t he park at29thandfairfax great - denvergov.org · mister adult optional no b medium light medium...
TRANSCRIPT
The Park at 29th and Fairfax 20 February 2019
5:30 - 7:30 PMFebruary 20, 2019
Welcome
Together!
Let’s Create a
GREATPARKThe
Park at 29th and Fairfax
Workshop and Open House
The Park at 29th and Fairfax 20 February 2019
Public Meeting 1 Input Review
Park Hill is....
Park Design Exercise Themes:
Feedback from January 26th Open House
The Park at 29th and Fairfax 20 February 2019
Site Concepts
Concept A
Concept Program Comparison Matrix
Concept Playground Trees Grass Shelter and Picnic Water Option Exercise Basketball
A Large Medium LargeLarge
Traditional
Playground Mister
Adult Optional
No
B Medium Light Medium Medium ArborWater
WallNo
3-PT Optional
C Large Heavy Small 2 Small TraditionalSpalsh
PadNo No
Playground with water play
Adult
Exercise
or Swings
Shelter
24’x24’
Grass
Sidewalk
Enhanced in front of Park
Grass
Walk
Benches
Game Tables under trees
Gates, typGates, typ
Low Walls along Alley
Outdoor Class
BBQ
DPR Sign DPR Sign
Pat
h
Fence, typ
Plants, typ
Art Columns
Picnic Tables under Trees
Existing Tree
Alley
Fairfax
Soft Surface under Trees
Art Columns
Bike Rack
The Park at 29th and Fairfax 20 February 2019
Site Concepts
Concept B
Concept C
Playground
3 pt Basketball
or Climbing Rock
Arbor
16’x16’
Grass
Sidewalk shifted &
enhanced in front of Park
Walk
Game Tables under trees
Benches, typ
Low Walls along Alley, possible art location
Outdoor Class
DPR Sign
Fence, typ
Benches
Picnic Tables under Trees
Existing Tree
Alley
Fairfax
Soft Surface under Trees
Water Wall with Art
Bike Rack, typ
Playground
Splash Pad
Shelter
16’x16’
Grass
Sidewalk
Enhanced in front of Park
Grass
Walk
Benches
Benches under trees
Gates, typGates, typ
Fence along Alley
Outdoor Class
BBQ
DPR Sign DPR Sign
Fence, typ
Plants, typ
Art Columns
Picnic Tables under Trees
Existing Tree
Alley
Fairfax
Soft Surface under Trees
Art Columns
Bike Rack
Walk
Grass
Bike Rack
Fence
Plants, typ
Low Wall
Soft Surface under Trees
BBQ
Fence, typ
Walk
4’ high Legacy Art Walls
Walk
Grass
Shelter
16’x16’
BBQ
Benches under trees
Game Tables under trees
Benches
Bike Rack
Soft Surface under Trees
Benches
Wal
k
The Park at 29th and Fairfax 20 February 2019
Site Elements
Use your Park Bucks to indicate how you would distribute the project budget.
Place your Park Bucks in the containers associated with the various options and scales of park elements.
LargePlayground$400
$50
$50 $50
$50
$50
$50
$100
Trees and Plants
$250 Small Playground
Adult Exercise
$50 Swings
$150 $100 $100Large Shelterwith Tables
Small Shelters with Tables
Arbor with Tables
$400 $300 $200Large Splash Pad
Small Splash Pad
Water Feature
Playground Misters
Pavement Enhancements
$50 Benches
GrassArea
Arts and Culture Installations
3-PT Basketball
The Park at 29th and Fairfax 20 February 2019
Playgrounds
Tell us your favorite playground style and preferred type of swing on your comment card.
1. Urban Climbing Structures
2. Rope Climbing Structures
3. Nature and Water Play
Swings
A B C
The Park at 29th and Fairfax 20 February 2019
Design Character A
What do you like about the character of this palette of design elements?
Answer on your comment card.
The Park at 29th and Fairfax 20 February 2019
Design Character B
What do you like about the character of this palette of design elements?
Answer on your comment card.
The Park at 29th and Fairfax 20 February 2019
Design Character C
What do you like about the character of this palette of design elements?
Answer on your comment card.
The Park at 29th and Fairfax 20 February 2019
Park Hill Commons Architectural Elevations