t y) p.€¦ · s.hj tq 1600, ^4 king street west, toronto, ontario. post office address do hereby...

10
t y) P. 52 JMSW5033 W6903-ee0 17 DRAYTON PllWil V w W*Tl * of WO* W fct To the Recorder of...................P.a.U.i.P.Ja........................................ l ..E.,..C,...j3Ckla 0 ..pn..be.half..p.f..Ke.r.r..Add i SQn..^i.ne.s..L.i.mi.1;ed .Mining Division J5P7.2 name of Recorded Holder Miner's Licence X6.QP.*....4A.riJng..5.t..re.e.t..We.^ Post Office Address'"" - do hereby report the performance of ...ft 8 M-. 6 . . .................... days of P. i .? onl.t?. r:. i..U.! n 9. Claim No. PA 43490 * tt* t ft 111111 &&L.. 43592 43494 Days .2.?.... 29.... 29 .2.9... .2.9... 29 m the fol lowing Claim No. PA 43496 ^.349.7.... 43498 43499 43500 contiguous clain Days 29 .29... 29 29 29 Claim No. PA 43502 &5P3..... 43504 43505 43506 type of work Days ..?9... 23 29 .29... .29... 43501 4350^29 . i.(......i i * * * t*i* 43507 .29.. b,'' 44406, 435957^3 596'^ 44403, 44402," All the work was performed on Mining Claim (s) ..44412.,..U4All,..4j5.1S.,..U464Z...................................... (In the case of geological and/or geophysical survey (s) where more than lo claims are involved attach a schedule) READ CAREFULLY: THE FOLLOWING INFORMATION IS REQUIRED BY THE MINING RECORDER. For Manual Work, Stripping or Opening up of Mines, Sinking Shafts or Other Actual Mining Operations - Names and addresses of the men who performed the work and the dates and hours of their employment. For Diamond and other Core Drilling - Footage, No. and angle of holes and diameter of core. Name and address of owner or operator of drill. Dates when drilling was done. Signed core log and sketch in duplicate. For Compressed Air or Other Power Driven or Mechanical Equipment Type of drill or equipment. Names and addresses of men engaged in operating equipment and the dates and hours of their employment. For Power Stripping - Type of equipment. Name and address of owner or operator. Amount expended. Dates on which work was done. Proof of actual cost must be submitted within 30 days of recording. With each of the above types of work sketches ore required to show the location and extent of the work in relation to the nearest claim post. In the case of diamond or other core drilling the sketch must be submitted in duplicate. For Geological and Geophysical Survey - The names and addresses of men employed os well as dates. Type of instrument used in the case of geophysical survey. Reports and maps in duplicate must be filed with the Minister within 60 days of recording. For Land Survey - the name and address of Ontario Land surveyor. The Required Information is os Follows: (Attach a list if this space is insufficient) OR BOTH EN S IMPR x 3 tt O D. D. Contractor Drilling Dates J. H. Edwards D. D. Ltd.. P.O. Box 369. Kenora Nov. 2. 1968 - Feb. 13. 1969 z t- 01 0 D. IU DC ^ore Diameter A x T (li inches) Jore S torage at drilling sites Holes G , d epths A - jyTllSO ft. A - 4 y - 400 ft. y- 156 ft. AH151. 5 ft., AJ2 162.5 ft., A13. 237.0 ft. A14172.5 ft. A15- 209 ft. A16. 175.0 ft. A - 2 y -7 499.5 ft, A - 6/ 192.6 ft, A - 9 ^ 153.0 ft, •i . y A - 3 - 502 ft. A - ?V 358 ft. A -10-^ 212 ft. Dote /'/Y- The Mining Act Certificate Verifying Report of Work u m i ei* MMHNO ON, (Post Office Address) hereby certify: 1. That l have a personal and intimate knowledge of the facts set forth in the report of worT annexed here to, having performed the work or witnessed same during and/or after its completion. 2. That the annexed report is true. Dated.... ^ fr. t .19 .':: ui j * o z Df o Ul D. Ul T. ignature

Upload: others

Post on 11-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: t y) P.€¦ · S.HJ tQ 1600, ^4 King Street West, Toronto, Ontario. Post Office Address do hereby report the performance of MOHu^b days of ^ ' 1 A separate form is required for

t y) P.

52 JMSW5033 W6903-ee0 17 DRAYTONPllWil V w W*Tl

* of WO* W fct

To the Recorder of...................P.a.U.i.P.Ja........................................

l ..E.,..C,...j3Ckla0 ..pn..be.half..p.f..Ke.r.r..Add i SQn..^i.ne.s..L.i.mi.1;ed

.Mining Division

J5P7.2name of Recorded Holder Miner's Licence

X6.QP.*....4A.riJng..5.t..re.e.t..We.^ Post Office Address'"" -

do hereby report the performance of ...ft8M-. 6. . .................... days of P.i.? onl.t?.r:. i..U.! n 9.

Claim No.

PA 43490* tt* t ft 111111

&&L.. 43592

43494

Days

.2.?....

29....

29

.2.9...

.2.9...

29

m the fol lowing

Claim No.

PA 43496

^.349.7....

43498

43499

43500

contiguous clain

Days

29

.29...29

29

29

Claim No.

PA 43502

&5P3.....43504

43505

43506

type of work

Days

..?9...

2329

.29...

.29...

43501 4350^29. i.(......i i * * * t*i*43507 .29..

b,'' 44406, 435957^3 596'^ 44403, 44402,"All the work was performed on Mining Claim (s) ..44412.,..U4All,..4j5.1S.,..U464Z......................................(In the case of geological and/or geophysical survey (s) where more than lo claims are involved attach a schedule)

READ CAREFULLY: THE FOLLOWING INFORMATION IS REQUIRED BY THE MINING RECORDER.

For Manual Work, Stripping or Opening up of Mines, Sinking Shafts or Other Actual Mining Operations - Names andaddresses of the men who performed the work and the dates and hours of their employment.For Diamond and other Core Drilling - Footage, No. and angle of holes and diameter of core. Name and address ofowner or operator of drill. Dates when drilling was done. Signed core log and sketch in duplicate.For Compressed Air or Other Power Driven or Mechanical EquipmentType of drill or equipment. Names and addresses of men engaged in operating equipment and the dates and hours oftheir employment.For Power Stripping - Type of equipment. Name and address of owner or operator. Amount expended. Dates on whichwork was done. Proof of actual cost must be submitted within 30 days of recording.With each of the above types of work sketches ore required to show the location and extent of the work in relationto the nearest claim post. In the case of diamond or other core drilling the sketch must be submitted in duplicate.For Geological and Geophysical Survey - The names and addresses of men employed os well as dates. Type ofinstrument used in the case of geophysical survey. Reports and maps in duplicate must be filed with the Ministerwithin 60 days of recording.For Land Survey - the name and address of Ontario Land surveyor.

The Required Information is os Follows: (Attach a list if this space is insufficient)

OR BOTH

EN

S IMPR

x3tt O

D. D. Contractor Drilling Dates

J. H. Edwards D. D. Ltd.. P.O. Box 369. Kenora Nov. 2. 1968 - Feb. 13. 1969

z t-01 0 D. IU DC

^ore Diameter A x T (li inches)Jore S torage at drilling sitesHoles G, depths A - jyTllSO ft.

A - 4 y - 400 ft.y- 156 ft.

AH151. 5 ft., AJ2 162.5 ft., A13. 237.0 ft. A14172.5 ft. A15- 209 ft. A16. 175.0 ft.

A - 2 y -7 499.5 ft,A - 6/ 192.6 ft,A - 9 ^ 153.0 ft,

•i .

yA - 3 - 502 ft.A - ?V 358 ft.A -10-^ 212 ft.

Dote/'/Y-

The Mining Act Certificate Verifying Report of Work

u m i ei*MMHNO ON,

(Post Office Address) hereby certify:

1. That l have a personal and intimate knowledge of the facts set forth in the report of worT annexed here to, having performed the work or witnessed same during and/or after its completion.

2. That the annexed report is true.

Dated.... ̂ fr.t

.19 .'::

uij *

oz

Dfo

UlD.

UlT.

ignature

Page 2: t y) P.€¦ · S.HJ tQ 1600, ^4 King Street West, Toronto, Ontario. Post Office Address do hereby report the performance of MOHu^b days of ^ ' 1 A separate form is required for

r\

* ' -r.- ' -'' ' .- J

THE MINING ACT REPORT OF WORK

To the Recorder of .............Rd.t.C.i.C.i.d........... ..........................................

1 E. C. Jacka. on behalf of Kerr Addison Mines Limitedname of Recorded Holder

S.HJ tQ 1600, ^4 King Street West, Toronto, Ontario.Post Office Address

do hereby report the performance of MOHu^b days of ^ '

1A separate form is required for each type of work to be recorded.

A 35072Miner's L icenc o

amond Drillingtype of work

not before reported to be applied on the following contiguous claims

Claim No. Days Claim No. Days Claim No. Days

PA 43508 29 PA 43514 28 PA 43520 28

I+35Q3... 29 43515 28 435 21 28

H35.1P.... 2.9.... .43.5.16... .28.. 4.3.5.22.... ..28... 43511 29 43517 28 43523 2843512 29 43518 28 43524 28

43513 29 43519 v^-6? 28 435*. . .. ..... ..... . ....... ..... p A f . r 7 A r\ ' ' ' fi 1 . t . n fi ii3CC|C*" r" "J J*Jy, HHHUD, H y p y y y

All the work was performed on Mining Claim (s) 44412, 44411, 43515, 4'

25 28 •4J596, 4440 3, "44*0 2*642

i Si en

rHS IMPRISONMENT OR BOTH

(In the case of geological and/or geophysical survey (s) where more than 18 claims 'are involved attach a schedule) ^

READ CAREFULLY: THE FOLLOWING INFORMATION is REQUIRED BY THE MINING RECORDER. x

For Manual Work, Stripping or Opening up of Mines, Sinking Shafts or Other Actual Mining Operations - Names and oaddresses of the men who performed the work and the dates and hours of their er For Diamond and other Core Drilling - Footage, No. and angle of holes and diaowner or operator of drill. Dates when drilling was done. Signed core log and sk For Compressed Air or Other Power Driven or Mechanical Equipment

nployment. meter of core. Name and addr etch in duplicate.

Type of drill or equipment. Names and addresses of men engaged in operating equipment and the dates and fx their employment. For Power Stripping - Type of equipment. Name and address of owner or operator. Amount expended. Dates onwork was done. Proof of actual cost must be submitted within 30 days of recording. With each of the above types of work sketches are required to show the location and extent of the work in r* to the nearest claim post. In the case of diamond or other core drilling the sketch must be submitted in d up For Geological and Geophysical Survey - The names and addresses of men employed as well as dates. Tinstrument used in the case of geophysical survey. Reports and maps in duplicate must be filed with the M within 60 days of recording. For Land Survey - the name and address of Ontario Land surveyor.

The Required Information is as Follows: (Attach a list if this space is insufficient)

D. D. Contractor J. H. Edwards D. D. Ltd.. P.O. Box 369, KenoraDrilling Dates Nov. 2^ 1968 - Feb. 13. 1969Core Diameter A X T (li inches)Core Storage at drilling sitesHoles & depths A - 1 - 1160 ft. A - 2 - 499.5 1

A - 4 - 400 ft. A - 6 - 192.6 \ A - 8 - 156 ft. A - 9"- 153.0 1

All. 151.5 ft., A12. 162.5 ft., A13. 237.0 ft. A14. 17A 16. 175.0 ft.

Signature of— — —— — —————————————————————————————————— — — — l

The Mining Act Certificate Verifying Report of Work

| R, 0, MacTavish, Senior Geolpgist ~ Exp lofat, ipn

Suite 1600, 44 King Street West^ Toronto,, Ontario.(Post Office Address)

hereby certify:

F t. A - 3 - 502 ft. Ft. A - 7 - 358 ft. Ft. A-10 - 212 ft.

2.5 ft. A15. 290 ft.

Rli^M**ftft***K* Agent

PA1KIV*!** MINING CMV.

rq) EBEIVtp

.4m........ ....................Ml7.ft.fl,io.1li1?.'l'2i3'A'5*

ess of S

*/)

)urs of H

which g

. 1-Hation tt licote. {j ype of a nister O

Oz <H tt O Q. UJ Ofin

LSE STATEMENT IN THI

*lu.

z

A ~n the rennrt of wBrk annexed here- ?

to, having performed the work or witnessed same during and or after its completion.

2. That the annexed report is true.

's^ ' / f - -

"'' S ignature

Page 3: t y) P.€¦ · S.HJ tQ 1600, ^4 King Street West, Toronto, Ontario. Post Office Address do hereby report the performance of MOHu^b days of ^ ' 1 A separate form is required for

ONTARIO

THE MINING ACT REPORT OF WORK

To the Recorder of ...................Pj9.tr. J.C.lfl............................................

l fi /. .C.s Jac.ka t on b eh la f of Ke r r

A separata form it required for each type of work to be recorded.

.Mining Division

name of Recorded Hold Miner's Licence

Post Office Addressdo hereby report the performance of ........484.0*6.................... days of . ...Diamond. fiX.Uiing...

type of worknot before reported to be applied on the following contiguous claims

Claim No.

PA .43526....

435.2.8....

.^5.90... 43591

Days

.2J3...

.?8...

.2.8... 2.8...

.?8... 28

Claim No.

PA.. 4.359 2...

3.352?... ..^3594..

3.596.

43597

Days

28,.. 2.8...

2.8...

28

28

28

Claim No.

PA .43,6.0.8....

43609

43611

43612

Days

..28.

..28.

28

SPA 45309'" 44406, 43595r'4J596, 4460J;"44402,All the work was performed on Mining Claim (s) ..4.4.4.JJ?,.AWf.U^./tS&W*..WJ&JL.....................................(In the case of geological and/or geophysical survey (s) where more than 18 claims ore involved attach a schedule)

READ CAREFULLY: THE FOLLOWING INFORMATION is REQUIRED BY THE MINING RECORDER.

For Manual Work, Stripping or Opening up of Mines, Sinking Shafts or Other Actual Mining Operations - Names andaddresses of the men who performed the work and the dates and hours of their employment.For Diamond and other Core Drilling - Footage, No. and angle of holes and diameter of core. Name and address ofowner or operator of drill. Dates when drilling was done. Signed core log and sketch in duplicate.For Compressed Air or Other Power Driven or Mechanicol EquipmentType of drill or equipment. Names and addresses of men engaged in operating equipment and the dotes and hours oftheir employment.For Power Stripping - Type of equipment. Name and address of owner or operator. Amount expended. Dates on whichwork was done. Proof of actual cost must be submitted within 30 days of recording.With each of the above types of work sketches are required to show the location and extent of the work in relationto the nearest claim post. In the case of diamond or other core drilling the sketch must be submitted in duplicate.For Geologicol and Geophysical Survey - The names and addresses of men employed as well as dotes. Type ofinstrument used in the case of geophysical survey. Reports and maps in duplicate must be filed with the Ministerwithin 60 days of recording.For Land Survey - the name and address of Ontario Land surveyor.

The Required Information is os Follows: (Attach o list if this space is insufficient)

D. O, Contractor Ori l ling Dates Core Diameter Core Storage Holes S- depths

J. H. Edwards 0. D. Ltd.. P.O. Box 369. Kenora Nov. 2.1968 -Feb. 13. 1969

A x T (Ijinches)at drilllng sites

A - l - 1160 ft.A - k - 400 ft.

- 156 ft.

A - 2 - 499.5 ft.A~^T - 192.6 ft.A - 9 - 153.0 ft.

A - 3 - 502 ft. A - 7 - 358 ft. A -10 - 212 ft.

All. 151.5 ft., A 12. 162.5 ft.. A 13. 237.0 ft. A 14. 172.5 f)t. A15. 209 ft. Al6T 175.0 fj. - ^

Date ....,........Signature of Recorded Holder or Agent

1 J3L* Q* MdtT/3^Suite 1600,

hereby certify:

The Mining ActCertificate Verifying Report of Work

/J.5.b.,..S.eflApr...GfiRioS.i.^t..~..E.^P.lPr.a.t.i.PO.....................44 King St. West, Toronto, Ontario.

(Post Office Address)

~ —— F"ATRqlcTA ————

^ EiTHlElfj)ry\ \AfJ

MAR 31969AM f *i K 010-11,1?. 112.3.4.5-8

1. That l have a personal and intimate knowledge of the facts set forth in the report of work annexed her to, having performed the work or witnessed same during and/or after its completion.

2. That the annexed report is true.

Signature

o*

s

o.

t/)

ix

tt o

HIt-

u

tt Ut O

o z

oa.

Ul

IU

-l < u.

o

zOfOli.

Page 4: t y) P.€¦ · S.HJ tQ 1600, ^4 King Street West, Toronto, Ontario. Post Office Address do hereby report the performance of MOHu^b days of ^ ' 1 A separate form is required for

PA

ONTARIO

THE MINING ACT REPORT OF WORK

To the Recorder of...................................P.ftftr.l.C.U............................

A separate form it required for each type of work to ke recorded.

(A)

.Mining Division

.^ name of Recorded Holder Miner's Licence

do hereby

not before

Claim No.

^33944400

•WA&Q 1

ull/iQO

44403

All the wo

report the performance of

reported to be applied on

Days

2.8.... l

2828

28

28

28

rk was performed on Minir

4840,6

the following

Claim No.

44405

44406

44407

44408

44409

ia Claim (s) .

Post Office Address ...................... days of

contiguous claims

Days

28... PA

2828

28

28

28PA45 309 "'41*406, 4 3595

Diamond

Cloim No.

444JO4441144412

44413

44414

44415,"U3S96y

Drillingtype of work

Day*

2.8.28

28

28

28

2844&03, 44-4XT2,

(In the case of geological and/or geophysical survey (s) where more than IB claims are involved attach a schedule)

READ CAREFULLY: THE FOLLOWING INFORMATION is REQUIRED BY THE MINING RECORDER.

For Manual Work, Stripping or Opening up of Mines, Sinking Shafts or Other Actual Mining Operations Names andaddresses of the men who performed the work and the dates and hours of their employment.For Diamond and other Core Drilling - Footage, No. and angle of holes and diameter of core. Name and address ofowner or operator of drill. Dates when drilling was done. Signed core log and sketch in duplicate.For Compressed Air or Other Power Driven or Mechanical EquipmentType of drill or equipment. Names and addresses of men engaged in operating equipment and the dates and hours oftheir employment.Fer Power Stripping - Type of equipment. Nome and address of owner or operator. Amount expended. Dates on whichwork was done. Proof of actual cost must be submitted within 30 days of recording.With each of the above types of work sketches are required to show the location and extent of the work in relationto the nearest claim post. In the case of diamond or other core drilling the sketch must be submitted in duplicate.For Geological and Geophysical Survey - The names and addresses of men employed as well as dates. Type ofinstrument used in the case of geophysical survey. Reports and maps in duplicate must be filed with the Ministerwithin 60 days of recording.For Land Survey - the name and address of Ontario Land surveyor.

The Required Information is os Follows: (Attach a list if this space is insufficient)

D. D. Contractor Drllllng Dates Core Diameter Core Storage Holes S depths

J. H. Edwards D. 0. Ltd.. P.O. Box 369. Kenora Nov. 2. 1968 -Feb. 13. 1969.

A x Tat drl 1

li Jnchesjling s I tew

A " l - 1160 ft.A - 4 - 400 ft.- 156 ft.

A - 2 - 499.5 ft. A -3 - 502 ft.A""n? - 192.6 ft. A -7 - 358 ft.A - 9 - 153.0 ft. A -10- 212 ft.

All. 151.5 ft., A12. 162.5 ft., A13. 231.0 ft. A14. 172. A16T 175*0 ft.

The Mining Act Certificate Verifying Report of Work

Suite 1600, 44 King Street West, Toronto(Post Office Address)

EBE1VE

hereby certify:

1. That l have a personal and intimate knowledge of the facts set forth in the report of work afriexed here to, having performed the work or witnessed same during and/or after its completion.

2. That the annexed report is true.

^, Si-'XH^/fr^**. ,....ji.r..r.....^.....'.............\i .̂ .../................................../..(••.•••••••••.•^•••*"*'.irr^r.............................7 S ignature

2 SEa.

x91at o

u

Uae

o

ac O

iu

IU

J

lDC O

uiD.

IU

Page 5: t y) P.€¦ · S.HJ tQ 1600, ^4 King Street West, Toronto, Ontario. Post Office Address do hereby report the performance of MOHu^b days of ^ ' 1 A separate form is required for

U

ONTARIO

THE MINING ACT REPORT OF WORK

To the Recorder of................................... Pdtr.U.U...........................

A seporote form is required for eoch type of wort lo be recorded.

.................,........................ ....Mining Division

:..*er.r..Adrib.Qn..rAi^^^ nome of Recorded Holder Miner's Licence

We.?.^..Tornt;o,..pntar.i.o lPost Office Address

do hereby report the performance of ..................WHfQ,.6........... days of ..Q.tanWnd.JD.t.Uiing....type of work

not before reported to be applied on the following contiguous claims

Claim No.

PA

Days

28...

28... 28

28 28""

28

Claim No.

5163

1*5166

Days

28....

2.8... 28

28

28

28

Claim No.

PA !t516.7....

^5169

Days

..2J8..

.2.8..28

.28.. 28

, 1*3595^3596, W*03',"W*02,All the work was performed on Mining Claim (s) ......^Jl2,,..(tW.l.U..435^.,..W.6^2...................................(In the case of geological and/or geophysical survey (s) where more than 18 claims are involved attach a schedule)

READ CAREFULLY: THE FOLLOWING INFORMATION IS REQUIRED BY THE MINING RECORDER.

For Manual Work, Stripping or Opening up of Mines, Sinking Shafts or Other Actual Mining Operations - Names andaddresses of the men who performed the work and the dates and hours of their employment.For Diamond and other Core Drilling - Footage, No. and angle of holes and diameter of core. Name and address ofowner or operator of drill. Dates when drilling was done. Signed core log and sketch in duplicate.For Compressed Air or Other Power Driven or Mechanical EquipmentType of drill or equipment. Names and addresses of men engaged in operating equipment and the dates and hours oftheir employment.For Power Stripping - Type of equipment. Name and address of owner or operator. Amount expended. Dotes on whichwork was done. Proof of actual cost must be submitted within 30 days of recording.With each of the above types of work sketches are required to show the location and extent of the work in relation to the nearest claim post. In the case of diamond or other core drilling the sketch must be submitted in duplicate. For Geological and Geophysical Survey - The names and addresses of men employed as well as dates. Type ofinstrument used in the case of geophysical survey. Reports and maps in duplicate must be filed with the Ministerwithin 60 days of recording.For Land Survey - the name and address of Ontario Land surveyor.

The Required Information is os Follows: {Attach o list if this space is insufficient)

satO

SS a.z

ae O

D j 0. Contractor Drl 11 ing Dates Core Diameter" Core Storage Holes ft depths

J. H. Edwards 0. D. Ltd.. P.O. Box 369. Kmora Nov. 2. 1968 - Feb. 13. 1969

A x T (lj inches)

u

uOf5o z

ec Oo.Ulae

at dri l ling sitesA - l - 1160 ft. A - k - 400 ft.

156 ft.

A - 2 - i*99.5 ft.F^T - 192.6 ft.A - O - 153.0 ft.

A - 3 - 562 ft.A -7 - 358 ft.

- 212 ft.

All. 151.5 ft., A12. 162.5 ft., A13. 237.0 ft. Al^. 172.5 ft.) A15. 209 ft. 175.0 ft. v L s ^ ,'••//•' Q c f (f C- f/ fi 6 tt i A^f 4. L? ^ u ' ' ^ ' '" - / ' .. .V........I.................................. .........................* t ±t •r*...'*.*'.*.**.....**.***.*'.' 1 .''

Signature of R^turJBJ Hul4*i ui AgentDate

The Mining Act Certificate Verifying Report of Work

(Post Office Address)

P A TR l C I AMiNIMO DIV.

EItfE'Mffli -31969'

•AM. •P*

hereby certify:

1. That l have a personal and intimate knowledge of the facts set forth in the report of work annexed here to, having performed the work or witnessed same during and/or after its completion.

2. That the annexed report is true.

vi b ^L ]9(,'f. ' ....................^.^.:..^^^^.^.^^'"/'""""" Signature

i/*UJ VI

oc O u.

Page 6: t y) P.€¦ · S.HJ tQ 1600, ^4 King Street West, Toronto, Ontario. Post Office Address do hereby report the performance of MOHu^b days of ^ ' 1 A separate form is required for

,,,**

r,,,.

'

:r o *— *

w VI

^1 CL ^ rf D-

(A

O O -i O t/J rf O -1

0) 0 n

0 O -t n 0 0* g rf n T

0 -t •*

(•^

^*

K*

3 0 01 r* (0 VI

o * o * o 0 3

rf -t 0 0 rf O -\

(T\

ZI lg. s

l m S o o. 1 IT

5'

o o'

39 M

sS

2,

> l O

9-

o 9-

"E

O-r

, K

S

, 2^

*0

-no

•" 0 2

-

ri f -

s-s1-

^^

-9 S. "O 3

5 Q

< j

I-* o

o j*

-53-^

3

3 9

we

3

Q.

3

O

s, s

— (O

3-3

• 0

5- o-

z 5-

* s

5S

*D

O

- O

-no

o

o.5

o.55 O

W I:l

?LM s

*M; s

9F

5-1

-1

r|ip

O*

, 5

.x9

--n

* c

e —

o ^

3

— o

o

o

-503-

X

3

9

S

Q.-

"w

on

o g;

9 L

S"!

IS.

Q.

Q.

-, 3

O

, .

-- 0

i8-?

s-S'S

S g

-9.

? o-

S

l a

- l

o55

o o s-S.

o

S w c

" o5 f

e

^ l

5--

-*

- 9

Si,

i?

ib-T

5

Q 8

Si

?s'

-S"

3^3

f

9

Cc

o. w

as a

2 *

9ng

equipm

ent

Amount

and

sketchSs

-a.

*O

-~1"!

• "2

.

s-ri

li:- r?

rW

W H Dates

and da and

uplicate

s. S

n i

"

i7^

l- !

0

0- 8. a.

3

O 3- z 5' I' fr 1 Sfi?

o

2-"8

-c o

5"

l?

m

Q

o.

O \

3 o

s

* it

X

TJ

OVI

Q

n

3

O

2.^

,

ss

- r

:O0

:OD

:O0

co :

co

o

^

JL

.-vi

Vn

Q

o i" z

cr A O

TJ O 3 3- 9 |T

o"

-o 3 3

A

O

lii?5

*

o

:. ,.

c

9 o j

—M

3j^

f:o

r *^

9

:^~ f

o o rrvA

j 2.

\n

3

Vo

o

2 V/

i

. 3 in

^

g XD

:co

-co

^co

ooco

2T

: ^

c 2 o 3"

:r^ 3

-.

:- /

pig-

jo

o

i 3~

•*^f

^":

-ti

'•rt

—-o

:J*

o

:~"

CO

|rt

^~

((

/IO

:r

f

9 :W

::O O

II "^

^ *^

W"

O*

:—

S '3

:vn

o. 9

-:"1

i~"

^

Sio

:1

ip-

v

VA*

V/1

:.p-

ovi

r-A*

J r.

-.r-

3

. t, H

- o -J

-

:co

uco

-c

oo

: n

5 -S

J o

o

THE

PEN

ALT

Y FO

R M

AKIN

G A

FA

LSE

STA

TEM

ENT

IN T

HIS

REP

OR

T A

ND

/OR

CE

RTI

FIC

ATE

IS S

500.

OR

SIX

MO

NTH

S IM

PRIS

ON

MEN

T OR

BO

TH

Page 7: t y) P.€¦ · S.HJ tQ 1600, ^4 King Street West, Toronto, Ontario. Post Office Address do hereby report the performance of MOHu^b days of ^ ' 1 A separate form is required for

m(Cit^ (r fa*e -^-A^tL^fli- x^SONTARIO

THE MINING ACT REPORT OF WORK

To the R ecorder of ..................Rat.r.icj.a........................................... .

**(xifot* win 1* .r.q0|rtdfor.**h type of wock t* b*r.oord.d.

l, ...?A..?.t...^?.?.^3.*..9.CL.b?.l?.a.!.f.^

.Mining Di vi tion

name of Recorded Holder , S H J. f.e.. .16.00 j. .44. K j ng.. S t ree t. We s t. Tp ron to. Ontario.

Miner's L icence

Post Office Addressdo hereby report the performance of ........4340.J6..................... days of Diamond..P.T.U.U.O.9......

type of work not before reported to b e applied on the following contiguous claims

Claim No.

45354.....

^5.5....,45356

4535745358

4.5m...

Days

19....28.2828

28

28

Claim No.

P A..45 3.6.0...

..^.3,6.1...45362

4536345364

Days

28.....

2828

2828

28

Claim No.

PA 4.53.6.6....!*5367....453684536945370

Days

M,.

2828

2828

28'"""""PA453097'^406, 43595","'4'359'6, 44403, Wi02, 44412,

All the work was performed on Mining Claim (s) ...444.1.1.,..4.3515.,...446.42..................................................{In the case of geological and/or geophysical survey (s) where more than 18 claims are involved attach a schedule)

READ CAREFULLY: 7HE FOL LOWING INFORMATIONS REQUIRED BY THE MINING RECORDER.

g Ofo

wzSOfo.

l/)IK-zi

For Manual Work, Stripping orJDpemjio^up of Mines, Sinking Shafts or Other Actual Mining Operations - Names andaddresses of the men who performed the work and the dates and hours of their employment.For Diamondl. and qther^Cp^re^Drj[l[ing - Footage, No. and angle of holes and diameter of core. Nome and address ofowner or operator of drill. Dates when drilling was done. Signed core log and sketch in duplicate.For Compressed Ajr or Other jPower Driven oj- Mechanical Eo^ui^mentType of drill or equipment. Names and addresses of men engaged in operating equipment and the dates and hours oftheir employment.For Power gripping - Type of equipment. Name and address of owner or operator. Amount expended. Dotes on whichwork was done. Proof of actual cost must be submitted within 30 days of recording.With each of the above types of work sketches ore required to show the location and extent of the work in relationto the nearest claim post. In the case of diamond or other core drilling the sketch must be submitted in duplicate.F^r^eological and Geophyskai^ Survey - The names and addresses of men employed as well as dates. Type ofinstrument used in the case of geophysical survey. Reports and maps in duplicate must be filed with the Ministerwithin 60 days of recording.For Land purvey - the name and address of Ontario Land surveyor.

The Regujred [fi forma t i an i^as Follows: (Attach a list if this space is insufficient)

D. D Contractor Dr i 11 ing Dates Core Diameter Core Storage jjoles S depths

J""H. Edwards D. D. Ltd.. P.O. Box 369. KenoraNov. 2. 1968 -

-AAt

x TFeb. 13, J969

[Is. inches)

A -^ --A^LJL' A - 8 -

d ri l ling 160 ft. 400 ft. 156 ft.

sitesA - 2A

— - 499-5- 6 - 192.6

153A - 9 - 0

ft. A - 3 - 502 ftft. A - 7 - 358 ftft. A -10 - 212 ft.

/Ul. 151 5 ft.. A12. 162.5 ft., AJJ. 237.0 ft. A14. 172.5 ft. A15,. 209 ft. A 16. 175.0 ft. '

OfO

Of

5oz <

o a. iuOf

it-zl™

zLil

DateSignature Agent

The Mining Act Certificate Verifying Report of Work

p j Ao DPV-

l .. B 9- tl^'rJ. nv '' '''' St no h Goolocjist - Exploration

Suite 1600, 4^ Kinq Street We^t. Toronto(Post Office Address)

. , , i.)) ^ |g [^ |] \] [h, jp]!

li-'-

- A- M - -7 H

••fi*

^ 1 JJ-fhereby c ertify:

1. Thot l have o pe.-sonol and intimate knowledge o f the facts set forth in the report of work aJwxed he to, h aving performed the work or witnessed some during a nd/or after its completion.

2. Thot the annexe j report is true.

DatedSignature

u.

g!ii!<sUt'.O!U-

Page 8: t y) P.€¦ · S.HJ tQ 1600, ^4 King Street West, Toronto, Ontario. Post Office Address do hereby report the performance of MOHu^b days of ^ ' 1 A separate form is required for

^ ^

'^

^ :

5*51

*S

^S

sto

J'

* —

S 2

*- t

*-S

**i

*JI

fr

r

l?

^

'ff*

;^-. '

ci "

JS^;

^ x? ^^ f K

THE

PE

NA

LTY

FO

R M

AKIN

G A

FA

LSE

STA

TEM

ENT

IN T

HIS

REP

OR

T A

ND

/OR

CE

RTI

FIC

ATE

IS S

500.

OR

SIX

MO

NTHS

IM

PRIS

ON

MEN

T O

R B

OTH

Page 9: t y) P.€¦ · S.HJ tQ 1600, ^4 King Street West, Toronto, Ontario. Post Office Address do hereby report the performance of MOHu^b days of ^ ' 1 A separate form is required for

(#k:,i

til" Li! ONTARIO

i- T HE MINING ACT REPORT OF WORK

To the Recorder of ........................ Patricia......................................

t liA s*porot* form istot e acii

CI WO'k 10 fc*

r.eord.d

.Miining Division

\, . .^.•...P.!...^9. k.aj..pn J?? n ?K of Ke.r r Edison N'nes Limited A 35972name of Recorded Holder Miner's Licence

.....S.uAtfc..J6QQ.,...44...kina..SXree.t..W^Post Office Address

do hereby report the performance of ...A94.9.t.6......................... days of ...P.i a. lJ!9.0.d...P.r.i.Ujn.g....................type of work

not before reported to be applied on the following contiguous claims

Claim No.

&539P.....

/t.5.39.!.... 45392

&3.91....i*5.391f.... 45395

Days

2.8...

28

28

2.8...

28

28

Claim No.

PA .4.5.33.6...

.45397... 45398

..f*53.9.9...45400

45401

Days

2.8....

28

28

28...

28

28

Claim No.

PA .454.0.2....

45404

.^95.... 45728.

45729

Days

..Z8

..28.

28

.18..

28..

28'""""""PA45309'."4*4406. 43595,"4'35'9'6, 44403, 4'4'4'02,

All the work was performed on Mining Claim (s) 44Ul2....u44.11r ..43515? .,W*j642.........................................(In the case of geological and/or geophysical survey (s) where more than 18 claims ore involved attach o schedule)

READ CAREFULLY: THE FOLLOWING INFORMATION is REQUIRED BY THE MINING RECQR.PER.

z i-SOfO

NMEN

S IMPR

x

For Manual Work, Stripping or Opening up of Mines, Sinking Shafts or Other Actual Mining Operations - Names andaddresses of the men who performed the work and the dates and hours of their employment.For Diamond and other Core Drilling - Footage, No. and angle of holes and diameter of core. Nome and address ofowner or operator of drill. Dates when drilling was done. Signed core log and sketch in duplicate.For Compresse^Ajj or Other Power Dnven or Mechanical EquipmentType of drill or equipment. Names and addresses of men engaged in operating equipment and the dates and hours oftheir employment.^or Power Stripping - Type of equipment. Name and address of owner or operator. Amount expended. Dates on whichwork was done. Proof of actual cost must be submitted within 30 days of recording.With each of the above types of work sketches are required to show the location and extent of the work in relationto the nearest claim post. In the case of diamond or other core drilling the sketch must be submitted in duplicate.For Geological and Geophysjcaj Survey - The names and addresses of men employed as well as dates. Type ofinstrument used in the case of geophysical survey. Reports and maps in duplicate must be filed with the Ministerwithin 60 days of recording.For Land Survey - the name and address of Ontario Land surveyor.

The Required Information is os Follows: (Attach a list if this space is insufficient)

D. 0. Contractor- Drilling Dates Core Diameter Core Storage Holes ^ depths

J. H. Edwards D. Q , Ltd.. P.O. Box 369. Kenora Nov. 2. 1968 * Feb. 13. 1969""

Ax T (lj; inches)at drilling s ite

A - l - 1160 ft.A - 2 - 499.5 ft. A - 3 - 502 ft.AT~5 - 400 ft. A~^~5 - 192.6 ft. A - 7 - 358 ft.A - 8 - 156 ft. A - 9 - 153.0 ft. A - 10 - 212 ft.

All. 151.5 ft., A12. 162.6 ft., Alj AT67 175.0 ft.

'

23?.O ft. A14. 172.5 ft. A15. 209 ft.

Signature of Recorded Holder or Agent

TL .,. . A I ne Mining ActCertificate Verifying Report of Work

. .5.4 J. f.?.. .i^.O.P.,. .44 K.i.ng.. St ree t .We s t, Tp ron to,

P A TR l C l AM1NINO OIV.

IS l i E 1 11 l. V .............................^, M .

7:H 1 ,10,11 l {M.2i2t't5 f

THIS REPORT AND/OR CERT

SE STATEMENT

u.•* o5 ^5! of O

J a.

(Post Office Address)hereby certify:

1. That l have a personal and intimate knowledge of the facts set forth in the report of work^nnexed here to, having performed the work or witnessed same during and/or after its completion.

2. That the annexed report is true.

....K.l....^(:.........19^ 7^*^-'. s*J32—ffyy-41?,' Signature

Page 10: t y) P.€¦ · S.HJ tQ 1600, ^4 King Street West, Toronto, Ontario. Post Office Address do hereby report the performance of MOHu^b days of ^ ' 1 A separate form is required for

Bs-

Ift

ONTARIO

THE MINING ACT REPORT OF WORK

A **p0rat* fern It required for *oeh fyp* Q! work recorded.

To the Recorder of...............PAtri^ia..............................................

Ke r r Add .1 son .M l, ne s. L \ m\\ Jed.Mining Division

name of Recorded Holder .Suite.1600, M; Kling..S..treet West A T|prp.nto, Ontario.

Miner's Licence

do hereby report the performance of ....A8M.6........................ days of R.lffW?nd..Pj:.UUnfl.......type of work

not before reported to be applied on the following contiguous claims

Claim No.

45886

Days 28... 28

2.9....

2.8....2828

Claim No.

PA .1*5887...

^5888..

.1*588.9,.

^589 1

Days Claim No.o O i O

28

28....

28.... .............28

PA'45309;" W+06, k35557'^3396,

DaysX

8 g

, W*12, ^All the work was performed on Mining Claim (s) ...(In the case of geological and/or geophysical survey (s) where more than 18 claims are involved attach a schedule)

READ CAREFULLY: THE FOLLOWING INFORMATION is REQUIRED BY THE MINING RECORDER.

For Manual Work, Stripping or Opening up of Mines, Sinking Shafts or Other Actual Mining Operations - Names andaddresses of the men who performed the work and the dates and hours of their employment.For Diamond and other Core Drilling - Footage, No. and angle of holes and diameter of core. Name and address ofowner or operator of drill. Dates when drilling was done. Signed core log and sketch in duplicate.For Compressed Air or Other Power Driven or Mechanical EquipmentType of drill or equipment. Names and addresses of men engaged in operating equipment and the dates and hours oftheir employment.For Power Stripping - Type of equipment. Name and address of owner or operator. Amount expended. Dates on whichwork was done. Proof of actual cost must be submitted within 30 days of recording.With each of the above types of work sketches are required to show the location and extent of the work in relationto the nearest claim post. In the case of diamond or other core drilling the sketch must be submitted in duplicate.For Geological and Geophysical Survey - The names and addresses of men employed as well os dates. Type ofinstrument used in the cose of geophysical survey. Reports and maps in duplicate must be filed with the Ministerwithin 60 days of recording.For Land Survey - the name and address of Ontario Land surveyor.

The Required Information is os Follows: (Attach a list if this space is insufficient)

XRS

D. Q. Contractor Dr111Ing Pates Core Diameter Core Storage Holes S- depths

AIL 151.5 ft., A12.

J. H. Edwards D. D. Ltd. p.O. Box 369. Kenorav f i ij w\jTwg i y j "jj •'f w MM t i

November 2. 19& -Feb. 13. A x T (It inches) at drilling sites

A - l -1160 ft.- i+oo ft.- 156 ft.

A - 2 - **99.5 ft.- 192.6 ft.- 153.0 ft.

- 502 ft.- 358 ft.- 212 ft.

x \ 162.5 ft., A13. 237.0 ft. Al^. 1TO.5 ft. A 15. 209 ft.

' ——^fc—^ ••HM^VK \ / WMMMAMi*

Tf

The Mining Act Certificate Verifying Report of Work

PATRICIAMINIMS DfV.

uiH

iBo

fOO. HI ttVI

Ul

fcUl

UL

Q

.O.'.^(Post Office Address)

hereby certify:

1. That l have o personal and intimate knowledge of the facts set forth in the report of wor*annexed here to, having performed the work or witnessed same during and/or after its completion.

2. That the annexed report is true.

Dated. 19 6.Signature

o.Uix