THE FUTURE OF KENNEDY SPACE CENTER
Robert CabanaDirector, Kennedy Space Center
![Page 2: T HE F UTURE OF K ENNEDY S PACE C ENTER Robert Cabana Director, Kennedy Space Center](https://reader037.vdocument.in/reader037/viewer/2022110101/56649ed55503460f94be57b3/html5/thumbnails/2.jpg)
KSC VISION AND MISSION
• VISION: KSC is the world’s preeminent launch complex for Government and commercial space access, enabling the world to explore and work in space
• MISSION: KSC safely manages, develops, integrates, and sustains space systems through partnerships that enable innovate, diverse access to space and inspires the Nation’s future explorers
![Page 3: T HE F UTURE OF K ENNEDY S PACE C ENTER Robert Cabana Director, Kennedy Space Center](https://reader037.vdocument.in/reader037/viewer/2022110101/56649ed55503460f94be57b3/html5/thumbnails/3.jpg)
Launch ServicesProgram (LSP)
Ground Systems Development and
Operations Program (GSDO)
Commercial Crew Program
(CCP)
KSC PROGRAMS
![Page 4: T HE F UTURE OF K ENNEDY S PACE C ENTER Robert Cabana Director, Kennedy Space Center](https://reader037.vdocument.in/reader037/viewer/2022110101/56649ed55503460f94be57b3/html5/thumbnails/4.jpg)
LAUNCH SERVICES PROGRAM (LSP)2012
2013
2014
NuStar - Nuclear Spectroscopic
Telescope Array
RBSP – Radiation Belt Solar Probes
TDRS K – Tracking and Data Relay System
IRIS – Interface Region Imaging Spectrograph
MAVEN - Mars Atmosphere
and Volatile EvolutioN
LDCM – Landsat Data Continuity
Mission
OCO 2 - Orbiting Carbon
Observatory
MMS –Magnetospheric
Multiscale
SMAP – Soil Moisture
Active Passive
TDRS L – Tracking and Data Relay System
Jason-3
![Page 5: T HE F UTURE OF K ENNEDY S PACE C ENTER Robert Cabana Director, Kennedy Space Center](https://reader037.vdocument.in/reader037/viewer/2022110101/56649ed55503460f94be57b3/html5/thumbnails/5.jpg)
GROUND SYSTEMS DEVELOPMENT AND OPERATIONS (GSDO)
Clean pad Flexible Launch Capability
Shuttle pad configuration
Multi-use Integration (VAB)Mobile Launcher
![Page 6: T HE F UTURE OF K ENNEDY S PACE C ENTER Robert Cabana Director, Kennedy Space Center](https://reader037.vdocument.in/reader037/viewer/2022110101/56649ed55503460f94be57b3/html5/thumbnails/6.jpg)
PAD B MODIFICATIONS
• Demolished FSS/RSS• Installed Lightning
Protection
• Cable trays repaired and replaced
• Shuttle instrumentation racks removed
• Weather instrumentation racks installed
![Page 7: T HE F UTURE OF K ENNEDY S PACE C ENTER Robert Cabana Director, Kennedy Space Center](https://reader037.vdocument.in/reader037/viewer/2022110101/56649ed55503460f94be57b3/html5/thumbnails/7.jpg)
SPACE LAUNCH SYSTEM (SLS)
Block 1 (70t)
Block 1A (105t)
Block 2 (130t)
![Page 8: T HE F UTURE OF K ENNEDY S PACE C ENTER Robert Cabana Director, Kennedy Space Center](https://reader037.vdocument.in/reader037/viewer/2022110101/56649ed55503460f94be57b3/html5/thumbnails/8.jpg)
MULTI PURPOSE CREW VEHICLE (MPCV)Processing in the Operations and Checkout Building at KSC
![Page 9: T HE F UTURE OF K ENNEDY S PACE C ENTER Robert Cabana Director, Kennedy Space Center](https://reader037.vdocument.in/reader037/viewer/2022110101/56649ed55503460f94be57b3/html5/thumbnails/9.jpg)
COMMERCIAL CREW PROGRAM
Blue Origin Boeing Sierra Nevada SpaceX
ATK ExcaliburAlmaz
ULA
![Page 10: T HE F UTURE OF K ENNEDY S PACE C ENTER Robert Cabana Director, Kennedy Space Center](https://reader037.vdocument.in/reader037/viewer/2022110101/56649ed55503460f94be57b3/html5/thumbnails/10.jpg)
PARTNERSHIPS
Center Planning and Development Office
KSC’s “Front Door” to engage new business focusing on:
Master plan for KSC infrastructure, land use, and real estate strategies
Commercial space transportation and services
Retention of highly skilled aerospace workers and facility assets
![Page 11: T HE F UTURE OF K ENNEDY S PACE C ENTER Robert Cabana Director, Kennedy Space Center](https://reader037.vdocument.in/reader037/viewer/2022110101/56649ed55503460f94be57b3/html5/thumbnails/11.jpg)
Recommended Program Allocation Historical STS & ISS Utilization
REUTILIZATION OF FACILITIES
![Page 12: T HE F UTURE OF K ENNEDY S PACE C ENTER Robert Cabana Director, Kennedy Space Center](https://reader037.vdocument.in/reader037/viewer/2022110101/56649ed55503460f94be57b3/html5/thumbnails/12.jpg)
Launch Complex 39 Area
Industrial Area
Mobile Launcher
Mobile Launch Platforms
AVAILABLE FACILITIES AND ASSETS
![Page 13: T HE F UTURE OF K ENNEDY S PACE C ENTER Robert Cabana Director, Kennedy Space Center](https://reader037.vdocument.in/reader037/viewer/2022110101/56649ed55503460f94be57b3/html5/thumbnails/13.jpg)
• 15 year use permit agreement
• Operations and maintenance savings of approximately $9.1 million to KSC
• Space Florida has an agreement to lease OPF 3 to Boeing
ORBITER PROCESSING FACILITY 3 AGREEMENT
![Page 14: T HE F UTURE OF K ENNEDY S PACE C ENTER Robert Cabana Director, Kennedy Space Center](https://reader037.vdocument.in/reader037/viewer/2022110101/56649ed55503460f94be57b3/html5/thumbnails/14.jpg)
EXPLORATION PARK
![Page 15: T HE F UTURE OF K ENNEDY S PACE C ENTER Robert Cabana Director, Kennedy Space Center](https://reader037.vdocument.in/reader037/viewer/2022110101/56649ed55503460f94be57b3/html5/thumbnails/15.jpg)
![Page 16: T HE F UTURE OF K ENNEDY S PACE C ENTER Robert Cabana Director, Kennedy Space Center](https://reader037.vdocument.in/reader037/viewer/2022110101/56649ed55503460f94be57b3/html5/thumbnails/16.jpg)