T24/2021SUPPLY, DELIVERY, INSTALLATION
AND MONITORING OF FIBER CABLING, NETWORK AND
SERVER ROOM
![Page 2: T24/2021 SUPPLY, DELIVERY, INSTALLATION AND MONITORING …](https://reader036.vdocument.in/reader036/viewer/2022081623/61580662bfb0e804852d9078/html5/thumbnails/2.jpg)
OVERVIEW
• Purpose of this project is to deliver Internet connectivity to the VUT main campus residence through fiber cabling and wifi infra-structure.
• You are required to supply, deliver, install and commission the following goods and services.
![Page 3: T24/2021 SUPPLY, DELIVERY, INSTALLATION AND MONITORING …](https://reader036.vdocument.in/reader036/viewer/2022081623/61580662bfb0e804852d9078/html5/thumbnails/3.jpg)
![Page 4: T24/2021 SUPPLY, DELIVERY, INSTALLATION AND MONITORING …](https://reader036.vdocument.in/reader036/viewer/2022081623/61580662bfb0e804852d9078/html5/thumbnails/4.jpg)
This tender contains 4 main components:1. The Server Room preparation2. The Fiber cable laying3. The CAT 6 cabling4. Electrical work on Server Room and Drop points
![Page 5: T24/2021 SUPPLY, DELIVERY, INSTALLATION AND MONITORING …](https://reader036.vdocument.in/reader036/viewer/2022081623/61580662bfb0e804852d9078/html5/thumbnails/5.jpg)
Server Room PreparationPrepping the server room as per on the specificationPaint Work (1 meter wide, 3.5 meters Length and 2.5 meters height)Security doorRelocating the fibre cableElectrical work
![Page 6: T24/2021 SUPPLY, DELIVERY, INSTALLATION AND MONITORING …](https://reader036.vdocument.in/reader036/viewer/2022081623/61580662bfb0e804852d9078/html5/thumbnails/6.jpg)
![Page 7: T24/2021 SUPPLY, DELIVERY, INSTALLATION AND MONITORING …](https://reader036.vdocument.in/reader036/viewer/2022081623/61580662bfb0e804852d9078/html5/thumbnails/7.jpg)
![Page 8: T24/2021 SUPPLY, DELIVERY, INSTALLATION AND MONITORING …](https://reader036.vdocument.in/reader036/viewer/2022081623/61580662bfb0e804852d9078/html5/thumbnails/8.jpg)
The Fiber Cable Length
Red = 755 metersYellow = 900 metersPurple = 205 metersBlue = 30 meters