· table of c 1 intro 2 syste 1 visual 2. visual 3. visual 4. visual applianc 5. visual 6. visual...

89
U Use Case se C es Case es 1 / 89

Upload: others

Post on 23-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

U

Use Case

se C

es

Case

es

1 / 89

Page 2:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

Table of c

1  INTRO

2  SYSTE

1 VISUAL

2. VISUAL

3. VISUAL

4. VISUAL

APPLIANC

5. VISUAL

6. VISUAL

7. MULTI-8. VISUAL

STARTING

9. VISUALISUFFICIEN

10. REQUESUFFICIEN

11. HOME POWER IN

11.1 POWECAUSE OF CIRCUIT B

11.2. OVER

11.3. POWE

12. ACTIVE

13. TARIFF

14. ENERGY

15. DEVICE

16. DEVICE

DEVICE CO

ontents

ODUCTION .

EM ARCHIT

IZATION OF CU

LIZATION OF C

LIZATION OF C

LIZATION OF H

CES) ..............LIZATION OF H

LIZATION OF H

-TARIFF ENER

LIZATION OF E

G TO RUN .......

IZATION OFNT TO RUN A

ST OF CONFNT TO RUN A

DOMAIN ON ORDER TO

ER LOSS NOA POWER L

BREAKER) ..

RLOAD MAN

ER LOSS NO

E DEMAND A

F-CONSUMP

Y PRODUCT

E REMOTE M

E REMOTE C

ONFIGURAT

......................

TECTURE .....

URRENT ENER

CURRENT HOM

CURRENT HOM

HISTORICAL DA

......................HISTORICAL DA

HISTORICAL DA

RGY USE OPTIM

ESTIMATED EN

......................

F A WARNINA SMART A

FIRMATIONA SMART A

VERLOAD MO AVOID HO

OTIFICATIOLOSS EVEN......................

NAGEMENT

OTIFICATIO

AND LOAD

PTION INFO

TION/STOR

MONITORIN

CONTROL ..

TION (MAN

......................

......................

RGY AND POW

ME ENERGY CO

ME ENERGY CO

ATA FOR THE

......................ATA COMPAR

ATA COMPAR

MIZATION IN C

NERGY CONSU

......................

NG IF AVAILAPPLIANCE

N TO STARTAPPLIANCE

MANAGEMOME DOMAI

ON AND ANAT (E.G. A BL......................

T EX-ANTE .

ON AND EX-

SHIFTING T

ORMATION E

RAGE ............

NG ................

......................

AGEMENT)

Use Case

......................

......................

WER DATA ......ONSUMPTION

ONSUMPTION

SINGLE CUST

......................ED WITH A BE

ED WITH A US

CASE OF SMAR

UMPTION OF S......................

LABLE TOT.....................

T IF AVAILA.....................

MENT - THE CIN OVERLO

ALYSIS - THLACKOUT O......................

......................

-POST ANAL

TO REDUCE

EXCHANGE

......................

......................

......................

) ....................

es

......................

......................

......................

......................WITH ENERGY

TOMER (GLOB

......................ENCHMARK .....SER COMMUNIT

RT AND NON-SSMART APPLIA

......................

TAL POWER......................

ABLE POWE......................

CEMS WANOAD. ..............

HE USER WAON THE EXT......................

......................

LYSIS ...........

E CONSUMP

E ....................

......................

......................

......................

......................

......................

......................

......................

......................Y COST INFOR

BAL IN HOUSE

......................

......................TY .................

SMART APPLIA

ANCES AND IT

......................

R (IN THE HO......................

ER (IN THE ......................

NTS TO OPTI......................

ANTS TO UNTERNAL GR......................

......................

......................

PTION AT P

......................

......................

......................

......................

......................

......................

......................

......................

......................RMATION ........ AND SMART

......................

......................

......................ANCES ...........TS COST BEFO

......................

HOME) IS NO......................

HOME) IS N......................

IMIZE THE......................

NDERSTANDRID OR A TR......................

......................

......................

PEAK TIME .

......................

......................

......................

......................

......................

2 / 89

................... 3

................... 4

................... 8

................. 12

................. 15

................. 18

................. 21

................. 23

................. 25ORE

................. 29

OT ................. 31

NOT ................. 33

USE OF ................. 36

D THE RIP OF THE................. 37

................. 38

................. 48

................. 51

................. 59

................. 68

................. 80

................. 84

................. 89

8 2 5 

8  

3 5 

 

E 7 

 

Page 3:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

1 Introd

Energy@hfor energy communicabased on Smart Grid This docuof IEC-TC (Comitato that WG2systems centitled “Smanagemecases andelectrical buildings The AssocIndesit Commembers fappliancestelecommuIntecs), mifor the inveMario BoeUrmet). The Energtransform tthe electritelecommudevices to domestic eThe activitof architecon the regspecificatioEnergy@hintegrates .

Inforenco

Enerwitho

duction

ome is a noefficiency i

ation. Its gothe collabo

d.

ment is go57 as a coElettrotec

1 of IEC-Tconnected Systems inent systemd requiremgrid and cand indust

ciation was mpany and from differe

s manufactunications (cro-electronerter and stlla) and sm

gy@home athe home eic meter, h

unications, sbe integrat

energy systeies of the A

ctures and tgulatory enons. ome is an devices, fun

mation in thouraged to r

rgy@home out any prio

o-profit assoin the homeoal is to prooration of th

oing to be sontribution nico Italian

TC57 is reto the ele

nterface bem – Part 2: ments for t

customer etry.

founded onit is open t

ent industriturers (Ele(Telecom Itnics vendortorage syste

mall/medium

aims to useenvironmenthousehold small renewted in a smem, and givAssociation technical spnvironment,

acknowledgnctionalities

his documeeview and p

reserves thr notice.

ociation thae, for the beomote the dhe applianc

submitted to the tech

no). Whereesponsible ectrical gretween cusUse caseshe interfacenergy ma

n July 2012to new memes: the ele

ectrolux, Intalia and Vrs (Freescaems (Power-sized com

e the new it in an eco-appliances

wable powerart way, incing consumare organiz

pecificationsexperimen

ged contribus and use ca

ent is prelimprovide com

commen

he right to

Use Case

at aims to denefit of thedevelopmen

ces within t

by Energy@hnical repo

e, for the sfor “Inter

id”, while stomer enes and requce betweenanagement

2 by Telecombers. At thectrical systndesit ComVodafone), le, Renesar-One), as w

mpanies (i-e

nformation -system of ds, electricalr plant and ecreasing en

mers more inzed into wors, include thnting with p

utor to the ases of Ene

minary and mments at th

nts@energy

publish fu

es

evelop & pre environment and widehe househo

@Home Asort IEC 627ake of comrfaces and

the technergy manairements” n the powsystems f

om Italia, Elhe time of wtem industrmpany, Wh

ICT compas, and ST well as resem, Flexgrid

technologiedevices thal system, energy storergy efficie

nformation arking groupshe analysis pilot project

ZigBee Hoergy@home

subject to che following

y-home.it

uture versio

romote techent, based espread of old and the

ssociation t746-2 TR thmpleteness protocol ical reportgement syand is inteer managefor residen

lectrolux, Ewriting, the ry (Enel anhirlpool, ananies (AltraMicroelectroearch institud, Eurotherm

es and elect communicand the nage. Commncy, reliabil

and power os and, in adof the use

ts and the

me Automa.

change, how e-mail add

ons of thes

hnologies aupon devicproducts an

eir integratio

to Workinghrough the s, it is here

profiles rt IEC 6274

ystem and ended to pement systntial and c

Enel DistribuAssociation

nd Edison), nd Aristonan, Flash onics) and utes (Istitutom, MAC, G

ctronic equcate with eanetwork of munication a

lity and secof choice. ddition to th

cases anddissemina

ation 1.2 sta

wever anyodresses:

se specifica

3 / 89

nd servicese to devicend serviceson with the

g Group 21Italian CEI

e remindedrelevant to46-2 TR isthe powerrovide usetem of thecommercial

uzione, andn counts 22

household Thermo),Reply, anda company

o Superioreemino, and

ipment’s toach other’s:

broadbandllows these

curity of the

he definitionthe impact

tion of the

andard that

one is

ations

s e s e

I

d o s r e e l

2

y e

o

d e e

n t

e

t

Page 4:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

2 Syste

Following tflexible demsupport offlexibility tConnectionThe generCustomer a

1 Developed

Reference

m Architec

the Europemand and gf an efficiehat a custon Point”, tharic architectand the Grid

by the “Smae: http://ec.eu

cture

an roadmageneration ant integratiomer could at representture that dd actors is r

art Grid Coorropa.eu/energ

p for the imare taken inon of reneoffer to th

ts the physiescribes threported in

rdination Grouy/gas_electric

Use Case

mplementatinto accountwable ener

he Smart Gcal and log

he functionsFigure 1

up” as requescity/smartgrids

es

on of the St, one of thergy sources

Grid actors ical interfacs involved

sted by the Es/doc/xpert_gro

Smart Grid1e cornerstons into the through a s

ce from the cin the inte

European Comoup1_sustaina

1, where cone requiremenergy sysso called “customer to

eractions be

mmission, maable_processe

4 / 89

oncepts likement for thestem is theSmart Grid

o the grid. etween the

andate M/490.es.pdf

e e e

e

.

Page 5:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

The functiosystems anbe mappedshown in energy coarchitecturinterests of

Figure 2: E

onal compond devices. d in the EnFigure 2, p

onsumption re is expectf the Energy

Energy@hom

Figu

nents repreIn this doc

nergy@homproviding to

awarenessed to increay@home m

me architect

ure 1: Flexib

esented in tument it wi

me architecto the custos, up to aase in scopembers.

ture

Use Case

bility functio

his figure cll be shownture. The Aomers new a fully intepe as a resu

es

onal architec

could be impn how this gAssociation

value addeegrated enult of the on

cture

plemented/aeneric funcadopted th

ed servicesergy mana

ngoing colla

aggregated ctional archihe system as ranging fagement syaboration ac

5 / 89

in differenttecture canarchitecturerom simpleystem. Thectivities and

t n e e e

Page 6:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

In a Home all the actocommunicaof indoor pservices pr Devices inAutomationand officiacommunicauser device The HAN provides m(Enel DistrNetwork anreceived fr The HAN ddevices thaPlug. In Ento receive on/off remidentify themonitor anproblems aproprietarythrough a sThe Powerwashing mschedulablestimated schedulinga schedulioptimizes talways subthe availab The main a Smart

of theiro

o o

o

In asupthe exashaSmsomconcon

Custom

Domain, thors (home dation mechaplatform anrovided outs

n the HANn version 1.ally ratifiedation includes. This ens

will interfacmeasuremenribuzione) pnd it commrom the all t

devices areat do not imnergy@homenergy data

motely. Smae type of loand control thas well as y informatioscheduling ar Profile is achine eace phase ntime requir the phaseing algoriththe total debject to any bility of ener

actors in the

Appliancesr possible ne

Display to instant powDispatch inAutonomoucoming frobeyond a tCooperativload shiftin

any case, thpervision, sh

correct example, a small assure thart plugs

mehow incluntrol over thntrolled by Smer Interfa

hat includesdevices, CEanism. The d it is exprside the Ho

N communic.2 developed in July ing the syntsures full in

ce with thent data recopower-line p

municates ushe DSO me

e divided inmplement anme have bee

a and instaart devices ad (e.g., typhe start andthe transmn of the apalgorithm tha vector w

h element onot interruped, the exp. The CEMS

hm to calcumand in terrestriction

rgy from pow

e Home Dom

s: an evoluew functionthe custom

wer, etc.) n the HAN inusly adapt om the houshreshold)

vely operateng and load he load conthall be perfxecution of

mart washinhe result of t

(able to pruded in thee effect of r

Smart Plugsces: see he

s both the HEMS, Smartaim of Ene

ressly out ome Domain

cate with ed in collabo

2013. Thetax and semteroperabili

e DSO metorded by thprotocol. Onsing the Zigeters and ca

to "legacy ny communien defined antaneous pare conne

pe of appliand the statusission of stppliance. Evhat uses thewhich represof the vectoptible descrpected enerS collects thulate the dms of maximset by the cwer plants a

main are the

tion of the alities:

mer informa

nformation otheir behav

se. (e.g. red

e with othershedding

trol operatioormed undef its workinng machinethe washingrovide remoe Smart Apremote cont

s ereunder so

Use Case

HAN (Home t Info and C

ergy@homeof the scop.

each otheroration betwese internamantics of aity between

ter using ahe electronin the othergBee protocan be querie

devices" ancation skills

all the messower, and wcted devicence, supplies of operatitatistical infvery electri

e data strucsents the e

or representribed by 4 rgy consumhe Power P

delay of eamum powerclient (suchand storage

e following o

actual and

ation on the

on their enevior accordduce their

r entities in

ons either per the compng procedu, when req

g cycle. ote meterinpliances catrol activitie

ome of their

es

Area NetwoCustomer In is to identi

pe the defin

r via the wween the Zigational spepplication msystems an

smart metc meter co

r side, this col: it can ed in polling

nd " smart s and can oages needewhere the loes for whicer name, firon, to comm

formation acal load ofture definedenergy needs a phase ofields: the

ed and, finProfile of allach stage fr and hourly as the time

e systems in

ones:

standard w

eir energy c

ergy consuming to inforload when

order to op

performed aplete controure and itsuested to m

ng and to bategory althes. In partic

possible fu

ork) and thenterfaces) cfy and desc

nition of the

wireless prgBee Allian

ecifications messages exnd devices f

tering gatewmmunicatindevice is pbe configur

g to acquire

devices”. Tnly be cont

ed to configoad permitsch the mesmware versmunicate innd the tunnf a smart dd in Power Pds of a devof the washe maximumally, the madevices co

for each dey cost of enee of terminan the home.

white goods

consumptio

mptions rmation on global hous

ptimize the

utonomouslol of the app

results anmodify its c

be remotelyough they ular, Smart

nctionalities

e HN (Homecan cooperacribe the ree other inte

rotocol Zignce and Ene

define allxchanged bfrom multipl

way (Smarng with it vipart of the red to sendon-demand

The first aretrolled throuure these s

s, to controssages are sion, etc.) anformation tneling of mevice can Profile. vice, in theing. Each e

m power reaximum de

onnected anevice; this ergy that, o

ation of a w

s; see hereu

ons (e.g. us

energy cose consump

energy usa

ly or under pliance, whnd performconsumptio

y controlledcan providAppliances

s:

6 / 89

e Network),ate through

equirementserfaces and

Bee Homeergy@home levels of

between thele vendors.

t Info) thatia the DSOHome Area

d push datad data.

e traditionalugh a Smartsmart plugs,l the switchdefined to

s well as toto diagnoseanufacturerbe planned

e case of aelement is aquired, thelay allowed

nd performspermits to

of course, isash) and to

under some

sed energy,

nsumptionsptions goes

age through

an externalich assuresances. Forn behavior,

d) could bee no direct

s will not be

h s

e e f e

t O a a

l t

h o o e r

a a e d s o s o

e

s s

h

l s r

e t

e

Page 7:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

o

o

o

The CupossibiinterfacpreviouTypicalentertaimplem(e.g. th

CustomfunctioCEM isreceivestandaconnecgenerathe conmultiple

Smart into thElectricpossiblof abouembedand use

Outstandin WSN-C

HAN dapplica

ElectridifferenMoreovthe me

Aggregthe ADoffers t

Please notdevices in functionalitwith a rich same way,perform su

Display infinformationevery singinterface isTransmit cbehavior Configure computer utime slots)

ustomer Inteility to havece, but the usly stated. l Customer

ainment syments the ushe Home Gamer Energynalities, it is a logical ed from the rds. The C

cted devicesl or dedicat

nnected deve loads/genInfo: it is the HAN. Pu

city Meter, ly generatedut 1 Hertz ded inside ed to dispat

ng compone

C: Wireless devices andations. city Meter

ntiated regver, the metter. gator: med

D buyers, pto the marke

te that the the Home

ties from muser interfa while typicch operatio

formation on and similagle smart as freely deficontrol mes

Smart Applused to con

erface, frome Customer definition o

Interfaces stems, in-h

ser interfaceateway) andy Manager is the gatewfunction op grid, consu

Customer Es; especiallted load anvices. It proneration resohe element,ublished dahence the Sd by the Smfrequency the Smart Itch data ge

ents outside

Sensor Ned provides

r: An elecisters, andter should p

iator betweools flexibiets.

proposed cDomain, w

ore than a ace, could acal smart apons, should

on energy ar, from theppliance. Tned by everssage to S

liances to mnfigure a th

m this perspInterfaces

f this interfa

are personhouse mone, could be d accessed tSystem (CEway betwee

ptimizing enumer’s sett

Energy Many the in-ho

nd generatioovides vice ources can provided bata are a Smart Info a

mart Info itseor higher) nfo. Additionerated by

the Home D

etwork Centservice or

tric meter, capable o

provide bi-d

en consumlities of co

classificatiowithout any category. A

also implemppliances arbe consider

Use Case

usage like e whole ho

The level ory device Smart Appl

modify theirhermostat to

pective, is caccessing

ace is out o

nal computenitor and local in thethrough weEMS) The Cen the HANnergy consuings and conager colle

ome/buildingon managemversa informbe combine

by the DSO,sub-set of acts like a elf. Noticeashould be

onal elemenother meter

Domain are

ter: it manariented inte

able to of transmitt

direction com

ers and ADnsumers to

n is mainlylimitation t

As an exament functionre smart whred an appl

es

instant pouse (cominf details an

liances to

r power cono activate th

connected ithe house

of the scope

ers, Smart similar. Th device or rb-services. CEMS is CEN, the HN aumption andontracts, anects messag sector hasment commmation towaed in the CE which dispthose alre

proxy of thebly, near reacquired by

nts (SI’) canrs into the H

e:

ages, togeterfaces for

measure ating such mmunicatio

D buyers, coo build Acti

y intended tto the possple, an adv

nalities typichite goods, aiance from t

ower, historg from the

nd graphica

request a

nsumption phe controlle

n the HN/Hfrom the We of the Ene

Phones, PDhe softwarremotely ho

EM integrateand the WAd or producnd devices ges sent ts to be me

mands and tards the “grEM to be muatches ene

eady availae meter. Adal-time insty another m also be pr

HAN.

her with thethe devel

and record data to cen to allow re

ollects requve Demand

o identify tsibility for aanced Sma

cal of a Cusalso a persothis perspec

rical data, Smart Info

al layout of

modificatio

profile (e.g. ed load only

HAN; it is foWAN through

ergy@home

DAs, ad hore applicatosted in ano

ed with comAN (e.g. intction based minimum pto and recntioned. It then forwardrid / market”utually contrgy related

able inside dditional datant power (metering derovided by t

e Home Gaopment of

usage daentral utilitieremote man

uests and sd services

the main caa device toart Appliancstomer Interonal compuctive.

7 / 89

contractualo) and fromf their user

on of their

a personaly in certain

oreseen theh a specifice project as

oc displays,tion, whichother device

mmunicationernet). Theon signals

erformanceeived fromcan handleds these to”. Note thatrolled. informationthe Home

ta could be(sampled atevice, likelyhird parties

ateway, thethird-party

ata in timees system.agement of

ignals fromand makes

ategories of implemente, provided

rface. In theuter, able to

l m r

r

l

e c s

h e

n e s e m e o t

n e e t y s

e y

e

f

m s

f t

e o

Page 8:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

1 Visualiza

Name of U

ID DZ

1.1

Version M

Version No.

1

Scope and

Scope

ObjectivRelatedcase(s)

Narrative o

Short dThe cushis/her hpossiblyComple Among referencpricing. hours orin the Snecessacolumn.

No Diagr

Actors

Groupin Actor Nasee Acto

Smart Inf

ation of cu

Use Case

Domain(s)/ Zone(s)

anagement

Date

d Objective

ve(s) d business

of Use Cas

escription stomer is phouse. Data

y, integratesete descript

the data cce to the cuIn this con

r days. Datamart Applia

ary; its pres

ram is availa

ng (e.g. dom

ame or List

fo

rrent energ

/ Nam

Vis

t

Name of Author(s)

Stella Di Ca

es of Use C

S

The aimon the cVisualiz A.2.19

se

resented wa are provids those datation oming from

urrent tariff text “curren

a can be preance or in thsence would

able for this

mains, zones

Actor Typsee Actor

gy and pow

Use Cme of Use

ualization o

Versi

arlo

ase

Scope and

m of followicurrent situazation of glo

pag 215 v.

Narra

with informaded by the a with near r

m the Metershows just

nt” means nesented in dhe Customed allow a n

Diagras use case

s) G

pe r List

As

PcacaDrtc

Use Case

wer data

ase IdentifCase

of current en

ion ManageChang

Objectives

ng use casation of the obal current

069

ative of Use

tion about Smart Info,real-time po

r no informat which is tnear real timdifferent forer Interfaceumber of e

am(s) of Us

Actors Group Desc

Actor Descsee Actor Li

Provides acontained iand, eventucalculated another devData are request atransition changing da

es

fication

nergy and p

ement ges

s of Use Ca

ses is to procustomer c

t metering d

e Case

the global which retr

ower, measu

ation about he active tame data anmats (plain . In this Usxtra functio

se Case

cription

cription ist

a sub-set n the Sma

ually, instanby the SI

vice connecdispatche

and in c(only for

ata). The S

ower data

se

ovide custoconsumptionata from Sm

current eneieved them ured by an e

costs are ariff at the nd the cons

numbers, ge Case the

onalities des

of data art Meter nt power,

itself or cted to it. d upon

case of slowly

mart Info

ApproStatu

omer with inns mart Meter

ergy consu from the Mextra modu

provided, hmoment, b

sumptions ographics, tae CEMS is nscribed in t

Further informatiospecific Use Case

8 / 89

oval s

nformation

and DSO

mption of Meter and, le.

hence any ut not the

of last few bles, etc.)

not strictly the CEMS

n to this

Page 9:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

CEMS

Smart Ap

Steps – Sc

No. Sc

ppliances

cenario Nam

cenario

me

Primary

ptermFbltAcopttHcaf

EIptpvIEfptpv

ImHiwP

IwPmbWRSmhDdr

Scen

Actor T

Use Case

performs nthe data retexcept therequired tomemorize aFor examplbe dispatchevel of resthe meter Any operachange Meor to integrapower, shathe device to the custoHosts a Wcollects dataand organizfriendly pres

Exposes a wP HN that

party applicto elaborateprovides visualizationmplements

Environmenframework fparty applicto elaborateprovides visualization

mplements manage all HAN; this fmplementewith the Platform

mplements with the Platform anmediate between loWSN-C SerReceive ovSmart Infometering dhouse energDisplay a sdata, deprichness of

nario Cond

Triggering

es

o elaboratrieved by th basic pr

o retrieve, and dispatce, load prohed with thsolution ava

(e.g. 15 mation nee

eter data rate them witll be perfowhich displmer.

Web applicaa from HAN

zes them fosentation.

web-based can be use

cations thae current d

a n.

an Ent (e.g. for Java) tocations thae current d

a n.

a Trust Asecurity ke

functionalityd via colla

WSN-C

the commWSN-C

nd providescomm

ocal bundvice Platfor

ver the HAo) global data and gy consumpsub-set of pending oits user inte

itions

Pre

ion over he Meter, rocessing

validate, ch them. ofile shall he same ailable in minutes).

eded to esolution th instant

ormed by ays data

tion that N devices r a user-

API over ed by 3rd t wishes data and

different

Execution OSGi

o host 3rd at wishes data and

different

Agent to ys of the

y can be aboration

Service

unication Service

APIs to unication les and m.

AN (from current

total in-ption. available on the

erface

e-Condition

n Post-

9 / 89

-

Page 10:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

Na1 Vis

of cume+ inf

2 Visof encoanSmApglome

3 Visof encoanSmApglome+ inf

4 Visof encoof

ame sualization

globaurrent etering data

cosformation

sualization curren

nergy onsumptionsnd power omart ppliances+ obal currenetering data

sualization curren

nergy onsumptionsnd power omart ppliances +obal etering data

cosformation sualization

estimatednergy onsumption

Smar

al

a t

Smart CEMS –applianc

t

s f

t a

Smart CEMS –applianc

t

s f

+

a t

d

rt

EInfo –

– Smart ces

Info – – Smart

ces

Use Case

Event

es

ThiaddinfotheuseAccruletheDSbe proinfobeiRetsubto rateIn thealstheenecontheapplevfreqquacouamdevbe cliesucdisdatwitconsucshaperCusInteSimpresceinfocos

Onimpof is tcon

s scenad aormation ab cost of

ed enercording es imposed Authority, O could

allowed ovide sormation, ng the Enetailer the object entit

define fes for clientthis scena customero informed curr

ergy nsumptions sin

pliance. Tel of detquency aality of duld be differong differvices. It sho

possible ents to dispch aggregatedta togeth total honsumptions;ch functionaall rformed stomer erfaces milar to evious enario wormation sts

e of the mportant gothis use cato educate nsumer

Condario also bout

the rgy.

to d by

the not

to uch

ergy only tled final ts.

ario, r is on rent

of ngle The tail, and

data rent rent ould

for play

d ther use ; ality

be by

the

with on

most oals ase the

in

10 / 89

dition

Page 11:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

Apanbesta

ppliances nd its cosefore arting to run

t

n

Use Casees

selparthefeehercosconbefbutprestuthadisinfoeneconsav15 achsinTheAppestenebe duropecycposgivalsenetheopereqCEeneevaMocasusepricapprecinfowhcur

ecting rameters cycdbacking

r/him thsts and enensumption, fore the stton will essed. Madies sht, only playing tormation, ergy nsumption ving of

% could hieved on gle appliance Smpliances imate ergy that

consumring its neration (cle). ssible, te informato about ergy cost a n

eration costquiring to MS to perfoergy caluation. reover,

se of timee (TOcing, pliance ceives ormation abich tariff rrently in us

the of

cles

heir ergy

start be

any how

by this

a

10-be

the ce.

mart

the will

med next (ex:

If hey tion the

and next t by the

orm cost

in e-of-OU) the

bout is

se.

11 / 89

Page 12:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

2. Visualiz

Name of U

ID DZ

1.2 C

Version M

Version No.

Scope and

Scope

ObjectivRelatedcase(s)

Narrative o

Short deThe cushis/her appliancComple The cushis/her possiblycannot pjust relareal timdifferenton anotpresencadditionappliancdevices.house co

General R

Consumpfunctionameasure

Diagrams

zation of cu

Use Case

Domain(s)/ Zone(s) Customer/M

anagement

Date

9/5/2014

d Objective

ve(s) d business

of Use Cas

escription stomer is phouse and

ces themselete descriptstomer is phouse. Dat

y, integratesprovide infote to the ace data andt formats (pther Custome would al, the custom

ces. The lev. It should bonsumption

emarks

ption of Smality the apment.

of Use Cas

urrent hom

/ Nam

Market VisSmApp

t

Name of Author(s)

Marco Sign

es of Use C

S

The aimon the the oneVisualizA.2.19

se

resented wd Smart Apves or on ation presented wta are provs those dataormation abctive tariff ad the consulain number

mer Interfaclow a num

mer is also vel of detailbe possible

ns; such fun

mart Applianpliance is p

se

e energy co

Use Cme of Use

ualization oart pliances wit

Versi

na

ase

Scope and

m of followicurrent situ

e of Smart Azation of cupag 215 v.

Narra

with informappliance onnother devi

with informaided by the

a with near bout energy t the momeumptions ofrs, graphicsce. In this ber of extrinformed on, frequency for users tctionality sh

Gennce can be performing,

Use Case

onsumptio

ase IdentifCase

of current h

th cycle cos

ion ManageChang

Objectives

ng use casuation of he

Appliancesrrent energy069

ative of Use

tion about n a selecteice.

ation about e Smart Infreal-time pcost, henc

nt, but no pf last few hs, tables, et

Use Casera functionan the curren

y and qualityto display shall be perfo

neral Remaan estimat not neces

es

n

fication

home energ

st informatio

ementges

s of Use Ca

ses is to proer/his home

y and powe

e Case

the global ed user in

the global fo, which reower, meas

ce any referpricing. In thhours or dac.) either on

e the CEMSalities descnt energy coy of data cosuch disaggormed by C

arks e based onsarily the c

gy consump

on

se

ovide custoe consumpt

r data

current eneterface, tha

current enetrieved it fsured by an rence to thehis context “ays. Data cn the SmartS is not st

cribed in thonsumptionould be differegated datustomer Int

n the phaseconsumption

ptions and

ApproStatu

omer with intion and in

ergy consuat could b

ergy consufrom the M extra modue current ta“current” mecan be pret Appliance trictly necee CEMS cs of the sin

erent amongta together terfaces.

e of the cycn value com

12 / 89

power of

oval s

nformation particular

mption of e on the

umption of Meter and, ule. Meter ariff would eans near

esented in display or

essary; its olumn. In gle Smart g different with total

cle or the mes from

Page 13:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

No Diagr

Actors

Groupin Actor Nasee Acto

Smart Inf

CEMS

ram availab

ng (e.g. dom

ame or List

fo

le for this U

mains, zones

Actor Typsee AcList

TBD

TBD

DiagraUse Case

s) Group

pe ctor

Actor see Ac

Providin the instantitself oit. Datand inslowlyInfo pedata rthe bretrievdispatcprofilesame the moperatdata rwith performdisplayIn addpower in ordecalibraHosts data organipresen ExposHN thapplicacurrenvisuali ImplemEnvirofor Japplicacurrenvisuali Implemall sefunctiocollaboServic Implem

Use Case

am(s) of Us

Actors p Descriptio

Descriptioctor List

des a sub-seSmart Me

t power, caor another dta are dispan case of changing erforms no retrieved bybasic proceve, validatch them. shall be dlevel of res

meter (e.g. tion neededresolution o

instant med by ys data to thdition, nea informatioer to allow ate its energ

an applicfrom HA

zes them ntation.

es a web-hat can be ations that

nt data and ization.

ments onment (e.gJava) to ations that

nt data and ization.

ments a Trucurity keys

onality can oration w

ce Platform

ments the

es

se Case

on

on

et of data cter and, evalculated bdevice connatched upon

transition data). Th

elaborationy the Meteressing reqe, memorFor exampdispatched solution ava

15 minuted to changor to integrapower, shthe devicehe customer real timen is to be Smart Applgy consumpcation that AN devicefor a use

based API used by

wishes to eprovides a

an Eg. OSGi fr

host 3r

wishes to eprovides a

ust Agent tos of the Hbe impleme

with the

communica

contained ventually, y the SI

nected to n request (only for e Smart over the r, except uired to ize and

ple, load with the

ailable in es). Any ge Meter ate them hall be e which r.

e instant provided iances to

ptions. collects

es and r-friendly

over IP 3rd party elaborate

different

Execution amework d party elaborate

different

o manage AN; this

ented via WSN-C

tion with

Further informatiospecific Use Case

13 / 89

n to this

Page 14:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

SMART APPLIAN

NCE TBD

the WprovidcommubundlePlatfor Providpoint respecconsum ReceivInfo) about consumEach Ssub-seon thelike: its o

draw the

cons In adddispatcconsumpossibenergyto the interfa

Use Case

WSN-C Seres APIsunication es and rm.

des to user of contac

ctive cmption infor

ve over theglobal cur

total mption. Smart Applet of availabe richness o

own energy wn data total house sumption

ition, each ches it ownmption data

ble use by thy managemend user on

aces.

es

rvice Platfos to

between WSN-C

appliancesct to publicurrent rmation.

e HAN (frorent meterin-house

iance may ble data, deof its user i

consumptio

energy

Smart Appl energy

a over the Hhe CEMS foent or visuan specific

orm and mediate

local Service

a single sh their

energy

m Smart ing data

energy

display a epending nterface,

on/power

iance

HAN for or overall alization

14 / 89

Page 15:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

3. Visualiz

Name of U

ID DZ

1.3 C

Version M

Version No.

Scope and

Scope

Objectiv

Relatedcase(s)

Narrative o

Short deThe cushis/her appliancenergy dComple The cushis/her hSmart Intime powaccordininformatto definedifferentand the differenton anothconsumpcould bedisaggreperformeeducate on the c

zation of cu

Use Case

Domain(s)/ Zone(s) Customer\M

anagement

Date

9/5/2014

d Objective

ve(s)

d business

of Use Cas

escription stomer is phouse and

ces themselduring the d

ete descriptstomer is phouse and enfo, which rewer, measung to rules tion, that wie final ratest media (likconsumptio

t formats (pher Customptions of the different egated dataed by Cust the consumcosts and e

urrent hom

/ Nam

Market VisSmApp

t

Name of Author(s)

Marco Sign

es of Use C

S

The aimcurrent provideduring tselecteProvidespecificand ratiA.2.19

se

resented wd Smart Aplves or on a

day as well ation presented wenergy costetrieved it fred by an e

imposed bll be provids for clientse internet fons of last lain numberer Interfacee single Smamong diffa together tomer Interfmer in selecenergy cons

e energy co

Use Cme of Use

ualization oart pliances wit

Versi

na

ase

Scope and

m of this usehome ener

customer wthe day andd cycle at a

e informatiocally on appionale use opag 215 v.

Narra

with informappliance onanother devas the energ

with informat informationrom the Mextra module

by the Authed instead

s. Energy Rfor examplefew hours rs, graphics

e. In additiomart applianferent devic

with totalfaces. Onecting the pasumption, b

Use Case

onsumptio

ase IdentifCase

of current h

th energy co

ion ManageChang

Objectives

e cases is trgy consumwith informad specificalla certain timon to consupliance cyclof the energ069

ative of Use

tion about n a selectevice. In addgy cost of s

ation about n throughou

eter and, poe. Meter canhority, so tby the Ene

Retailer woue). In this co

or days. Das, tables, etn, the custo

nces. The leces. It shoul house co of the mo

arameters obefore the s

es

n with ene

fication

home energ

ost informat

ement ges

s of Use Ca

o expand Umptions and ation on thely the cost o

me of the dayumers on ee cost to ed

gy

e Case

the global ed user inition, the co

selected cyc

the global ut the day. Essibly, integnnot providethe DSO isrgy Retailerld provide eontext “currata (energyc.) either onomer is alsoevel of detauld be posonsumptionost importanof the cyclesstart button

rgy cost in

gy consump

tion

se

se Case IDpower of Senergy cos

of running Sy. nergy cost ducate them

current eneterface, tha

onsumer cacles for Sma

current enEnergy datagrates thosee informatio not allow

r who is theenergy costrent” meansy and cost) n the Smarto informed oil, frequencsible for uss; such funt goals of s by providi will be pre

formation

ptions and

ApproStatu

D xxx (VisuaSmart Applist at any poSmart Appli

during them on a mor

ergy consuat could bn see the c

art Applianc

ergy consua are provide data with on about enwed to prove only subjet informatios near real can be pre

t Appliance on the currecy and qualisers to disunctionality

this use cing her/himessed. Man

15 / 89

power of

oval s

alization of iances) to int in time iance with

e day and e efficient

mption of e on the

cost of the ces

umption of ded by the near real-ergy cost, vide such ct entitled

on through time data

esented in display or

ent energy ity of data play such

shall be case is to feedback

ny studies

Page 16:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

show thbe achieThe Sma(ex: cycEnergy ron a spreceives

General R

Consumpfunctionameasure

Actors

Groupinzones) Actor Nasee AList

SMART INFO

CEMS

at, only by eved on the art Applianc

cle). The Cretailer. Fin

pecific user s informatio

emarks

ption of Smality the apment.

ng (e.g. do

ame Actor

ActoTypesee List TBD

TBD

displaying single appl

ces estimatEMS will pal cost infointerface.

n about whi

mart Applianpliance is p

mains, Gr

or e

Actor

Acse

ProSmcacoreqslonoMeretFowittheneintpetheIn infSmcoussigtak

HoHAfrie Exbeelavis ImOSapda

this informaiance. e the energ

perform thermation willMoreover, ch tariff is c

Gennce can be performing,

roup Descr

ctor Descripe Actor List

ovides a smart Meter lculated bynnected toquest and owly changi elaboratio

eter, excepttrieve, valid

or example,th the same meter (eeded to chegrate therformed by e customer.

addition, formation ismart Appliansumptionse (TOU) p

gnal in the king place.osts an apAN devices endly prese

xposes a we used by 3r

aborate cursualization.

plements aSGi framewplications ta and prov

Use Case

ation, a ene

gy that will be energy col be displayin case of

currently in

neral Remaan estimat not neces

Actors ription

ption t

sub-set of and, even

y the SI itso it. Data

in case ong data). Tn over the t the basic ate, memor load profie level of

e.g. 15 mihange Metem with insthe device near real

s to be provances to s. In additiopricing, the HAN, when

plication thand organ

entation.

eb-based Ard party apprent data a

an Executiwork for Ja

that wishevides a diffe

es

ergy consum

be consumeost evaluatied either onf time-of-ususe.

arks e based onsarily the c

data contantually, insself or ano

are dispatof transitiohe Smart Indata retrie

processingrize and disle shall beresolution nutes). Anyr data resostant powewhich disp

time insvided in ord

calibrate on, in case

Smart Infnever a tarif

hat collectsnizes them

PI over IP lications thand provides

on Environava) to hoses to elaboerent visualiz

mption savi

ed during thon based o

n the Smart e (TOU) pr

n the phaseconsumption

ined in thetant power

other devicetched uponn (only fo

nfo performseved by the

required topatch themdispatched

available iny operation

olution or toer, shall belays data to

tant poweder to allowits energy of time-ofo can emiff change is

s data fromfor a user

HN that canat wishes tos a differen

nment (e.gst 3rd partyrate currenzation.

ing of 10-15

he selected on data rect Appliance ricing, the

e of the cycn value com

Further informaspecificUse Cas

e r, e n r s e o

m. d n n o e o

r w y f-it s

m r-

n o

nt

g. y

nt

16 / 89

5 % could

operation ceived by display or appliance

cle or the mes from

ation c to this se

Page 17:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

SMART APPLIAN

NCE TBD

ImsebeWS ImSecoWS Procoen ThEncoprositinfwecoApthithetarSmevCE Disinf

Recuenencoma Eaavus

plements curity keys implemenSN-C Servic

plements thervice PlatfommunicatioSN-C Servic

ovides to untact to pergy consu

he CEMS hnergy Cost sts obtaininoper form toe to gathformation. eb applicationsumption,

ppliances ws interface e cost per riff change mart Info (thaluate the

EMS and Me

stributes oformation toeceive over rrent meterergy consuergy cost. Insumed to ay provide it

ach Smart Aailable dataer interfaceits own enedata The estimatselected cycurrent tarifthe total ho

Use Case

a Trust Aof the HAN

nted via cce Platform

he communorm and proon betweence Platform

user appliapublish themption info

hosts a deAlgorithm

ng (either vo be filled bher the iMoreover, on to displa

including cwith selecte

shall also pkWh. The occurs ca

his operatioe possibleeter real-tim

ver the Ho interested

the HAN (fring data abmption and t estimate tperform thet to the CEM

Appliance ma, dependine, like: ergy consum

ted energy ycle and its ff.

ouse energy

es

Agent to mN; this functcollaboration

ication withovides APIsn local bu.

nces a singeir respectrmation.

dicated alg, to evalu

via a propey user or a nformation)implements

ay both costcost for run

ed cycles. provide a wexact momn be obtain could als differenc

me clocks)

AN networdevices.

rom Smart Iout total in-information

the energy te next operaMS.

may display g on the ric

mption/powe

consumptiocost based

y consumptio

manage altionality cann with the

the WSN-Cs to mediateundles and

gle point oive curren

gorithm, theate energyr code or aremote web the coss a propeand energy

nning SmarIn additionay to obtainent when aned by theo require toe between

rk the cos

nfo) global house

n about to be ation and

a sub-set ochness of its

er drawn

on of on ToU or

on

ll n e

C e d

of nt

e y a b st r y rt n, n a e o n

st

of s

17 / 89

Page 18:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

4. VisualizAppliance

Name of U

ID DZ

1.7 C

Version M

Version No.

01

Scope and

Scope Objectiv

Relatedcase(s)

Narrative o

Short deThe cusCompleProvide disaggreApplianc

2 Diagram

No Diagr

Actors

Groupin Actor Nasee Acto

Smart Inf

zation of his)

Use Case

Domain(s)/ Zone(s) Customers/P

anagement

Date

d Objective

ve(s)

d business

of Use Cas

escription tomer acce

ete descriptcustomers

egating theces and oth

ms of Use C

ram availab

ng (e.g. dom

ame or List

fo

storical da

Na

rocess Vishou

t

Name of Author(s)

Sergio BraDistribuzionStella Di Distribuzion

es of Use C

S

CustomEnergy permanPartiallyJWG10

se

ss the histotion s historicae global ener devices.

ase

le for this U

mains, zones

Actor Typsee Actor

ata for the s

Use Cme of Use

sualization ouse and Sm

Versi

ambilla (Enne)

Carlo (Enne)

ase

Scope and

mer awareneefficiency

nent and lony covered b

Narra

orical data a

l and stanergy time

DiagraUse Case

s) G

pe r List

As

IteHsiM

Use Case

single cust

ase IdentifCase

of historicamart Applian

ion ManageChang

nel

nel

Objectives

ess. focuses on

ng-term reduby WGSP 21

ative of Use

and verify ho

tistical infoe variations

am(s) of Us

Actors Group Desc

Actor Descsee Actor Li

t is the elthe DSO, energy infHAN. Publisset of thosnside the Meter, hen

es

omer (Glob

fication

l data for tces)

ement ges

s of Use Ca

energy sauction of ele111 A.2.19.2

e Case

ow he used

ormation os with the

se Case

cription

cription ist

ement, prowhich

formation shed data ae already

Home Ece the Sm

bal in hous

the single c

se

ving –“doinectricity usa2 pag 217 v

energy dur

on their eone comi

vided by provides

into the re a sub-available

Electricity mart Info

se and Sma

customer (G

ApproStatu

ng more witage. v. 069

ring time.

energy conng from t

Further informatiospecific Use Case Retrieves, Meter, historical dthe in-housprofile) andinternally ginstant

18 / 89

rt

Global in

oval s

h less”; a

sumption, he Smart

n to this

from the available

data (i.e. se power d possibly generated

power

Page 19:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

CEMS

Smart Ap

ppliances

a

CSifbtCoasccmsEmfescdmtcvtmrtcItswotiaTac

Use Case

acts like a p

Customer System. Thntegrated wfunctionalitiebetween thethe WAN (CEM is aoptimising eand or prosignals receconsumer’s contracts, minimum standards. Energy Mmessages sfrom conespecially tsector has can handdedicated lomanagementhen forwaconnected dvice versa the “grid / multiple resources cthe CEM controlled.t is an app

the HAN asome intelliwith the otorder to prto the constance eawareness, The Smart active role complying

es

proxy of the

Energy he CEMS with commes, it is the e HAN, the(e.g. interna logical energy conoduction beived from

settingsand

perfThe C

Manager sent to and nnected he in-hometo be mentdle geneoad and gent commanards these devices. It informationmarket”. N

loads/gecan be com

to be

pliance connand equippgence to cher home aovide new onsumer, nergy condemand r

Appliance in the homewith the

meter

Manager is CEM

unication gateway HN and

net). The function

sumption ased on the grid,

s and devices

formance Customer

collects received devices;

e/building tioned. It

eral or eneration nds and

to the provides towards

Note that eneration

mbined in mutually

nected in ped with cooperate actors in services like for sumption esponse. plays an e system

system

samples. resolution number of could according configuratioSmart Infdoes not operations change resolution coming frMeter. Anyoperation, integration additional shall be pby the CInterface deThe accesnetwork allows theof the tosingle apenergy consumptioCEMS canand athose dpresent theuser throBrowser. The CEMSexternal applicationsHN to retrstored data

The Appliancesdisplay specific concerningenergy consideringintrinsic liof theirInterface It will provi

19 / 89

Data and

samples vary,

to meter on. The fo itself

perform to

time of data

rom the y needed

or with

data, performed Customer evice. s to the platform, storage

otal and ppliance’s

on. The n access aggregate ata to

em to the ough a

S allows

s in the rieve the

a

Smart can

some data their

usage, g the imitations

User

de to the

Page 20:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

pwitiSActDc(a

Use Case

policies, swhishes ants best pethese technnformation Smart GridAppliance communicatthe HAN anDomain) control and(inside anappliance).

es

atisfying td always rformance.

nologies imptransfer f

ds to the(thus

tion channend outside t

and an ad supervisind/or outs

he user assuring Most of

ply some from the e Smart

a el within he Home additional on logic ide the

HAN its infon consumptio

20 / 89

formation energy

on.

Page 21:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

5. Visualiz

Name of U

ID DZ

2.2 C

Version M

Version No.

01

Scope and

Scope Objectiv

Relatedcase(s)

Narrative o

Short deThe cuscheck thCompleProvide disaggreApplianc

Diagrams

No Diagr

Actors

Groupin Actor Nasee Acto

Smart Inf

zation of hi

Use Case

Domain(s)/ Zone(s) Customers/P

anagement

Date

d Objective

ve(s)

d business

of Use Cas

escription tomers may

heir behavioete descript

customersegating theces and oth

of Use Cas

ram availab

ng (e.g. dom

ame or List

fo

storical da

Na

rocess Vis

t

Name of Author(s)

Sergio BraDistribuzionStella Di Distribuzion

es of Use C

S

CustomEnergy perman

se

y compare tor against vition s historicae global ener devices.

se

le for this U

mains, zones

Actor Typsee Actor

ata compare

Use Cme of Use

sualization o

Versi

ambilla (Enne)

Carlo (Enne)

ase

Scope and

mer awareneefficiency

nent and lon

Narra

their own enrtuous refer

l and stanergy timeCompare th

DiagraUse Case

s) G

pe r List

As

IteHsiM

Use Case

ed with a b

ase IdentifCase

of historical

ion ManageChang

nel

nel

Objectives

ess. focuses on

ng-term redu

ative of Use

nergy consurences.

tistical infoe variationshese data w

am(s) of Us

Actors Group Desc

Actor Descsee Actor Li

t is the elthe DSO, energy infHAN. Publisset of thosnside the Meter, hen

es

benchmark

fication

data compa

ement ges

s of Use Ca

energy sauction of ele

e Case

umptions wi

ormation os with the with a bench

se Case

cription

cription ist

ement, prowhich

formation shed data ae already

Home Ece the Sm

ared with a

se

ving –“doinectricity usa

th other cus

on their eone comi

hmark availa

vided by provides

into the re a sub-available

Electricity mart Info

benchmark

ApproStatu

ng more witage.

stomers to

energy conng from table in the n

Further informatiospecific Use Case Same as U

21 / 89

k

oval s

h less”; a

be able to

sumption, he Smart network.

n to this

C 2.1

Page 22:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

CEMS

aCSifbtCoasccmsEmfescdmtcvtmrtc

Use Case

acts like a pCustomer System. Thntegrated wfunctionalitiebetween thethe WAN (CEM is aoptimising eand or prosignals receconsumer’s contracts, minimum standards. Energy Mmessages sfrom conespecially tsector has can handdedicated lomanagementhen forwaconnected dvice versa the “grid / multiple resources cthe CEM controlled.

es

proxy of the Energy

he CEMS with commes, it is the e HAN, the(e.g. interna logical energy conoduction beived from

settingsand

perfThe C

Manager sent to and nnected he in-hometo be mentdle geneoad and gent commanards these devices. It informationmarket”. N

loads/gecan be com

to be

meter Manager is CEM

unication gateway HN and

net). The function

sumption ased on the grid,

s and devices

formance Customer

collects received devices;

e/building tioned. It

eral or eneration nds and

to the provides towards

Note that eneration

mbined in mutually

Guarantee access application network in enable cowith other u

22 / 89

a simple to the

in the order to

mparison users.

Page 23:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

6. Visualiz

Name of U

ID DZo

2.3 C

Version M

Version No.

01

1.3 Scope

Scope Objectiv

Relatedcase(s)

1.4 Narrat

Short deThe cusCompleProvide disaggreAppliancthe netw

2 Diagram

No Diagr

3 Technica

3.1 Actors

Groupin Actor Nasee Acto

Smart Inf

zation of hi

Use Case

omain(s)/ one(s) ustomers/P

anagement

Date

and Objec

ve(s)

d business

ive of Use

escription tomers may

ete descriptcustomers

egating theces and oth

work.

ms of Use C

ram availab

al Details

s

ng (e.g. dom

ame or List

fo

storical da

Na

Process Vis

t

Name of Author(s)

Sergio BraDistribuzionStella Di Distribuzion

ctives of Us

S

CustomEnergy perman

Case

y compare ttion s historicae global enher devices

ase

le for this U

mains, zones

Actor Typsee Actor

ata compare

Use Came of Use

sualization

Versi

ambilla (Enne)

Carlo (Enne)

se Case

Scope and

mer awareneefficiency

nent and lon

Narra

heir own en

l and stanergy time. Compare

DiagraUse Case

s) G

pe r List

As

IteHsiM

Use Case

ed with a u

ase Identife Case

of historica

ion ManageChang

nel

nel

Objectives

ess. focuses on

ng-term redu

ative of Use

nergy consu

tistical infoe variations

these data

am(s) of Us

Actors Group Desc

Actor Descsee Actor Li

t is the elthe DSO, energy infHAN. Publisset of thosnside the Meter, hen

es

user commu

fication

l data comp

ement ges

s of Use Ca

energy sauction of ele

e Case

umptions wit

ormation os with the

with a with

se Case

cription

cription ist

ement, prowhich

formation shed data ae already

Home Ece the Sm

unity

pared with a

se

ving –“doinectricity usa

th user com

on their eone comi

h a user co

vided by provides

into the re a sub-available

Electricity mart Info

a user comm

ApproStatu

ng more witage.

mmunities

energy conng from t

ommunity av

Further informatiospecific Use Case Same as U

23 / 89

munity

oval s

h less”; a

sumption, he Smart vailable in

n to this

C 2.1

Page 24:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

CEMS

Smart Ap

ppliances

aCSifbtCoasccmsEmfescdmtcvtmrtcItswotiaTacpwitiSActDc(a

Use Case

acts like a pCustomer System. Thntegrated wfunctionalitiebetween thethe WAN (CEM is aoptimising eand or prosignals receconsumer’s contracts, minimum standards. Energy Mmessages sfrom conespecially tsector has can handdedicated lomanagementhen forwaconnected dvice versa the “grid / multiple resources cthe CEM controlled.t is an app

the HAN asome intelliwith the otorder to prto the constance eawareness, The Smart active role complying policies, swhishes ants best pethese technnformation Smart GridAppliance communicatthe HAN anDomain) control and(inside anappliance).

es

proxy of the Energy

he CEMS with commes, it is the e HAN, the(e.g. interna logical energy conoduction beived from

settingsand

perfThe C

Manager sent to and nnected he in-hometo be mentdle geneoad and gent commanards these devices. It informationmarket”. N

loads/gecan be com

to be

pliance connand equippgence to cher home aovide new onsumer, nergy condemand r

Appliance in the homewith the

atisfying td always rformance.

nologies imptransfer f

ds to the(thus

tion channend outside t

and an ad supervisind/or outs

meter Manager is CEM

unication gateway HN and

net). The function

sumption ased on the grid,

s and devices

formance Customer

collects received devices;

e/building tioned. It

eral or eneration nds and

to the provides towards

Note that eneration

mbined in mutually

nected in ped with cooperate actors in services like for sumption esponse. plays an e system

system he user assuring Most of

ply some from the e Smart

a el within he Home additional on logic ide the

Guarantee access application network to the energwith a comusers.

24 / 89

a simple to the

in the compare

y usage munity of

Page 25:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

7. Multi-ta

Multi-tariff

ID DZ

1.10 C

Version M

Version No.

1.0

Scope and

Scope

Objectiv

Relatedcase(s)

Narrative o

Short de- Comple CoordinThe cussingle ooperatioused to order to The Smdevices Self manThe cussets the automat

General R

This Useperform aimportan

riff energy

f energy us

Domain(s)/ Zone(s) Customers/P

anagement

Date

09/05/2014

d Objective

ve(s)

d business

of Use Cas

escription

ete descriptnated manastomer can or multiple onal time int

manage opsimplify the

mart Applianto minimize

nagement: tomer prepa needed cotically waits

emarks

e Case is ma specific ot exception

use optim

se optimiza

Na

rocess Muapp

t

Name of Author(s)

Lucio BiancCompany)

es of Use C

S

Energy@to optim

Energy@energy cand self

a.2.4. pa.2.2 JW

se

tion gement: define/modappliances.terval allowperational te process, dnces can ae user cost a

ares the Smndition for auntil the giv

meaningful foperating cyis the fridg

ization in c

ation in cas

Use Cme of Use

lti-tariff enerpliances

Versi

chi (Indesit

ase

Scope and

@home systize energy c

@home systcost. The opf-manageme

pag 76; JWGWG 1100 pa

Narra

dify the hou For any aed for the dime interva

default confactivate enhaccording to

mart Applianactivation, even conditio

Genor all thosecle, such ase, which op

Use Case

case of sma

se of smart

ase IdentifCase

rgy use opt

ion ManageChang

Objectives

tem providescost accordin

tem performsptimization ofnt regulation

G-spuc 1.2; ag 63

ative of Use

use rules foappliances device (e.g.al for a set figurations chanced feao the variab

nce for its oe.g. the lowon is met.

neral Remae appliancess a washing

perates cont

es

art and non

t and non-s

fication

timization in

ementges

s of Use Ca

s an optimizang to the vari

s actions in f energy costn.

e Case

or the energthe custom from 6:00 of non-sma

could be contures that

ble tariffs.

perating cycest energy

arks s which areg machine, otinuously

n-smart app

smart appli

case of sm

se

ation of appable energy

order to redt can leverag

gy costs oper can set to 24:00). S

art appliancnsidered. guarantee

cle (i.e. a wprice time. T

activated boven and di

pliances

iances

mart and n

ApproStatu

liances usagtariffs.

duce and opge both on c

ptimization iparameter

Smart Plugsces (e.g. a

to the who

washing progThe Smart

by the custoishwasher.

25 / 89

non-smart

oval s

ge in order

ptimize the coordinated

n case of s like the

s could be boiler). In

ole set of

gram) and Appliance

omer and The most

Page 26:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

Diagrams

No Sequ

Actors

Groupin Actor Nasee Acto

Smart Inf

CEMS

of Use Cas

ence Diagra

ng (e.g. dom

ame or List

fo

se

am availabl

mains, zones

Actor Typsee Actor

Diagrae yet for thi

s) G

pe r List

As

PcacaDrtcptermFbltAcopttIpst(IibSi

C

TaCef

Use Case

am(s) of Usis Use Case

Actors Group Desc

Actor Descsee Actor Li

Provides acontained iand, eventucalculated another devData are request atransition changing daperforms nthe data retexcept therequired tomemorize aFor examplbe dispatchevel of resthe meter Any operachange Meor to integrapower, shathe device to the custon case of

pricing, the signal in thtariff chang(see notes bn additionnstant powbe providedSmart Applts energy c

Coordinate

The CEMapplication Customer energy ufunctionalitie

Allowdefininterappl19:0

es

se Case e

cription

cription ist

a sub-set n the Sma

ually, instanby the SI

vice connecdispatche

and in c(only for

ata). The So elaboratrieved by th basic pr

o retrieve, and dispatce, load prohed with thsolution ava

(e.g. 15 mation nee

eter data rate them witll be perfowhich displmer.

time-of-usSmart Info e HAN, wh

ge is takinbelow). n, near rewer informatd in order liances to onsumption

d managem

MS hostthat allo

to optimse. The es could bew the Cusne for earval the iances list

00 to 23:00

of data art Meter nt power,

itself or cted to it. d upon

case of slowly

mart Info ion over he Meter, rocessing

validate, ch them. ofile shall he same ailable in minutes).

eded to esolution th instant

ormed by ays data

e (TOU) can emit enever a g place.

eal time tion is to to allow calibrate

ns.

ment:

ts the ows the ize the

macro : tomer to

ach time priority

(i.e. from 0 priority

Further informatiospecific Use Case

26 / 89

n to this

Page 27:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

Smart Ap

ppliances

Tcf

S

PiptcaAshoC

Tiirpctsda

S

Use Case

to mac

AllowassoPlugapplconn

ReceApplthe powprogthe C

Contin enerqual

The CEMS customer ifunctionalitie

Self-regula

Provide nformation profiles, enetime.As a complexity algorithm aAppliance, software inhelp the deoptimal starCoordinate

The appliannforms thets estimatereceived profile datacentral unitime when start (accodesiderata, availability a

Self-regula

estimbe cthe n

dispener

receof eHAN

dispImpldele

es

the hine) w the uociate to thg a niance (n

nected to theive fromliances infoestimated aer profile

gram activCustomer. trol the aporder to rgy costs ity

also providenterface foes.

tion:

the HANabout ene

ergy costs afunction

of the optand of the

some n the CEMeterminatiort time. d regulatio

nce beforee central un

d power prappliance

a are usedt to calcuthe applia

ording to tthe tota

and the tarif

tion:

mate the econsumed tonext operatilay the ergy value eive the infenergy costN lay thisements gates to th

washing

user to he Smart on-smart ot yet e HAN) Smart

o’s about appliance

of the ated by

ppliances optimize and life

es a web or these

N with rgy tariff

and clock of the

imization e Smart

specific MS could

n of the

on:

starting nit about ofile: the

power d by the ulate the ance can the user l power ff policy).

nergy to o perform on

estimated

formation through

cost or

he CEMS

27 / 89

Page 28:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

Use Case

the the logic

Offethe activThisperfowaysleveaccoUsercapaexamappla bwheusedapplrich the and to ch

If ththe Smauntilcond

Dispof tand “delaecon(deprichnInter

es

implementdelay deter

c r to the c

possibilvate a delay operation ormed in s and with l of co

ording to thr abilities. mple, a iance can h

button for n the lowesd. A more iance can

interface tariff profileletting the c

hoose whene customerdelayed s

art Applianc the

dition is metplay the acthe require

the ayed nomical pending oness of irface)

tation of rmination

customer ity to yed start.

can be several

different omplexity e built-in Interface

For simple

have just starting

st tariff is complex offer a

showing e in time customer

n to start. r accepts tart, the ce waits required

t. tual cost ed cycle

relevant start”

saving on the ts User

28 / 89

Page 29:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

8. Visualizstarting to

ID DZ

1.4 C

Version M

Version No.

1.4

Scope and

Scope

Objectiv

Relatedcase(s)

Narrative o

Short deThe Smacycle). Iby requMoreovetariff is cComple

Diagrams

No Sequ

Technical

Actors

Groupin Actor Nasee Acto

Smart Inf

zation of eso run

Domain(s)/ Zone(s) Customers/P

anagement

Date

09/05/2014

d Objective

ve(s)

d business

of Use Cas

escription art Appliancf possible, tiring to the

er, in case ocurrently in

ete descript

of Use Cas

ence Diagra

Details

ng (e.g. dom

ame or List

fo

stimated en

Na

rocess Visits c

t

Name of Author(s)

Lucio BiancCompany)

es of Use C

S

One of consumtheir copressedDispatccost of A.2.3 p

se

ces estimatthey give inCEMS to p

of time-of-uuse

tion

se

am availabl

mains, zones

Actor Typsee Actor

nergy cons

Use Cme of Use

ualization ofcost before s

Versi

chi (Indesit

ase

Scope and

the most immer in selectosts and ened. ch and visuthe selectedag 73 v0.6.

Narra

e the energnformation aerform enerse (TOU) p

Diagrae yet for thi

s) G

pe r List

As

Pca

Use Case

umption of

ase IdentifCase

f estimated estarting to ru

ion ManageChang

Objectives

mportant goating the parergy consum

ualization od program 9

ative of Use

gy that will also about trgy cost eva

pricing, the a

am(s) of Usis Use Case

Actors Group Desc

Actor Descsee Actor Li

Provides acontained iand, eventu

es

f Smart App

fication

energy consn

ement ges

s of Use Ca

als of this uameters of

mption, befo

of the estim

e Case

be consumethe energy caluation.. appliance re

se Case e

cription

cription ist

a sub-set n the Sma

ually, instan

pliances an

umption of S

se

se case is tthe cycles f

ore the start

mated energ

ed during itcost and the

eceives info

of data art Meter nt power,

nd its cost

Smart Applia

ApproStatu

to educate tfeedbackingt button will

gy consum

ts next opere next oper

ormation ab

Further informatiospecific Use Case

29 / 89

before

ances and

oval s

the g her/him be

ption and

ration (ex: ration cost

bout which

n to this

Page 30:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

CEMS

Smart Ap

ppliances

caDrtcptermFbltAcopttPipt

Use Case

calculated another devData are request atransition changing daperforms nthe data retexcept therequired tomemorize aFor examplbe dispatchevel of resthe meter Any operachange Meor to integrapower, shathe device to the custoProvide nformation profiles, enetime.

estimbe cthe n

dispener

receof eHAN

disp

es

by the SI vice connec

dispatcheand in c

(only for ata). The So elaboratrieved by th basic pr

o retrieve, and dispatce, load prohed with thsolution ava

(e.g. 15 mation nee

eter data rate them witll be perfowhich displmer. the HANabout ene

ergy costs a

mate the econsumed tonext operatilay the ergy value eive the infenergy costN lay this cos

itself or cted to it. d upon

case of slowly

mart Info ion over he Meter, rocessing

validate, ch them. ofile shall he same ailable in minutes).

eded to esolution th instant

ormed by ays data

N with rgy tariff

and clock

nergy to o perform on

estimated

formation through

t

30 / 89

Page 31:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

9. Visual

ID DZ

1.5 C

Versio

Version No.

1.0

Scope

Scope

ObjectivRelatedcase(s)

Narrat

Short deThe aimof her/hiCompleThe SmoperatioIf the totuser

Diagra

No Sequ

Actors

Groupin Actor Nasee Acto

SmartInf

lization of

Domain(s)/ Zone(s) Customers/P

on Managem

Date

06/05/2014

e and Objec

ve(s) d business

tive of Use

escription m of followin

is consumptete descriptmart Applianon (ex: cycletal available

ams of Use

ence Diagra

s

ng (e.g. dom

ame or List

o

a warning

Na

rocess Visnot

ment

Name of Author(s)

Andrea (Telecom It

ctives of Us

S

CustomenhancdisplayisuggesVisualiz

Case

g use casetions tion nce estimate). e power in t

Case

am availabl

mains, zones

Actor Typsee Actor

TBD

if availableSm

Use Cme of Use

sualization ot sufficient t

Versi

Ranatalia)

se Case

Scope and

mer awarene customeing some t directly to zation of cu

Narra

s is to prov

tes the max

the home is

Diagrae yet for thi

s) G

pe r List

As

PcacaD

Use Case

e total powemart Applia

ase IdentifCase

of a warninto run a Sm

ion ManageChang

alli

Objectives

ess: the gr awarenesuseful enethe custom

rrent energy

ative of Use

vide custom

ximum pow

s not sufficie

am(s) of Usis Use Case

Actors Group Desc

Actor Descsee Actor Li

Provides acontained iand, eventucalculated another devData are

es

er (in the hnce

fication

g if availabart Applianc

ementges

s of Use Ca

goal of thisss about hrgy related

mer any relay and powe

e Case

mer with info

wer that wil

ent to run, t

se Case e

cription

cription ist

a sub-set n the Sma

ually, instanby the SI

vice connecdispatche

ome) is no

le total powce

se

s level of her/his ene data. Theted action r data

ormation on

l be consu

the Smart A

of data art Meter nt power,

itself or cted to it. d upon

ot sufficient

wer (in the

ApproStatu

functionalitrgy consume appliance

the curren

umed during

Appliance n

Further informatiospecific Use Case

31 / 89

t to run a

home) is

oval s

ties is to mption by e will not

t situation

g its next

otifies the

n to this

Page 32:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

Smart Ap

ppliances TBD

rtcptermFbltAcopttIibSiT

ett

Use Case

request atransition changing daperforms nthe data retexcept therequired tomemorize aFor examplbe dispatchevel of resthe meter Any operachange Meor to integrapower, shathe device to the custon additionnstant powbe providedSmart Applts energy cThe Smart A estimate t

to be conthe next o

receive thtotal avaihome thro

display a if it is not

eventually sthat it is nthrough the

es

and in c(only for

ata). The So elaboratrieved by th basic pr

o retrieve, and dispatce, load prohed with thsolution ava

(e.g. 15 mation nee

eter data rate them witll be perfowhich displmer.

n, near rewer informatd in order liances to onsumptionAppliances:the maximusumed to poperation he informatilable powerough HAN warning to possible to

send the infnot possibleHAN

case of slowly

mart Info ion over he Meter, rocessing

validate, ch them. ofile shall he same ailable in minutes).

eded to esolution th instant

ormed by ays data

eal time tion is to to allow calibrate

ns.

m power erform

on of r in the

the user run formation e to run

32 / 89

Page 33:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

10. RequeSmart App

ID DZ

1.6 C

Version M

Version No.

1.0

Scope and

Scope ObjectivRelatedcase(s)

Narrative o

Short deThe EneSmart A

1) CThe Enerun the estimatenotifies t

2) SThe SmaIf the totuser andCompleThe appsystem coperatedcustomemanage

1) CIn this cbehaviowhen thaccordinany caseHome Dside, thedifferentin the ho

2) SIn this cenergy i

st of confirpliance

Domain(s)/ Zone(s) Customers/P

anagement

Date

06/05/2014

d Objective

ve(s) d business

of Use Cas

escription ergy@home

Appliance maCoordinatedergy@homeSmart Appl

ed power prthe CustomSelf-manageart Applianctal availabled asks to th

ete descriptpliance regucomplexity: d autonomoer automatiment of theCoordinatedconfigurationr accordinge regulatio

ng to the types coordina

Domain Syste involved t and time vouse. Self-Manageconfiguratioinformation

rmation to

Na

rocess Renot

t

Name of Author(s)

Andrea (Telecom It

es of Use C

S

Applian Not cov

se

e system maay lead to pd managemee system chiance, deperofile and o

mer and asksement: ce estimatese power in te customer tion

ulation can b a coordina

ously by theically with

e house. d Managemen, all the Sm

g to global n is neededpe of appliaated and hartem, the fulalgorithms

variable ene

ement applion, the sing

of the hou

start if ava

Use Cme of Use

quest of cot sufficient t

Versi

Ranatalia)

ase

Scope and

nce regulatio

vered

Narra

ay require epower overloent:

hecks if theending on iton the curres the confirm

s the appliathe home isthe confirm

be performeated regulat Smart Appsuggestion

ent appliancmart Appliaenergy infod. The typence. The rermonized. Oll performanwill be the

ergy states

iances regugle Smart Ase, such as

Use Case

ailable pow

ase IdentifCase

onfirmation tto run a Sm

ion ManageChang

alli

Objectives

on

ative of Use

explicit confoad.

total availats power proent total in mation to st

ance power s not sufficiemation to sta

ed accordingtion among

pliances. Thns and ass

ces regulatinces in the

ormation of e of regulategulation logOnly knowinnces of the

most compof the Sma

ulation Appliance rs current in

es

er (in the h

fication

to start if avart Applianc

ementges

s of Use Ca

e Case

firmation fro

able power ofile estimahouse con

tart.

profile abouent to run, tart

g to 2 increthe devicese goal of bo

sistance on

ion house coothe house,

ion performgic could beng the entire

system couplex, having

art Appliance

regulates itstant powe

home) is no

vailable powce

se

om the Cus

in the homtion, on othsumption. T

ut its next othe Smart A

asing levelss of the HANoth approacn how to

perate toge their curre

med by the ae centralizede energy anduld be guarg to take ines and stan

s behavior r and energ

ot sufficien

wer (in the

ApproStatu

stomer if the

me is not suher Smart AThe Smart

operation (exAppliance n

s of performN or a self-ches is to pimprove th

ether to reguent state anappliance cd or distribud power staranteed; on nto considendard electr

according gy price. Th

33 / 89

t to run a

home) is

oval s

e use of a

ufficient to Appliances Appliance

x: cycle). otifies the

mance and regulation rovide the

he energy

ulate their nd priority could vary uted but in atus of the

the other ration the rical loads

to global he type of

Page 34:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

regulatiocurrent sSince intheir poperformathis scenof coordShe/he w

Diagrams

No Sequ

Actors

Groupindomains, Actor Name see AcList

Smart Inf

CEMS

on performestate when

n this level tower consumances of thenario should

dinating the will always

s of Use Ca

ence Diagra

ng (e.g, zones)

ctor

ActorType see Actor List

fo TBD

TBD

ed by the athe regulatithere is no mption (ande system cod be considuse of othedecide if ac

se

am availabl

g. Group D

r

Actor Dsee Acto

ProvidesSmart Mcalculateconnecterequest slowly performsretrievedprocessmemorizload prolevel of 15 minuMeter dainstant device wIn addiinformatSmart consumpCoordinathe appcoordinathe avaipotentiaAppliancprogramSelf manotified

appliance con is needecoordinatiod of other ould not be dered as suger Smart Apccepting or n

Diagrae yet for thi

Description

escription or List

s a sub-seMeter and, ed by the ed to it. Dand in cachanging

s no elad by the ing requireze and disofile shall be

resolution tes). Any oata resolutiopower, sh

which displation, near tion is to beAppliances ptions ated mana

plication thaate the Smailable powel activity sces in the

mmed schedanagement:of the state

Use Case

could vary aed. No cooon with othe

independeguaranteed

ggestions: tppliances annot the sugg

am(s) of Usis Use Case

Actorsn

t of data ceventually

SI itself orData are dase of tran

data). Thaboration o

Meter, exed to retpatch theme dispatcheavailable in

operation neon or to inteall be per

ays data to treal time

e provided to calibr

gement: That allows tart Appliancer and to kschedules

e HAN (e.gules). : The CE

e of the Sma

es

according toperation wit

er Smart Apnt electricad; this is whthe customend independgestions fro

se Case e

contained in, instant pr another ddispatched nsition (onlhe Smart over the

xcept the trieve, val

m. For exaed with the n the meter eeded to chegrate themrformed bythe custome instant pin order to rate its en

he CEMS he Customces accordinowledge oof other Sg. due to

EMS shouldart Applianc

o the type th other apppliances an

al loads of y the outpu

er nevertheldent electricom the syste

FurspeCas

n the ower, evice upon y for

Info data

basic idate, mple, same (e.g.

hange m with y the er. power allow nergy

hosts er to ng to

of the Smart

pre-

d be e.

CoomanApp se

atoreinp

incstcaoco

Self

of appliancpliances is ind thus kno

the houseut of the useless will be cal load of tem

rther inecific to se

ordinated nagement: pliance: ends the esppliance po

o the centraeceives fromnformation apower overlonteracts withustomer to tarting the case of pote

overload by onfirmationf manageme

34 / 89

ce and its nvolved. wledge of ), the full e cases of in charge

he house.

nformationthis Use

The Smart

stimated ower profile al unit and m it the about the oad risk h the avoid cycle in ntial asking for ent:

n e

t

Page 35:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

Smart Applianc

ces TBD

Use Casees

The e

ptoo

reoinH

dthp

eveinfoposthe Intecustthe poteask

e Smart Appstimate the

power to be o perform th

operation eceive the i

of total availn the home HAN

isplay a wahe user if it

possible to rentually sormation thassible to ru

HAN. eracts wtomer to av

cycle inential oveing for conf

35 / 89

pliances: maximum consumed

he next

nformation able power through

rning to is not un send theat it is notun through

with thevoid starting case oferload byfirmation.

e t

h

e g f y

Page 36:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

11. Home order to avThe customDomain Ovmanage pohouse will the customconsideredThe Smart maximum eAppliance consumptioThe purpossuch as alreport to tfollowing sEx-ante. Tsituation o(when any being exceit the userbetter undoverload ispower: The meter no warningThe meteramount of The meter time (usuaFinally, if breaker imThe use caand notificoverload wEx-post. Tthe systemPost-morteanalysis inbecause thanalysis is to avoid it specificatio

Domain Ovvoid Homemer can deverload, to bower disconimplement

mer the criticd. Appliancesenergy concan performon to the ovse of this uslerting the the user reub-cases:

This is the cr the case componen

eeded) and r, or the Hoerstand the

s regulated

allows for ag up to 3.3kW allows for time (usualallows for

lly 2 minutethe meter mediately dase intendscations direwarning.

his scenarim notifies theem. In thisn order to ehe washinguseful bothcan happe

on for new m

verload Ma Domain Oefine/modifybe applied tnnection prithe coordincal conditio

s can activasumption (p

m load shedverall statusser story is user, reduc

elated to th

case when when theret/device of the breaker

ome Energye sequencein Italy by

an excess oW of absorba current

ly 2 hours),a current a

es), after thimeasures a

disconnects to adopt actly sent b

o deals wite user and t scenario

estimate whg machine ah to educaten again in

message ex

anagement verload. y the load to smart anorities for n

nation logic.n. In order

ate enhancepeak limit). dding, modis of the hous

to manage cing peak chis event. A

the systeme is enoughthe overall

r disconnecty Manageme diagrams using as an

of 10% of thbed power.absorption after this ti

absorption bs time the ba current a. n approachy the mete

th what hapthe devices the Home

hy the evenand the hae the users the future.

xchanges be

Use Case

- The CEM

shedding pnd non-smanon-smart a. An alarm to simplify

ed features In case of fying its bese. a peak ove

consumptionAs a matte

m exploits ah time betw system notion, i.e. theent Systemin the follo

n example a

he contracte

between 3ime the breabetween 4.1breaker discabsorption h

where a coer is used i

ppens after in the HANEnergy M

nt happenedair dryer weas well as tThis scena

etween user

es

S wants to

priorities anart appliancappliances).(e.g. acousthe proces

that guaranself manag

ehavior in o

erload in ordn of resider of fact, w

a forecast aween the ov

tices that tere is time s

m, or a smaowing pagea typical co

ed peak for

.3 kW and aker discon

1 kW and 1connects higher than

ombination n order to

the breakeN that this evManagement

d, e.g. the ere runningto train an aario seems r devices

o optimize t

nd strategiees (Smart P A central

stic) can be s, default c

ntee to the wgement, whrder to redu

der to take ntial electriwe can dis

algorithm toverload warhe maximumsufficient to rt appliances, it is worntract with

r an unlimite

4.1 kW (i.enects 4 kW for a

14 kW, fo

of consumpprevent as

er disconnecvent happent System mcontracted at the sam

automatic lenot to requ

the use of p

es in case Plugs could unit locatedgenerated

configuration

whole set oile workinguce or adap

any appropcal loads, tinguishes

o prevent aning notificm contracte react to thie to react. rth to remin3 kW contr

ed amount

e. +25%) fo

a very short

or safety re

ption forecas well as to

ction happened. makes a p

power wasme time. T

earning systuire so far a

36 / 89

power in

of a Homebe used to

d inside theto notify to

ns could be

of devices a, the Smartpt its power

priate actionproviding aamong the

an overloadation event

ed power isis event, beIn order to

nd how theracted peak

of time, i.e.

or a limited

t amount of

easons, the

ast methodso notify the

ened, when

ost-mortems exceededhis type ofem in order

any specific

e o e o e

a t r

n a e

t s e o e k

f

e

s e

n

m

f r c

Page 37:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

11.1 Powepower lossThe Custoan SMS to If UPS capserver afteAt the endappliancesreduce the

er Loss Nos event (e.gmer Energythe custom

pability is ner ½ hour of d of the evs consumpt loads.

tification ag. a blackoy Managem

mer to informnot available

gateway invent the CEion before

and Analysiout on the eent System

m him that ae or fail, poactivity.

EMS restartthe event;

Use Case

is - The useexternal gri, if it has U

a power lossower loss d

ts sending the user

es

er wants toid or a trip

UPS capabils event occudetection co

to the cuscan eventu

o understanof the circities, switch

urred. ould be perf

stomer a reually choose

nd the causuit breakerhes to UPS

formed by

eport about e to do so

37 / 89

se of a r) and sends

an external

home andomething to

s

l

d o

Page 38:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

11.2

Name of U

ID DZo

1.9 C

Version M

Version No.

1.0

1.1

Scope an

Scope

Objectiv

Relatedcase(s)

Narrative o

Short deThe EneOverloadCoordinaThe cusDomain used to inside tgeneratedefault cThe Smdevices Self manWhile woto reducCompleAt 8:00

2. Overloa

Use Case

omain(s)/ one(s) ustomers/P

anagement

Date

08/05/20

12/06/20

d Objective

ve(s)

d business

of Use Cas

escription ergy@homed. ated manag

stomer can Overload, manage pohe house ed to notifyconfiguratio

mart Appliana maximum

nagement: orking, the

ce or adapt ete descript

AM Mary, t

ad managem

Na

Process Ho

t

Name Autho

014 Stefan(Ediso

014 Andrea(Telec

es of Use C

S

In this spower acoordincases. drawn eDomainacoustialarm. The aimthere isWGSP emerge

se

e system ca

gement: define/modto be appl

ower disconwill implem

y to the cuns could be

nces can am energy co

Smart Applits power cotion the end use

ment ex-an

Use Came of Use

ome Domain

Versiof

or(s)

no Ginoon) a R

com Italia)

Case

Scope and

scenario, thavailability. ated and sAlso, The

exceeds then Overload.c). The cus

m of followins enough po

21 22-212ency situatio

Narra

an optimize

ify the loadied to smanection prio

ment the customer thee consideredactivate enhnsumption (

iance can ponsumption

er of this st

Use Case

te

ase Identife Case

n Overload

ion ManageCha

occhio

Ranalli

Objectives

he single apThe powe

self-managecustomer

e maximum The notifistomer can

ng use caseower in orde21 , JWG1on

ative of Use

e the use o

shedding part and nonorities for nooordination

e critical cod. hanced fea(peak limit)

perform load to the over

ory, wakes

es

fication

manageme

ement anges

s of Use Ca

ppliance regr peak manement reguis promptly

m available cation shal also acce

es is to foster to avoid o100* to

e Case

of power in

priorities ann-smart appon-smart ap logic. An

ondition. In

tures that .

d shedding, rall status of

up and sw

nt ex-ante

se

gulates its bnagement culation as iy informed

power, henl be notifiess to an h

ter the use overloading. be implem

n order to a

nd strategiepliances (Sppliances). A

alarm (e.gorder to s

guarantee

modifying if the house

itches on th

AppStat

behaviour ucan leverageindicated inif the over

nce causinged local alaistorical vie

the applian. ment a new

avoid Hom

es in case omart Plugs A central ung. acousticsimplify the

to the who

its behaviou.

he washing

38 / 89

proval tus

pon home e both on n the use rall power g a Home arms (e.g. ew of any

nces when

w UC for

e Domain

of a Home could be

nit located c) can be e process,

ole set of

ur in order

machine.

Page 39:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

After haexceedsThere is(flexible their powstart of aintervenWhen Mmanage The samTherefornotificatuser to by a texBut, sevagain thsmart ap

Diagrams

The use sequence

Id Ph

1 Po

2 UnPr

3 Ov

4 Ovup

5 Us

Sequenc

alf an hours the maxims no need t

HAN devicwer consuma water heation and wit

Mary will laud automatic

me events hre, the Cuion devicesmanually sw

xt message veral other he meter loppliance wo

of Use Cas

cases is dee diagram.

hase Name

ower Profile

nschedulabrofile

verload Wa

verload warp

ser Notificat

ce diagram

, her daugum contraco get the a

ces) and thamption and\oating phase thout degraunch again cally thanks

happened astomer En

s (e.g. buzzewitches off (SMS) on htimes happ

ocated in thould have av

se

escribed th

e

e scheduling

le Powe

rning

rning cleare

tion

1:

hter switchted power a

attention of anks to theiror postponein a washinding the quthe CEMS

to the supp

at the Johnergy Manaer, text messome loads

his mobile apened that Jhe basemenvoided such

Diagrrough a set

Descri

g An HAThis psafe scprovideis repocan bmanufacertaincomply

er An HAThis preturn

The Swarnin

ed The Smwas clfunctio

The Ccapabioverloait notifi

Use Case

hes on the and the systMary becaur flexibilities

e the startinng machineality of the

S app, the aport of the w

’s house pragement Syssaging) in s. John wasand switcheJohn was nnts; in this h a problem

ram(s) of Ut of compos

iption

AN device rehase showschedule. We the cycle orted if loade reduced acturer cho

n part of thy with the re

AN device rephase show

a safe sche

mart Meterng

mart Meter leared up a

oning

CEMS requeility to notifad warning)ies back the

es

hair dryer.tem notifiesuse fortunas the CEMSg of high po) and prevewashing cyapp will telwashing ma

remises butystem of Jorder to ge

s quick enoes off the hanot quick encase the C.

se Case sable phase

equests the s the case hen a new power profid can be re

depends ice. NOTE e

he cycle, it equest.

equests the ws the caseedule

r notifies th

notifies theand the sit

ests the Hfy the user ). When an e CEMS

. The total s this event.tely Mary h

S is able to ower absorbnt the blackcle. l Mary thatchine.

t John has ohn decide

et the user aough to seeair drier to pnough and

CEMS app

es, each ph

CEMS to swhen the Ccycle is plale where fo

educed or non the typeven if the ldoes not m

CEMS to se when the

e CEMS th

e CEMS thtuation is n

AN deviceof a givenHAN device

house con

has smart aautomaticabing phaseskout without

t the event

no smart aes to use attention an

e the notificprevent thehe had to reminds Jo

hase is des

schedule a pCEMS is abanned, the aor each blocnot. How mpe of prodload can bemean the a

schedule a p CEMS is

hat there is

at the overnow back to

s with use event (in e gets the u

39 / 89

nsumption

appliances lly reduce s (e.g. the t any user

was well

appliance. the user

nd ask the ation sent blackout. switch on

ohn that a

cribed by a

power profille to returnappliance w

ck of the cycmuch the loaduct and the reduced inappliance w

power profilNOT able

s an overloa

rload warnino the norm

er notificatiothis case th

user attentio

a

le a

wicleadhe

n awi

leto

ad

ngma

onhe

on

Page 40:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

Descript An HAN scheduleeventualcycle is cycle is the type certain p Message This useexchange Sequenc

tion of the

device sene. The CEMly uses a fplanned, threported if of product

art of the cy

e exchange

e case is ae need to b

ce diagram

phase 1:

nds to the CMS retrieveforecast alghe applianceload can bet and the mycle, it does

e 1:

already cove specified

2 (Power p

CEMS a reqs via the S

gorithm, ande will provide reduced o

manufactures not mean

vered by cuso far.

profile is un

Use Case

quest to schSmart Info d returns ade the cyclor not. Hower choice. N

the applian

urrent Ener

nscheduled

es

hedule a nethe curren

a safe powee power pr

w much the NOTE even ce will com

rgy@home

d):

ew power prnt total houer profile scofile whereload can beif the load

ply with the

specificatio

rofile, or touse power chedule. W

e for each be reduced d

d can be ree request.

ons, no new

40 / 89

change itsabsorption,

When a newblock of thedepends oneduced in a

w message

s

w e n a

e

Page 41:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

Descript This is athe CEMrequeststo changschedule Sequenc

tion of the

slight variaMS is not a

the flexiblege its schede

ce diagram

phase 2:

ant of the pable to retue HAN devicdule, the C

3 (Overloa

revious phaurn a safe ces to chan

CEMS runs

ad Warning

Use Case

ase. In this schedule f

nge their scagain the

g notificatio

es

case the fofor this powhedule if poscheduling

on sent from

orecast & scwer profile. ossible. If a

algorithm a

m the Mete

cheduling aTherefore

an HAN devand try to

er):

41 / 89

algorithm ofthe CEMS

ice acceptsfind a safe

f S s e

Page 42:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

Descript The SmaThe Metbefore di Notice thcondition

- T- T

Message

ID messag

1 Sequenc

tion of the

art Meter, ther is requeisconnection

hat the Sman changes: The time befThe overload

e exchange

ge From

SmarMeter

ce diagram

phase 3:

hrough the ested to pron.

rt Meter is r

fore disconnd warning is

e 3:

m to

rt r CEMS 4 (Overloa

Smart Infoovide two p

requested t

nection chans cleared up

descri

S Overloawarning

ad Warning

Use Case

o, notifies thparameters

o do its bes

nges becaup and the sy

ption par

ad g

WatpowTimdisc(in s

g ClearedUp

es

he CEMS th: the meas

st effort to n

use a new aystem can re

rameters

tt: measurewer me: time connection seconds) p notificatio

hat there isured power

notify again

larm thresheturns to its

Acknow(if any)

ed

to

Ack neeon sent fro

s an overloar absorptio

the CEMS

old was reas normal sta

wledgment

eded om the Mete

42 / 89

ad warning.n, the time

when some

ached ate

message

er):

e

e

Page 43:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

Descript The Smaup and th Message

ID messag

1 Sequenc

Descript

tion of the

art Meter, thhe system is

e exchange

ge From

SmarMeter

ce diagram

tion of the

phase 4:

hrough the Ss returned t

e 4:

m to

rt r CEMS

5 (Notifica

phase 5:

Smart Info, to its norma

descri

S

OverloawarningCleared

ation of the

Use Case

notifies theal state.

ption parad g d Up

Watpow

e Overload

es

e CEMS tha

rameters

tt: measurewer

Warning Ev

at the overlo

Acknow(if any)

ed Ack nee

vent to the

oad warning

wledgment

eded

e User):

43 / 89

g is cleared

message

d

Page 44:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

The CEMdevice (oIt is respto avoid Message

ID messag

1

2

Actors

Groupin Actor Nasee Acto

Smart Inf

MS notifies or which setonsibility ofthe CEMS s

e exchange

ge From

CEMSHAN Devic

ng (e.g. dom

ame or List

fo

an Event tt of HAN def the HAN dscales up th

e 5:

m to

S HAN Devic

ce CEMS

mains, zones

Actor Typsee Actor

TBD

to the user.vices) shouevice, if it g

he notificatio

descri

ce

NotifiesEvent user

S The was no

s) G

pe r List

As

TusmcntecTSbt

PcacaDrtc

Use Case

. It is respould be requegets the useon to anoth

ption par

s an to the

EveWais by paraWatpowabsTimdisc(in s

user otified Non

Actors Group Desc

Actor Descsee Actor Li

The Smaruseful infsystem sucmaximum current abnotifies a wthe total hexceeds contracted pThe SmartSmart Info abridge to tthe home pr

Provides acontained iand, eventucalculated another devData are request atransition changing da

es

onsibility ofested to noter attention,er notificatio

rameters ent. Thrning Eve

representetw

ameters: tt: curre

wer sorption me: time connection seconds)

ne

cription

cription ist

rt Meter formation h as the copower a

bsorption. warning evehouse con

the mpower. t Meter uas a commhe user deremises.

a sub-set n the Sma

ually, instanby the SI

vice connecdispatche

and in c(only for

ata). The S

f the CEMSify the user to notify baon device.

Acknow(if any)

he ent ed wo

ent

to

Ack nee

none

provides to the

ontracted and the

It also ent when sumption maximum

ses the unication evices in

of data art Meter nt power,

itself or cted to it. d upon

case of slowly

mart Info

S to select . ack the CEM

wledgment

eded

Further informatiospecific Use Case

44 / 89

which HAN

MS in order

message

n to this

r

Page 45:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

CEMS

TBD

ptermFbltAcopttIibSi

TtmtcSaCApptItpwraetIda

Gioaeeias

Use Case

performs nthe data retexcept therequired tomemorize aFor examplbe dispatchevel of resthe meter Any operachange Meor to integrapower, shathe device to the custon additionnstant powbe providedSmart Applts energy c

The Smart the Meter, omax-power-that powecontractual Smart Info, an alarm inCustomer Appliances providing inpercentage the thresholt should b

the alarm ipaired devicwhich haveregistered alarms. Themitted morthe Meter opt collects

devices anda user-friend

Generally mplements of the overaand it takesevents to Hexploit forecmplementatalgorithms scope of the

es

o elaboratrieved by th basic pr

o retrieve, and dispatce, load prohed with thsolution ava

(e.g. 15 mation nee

eter data rate them witll be perfowhich displmer.

n, near rewer informatd in order liances to onsumption

Info receivor generates-alarm, ier is be

thresholdconsequen the HAN tInterfaces,and to the

ndication aof power

d (if availabbe defined s to be seces or only e been pfor receiv

e alarm cre than oncpens the br

data frod organizes dly presenta

speakinthe decisio

all customes care of disHAN devicecast algorittion of

are outsese specific

ion over he Meter, rocessing

validate, ch them. ofile shall he same ailable in minutes).

eded to esolution th instant

ormed by ays data

eal time tion is to to allow calibrate

ns.

ves from s itself, a ndicating yond a d. The tly, emits to all the Smart

e CEMS, bout the

beyond ble).

whether ent to all

to those reviously

ving the could be e, before eaker.

om HAN them for

ation.

g, it on logics r system

spatching s. It can hms, the

these side the ations.

45 / 89

Page 46:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

ImHiwc

Ili

CTaHMf•d(•anc•Aepb•ao•aa•Tcf

Ittsdad

STt(c

Use Case

mplements manage all HAN; this fmplementewith a Servcloud.

mplements ogics with n the cloud

CoordinatedThe CEMapplication Home DManagemenfunctionalitie• Allowdefine its o(i.e. applian• Allowassociate tonon-smart connected t• ReceAppliances estimated profile of thby the Custo• Coorappliances overload co• Inforabout any aacoustic wa• …. The CEMS customer ifunctionalitie

t can activthrough aterminal. It set the priodevice/appliactivation dishwasher

Self manageThe CEMS sthe mod(appliance change)

es

a Trust Asecurity ke

functionalityd via collavice Platfor

the comma Service

.

d managemeMS host

that alloDomain nt. Thees could bew the Cusown overloces priority

w the Cuso the Smarappliance o the HAN)eive from

info’s abappliance

e program omer rdinate in order to andition rm the Cactivated acrning)

also providenterface foes.

vate the locan in ho

allows theorities for thiance (i.e. TI machine, e

ement: should be ndified b

power of the

Agent to ys of the

y can be aboration m in the

unication Platform

ent: ts the ows the Overload e macro : tomer to ad rules ) tomer to rt Plug a (not yet

Smart bout the

power activated

the avoid the

Customer ction (i.e.

es a web or these

cal alarm ouse TI e user to he house

alarm terminal, ct.)

notified of behaviour

profile Smart

46 / 89

Page 47:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

Smart Ap

ppliances TBD ATip

Tdrrdl

Aacthcab

CT

STfiibsnpi

Use Case

Appliance.They provinformation profile.

They can degree of frequests frreduce the different levevel.

At the sannounce capabilities the registrhave also capability attention (ebuzzer, a te

CoordinatedThe Smart A

recethe c

execactioits s

dispto th

befothe the profi

Self manageThe Smart from HAN tn the Homenformation,behaviour shedding acnotifies itsprofile chanf possible,

es

ide to theabout th

also exhibflexibility to rom the Cpower abso

vels down to

tartup timand registwith the C

ration phato indica

to get the.g. via a dext message

d managemeAppliance eives throucoordinationcutes the ons, as a futatus lays an inf

he user ore starting,

central unappliance

ile

ement: Appliance

the availabe Domain. U it ada

by somctions. In ad appliance

nge in the Hin its UI.

e CEMS eir load

bit some react to

CEMS to orption at o ‘pause’

e, they ter their

CEMS. At se they

ate their he user isplay, a

e).

ent:

gh HAN n signals

relative unction of

formation

, informs nit about power

receives le power

Using this apts its e load ddition, it e power HAN and,

47 / 89

Page 48:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

11.

Name of U

ID DZo

1.8 C

Version M

Version No.

1.0

Scope and

Scope

Objectiv

Relatedcase(s)

Narrative o

Short deThe Cuspower loa reportchoose t Comple Before SmartInfSystem switchesIf UPS cserver, eAt the eof the poof the crestart inthe Smaevent (balso homdo some

Diagrams

Detectio

3. Power l

Use Case

omain(s)/ one(s) ustomers/P

anagement

Date

08/05/20

d Objective

ve(s)

d business

of Use Cas

escription stomer Eneross event ot about homto do somet

ete descriptthe power fo routinely(so far in E

s to UPS ancapability is e.g. after ½ nd of the poower loss (eircuit breakn the same artInfo the ablackout on me and appething to red

of Use Cas

on of a pow

oss notific

Na

Process Po

t

Name Autho

014 Stefan(Ediso

es of Use C

S

In caseguarantthe cusUPS isOverloaThe aimcause o

se

rgy Manageccurred. At

me and appthing to red

tion loss measu

y sends gloE@h this rond sends an

not availabhour of gat

ower loss eex post ana

ker. The loastate they

alert occurrthe grid/cir

pliances conduce the loa

se

wer loss eve

ation and e

Use Came of Use

ower Loss N

Versiof

or(s)

no Ginoon)

ase

Scope and

of energy tee the corrtomer abou

s not presead Managemm of followinof a power lo

Narra

ement Systethe end of

pliances couce the load

urable loadsbal consumle is implem SMS to the

ble or fail, pteway inacti

event , the calysis) and cads restart fwere when red before trcuit breakensumption bads.

Diagraent phase

Use Case

ex-post ana

ase Identife Case

Notification a

ion ManageCha

occhio

Objectives

black out threct activity ut the eventent, this isment use cang use caseoss event a

ative of Use

em sends athe event t

nsumption ds.

s routinely smption and amented by te customer.ower loss divity. customer hacan make afollowing thblack out o

the event, aer trip) and before powe

am(s) of Us

es

alysis

fication

and Analysi

ement anges

s of Use Ca

he CEMS, efor a minim

t with an alas typically ase. e is to help and to mana

e Case

n SMS to ththe CEMS rbefore the

send consualerts. The he Smart G

detection co

as to be infoappropriate heir own prooccurred. Thand calculasends to th

er loss .The

se Case

s

se

equipped witmum time (<arm (e.g SMthe “ex-po

the customage proper l

he customerrestarts sen

event; the

mption dataCustomer

Gateway) if

uld be perfo

ormed abouchoices to

ocedures. She CEMS reate the durahe customee user can

AppStat

th an UPS, < 60 sec.). ItMS, phone cost” scenar

mer to underoad recove

r to inform nding to the

user can e

a to the CEEnergy Mahas UPS ca

ormed by a

ut the type aavoid e.g. a

Smart Appliaestarts, receation and tyer a report ceventually

48 / 89

proval tus

is able to t can alert call). If an rio of the

rstand the ry after it.

him that a customer

eventually

EMS. Also nagement apabilities

n external

and cause a new trip ances will eives from ype of the containing choose to

Page 49:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

Actors

Groupin Actor Na

ng (e.g. dom

ame

mains, zones

Actor Typ

s) G

pe A

Use Case

Actors Group Desc

Actor Desc

es

cription

cription Further

49 / 89

Page 50:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

see Acto

Smart Inf

CEMS

Smart Ap

or List

fo

ppliances

see Actor

TBD

TBD

TBD

r List s

TSbtTdASSCt

IItetTMSUppsgACtaoCaT-sC-tt

Use Case

see Actor Li

The SmartSmart Info abridge to tthe home prThe Smart during the pAt the endSmart MeteSmart InfoCEMS the athe event.

n case of bnfo will no

the Meter, emit any dtoward the HThe CuManagemenSMS to theUPS capapower loss performed server, e.ggateway inaAt the endCEMS will to calculateand type of on the grid/cCEMS coulda voice call The Smart A- before tsend consuCEMS - at the endto the statuthe event.

es

ist

t Meter uas a commhe user deremises.

Info is nopower loss ed of the eer, by mean, provides

alert occurre

black out thot be able

hence it sdedicated HAN. ustomer nt System se customer abilities odetection by an

. after ½ activity. d of the ehave the p

e the durathe event

circuit breakd activate aalarm

Appliances:he event

umption dat

d of the eveus they wer

ses the unication evices in

ot active event vent the

ns of the to the

ed before

he Smart to reach shall not message

Energy sends an

if it has otherwise could be external hour of

vent the possibility tion and (blackout ker trip). a SMS or

routinely ta to the

ent return re before

informatiospecific Use Case

50 / 89

n to this

Page 51:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

12.

ID DZ

1.11 C

Version M

Version No.

01

Scope and

Scope Objectiv

Relatedcase(s)

Narrative o

Short deThe Aggproductigiven geCompleThe Agg(for exadiscountand temor requeCase 1:time. The apppower cbut will hThe houin termsforecast

Active Dem

Domain(s)/ Zone(s) Customers/M

anagement

Date

d Objective

ve(s)

d business

of Use Cas

escription gregator pron in the fo

eographical ete descriptgregator caample, hight. Alternativporal slot, A

ests for load Aggregato

pliance responsumptionhave a prob

usehold CEMs of power ct thus better

Sub cRequeits cycof proconsuhe masafetyreduct

Sub cThe rebeforeapplia

mand and L

/ Nam

Market Acttime

t

Name of Author(s)

es of Use C

S

CustomDemandtheir cudesignewhen sy

se

rovides cusorm of enerregion and

tion n provide iner renewab

vely, in ordeAggregator d shifting maor is sendin

ponse can bn on peak tibability of doMS will cooconsumptionr optimizing

ase 1: The est to reduccle. In this cduct, what tmer has en

ay have fromy or damagetion varies p

ase 2: The equest to ave the producance taking

Load Shiftie Cas

me of Use

ive Demande

Versi

ase

Scope and

mer awarened Responseurrent consed to adjustystem reliab

Narra

stomer incergy cost dis

temporal s

ncentives foble energy er to perfor may provi

ay vary eacng a reques

be triggeredime. The apoing so basrdinate betwn, and will tthe energy

appliance isce consumptcase it may the product abled this f

m utilities ore to consumproduct by p

appliance isvoid consumct starts its into accoun

Use Case

ng to reduse IdentificCase

d and Load

ion ManageChang

Objectives

ess. e as changeumption pat electricity bility is jeop

ative of Use

entives for count, or inlot.

or consumiproduction

m power limide incentivh day and ost to reduc

d as Utility sppliance is ed on user ween the ditake into co

y costs and

s already rution arrivesreduce the is currentlyfunctionalityr DSOs). Po

mers and theproduct and

s in smart smption at a ccycle. The

nt the reque

es

ce consumcation

d Shifting to

ement ges

s of Use Ca

es in electriatterns in re

usage in repardized.

e Case

consumingn order to p

ng energy iVs foreca

mitation wites to postp

on a short ne househo

sends to thenot guaransettings, kinifferent actoonsiderationprevent ove

unning. when the tpower cons

y doing and y because oower will be eir belongingd so does th

start mode. certain timeCEMS will tst from the

mption at pe

o reduce co

se

c usage by esponse toesponse to

energy inperform pow

in case of est) in the fhin a givenone consumotice. ld power co

e householdteed to rednd of appliaors in the hon the overalerloads.

he product sumption dethe consumf incentivesreduced wi

g. The perche time dura

e is receivedthen plan thAggregator

eak time

onsumption

ApproStatu

end-consumo incentive

the market

n case of ewer limitatio

excess of pform of en geographic

mption. Spe

onsumptio

d a request uce its con

ance and itsouse and thl power con

has alreadyepending onmer settingss or special ithout posinentage of p

ation at low

d by the CEhe starting or or may shi

51 / 89

at peak

oval s

mers from payments

t prices or

excess of n within a

production ergy cost cal region cial offers

n at peak

to reduce sumption, status.

heir needs nsumption

y started n the kind s (i.e. contract g risks of

power power.

MS of the ft the

Page 52:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

If the Cthe Aggrwill carryCase 2:at a cert The apincreasemode ison user The houin termsforecast Story caToday, Tsend to 17.30 toThe CEMMary leconsumpOn Fridathe manCEMS rconsumpAt 18 MaMary waaggregacarry ouJohn faidoes no

General R

With the the unprsmall comIn this codomestic This use the flexibalancing This usenetwork even ser In this uway in w We will needed cases.

start opeak tdefroscustom

EMS is ableregator. Afty out the pa The Aggretain time. pliance rese power con not guaransettings an

usehold CEMs of power ct thus better

ase Thursday ma selection

o 18.00 on FMS alert Maave the Enption in theiay at 17 Jonual operatireassesses ption takingary and Johas able to mator. After ve

t the paymels to meet tt send any s

emarks

developmeedictability mmercial anontext, it is c consumers

case only cbility of smg and ancill

e case doeoperator anvices for th

se case wihich the AD

not consideto answer

of an alreadtime and mast on No-Fromer settings

e to meet ter verificati

ayment of thegator is s

ponse can nsumption dnteed to and kind of apMS will cooconsumptionr optimizing

morning, then of its cusFriday. ary and Johnergy@homir house. hn realizes ion of the wthe optimiz

g into accouhn’ CEMS acmeet the ADerification oent to Mary.the AD servsignal to the

ent of renewand this co

nd domesticalways mo

s to balance

considers thmall comme

ary service

esn’t considnd it doesn’e managem

ll be not anD programs

er also the to the agg

y planned aay also shiftost freezerss and on the

he Aggregaon of the da

he incentivesending a r

be triggeredue to excesticipate its

ppliance. rdinate betwn, and will tthe energy

e aggregatostomers an

n about theme system

that he urgwashing mzation of thnt the load cquire the c

D service anof the data w.

vice requeste aggregato

Genwable resouould be mac consumersre plausible

e services.

he services ercial and ds.

der the diret consider

ment of the d

nalyzed theare generat

planning aregator req

Use Case

appliance int the activat

s). The posse kind of pro

ator requesata with info

e to the userrequest to

d as Aggress of energstarting, bu

ween the ditake into co

y costs and

or, based onAD reques

request recin automat

gently needmachine ove

e electricalcurve recei

consumptionnd her CEMwith informa

t sent by theor.

neral Remarces, suppl

anaged by us. e in the nea

offered by domestic c

ect managenetwork sedynamic tar

relationshited and sen

nd optimizaquests. The

es

n order to avtion of certasibility to shoduct.

ts, it sendsormation cor. increase h

gator sendsy availabilit

ut will have

ifferent actoonsiderationprevent ove

n the consust to reduce

ceived. tic mode a

s to start therriding the loads of thved by the n data from S sends a mation comin

e aggregato

arks y energy isusing the a

ar future to

the aggregaonsumers a

ement of thrvices that iff of electri

ip between nt to the con

ation activitese activitie

void taking eain features ift loads is d

a messageoming from

ousehold p

s to the houty. The appla probabilit

ors in the hon the overalerloads.

umption proe electric c

nd it can

he washing signal sen

he house awashing mathe smart i

message ofg from DSO

or. CEMS cl

becoming aggregated

have the a

ator. It will pand sell it

he electricarequires reacity.

aggregatornsumers.

ies carried es are deve

energy duri (for exampdependent o

e of AD fulfDSO, the a

power cons

usehold a rliance in ‘smty of doing

ouse and thl power con

ofile of its consumption

optimize t

machine ant by the agand optimizeachine. nfo. f AD fulfillmO, the aggre

loses the ac

more difficuflexibility o

ctive partic

provide to a in the m

al equipmenal-time ans

rs and DSO

out within eloped in o

52 / 89

ng the ple: on

fillment to aggregator

sumption

request to mart start’ so based

heir needs nsumption

ustomers, n between

the power

and forces ggregator. es energy

ment to the egator will

ctivity and

ult due to offered by

ipation of

aggregate market for

nt by the wers and

O and the

the HAN other use

Page 53:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

The figur

2 Diagram

Actors

Groupin Actor Nasee Acto

Smart Inf

re below sh

ms of Use C

ng (e.g. dom

ame or List

fo

ows the act

ase

mains, zones

Actor Typsee Actor

tors and the

Diagr

s) G

pe r List

As

IteHsiM

Use Case

eir relationsh

ram(s) of U

Actors Group Desc

Actor Descsee Actor Li

t is the elthe DSO, energy infHAN. Publisset of thosnside the Meter, hen

es

hips needed

se Case

cription

cription ist

ement, prowhich

formation shed data ae already

Home Ece the Sm

d to carry ou

vided by provides

into the re a sub-available

Electricity mart Info

ut this use c

Further informatiospecific Use Case

53 / 89

case.

n to this

Page 54:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

CEMS

Smart Ap

Aggregat

ppliances

tor

aCSifbtCoasccmsEmfescdmtcvtmrtcItswotiaTacpwitiSActDc(aittpt

Use Case

acts like a pCustomer System. Thntegrated wfunctionalitiebetween thethe WAN (CEM is aoptimising eand or prosignals receconsumer’s contracts, minimum standards. Energy Mmessages sfrom conespecially tsector has can handdedicated lomanagementhen forwaconnected dvice versa the “grid / multiple resources cthe CEM controlled.t is an app

the HAN asome intelliwith the otorder to prto the constance eawareness, The Smart active role complying policies, swhishes ants best pethese technnformation Smart GridAppliance communicatthe HAN anDomain) control and(inside anappliance).t is the keythe consumthe marketpower systthe other sid

es

proxy of the Energy

he CEMS with commes, it is the e HAN, the(e.g. interna logical energy conoduction beived from

settingsand

perfThe C

Manager sent to and nnected he in-hometo be mentdle geneoad and gent commanards these devices. It informationmarket”. N

loads/gecan be com

to be

pliance connand equippgence to cher home aovide new onsumer, nergy condemand r

Appliance in the homewith the

atisfying td always rformance.

nologies imptransfer f

ds to the(thus

tion channend outside t

and an ad supervisind/or outs

y mediators ers on one ts and them participde:

meter Manager is CEM

unication gateway HN and

net). The function

sumption ased on the grid,

s and devices

formance Customer

collects received devices;

e/building tioned. It

eral or eneration nds and

to the provides towards

Note that eneration

mbined in mutually

nected in ped with cooperate actors in services like for sumption esponse. plays an e system

system he user assuring Most of

ply some from the e Smart

a el within he Home additional on logic ide the

between side and

he other pants on

54 / 89

Page 55:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

Steps – Sc

No. ScNa

1 ReAD

Steps – Sc

ScenarioName : Step No.

Evnt

1

2

cenario Nam

cenario ame equest oD service

cenarios

o No. 1

vet

NameProceActivi

Providrequeson LShiftinncreas

Consution predicn

me

Primary

f Aggrega

- Re

of ess/ ity

Descof PrActiv

de st oad

ng/ise

The AggresendsrequeAD S

ump

ctio

CEMSinformaboutexpecconsuns smartproduthe throucycleenerg

-rDcb-cDoafdl-dpm

Scen

Actor TE

ator Ms

equest of A

cription rocess/ vity

See

egator s a est for ervice.

ADseret

S gets mation t cted umptioby all t ucts in

home gh the ’s

gy

Use Case

- The aggrrequests anDemand-bacoming frobuyers. - Pools consumers Demand seoffers to aggregator from the fdemand, aevel of dem- It sells “different participants markets or b

nario Cond

Triggering Event Market pricsystem relia

ScenarioAD service

ervic Infoon Pro(Ac

D ervice equies

Aggor

SmApps

es

regator collnd signals fsed m the ma

“flexibilitito build

ervices andthe marksells a

forecasted nd not a

mand. “flexibilities

power throug

bilateral con

itions

Pre

ces or ability

o

ormati

oducer ctor)

InfonRe(A

gregat CE

art pliance

CE

lects the or Active services

arkets/AD

es” of Active d makes ket. The deviation level of specific

” to the system

h the ntracts.

e-Condition

formatin eceiver ctor)

InoEd

EMS Are(mIDCIDAtiDCvas

EMS

n Post-Cond

nformation Exchanged AD service equest message D,

Customer D,

Activation ime,

Duration, Combined volume and prise signal …)

55 / 89

-dition

Requirements , R-ID

Acknowledgment message is required; 1-7.1

2-7.1

Page 56:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

3

Schedng pha

profileis baconsuselecThis informis reto beto aubest time meet user’sneedswell Utilitygatorones.

duliase

CaseCEMSelaboa sto mconsun forunniproduordermeet consun reduccreasrequewhile fulfilliconsuneedsstratetakesconsin appliaavailato reto srequewhichbasedconsuinput phasethe cyCaseCEMSelaboa sfor rall reque

e that sed on umer tion.

mation equired e able to plan

start to

end s s as

as y\Aggre’s .

1: S

orates strategy inimize

umptioor all ng ucts in to

the umptio

ction\inse est

still ng umer’s s. The egy s into deratio

the ance ability espond uch a

est h is d on umer’s

and e of ycle.

2: S

orates strategy running

ested

Use Case

CE

es

MS SmAps

mart ppliance

56 / 89

Acknowledgment message is required; 3-7.1

Page 57:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

4

5

6

Informatio

Name ofInforma(ID) 1-7.1

Produfeedba

Housed poconsuion readin

Consution confirmion

on Exchang

f tion

DeEx

Thefor be shocasCEor

cycleprodufunctiand ssignaproduwith start whentime start.

ct ack

The produreturnconfirthat fulfill requefrom CEMS

eholower mpt

ng

The Info providthe the energconsun ohouseduringtime whichload shoulplace

ump

mat

CEMAsendsAggrean informthat requis havfulfilleduringrequetime

ged

escription xchanged

e AggregatAD Servicedone well i

ort notice, se. The req

EMS throughdirectly dep

s (or uct’s ions) sends a al to the ucts

the time or is

to

smart uct ns rmation it will

the est

the S

Smart

des to CEMS overall

gy umptioof the ehold g the

in h the

shift d take

e.

A s to the egator

mation the

rementve been ed g the ested

ADsefunt

Informof Info

tor sends ae.. The requn advance depending

quest arriveh the home pending on t

Use Case

SmApps

SmInfo

D ervice lfilme

t

CE

mation Exchormation

a request uest may or with a

g on the es to the gateway the case.

es

art pliance

CE

art o

CE

MS Agor

hanged Requireme

The requeincentives consumptiotime intervaunit of timPower meacalculated

EMS

EMS

ggregat Afu(mIDCIDAtiDM

ents to info

st containsoffered

on is maintal within a

me is multiasurement in multiples

AD service ulfilment message D,

Customer D,

Activation ime,

Duration, Measure)

ormation da

s the valuto custo

tained in arange of poiple of 15 and incen

s of 15 min

57 / 89

4-7.1

5-7.1

Acknowledgment message is required; 6-7.1

ata

e of the omers if a defined ower. The

minutes. ntives are utes. The

Page 58:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

6-7.1

Common T

Term Flexibilit

Active D

AD servi

Coincactrefthethe

At acqtotathereqcasbeereqAftreqconADconbasmaby procus

Terms and

ty

Demand (AD

ice:

nsumers centive (€ tually conserence to th

ey will followe aggregato

the end ofquires data al househol

e Smart Infoquester of se that theen fulfillquested timeerwards th

quest to thensumption d

D request. Lnsumption sed on t

ade by the the DSO,

ovide to paystomer.

Definitions

De“Oinjsigwifletheu

D) It sypoIt mwith

will receas a fun

umed kW) he absolute w the signar.

f AD servicconsumpti

ld consumpo and sends

the Load requireme

ed durine. he aggrega

e DSO the cduring the ooking at thof the co

the measumeter and the aggreg

y the incenti

s

Common Tefinition

On an indivijection andgnal (price ithin the enexibility incle rate of c

urelectric, Jis the activ

ystem markower system

is a requeaintain a ceill give an ine fulfillment

Use Case

eive an nction of

with no values if

al sent by

ce CEMS on about

ption from s it to the

Shift in nts have

ng the

ator will consumer period of he actual onsumers urements acquired

gator will ive to the

Terms and

dual level, d/or consum

signal or nergy systelude: the a

change, the an 2014]

ve participatkets and in m participanest sent frertain powencentive (€ t of the prog

es

power of calculated period.

AD service

Definitions

flexibility ismption patte

activation) em. The pamount of presponse

tion of residthe provisits by particom the agr level in a as a functiogram.

the 15 on the ener

fulfillment

s

s the modifierns in reac

in order toarameters uower modutime, the lo

dential conson of flexibipating in Agregator toperiod of ti

on of kW ac

minute prgy consum

ication of gction to ano provide a

used to chaulation, the ocation etc.

sumers in tbility to the

AD service. o the consime. The ag

ctually consu

58 / 89

period is ed in that

eneration external a service aracterize duration, ” [source

he power different

umers to ggregator umed) for

Page 59:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

13.

Name of U

ID

JWG- 211x

Version Ma

Version No.

0.2

0.4

0.5

0.51

0.6

0.7

Scope and

Tariff-Con

se Case

Area Domain(sZone(s) Smart Gri

anagement

Date

01/03/212

11/07/212

12/11/212

Feb. 2014

March 24,201

May 22014

Objectives

sumption I

/ s)/

Na

d Exex

Name Author

20 WillemThe Smart Industr(ESMIG

Tim SEuropeMeter Group

VariouscontribSmart Coordimembehistoryincludeversion

20 Tim SEuropeMeter Group

20 Tim SEuropeMeter Group

3, Yasuro(JPNC Expert)

4 Stepha(TC59x

26, Marco (Energ

s of Use Cas

Information

Use Came of Use

xchanging internal actor

Versiof r(s)

StrabbingEuropea

Metry GrouG)

ablon - Thean Sma

Indust(ESMIG)

s utions fro

Grnation Grouers (versio

will bed in the nen).

ablon - Thean Sma

Indust(ESMIG)

ablon - Thean Sma

Indust(ESMIG)

o ShobataTC57/WG2

)

an Fertx/WG7)

Signy@home)

se

Use Case

n Exchange

ase Identif Case

nformation rs and within

ion ManageChang

- an ter up

he art try

om rid up on be ext

Initial d

he art try

Review

he art try

Review

ke 21

Fit deFormat

tig ModfieID

na Modifie

es

e

fication

on consumn the home

ementges

draft

wed version

wed version

escription t

d to new JW

ed to includ

ption, price

into IEC/T

WG Use Ca

e E@H part

e and warni

ApproStatu Draft

Versiocommphase

Versiofinal comm

TC8

ase Draft

t DRAF

59 / 89

ings with

oval s

on after menting e

on for

menting

FT

Page 60:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

Scope

Objectiv

Relatedcase(s)

2 Upstream in

ve(s)

d business

n this context

S

The sco"upstreaconsumapplian When tdependby crearesponsloads/gcombin From aintroducinterfacand in-hSGCP ia Smar

Please Smart MCEM ccommuthroughThe obexterna- Ma- Pro

ene- Ena

(chtheper

- Secer

- Enahom

A combRespon

means toward

Scope and

ope of this am"2 acto

mer and (in-ces, genera

the consument distributing an incese to priceeneration ed in the CE

n architectuced the "Sce between home/buildin its envirot metering g

note that tMeter and Ccan also nication wit

h separate inbjective of al actors, theke consume

oviding exteergy consumable consum

hanges in) eeir consumprsonal prefend warningrtain (contraable externme smart de

bination of nse”, followi

ds actor A or B

Use Case

Objectives

use case isrs As well home) sma

ators and st

mer has a pution tariff, entive for loe changesresources EM to be m

ural point oSmart Grid

Smart Griding systems

onment. NOTgateway.

the boxes CEM can be

be integrth the Grid nfrastructurthis use c

e premise aers aware oernal markmption mers or theenergy priception to useerences) gs to the cacted) levelnal actors toevices

the functioning the defi

B (see actor de

es

s of Use Ca

s the commas the comrt devices.

torage (see

rice dependprice basead manage (RTP, CP(even fromutually cont

of view the Connection

d actors (aps or devicesTE: ENEL’s

in the diage one or twrated in Smarket/app

res. case is to and the consof their eneret roles w

eir Energy Mes, thus sucheaper or

consumer t

o retrieve t

ns describenition of Eu

efinitions)

se

unication bemmunicationSmart devictable with a

dent energyd demand ment by conPP, ToU). m multiple trolled.

Smart Gridn Point" (S

pplications as. The diagr Smart Info

gram abovewo separate Smart in-hplications ca

exchange sumer in ordrgy consumpith informa

Managemenpporting cor greener e

to keep co

he state an

ed in this uurelectric, w

etween the n between ces cover aactors).

y tariff and/response isnsumers or

Note thatpremises)

d CoordinatiSGCP) entand/or orgaram below s

o is then ver

e are functi physical bo

home devican be throu

informationder to: ption tion on (fo

nt System toonsumers tonergy (depe

onsumption

nd consump

se support which is refe

60 / 89

CEM and CEM, the

also smart

/or a time s enabled a CEM in t multiple ) can be

ion Group ity as an

anizations) shows the ry close to

onal. The oxes. The ces. The gh one or

between

orecasted)

o react on o optimize ending on

below a

ption of in

“Demand erenced in

Page 61:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

Narrative o

Short deThis usefrom upsas well upstreamdescribeComple This hig

1. J

The Smthe housinformatrate of c

This use

- Ssacimc

- Sic

Note thaa negotithe price

Also notB and tosplit up sending Consum

In case power ccontrolla

2. J

Actor Ainformatmanagemake thamount

3 Note that

consumpcommun

of Use Case

escription e case desstream actoas smart d

m actors. .ed. ete descriptgh level use

JWG 2111:

art Meter mse. The CEtion per smachange in th

e case scen

Sending infsmart devicaggregate consumer’s ntegrated inmay executconsumption

Sending infos provided consumption

at several uiation whiche, which mig

te that the co the consuinto three sthe inform

mer Display)

of Remoteconsumptioable device

JWG 2112:

A will sention, warninment gatewe consumeand income

the CEM m

ption informaication with

the Sus

e

scribes howors to CEM evice statu. Also the

tion e case comp

Informatio

makes availaEM receivesart device.3

he power dra

ario consist

formation reces. This init and usedisplay an

n smart devte this scen, but only p

ormation reby the sman/generatio

se case sceh uses the pght be bindi

consumptionumer or in-hsub-use ca

mation to A.

-controllabln or genehas the cap

Price and/

d informatng messag

way; Actor Br or his deve for selling

ay be a func

ation), in whica gateway o

stainable Pr

Narra

w informatioand how infses and cocase that

prises four d

on regardin

able the infs this inform3 The rate oawn.

ts of two sc

egarding (funformation i it to fored external

vices in the nario. In thpartial infor

egarding totart meter, sn and forwa

enarios mayprice (WGSng from the

n informatiohome deviceses, each wActor B an

e device isration to ipability of sh

or environm

tion (e.g. ges) to theB may do thevices awareg energy ba

ction embeddch case the ir the smart m

Use Case

rocesses wo

ative of Use

n regardingformation re

onsumption remote-con

different prim

g power co

formation onmation but cof update of

enarios:

uture) poweis provided ecast consuactors whecustomer p

his case, omation.

tal power coent to the C

ard this to th

y work togetSP2112) to ere on.

on can be tres. This impwith its ownnd sending

connectedndividual rhowing suc

mental info

price, mete consumee same via

e of the amock to the gr

ded in the Sinformation ometer

es

orkgroup’s r

e Case

g price andegarding enare being

ntrollable d

mary use ca

onsumption

n total powecan also rethe informa

er consumpby the sm

umption/genn required.

premises, mone CEM d

onsumptionCEM that mhe consume

ther in an itget a foreca

ransferred vplies that thn goal (send the inform

to CEM, Cremote-conth informatio

ormation

teorologicalr or his sthe Smart Mount and corid, or of ot

Smart device on total cons

report.

environmenergy consusent back tevice is co

ases:

n or genera

er consumpceive consu

ation must b

ption or genmart device neration an

As the CEmore than ondoes not h

or generatmay use it toer’s display

terative wayast (WGSP2

via differenthe use caseding the infmation to t

CEM asks introllable deon.

, environmsmart devicMetering gaost of consuher elemen

(having thuumption is p

ental aspecumption or gto the consonnected to

ation

ption or genumption / gbe proportio

neration of to CEM, w

nd send thEM can be ane CEM in ave the to

tion. This ino make a foand externa

y. E.g. there2111), then

t channels te could effeformation tothe Simple

nformation evice if the

mental, cosces via th

ateway. Theumed energts relevant

us access toprovided to th

61 / 89

cts is sent generation sumer and o CEM is

neration in generation onal to the

individual which may his to the a function the house tal house

nformation orecast of al actors.

e might be n adapting

o actor A, ectively be o Actor A, External

regarding e remote-

st related e Energy goal is to

gy and the to energy

o only partialhe CEM by a

l a

Page 62:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

managenotificat

To movcertain pshift varperiods the smaso that parametamount and/or sthe CEM

The pricmessageis able tschemewith a taCoordina

The commessagehappen

Note thaa negotithe price Also noimplies t

In case environm

3. J

This prim

- Ac

Tmbttcb

Imch

- Teaow

ment (e.g.: ion that the

e out peakperiods of trious uses and days m

art grid. Whethey can

terised or mof green e

shifts its opeM and smart

ce informates or a fixeo provide th. This implieariff update ation Group

mmunicationes from an within a cer

at several uiation whiche (WGSP21

te that thethat this use

of Remote-mental infor

JWG 2113:

mary use ca

A warning mconsumed d

The Smart maximum cbe consumethreshold ofthe smart deconsumer dbe limits for

n case of Rmessage ifconsumptionhas the cap

The warningexceeded, baction to lowof this use warning mes

the percen tariff has b

k loads, an the day or or lower t

may not be fen such a h

be ready managed by energy is oeration befot devices ar

tion can beed tariff schehe informaties that pricin the sma

p use case r

n functionaliexternal acrtain period

se case sceh uses the p12), which

informatioe case could

controllablermation and

Warning m

ase scenario

message isduring its ne

Device receontracted ped during if the maximevice or othisplay). The

r instant pow

Remote-conf needed. n to individability of sh

g message based on infwer the concase and

ssages are

ntage amoubeen change

external aduring certa

their consufixed in advhigher cost

to react the CEM tover a set lore or after e the respo

e either reaedule. Noteon for, or toe related chrt meter; threpository.

ties describtor to the coof time, un

enarios mayprice (WGSmight be bin

n may be d be effectiv

e device is c controls th

messages fr

o consists o

generatedext operatio

eives informpower. The its next op

mum contracher customee threshold wer or accum

ntrollable deIn order to

dual remotehowing such

is generateformation fr

nsumption othe work obeing sent.

Use Case

nt of greened.

actor can pain days inmptions in

vance, but rperiod occuto these

o start whenevel or to a peak con

onsibility of t

al-time price that dynamo calculate thanges in tis is describ

bed in this uonsumer, wless change

y work togetSP2112) to nding from

provided bvely split up

connected tois type of d

rom CEM /

of two scena

by the smn will excee

mation fromSmart Devieration (excted powerer interfaces

is based omulated ene

evice is coo do this,

e-controllablh informatio

ed by the Crom the smaof smart devof the SG-C.

es

power). Th

ropose a ta order to inits housin

rather deterurs, the cusprice messn the energytemporarily

nsumption pthe consum

ce, real timmic pricing the cost of ethe CEM bybed in use

use case mawarning him es in consu

ther in an itget a forecathere on.

y Actor A p in two sub

o CEM, CEMevice remot

Smart Dev

arios:

mart device ed maximum

the CEM oice estimate

x: cycle). If , a warnings (e.g. othe

on limits recergy consum

nnected to CEM asks

e device ifn.

CEM after nart meter. Nvices; sinceCG, this sc

he consume

ariff of elecnvite his cug during thmined on thstomers aresages. Smay costs less

y lowers itsperiod. Theer.

me combinerequires a menergy base

y actor A or case BI.03.

ay also be uthat emergemption / gen

terative wayast (WGSP2

or Actor Bb-use cases

M interpritetely.

ice

after estimm contracted

on total houes the maxi

there is a is generat

er devices oceived from mption.

CEM, CEMs informatio

the remote

oticing thatNote that thee these actiocenario only

er can also

ctricity highustomers to hese periodhe flexibilitye notified inart devicess or when ths power cone parameter

ed price anmetering syed on, a fle

r B may be of the Sma

used to senency load cneration tak

y. E.g. there2111), then

B alternative.

s the Price

ating that td power.

use consumimum powe

a risk to exted and disor the simple

the CEM, w

M makes theon regardie-controllab

t contractede CEM mayons are noty describes

62 / 89

receive a

her during delete or

ds. These y needs of advance, s can be he relative nsumption rization of

d volume ystem that xible tariff combined

art Meters

d warning control will ke place.

e might be n adapting

ely, which

and/or

the power

mption and er that will xceed the played on e external which can

e warning ng power ble device

d power is y also take t in scope s how the

Page 63:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

The limiis close usual ins

4. J

The cusSmart ddifferentwith totaOne of tparametbefore thenergy c

The Smacycle). Tretailer. specific informat

An exterinformatcustomeexternal

In case needed.device if

Nr 1.

2.

3.

4.

Actors

Groupin Actor Nasee Acto

ts (for instato the limit

stant power

JWG 2114:

stomer is adevices. Tht devices. Ital house cothe most imters of the che start butconsumption

art device eThe CEMS Final cost user interfa

tion about w

rnal actor ction may beer, having g actor.

of Remote- In order tf the remote

This high -upstream- downstreWhere relactors There is CEMs anduser beinggap wouldNext stepfunctionalcome out

ng

ame or List

ant power) ct of his conr consumpti

Retrieve s

also informee level of t should be

onsumptionsmportant gocycles by pton is pressn saving of

estimates thwill performinformationace. Moreov

which tariff i

an retrieve e retrieveduaranteed t

-controllableto do this, e-controllab

level use cam communiceam and witevant all pr

not yet a ud the aggreg informed d be a next : define ad architectur

Actor Type see ActorList

can include ntracted powon when the

tatus of sm

ed of the cdetail, freq

e possible fs; such funals of this roviding he

sed. Many s10-15 % co

e energy thm the energ will be disver, in cases currently

the state oby en ext

that some o

e device is cCEM asks

le device ha

Notes

ase may in ation (consuthin home crimary use c

use case cogation takethat he is (step ditonal use

re as a blac

Group D

r

Actor Desee Acto

Use Case

not only upwer) but alse customer

mart device

current eneruency and

for users toctionality shuse case isr/him feedb

studies showould be achi

hat will be cgy cost evasplayed eithe of time-ofin use.

of a smart dternal actorof his smart

connected ts status infas the capa

s and open No

the future bumption, de

communicatcase (scena

overing thes place in t(going to) e

e cases usick box and

Actors Description

escription or List

es

pper limits (fso lower limis out or du

es

rgy consumquality of

display suhall be perfs to educateback on the w that, only ieved on the

onsumed dualuation basher on the Sf-use (TOU)

evice directr who has t devices ar

to CEM, CEformation toability of sho

issuesotebe split up inevice statustion (price) arios) may b

e situation wthe grid sidexceed his c

ng the top identifying

for examplemits (for exauring night t

mptions\genedata couldch disaggreformed by Ce the consucosts and by displayin

e single app

uring the sesed on dataSmart Applia) pricing, th

tly from thea businesse (exclusive

EM makes to individualowing such

n two high le)

be split up a

where theree of the SGcontractual

down methwhich mes

e, when theample, the time).

eration of t be differeegated dataCustomer Iumer in seleenergy conng this inforpliance.

elected opera received bance displae appliance

e CEM. Thiss relationshely) control

the status ml remote-coinformation

evel use ca

according to

e would beGCP. (e.g. h

power). Clo

hod, considssages wou

Furtinforspecthis Case

63 / 89

customer remaining

the single nt among

a together nterfaces. ecting the sumption, rmation, a

ration (ex: by Energy ay or on a e receives

s real time hip to the led by the

message if ontrollable .

ses:

o external

e multiple ow is the

osing this

ering the ld go in /

her rmation cific to

Use e

Page 64:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

CustomeManager

Energy managemgateway

er Energy r (CEM)

ment

Internal

Internal

The CEenergy con mesconsumedevices mCustomesent to aespeciallbe mendedicatecommanconnecteinformatiHosts anHAN devfriendly p

The CEMEnergy costs obproper foweb siteinformatiweb appenergy running cycles. Iprovide a

Exposescan be wishes toa differen

ImplemeOSGi fraapplicatiodata and

Implemesecurity can be imWSN-C S

ImplemeC Servicmediate bundles that mulbe combcontrolle

When communCustomeCEMS. An acceand receand comCEM, letthe eve

Use Case

M is a loconsumptionssages reer’s settingminimum pe

er Energy Mand receively the in-ho

ntioned. It d load andds and the

ed devicesion towardsn applicatiovices and opresentation

MS hosts aCost Algor

btaining (eithorm to be f

e to gather ion. Moreovplication to

consumptiSmart A

In addition,a way to ob

a web-baused by 3o elaboratent visualizat

nts an Exeamework foons that w

d provides a

nts a Trukeys of th

mplementedService Plat

nts the comce Platform

communand WSN-tiple loads/bined in t

ed.

the CEMication fun

er Energy

ess point (eiving smarmmands betting the CE

ents. The

es

ogical funcn and or preceived frogs and cerformance

Manager cold from conn

ome/buildingcan hand

d generatioen forwards. It provid

s the “grid /on that collorganizes thn.

a dedicatedrithm, to eher via a prfilled by usthe inform

ver, implemo display on, includ

Appliances , this interftain the cos

sed API ovrd party ap current dation.

ecution Envor Java) to wishes to ela different vi

st Agent the HAN; thd via collabtform

mmunicationm and pronication bC Service /generation he CEM t

M is intctionalities Manageme

functional rt grid relaetween actEM decide

communica

tion optimioduction baom the gcontracts, standards. lects messanected devig sector hadle generan managems these to

des vice v/ market”. Cects data f

hem for a u

algorithm,valuate enroper code ser or a rem

mation) the ments a proboth cost

ding cost with sele

face shall st per kWh.

ver IP HN pplications ta and prov

vironment (host 3rd p

aborate cursualization.

to managehis functionoration with

n with the Wovides APIsbetween lPlatform.. Nresources

o be mutu

tegrated it is calle

ent System

entity) sented informator A and how to procation is o

ising ased grid, and The

ages ices;

as to l or ment the

versa CEM from

user-

, the ergy or a

mote cost oper and for

ected also

that that

vides

(e.g. party rrent .

e all nality h the

WSN-s to local Note can

ually

with ed a m or

nding ation

the cess often

64 / 89

Page 65:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

Smart gateway

Smart me

NNAP

Simple consume

Metering (LNAP)

eter

external er display

Internal

Internal

Internal

External

achievedthrough aThis gaincludingmanagemcapabilit

An accesaccess tand, whadvancedevices c

A LNAPbetween connectesimply abetween display/hNeighbou

It may alconversioservice cas functproxy sedevices c

The metthe followSmart M

Mcinmmso

Ocm

Meter coThe Neiga functioor moredisplays connecte(NN). It different same NNDedicatethe smacustomeplanned historicaexist to dcustomemobile p

Use Case

d through aa wireless c

ateway mag protocoment, seies.

ss point (futo one or mhen equippd display connected t

P also ma differen

ed to the saas a route the mete

home autourhood netw

lso provide on, device capabilities.tions of thervices on bconnected t

tering end dwing meter-etering refe

Metrology conventionandex) thametrologicalmetrologicalshall meet tof the MID;

One or morcovered by make use of

ommunicatioghbourhood

onal entity the LNAP’s,

and homeed to the

may allowfunctional

N. ed display sart meter/r to cheload reducl. Other nodeliver consr, such as thone or the

es

an internetconnection.y also prol converecurity

nctional enmore meteri

ed with a/ home a

to the local

ay allow dnt functiome LN. Theer transferering end mation devwork of wide

services incmanageme Services me LNAP itsbehalf of limto the local

device is a -related fun

erence archi

functions l meter dispat are control. control, tthe essentia

re additionathe MID. T

f the display

on functionsd Network Ahat provides

metering e automatio

neighbouw data exch

entities co

screen in cSGCP avack power

ctions and ot dedicatesumption infthe personae TV set.

connection

ovide servrsion, deand ser

tity) that alng end devn interface

automation network.

data exchaonal ente LNAP mayring messadevice an

vices and e area netw

cluding protnt, security

may be provself or promited capabnetwork.

combinationctions fromitecture:

including play (registe

under lWhen u

hese functal requirem

al functionsThese may y;

s. Access Poins access to

end devion end devrhood netwhange betw

onnected to

connection ailable to

consumpload reducted means formation to

al computer,

n of

vices evice rvice

lows vices e, to

end

ange tities y act ages nd/or

the work.

tocol and

vided ovide bility

on of m the

the er or legal nder tions

ments

s not also

nt is one ices, vices work ween o the

with the

ption, tions also

o the , the

65 / 89

Page 66:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

Smart de

Smart (white go

evice

appliance oods)

External

External

A smargeneratodevices electricitybatteriesfuel cellsand cooetc…). Tdirectly fthe CEMmessage

Since thethe SGCactor

An examgoods ahas the messageits behanetwork.utility or directly system,

The mesof enerrenewabRespondother relmust recon pre-se

Each Smof availaof its use

�its owndata

�The esselected current ta

�the tota

The smrespond,and useexpected

The consappliance(e.g. ovoperationcertain nroom tem

Any appshall be consume

Use Case

rt device or or stora

include ty storages s, heat pumps with heaoling devicThe smart from the griM and can es from the

e smart devCG, it must

mple of a smppliance wcapability

e from the aviour tow The messaa third paror via a h

ssage can brgy or thle energy,

d message lated informceive, interpet or active

mart Applianble data, deer interface,

n energy con

timated ene cycle and iariff.

al house en

mart applian, but will der settings d performan

sumer has e and can o

verride a dn, limit denumber of mperature).

pliance opeeasy for a

er to activat

es

may be ge device

direct asuch as

ps and micrat buffers, aces with t

device cad, though a

react to cgrid in an in

vice is outsit be seen

mart device iwhich is an

to act in grid and thards the

age can be rty energy some energ

be informatie amountor it can (delay loa

mation) thatpret and reaconsumer i

nce may dispepending on, like:

nsumption/p

ergy consumts cost base

ergy consu

nce is not do so base

in order nce.

the ultimateoverride anydelay to allays to nohours, or

eration settan averagee or implem

an applia(Local stor

and functielectrochemro CHP sucair conditiohermal inen receive n interface commands ntelligent wa

de the scopas an exte

is a smart wappliance response t

hereby optimenergy sureceived fro

service provy managem

on like the of avail

be a Demad messaget the appliaact upon banput.

play a sub-sn the richne

power drawn

mption of ed on ToU o

mption.

guaranteedd on its stto ensure

e control ofy specific mllow immed

o more thamaintain a

ings or moe, non-technment.

ance, rage ional mical ch as oning ertia, data with and

ay.

pe of ernal

white that

to a mize

upply om a vider ment

cost lable

mand e or ance ased

set ess

n

or

d to tatus

the

f the mode diate an a a set

odes nical

66 / 89

Page 67:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

Actor A

HES

MDM

Actor B

External

Internal

Internal

External

External interactincomponenetwork communmarket rEnergy etc…

Responsmeters a

Delivers

Repeats

Is the smonths)

Pushes MDM

Supportsconcentr

Containsaggregatsolutions

Is the smetering

Is the lon

Ensures higher le

Connects

Is the coreach theand back

Delivers systems

Acts as businessadvance

Containsaggregat

External interactincomponenetwork channel.collectingmarket roetc.

Use Case

actor (Sng with thents in the

through tication charoles are tServices P

sible for aand/or from

the raw me

the reading

short-term for meter re

the event

s the sperators and m

s some totion functios

single meteg data

ng-term stor

the data evel busines

s all head-e

onnection pe smart mek

the meterfor further u

the criticals and operd metering

s some totion function

actor (Sng with thents in the through the This acg meteringoles are the

es

mart Grid he system home or hothe energy

annel.. Exathe EnergyProvider, t

acquiring thdata conce

eter reads to

g for any mi

interim dateads

informatio

ecific protmeters

opology inonality for

er data rep

rage for the

quality byss processe

end systems

point for otters i.e. a g

reads to usage

security firational sysinfrastructu

opology innality

mart Grid he system home or hoe metering ctor is re

data. Exae DSO, met

Market Rfunctions

ome automay managemmples of s

y Provider, he aggrega

he reads fntrators

o MDM

ssing reads

a storage

on upwards

tocols of

nformation plug &

pository for

e metering d

y VEE for s

s

her systemgateway to

other busin

rewall betwstems and re.

nformation

Market Rfunctions

ome automacommunica

esponsible amples of stering comp

Role) and

ation ment such

the ator,

from

s

(1-3

s to

the

and play

r all

data

the

ms to HES

ness

ween the

and

Role) and

ation ation

for such

pany,

67 / 89

Page 68:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

14.

ID DZ

1.12

G

1.2 Versio

Version No.

1.0

1.3 Scope

Scope

Objectiv

Relatedcase(s)

1.4 Narrat

Short deThe aimher/his pnot onlyproductiComple The goaand the This inteto monitsystem: On the inside thCurrentlappliancplants. Storing period aother hastored insometimstoring efrom thehow mu

Energy pro

Domain(s)/ Zone(s) Generation/

n Managem

Date

07/05/2014

and Objec

ve(s)

d business

ive of Use

escription m of this usproduction py on the cuon of the ph

ete descriptal of this usstorage sys

egration aimtor from a ucurrent powother hand

he algorithmy this algo

ces. This in

energy in aand so the and a scennto a DHW

mes presentenergy into

e grid maximuch electric

oduction/s

/ Nam

Field Ene

ment

Name of Author(s)

Luca WieLanzetta (i-

ctives of Us

S

The gophotovoa PV pl- Mo

pro

- Tuncur

JWG6/7

Case

se case is tplant, includrrent and fohotovoltaic tion se case is tostems that c

ms to have auser-friendlywer, energyd informatiom that definorithm incl

ntegration w

a battery ssystem canario could (Domestic

t into house a thermal

mizing autocity is expor

torage

Use Cme of Use

ergy produc

Versi

egand, Ci-EM)

se Case

Scope and

al of this uoltaic (PV) pant in the E

onitoring sysoduction sys

ning of the rrent and fo7-10 pag47.

Narra

to provide cding suggesorecasted cplant

o integrate could be link

a dual beney interface a productionn about cunes the besudes only

will produce

ystem allown achieve cbe executeHot Water)

e’s hydraulistorage all

consumptionrted into th

Use Case

ase IdentifCase

ction/storage

ion ManageChang

iro First dr

Objectives

use case is plants and t

Energy@Hostem for alstem, throug

appliancesrecasted en.--> to inclu

ative of Use

customer wstions abouconsumption

the productked to a PV

efit for the fiall the signi, battery sta

urrent and fst execution

current ane a more a

w the systecost optimized where th) storage, bic circuit orow the sysn. For exam

he grid can

es

fication

e integratio

ementges

raft

s of Use Ca

to integratthe storageme architecl the signifgh a user-fr

s timing algonergy produde: possibil

e Case

with informat when an ans, but also

tion from doV plant in the

inal user: onificant quanate of chargforecasted n time in wnd expecteccurate res

em to releazation/peak he excess euffer primar direcly feestem to limimple the CE adopt an

n

se

e the produsystems th

cture. icant quantiendly interf

orithms usiction. ity to sell en

ation on theappliance sho on the cu

omestic phoe Energy@H

n the one hntities that rge, forecast energy pro

which an aped consumsult for use

se electric consumptio

energy fromry water (foed into the t use of ele

EMS, receivialghoritm a

ApproStatu

uction fromhat could be

tities that rface

ng informat

nergy to the

e current sihould be us

urrent and f

otovoltaic (PHome archi

and user wregard the p

data, etc…duction wil

ppliance shoptions of rs with dom

power in aon reductiom PV plant or heating o circuit. In ectric energing informatable, as a

68 / 89

oval s

domestic e linked to

egard the

tion about

e grid

tuation of sed based forecasted

PV) plants tecture.

will be able production l be used ould start. the other mestic PV

a different n. On the could be

or cooling) this case

gy coming tion about target, to

Page 69:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

reduce tbe allowbattery/treduce t

The storand it isDHW binverter/through remote W

to zero the vwed accordithermal stothe global s

rage compos managed buffer or C/storage sya zigbee m

Web Servic

value of eneing to econrage ratherystem ener

onent could by inverter

CH/Cooling ystem will cmodule. Thee.

ergy given tnomic reasor than sell egy efficienc

be installedcontroller, obuffer pri

communicae CEMS wi

Use Case

to the grid ions. In factelectric ene

cy.

d, if a batteotherwise cmary watete PV planill be able

es

tself. Electt it could bergy coming

ery storage could be inser managnt and storto retrieve

tric energy ae cheaper

g from PV p

will be usestalled in thed by hearage informforecast in

autoconsumto store en

plant even

d, inside the hydraulicating contr

mation to thformation i

69 / 89

mption can nergy into if it could

he inverter circuit as

oller The he CEMS nvoking a

Page 70:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

Diagrams

Scenario

s of Use Ca

o 1: Visuali

CEM

se

ization of p

S

S

MS

Diagra

production

tep 1: Plan

Step 2: Inv

Step 3: For

InsertPlan

O

Use Case

am(s) of Us

informatio

nt Forecast

verter data

recast data

nt(PlantInfo,

OK(PlantID)

es

se Case

n

registratio

acquisition

acquisitio

UID)

)

on

n

n

ForecasProvide

st er

70 / 89

Page 71:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

Scenario S

Actors

o 2: peaks/

Standard ap

costs optim

ppliance

Step 4:

mization

Use Case

User visua

es

alization

Ther

rmal storag

ge

71 / 89

Page 72:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

Groupin Actor Nasee Acto

Inverter/S

CEMS

Forecast

HAN use

Triggering

Actor/Sy

ng (e.g. dom

ame or List

Storage_sy

t Web Servi

er

g Event, Pre

ystem/Infor

mains, zones

Actosee

stem

ce

econdition

rmation/Co

Scenario

s)

or Type Actor List

s, Assump

Use Cntract Tri

Ev1: visualiza

Use Case

Actors Group D Actor Dsee Acto

Providesretrievedplant prpossiblysystem. is couldthe invhydraulicdirect betweenCEMS. upon reinverter exclusivCEMS wkeep hisHosts a collects and foorganizefriendly Data triggeredperiodicaamount the comonce a once ainverter)Forecasavailableinvoked,of expvalues fin a spec The sepower vfor the nIt’s theinteractsget productisystem

tions

Case Condiggering

vent ation of pro

es

Description

escription or List

s a set d by production s, by theThe stora

d be includerter or ic circuit, s

comn the storag

Data are equest. Dat

ely current will store thestorical data

Web applidata from

recast seres them fopresentatio

collection d by thally every of time, depponent to qday for the

a minute ). t providee a service , returns aected plafor the plancific home.

ervice provalues, oncnext 72 houre home s with CEMinformationon and

itions Pre-conditio

oduction in

n

of data hotovoltaic tatus and,

e storage ge system ded inside nside the o there is munication ge and the dispatched a sent by represents values, so

ese data to . cation that

m Inverter rvice and or a user-n.

will be e CEMS a certain

pending on query (e.g. e forecast,

for the

r makes that, when collection

nt power nt installed

ovides 72 e an hour rs. user that

MS GUI to about

storage

ons Ass

nformation

Further informatispecific Use Case

sumption

72 / 89

ion to this

e

Page 73:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

HAN use

CEMS

CEMS

HAN use

E@H app

3.

Steps – Sc

No. ScNa

1 Visof inf

2 Peop

Steps – Sc

er

er

pliance

cenario Nam

cenario ame sualization

productionformation

eaks/costs ptimization

cenarios

Sc

me

Primary

n HAN CEMS

E@H ap

Step 1: plaUsfill regforCE

Step 2: InvCEpestareqprovalPV

Step 3 :forCEpestareqproforFoSe

Step 4:Usto GUPVvar

enario 2: PAnapaskCEbestim

Scen

Actor TE

user, Utmv

pliance Aatbt

Use Case

nt forecast ser starts t

the plangistration rm in thEMS GUI verter data

EMS riodically

arts tquest planoduction lues to th

V inverter recast data EMS riodically

arts tquest planoduction recast to threcast We

ervice : User visua

ser accessethe CEMS

UI to monitoV planriables

Peaks/costs hompliance ks th

EMS for thst executio

me

nario Cond

Triggering Event User accessthe CEMS Gmonitor PVvariables

An appliance the CEMS fbest exetime

es

registrationo

nt

e

None

acquisition

o nt

e

None

acquisition

o nt

e b

Step 1

alization s S or nt

Step 2 &

s optimizate

e e n

Inverterforecastacquisitrunning

itions

Pre

ses to GUI to

plant

Invforeacqrunhasregfore

home asks

for the cution

Invforeacqrun

n

ConCEMto exe

& 3

ionand

t data ion is

e-Condition

erter aecast dquisition nning. PV pls begistered in ecast servicerter aecast dquisition nning

nnection MS and invbe establis

ecuting this

n Post-Cond

and data

is lant een the

ce

User to thproduforecainform

and data

is

Appliasuggeits executhankCEMSrespo

73 / 89

between verter has sh before step

-dition

accesses he plant

uction and ast mation

ance ests user

best ution time ks to S onse

Page 74:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

ScenarioName : Step No.

Evnt

1 Noe

2 Noe

o No. 1

vet

NameProceActivi

on plant forecaregistron

on Invertedata acquisn

- Visualiza

of ess/ ity

Descon ProceActiv

ast rati

CEMSprovidregistn forthe ufill plant After submn, datsent tforecaweb servicthat sthem providan Ibe for forecareque

er

sitio

Perioy CEMSstartsinvertdata acquiprocethe Cmakerequeaskinthe four variabThe invertrespoto requewith valuethat storedCEMSdatabto letbe availaby when

tion of pro

criptiof

ess/ vity

Sere

S des a tratiorm to ser to

PV data.

issiota are to the ast

ce, stores

and des D to used

ast ests

CRTE

dicallthe

S s the ter

sition ess: CEMS es 4 ests g for main

bles.

ter onds these

ests 4

s are

d by S in a base

them

able user

GE

Use Case

Scenariooduction inf

rvic Inforon Prod(Acto

EA CEM

T Invertoragsyste

es

formation

rmati

ducer or)

Infoon Rec(Ac

MS ForeServ

rter/Sge em

CEM

ormati

ceiver tor)

InfonExd

ecast vice

Pla

MS •CPV•Oenproby pla•Cenavin (if pre•Ineopoavfroba

formatin

RmRxchange

ant info

urrent V power

Overall nergy oduced

y the ant urrent

nergy vailable

storage

esent) nstantanous ower vailable om the attery

74 / 89

Requirements , R-ID

Page 75:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

3 St1

4 St2/3

ep forecadata acquisn

ep 3

User visualion

he/shrequethe produinformn.

ast

sitio

Perioy CEMSstartsforecadata acquiprocethe Cmakerequethe ForecWeb Serviaskinthe expecplant powethe hoursForecservicreturnsequeof expecpowea spdate that storedCEMSdatabto letavailaby whenhe/shrequethe expecplant produinformn.

izatUser requeinformn his/heEnergProdu

he ests

plant uction matio

dicallthe

S s the ast

sition ess: CEMS es a est to

cast

ce g for

cted

r of next

s. cast ce ns a ence

cted rs in

pecific time

is d by S in a base t it be able

user

he ests

cted

uction matio

GE

ests matioabout er gy uction

RERT

Use Case

T ForeWeb Serv

PO CEM

es

cast

ice

CEM

MS HAN

MS 72vaonhothe72

N User Noinfn ex(inn En

2 power lues,

nce an our for e next

2 hours

o formatio

xchanged nformatio

about nergy

75 / 89

Page 76:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

ScenarioName : Step No.

Evnt

1 St2/3of Scar1

o No. 2

vet

NameProceActivi

ep 3

cenio

Get bexecutime

Systethe Cthrouthe Gatewweb applic. CEMSshowinformn iuser-friendinterf

- peaks/co

of ess/ ity

Descon ProceActiv

best tion

This is san updatof algorthat estabs theappliaexecutime. CEMS(due scena1) alreadstoredits databthe produinformn reqin algorCEMSto theseinformn additithe existiused informn, suappliacurre

em to CEMS gh Home way

cation

S s this

mation a

dly ace. sts optimiz

criptiof

ess/ vity

Sere

step simply

ting the

ithm

blishee best ances ution

S to

ario has

dy d in

base

uction matioquired

the ithm. S has

use e new matio

in ion to

ng

matioch as ances nt

UPTE

Use Case

zation (stan

rvic Inforon Prod(Acto

DA CEM

es

ndard appli

rmati

ducer or)

Infoon Rec(Ac

MS Apps

ProSyaresh

iance)

ormati

ceiver tor)

InfonExd

pliance Thscedonefurmein of exme(i.ebeextimap.

oduction ystem e only own)

formatin

RmRxchange

his enario

oesn’t eed any rther essage

addition the

xisting essages e. the

est xecution me of an ppliance)

76 / 89

Requirements , R-ID

Page 77:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

ScenarioName : Step No.

Evnt

1

2

3

o No. 2

vet

NameProceActivi

Get Min/Mmodulon

Get Storabenergy

Get Min/Mchargepowermachi

and expecconsuon overahomeconsuon.

- peaks/co

of ess/ ity

Descof PrActiv

ax ati

This simplallowCEMSinformon appliamoducapabin orknowlimitsminimaximuvalueneces0/100somesituatthe appliacouldlimitaon value

ble y

This enablCEMSknowquantenergactuastorabthe applia

ax e r ne

This allowCEMSinformon minimaximuinstanus the applia

cted umpti

and all e umpti

sts optimiz

cription rocess/ vity

Sece

step y s S have mation thermo

ance ulation bilities rder to

its . The

mum/mum is not ssary 0, in e tions thermo

ance have tions

this s.

G

step les S to

the tity of gy ally ble in thermo

ance.

G

step s S have mation

the mum/mum ntaneo

power thermo

ance

G

Use Case

zation (ther

ervie

Inforon Prod(Acto

GET Therappli

GET Therappli

GET Therappli

es

rmal storag

rmati

ducer or)

Infoon Rec(Ac

mo ance

CEM

mo ance

CEM

mo ance

CEM

ge)

ormati

ceiver tor)

Infon

MS MiMon

MS Stoen

MS Michpo

formatin

RmR

n/Max odulatio

orable nergy

n/Max arge

ower

77 / 89

Requirements , R-ID

Page 78:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

4

5

Informatio

Name ofInforma

Pla

Totalproduct

Storageenerg

Peak pthe

Get energygeneran efficie

Get scommd winformon abpowerrate

on Exchang

f tion (ID)

nt info

l Energy tion (kWh)

e available gy (kWh)

ower from battery

can mwhensinkinenergthe plant.

y atio

ncy

This defineefficiefor appliausefuthe able makechoic(possthe conveamondiffersolutithe systecapab

start anwith

matibout r

This enablthermappliafollowCEMSindicaabouttime poweabsorexprein te% modu

ged

DescriptExchang

Vital statabout PV

CEMS quEnergy pcurrent PCEMS qStorage returns thany) CEMS Apower a

manage

ng gy from

PV .

step es the ency thermo

ance ul to let

CEMS to

e e

sibly most

enient) ng ent ons

whole m is ble of.

G

step les the

mo ance to

w S ations t start

and r rption essed rms of

of ulation

G

Informtion oged

Scetistics and g

V plant Sce

ueries the production. PV Energy pqueries the

available he Storage

Asks for vailable fro

Use Case

GET Therappli

GET CEM

mation Exchf Info

enario 1 – Sgeneral info

enario 1 – SInverter forInverter ret

production e Inverter

energy. available e

the instanom the ba

es

mo ance

CEM

MS Theapp

hanged rmation R

dtep 1

ormation

tep 2 r the PV urns the

for the Inverter

nergy (if

ntaneous attery (if

MS Engeeff

rmo liance

CostapaPoe exas mon

Requiremendata

nergy eneration ficiency

ommand art with ayload of owerRat

xpressed % of odulatio

nts to inf

78 / 89

formation

Page 79:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

Plant po

Common T

Term PV plant

forecast ower

Terms and

any). Invdeliverab

CEMS ascurrent returns th

Definitions

DePh

verter returnble from the

Scesks the forePV power.he expected

s

Common Tefinition hotovoltaic

Use Case

ns the Pea battery

enario 1 – Secast service

Forecast d plant powe

Terms and

plant

es

k power

tep 3 e for the

service er

Mo

Definitions

Must be 7once per ho

s

72 forecasur (3 days)

79 / 89

t values,

Page 80:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

15.

ID DZ

1.13 C

Version M

Version No.

1.0

Scope and

Scope

Objectiv

Relatedcase(s)

Narrative o

Short de- Comple The use

t t t t

e t

Furthermevents topen, th For everavailableon/off st

General R

Device rem

Domain(s)/ Zone(s) Customers/P

anagement

Date

09/05/2014

d Objective

ve(s)

d business

of Use Cas

escription

ete descripter acces rem

the current the current the selectedthe selectedextrarinse, the remaini

more some hat occurre

he oven has

ry subsystee informatiotatus, the pr

emarks

mote monit

Na

rocess Dev

t

Name of Author(s)

Lucio BiancCompany)

es of Use C

S

Managefunction

The usePC/mobthe ligh

se

tion motely the d

status (Runphase (e.g.d program d options (tesuperfreezeng time to e

event/alert d (e.g. the w reached th

m to be moon must be drogram/optio

toring

Use Cme of Use

vices monito

Versi

chi (Indesit

ase

Scope and

ement of thenalities

er can recebile the statting system

Narra

devices info

nning, End, . for a wash

emperaturee, …) end the cycl

can be defiwashing mae heating te

nitored (lighdefined eveon selected

Use Case

ase IdentifCase

oring

ion ManageChang

Objectives

e connected

eive remoteltus of his de

m, the HVAC

ative of Use

ormation suc

Pause, Delhing machin

, duration, s

le

ned and moachine has jemperature

hting systemen if some bd, the alarm/

es

fication

ementges

s of Use Ca

d devices to

ly (inside orevices to letC sytem, the

e Case

ch as:

ay, …) e Heating, R

spin, …) an

onitored to ijust finished, some fault

m, HVAC sybasic inform/event notifi

se

o monitor the

r outside hot him monitoe alarm syst

Rinse, Spin

d special fu

nform the ud, the fridgets occurred

tem, alarm ation are alication…).

ApproStatu

eir status a

ome) on his oring the aptem.

n, …)

unctions (pr

user of spece door rema

on the dish

system ,…)ways applic

80 / 89

oval s

nd

ppliances,

ewash,

cial ined

h washer)

) the cable (the

Page 81:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

Before stwhich aretype of pand optio

Diagrams

Actors

Groupin Actor Nasee Acto

tarting any e the capabrograms an

ons or betw

of Use Cas

ng (e.g. dom

ame or List

monitoring bilities that nd options aeen 2 optio

se

mains, zones

Actor Typsee Actor

Genand controlthe local rend of relations) .

Diagra

s) G

pe r List

As

Use Case

neral Remaling activitie

emote interfaonship betw

am(s) of Us

Actors Group Desc

Actor Descsee Actor Li

es

arks es, the remoace implem

ween them (

se Case

cription

cription ist

ote user inteents in termi.e. compat

erface mustms of numbetibility betwe

Further informatiospecific Use Case

81 / 89

t know er and een cycle

n to this

Page 82:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

Smart Ap

CEMS

Remote GUI/Bac

ppliance

kend

Ti(

Tis

Tf

Nrs

InsH

IGsnG

InwrndsG

DtcbRsdIt

Invs

I

Use Case

The device nformation (device stat

The devicnforms thestatus chang

The status from:

the user

the the over

the occu

Note: the derespond ostatus

t collecnotification sent from thHAN

t receives GUI the reqstop the notification GUI.

t sends notification when thereceived annotification device , ustop requesGUI.

Depending technical scan act asbetween thRemote GUsome type data receivet provides t

the user to t

t providesnumeric, tevisualizationstatus, even

t sends t

es

is able toabout his cus)

ce sponte CEMS abge.

change ca

interactior with the denormal evofunctional

r the time ala

urrence

evice is alsn-demand

ts the , events,

he devices

from the quest to st

device toward the

the deviceto the Rem

e start rend after an

received fntil it recest from the

on the olution, thes a simple

he device UI or can im

of parsinged the secure athe monitor

s to the xtual and g

n of the nts, alarms

to the CE

o provide onditions

aneously bout any

an result

n of the evice olution of

phases

arm/event

o able to on his

status alarms over the

Remote art or to

status Remote

e status mote GUI quest is

ny status from the

eives the Remote

adopted e CEMS e tunnel and the

mplement g of the

access of ing page

users a graphical

device

EMS the

82 / 89

Page 83:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

Name ofInformaStart NotificatRequestStatus N

Stop NotificatRequest

f tion (ID)

Statusion

t Notification

Statusion

t

DescriptExchang

The Remopen thestatus This pacStatus Nover the the updathe dispalways e

s The Remclose thstatus

rdm

Ioo

Informtion oged mote GUI ae forwardin

cket is theotification sHAN. The

ate value fopatching fronabled.

mote GUI ase forwardin

Use Case

request fodevices omonitoring p

t can adds on the deonline, user

mation Exchf Info

asks the Cng of the

e mirroring sent by theCEMS has

or the statuom the de

sks the gatng of the

es

or monitoror to stphase.

reacher infvice usage

r guide onlin

hanged rmation R

dCEMS to

devices -

of the e device s always us since evice is

Ttca

teway to devices

-

ring the top the

formation e, help ne.

Requiremendata

The status he informa

condition of an appliance

RunnDela

Heat selec temp

spin, prew

supe rema

the c

nts to inf

packet incation relatef the devicee can be:

ning, End, Pay, …) ting, Rinse, cted prograperature, du, …

wash, extrarerfreeze, … aining time tcycle

83 / 89

formation

cludes all ed to the e, e.g. for

Pause,

Spin, … m

uration,

inse,

to end

Page 84:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

16.

ID

1.14

Version M

Version No.

1.0

Scope and

Scope

Objectiv

Relatedcase(s)

Narrative o

Short de- Comple The use

O R R R S

For eveavailableon/off st

General R

Before st

Device rem

DomaiZone(sCustom

anagement

Date

09/05/2014

d Objective

ve(s)

d business

of Use Cas

escription

ete descript

r controls re

ON/OFF staRequired cyRequired waRequired opStart, Stop,

ry subsystee informatiotatus, the pr

Remarks

tarting any

mote Contr

n(s)/ s)

mers/Process

t

Name of Author(s)

Lucio BiancCompany)

es of Use C

S

Managefunction

The usedevicesapplian

To be d

se

tion

emotely the

atus of the aycle ashing/cookptions and fPause com

em to be con must be rogram/optio

monitoring

rol Use C

Name of

s Devices c

Versi

chi (Indesit

ase

Scope and

ement of thenalities

er can conts using his Pces, the ligh

discussed

Narra

e devices pa

appliance

king/freezingunctions (s

mmands

controlled (ldefined eveon selection

Genand control

Use Case

ase Identiff Use Case

control

ion ManageChang

Objectives

e connected

trol remotelyPC/mobile, hting system

ative of Use

arameters s

g temperatusuperwash,

lighting sysen if some bn, …).

neral Remaling activitie

es

fication

ement ges

s of Use Ca

d devices to

y (inside or setting them, the HVAC

e Case

uch as:

ure, spin sprapid wash

stem, HVACbasic inform

arks es, the remo

se

o control the

outside homrequired fu

C sytem, th

eed, duratio, super cool

C sytem, almation are a

ote user inte

ApproStatu

eir status an

me) the staunctionalitiee alarm sys

on ling, …)

arm systemlways appli

erface must

84 / 89

oval s

nd

tus of his s on the

stem.

m ,…) the cable (the

t know

Page 85:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

which aretype of pand optio

Diagrams

Actors

Groupin Actor Nasee Acto

e the capabrograms an

ons or betw

of Use Cas

ng (e.g. dom

ame or List

bilities that nd options aeen 2 optio

se

mains, zones

Actor Typsee Actor

the local rend of relations) .

Diagra

s) G

pe r List

As

Use Case

emote interfaonship betw

am(s) of Us

Actors Group Desc

Actor Descsee Actor Li

es

ace implemween them (

se Case

cription

cription ist

ents in termi.e. compat

ms of numbetibility betwe

Further informatiospecific

85 / 89

er and een cycle

n to this

Page 86:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

Smart Ap

CEMS

Remote GUI/Bac

ppliance

kend

Tsscrtue

Tis

Tf

InsH

IGsstc

IrH

In

DtcbRsd

It

In

Use Case

The device status costatus) accommands remote GUIthe constrauser (e.g.enabled)

The devicnforms thestatus chang

The status from:

the userbothremo

the the over

the occu

t collecnotification sent from thHAN

t receives GUI the reqstatus of selection of the decommands)

t sends request to tHAN

t sends notification

Depending technical scan act asbetween thRemote GUsome type data receive

t provides tthe user to t

t providesnumeric, te

es

is able to monditions

ccording wdispatched

and accordints selecte. remote

ce sponte CEMS abge.

change ca

interactior with the locallyotely normal evofunctional

r the time ala

urrence

ts the , events,

he devices

from the quest to mthe devica cycle, ON

vice, s

the mothe devices

the deviceto the Remo

on the olution, thes a simple

he device UI or can im

of parsinged.

the secure athe monitor

s to the xtual and g

modify his (device

with the d by the ding with

ed by the control

aneously bout any

an result

n of the device,

y and

olution of phases

arm/event

status alarms over the

Remote odify the es (e.g. N/OFF of start/stop

dification over the

e status ote GUI

adopted e CEMS e tunnel and the

mplement g of the

access of ing page

users a graphical

Use Case

86 / 89

Page 87:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

vs

Irt

Ioo

Use Case

visualizationstatus, even

t sends trequest for their status

t can adds on the deonline, user

es

n of the nts, alarms

to the CEthe modifi

reacher infvice usage

r guide onlin

device

EMS the cation of

formation e, help ne.

87 / 89

Page 88:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

Further Inf

Relation

Name ofInformaSelect a

Change parametSend allstart cyc

Status N

formation t

n to Other U

f tion (ID) cycle

oneer data & Set

cle

Notification

to the Use

Use Cases

DescriptExchangThe Remset the re

The Remset the re

t Once thselected commanda direct ca periodinformatiappliancefrom thefrom the After thremote rupdated network

Case for C

Classifi

Informtion oged mote GUI asequired cycl

mote GUI asequired parae Remote

options d such as Sconfirmationdical timeon releatede configura backend CEMS to th

he applianrequest, stastatus is d

Use Case

Classificatio

ication Info

mation Exchf Info

sks the bacle on the desks the bacameter GUI confir

with a Start cycle n command basis), d to the

ation is disto the CE

he appliancece executatus changispatched o

es

on / Mappin

ormation

hanged rmation R

dckend to evice

T

ckend to T

rms the direct

(or with or after all the required

spatched MS and e

TTT

ted the ge , the over the

Ttca

r

ng

Requiremendata Type/numbe

Type/value o

Type/numbeType/value oType of com

The status he informa

condition of an appliance

RunnDela

Heat selec temp

spin, prew

supeemaining tim

nts to inf

er of cycle

of paramete

er of cycle of paramete

mmand to ex

packet incation relatef the devicee can be:

ning, End, Pay, …) ting, Rinse, cted prograperature, du, …

wash, extrarerfreeze, … me to end t

88 / 89

formation

er

er xecute

cludes all d to the

e, e.g. for

Pause,

Spin, … m

uration,

inse,

he cycle

Page 89:  · Table of c 1 INTRO 2 SYSTE 1 VISUAL 2. VISUAL 3. VISUAL 4. VISUAL APPLIANC 5. VISUAL 6. VISUAL 7. MULTI-8. VISUAL STARTING 9. VISUALI SUFFICIEN 10. REQUE SUFFICIEN 11. HOME POWER

DevAdd a newThe user bsimplest hinterconneIf the HANadmission allows the activated foIn case thewhich shal

Remove a In case ofcustomer is MaintenanIf the custocould presHAN but communicaIf the CEM

vice configw device buys a Smahuman intection of the

N was prevprocedure,new Smart

or the Smare CEMS is nl provide us

device f both joinins provided w

nce omer experent the statnot respon

ation probleS is not ava

guration (m

art Appliancraction posSmart Info

iously activ, identifies t Appliance rt Info. not availablser with a us

ng of not dwith this pro

rienced somtus of the Hnding ), etems. ailable, this

anagement

e and woulssible. The, Smart App

vated by thethe new Zto join the

e, the admiser-friendly

desired devocedure. Th

me problemsHAN includintc. Also

functionalit

Use Case

t)

d like to ste admissionpliances ande CEMS, thZigBee devEnergy@H

ssion proceinterface.

vice to the he user expe

s with Enerng the devicWarning a

ty is critical

es

art it up in n procedurd CEMS owhrough a w

vice checkinome solutio

edure shoul

HAN and rerience cou

rgy@Home ces list, thend Alarm

to be provid

the Energye is requirned by the

web interfacng manufacon. The sam

d be manag

replacemenld be simila

a Web appe devices st

could be

ded.

y@Home HAred to guasame custo

ce, the usercturer and me procedu

ged by anot

t of brokenar to ADD on

plication ontatus (i.e. joactivated

89 / 89

AN with thearantee theomer. r starts themodel andre could be

ther device,

n ones, thene.

the CEMSoined to thein case of

e e

e

e

e

S e f