t-s'|s otffi{ rk t ftd-r1o

10
sfg:d TF{{ - }d Covernmentof India-lHinistrv of Railrva}s ,:,fC€qH 3IF{W{ :fu q1qm Research Debigns & Standarrls Orgnlistticn drFr-5 - 2?6 011 EPBX (0522) 24s12fl0 Fax (0522) ?458500 Luckno* - 2?6 {}t I DiD (0522) 2450115 DrD (0522) 2465310 Fax No. 0522-2453916 No. MWSPD/BG/BOXNHL g-{rq fttsrd, t-S'|s S-c otffi{ oTqIPTc arlq gF-sfl fto, fr-qql oa, q.Tfr i-flq nd-r eglc Rk T orq-d'tr, { ftd-r1o oo1 Dated:01,.10.2019 Sub: Final speed certificate of 22.9t axle load Broad Gauge Bogie Open wagon type 'BOXNHL'for operation over routes of Dedicated Freight corridors of DFCCIL. Ref:(i) Railway Board letter No. 201 6/CEDO/ORl/O/01 dated 05-06-2018. (ii)GGM/Mech-ll DFCCIL letter No. Co/Mech.2O18/Axle Load Wagon I 201800591 dated 25-05-2018. (iii)MD/ DFCCIL D.O. No. CO/Mech.2018l25r Wagon | 201800591 dated 12-04-2019. 1.0 Broad Gauge Bogie Open Wagon type'BOXNHL'with maximum axle loadof 22.91 to RDSO Drg. No.WD- WD-05086-S-02 Alt.8 has been designed by RDSO for transportation of coal, ore etc. The 'BOXNHL' wagon is fitted with Casnub 22HS Bogies, high tensile non transition Centre Buffer Coupler, high capacity draft gear and twin pipe graduated release air brake system. The salient features of the wagon type'BOXNHL' are given in Annexure-|. 1.1 ln order to assess the riding quality and stability behaviour of 'BOXNHL'wagon in empty and loaded condition, detailed oscillation trials had been conducted over Hatia - Bondamunda section of Ranchi Division of South Eastern Railway. The results of the trial are mentioned in RDSO Report no. MT-936/F of April 2O0g.Oscillation trial results indicate that 'BOXNHL' wagon has exhibited satisfactory riding and stability behaviour up to a test speed of 1 10 kmph in empty and loaded condition on track maintained to other than C&M-|, VoL-l Standard. 1.2 BOXNHL wagon with maximum axle load of 22.9tto RDSO Drg. No.WD-05086-S- 02 Alt.8 has been permitted to run upto maximum speed of 100 kmph in empty and 75 kmph in loaded condition over lR track vide RDSO's final speed certificate No. MWSPD/BG/BOXNHLl22.9t dated 23-03-2009 followed by amendment No. 1 dated 09-04-2009 and amendment No. 2 dated 31-12-2009 on the basis of RDSO's oscillation trial report no. MT-936 /F of April 2009. 2.0 Based on the design feature and details given in Annexure-l and satisfactory test results as indicated in RDSO's report No. MT-936 /F of April 2009, it is certified that 'BOXNHL'wagon to RDSO Drg. No. WD-05086-S-02 Alt.8 may be permitted to run upto maximum speed of 100 kmph in empty and loaded condition over routes of Dedicated Freight corridors of DFCCIL subject to the following conditions: Page tr of6

Upload: others

Post on 26-Apr-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: t-S'|s otffi{ Rk T ftd-r1o

sfg:d TF{{ - }d Covernmentof India-lHinistrv of Railrva}s,:,fC€qH 3IF{W{ :fu q1qm Research Debigns & Standarrls Orgnlistticn

drFr-5 - 2?6 011

EPBX (0522) 24s12fl0Fax (0522) ?458500

Luckno* - 2?6 {}t I

DiD (0522) 2450115DrD (0522) 2465310

Fax No. 0522-2453916

No. MWSPD/BG/BOXNHL

g-{rq fttsrd,t-S'|s S-c otffi{ oTqIPTc arlq gF-sfl fto,fr-qql oa, q.Tfr i-flq nd-r eglc Rk T orq-d'tr,{ ftd-r1o oo1

Dated:01,.10.2019

Sub: Final speed certificate of 22.9t axle load Broad Gauge Bogie Open wagon type'BOXNHL'for operation over routes of Dedicated Freight corridors of DFCCIL.

Ref:(i) Railway Board letter No. 201 6/CEDO/ORl/O/01 dated 05-06-2018.(ii)GGM/Mech-ll DFCCIL letter No. Co/Mech.2O18/Axle Load Wagon I 201800591

dated 25-05-2018.(iii)MD/ DFCCIL D.O. No. CO/Mech.2018l25r Wagon | 201800591 dated

12-04-2019.

1.0 Broad Gauge Bogie Open Wagon type'BOXNHL'with maximum axle loadof 22.91to RDSO Drg. No.WD- WD-05086-S-02 Alt.8 has been designed by RDSO fortransportation of coal, ore etc. The 'BOXNHL' wagon is fitted with Casnub 22HSBogies, high tensile non transition Centre Buffer Coupler, high capacity draft gearand twin pipe graduated release air brake system. The salient features of thewagon type'BOXNHL' are given in Annexure-|.

1.1 ln order to assess the riding quality and stability behaviour of 'BOXNHL'wagon in

empty and loaded condition, detailed oscillation trials had been conducted overHatia - Bondamunda section of Ranchi Division of South Eastern Railway. Theresults of the trial are mentioned in RDSO Report no. MT-936/F of April2O0g.Oscillation trial results indicate that 'BOXNHL' wagon has exhibitedsatisfactory riding and stability behaviour up to a test speed of 1 10 kmph in emptyand loaded condition on track maintained to other than C&M-|, VoL-l Standard.

1.2 BOXNHL wagon with maximum axle load of 22.9tto RDSO Drg. No.WD-05086-S-02 Alt.8 has been permitted to run upto maximum speed of 100 kmph in empty and75 kmph in loaded condition over lR track vide RDSO's final speed certificate No.MWSPD/BG/BOXNHLl22.9t dated 23-03-2009 followed by amendment No. 1

dated 09-04-2009 and amendment No. 2 dated 31-12-2009 on the basis of RDSO'soscillation trial report no. MT-936 /F of April 2009.

2.0 Based on the design feature and details given in Annexure-l and satisfactory testresults as indicated in RDSO's report No. MT-936 /F of April 2009, it is certified that'BOXNHL'wagon to RDSO Drg. No. WD-05086-S-02 Alt.8 may be permitted torun upto maximum speed of 100 kmph in empty and loaded condition overroutes of Dedicated Freight corridors of DFCCIL subject to the followingconditions:

Page tr of6

Page 2: t-S'|s otffi{ Rk T ftd-r1o

2.1 Track

2.1.1 The track swith 1660 of 60Kg (90UTS) rait taid on pSC steeperconsist of 2 ilt#l*i""jow

the sleepers which shatl

2.1.3 The mar'

;;;.;'ffi #i3'Jf.':H;5';.:ff "S"i,l,',:Tff :il.l"*Xilfi :ffi?g".lf i.$,ll,l

2'1'5 DFCOIL shall ensure further details examination oJ track as deemed fit based onage cum condition, overdue renewar an conoition oi rorr"iio; ;. ;;;r provisionsof chapter-t of RpwM -2oo4iegarding p"'"n"ni*ay renewars.

2.2 Bridges

ng paramet].uof.e;Xruni' wagon.

_ 22.9 taxle _ rc%of axleloadPty) - 1o2o mmaded) _ 1998 mm

2.2.1.1(i) li'."rT3tffifiil3hi" standard spans or BGML/RBG/MBG roadins standards are rit

(ii) In roaded condition, ail standard spans of BGML/RBG/MBG span upto 47.25m(effective) is restricted to ZS kmpn.

(iii) In loaded condition, all standard spans of BGML/RBG/MBG span of 63.0m & z8.Bm(ail effective) is restricted to 60 lmprr.

2'2'3 Superstructures & Bearings of "tl::il^Ta:' (desig.ned and constructed by zonalRailways/DFcclL based 5n site requirements; inctuiing Arches and sub-structure

Page 2 of 6

Page 3: t-S'|s otffi{ Rk T ftd-r1o

of all bridges (all Standard Spans & Special Spans) are to be examined under thedirections of the Chief Bridge Engineer/GGM (Engg.) concern and certified safe withrespect to current Indian Railway Standard Codes with up to-date correction slips.

2.2.4 Other specific restrictions are applicable which as mentioned in relevantSpeed Certificates of hauling locomotives/attached wagon issued by RDSO

2'2.5 Location of bridges on which speed restrictions are imposed shall be notified by theRailways and incorporated in the working timetable.

2.2.6 The above clause have been arrived considering bridges are in physically soundcondition. In case the bridges are not in satisfactory physical condition, necessaryspeed restriction to be imposed by concern Chief Bridge Engineer of the ZonalRailway.

2.2-7 The directives of RDSO for operation of CC+8t+2t axle load 22.821communicatedvide RDSO letter No. CBS/Golden/Q/Strength dated 21127-07-2009 shail atso befollowed.

2.3 Signalling

2-3.1 Provisions of GR, SR, SEM & all extant instructions issued from time to time shallbe complied with.

2.3.2 While running through a station, speed of the train shall be restricted to themaximum permissible speed as per standard of interlocking provided at the station.

2.3.3 On the sections where EBD of more than 1 km is to be catered for, second distantsignal or automatic signalling shall be available failing which suitable speedrestrictions is to be imposed.

2-3.4 In the normal single phase 25KV AC electrified section where electric locomotive isused, provisions given in Para 22.6, 221 , 22.8, 22.9 & 22.10 of SEM pt.ll regardingmaximum permissible length of track circuits, signal feed, maximum permissiblelength for operation of point motor, use of block instruments and use of track circuitssuch as DC Track circuit/AFTC shall be complied by the Raitway.

2-3'5 All level crossing gates within station limit shall be manned and interlocked withstation signals. All manned level crossing gates outside station limit shall beinterlocked depending on the classification of the level crossing.

2.3.6 Suitable communication shall be provided in the locomotive and guards brake vanfor communication between Loco Pilot, Guard and adjacent station master.

2.3.7 lt is necessary to provide means/arrangements to put back the home signal and laststop signal to its "oN" position immediately after passage of the train.

2.3.8 The condonation regarding infringements in schedule of dimensions, if any, shall beobtained in accordance with local conditions, before initiating the operation.

2.3.9 Precaution for Automatic signalling system working:

For running through the train at a station, the last stop signal shall not be taken"OFF' at the station unless:

a) The sections up to the station in advance is clear,

Page 3 of6

Page 4: t-S'|s otffi{ Rk T ftd-r1o

b) At the station in advance, the route of the train is clear, correctly set and locked forreception of train.

c) All manned level crossing gates in a stretch of block sections referred to aboveare closed to road traffic and locked.

2.3.1O Precautions for Absolute block system working:

For running through the train at a station, the signals shall not be taken 'OFF' at thestation unless:

a) The section up to the station in advance is clear and the station in advance has

confirmed that it has obtained permission to approach from the next station.

b) At the station in advance, the route for the run through of the train via main line is

clear, correctly set and locked.

c) All manned level crossing gates in a stretch of two block sections referred toabove are closed to road traffic and locked.

2.4 Rolling Stock

2.4.1 Before initiating the operation, the GGM (Mechanical) of the DFCCIL shall arrangeto certify the track worthiness and safety of the rolling stocks. He shall ensure theproper maintenance of the rolling stocks.

2.4.2 Brakes of the rake of wagons shall be in good working order during the operation.

2.5 Traction Installation

2.5.1 In 25kv AC traction area, the CEE / GGM (electrical) of the DFCCIL shall have toensure that the minimum height of contact wire and electrical clearances asstipulated in provisions of Chapter-XlV, Electric Traction 'Standard Schedule ofDimensions for Dedicated Freight Corridors' with latest Addendum & Corrigendumslips is not violated and strictly followed to ensure its safe lunning.

2.5.2 In addition to above, the Chief Electrical Engineer/ GGM (electrical) of theconcerned DFCCIL may impose any temporary speed restriction on the basis ofpersonal knowledge, experience of the sectional OHE and field conditionsprevailing on the particular section.

2.5.3 When the wagon is being moved, it shall be ensured that all protruding parts arewithdrawn and suitably locked, so that during the run there is no possibility of anyinfringement occurring to the standard moving dimensions.

2.6 General

2.6.1 Allthe permanent and temporary speed restrictions enforced and those that may beimposed from time to time due to track, bridges, curves, signaling and interlockingetc shall be observed.

2.6.2 For movement of wagon on any private or assisted siding for loading or unloadingthe consignments, the GGM(Engg.) of DFCCIL shall be referred to.

Page 4 of6

Page 5: t-S'|s otffi{ Rk T ftd-r1o

2-6.3 The design o_f 'BOX\HL'wagon does not infringes to any clause of Chapter lV forEastern Dedicated Freight Corridor and Chapter Xl for Western Dedicatbd Freightcorridor of 'standard schedule of Dimensions of Janua ry 2013,.

\{C,IfftF: (i) Drg. No. WD-05086-S-02 Att.-8(ii) Annexure-t -Satient Features of ,BOXNHL,

(iii) Annexure-ll (List of referred documents)-in a Comp

orffi fttq-o. qr{o.qfrtufr:

(l) etr-q lndF-d-d /{S), ffi qYg, t-o ,r+c,q$ fud - 110001

@ gLq t-d r{ven urgm, 3rctro. qrf, aq+o-226001(3) Tdr g-qsr6 1$.ffio-a/q|-aMra/q-da qs qq-€-fl{),

(i) qy.ffi, E-rqh ffi effi{H, g*{- 4oo oo1.(ii) Td iEa, ffi d-s, d-d-mT-dr - 200 001.(iii) sd{ W, q_cYdT Efs-q, T$ ftdr - 1,10 00.1.

(iv) <fuq 1"1, qrd ersq, +.{ - 600 oo3.(v) ql$q qtu ffi, € ftdiqq, fuf,<-irotq - 500 021.

(xii) sd{ qur H, ETfrrq irs ,gdrgrqt-E - 2j1 oo1.

(4) otfiur ffi orqfqpTq ftft's, frw qr6s io e, norgq.r-d{, f+es -1, ft.fi-Snfl:i,Tft UE-$ - 400614

RII=IIF: (i) Drg. No. WD-05086-S-02 Att.-S(ii) Annexure-l -Satient Features of ,BOXNHL

25T,(iii) Annexure-ll (List of referred documents)-in a Compact Disc enclosed.

(fr. d. ernora)oTffi f{iqTo. qHolqraq $fu

Page 5 of6

Page 6: t-S'|s otffi{ Rk T ftd-r1o

Annexure-lSalient features of 22.9t axle load BOXNHL Waqon

S.No Description Details01 Principle dimension of Rolling

Stock(Diagram drawing no. WD-05086-S-02Art.-8)a. Length over Couplers/ = 10963 mm

Buffersb. Bogie centre distance = 6690 mmc. Wheel Base = 2000 mmd. Axle load (loaded) = 22.9 te. Axle load (Empty) = 5.13 t

02 Details of Bogie and wheel a. CASNUB22HS Bogieb. 1000 mm diameter wheels set to

Drg.no. WD-89025-S-01 andspecification no. R-19/93 Pt-1.

03 Details of Brake svstem Boqie Mounted Brake Svstem04 Details of Coupler and buffer a. E E/F NT-Coupler to RDSO

Specification No. 48-BD-08/ WD-70BD-1 0

b. Draft Gears to RDSO SpecificationNo. 49-BD-0 8MD-7 1BD-1 5.

05 Periodic maintenance schedulesand standards (safety limits) to befollowed in respect of safety items.

a. Bogie maintenance manual no. G-95b. For wheel &axle ref. para2.8 of chapter-

2 of IRCA Part-lll additition-1973c. Air Brake Maintenance Manual no.

G-97.d. Coupler Maintenance Manual no. G-76

(for Workshop staff)e. Coupler Maintenance Manual no.

G-80(for Line stafO06 Carrvino caoacitv 71.08 T

Annexure-ll

List of referred documents in the speed certificate are available in a Compact Disca) RDSOdrg.no.WD-05086-S-02Alt.-8b) WheelSpec. no. R-19/93 Pt.1c) IRCA Part lll | 1973d) Air Brake Spec. No. 02-ABR-02e) Air Brake Maintenance Manual No. G-97f) E/F NT.CBC Spec. No. 48-BD-08 / WD-708D-10g) E/F NT.CBC Spec. No. Instruction & Maintenance Manual of CBC.

(a) G-80 (For workshop staff)(b) G-76 (For line staff)

h) Draft Gear Spec. No. 49-BD-08/ WD-718D-15i) Bogie Maintenance Manual No. G-95j) Railway Board's letter No.65A/VDO/SR/26 dated 19t20.10.1966k) Indian Railways Permanent Way Manual reprint-2004l) USFD manual, Revised 2012m) Maximum moving profile of 1D (EDOIT-2202) of tRSOD, revised 2004.n) RDSO's Oscillation trial report No. MT-936 /F of Aprit 2009o) Final speed certificate No. MWSPD/BG/BOXNHLl22.9t dated 23-03-2009 for

BOXNHL 22.91, Amendment No.1 dated 09-04-2009 and Amendment No.2 dated 31-12-2009.