.9.1 Anode hangers installed.
4.9.2 hangers and the upper small frame spacing deviation 5mm.4.9.3 Cathode cage installed to the plate in place the framework of a single block of
plate calibration, size, shape and position tolerances conform JB/T5906-1997 requirements
such as calibration frame (Fig. 3), with the handling spreader (Figure 4) into the auxiliary
oriented framework (Figure 5) at the same time, each child put a fixed anode board, general
lifting blocks 5-6.
4.9.4 Auxiliary guide frame lifting, lifting methods such as the Ministry of the anode
plate (Figure 6).
4.9.5 Anode into the anode and cathode planes flying between the small frame, in place
after the correction, a very different pitch deviation 10mm.
4.9.6 ESP anode plate in the lower part of convex sets of connections are tight in the end
use, the fastening bolts must be tightened, tighten the requirements for the 160Nm torque.
4.10 Cathode ray installation
4.9.4 Nng dm theo hng ph, cc phng phpnng nhbtm cc dnganode(Hnh 6).
4.10.1 Tubular prick line installation, check the cathode line, installed in strict accordance
with design requirements may not be reversed or inverted, circular hole at the waist and
tightening torque required by plans, ensuring freedom of not very linear thermal expansion
shaking, and then welded the bolts. Anode gap deviation (Table 2):
Table 2
Plate length 7m Cathode, anode spacing 5mm
Plate length7m Cathode, anode spacing5mm
4.11 Cathode and anode installation of the vibration system.
4.11.1 Require the installation of drawings, The coaxial shaft vibration is less than 3mm
can be installed after the vibration hammer, the vibration hammer impact anvil cold center
and design center called the imitation of a point difference between the level of 3mm. Poor
imitation of the vertical center of 3mm.
4.11.2 All parts of the shaft used in all welding welding T506 or T507.
4.11.3 Look for the direction of rotation, manual handling rapping shaft, inspectors arenormal. The direction of power required. Check the operation to ensure normal.
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
45/54
45
4.12 Installed head import and distribution board.
4.12.1 According to lifting capacity, lifting import and export of assembled heads.
4.12.2 Distribution plate in strict accordance with plans in place.
4.13 Pay attention thermal expansion when install the outside top.
4.14 Installed ash bodies and other maintenance Manhole. Manhole installation process
needs to pay attention to open the flexibility and sealing.
4.15 insulation and coating.4.15.1 required by the manufacturer to determine the actual situation with the user
holding institutions.
4.15.2 Coating line with JB/ZQ4000.10 requirements.
4.16 The protection board is securely installed and look beautiful.
5. The problem that should pay attention to during the installation
5.1 The installation program should be developed against welding deformation measures.
5.2 The non-leakage welding, false welding, especially in the inner parts of the weld.
5.3 strictly controlled to ensure the tightness of the shell welding, the welding joints leak
attention.
5.4 It is important to ESPs efficiency and other performance that adjust the electrodedistance,when Cathode and anode installing, adjustment should be carefully checked toensure the spacing error of a very different requirements.
6.Final inspection of installation.
6.1 dismantling all temporary facilities and scaffolding, and welding.
6.2 ESP cleared within a comprehensive, does not allow any tools, debris left behind,
Manhole strictly sealed.
6.3 Insulator port must be clean.
6.4 Check gear oil spaces should meet the relevant standards.
6.5 ESPs case and auxiliary equipment grounding a good grounding bolts, nuts,fastening bolts, nuts, according to construction specifications into the electrical connection to
ground.
6.6 The temporary support removed and placed in specified location.
6.7 Check the cathode insulation resistance should be consistent with JB/T5909.1-4
requirements.
7. Installation and commissioning content
7.1 Acceptance of ESP need to comply with the provisions of JB/T5910-1997.
7.2 ESP debugging in accordance with the " ESP debugging framework "
7.3 Shell tightness test, inspection methods for the infiltration in the form of kerosene.
8. ESP debugging framework
8.1 Debugging content
Electrostatic precipitator to achieve the desired results, must have good quality of the
installation, and post-installation testing and commissioning work is essential to ensurequality of the installation means the content of their work often includes that:
a. ESP inspection and test equipment components.b. Sealing test ESP.
c. ESP inspection and adjustment after installation
d. Check and adjust the low-voltage control loop of ESP
e. Check and adjust the high-voltage control loop of ESP
f. Debug of the ESPs rap device and ash transmiss deviceg. The test of that power of electric heater of ESP
h.The test of the cold-electric load of ESP
I. The test of the hot-electric load of ESP
Note: On the air distribution test, field test results due to better-than-model test results,do not do it on-site air distribution adjustment test.
8.2 Preparation before commissioning the work and safety precautions
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
46/54
46
8.2.1 Commissioning of ESP should be responsible for implementing the installer,
installers, owners, producers, user representatives and other participants, the establishment of
commander and professional person in charge of the commissioning, commissioning,
operation system specific (organization, command, operation volume , personnel),
development of commissioning works, form problems and coordinate the implementation of
the settlement, seriously record debugging problems, solutions and a variety of data, testing
commissioning report after the conclusion of writing, sent to relevant departments.8.2.2 Debugging should carefully read the instructions and the relevant technical
information equipment, familiar with equipment, system design, by commissioning a project
outline, methods, procedures and requirements.
8.2.3 Ready for commissioning work required in the consumption of materials, tools,
grease, and equipment. Instruments are the main:
a. Electrostatic voltmeter 100KV 1 piece
b. Digital Multimeter 1 piece
c. Pliers ammeter 1-5A 1 piece
d. Megger meter 2500V500V Each piece
e. Voltmeter 600V0.5 1 piece
f. Debug tools commonly used electrical 1 set
g. Incandescent bulbs 200V/100W2 1 sethomemade
h. Insulating rod 10KV Three 1 setDischarge with
I. Some signs and bar rope (provided)
J. Plastic multi-core test connection a number of soft wire (Owned)
k. High-energy radio (when the high-level arrangement with) 2.
8.2.4 Scheduling project staff
Total commander 1
Operator 2
Inspector 2-3
People for adjustment 2-3
Electrician 2-3
Liaison 1-2
Total 10-15
8.2.5 Confirmation of several items
a. With public facilities (water, compressed air, electricity, etc.) ;
b. Confirm that the facilities such as power supply, fire fighting equipment;
c. Confirm the main circuit insulation resistance;
d. Sure control loop checks, etc.
8.2.6 Inspect, test results are recorded by the manufacturer, the company installed three
parties signed valid user, need to write a summary report after commissioning by the threeparties signed and filed.
8.2.7 Safety precautions should be consistent with JB6407 standards.
8.3 ESP's inspection and test equipment components.
8.3.1 Check the main insulated high-voltage network components, such as: high-voltage
isolation switch, porcelain insulation suspended cathode, the cathode insulating ceramic shaft,
wall bushing, etc. need to be qualified by the pressure test: The measurement of high voltage
megger 2500 network, the insulation value should 1000M above.8.3.2 Transformer high-voltage rectifier assembly debugging, check the rectifier
transformer shall be exhaust gas relay.
8.3.3 Check operation of high-voltage isolation switch should be flexible, accurate and
in place, with the auxiliary contact device, contact division and sensitive.
8.3.4 Check the cable head should be no oil leakage.
8.3.1 Kim tra cc thnh phn chnh ca hthng cch in cao th, chng hn nh: dao
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
47/54
47
8.3.5 High-voltage silicon rectifier transformer commissioning, should be studied in the
project by the power plant instructions.
8.3.6 High-voltage transformer rectifier output, such as when using high voltage power
transmission cables, high-voltage cables should be the following tests:
a. High-voltage cable oil strength test, one-time breakdown voltage of not less than
35KV;
b. DC leakage test high voltage cable;c. Measured using the 2500V megger test before and after the cable insulation resistance;
d. ESP-specific DC voltage DC cable test voltage is 2U (twice the rated voltage) for 10minutes.
If the alternative use of other specifications, power cable, its pressure and duration of the
standard should be national standard "installation of electrical installations for construction
and acceptance (GBJ232-82) (seventeenth chapter of electrical over test articles)" in the DC
power cable pressure test standards.
Test: can be divided into 0.25,0.5,0.75,1 times the test voltage step-up paragraph by
paragraph, each stay a minute, record the value of leakage current measurement should be to
eliminate stray current.
8.3.7 DC leakage current test of the cable as the following one of the cable insulationmay be defective, defective parts should be identified and dealt with:
a. Leakage current is very unstable;
b. Leakage current increases sharply with the test voltage;
c. Leakage current has increased over time, the phenomenon of long ting.
8.3.8 High-voltage silicon rectifier transformer control cabinet tests should be according
to the Specification of the power plant.
8.3.9 ESP installed by a variety of porcelain pieces, including a highly insulated wall
bushing porcelain ceramic shaft vibration, pre-installation should be the standard visual
inspection, porcelain, ceramic pieces should be intact and no cracks.
8.3.10 Prior to installation of various pieces of porcelain insulation resistance should be
measured and AC voltage test, shall comply with manufacturer requirements. (General: room
temperature, 100KV voltage 1 minute).
8.3.11 Vibration damper on the motor, maintenance should be carried out before
installation, the bearing should be required to add grease.
8.3.12 Nameplate on the heater model and parameters should be consistent with the
design requirements. Before installation, visual inspection should be intact, with a 500V
insulation resistance meter to measure the shaking, the resistance should be greater than
500. If resistance is less than 500, can pass low voltage dry.8.4 ESP sealing test
Filter installed, before the laying of insulation should be checked for tightness.
Generally use kerosene penetration test.8.5 ESP inspection and adjustment after installation
8.5.1 Center distance between anode inspection and adjustment:
a. In addition to the ground anode block by block 100% correct, but insist on 100% of
the re-examination, re-calibration;
b. Cathode ray should be checked by the quality of the root, if found to be defective,
should be scrapped, update;
c. Check all channels, but also for inspection before and after each channel;
d. In the channel, very different from the standard deviation should be consistent with
JB5910: when height h 7m anode, then the anode and cathode of the maximum deviation of 5mm; when height h7m, then the anode and cathode of the maximum deviation of
10mm;e. Check the adjustment, the channel height and the horizontal direction, the framework
should be based on each level of the small cathode tube outer wall to the anode side wind
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
48/54
48
from the outer groove flange as the detection point;
f. On one side of each channel to check the direction of the height of 5-9 points, that is,
the framework of the cathode of small point of each level of support tube, with the system
"T"-shaped gauge testing, and make records. Failed parts should be re-adjusted or reworked;
g. Make adjustments on the anode plate should be carefully slow movement, not too
much force on the anode plate;
h. Prohibit the use of heating method for correction.8.5.2 To the anodic and cathodic parts of the sharp corners of the burrs, examine the
electric field inside the shell than the cathode and anode exclusion, where the plate spacing is
less than the level of potential sites from different pole line need to be addressed at all.
8.5.3 Row of anode plate, cathode big frame, small frame, the cathode and anode
rapping various parts of the bolts should be in good condition and to make only transfer
welding.
8.5.4 Hammerhead cathode, anode hammer blow with the commitment to meet the
requirements anvil contact position, axes, hammers rotating flexible and reliable.
8.5.5 electric field of the foreign body removed.
8.5.6 Check the throttle motor gear motor vibration motor functioning correctly ash
flexible, clean parts of the lubrication oil.8.5.7 Regulation of the flue connection door, tailgate, Fan, ash equipment, roof,
Manhole sealing well.
8.5.8 Various parts of the weld solid and reliable, error-free solder, missing solder,
sealing well.
8.5.9 The porcelain and ceramic shaft clean and dry.
8.5.10 ESP grounding resistance is less than 2 ohms, electrical equipment grounding
resistance is less than 0.5-1 ohms.
8.5.11 Measured with 2500 volt megger insulation resistance of high-voltage network,
should be greater than 1000 megohms.
8.5.12 The case of ESP and high-voltage cables should be connected cathode rectifier
transformer in good condition and tighten."
8.5.13 High-voltage isolation switch control mechanism should be flexible, location
accurate.
8.5.14 Check with a 500-volt megger motor vibration motor throttle motor and cable
insulation discharging situation, the insulation resistance of not less than 0.5 M.8.5.15 Check all parts of the control wiring drawings are correct.
8.6 ESP voltage control loop checks and debugging
8.6.1 ESP line of electrical system check is complete,then,check the power transmission
test systems and equipment for air load test run.
8.6.2 Check the low voltage power control equipment operation, including: alarm
system testing, vibration loop checks, ash circuit inspection, heating and temperaturedetection circuit inspection.
8.6.3 Before the power, the cabinet and the low-voltage components of ESP disconnect
from the terminal and then proceed to power low-voltage control equipment, the JIU. Power,
the start of the cabinet the cabinet power switch power supply voltage meter shall have the
instructions."
8.6.4 Manual or automatic start alarm system tests, the transient, delay sound, light
signals should be the correct action to lift and reliable.
8.6.5 Rapping circuit inspection, the methods and requirements are as follows:
a. Try: From the plate off the motor power cable, closing transmission. Manually:
division and three times on and off the right contacts, the signal light plate shall meet the
design requirements. Automatic control: Set a play cycle, three small circular motionsequence, the correct vibration cycle, contacts and the signal light division and should be the
correct word And control tests can be adjusted in the field.
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
49/54
49
Process control: start a program of work of the three procedures, their implementation
cycle and the logic should be correct. And in field trials and the logic of the cycle when they
perform adjustable.
Motor recovery after power failure test terminal.
b. No-load operations: unlock the coupling, closing transmission;
Manual mode: In the start, the motor direction of rotation should be consistent with the
requirements of the control unit. Switch three times, measuring the value of starting current,load current value and phase unbalance current value.
Automatic control mode: when the program control mode, respectively, three timing and
procedures of work, the cycle with the logic of the implementation should be correct.
Test accuracy, the power recovery couplings.
c. Before the power , cold commissioning of the rated load operation;"
Manual mode: starting current value recorded when the test run, measure three-phase
current value and the maximum unbalanced current value. Approved the setting value of
thermal components, division and three should be normal.
Check the hammer on the anvil against the vibration point of contact to stay around the
upper and lower values of the design requirements. Rotating flexible and not cards hammer,
hammer can not afford, no hammer-free phenomenon.Automatic Control: The design process is given by the manufacturer, try to play three
cycle process is not the correct sequence and timing disorder.
Maintenance and electrical inspection is passed, a continuous vibration test run of not
less than 8 hours should be normal.
8.6.6 Dumping of ash and ash circuit inspection, the methods and requirements are as
follows:
a. Test operation: the power before the open from the bottom of the contactor motor
power wiring.
Manually: switch three times, contacts and the signal, the light should move the right
word.
Automatic mode: the artificial linkage of the niche conditions three times, interlock
should be correct.
Test service restoration of motor wiring is correct;
b. No-load test run: Break the ash mechanical load, transmission test switch motor.
Manual mode: start the motor to determine the direction of rotation. Measuring the
motor starting current and phase current value. Installation instructions should be consistent
with the signal unit.
Auto mode: Analog started three times, bit number, and chain should be correct. No-load
trial run service restoration of normal mechanical loading;
c. Transfer operations with the commissioning of ash handling machiner.
Manual mode: Start measuring the value of starting current, three-phase currentchecking heat element current setting.
Auto mode: Analog started three times, should be operating normally. As for the linkage
test hot niches actual operating conditions should be in the future debugging.
"Maintenance and electrical inspection is passed, switch to 8 hours continuous testing;
requires rotating flexible.
8.6.7 Heater current alarm and temperature detection circuit inspection, the methods and
requirements are as follows:
a. Manual: Transmission measuring the current value of 30 minutes, check the heating
element setting value, the signal and installation of units should be correct;
b. When the heating circuit has less current alarm device, artificial removal of the loop
should be any electric heater, under current alarm should be the correct action;c. Temperature control: analog division and two, contactors and signal should be the
correct action, temperature control should meet the design requirements. Power later, when
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
50/54
50
the temperature rises to upper setting value should be able to automatically stop the heating
when the temperature dropped to minimum setting value should be able to automatic heating
device.
8.6.8 Debugging in the implementation of low-voltage control loop when the light
manufacturing test instructions.
8.7 ESP pressure control loop check and commissioning
8.7.1 High-voltage silicon rectifier transformer control circuit operation test.Disconnect the rectifier transformer low voltage side of the connection of the case, for
local and remote sub-closing test, simulation of gas, flow, temperature limit protection trip
drive, level, temperature, alarm and security even jump, air chain and other pilot projects , the
lights, signals, audio should be correct.
8.7.2 Pressure control loop commissioning include: closed-loop control plug-in and open
their own load debug device for setting the limit parameters.
8.7.3 High-voltage silicon rectifier transformer control circuit before the check in debug
a. Check the installation diagram at the internal and external wiring should be correct;
b. Cell components and discrete components of the inspection should meet the
requirements of the relevant regulations;
c. The adjustment button should be in the starting position.8.7.4 High-voltage silicon rectifier transformer control circuit debugging, debugging
should outline procedures and requirements, the general loop and closed loop two separate
steps.
8.7.5 High-voltage silicon rectifier transformer open-loop control circuit debugging
methods and requirements are as follows:
a. Open-loop simulation test can be carried out stations or control cabinet, device control
plug-in all sectors of the static measurement of adjustable parameters. Conducted in the
control cabinet, it should disconnect all the wiring the main circuit rectifier transformers,
access two 200V, 100W incandescent bulbs false load;
b. Experimental methods in detail instructions to press the power plant.
8.7.6 High-voltage silicon rectifier transformer control circuit of the closed-loop testing
method and requirements, combined with the power plant to use instructions.
8.8 ESP cathode rapping, anode rapping, rapping the distribution board (if any) and
adjust the drive ash body parts"
8.8.1 Purpose
To ensure safe operation of the ESP line of the cathode, anode plate and the air
distribution plate vibration device and ash body during installation and commissioning of
ESP machine, you must run a separate debug them to check the vibration part of the work.
8.8.2 Preparation:
a. Transmission device is not installed before the installation of the vibration of the
fighting has been rapping and rapping hammer shaft must be a comprehensive examination;b. All parts of the burrs and weld spatter shall be cleaned;
c. For mounting dimensions should be consistent with design requirements
d. Hands should be able to move the rotation axis of vibration;
e. For the anode vibration, impact hammer should hit the center of 4mm iron rod at the
anvil, hammer, angle between two adjacent vibration pattern should be consistent with the
requirements;
Check gearbox oil level and oil plugs.
Check the rapping shaft seal situation.
Close contact with all the bolts and nuts, and welding fixed.
f. Cathode pin wheel vibration and anastomosis to the right;
Bushing insulation should be cleaned to remove debris.g. Air distribution rapping rapping can be very terms of reference.
8.8.3 Commissioning
-
7/22/2019 T-A 18-4-2013 a-V Loc Bui Tinh Dien.doc
51/54
51
8.8.3.1 Anode rapping:
a. Anode vibration motor must run in non-load two hours, then check for abnormal
heating phenomenon, vibration and noise, and elimination;"
b. An overall test to check whether the phenomenon of being stuck, and elimination;
c. When testing the direction of rotation by vibration, does not allow reverse rotation;
d. Start the anode shaft, when the motor reaches full speed after the stop button by
accident, such as the shaft does not go a week, then the above method can be started once andcheck the correct operation after continuous electrical closing notice;
e. First of all required test switch to one hour, then stop, conduct a comprehensive
inspection,if no abnormal phenomenon, that the installation of qualified.
8.8.3.2 Cathode rapping
Commissioning shall comply with the provisions of Article 8.3.1.
8.8.3.3 Air distribution plate vibration
Reference to Article 8.8.3.1.
8.8.3.4 Ash system
Reference to Article 8.8.3.1.
8.8.3.5 End of the work
a. Disconnect all electrical power to all, closed local switch;b. Rapping shaft piercing the hole must be kept tight;
c. Clear the debris left by the time the test run.
8.8.3.6 Security measures
a. All motors must be of professional personnel to operate the motor;
b. Shall not be adjusted and maintenance when the machine is running;
c. ESP internal check in the need for adequate lighting;
d. Adequate supplies for fire fighting.
8.9 Commissioning of ESP electric heater power
8.9.1 Electric heater electric heater before installation to be checked on the nameplate of
the model and parameters are consistent with the design requirements, and the voltage test
and insulation resistance measurement. AC voltage test is 2000V, the insulation resistance
500.8.9.2 If the time interval from installation to use the longer, the rated voltage should be,
before shaking the insulation resistance test about whether the standards.
8.9.3 Open the electric heater to check:
a. Whether the open circuit condition or not.;
b. Heating rate conditions;
c. Whether temperature control is accurate or not.
8.9.4 The test of heating by the thermostat automatically controlled must be normal
before the actual conduct of smoke.
8.10 Cold electric field and smoke-free load of ESP debugging.8.10.1 High-voltage thyristor equipment in the no-load performance tuning pass before
proceeding to the cold, smoke-free electric field (hereinafter referred to as the cold air field)
load test.
8.10.2 Cold air field commissioning sequence, should be put into low-voltage operation
control device (especi