Page 1: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located
Page 2: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

i

TABLE OF CONTENTS

EXECUTIVE SUMMARY ................................................................................................................. 1

Introduction ........................................................................................................................................... 1

Environmental Monitoring Works ......................................................................................................... 2

Key Information in the Reporting Month .............................................................................................. 2

Future Key Issues .................................................................................................................................. 3

1. INTRODUCTION .............................................................................................................................. 4

Background ........................................................................................................................................... 4

Project Organizations ............................................................................................................................ 4

Construction Activities undertaken during the Reporting Month .......................................................... 5

Summary of EM&A Requirements ..................................................................................................... 12

2. AIR QUALITY ................................................................................................................................. 13

Monitoring Requirements .................................................................................................................... 13

Monitoring Locations .......................................................................................................................... 13

Monitoring Equipment ........................................................................................................................ 14

Monitoring Parameters, Frequency and Duration ................................................................................ 14

Monitoring Methodology and QA/QC Procedure ............................................................................... 14

Results and Observations..................................................................................................................... 16

3. NOISE ................................................................................................................................................ 18

Monitoring Requirements .................................................................................................................... 18

Monitoring Locations .......................................................................................................................... 18

Monitoring Equipment ........................................................................................................................ 18

Monitoring Parameters, Frequency and Duration ................................................................................ 19

Monitoring Methodology and QA/QC Procedures .............................................................................. 19

Maintenance and Calibration ............................................................................................................... 20

Results and Observations..................................................................................................................... 20

4. COMPARISON OF EM&A RESULTS WITH EIA PREDICTIONS......................................... 22

5. LANDSCAPE OF VISUAL ............................................................................................................. 25

Monitoring Requirements .................................................................................................................... 25

Results and Observations..................................................................................................................... 25

6. ENVIRONMENTAL AUDIT .......................................................................................................... 26

Site Audits ........................................................................................................................................... 26

Review of Environmental Monitoring Procedures .............................................................................. 26

Status of Waste Management .............................................................................................................. 26

Implementation Status of Environmental Mitigation Measures ........................................................... 26

Summary of Mitigation Measures Implemented .................................................................................. 27

Implementation Status of Event Action Plans ..................................................................................... 27

Summary of Complaint, Warning, Notification of any Summons and Successful Prosecution ........... 27

7. FUTURE KEY ISSUES ................................................................................................................... 28

Key Issues for the Coming Month ....................................................................................................... 31

Monitoring Schedule for the Next Month............................................................................................ 32

8. CONCLUSIONS AND RECOMMENDATIONS .......................................................................... 33

Conclusions ......................................................................................................................................... 33

Recommendations ............................................................................................................................... 33

Page 3: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

ii

LIST OF TABLES

Table I Non-compliance Recorded for the Project in the Reporting Month

Table II Summary Table for Key Information in the Reporting Month

Table 1.1 Key Project Contacts

Table 1.2 Summary Table for Major Site Activities undertaken within KTD in the

Reporting Month

Table 1.3 Construction Programme Showing the Inter-Relationship with Environmental

Protection/Mitigation Measures

Table 2.1 Locations for Air Quality Monitoring

Table 2.2 Air Quality Monitoring Equipment

Table 2.3 Impact Dust Monitoring Parameters, Frequency and Duration

Table 3.1 Noise Monitoring Stations

Table 3.2 Noise Monitoring Equipment

Table 3.3 Noise Monitoring Parameters, Frequency and Duration

Table 3.4 Baseline Noise Level and Noise Limit Level for Monitoring Stations

Table 4.1 Comparison of 1-hr TSP data with EIA predictions

Table 4.2 Comparison of 24-hr TSP data with EIA predictions

Table 4.3 Comparison of Noise Monitoring Data with EIA predictions

Table 7.1 Summary Table for Site Activities undertaken within KTD for Coming Month

LIST OF FIGURES

Figure 1 Layout Plan of the Project Site

Figure 2 Locations of Air Quality Monitoring Stations

Figure 3 Locations of Construction Noise Monitoring Stations

Figure 4 Locations of Wind Anemometer

LIST OF APPENDICES

A Action and Limit Levels for Air Quality and Noise

B Copies of Calibration Certificates

C Weather Information

D Environmental Monitoring Schedules

E 1-hour TSP Monitoring Results, Graphical Presentations

F 24-hour TSP Monitoring Results, Graphical Presentations

G Noise Monitoring Results and Graphical Presentations

H Summary of Exceedance

I Site Audit Summary

J Event Action Plans

K Environmental Mitigation Implementation Schedule (EMIS)

L Summaries of Environmental Complaint, Warning, Summon and Notification

of Successful Prosecution

M Summary of Waste Generation and Disposal Records

Page 4: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 1

EXECUTIVE SUMMARY

Introduction

1. This is the 16th

Environmental Monitoring and Audit (EM&A) Report prepared by Cinotech

Consultants Limited for the “Contract No. KLN/2010/04 - Environmental Monitoring Works for

Kai Tak Development” (hereinafter called “the Project”). This report documents the findings of

EM&A Works conducted in April 2012.

2. During the reporting month, the following works contracts were undertaken within Kai Tak Site:

• KL/2009/01 - Site Formation for Kai Tak Cruise Terminal

• KL/2008/09 - Stage 1 Infrastructure works at North Apron

• KL/2008/07 - Stage 1 Advance Infrastructure Works

• CV/2007/03 - Development at Anderson Road

• DC/2008/12 - Sewage Interception Scheme in Kowloon City

• DC/2010/03 - Kai Tak Nullah Improvement Works at Prince Edward Road East

• DC/2009/21 - Provision of Interception Facilities at Jordan Valley Box Culvert

• 20090097 - Public Rental Housing Development at Kai Tak Site 1A

• 20090006 - Public Rental Housing Development at Kai Tak Site 1B

• 3/WSD/08, 6/WSD/08, 7/WSD/08 & 8/WSD/08 - Replacement and Rehabilitation of Water

Mains Stages 2 & 3

• SS W 303 - Kai Tak Cruise Terminal Building and Ancillary Facilities

• CKL-KCT circuit 1&2 - CLPP (132kV cable installation)

• 1016EM10 - Chilled Water Pipe Laying Works at North Apron Area for District Cooling

System at Kai Tak Development

• 1017EM10 - Design-Build-Operate a District Cooling System (Phase II Works) at Kai Tak

Development

• KL/2010/02 - Kai Tak Development – Kai Tak Approach Channel and Kwun Tong Typhoon

Shelter Improvement Works (Phase 1)

• KL/2010/03 - Kai Tak Development – Stage 2 Infrastructure Works at North Apron Area of

Kai Tak Airport for Residential Development and Government Facilities)

• 1049EM10 - Kai Tak Cruise Terminal Development – On-shore Sewage Collection, On-shore

Fresh Water Supply, and Fire Hydrant Water Supply Systems

• 1050EM10 - Design and Build of Seaport Passenger Boarding Bridges for the Kai Tak Cruise

Terminal

• 1140EM11M - Advance Works for the Apron Lighting System of the Kai Tak Cruise Terminal

• DC/2011/04 - Reconstruction, Improvement and Rehabilitation of Kai Tak River from Wong

Tai Sin Police Station to Tung Tau

• SS W304 – Design and Construction of Trade and Industry Tower in Kai Tak Development

Area

3. Stockpiling of excavated & construction materials, storage of equipments, operation of concrete

batching plant, business in the recovery and recycling and car parks, etc are the major activities

for short term tenancy (STT) / temporary government land allocation (TGLA).

Page 5: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 2

Environmental Monitoring Works

4. Environmental monitoring for the Project was performed in accordance with the EM&A Manual

and the monitoring results were checked and reviewed. Site Inspections/Audits were conducted

once per week. The implementation of the environmental mitigation measures, Event Action

Plans and environmental complaint handling procedures were also checked.

5. Summary of the non-compliance in the reporting month for the Project is tabulated in Table I.

Table I Non-compliance Record for the Project in the Reporting Month

Parameter No. of Exceedance Action

Taken Action Level Limit Level

1-hr TSP 0 0 N/A

24-hr TSP 0 0 N/A

Noise 0 0 N/A

1-hour & 24-hour TSP Monitoring

6. All 1-hour & 24-hour TSP monitoring was conducted as scheduled in the reporting month. No

Action/Limit Level exceedance was recorded.

Construction Noise

7. All construction noise monitoring was conducted as scheduled in the reporting month. No

Action/Limit Level exceedance was recorded.

Key Information in the Reporting Month

8. Summary of key information in the reporting month is tabulated in Table II.

Table II Summary Table for Key Information in the Reporting Month

Event Event Details Action Taken Status Remark

Number Nature

Complaint received 0 --- N/A N/A ---

Reporting Changes 0 --- N/A N/A ---

Notifications of any

summons &

prosecutions received

0 --- N/A N/A ---

Page 6: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 3

Future Key Issues

9. The future key environmental issues in the coming month include:

• Dust generation from stockpiles of dusty materials, exposed site area, excavation works and

rock breaking activities;

• Watering for dust generating activity and on haul road;

• Proper storage of construction materials on site;

• Storage of chemicals/fuel and chemical waste/waste oil on site;

• Accumulation of general and construction waste on site;

• Noise from operation of the equipment, especially for rock-breaking activities, piling works

and machinery on-site;

• Runoff from exposed slope;

• Wastewater and runoff discharge from site;

• Regular removal of silt, mud and sand along u-channels and sedimentation tanks; and

• Review and implementation of temporary drainage system for the surface runoff.

Page 7: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 4

1. INTRODUCTION

Background

1.1 The Kai Tak Development (KTD) is located in the south-eastern part of Kowloon Peninsula,

comprising the apron and runway areas of the former Kai Tak Airport and existing

waterfront areas at To Kwa Wan, Ma Tau Kok, Kowloon Bay, Kwun Tong and Cha Kwo

Ling. It covers a land area of about 328 hectares. The Project also covers Kowloon Bay and

Kwun Tong Typhoon Shelter and the adjacent water bodies. The general layout of the

Project is shown in Figure 1.

1.2 Civil Engineering and Development Department (CEDD) had completed an Environmental

Impact Assessment (EIA) study for KTD under Agreement No. CE 35/2006(CE) Kai Tak

Development Engineering Study cum Design and Construction of Advance Works –

Investigation, Design and Construction (hereafter called “Schedule 3 EIA Report”). The

Schedule 3 EIA Report was approved under Environmental Impact Assessment Ordinance

(EIAO) in March 2009.

1.3 As recommended in the Schedule 3 EIA Report, EM&A programme shall be required for

different phases of the KTD as a whole. In August 2010, Cinotech Consultants Limited was

commissioned by CEDD to undertake the Environmental Monitoring and Audit (EM&A)

works for KTD. Under the Contract, Environmental Team (ET(KTD)) shall oversee all the

environmental issues within the Kai Tak Development (KTD), including but not limit to the

Schedule 2 Designated Projects and other work contracts.

1.4 Cinotech Consultants Limited was commissioned by CEDD to undertake the Environmental

Monitoring and Audit (EM&A) works for KTD. This is the 16th

Monthly EM&A report

summarizing the EM&A works for the Project in April 2012.

Project Organizations

1.5 Different parties with different levels of involvement in the project organization include:

• Environmental Protection Department (The Authority);

• Project Proponent – Civil Engineering and Development Department (CEDD).

• The Engineer and the Engineer’s Representative (ER) – AECOM.

• Environmental Team (ET(KTD)) – Cinotech Consultants Limited (CCL).

• Independent Environmental Checker (IEC(KTD)) – Allied Environmental Consultants

Limited (AEC).

Page 8: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 5

1.6 The key contacts of the Project are shown in Table 1.1.

Table 1.1 Key Project Contacts

Party Role Contact Person Phone No. Fax No.

CEDD Project Proponent

Mr. K Y SHIN 2301 1461 2301 1277

Mr. William WONG 3104 2197 2301 1277

AECOM Engineer’s

Representative

Ms. Anna CHUNG 3922 9437 2317 7609

Cinotech Environmental

Team (KTD)

Dr. Priscilla Choy 2151 2089 3107 1388

Ms. Ivy Tam 2151 2090

AEC

Independent

Environmental

Checker (KTD)

Ms. Grace Kwok

2815 7028 2815 5399

Construction Activities undertaken during the Reporting Month

1.7 There are several works contracts undertaken within KTD during the reporting month. In

order to collect relevant environmental information from the work contracts and incorporate

into this monthly monitoring report, a survey form for monthly environmental performance

records was sent to all work contracts/tenants within KTD on 30 November 2010. The

survey form shall be returned by 5th each month to provide the environmental monthly

information of respective work contracts within KTD.

1.8 Based on the returned survey form from work contracts and site observation for short term

tenancy (STT) / temporary government land allocation (TGLA) during the weekly site

inspection, the major site activities undertaken within Kai Tak Development (KTD) in the

reporting month are summarized in Table 1.2:

Table 1.2 Summary Table for Major Site Activities undertaken within KTD in the

Reporting month

KDO, CEDD projects

Contract No. Project Title Site Activities

KL/2009/01 Site Formation for Kai Tak

Cruise Terminal

1) Dredging of Marine Sediment

2) Installation of temporary steel bracing

3) Sorting of C&D material from existing seawall

4) RC Desk Construction

5) Reconstruction of Seawall

6) Impact water monitoring / surveillance system

7) Construction of capping beam

8) Removal of existing seawall

KL/2008/09 Stage 1 Infrastructure

works at North Apron

1) Drainage Works

2) Watermain Works

3) Footbridge Superstructure construction

4) Construction of subway extension

Page 9: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 6

5) Road Works

6) Enhancement of existing subways

7) Construction of subway extension

8) Cladding installation

9) Transplanting

KL/2008/07 Stage 1 Advance

Infrastructure Works

1) Pavement works at Road TD3, TD4, TL14 and Taxiway

Bridge

2) Street Furniture works along Road TD3, TD4 and Taxiway

Bridge

3) Construction of boundary wall of Sewage Pumping Station

PS6

4) Finishing works and E&M works for the sewage pumping

station

5) Roadworks of the access track road to public landing step

6) Landscape Works

KL/2010/02 Kai Tak Development –

Kai Tak Approach

Channel and Kwun Tong

Typhoon Shelter

Improvement Works

(Phase 1)

1) Initial Condition Survey for embankment improvement

2) Dredging and disposal of Type 3 sediment

3) Water quality monitoring for dredging

4) Pre-treatment sediment quality survey for bioremediation

5) Demolition of disused dolphin

KL/2010/03 Kai Tak Development

Stage 2 Infrastructure

Works at North Apron

Area

1) Site Clearance

2) Erection of Hoarding and Fences

3) Utility Inspection

4) Excavation for Box Culvert Construction

5) Sewage Pumping Station Construction

CEO, CEDD project

Contract No. Project Title Site Activities

CV/2007/03 Development at Anderson Road Disposal of inert C&D material at Kai Tak

DSD project

Contract No. Project Title Site Activities

DC/2008/12 Sewage Interception Scheme in

Kowloon City

1) Construction of boundary wall

2) Laying of gravity sewer by trenchless method

3) Construction of drawpit, manaholes.

4) Trench works, pipe laying and backfilling

5) E&M works for pumping stations

6) Architectural finishing works for pumping

stations

7) Laying of twin rising mains and gravity sewers

by open trench method

DC/2010/03

Kai Tak Nullah Improvement

Works at Prince Edward Road

East

1) Maintain Engineer’s Principal Office

2) Maintain Contractor’s Site Office and Site

Compound

3) Construction of temporary road diversion at

Portion E

4) Stockpile excavated C&D waste material of

Page 10: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 7

Prince Edward Road East

5) Removal of temporary backfill at MHA 39.0

DC/2009/21 Provision of Interception

Facilities at Jordan Valley Box

Culvert

1) Excavation

2) Steel Fixing

3) Formworks

4) Concreting

DC/2011/04 Reconstruction, Improvement and

Rehabilitation of Kai Tak River

from Wong Tai Sin Police Station

to Tung Tau

1) Maintain of Engineer’s Principal Office

2) Construction of Contractor’s Site Office and Site

Compound

3) Fabrication of Temporary Steel Decking

Materials

4) Construction of fencing for the access road to

the Principal Office

HD projects

Contract No. Project Title Site Activities

20090097 Public Rental Housing

Development at Kai Tak Site 1A

1) Construction of Superstructure (6 blocks)

2) External Works

3) Excavation

4) Construction of Carpark

5) Construction of Commercial Centre

20090006 Public Rental Housing

Development at Kai Tak Site 1B

1) Construction of Substructure works

2) Construction of Superstructure works

WSD project

Contract No. Project Title Site Activities

3/WSD/08 Replacement and Rehabilitation

of Water Mains Stages 2 & 3

1) Site Office of the Contractor

2) Storage of water works material

3) Storage and sorting of C&D materials

6/WSD/08 1) Construction material storage (Portion G2)

2) C&D material storage (Portion G4)

7/WSD/08 1) Transportation and storage of pipe works

material (Portion BX1)

2) Transportation and sorting of construction waste

(Portion BX1)

3) Fabrication of special pipe fittings (Portion B1)

8/WSD/08 1) C&D materials storage (Portion T1)

2) Pipe materials storage (Portion T2)

ArchSD project

Contract No. Project Title Site Activities

SS W 303 Kai Tak Cruise Terminal Building

and Ancillary Facilities

1) RF main box beam construction

2) RF secondary beam construction

3) UG drainage installation

4) UG plantroom construction

5) GL 1-72 cast insitu superstruction construction

6) BS Installation inside Main Box Beam

7) Trades Works Construction

Page 11: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 8

8) BS Works Construction

9) Façade Installation

10) Feature Roof Installation

SS W304 Design and Construction of Trade

and Industry Tower in Kai Tak

Development Area

1) Erection of Site Office

2) Erection of Hoarding

CLP projects

Contract No. Project Title Site Activities

Kai Tak Cruise Terminal Cable

Tunnel

No civil activity

Eastern Road Substation No civil activity

CKL-KCT circuit

1&2

CLPP (132kV cable installation) 1) 132kV cable trenching and cable laying

2) 11kV cable trenching and cable laying

EMSD projects

Contract No. Project Title Site Activities

1016EM10 Chilled Water Pipe Laying Works

at North Apron Area for District

Cooling System at Kai Tak

Development

1) Trench Excavation

2) Pipe Laying

3) Pipe Jacking

1017EM10 Design-Build-Operate a District

Cooling System (Phase II Works)

at Kai Tak Development

1) ELS works at NDCS & SDCS Plants

2) Dewatering works at SDCS Plant and SWPR

3) Dewatering works at NDCS Plant

4) Bulk excavation at NDCS & SDCS Plants

5) DCS Pipeworks Installation at Concorde Road

6) ELS works at Southern Runway for DCS Pipe

Installation

7) DCS Pipeworks installation at Southern Runway

8) DCS Pipeworks installation within Cruise

Terminal

9) RC Structure (formwork, steel reinforcement

and concreting)

1049EM10 Kai Tak Cruise Terminal

Development – On-shore Sewage

Collection, On-shore Fresh Water

Supply, and Fire Hydrant Water

Supply Systems

Installation of pipes inside branch trough

1050EM10 Design and Build of Seaport

Passenger Boarding Bridges for

the Kai Tak Cruise Terminal

NIL

1140EM11M Advance Works for the Apron

Lighting System of the Kai Tak

Cruise Terminal

NIL

Page 12: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 9

List of Temporary Government Land Allocations (TGLAs)

TGLA No. Name of Occupants Site Activities

GLA-TNK 1591 CE/LW, Civil Engineering

& Development

Department

Works area

GLA-TNK 1751 Housing Department Works Area and Storage Area

GLA-TNK 1801 Housing Department Works and storage area (Site 1B3)

GLA-TNK 1177 Electrical and Mechanical

Services Department

Vehicle maintenance depot next to the existing

HATCL II Building

GLA-TNK 1338 Highways Department Maintenance Depot; off Cargo Circuit

GLA-TNK 1635 CE/SP, Drainage Services

Department

Works Area

GLA-TNK 1713 CHE/K, Highways

Department

Depot Area

GLA-TNK 1749 CE/SP, Drainage Services

Department

Additional Works area

GLA-TNK 1568 Fire Services Department Driving training ground

GLA-TNK 1360 HK Police Force Storage of police water barriers and metal gates

GLA-TNK 1675 PM(K), Civil Engineering

& Development

Department

Works Area

GLA-TNK 1760 CE/DP, Drainage Services

Department

Site office and storage area

GLA-TNK 1646 CGE/LPM, Civil

Engineering and

Development Department

Works Area

GLA-TNK 1608 Transport Department Works Area

GLA-TNK 1580 PM(K), Civil Engineering

& Development

Department

Works Area

GLA-TNK 1581 PM(K), Civil Engineering

& Development

Department

Works Area

GLA-TNK 1334 CE/Construction, Water

Supplies Department

Works Area

GLA-TNK 1144 CE/PW, Civil Engineering

and Development

Department

Works Area

GLA-TNK 1226

GLA-TNK 1191 Hong Kong Observatory Automatic Weather station

GLA-TNK 1542 Weather Station

GLA-TNK 1507 CE/SD, Civil Engineering

and Development

Department

Barging point and storage area

GLA-TNK 1671 Civil Engineering and

Development Department

Works Area/Engineer’s & Contractor’s

Accommodation/Fabrication Yard

GLA-TNK 1707 PM(K), Civil Engineering

& Development

Works Area/Stockpiling Area

Page 13: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 10

Department

GLA-TNK 1759 PM(K), Civil Engineering

& Development

Department

Works Area

GLA-TNK 1823 PM(K), Civil Engineering

& Development

Department

Works Area

GLA-TNK 1850 PM(K), Civil Engineering

& Development

Department

Works Area

GLA-TNK 1548 CE/PM, Water Supplies

Department

Works Area

GLA-TNK 1571 ArchSD Works Area

GLA-TNK 1692 CE/CM, Drainage

Supplies Department

Works Area

GLA-TNK 1693 Architectural Services

Department

Works Area/Stockpiling area

GLA-TNK 1899 CE/K, Water Supplies

Department

Works Area

GLA-TNK 1717 EMSD Works Area/Stockpiling Area/Site Office for DCS

GLA-TNK 1814 CMP 202, Architectural

Services Department

Works Area

GLA-TNK 1821 CE/Municipal, EMSD Works/Storage Area

GLA-TNK 1862 CE/PM, DSD Works Area

GLA-TNK 1885 ArchSD Barging Point

List of Short Term Tenancy (STT)

STT No. Name of Occupants Site Activities

KX2688 Goldway Parking Ltd. Car-park

KX2345 CLP Power Hong Kong

Limited

Storage of construction materials and plant

equipments

KX2662 Hong Kong Cricket

Association

Operation of Hong Kong Cricket Association

KX2628 Moral Well International

Enterprise Limited

Car-park

KX2552 Era International

Investment Limited

Car-park

KX2629 Graceful Ocean

Development Limited

Car-park

KX2261 Hong Kong Aviation Club

Ltd.

Training for air traffic controllers

KX2574 Future Chinese Limited Car-park

KX2575 Nanjing Limited Car-park

KX2109 Multi-Light Limited 1) Concrete production

2) Storage of building materials

KX2675 Wang Lee Building Operation of business in the recovery and

Page 14: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 11

Materials Trading Ltd. recycling

KX2676 Ga Shing Transport Co. Operation of business in the recovery and

recycling

KX2677 Chuen Kee Metal Trading

Co Ltd.

Operation of business in the recovery and

recycling

KX2678 Kin Xun Environment

Recycle Ltd

Operation of business in the recovery and

recycling

KX2569 Sureguard Logistics

Limited

Open storage of goods and dangerous goods

KX2641 Citybus Limited Parking of buses

KX2642 Goldway Parking Ltd. Car-park

KX2189 The Hong Kong Housing

Authority

Site and road formation, building and associated

works for the development of the premises KX2190

KX2616 CLP Power Hong Kong

Limited

Constructing, maintaining and operating

Underground Strata I and II and The Pink Edged

Red Area

1.9 The construction programme showing the inter-relationship with environmental

protection/mitigation measures are presented in Table 1.3.

Table 1.3 Construction Programme Showing the Inter-Relationship with Environmental

Protection/Mitigation Measures

Construction Works Major Environmental Impact Control Measures

As mentioned in Table 1.2

Noise, dust impact, water quality

and waste generation

Sufficient watering of the

works site with active dust

emitting activities

Properly cover the

stockpiles

On-site waste sorting and

implementation of trip

ticket system

Appropriate

desilting/sedimentation

devices provided on site for

treatment before discharge

Use of quiet plant and well-

maintained construction

plant

Provide movable noise

barrier

Provide sufficient

mitigation measures as

recommended in Approved

EIA Report/Lease

requirement

Page 15: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 12

Summary of EM&A Requirements

1.10 The EM&A programme requires construction noise monitoring, air quality monitoring,

landscape and visual monitoring and environmental site audit. The EM&A requirements for

each parameter are described in the following sections, including:

• All monitoring parameters;

• Action and Limit levels for all environmental parameters;

• Event Action Plans;

• Environmental mitigation measures, as recommended in the Schedule 3 EIA Report; and

• Environmental requirements in contract documents under Contract No. KLN/2010/04.

1.11 The advice on the implementation status of environmental protection and pollution

control/mitigation measures is summarized in Section 6 of this report.

1.12 This report presents the monitoring results, observations, locations, equipment, period,

methodology and QA/QC procedures of the required monitoring parameters, namely air

quality and noise levels and audit works for the Project in April 2012.

Page 16: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 13

2. AIR QUALITY

Monitoring Requirements

2.1 According to EM&A Manual of the Kai Tak Development EIA Study and contract

requirement under Contract No. KLN/2010/04, 1-hour and 24-hour TSP monitoring were

conducted to monitor the air quality for KTD. For regular impact monitoring, a sampling

frequency of at least once in every six days at all of the monitoring stations for 24-hour TSP

monitoring. For 1-hour TSP monitoring, the sampling frequency of at least three times in

every six days shall be undertaken when the highest dust impact occurs. Appendix A shows

the established Action/Limit Levels for the environmental monitoring works.

Monitoring Locations

2.2 Six designated monitoring stations were selected for air quality monitoring programme.

Impact dust monitoring was conducted at five air quality monitoring stations, namely Kai

Tak Operational Base (AM1(A)), Lee Kau Yan Memorial School (AM2), Holy Trinity

Bradbury Centre (AM3(A)), EMSD Workshops (AM4(A)) and Po Leung Kuk Ngan Po Ling

College (AM5(A)) in the reporting month. Table 2.1 describes the air quality monitoring

locations, which are also depicted in Figure 2.

Table 2.1 Locations for Air Quality Monitoring

Remarks: # Baseline/Impact monitoring will be conducted when the premise is occupied or instructed by

Engineer.

Monitoring Stations Locations Location of Measurement

AM1(A) Kai Tak Operational Base Rooftop (about 9/F) Area

AM2 Lee Kau Yan Memorial

School

Rooftop (about 8/F) Area

AM3(A) Holy Trinity Bradbury

Centre

Rooftop (about 8/F) Area

AM4(A) EMSD Workshops Rooftop (about 6/F) Area

AM5(A) Po Leung Kuk Ngan Po

Ling College Rooftop (about 10/F) Area

#AM6 PA 15 Site 1B4 (Planned)

Page 17: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 14

Monitoring Equipment

2.3 Table 2.2 summarizes the equipment used in the impact air monitoring programme. Copies

of calibration certificates are attached in Appendix B.

Table 2.2 Air Quality Monitoring Equipment

Equipment Model and Make Quantity

Calibrator G25A 1

1-hour TSP Dust Meter Laser Dust Monitor – Model LD 3B 5

HVS Sampler GMWS 2310 c/w of TSP sampling inlet 5

Wind Anemometer Davis Weather Monitor II, Model no. 7440 1

Monitoring Parameters, Frequency and Duration

2.4 Table 2.3 summarizes the monitoring parameters and frequencies of impact dust monitoring

for the whole construction period. The air quality monitoring schedule for the reporting

month is shown in Appendix D.

Table 2.3 Impact Dust Monitoring Parameters, Frequency and Duration

Parameters Frequency

1-hr TSP Three times / 6 days

24-hr TSP Once / 6 days

Monitoring Methodology and QA/QC Procedure

1-hour TSP Monitoring

Measuring Procedures

2.5 The measuring procedures of the 1-hour dust meters were in accordance with the

Manufacturer’s Instruction Manual as follows:

• The 1-hour dust meter is placed at least 1.3 meters above ground.

• Set POWER to “ON” and make sure that the battery level was not flash or in low level.

• Allow the instrument to stand for about 3 minutes and then the cap of the air sampling inlet

has been released.

• Push the knob at MEASURE position.

• Set time/mode setting to [BG] by pushing the time setting switch. Then, start the

background measurement by pushing the start/stop switch once. It will take 6 sec. to

complete the background measurement.

• Push the time setting switch to change the time setting display to [MANUAL] at the

bottom left of the liquid crystal display. Finally, push the start/stop switch to stop the

measuring after 1 hour sampling.

Page 18: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 15

• Information such as sampling date, time, count value and site condition were recorded

during the monitoring period.

Maintenance/Calibration

2.6 The following maintenance/calibration was required for the direct dust meters:

• Check and calibrate the meter by HVS to check the validity and accuracy of the results

measured by direct reading method at 2-month intervals throughout all stages of the air

quality monitoring.

24-hour TSP Monitoring

Instrumentation

2.7 High volume (HVS) samplers (Model GMWS-2310 Accu-Vol) completed with appropriate

sampling inlets were employed for 24-hour TSP monitoring. The sampler was composed of

a motor, a filter holder, a flow controller and a sampling inlet and its performance

specification complied with that required by USEPA Standard Title 40, Code of Federation

Regulations Chapter 1 (Part 50). Moreover, the HVS also met all the requirements in section

2.5 of the updated EM&A Manual.

Operating/Analytical Procedures

2.8 Operating/analytical procedures for the operation of HVS were as follows:

• A horizontal platform was provided with appropriate support to secure the samplers

against gusty wind.

• No two samplers were placed less than 2 meters apart.

• The distance between the sampler and an obstacle, such as buildings, was at least twice

the height that the obstacle protrudes above the sampler.

• A minimum of 2 meters of separation from walls, parapets and penthouses was required

for rooftop samples.

• A minimum of 2 meters separation from any supporting structure, measured horizontally

was required.

• No furnaces or incineration flues were nearby.

• Airflow around the sampler was unrestricted.

• The sampler was more than 20 meters from the drip line.

• Any wire fence and gate, to protect the sampler, should not cause any obstruction during

monitoring.

2.9 Prior to the commencement of the dust sampling, the flow rate of the high volume sampler

was properly set (between 1.1 m3/min. and 1.4 m

3/min.) in accordance with the

manufacturer's instruction to within the range recommended in USEPA Standard Title 40,

CFR Part 50.

2.10 For TSP sampling, fiberglass filters have a collection efficiency of > 99% for particles of 0.3

µm diameter were used.

2.11 The power supply was checked to ensure the sampler worked properly. On sampling, the

Page 19: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 16

sampler was operated for 5 minutes to establish thermal equilibrium before placing any filter

media at the designated air monitoring station.

2.12 The filter holding frame was then removed by loosening the four nuts and a weighted and

conditioned filter was carefully centered with the stamped number upwards, on a supporting

screen.

2.13 The filter was aligned on the screen so that the gasket formed an airtight seal on the outer

edges of the filter. Then the filter holding frame was tightened to the filter holder with

swing bolts. The applied pressure should be sufficient to avoid air leakage at the edges.

2.14 The shelter lid was closed and secured with the aluminum strip.

2.15 The timer was then programmed. Information was recorded on the record sheet, which

included the starting time, the weather condition and the filter number (the initial weight of

the filter paper can be found out by using the filter number).

2.16 After sampling, the filter was removed and sent to the HOKLAS laboratory (Wellab Ltd.) for

weighing. The elapsed time was also recorded.

2.17 Before weighing, all filters were equilibrated in a conditioning environment for 24 hours.

The conditioning environment temperature should be between 25°C and 30°C and not vary

by more than ±3°C; the relative humidity (RH) should be < 50% and not vary by more than

±5%. A convenient working RH is 40%.

Maintenance/Calibration

2.18 The following maintenance/calibration was required for the HVS:

• The high volume motors and their accessories were properly maintained. Appropriate

maintenance such as routine motor brushes replacement and electrical wiring checking

were made to ensure that the equipment and necessary power supply are in good working

condition.

• High volume samplers were calibrated at bi-monthly intervals using G25A Calibration

Kit throughout all stages of the air quality monitoring.

Results and Observations

2.19 All 1-hour TSP monitoring was conducted as scheduled in the reporting month. No

Action/Limit Level exceedance was recorded.

2.20 All 24-hour TSP monitoring was conducted as scheduled in the reporting month. No

Action/Limit Level exceedance was recorded.

2.21 The air temperature, precipitation and the relative humidity data was obtained from Hong

Kong Observatory where the wind speed and wind direction were recorded by the installed

Wind Anemometer set at rooftop (about 9/F) of Kai Tak Operational Base. The location is

shown in Figure 4. This weather information for the reporting month is summarized in

Appendix C.

Page 20: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 17

2.22 The monitoring data and graphical presentations of 1-hour and 24-hour TSP monitoring

results are shown in Appendices E and F respectively.

2.23 The summary of exceedance record in reporting month is shown in Appendix H. No

exceedance was recorded for the air quality monitoring.

2.24 According to our field observations, the major dust source identified at the designated air

quality monitoring stations are as follows:

Station Major Dust Source

AM1(A) – Kai Tak Operational Base Road Traffic Dust

Exposed site area and open stockpiles

Excavation works

Site vehicle movement

AM2 – Lee Kau Yan Memorial School Road Traffic Dust

Exposed site area and open stockpiles

Excavation works

Site vehicle movement

AM3(A) - Holy Trinity Bradbury

Centre

Road Traffic Dust

Exposed site area and open stockpiles

Site vehicle movement

AM4(A) – EMSD Workshops Concrete Batching Plant

Recycling Company

AM5(A) – Po Leung Kuk Ngan Po

Ling College

Road Traffic Dust

Loading/unloading activities and excavation

works at the site (Contract No.: 1/WSD/08(K))

facing Po Leung Kuk Ngan Po Ling College

Page 21: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 18

3. NOISE

Monitoring Requirements

3.1 According to EM&A Manual of the Kai Tak Development EIA Study and contract

requirement under Contract No. KLN/2010/04, construction noise monitoring was

conducted to monitor the construction noise arising from the construction activities within

KTD. The regular monitoring frequency for each monitoring station shall be on a weekly

basis and conduct one set of measurements between 0700 and 1900 hours on normal

weekdays. Appendix A shows the established Action and Limit Levels for the

environmental monitoring works.

Monitoring Locations

3.2 Eleven designated monitoring stations were selected for noise monitoring programme. Noise

monitoring was conducted at nine designated monitoring stations (M1, M2, M3, M4(A), M5,

M6(A), M7, M8 and M9) in the reporting month. Figure 3 shows the locations of these

stations.

Table 3.1 Noise Monitoring Stations

Monitoring Stations Locations Location of Measurement

M1 Buddhist Chi King Primary School 7/F Sport Area

M2 S.K.H. Kowloon Bay Kei Lok

Primary School 7/F Podium

M3 Rhythm Garden 1/F Podium

M4(A) Kai Tak Operational Base Rooftop (about 9/F) Area

M5 Lee Kau Yan Memorial School Rooftop (about 7/F) Area

M6(A) Kowloon City District Kaifong

Association Rooftop (about 6/F) Area

M7 Holy Carpenter Primary School Rooftop (about 7/F) Area

M8 CCC Kei To Secondary School Rooftop (about 8/F) Area

M9 Po Leung Kuk Ngan Po Ling

College Staircase Area (about 9/F)

#M10 Site 1B1 (Planned) -

#M11 Site 1B4 (Planned) -

Remarks: # Baseline/Impact monitoring will be conducted when the premise is occupied or instructed by

Engineer.

Monitoring Equipment

3.3 Table 3.2 summarizes the noise monitoring equipment. Copies of calibration certificates are

provided in Appendix B.

Page 22: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 19

Table 3.2 Noise Monitoring Equipment

Equipment Model and Make Qty.

Integrating Sound Level Meter SVAN 955 & 957 5

Calibrator SVAN 30A 2

Monitoring Parameters, Frequency and Duration

3.4 Table 3.3 summarizes the monitoring parameters, frequency and total duration of monitoring.

The noise monitoring schedule is shown in Appendix D.

Table 3.3 Noise Monitoring Parameters, Frequency and Duration

Monitoring

Stations Parameter Period Frequency Measurement

M1

M2

M3

M4(A)

M5

M6(A)

M7

M8

M9

L10(30 min.)

dB(A)

L90(30 min.)

dB(A)

Leq(30 min.)

dB(A)

0700-1900 hrs on normal

weekdays

Once per

week Façade

Monitoring Methodology and QA/QC Procedures

• The Sound Level Meter was set on a tripod at a height of 1.2 m above the ground.

• The battery condition was checked to ensure the correct functioning of the meter.

• Parameters such as frequency weighting, the time weighting and the measurement time

were set as follows:

— frequency weighting : A

— time weighting : Fast

— time measurement : 30 minutes

• Prior to and after each noise measurement, the meter was calibrated using a Calibrator

for 94.0 dB at 1000 Hz. If the difference in the calibration level before and after

measurement was more than 1.0 dB, the measurement would be considered invalid and

repeat of noise measurement would be required after re-calibration or repair of the

equipment.

• The wind speed was frequently checked with the portable wind meter.

• At the end of the monitoring period, the Leq, L90 and L10 were recorded. In addition, site

conditions and noise sources were recorded on a standard record sheet.

• Noise measurement was paused temporarily during periods of high intrusive noise if

possible and observation was recorded when intrusive noise was not avoided.

• Noise monitoring was cancelled in the presence of fog, rain, and wind with a steady

speed exceeding 5 m/s, or wind with gusts exceeding 10 m/s.

Page 23: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 20

Maintenance and Calibration

3.5 The microphone head of the sound level meter and calibrator were cleaned with a soft cloth

at quarterly intervals.

3.6 The sound level meter and calibrator were checked and calibrated at yearly intervals.

3.7 Immediately prior to and following each noise measurement the accuracy of the sound level

meter shall be checked using an acoustic calibrator generating a known sound pressure level

at a known frequency. Measurements may be accepted as valid only if the calibration levels

from before and after the noise measurement agree to within 1.0 dB.

Results and Observations

3.8 Noise monitoring at the nine designated locations was conducted as scheduled in the

reporting month.

3.9 The summary of exceedance record in reporting month is shown in Appendix H. No

exceedance was recorded for the noise monitoring.

.

3.10 All the Corrected Noise Levels (CNLs) reported in this report were adjusted with the

corresponding baseline level (i.e. Measured Leq – Baseline Leq = CNL), in order to facilitate

the interpretation of the noise exceedance. The baseline noise level and the Noise Limit

Level at each designated noise monitoring station are presented in Table 3.4.

3.11 Noise monitoring results and graphical presentations are shown in Appendix G.

3.12 The major noise source identified at the designated noise monitoring stations are as follows:

Monitoring

Stations Locations

Major Noise Source

M1 Buddhist Chi King Primary School Traffic Noise

Site vehicle movement

Excavation works M2 S.K.H. Kowloon Bay Kei Lok Primary School

M3 Rhythm Garden Traffic Noise

M4(A) Kai Tak Operational Base

Traffic Noise

Site vehicle movement

Excavation works

Loading and unloading works

Breaking works

M5 Lee Kau Yan Memorial School

Traffic Noise

Site vehicle movement

Excavation works

M6(A) Kowloon City District Kaifong Association Traffic Noise

Site vehicle movement

M7 Holy Carpenter Primary School Road and marine traffic Noise

M8 CCC Kei To Secondary School Road and marine traffic Noise

Excavation work and loading/unloading

activities at the site (Contract No.:

1/WSD/08(K)) facing the schools

M9 Po Leung Kuk Ngan Po Ling College

Page 24: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 21

Table 3.4 Baseline Noise Level and Noise Limit Level for Monitoring Stations

Station Baseline Noise Level, dB (A) Noise Limit Level,

dB (A)

M1 64.4 (at 0700 – 1900 hrs on normal

weekdays)

70* (at 0700 – 1900 hrs

on normal weekdays)

M2

61.3 (at 0700 – 1900 hrs on normal

weekdays)

M3 71.1 – 73.8 (Background Noise Level

during noise measurement)

75 (at 0700 – 1900 hrs

on normal weekdays)

M4(A) 65.8 (at 0700 – 1900 hrs on normal

weekdays)

75 (at 0700 – 1900 hrs

on normal weekdays)

M5 76.7 (at 0700 – 1900 hrs on normal

weekdays)

70* (at 0700 – 1900 hrs

on normal weekdays)

M6(A) 70.5 (at 0700 – 1900 hrs on normal

weekdays)

75 (at 0700 – 1900 hrs

on normal weekdays)

M7 63.9 (at 0700 – 1900 hrs on normal

weekdays)

70* (at 0700 – 1900 hrs

on normal weekdays)

M8 68.7 (at 0700 – 1900 hrs on normal

weekdays)

M9 61.9 (at 0700 – 1900 hrs on normal

weekdays)

(*) Noise Limit Level is 65 dB(A) during school examination periods.

Page 25: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 22

4. COMPARISON OF EM&A RESULTS WITH EIA PREDICTIONS

4.1 The EM&A data was compared with the EIA predictions as summarized in 4.1 to 4.3.

Table 4.1 Comparison of 1-hr TSP data with EIA predictions

Station Predicted 1-hr TSP conc.

Scenario1 (Mid

2009 to Mid 2013),

µg/m3

Scenario2 (Mid

2013 to Late

2016), µg/m3

Reporting Month

(Apr 12), µg/m3

AM1(A) – Kai Tak

Operational Base

(Alternative station for

Rhythm Garden)

192 298 191.7

AM2 – Lee Kau Yan

Memorial School

290 312 186.3

AM3(A) - Holy Trinity

Bradbury Centre

(Alternative station for

Sky Tower)

217 247 207.5

AM4(A) – EMSD

Workshops

(Alternative station for

Grand Waterfront)

246 258 212.6

AM5(A) – Po Leung

Kuk Ngan Po Ling

College (Alternative

station for CCC Kei

To Secondary School)

159 221 158.5

Page 26: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 23

Table 4.2 Comparison of 24-hr TSP data with EIA predictions

Station Predicted 24-hr TSP conc.

Scenario1 (Mid

2009 to Mid 2013),

µg/m3

Scenario2 (Mid

2013 to Late

2016), µg/m3

Reporting Month

(Apr 12), µg/m3

AM1(A) – Kai Tak

Operational Base

(Alternative station for

Rhythm Garden)

121 156 62.7

AM2 – Lee Kau Yan

Memorial School

145 169 87.1

AM3(A) - Holy Trinity

Bradbury Centre

(Alternative station for

Sky Tower)

106 138 70.2

AM4(A) – EMSD

Workshops

(Alternative station for

Grand Waterfront)

143 152 54.6

AM5(A) – Po Leung

Kuk Ngan Po Ling

College (Alternative

station for CCC Kei

To Secondary School)

103 128 56.8

Page 27: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 24

Table 4.3 Comparison of Noise Monitoring Data with EIA predictions

4.2 The 1-hour TSP concentration in the reporting month were approximate to the prediction in

the approved Environmental Impact Assessment (EIA) Report while the 24-hour average

TSP concentration were well below the prediction in the approved EIA Report.

4.3 No Action/Limit Level exceedances were recorded for 1-hour and 24-hour average TSP

concentration.

4.4 The noise monitoring results in the reporting month was also within the range of predicted

mitigated construction noise levels in the EIA report.

Stations

Predicted Mitigated

Construction Noise Levels

during Normal Working

Hour (Leq (30min) dB(A))

Reporting Month (Apr 12),

Leq (30min) dB(A)

M1 - Buddhist Chi King

Primary School 51 – 68 55.3 – 64.1

M2 - S.K.H. Kowloon

Bay Kei Lok Primary

School

51 – 70 55.9 – 64.6

M3 – Rhythm Garden 45 – 75 72.1 – 74.1

M4(A) - Kai Tak

Operational Base

(Alternative station for

Cognitio College)

47 – 75 62.7 – 66.4

M5 - Lee Kau Yan

Memorial School 47 – 74 68.3 – 73.6

M6(A) - Kowloon City

District Kaifong

Association ( Alternative

station for South

Mansion)

47 – 78 65.5 – 70.7

M7 - Holy Carpenter

Primary School 47 – 86 47.6 – 63.7

M8 - CCC Kei To

Secondary School 45 – 68 63.1 – 68.0

M9 - Po Leung Kuk Ngan

Po Ling College 44 – 70 58.2 – 62.1

Page 28: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 25

5. LANDSCAPE OF VISUAL

Monitoring Requirements

5.1 According to EM&A Manual of the Kai Tak Development EIA Study and contract

requirement under Contract No. KLN/2010/04, ET(KTD) shall monitor and audit the

contractor’s operation during the construction period on a weekly basis, and to report on the

contractor’s compliance.

Results and Observations

5.2 Site audits were carried out on a weekly basis to monitor and audit the timely

implementation of landscape and visual mitigation measures within KTD. The summaries

of site audits are attached in Appendix I.

5.3 No non-compliance of the landscape and visual impact was recorded in the reporting month.

5.4 Should non-compliance of the landscape and visual impact occur, action in accordance with

the action plan presented in Appendix J shall be performed.

Page 29: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 26

6. ENVIRONMENTAL AUDIT

Site Audits

6.1 Site audits were carried out on a weekly basis to monitor the timely implementation of

proper environmental management practices and mitigation measures in the Project site.

The summaries of site audits are attached in Appendix I.

6.2 Site audits were conducted on 3rd

, 13th

, 20th

and 27th

April 2012 in the reporting month.

Monthly joint site inspection with IEC and the Engineer’s Representative was conducted on

27th

April 2012.

Review of Environmental Monitoring Procedures

6.3 The monitoring works conducted by the monitoring team were inspected regularly. The

following observations have been recorded for the monitoring works:

Air Quality Monitoring

• The monitoring team recorded all observations around the monitoring stations within

and outside the construction site.

• The monitoring team recorded the temperature and weather conditions on the monitoring

days.

Noise Monitoring

• The monitoring team recorded all observations around the monitoring stations, which

might affect the monitoring result.

• Major noise sources were identified and recorded. Other intrusive noise attributing to the

result was trimmed off by pausing the monitoring temporarily.

Status of Waste Management

6.4 The amount of wastes generated by the major site activities of the work contracts within

KTD during the reporting month is shown in Appendix M.

6.5 In respect of the dump truck cover, the Contractor of Work Contracts within KTD is advised

to take record photos and inspection to ensure that all dump trucks have fully covered the

skip before leaving the site.

Implementation Status of Environmental Mitigation Measures

6.6 ET (KTD) weekly site inspections were carried out during the reporting month and the

observations of respective works within KTD are shown in Appendix I.

6.7 Based on the major observations recorded during the regular site audit in the reporting

month, the Contractor was advised:

Page 30: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 27

• To implement dust suppression measures on all haul roads, stockpiles, dry surfaces and

dust generation works

• To check for any accumulation of waste materials or rubbish on site

• To ensure the performance of sorting of C&D materials at source

Summary of Mitigation Measures Implemented

6.8 An updated summary of the EMIS is provided in Appendix K.

Implementation Status of Event Action Plans

6.9 The Event Action Plans for air quality, noise and landscape and visual are presented in

Appendix J.

1-hr TSP Monitoring

6.10 No Action/Limit Level exceedance was recorded in the reporting month.

24-hr TSP Monitoring

6.11 No Action/Limit Level exceedance was recorded in the reporting month.

24-hr RSP Monitoring

6.12 No Action/Limit Level exceedance was recorded in the reporting month.

Construction Noise

6.13 No Action/Limit Level exceedance was recorded for construction noise.

Landscape and visual

6.14 No non-compliance was recorded in the reporting month.

Summary of Complaint, Warning, Notification of any Summons and Successful

Prosecution

6.15 The summaries of environmental complaint, warning, summon and notification of successful

prosecution for the Project is presented in Appendix L.

Page 31: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 28

7. FUTURE KEY ISSUES

7.1 Major site activities undertaken within (KTD) for the coming two month are summarized in

Table 7.1:

Table 7.1 Summary Table for Site Activities undertaken within KTD for Coming Two

Month

KDO, CEDD projects

Contract No. Project Title Site Activities

May 2012 and June 2012

KL/2009/01 Site Formation for Kai Tak Cruise

Terminal

1) Dredging of Marine Sediment

2) Installation of temporary steel bracing

3) Sorting of C&D material from existing seawall

4) RC Desk Construction

5) Reconstruction of Seawall

6) Impact water monitoring / surveillance system

7) Construction of capping beam

8) Removal of existing seawall

KL/2008/09 Stage 1 Infrastructure works at

North Apron

1) Drainage Works

2) Road Works

3) Footbridge Superstructure Construction

4) Watermain Works

5) Transplanting

6) Enhancement of existing subways

7) Footbridge Superstructure Construction

8) Construction of subway extension

9) Cladding Installation

KL/2008/07 Stage 1 Advance Infrastructure

Works

1) Pavement works at Road TD3, TD4, TL14 and

Taxiway Bridge

2) Street Furniture works along Road TD3, TD4

and Taxiway Bridge

3) Construction of boundary wall of Sewage

Pumping Station PS6

4) Finishing works and E&M works for the sewage

pumping station

5) Roadworks of the access track road to public

landing steps

6) Landscape Works

KL/2010/02 Kai Tak Development – Kai Tak

Approach Channel and Kwun

Tong Typhoon Shelter

Improvement Works (Phase 1)

1) Dredging and disposal of Type 3 sediment

2) Demolition of disused dolphin

3) Embankment improvement works

4) Water quality monitoring for dredging

5) Pre-treatment sediment quality survey for

bioremediation

6) Odour Patrol and Water Quality Monitoring

KL/2010/03 Kai Tak Development Stage 2

Infrastructure Works at North

Apron Area

1) Erection of Hoarding and Fences

2) Box Culvert Construction

3) Sewage Pumping Station Construction

Page 32: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 29

CEO, CEDD project

Contract No. Project Title Site Activities

May 2012 and June 2012

CV/2007/03 Development at Anderson Road Disposal of inert C&D material at Kai Tak

DSD project

Contract No. Project Title Site Activities

May 2012 and June 2012

DC/2008/12 Sewage Interception Scheme in

Kowloon City

1) Construction of retaining wall, boundary wall

2) Trench works, pipe laying and backfilling

3) Laying of rising mains & gravity sewer by

trenchless method

4) Construction of drawpit, channels and manholes

5) E&M works for pumping stations

6) Laying of twin rising mains and gravity sewers

by open trench method

7) Architectural finishing works for pumping

stations

DC/2010/03

Kai Tak Nullah Improvement

Works at Prince Edward Road

East

1) Maintain Engineer’s Principal Office

2) Maintain Contractor’s Site Office and Site

Compound

3) Stockpile excavated C&D waste material of

Prince Edward Road East

4) Construction of temporary road diversion at

Portion E

5) Pipe jacking at MHA39.0

DC/2009/21 Provision of Interception

Facilities at Jordan Valley Box

Culvert

1) Excavation

2) Steel Fixing

3) Formworks

4) Concreting

DC/2011/04 Reconstruction, Improvement and

Rehabilitation of Kai Tak River

from Wong Tai Sin Police Station

to Tung Tau

1) Maintain of Engineer’s Principal Office and

Contractor’s Site Office

2) Construction of Site Compound

3) Construction of fencing for the access road to

the Principal Office

HD projects

Contract No. Project Title Site Activities

May 2012 and June 2012

20090097 Public Rental Housing

Development at Kai Tak Site 1A

1) Construction of Superstructure (6 blocks)

2) External Works

20090006 Public Rental Housing

Development at Kai Tak Site 1B

1) Construction of Substructure works

2) Construction of Superstructure works

Page 33: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 30

WSD project

Contract No. Project Title Site Activities

May 2012 and June 2012

3/WSD/08 Replacement and Rehabilitation

of Water Mains Stages 2 & 3

1) Site Office of the Contractor

2) Storage of water works material

3) Storage and sorting of C&D materials

6/WSD/08 1) Construction material storage (Portion G2)

2) C&D material storage (Portion G4)

7/WSD/08 1) Transportation and storage of pipe works

material (Portion BX1)

2) Transportation and sorting of construction waste

(Portion BX1)

3) Fabrication of special pipe fittings (Portion B1)

8/WSD/08 1) C&D materials storage (Portion T1)

2) Pipe materials storage (Portion T2)

ArchSD project

Contract No. Project Title Site Activities

May 2012 and June 2012

SS W 303 Kai Tak Cruise Terminal Building

and Ancillary Facilities

1) RF main box beam construction

2) RF secondary beam construction

3) RF tertiary beam installation

4) RF Precast slab installation

5) UG drainage installation

6) UG plantroom construction

7) GL 1-72 cast insitu superstructure construction

8) BS Installation inside Main Box Beam

9) Façade Installation

10) Feature Roof Installation

SS W304 Design and Construction of Trade

and Industry Tower in Kai Tak

Development Area

1) Installation of site office and hoarding

2) Pre-boring

3) Sheet piling

4) Steel piling

CLP projects

Contract No. Project Title Site Activities

May 2012 and June 2012

Kai Tak Cruise Terminal Cable

Tunnel

No civil activity

Eastern Road Substation

CKL-KCT circuit

1&2

CLPP (132kV cable installation) 1) 132kV cable installation

2) 11kV cable trenching and cable laying

Page 34: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 31

EMSD projects

Contract No. Project Title Site Activities

May 2012 and June 2012

1016EM10 Chilled Water Pipe Laying Works

at North Apron Area for District

Cooling System at Kai Tak

Development

1) SRT

2) Pipe Laying

3) Pipe Jacking

4) Trenchless works by TBM

1017EM10 Design-Build-Operate a District

Cooling System (Phase II Works)

at Kai Tak Development

1) ELS works at NDCS & SDCS Plants & SWPR

2) Dewatering works at SDCS Plant and SWPR

3) Dewatering works at NDCS Plant

4) Bulk excavation at NDCS & SDCS Plants R

5) DCS Pipeworks installation at Concorde Road

6) DCS Pipeworks installation at Southern Runway

7) ELS works at Southern Runway for DCS Pipe

Installation

8) DCS Pipeworks installation within Cruise

Terminal

9) RC structure (formwork, steel reinforcement and

concreting)

10) Basement construction at NDCS

1049EM10 Kai Tak Cruise Terminal

Development – On-shore Sewage

Collection, On-shore Fresh Water

Supply, and Fire Hydrant Water

Supply Systems

Installation of pipes inside branch trough

1050EM10 Design and Build of Seaport

Passenger Boarding Bridges for

the Kai Tak Cruise Terminal

NIL

1140EM11M Advance Works for the Apron

Lighting System of the Kai Tak

Cruise Terminal

NIL

Key Issues for the Coming Month

7.2 Key environmental issues in the coming month include:

• Dust generation from stockpiles of dusty materials, exposed site area, excavation works and

rock breaking activities;

• Watering for dust generating activity and on haul road;

• Proper storage of construction materials on site;

• Storage of chemicals/fuel and chemical waste/waste oil on site;

• Accumulation of general and construction waste on site;

• Runoff from exposed slope;

• Wastewater and runoff discharge from site;

Page 35: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 32

• Regular removal of silt, mud and sand along u-channels and sedimentation tanks;

• Review and implementation of temporary drainage system for the surface runoff;

• Noise from operation of the equipment, especially for rock-breaking activities, piling works

and machinery on-site.

7.3 The tentative program of major site activities and the impact prediction and control

measures for the coming two months, i.e. May 2012 and June 2012 are summarized as

follows:

Construction Works Major Impact

Prediction

Control Measures

As mentioned in Table

7.1

Air quality impact

(dust)

a) Frequent watering of haul road and unpaved/exposed

areas;

b) Frequent watering or covering stockpiles with tarpaulin or

similar means; and

c) Watering of any earth moving activities.

Water quality

impact (surface

run-off)

d) Diversion of the collected effluent to de-silting facilities for

treatment prior to discharge to public storm water drains;

e) Provision of adequate de-silting facilities for treating

surface run-off and other collected effluents prior to discharge;

f) Provision of perimeter protection such as sealing of

hoarding footings to avoid run-off from entering the

existing storm water drainage system via public road; and

g) Provision of measures to prevent discharge into the stream.

Noise Impact h) Scheduling of noisy construction activities if necessary to

avoid persistent noisy operation;

i) Controlling the number of plants use on site;

j) Regular maintenance of machines; and

k) Use of acoustic barriers if necessary.

Monitoring Schedule for the Next Month

7.4 The tentative environmental monitoring schedules for the next month are shown in

Appendix D.

Page 36: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 33

8. CONCLUSIONS AND RECOMMENDATIONS

Conclusions

8.1 Environmental monitoring works were performed in the reporting month and all monitoring

results were checked and reviewed.

1-hr TSP Monitoring

8.2 All 1-hr TSP monitoring was conducted as scheduled in the reporting month. No

Action/Limit Level exceedance was recorded.

24-hr TSP Monitoring

8.3 All 24-hr TSP monitoring was conducted as scheduled in the reporting month. No

Action/Limit Level exceedance was recorded.

Construction Noise Monitoring

8.4 All construction noise monitoring was conducted as scheduled in the reporting month. No

Action/Limit Level exceedance was recorded.

Landscape and visual

8.5 No non-compliance was recorded in the reporting month.

Complaint and Prosecution

8.6 No environmental complaints and environmental prosecution were received in the reporting

month.

Recommendations

8.7 According to the environmental audit performed in the reporting month, the following

recommendations were made:

Air Quality Impact

• To prohibit any open burning on site.

• To regularly maintain the quality of machinery and vehicles on site.

• To implement dust suppression measures on all haul roads, stockpiles, dry surfaces and

excavation works.

• To provide hoarding along the entire length of that portion of the site boundary.

Noise Impact

• To inspect the noise sources inside the site.

• To space out noisy equipment and position the equipment as far away as possible from

Page 37: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Civil Engineering and Development Department Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Monthly EM&A Report – April 2012

MA0040\Monthly\Rpt_120516_v.1.0 Cinotech 34

sensitive receivers.

• To provide temporary noise barriers for operations of noisy equipment near the noise

sensitive receivers in an appropriate location.

Water Impact

• To prevent any surface runoff discharge into any stream course.

• To review and implement temporary drainage system.

• To identify any wastewater discharges from site.

• To ensure properly maintenance for de-silting facilities.

• To clear the silt and sediment in the sedimentation tanks.

• To review the capacity of de-silting facilities for discharge.

• To divert all the water generated from construction site to de-silting facilities with enough

handling capacity before discharge.

• To avoid accumulation of stagnant and ponding water on site.

Waste/Chemical Management

• To check for any accumulation of waste materials or rubbish on site.

• To ensure the performance of sorting of C&D materials at source (during generation);

• To carry out inspection of dump truck at site exit to ensure inert and non-inert C&D

materials are properly segregated before removing off site.

• To avoid any discharge or accidental spillage of chemical waste or oil directly from the

site.

• To avoid improper handling or storage of oil drum on site.

Landscape and Visual

• To protect the existing trees to be retained.

• To transplant the trees unavoidably affected by the works.

• To control of night-time lighting.

• To provide decorative screen hoarding.

• To complete landscape works at site area as early as possible.

Page 38: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

FIGURES

Page 39: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Title Scale Project

No.

Date Figure

Feb-11 1Site Layout Plan

MA0040Environmental Monitoring Works for Kai Tak Development

Contract No. KLN/2010/04N.T.S

Page 40: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

AM1(A)

AM2

AM3(A)

Title Scale Project

No.

Date Figure

Feb-11 2Location of Air Quality Monitoring Stations

MA0040Environmental Monitoring Works for Kai Tak Development

Contract No. KLN/2010/04N.T.S

AM5(A)

AM4(A)

AM1(A)

AM2

AM3(A)

AM5(A)

AM4(A)

AM1(A)

AM2

AM3(A)

Page 41: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

M1

M2

M3M4(A)

M5

M6(A)

M7

Title Scale Project

No.

Date Figure

Feb-11 3Location of Noise Monitoring Stations

MA0040Environmental Monitoring Works for Kai Tak Development

Contract No. KLN/2010/04N.T.S

M1

M2

M3M4(A)

M5

M6(A)

M7

M8

M9

M1

M2

M3M4(A)

M5

M6(A)

M7

M8

M9

Page 42: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Wind Data Monitoring Equipment set at

Kai Tak Operational Base

Title Scale Project

No.

Date Figure

Feb-11 4Location of Wind Data Monitoring Equipment

MA0040Environmental Monitoring Works for Kai Tak Development

Contract No. KLN/2010/04N.T.S

Wind Data Monitoring Equipment set at

Kai Tak Operational Base

Anemometer Station from The Hong

Kong Observatory

Wind Data Monitoring Equipment set at

Kai Tak Operational Base

Anemometer Station from The Hong

Kong Observatory

Page 43: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX A

ACTION AND LIMIT LEVELS

Page 44: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Appendix A

Appendix A - Action and Limit Levels

Table A-1 Action and Limit Levels for 1-Hour TSP

Table A-2 Action and Limit Levels for 24-Hour TSP

Table A-3 Action and Limit Levels for Construction Noise

Remarks: If works are to be carried out during restricted hours, the conditions stipulated in the Construction

Noise Permit (CNP) issued by the Noise Control Authority have to be followed. *70dB(A) and

65dB(A) for schools during normal teaching periods and school examination periods,

respectively.

Location Action Level, µg/m3 Limit Level, µg/m

3

AM1(A) 342

500

AM2 346

AM3(A) 351

AM4(A) 371

AM5(A) 345

Location Action Level, µg/m3 Limit Level, µg/m

3

AM1(A) 159

260

AM2 157

AM3(A) 167

AM4(A) 187

AM5(A) 156

Time Period Action Level Limit Level

0700-1900 hrs on normal weekdays

When one

documented

complaint is received

75 dB(A)

70dB(A)/65dB(A)*

Page 45: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX B

COPIES OF CALIBRATION

CERTIFCATES

Page 46: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located
Page 47: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located
Page 48: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located
Page 49: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located
Page 50: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located
Page 51: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located
Page 52: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located
Page 53: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located
Page 54: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located
Page 55: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located
Page 56: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located
Page 57: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located
Page 58: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located
Page 59: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located
Page 60: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located
Page 61: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located
Page 62: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located
Page 63: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located
Page 64: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located
Page 65: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located
Page 66: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located
Page 67: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX C

WEATHER INFORMATION

Page 68: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX C – WEATHER CONDITIONS DURING THE MONITORING PERIOD I. General Information

MA0040/Weather Conditions C - 1 Cinotech

Date Mean Air

Temperature (°C)

Mean Relative Humidity (%)

Precipitation (mm)

1 April 2012 19.0 – 23.4 53 – 82 0

2 April 2012 20.1 – 24.6 75 – 90 0

3 April 2012 22.0 – 28.4 64 - 92 0

4 April 2012 20.9 – 23.9 69 – 90 0

5 April 2012 20.4 – 23.2 85 – 99 48.5

6 April 2012 18.2 – 20.7 88 – 99 10.9

7 April 2012 18.4 – 21.4 59 – 84 0

8 April 2012 19.9 – 22.1 79 – 92 0.3

9 April 2012 20.3 – 25.9 78 – 99 28.9

10 April 2012 21.6 – 27.9 76 – 96 0

11 April 2012 22.3 – 28.5 65 – 94 0

12 April 2012 23.7 – 27.8 72 – 90 0

13 April 2012 24.7 – 29.5 73 – 91 Trace

14 April 2012 25.2 – 29.5 75 – 93 Trace

15 April 2012 25.5 – 29.6 68 – 89 Trace

16 April 2012 22.5 – 28.8 78 – 95 11.8

17 April 2012 20.0 – 23.9 88 – 98 16.6

18 April 2012 21.1 – 22.9 84 – 92 Trace

19 April 2012 21.7 – 22.9 90 – 99 28.2

Page 69: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX C – WEATHER CONDITIONS DURING THE MONITORING PERIOD I. General Information

MA0040/Weather Conditions C - 2 Cinotech

Date Mean Air

Temperature (°C)

Mean Relative Humidity (%)

Precipitation (mm)

20 April 2012 20.8 – 23.1 93 – 99 66.2

21 April 2012 21.1 – 25.8 67 – 95 0

22 April 2012 21.9 – 28.5 56 – 92 0

23 April 2012 23.5 – 28.0 77 – 95 0.3

24 April 2012 25.6 – 28.4 78 – 87 Trace

25 April 2012 23.6 – 29.0 78 – 90 4.8

26 April 2012 22.0 – 28.8 68 – 94 Trace

27 April 2012 21.5 – 23.6 86 – 99 34.5

28 April 2012 21.3 – 25.9 88 – 99 22.2

29 April 2012 23.9 – 30.2 79 – 97 21.2

30 April 2012 26.6 – 30.1 76 – 89 0.5

* The above information was extracted from the daily weather summary by Hong Kong Observatory.

Page 70: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX C – WEATHER CONDITIONS DURING THE MONITORING PERIOD II. Mean Wind Speed and Wind Direction

MA0040/Weather Conditions C - 3 Cinotech

Date Time Wind Speed m/s Direction 1-Apr-2012 0:00 1.6 SSE

1-Apr-2012 1:00 1.3 SSE

1-Apr-2012 2:00 1.2 ESE

1-Apr-2012 3:00 1.3 ESE

1-Apr-2012 4:00 1.2 ENE

1-Apr-2012 5:00 1 SSE

1-Apr-2012 6:00 0.9 NE

1-Apr-2012 7:00 1.2 NE

1-Apr-2012 8:00 1.3 NE

1-Apr-2012 9:00 1.6 ENE

1-Apr-2012 10:00 1.7 ESE

1-Apr-2012 11:00 2.1 ESE

1-Apr-2012 12:00 2.6 ENE

1-Apr-2012 13:00 2.6 ESE

1-Apr-2012 14:00 2.5 ENE

1-Apr-2012 15:00 2.3 NE

1-Apr-2012 16:00 2.3 NE

1-Apr-2012 17:00 2.2 NNE

1-Apr-2012 18:00 1.8 NNE

1-Apr-2012 19:00 1.8 ENE

1-Apr-2012 20:00 1.6 ENE

1-Apr-2012 21:00 1.6 ENE

1-Apr-2012 22:00 1.7 ESE

1-Apr-2012 23:00 1.8 ESE

2-Apr-2012 0:00 1.8 ENE

2-Apr-2012 1:00 1.8 NNE

2-Apr-2012 2:00 2 NE

2-Apr-2012 3:00 1.7 SE

2-Apr-2012 4:00 1.5 NNE

2-Apr-2012 5:00 1.2 NE

2-Apr-2012 6:00 1.1 NNE

2-Apr-2012 7:00 1.1 ENE

2-Apr-2012 8:00 0.9 SSE

2-Apr-2012 9:00 1.4 ENE

2-Apr-2012 10:00 1.8 SSE

2-Apr-2012 11:00 2.4 ESE

Page 71: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX C – WEATHER CONDITIONS DURING THE MONITORING PERIOD II. Mean Wind Speed and Wind Direction

MA0040/Weather Conditions C - 4 Cinotech

2-Apr-2012 12:00 2.6 S

2-Apr-2012 13:00 2.4 NNE

2-Apr-2012 14:00 2.4 W

2-Apr-2012 15:00 2.3 ESE

2-Apr-2012 16:00 2 SSE

2-Apr-2012 17:00 2 ENE

2-Apr-2012 18:00 1.7 NNE

2-Apr-2012 19:00 1.7 ENE

2-Apr-2012 20:00 1.6 NNE

2-Apr-2012 21:00 1.8 ESE

2-Apr-2012 22:00 1.4 E

2-Apr-2012 23:00 1.3 NE

3-Apr-2012 0:00 1.3 ENE

3-Apr-2012 1:00 1.7 WSW

3-Apr-2012 2:00 1.6 ESE

3-Apr-2012 3:00 1.6 NNE

3-Apr-2012 4:00 1.5 ENE

3-Apr-2012 5:00 1.6 SSE

3-Apr-2012 6:00 1.5 N

3-Apr-2012 7:00 1.6 N

3-Apr-2012 8:00 1.6 NE

3-Apr-2012 9:00 1.7 SSE

3-Apr-2012 10:00 2 NNE

3-Apr-2012 11:00 2.2 E

3-Apr-2012 12:00 2.2 ENE

3-Apr-2012 13:00 2.6 ENE

3-Apr-2012 14:00 2.2 ENE

3-Apr-2012 15:00 2.4 SE

3-Apr-2012 16:00 2.5 ENE

3-Apr-2012 17:00 2.6 NE

3-Apr-2012 18:00 2.4 NNE

3-Apr-2012 19:00 2.1 NE

3-Apr-2012 20:00 1.7 ENE

3-Apr-2012 21:00 1.7 ENE

3-Apr-2012 22:00 1.6 NE

3-Apr-2012 23:00 1.7 SE

4-Apr-2012 0:00 2.1 NNE

Page 72: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX C – WEATHER CONDITIONS DURING THE MONITORING PERIOD II. Mean Wind Speed and Wind Direction

MA0040/Weather Conditions C - 5 Cinotech

4-Apr-2012 1:00 2 NE

4-Apr-2012 2:00 1.9 NE

4-Apr-2012 3:00 1.8 ENE

4-Apr-2012 4:00 1.5 NE

4-Apr-2012 5:00 1.8 NE

4-Apr-2012 6:00 1.6 ENE

4-Apr-2012 7:00 1.6 ENE

4-Apr-2012 8:00 2 NE

4-Apr-2012 9:00 2.4 ESE

4-Apr-2012 10:00 2.6 N

4-Apr-2012 11:00 2.8 SE

4-Apr-2012 12:00 2.9 ESE

4-Apr-2012 13:00 2.9 SSE

4-Apr-2012 14:00 2.8 SE

4-Apr-2012 15:00 2.8 S

4-Apr-2012 16:00 2.4 NE

4-Apr-2012 17:00 2.1 SE

4-Apr-2012 18:00 1.7 ESE

4-Apr-2012 19:00 1.5 SE

4-Apr-2012 20:00 1.4 E

4-Apr-2012 21:00 1.5 SSW

4-Apr-2012 22:00 1.6 NE

4-Apr-2012 23:00 1.4 SE

5-Apr-2012 0:00 1.7 NE

5-Apr-2012 1:00 1.8 NE

5-Apr-2012 2:00 1.8 SE

5-Apr-2012 3:00 1.6 NE

5-Apr-2012 4:00 1.8 ENE

5-Apr-2012 5:00 1.7 NE

5-Apr-2012 6:00 2 NE

5-Apr-2012 7:00 1.7 NE

5-Apr-2012 8:00 2.1 NNE

5-Apr-2012 9:00 2.4 NNE

5-Apr-2012 10:00 2.6 N

5-Apr-2012 11:00 2.6 N

5-Apr-2012 12:00 2.8 N

5-Apr-2012 13:00 3 NE

Page 73: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX C – WEATHER CONDITIONS DURING THE MONITORING PERIOD II. Mean Wind Speed and Wind Direction

MA0040/Weather Conditions C - 6 Cinotech

5-Apr-2012 14:00 3 WSW

5-Apr-2012 15:00 3 SSE

5-Apr-2012 16:00 2.5 ENE

5-Apr-2012 17:00 2.3 ENE

5-Apr-2012 18:00 2.2 W

5-Apr-2012 19:00 1.8 SW

5-Apr-2012 20:00 1.8 SSW

5-Apr-2012 21:00 1.9 ENE

5-Apr-2012 22:00 1.7 ENE

5-Apr-2012 23:00 1.6 E

6-Apr-2012 0:00 2 SSE

6-Apr-2012 1:00 2.4 WNW

6-Apr-2012 2:00 2.1 W

6-Apr-2012 3:00 2.3 NNE

6-Apr-2012 4:00 2.3 SSW

6-Apr-2012 5:00 2 NE

6-Apr-2012 6:00 2 NNE

6-Apr-2012 7:00 1.8 ESE

6-Apr-2012 8:00 2.2 ESE

6-Apr-2012 9:00 2.2 NNE

6-Apr-2012 10:00 2.5 WSW

6-Apr-2012 11:00 2.7 ENE

6-Apr-2012 12:00 2.7 ENE

6-Apr-2012 13:00 3 SE

6-Apr-2012 14:00 2.6 ENE

6-Apr-2012 15:00 2.8 SW

6-Apr-2012 16:00 2.7 NE

6-Apr-2012 17:00 2.8 NE

6-Apr-2012 18:00 2.5 NNE

6-Apr-2012 19:00 2.4 ESE

6-Apr-2012 20:00 2.2 NE

6-Apr-2012 21:00 2 SSE

6-Apr-2012 22:00 2.1 ESE

6-Apr-2012 23:00 2 NNE

7-Apr-2012 0:00 1.9 ESE

7-Apr-2012 1:00 1.8 SW

7-Apr-2012 2:00 1.9 ENE

Page 74: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX C – WEATHER CONDITIONS DURING THE MONITORING PERIOD II. Mean Wind Speed and Wind Direction

MA0040/Weather Conditions C - 7 Cinotech

7-Apr-2012 3:00 1.7 NE

7-Apr-2012 4:00 1.6 ESE

7-Apr-2012 5:00 1.7 ENE

7-Apr-2012 6:00 1.4 SW

7-Apr-2012 7:00 1.5 ENE

7-Apr-2012 8:00 1.8 ENE

7-Apr-2012 9:00 2.2 NNE

7-Apr-2012 10:00 2.4 SSE

7-Apr-2012 11:00 2.5 WNW

7-Apr-2012 12:00 2.7 WNW

7-Apr-2012 13:00 2.8 WNW

7-Apr-2012 14:00 2.8 SSW

7-Apr-2012 15:00 2.8 WSW

7-Apr-2012 16:00 2.8 N

7-Apr-2012 17:00 2.6 NNE

7-Apr-2012 18:00 2.1 WNW

7-Apr-2012 19:00 1.8 NE

7-Apr-2012 20:00 1.5 E

7-Apr-2012 21:00 1.7 ENE

7-Apr-2012 22:00 1.7 ESE

7-Apr-2012 23:00 1.4 ENE

8-Apr-2012 0:00 1.3 ESE

8-Apr-2012 1:00 1.5 E

8-Apr-2012 2:00 1.6 S

8-Apr-2012 3:00 1.6 NE

8-Apr-2012 4:00 1.5 NNE

8-Apr-2012 5:00 1.7 NNE

8-Apr-2012 6:00 1.7 E

8-Apr-2012 7:00 1.7 E

8-Apr-2012 8:00 1.9 E

8-Apr-2012 9:00 1.9 WSW

8-Apr-2012 10:00 2.3 S

8-Apr-2012 11:00 2.5 ESE

8-Apr-2012 12:00 2.5 WSW

8-Apr-2012 13:00 2.6 ENE

8-Apr-2012 14:00 2.5 ESE

8-Apr-2012 15:00 2.5 ENE

Page 75: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX C – WEATHER CONDITIONS DURING THE MONITORING PERIOD II. Mean Wind Speed and Wind Direction

MA0040/Weather Conditions C - 8 Cinotech

8-Apr-2012 16:00 2.3 WNW

8-Apr-2012 17:00 2.2 ESE

8-Apr-2012 18:00 2 ESE

8-Apr-2012 19:00 1.9 SE

8-Apr-2012 20:00 1.8 NNE

8-Apr-2012 21:00 1.9 SSE

8-Apr-2012 22:00 1.6 WSW

8-Apr-2012 23:00 1.8 ENE

9-Apr-2012 0:00 1.9 ESE

9-Apr-2012 1:00 1.9 ESE

9-Apr-2012 2:00 1.7 SSE

9-Apr-2012 3:00 1.7 ESE

9-Apr-2012 4:00 1.8 N

9-Apr-2012 5:00 1.9 ESE

9-Apr-2012 6:00 1.9 ESE

9-Apr-2012 7:00 2.1 SE

9-Apr-2012 8:00 2.3 SE

9-Apr-2012 9:00 2.5 NNE

9-Apr-2012 10:00 2.9 SE

9-Apr-2012 11:00 2.9 NNE

9-Apr-2012 12:00 3.1 E

9-Apr-2012 13:00 2.9 ENE

9-Apr-2012 14:00 2.6 ENE

9-Apr-2012 15:00 2.7 NE

9-Apr-2012 16:00 2.6 NE

9-Apr-2012 17:00 2.8 NE

9-Apr-2012 18:00 2.6 NE

9-Apr-2012 19:00 2.3 NNE

9-Apr-2012 20:00 2.1 ESE

9-Apr-2012 21:00 2.2 ESE

9-Apr-2012 22:00 2.2 ESE

9-Apr-2012 23:00 2.3 SSE

10-Apr-2012 0:00 2.6 ENE

10-Apr-2012 1:00 2.4 SW

10-Apr-2012 2:00 2.2 SSE

10-Apr-2012 3:00 2.5 ESE

10-Apr-2012 4:00 2.5 ENE

Page 76: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX C – WEATHER CONDITIONS DURING THE MONITORING PERIOD II. Mean Wind Speed and Wind Direction

MA0040/Weather Conditions C - 9 Cinotech

10-Apr-2012 5:00 2.3 NE

10-Apr-2012 6:00 2.4 SSE

10-Apr-2012 7:00 2.2 NNE

10-Apr-2012 8:00 2.5 SE

10-Apr-2012 9:00 2.7 N

10-Apr-2012 10:00 2.7 SE

10-Apr-2012 11:00 2.8 ESE

10-Apr-2012 12:00 3.2 NNE

10-Apr-2012 13:00 3 SE

10-Apr-2012 14:00 2.9 ENE

10-Apr-2012 15:00 3.2 NE

10-Apr-2012 16:00 3 SSE

10-Apr-2012 17:00 2.6 NE

10-Apr-2012 18:00 2.1 NE

10-Apr-2012 19:00 1.9 NE

10-Apr-2012 20:00 1.8 NE

10-Apr-2012 21:00 2 N

10-Apr-2012 22:00 2 SSE

10-Apr-2012 23:00 2.1 NE

11-Apr-2012 0:00 2.1 NE

11-Apr-2012 1:00 1.7 NNE

11-Apr-2012 2:00 1.8 ENE

11-Apr-2012 3:00 1.9 SE

11-Apr-2012 4:00 1.7 E

11-Apr-2012 5:00 1.9 SW

11-Apr-2012 6:00 1.9 SSW

11-Apr-2012 7:00 1.9 SSW

11-Apr-2012 8:00 2.2 WNW

11-Apr-2012 9:00 3.1 W

11-Apr-2012 10:00 3.2 WNW

11-Apr-2012 11:00 3.3 W

11-Apr-2012 12:00 3.3 WNW

11-Apr-2012 13:00 3.4 WSW

11-Apr-2012 14:00 3.2 WSW

11-Apr-2012 15:00 3.3 WSW

11-Apr-2012 16:00 3.2 SW

11-Apr-2012 17:00 3.1 SSW

Page 77: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX C – WEATHER CONDITIONS DURING THE MONITORING PERIOD II. Mean Wind Speed and Wind Direction

MA0040/Weather Conditions C - 10 Cinotech

11-Apr-2012 18:00 2.5 SW

11-Apr-2012 19:00 2.6 SW

11-Apr-2012 20:00 2.8 WNW

11-Apr-2012 21:00 2.7 WNW

11-Apr-2012 22:00 2.3 WSW

11-Apr-2012 23:00 2.2 W

12-Apr-2012 0:00 2.2 WSW

12-Apr-2012 1:00 2.3 SW

12-Apr-2012 2:00 2.4 SSW

12-Apr-2012 3:00 2.4 SSW

12-Apr-2012 4:00 2.6 SSW

12-Apr-2012 5:00 2.6 WSW

12-Apr-2012 6:00 2.3 SW

12-Apr-2012 7:00 2.3 NE

12-Apr-2012 8:00 2.7 SSE

12-Apr-2012 9:00 2.8 SW

12-Apr-2012 10:00 3.1 SSW

12-Apr-2012 11:00 3.2 W

12-Apr-2012 12:00 3.3 WNW

12-Apr-2012 13:00 3.3 W

12-Apr-2012 14:00 3.3 WNW

12-Apr-2012 15:00 3.2 SW

12-Apr-2012 16:00 2.9 WNW

12-Apr-2012 17:00 2.8 WSW

12-Apr-2012 18:00 2.6 WSW

12-Apr-2012 19:00 2.5 SW

12-Apr-2012 20:00 2.2 SSW

12-Apr-2012 21:00 2.1 SW

12-Apr-2012 22:00 1.9 ENE

12-Apr-2012 23:00 2.1 S

13-Apr-2012 0:00 1.6 ESE

13-Apr-2012 1:00 1.6 ESE

13-Apr-2012 2:00 1.5 E

13-Apr-2012 3:00 1.5 ESE

13-Apr-2012 4:00 1.4 SE

13-Apr-2012 5:00 1.5 E

13-Apr-2012 6:00 1.5 SSE

Page 78: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX C – WEATHER CONDITIONS DURING THE MONITORING PERIOD II. Mean Wind Speed and Wind Direction

MA0040/Weather Conditions C - 11 Cinotech

13-Apr-2012 7:00 1.5 S

13-Apr-2012 8:00 1.8 ENE

13-Apr-2012 9:00 1.9 NE

13-Apr-2012 10:00 2.1 NE

13-Apr-2012 11:00 2.4 ENE

13-Apr-2012 12:00 3 ENE

13-Apr-2012 13:00 2.8 NE

13-Apr-2012 14:00 2.7 NNE

13-Apr-2012 15:00 2.5 NE

13-Apr-2012 16:00 2.3 ENE

13-Apr-2012 17:00 2.1 ESE

13-Apr-2012 18:00 2.1 ENE

13-Apr-2012 19:00 1.7 ENE

13-Apr-2012 20:00 1.5 NE

13-Apr-2012 21:00 1.4 NNE

13-Apr-2012 22:00 1.5 NE

13-Apr-2012 23:00 1.7 ENE

14-Apr-2012 0:00 1.3 SSE

14-Apr-2012 1:00 1.2 S

14-Apr-2012 2:00 1.3 SSE

14-Apr-2012 3:00 1.2 SSE

14-Apr-2012 4:00 1.1 S

14-Apr-2012 5:00 1.1 S

14-Apr-2012 6:00 1.1 SSW

14-Apr-2012 7:00 1.3 E

14-Apr-2012 8:00 1.7 ENE

14-Apr-2012 9:00 2.3 ENE

14-Apr-2012 10:00 2.3 ENE

14-Apr-2012 11:00 2.5 ENE

14-Apr-2012 12:00 2.6 ENE

14-Apr-2012 13:00 2.9 E

14-Apr-2012 14:00 2.8 ENE

14-Apr-2012 15:00 2.7 ENE

14-Apr-2012 16:00 2.6 E

14-Apr-2012 17:00 2.6 SE

14-Apr-2012 18:00 2.3 ENE

14-Apr-2012 19:00 2 ESE

Page 79: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX C – WEATHER CONDITIONS DURING THE MONITORING PERIOD II. Mean Wind Speed and Wind Direction

MA0040/Weather Conditions C - 12 Cinotech

14-Apr-2012 20:00 1.8 SSE

14-Apr-2012 21:00 2 E

14-Apr-2012 22:00 1.9 ESE

14-Apr-2012 23:00 1.7 SSE

15-Apr-2012 0:00 1.6 SE

15-Apr-2012 1:00 1.5 SSE

15-Apr-2012 2:00 1.6 SSE

15-Apr-2012 3:00 1.8 E

15-Apr-2012 4:00 1.9 NNE

15-Apr-2012 5:00 1.7 NE

15-Apr-2012 6:00 1.8 NNE

15-Apr-2012 7:00 1.8 ESE

15-Apr-2012 8:00 2 ESE

15-Apr-2012 9:00 2.2 W

15-Apr-2012 10:00 2.5 NNE

15-Apr-2012 11:00 2.7 NE

15-Apr-2012 12:00 2.9 NE

15-Apr-2012 13:00 2.8 ENE

15-Apr-2012 14:00 2.4 N

15-Apr-2012 15:00 2.5 N

15-Apr-2012 16:00 2.6 NE

15-Apr-2012 17:00 2.4 NNE

15-Apr-2012 18:00 2.3 NE

15-Apr-2012 19:00 2 NNE

15-Apr-2012 20:00 1.9 NNE

15-Apr-2012 21:00 2 ENE

15-Apr-2012 22:00 2 ENE

15-Apr-2012 23:00 1.9 ENE

16-Apr-2012 0:00 2.6 E

16-Apr-2012 1:00 2.4 E

16-Apr-2012 2:00 2.3 NE

16-Apr-2012 3:00 2.2 NE

16-Apr-2012 4:00 2.4 W

16-Apr-2012 5:00 2.5 ENE

16-Apr-2012 6:00 2.2 ENE

16-Apr-2012 7:00 2.2 ENE

16-Apr-2012 8:00 2 NE

Page 80: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX C – WEATHER CONDITIONS DURING THE MONITORING PERIOD II. Mean Wind Speed and Wind Direction

MA0040/Weather Conditions C - 13 Cinotech

16-Apr-2012 9:00 2.5 N

16-Apr-2012 10:00 2.6 E

16-Apr-2012 11:00 2.7 ENE

16-Apr-2012 12:00 2.8 WNW

16-Apr-2012 13:00 2.6 W

16-Apr-2012 14:00 2.5 WSW

16-Apr-2012 15:00 2.6 S

16-Apr-2012 16:00 2.8 WNW

16-Apr-2012 17:00 2.9 NW

16-Apr-2012 18:00 2.4 E

16-Apr-2012 19:00 2.5 NNE

16-Apr-2012 20:00 2.4 N

16-Apr-2012 21:00 2.6 N

16-Apr-2012 22:00 2.2 ENE

16-Apr-2012 23:00 2.1 WNW

17-Apr-2012 0:00 2 WNW

17-Apr-2012 1:00 1.9 WNW

17-Apr-2012 2:00 1.6 WNW

17-Apr-2012 3:00 1.4 WSW

17-Apr-2012 4:00 1.6 WSW

17-Apr-2012 5:00 1.8 SW

17-Apr-2012 6:00 2.1 WSW

17-Apr-2012 7:00 1.6 WNW

17-Apr-2012 8:00 1.6 WNW

17-Apr-2012 9:00 2.1 W

17-Apr-2012 10:00 2.4 W

17-Apr-2012 11:00 2.8 N

17-Apr-2012 12:00 2.9 WNW

17-Apr-2012 13:00 2.6 WNW

17-Apr-2012 14:00 2.3 WNW

17-Apr-2012 15:00 2.5 WNW

17-Apr-2012 16:00 2.7 WNW

17-Apr-2012 17:00 2 WNW

17-Apr-2012 18:00 1.9 WNW

17-Apr-2012 19:00 1.9 WSW

17-Apr-2012 20:00 1.9 WNW

17-Apr-2012 21:00 2 SSW

Page 81: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX C – WEATHER CONDITIONS DURING THE MONITORING PERIOD II. Mean Wind Speed and Wind Direction

MA0040/Weather Conditions C - 14 Cinotech

17-Apr-2012 22:00 1.9 SW

17-Apr-2012 23:00 1.9 W

18-Apr-2012 0:00 2 WNW

18-Apr-2012 1:00 2 NNE

18-Apr-2012 2:00 1.7 NNE

18-Apr-2012 3:00 1.9 SE

18-Apr-2012 4:00 1.9 ENE

18-Apr-2012 5:00 2 ENE

18-Apr-2012 6:00 2.1 NE

18-Apr-2012 7:00 2.2 ENE

18-Apr-2012 8:00 2.4 NE

18-Apr-2012 9:00 2.8 E

18-Apr-2012 10:00 3.3 ENE

18-Apr-2012 11:00 3.2 NE

18-Apr-2012 12:00 3.2 NE

18-Apr-2012 13:00 3.1 ESE

18-Apr-2012 14:00 3.2 ENE

18-Apr-2012 15:00 3.4 ENE

18-Apr-2012 16:00 3.2 ENE

18-Apr-2012 17:00 2.8 N

18-Apr-2012 18:00 2.8 ENE

18-Apr-2012 19:00 2.6 SW

18-Apr-2012 20:00 2.5 E

18-Apr-2012 21:00 2.6 E

18-Apr-2012 22:00 2.6 E

18-Apr-2012 23:00 2.5 ENE

19-Apr-2012 0:00 2.7 ESE

19-Apr-2012 1:00 2.6 ENE

19-Apr-2012 2:00 2.7 ESE

19-Apr-2012 3:00 2.5 NE

19-Apr-2012 4:00 2.4 ENE

19-Apr-2012 5:00 2.4 ENE

19-Apr-2012 6:00 2.3 NE

19-Apr-2012 7:00 2.1 NNE

19-Apr-2012 8:00 2.5 ENE

19-Apr-2012 9:00 2.8 ENE

19-Apr-2012 10:00 3 SSE

Page 82: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX C – WEATHER CONDITIONS DURING THE MONITORING PERIOD II. Mean Wind Speed and Wind Direction

MA0040/Weather Conditions C - 15 Cinotech

19-Apr-2012 11:00 3.1 ENE

19-Apr-2012 12:00 3.1 ENE

19-Apr-2012 13:00 3.1 E

19-Apr-2012 14:00 3 ESE

19-Apr-2012 15:00 3.3 ENE

19-Apr-2012 16:00 3 ENE

19-Apr-2012 17:00 2.7 ENE

19-Apr-2012 18:00 2.3 ESE

19-Apr-2012 19:00 2.3 SE

19-Apr-2012 20:00 2.3 NE

19-Apr-2012 21:00 1.9 NNE

19-Apr-2012 22:00 2.5 NNE

19-Apr-2012 23:00 2.4 SSE

20-Apr-2012 0:00 2.1 SSE

20-Apr-2012 1:00 2 NE

20-Apr-2012 2:00 2.1 ESE

20-Apr-2012 3:00 2.2 NNE

20-Apr-2012 4:00 2.1 NNE

20-Apr-2012 5:00 2.4 E

20-Apr-2012 6:00 2.3 ENE

20-Apr-2012 7:00 2 ENE

20-Apr-2012 8:00 2 ENE

20-Apr-2012 9:00 3 NE

20-Apr-2012 10:00 2.9 ENE

20-Apr-2012 11:00 3.4 NNE

20-Apr-2012 12:00 3.1 NE

20-Apr-2012 13:00 3.2 ESE

20-Apr-2012 14:00 2.9 ESE

20-Apr-2012 15:00 2.6 NE

20-Apr-2012 16:00 2.8 SE

20-Apr-2012 17:00 2.7 ENE

20-Apr-2012 18:00 2.2 SSE

20-Apr-2012 19:00 2.2 ESE

20-Apr-2012 20:00 2 ENE

20-Apr-2012 21:00 2.1 SSE

20-Apr-2012 22:00 2.1 W

20-Apr-2012 23:00 2.4 SE

Page 83: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX C – WEATHER CONDITIONS DURING THE MONITORING PERIOD II. Mean Wind Speed and Wind Direction

MA0040/Weather Conditions C - 16 Cinotech

21-Apr-2012 0:00 2 SSE

21-Apr-2012 1:00 2.1 SSE

21-Apr-2012 2:00 2.1 ESE

21-Apr-2012 3:00 2.4 SSE

21-Apr-2012 4:00 2.1 ENE

21-Apr-2012 5:00 2.3 ENE

21-Apr-2012 6:00 2.1 ENE

21-Apr-2012 7:00 2.1 SE

21-Apr-2012 8:00 2.4 SE

21-Apr-2012 9:00 2.5 SE

21-Apr-2012 10:00 3.1 SE

21-Apr-2012 11:00 3.3 SE

21-Apr-2012 12:00 3.4 ENE

21-Apr-2012 13:00 3.1 SE

21-Apr-2012 14:00 2.9 SE

21-Apr-2012 15:00 2.6 NE

21-Apr-2012 16:00 2.5 SE

21-Apr-2012 17:00 2.4 SE

21-Apr-2012 18:00 2.4 S

21-Apr-2012 19:00 2.5 SSE

21-Apr-2012 20:00 2.1 NE

21-Apr-2012 21:00 2.6 E

21-Apr-2012 22:00 2 ESE

21-Apr-2012 23:00 2.5 E

22-Apr-2012 0:00 2 ESE

22-Apr-2012 1:00 1.9 ESE

22-Apr-2012 2:00 1.6 NE

22-Apr-2012 3:00 1.9 E

22-Apr-2012 4:00 1.8 SE

22-Apr-2012 5:00 1.6 NE

22-Apr-2012 6:00 1.3 SSW

22-Apr-2012 7:00 1.5 ESE

22-Apr-2012 8:00 2.1 SSW

22-Apr-2012 9:00 2.1 SSW

22-Apr-2012 10:00 2.3 NE

22-Apr-2012 11:00 2.3 NE

22-Apr-2012 12:00 2.6 ESE

Page 84: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX C – WEATHER CONDITIONS DURING THE MONITORING PERIOD II. Mean Wind Speed and Wind Direction

MA0040/Weather Conditions C - 17 Cinotech

22-Apr-2012 13:00 2.6 ESE

22-Apr-2012 14:00 2.4 ESE

22-Apr-2012 15:00 2.3 ESE

22-Apr-2012 16:00 2.1 SSW

22-Apr-2012 17:00 2 SSE

22-Apr-2012 18:00 1.8 NE

22-Apr-2012 19:00 1.7 ENE

22-Apr-2012 20:00 1.7 ENE

22-Apr-2012 21:00 1.3 NE

22-Apr-2012 22:00 1.6 SE

22-Apr-2012 23:00 1.7 WNW

23-Apr-2012 0:00 1.7 WNW

23-Apr-2012 1:00 1.6 ENE

23-Apr-2012 2:00 1.7 N

23-Apr-2012 3:00 1.6 N

23-Apr-2012 4:00 1.6 NNE

23-Apr-2012 5:00 1.6 ESE

23-Apr-2012 6:00 1.5 ENE

23-Apr-2012 7:00 1.6 NE

23-Apr-2012 8:00 2 ENE

23-Apr-2012 9:00 2.6 ENE

23-Apr-2012 10:00 3.1 ENE

23-Apr-2012 11:00 3.4 N

23-Apr-2012 12:00 3 NW

23-Apr-2012 13:00 2.9 SSW

23-Apr-2012 14:00 2.8 SSW

23-Apr-2012 15:00 2.8 SSE

23-Apr-2012 16:00 2.9 SE

23-Apr-2012 17:00 2.6 SE

23-Apr-2012 18:00 2.2 SE

23-Apr-2012 19:00 2.2 SE

23-Apr-2012 20:00 1.9 SE

23-Apr-2012 21:00 1.8 SE

23-Apr-2012 22:00 1.9 SE

23-Apr-2012 23:00 1.7 ESE

24-Apr-2012 0:00 1.6 ESE

24-Apr-2012 1:00 1.8 ESE

Page 85: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX C – WEATHER CONDITIONS DURING THE MONITORING PERIOD II. Mean Wind Speed and Wind Direction

MA0040/Weather Conditions C - 18 Cinotech

24-Apr-2012 2:00 1.6 SE

24-Apr-2012 3:00 1.6 ESE

24-Apr-2012 4:00 1.8 S

24-Apr-2012 5:00 2 SSE

24-Apr-2012 6:00 2 SSW

24-Apr-2012 7:00 2 WSW

24-Apr-2012 8:00 2.4 WSW

24-Apr-2012 9:00 2.4 WSW

24-Apr-2012 10:00 3 SSW

24-Apr-2012 11:00 3.1 SW

24-Apr-2012 12:00 3 WSW

24-Apr-2012 13:00 3.3 N

24-Apr-2012 14:00 2.9 NE

24-Apr-2012 15:00 3 NE

24-Apr-2012 16:00 2.9 SSE

24-Apr-2012 17:00 3 SE

24-Apr-2012 18:00 2.5 SE

24-Apr-2012 19:00 2.3 SE

24-Apr-2012 20:00 2.2 SE

24-Apr-2012 21:00 2.3 SE

24-Apr-2012 22:00 2.3 SE

24-Apr-2012 23:00 2.4 SE

25-Apr-2012 0:00 2.3 SE

25-Apr-2012 1:00 2.4 NE

25-Apr-2012 2:00 2.1 NNE

25-Apr-2012 3:00 2.1 SE

25-Apr-2012 4:00 2.3 SE

25-Apr-2012 5:00 2.2 S

25-Apr-2012 6:00 1.9 S

25-Apr-2012 7:00 1.9 SE

25-Apr-2012 8:00 2 SE

25-Apr-2012 9:00 2.2 SSE

25-Apr-2012 10:00 2.5 SE

25-Apr-2012 11:00 2.8 SE

25-Apr-2012 12:00 3.1 SE

25-Apr-2012 13:00 2.7 SE

25-Apr-2012 14:00 2.5 SE

Page 86: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX C – WEATHER CONDITIONS DURING THE MONITORING PERIOD II. Mean Wind Speed and Wind Direction

MA0040/Weather Conditions C - 19 Cinotech

25-Apr-2012 15:00 2.6 N

25-Apr-2012 16:00 2.3 SSE

25-Apr-2012 17:00 2.2 SE

25-Apr-2012 18:00 2.3 NE

25-Apr-2012 19:00 2.1 NE

25-Apr-2012 20:00 2 ENE

25-Apr-2012 21:00 1.9 NNE

25-Apr-2012 22:00 2 SE

25-Apr-2012 23:00 1.9 E

26-Apr-2012 0:00 1.6 W

26-Apr-2012 1:00 1.5 SE

26-Apr-2012 2:00 1.6 E

26-Apr-2012 3:00 2 E

26-Apr-2012 4:00 1.4 ESE

26-Apr-2012 5:00 1.4 ESE

26-Apr-2012 6:00 1.2 SE

26-Apr-2012 7:00 1.5 E

26-Apr-2012 8:00 1.8 NE

26-Apr-2012 9:00 1.9 N

26-Apr-2012 10:00 2.3 NE

26-Apr-2012 11:00 2.7 E

26-Apr-2012 12:00 3.1 SE

26-Apr-2012 13:00 3.1 SE

26-Apr-2012 14:00 2.7 E

26-Apr-2012 15:00 2.3 NNE

26-Apr-2012 16:00 2.6 N

26-Apr-2012 17:00 2.3 NE

26-Apr-2012 18:00 2.2 NE

26-Apr-2012 19:00 2.1 NE

26-Apr-2012 20:00 2 E

26-Apr-2012 21:00 2.1 ENE

26-Apr-2012 22:00 2 NE

26-Apr-2012 23:00 2 NE

27-Apr-2012 0:00 2 E

27-Apr-2012 1:00 1.9 NE

27-Apr-2012 2:00 2 E

27-Apr-2012 3:00 1.9 E

Page 87: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX C – WEATHER CONDITIONS DURING THE MONITORING PERIOD II. Mean Wind Speed and Wind Direction

MA0040/Weather Conditions C - 20 Cinotech

27-Apr-2012 4:00 1.8 E

27-Apr-2012 5:00 1.8 ESE

27-Apr-2012 6:00 1.7 ESE

27-Apr-2012 7:00 1.8 ESE

27-Apr-2012 8:00 2 E

27-Apr-2012 9:00 2.9 E

27-Apr-2012 10:00 3.1 E

27-Apr-2012 11:00 3.2 SSE

27-Apr-2012 12:00 3.2 SE

27-Apr-2012 13:00 3.1 SE

27-Apr-2012 14:00 3.1 ESE

27-Apr-2012 15:00 2.8 SE

27-Apr-2012 16:00 2.5 E

27-Apr-2012 17:00 2.9 NE

27-Apr-2012 18:00 2.2 E

27-Apr-2012 19:00 1.8 ESE

27-Apr-2012 20:00 1.7 NNE

27-Apr-2012 21:00 1.9 E

27-Apr-2012 22:00 1.3 ESE

27-Apr-2012 23:00 1.9 SE

28-Apr-2012 0:00 2 E

28-Apr-2012 1:00 1.9 E

28-Apr-2012 2:00 2.2 SSW

28-Apr-2012 3:00 2 S

28-Apr-2012 4:00 2.1 W

28-Apr-2012 5:00 2 W

28-Apr-2012 6:00 1.8 NW

28-Apr-2012 7:00 1.8 NW

28-Apr-2012 8:00 2.3 NW

28-Apr-2012 9:00 2.5 ESE

28-Apr-2012 10:00 4 ESE

28-Apr-2012 11:00 4.2 ESE

28-Apr-2012 12:00 4.3 NE

28-Apr-2012 13:00 4.1 NNE

28-Apr-2012 14:00 4.5 NNE

28-Apr-2012 15:00 4.6 NE

28-Apr-2012 16:00 4.4 SE

Page 88: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX C – WEATHER CONDITIONS DURING THE MONITORING PERIOD II. Mean Wind Speed and Wind Direction

MA0040/Weather Conditions C - 21 Cinotech

28-Apr-2012 17:00 4.1 SE

28-Apr-2012 18:00 3.5 E

28-Apr-2012 19:00 2.8 E

28-Apr-2012 20:00 3.2 E

28-Apr-2012 21:00 3.9 E

28-Apr-2012 22:00 4.1 ESE

28-Apr-2012 23:00 4.1 SE

29-Apr-2012 0:00 3.9 ENE

29-Apr-2012 1:00 4 ENE

29-Apr-2012 2:00 4.1 E

29-Apr-2012 3:00 3.8 ESE

29-Apr-2012 4:00 3.5 N

29-Apr-2012 5:00 3.5 E

29-Apr-2012 6:00 3.4 E

29-Apr-2012 7:00 3.2 SE

29-Apr-2012 8:00 3.7 E

29-Apr-2012 9:00 4.1 E

29-Apr-2012 10:00 4.5 N

29-Apr-2012 11:00 4.4 SE

29-Apr-2012 12:00 4.5 SE

29-Apr-2012 13:00 4.5 SE

29-Apr-2012 14:00 4.4 SE

29-Apr-2012 15:00 4.5 E

29-Apr-2012 16:00 4.3 E

29-Apr-2012 17:00 4.1 E

29-Apr-2012 18:00 3.9 E

29-Apr-2012 19:00 3.8 ESE

29-Apr-2012 20:00 3.7 E

29-Apr-2012 21:00 3.6 ESE

29-Apr-2012 22:00 4.1 E

29-Apr-2012 23:00 3.7 ENE

30-Apr-2012 0:00 4 ENE

30-Apr-2012 1:00 4 SE

30-Apr-2012 2:00 3.7 SE

30-Apr-2012 3:00 2 SE

30-Apr-2012 4:00 2.3 ESE

30-Apr-2012 5:00 2.4 S

Page 89: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX C – WEATHER CONDITIONS DURING THE MONITORING PERIOD II. Mean Wind Speed and Wind Direction

MA0040/Weather Conditions C - 22 Cinotech

30-Apr-2012 6:00 2 SE

30-Apr-2012 7:00 2 WNW

30-Apr-2012 8:00 2.6 WNW

30-Apr-2012 9:00 2.8 SW

30-Apr-2012 10:00 3.1 SSE

30-Apr-2012 11:00 3.4 SSE

30-Apr-2012 12:00 3.5 ESE

30-Apr-2012 13:00 3.4 E

30-Apr-2012 14:00 3.1 ESE

30-Apr-2012 15:00 3.3 SE

30-Apr-2012 16:00 3.1 NE

30-Apr-2012 17:00 2.9 SE

30-Apr-2012 18:00 2.9 ESE

30-Apr-2012 19:00 2.7 E

30-Apr-2012 20:00 2.7 SSW

30-Apr-2012 21:00 2.6 SSW

30-Apr-2012 22:00 2.7 SSW

30-Apr-2012 23:00 2.6 SSE

Page 90: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX D

ENVIRONMENTAL MONITORING

SCHEDULES

Page 91: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

1-Apr 2-Apr 3-Apr 4-Apr 5-Apr 6-Apr 7-Apr

8-Apr 9-Apr 10-Apr 11-Apr 12-Apr 13-Apr 14-Apr

15-Apr 16-Apr 17-Apr 18-Apr 19-Apr 20-Apr 21-Apr

22-Apr 23-Apr 24-Apr 25-Apr 26-Apr 27-Apr 28-Apr

29-Apr 30-Apr

Air Quality Monitoring Station Noise Monitoring Station

AM1(A) - Kai Tak Operational Base M1 - Buddhist Chi King Primary School

AM2 - Lee Kau Yan Memorial School M2 - S.K.H. Kowloon Bay Kei Lok Primary School

AM3(A) - Holy Trinity Bradbury Centre M3 - Rhythm Garden

AM4(A) - EMSD Workshops M4(A) - Kai Tak Operational Base

AM5(A) - Po Leung Kuk Ngan Po Ling College M5 - Lee Kau Yan Memorial School

M6(A) - Kowloon City District Kaifong Association

M7 - Holy Carpenter Primary School

M8 - CCC Kei To Secondary School

M9 - Po Leung Kuk Ngan Po Ling College

24 hr TSP 24 hr TSP

Noise(M1, M2, M6(A), M7 and M8)

Noise (M3, M4(A), M5 and M9)

1 hr TSP X3 1 hr TSP X3

24 hr TSP

Noise(M1, M2, M6(A), M7 and M8)

Noise (M3, M4(A), M5 and M9)

1 hr TSP X3

24 hr TSP

Noise(M1, M2, M6(A), M7 and M8)

Noise (M3, M4(A), M5 and M9)

1 hr TSP X3

24 hr TSP

Noise(M1, M2, M6(A), M7 and M8)

Noise (M3, M4(A), M5 and M9)

1 hr TSP X3 1 hr TSP X3

Contract No. KLN/2010/04

Environmental Monitoring Works at Kai Tak Development Impact Air and Noise Monitoring Schedule for April 2012

Sunday Monday Tuesday Wednesday Thursday Friday Saturday

Page 92: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

1-May 2-May 3-May 4-May 5-May

6-May 7-May 8-May 9-May 10-May 11-May 12-May

13-May 14-May 15-May 16-May 17-May 18-May 19-May

20-May 21-May 22-May 23-May 24-May 25-May 26-May

27-May 28-May 29-May 30-May 31-May

The schedule may be changed due to unforeseen circumstances (adverse weather, etc)

Air Quality Monitoring Station Noise Monitoring Station

AM1(A) - Kai Tak Operational Base M1 - Buddhist Chi King Primary School

AM2 - Lee Kau Yan Memorial School M2 - S.K.H. Kowloon Bay Kei Lok Primary School

AM3(A) - Holy Trinity Bradbury Centre M3 - Rhythm Garden

AM4(A) - EMSD Workshops M4(A) - Kai Tak Operational Base

AM5(A) - Po Leung Kuk Ngan Po Ling College M5 - Lee Kau Yan Memorial School

M6(A) - Kowloon City District Kaifong Association

M7 - Holy Carpenter Primary School

M8 - CCC Kei To Secondary School

M9 - Po Leung Kuk Ngan Po Ling College

Noise(M1, M2, M6(A), M7 and M8)

Noise (M3, M4(A), M5 and M9)

1 hr TSP X3

24 hr TSP 24 hr TSP

Noise(M1, M2, M6(A), M7 and M8)

Noise (M3, M4(A), M5 and M9)

1 hr TSP X3 1 hr TSP X3

24 hr TSP

Noise(M1, M2, M6(A), M7 and M8)

Noise (M3, M4(A), M5 and M9)

1 hr TSP X3

24 hr TSP

Noise(M1, M2, M6(A), M7 and M8)

Noise (M3, M4(A), M5 and M9)

1 hr TSP X3

24 hr TSP

Noise(M1, M2, M6(A), M7 and M8)

Noise (M3, M4(A), M5 and M9)

1 hr TSP X3

Contract No. KLN/2010/04

Environmental Monitoring Works at Kai Tak Development

Tentative Impact Air and Noise Monitoring Schedule for May 2012

Sunday Monday Tuesday Wednesday Thursday Friday Saturday

Page 93: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX E

1-HOUR TSP MONITORING RESULTS

AND GRAPHICAL PRESENTATION

Page 94: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Appendix E - 1-hour TSP Monitoring Results

Location AM1(A) - Kai Tak Operational Base

Date Time Weather Particulate Concentration ( µg/m3)

3-Apr-12 14:00 Sunny 226.6

3-Apr-12 15:00 Sunny 264.6

3-Apr-12 16:00 Sunny 220.9

5-Apr-12 14:00 Cloudy 182.3

5-Apr-12 15:00 Cloudy 193.3

5-Apr-12 16:00 Cloudy 187.6

11-Apr-12 13:30 Sunny 99.9

11-Apr-12 14:30 Sunny 96.2

11-Apr-12 15:30 Sunny 98.8

17-Apr-12 14:00 Cloudy 131.5

17-Apr-12 15:00 Cloudy 142.6

17-Apr-12 16:00 Cloudy 153.7

23-Apr-12 13:40 Cloudy 175.7

23-Apr-12 14:40 Cloudy 165.7

23-Apr-12 15:40 Cloudy 182.3

27-Apr-12 14:10 Cloudy 322.7

27-Apr-12 15:10 Cloudy 310.2

27-Apr-12 16:10 Cloudy 295.3Average 191.7

Maximum 322.7

Minimum 96.2

Location AM2 - Lee Kau Yan Memorial School

Date Time Weather Particulate Concentration ( µg/m3)

3-Apr-12 13:00 Sunny 212.8

3-Apr-12 14:00 Sunny 218.9

3-Apr-12 15:00 Sunny 219.1

5-Apr-12 13:25 Cloudy 189.2

5-Apr-12 14:25 Cloudy 178.4

5-Apr-12 15:25 Cloudy 164.3

11-Apr-12 13:05 Sunny 108.4

11-Apr-12 14:05 Sunny 100.6

11-Apr-12 15:05 Sunny 110.7

17-Apr-12 13:30 Cloudy 124.3

17-Apr-12 14:30 Cloudy 136.8

17-Apr-12 15:30 Cloudy 130.0

23-Apr-12 13:03 Cloudy 161.7

23-Apr-12 14:03 Cloudy 174.3

23-Apr-12 15:03 Cloudy 162.4

27-Apr-12 13:30 Cloudy 336.1

27-Apr-12 14:30 Cloudy 318.9

27-Apr-12 15:30 Cloudy 306.7Average 186.3

Maximum 336.1

Minimum 100.6

MA0040/App E - 1hr TSP Cinotech

Page 95: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Appendix E - 1-hour TSP Monitoring Results

Location AM3(A) - Holy Trinity Bradbury Centre

Date Time Weather Particulate Concentration ( µg/m3)

3-Apr-12 13:03 Sunny 211.7

3-Apr-12 14:03 Sunny 229.7

3-Apr-12 15:03 Sunny 239.0

5-Apr-12 13:00 Cloudy 170.5

5-Apr-12 14:00 Cloudy 154.2

5-Apr-12 15:00 Cloudy 150.4

11-Apr-12 8:39 Sunny 112.5

11-Apr-12 9:39 Sunny 106.5

11-Apr-12 10:39 Sunny 108.8

17-Apr-12 13:00 Cloudy 191.9

17-Apr-12 14:00 Cloudy 181.2

17-Apr-12 15:00 Cloudy 170.8

23-Apr-12 9:00 Cloudy 271.6

23-Apr-12 10:00 Cloudy 283.7

23-Apr-12 11:00 Cloudy 261.6

27-Apr-12 13:00 Cloudy 309.7

27-Apr-12 14:00 Cloudy 287.9

27-Apr-12 15:00 Cloudy 292.4Average 207.5

Maximum 309.7

Minimum 106.5

Location AM4(A) - EMSD Workshops

Date Time Weather Particulate Concentration ( µg/m3)

3-Apr-12 9:00 Sunny 200.1

3-Apr-12 10:00 Sunny 255.5

3-Apr-12 11:00 Sunny 212.4

5-Apr-12 8:50 Cloudy 221.1

5-Apr-12 9:50 Cloudy 199.7

5-Apr-12 10:50 Cloudy 194.3

11-Apr-12 9:00 Sunny 108.4

11-Apr-12 10:00 Sunny 113.6

11-Apr-12 11:00 Sunny 109.2

17-Apr-12 8:45 Cloudy 156.4

17-Apr-12 9:45 Cloudy 172.8

17-Apr-12 10:45 Cloudy 158.5

23-Apr-12 8:45 Cloudy 270.6

23-Apr-12 9:45 Cloudy 263.9

23-Apr-12 10:45 Cloudy 274.9

27-Apr-12 8:45 Cloudy 303.7

27-Apr-12 9:45 Cloudy 299.3

27-Apr-12 10:45 Cloudy 312.7Average 212.6

Maximum 312.7

Minimum 108.4

MA0040/App E - 1hr TSP Cinotech

Page 96: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Appendix E - 1-hour TSP Monitoring Results

Location AM5(A) - Po Leung Kuk Ngan Po Ling College

Date Time Weather Particulate Concentration ( µg/m3)

3-Apr-12 8:47 Sunny 194.7

3-Apr-12 9:47 Sunny 184.5

3-Apr-12 10:47 Sunny 187.7

5-Apr-12 9:05 Cloudy 159.3

5-Apr-12 10:05 Cloudy 155.1

5-Apr-12 11:05 Cloudy 152.4

11-Apr-12 8:45 Sunny 92.3

11-Apr-12 9:45 Sunny 92.4

11-Apr-12 10:45 Sunny 95.9

17-Apr-12 9:00 Cloudy 139.8

17-Apr-12 10:00 Cloudy 156.4

17-Apr-12 11:00 Cloudy 147.5

23-Apr-12 9:00 Cloudy 151.7

23-Apr-12 10:00 Cloudy 164.3

23-Apr-12 11:00 Cloudy 152.4

27-Apr-12 9:00 Cloudy 207.4

27-Apr-12 10:00 Cloudy 211.5

27-Apr-12 11:00 Cloudy 208.3Average 158.5

Maximum 211.5

Minimum 92.3

MA0040/App E - 1hr TSP Cinotech

Page 97: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

1-hr TSP Concentration Levels

0

100

200

300

400

500

600

Co

nc

en

tra

tio

n, µ

g/m

3

Date

AM1(A) - Kai Tak Operational Base1-hour TSP

Action Level: 342 µg/m3

Limit Level: 500 µg/m3

300

400

500

600

Co

nc

en

tra

tio

n, µ

g/m

3

AM2 - Lee Kau Yan Memorial School1-hour TSP

Action Level: 346 µg/m3

Limit Level: 500 µg/m3

Title Scale Project

N.T.S No. MA0040

Date Appendix

Contract No. KLN/2010/04Environmental Monitoring Works for Kai Tak

DevelopmentGraphical Presentation of 1-hour TSP Monitoring Results

0

100

200

Co

nc

en

tra

tio

n, µ

g/m

Date

0

100

200

300

400

500

600

Co

nc

en

tra

tio

n, µ

g/m

3

Date

AM3(A) - Holy Trinity Bradbury Centre1-hour TSP

Action Level: 351 µg/m3

Limit Level: 500 µg/m3

Date Appendix

Apr 12 EGraphical Presentation of 1-hour TSP Monitoring Results

Page 98: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

1-hr TSP Concentration Levels

300

400

500

600

Co

nc

en

tra

tio

n, µ

g/m

3

AM5(A) - Po Leung Kuk Ngan Po Ling College1-hour TSP

Action Level: 345 µg/m3

Limit Level: 500 µg/m3

0

100

200

300

400

500

600

Co

nc

en

tra

tio

n, µ

g/m

3

Date

AM4(A) - EMSD Workshops1-hour TSP

Action Level: 371 µg/m3

Limit Level: 500 µg/m3

Title Scale Project

N.T.S No. MA0040

Date Appendix

Contract No. KLN/2010/04Environmental Monitoring Works for Kai Tak

DevelopmentGraphical Presentation of 1-hour TSP Monitoring Results

0

100

200

Co

nc

en

tra

tio

n, µ

g/m

Date

Date Appendix

Apr 12 EGraphical Presentation of 1-hour TSP Monitoring Results

Page 99: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX F

24-HOUR TSP MONITORING RESULTS

AND GRAPHICAL PRESENTATION

Page 100: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Appendix F - 24-hour TSP Monitoring Results

Location AM1(A) - Kai Tak Operational Base

Weather Air Atmospheric Filter Weight (g) Particulate Elapse Time Sampling Flow Rate (m3/min.) Av. flow Total vol. Conc.Condition Temp. (K) Pressure, Pa (mmHg) Initial Final weight (g) Initial Final Time(hrs.) Initial Final (m3/min) (m3) (µg/m3)

5-Apr-12 Cloudy 294.1 763.9 3.2671 3.4002 0.1331 2377.0 2401.0 24.0 1.22 1.22 1.22 1757.7 75.711-Apr-12 Sunny 297.3 763.0 3.1112 3.2425 0.1313 2401.0 2425.0 24.0 1.21 1.21 1.21 1747.2 75.117-Apr-12 Cloudy 293.4 761.1 3.1277 3.2129 0.0852 2425.0 2449.0 24.0 1.22 1.22 1.22 1756.4 48.523-Apr-12 Cloudy 297.1 760.4 3.2639 3.3448 0.0809 2449.0 2473.0 24.0 1.21 1.21 1.21 1744.9 46.427-Apr-12 Cloudy 295.2 761.0 3.0790 3.1975 0.1185 2473.0 2497.0 24.0 1.22 1.22 1.22 1751.1 67.7

Min 46.4Max 75.7

Average 62.7

Location AM2 - Lee Kau Yan Memorial School

Weather Air Atmospheric Filter Weight (g) Particulate Elapse Time Sampling Flow Rate (m3/min.) Av. flow Total vol. Conc.Condition Temp. (K) Pressure, Pa (mmHg) Initial Final weight (g) Initial Final Time(hrs.) Initial Final (m3/min) (m3) (µg/m3)

5-Apr-12 Cloudy 294.1 763.9 3.2241 3.4204 0.1963 2281.0 2305.0 24.0 1.21 1.21 1.21 1742.5 112.711-Apr-12 Sunny 297.3 763.0 3.0683 3.2608 0.1925 2305.0 2329.0 24.0 1.20 1.20 1.20 1732.8 111.117-Apr-12 Cloudy 293.4 761.1 3.1221 3.2251 0.1030 2329.0 2353.0 24.0 1.21 1.21 1.21 1741.3 59.223-Apr-12 Cloudy 297.1 760.4 3.2617 3.3882 0.1265 2353.0 2377.0 24.0 1.20 1.20 1.20 1730.8 73.127-Apr-12 Cloudy 295.2 761.0 3.0861 3.2241 0.1380 2377.0 2401.0 24.0 1.21 1.21 1.21 1736.4 79.5

Min 59.2Max 112.7

Average 87.1

Location AM3(A) - Holy Trinity Bradbury Centre

Weather Air Atmospheric Filter Weight (g) Particulate Elapse Time Sampling Flow Rate (m3/min.) Av. flow Total vol. Conc.Condition Temp. (K) Pressure, Pa (mmHg) Initial Final weight (g) Initial Final Time(hrs.) Initial Final (m3/min) (m3) (µg/m3)

5-Apr-12 Cloudy 294.1 763.9 3.2798 3.4182 0.1384 5016.2 5040.2 24.0 1.22 1.22 1.22 1750.9 79.011-Apr-12 Sunny 297.3 763.0 3.0703 3.2126 0.1423 5040.2 5064.2 24.0 1.21 1.21 1.21 1741.4 81.717-Apr-12 Cloudy 293.4 761.1 3.1177 3.2209 0.1032 5064.2 5088.2 24.0 1.22 1.21 1.22 1749.7 59.023-Apr-12 Cloudy 297.1 760.4 3.2454 3.3582 0.1128 5088.2 5112.2 24.0 1.21 1.21 1.21 1739.4 64.927-Apr-12 Cloudy 295.2 761.0 3.1020 3.2176 0.1156 5112.2 5136.2 24.0 1.21 1.21 1.21 1744.9 66.2

Min 59.0Max 81.7

Average 70.2

Start Date

Start Date

Start Date

MA0040/App F - 24hr TSP Cinotech

Page 101: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Appendix F - 24-hour TSP Monitoring Results

Location AM4(A) - EMSD Workshops

Weather Air Atmospheric Filter Weight (g) Particulate Elapse Time Sampling Flow Rate (m3/min.) Av. flow Total vol. Conc.Condition Temp. (K) Pressure, Pa (mmHg) Initial Final weight (g) Initial Final Time(hrs.) Initial Final (m3/min) (m3) (µg/m3)

5-Apr-12 Cloudy 294.1 763.9 3.2820 3.4032 0.1212 2016.0 2040.0 24.0 1.22 1.21 1.21 1749.2 69.311-Apr-12 Sunny 297.3 763.0 3.0722 3.1990 0.1268 2040.0 2064.0 24.0 1.21 1.21 1.21 1739.7 72.917-Apr-12 Cloudy 293.4 761.1 3.1232 3.1945 0.0713 2064.0 2088.0 24.0 1.21 1.21 1.21 1748.0 40.823-Apr-12 Cloudy 297.1 760.4 3.2461 3.3184 0.0723 2088.0 2112.0 24.0 1.21 1.21 1.21 1737.6 41.627-Apr-12 Cloudy 295.2 761.0 3.2392 3.3237 0.0845 2112.0 2136.0 24.0 1.21 1.21 1.21 1743.2 48.5

Min 40.8Max 72.9

Average 54.6

Location AM5(A) - Po Leung Kuk Ngan Po Ling College

Weather Air Atmospheric Filter Weight (g) Particulate Elapse Time Sampling Flow Rate (m3/min.) Av. flow Total vol. Conc.Condition Temp. (K) Pressure, Pa (mmHg) Initial Final weight (g) Initial Final Time(hrs.) Initial Final (m3/min) (m3) (µg/m3)

5-Apr-12 Cloudy 294.1 763.9 3.2873 3.4065 0.1192 2353.0 2377.0 24.0 1.22 1.22 1.22 1752.0 68.011-Apr-12 Sunny 297.3 763.0 3.0743 3.2214 0.1471 2377.0 2401.0 24.0 1.21 1.21 1.21 1742.0 84.417-Apr-12 Cloudy 293.4 761.1 3.1112 3.1805 0.0693 2401.0 2425.0 24.0 1.22 1.22 1.22 1750.8 39.623-Apr-12 Cloudy 297.1 760.4 3.2623 3.3387 0.0764 2425.0 2449.0 24.0 1.21 1.21 1.21 1739.9 43.927-Apr-12 Cloudy 295.2 761.0 3.1165 3.2004 0.0839 2449.0 2473.0 24.0 1.21 1.21 1.21 1745.7 48.1

Min 39.6Max 84.4

Average 56.8

Start Date

Start Date

MA0040/App F - 24hr TSP Cinotech

Page 102: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

24-hr TSP Concentration Levels

0

50

100

150

200

250

300

Con

cent

ratio

n, µ

g/m

3

Date

AM1(A) - Kai Tak Operational Base24-hour TSP

Action Level: 159 µg/m3

Limit Level: 260 µg/m3

150

200

250

300

trat

ion,

µg/

m3

AM2 - Lee Kau Yan Memorial School24-hour TSP

Action Level: 157 µg/m3

Limit Level: 260 µg/m3

Title Scale ProjectN.T.S No. MA0040

Date Appendix

Contract No. KLN/2010/04Environmental Monitoring Works for Kai Tak

0

50

100

Con

cen

Date

0

50

100

150

200

250

300

Con

cent

ratio

n, µ

g/m

3

Date

AM3(A) - Holy Trinity Bradbury Centre24-hour TSP

Action Level: 167 µg/m3

Limit Level: 260 µg/m3

Date AppendixApr 12 FGraphical Presentation of 24-hour TSP Monitoring Results

Page 103: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

24-hr TSP Concentration Levels

0

50

100

150

200

250

300

Con

cent

ratio

n, µ

g/m

3

Date

AM4(A) - EMSD Workshops24-hour TSP

Action Level: 187 µg/m3

Limit Level: 260 µg/m3

150

200

250

300

trat

ion,

µg/

m3

AM5(A) - Po Leung Kuk Ngan Po Ling College24-hour TSP

Action Level: 156 µg/m3

Limit Level: 260 µg/m3

Title Scale ProjectN.T.S No. MA0040

Date Appendix

Contract No. KLN/2010/04Environmental Monitoring Works for Kai Tak

0

50

100

Con

cent

Date

Date AppendixApr 12 FGraphical Presentation of 24-hour TSP Monitoring Results

Page 104: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX G

NOISE MONITORING RESULTS AND

GRAPHICAL PRESENTATION

Page 105: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Appendix G - Noise Monitoring Results

Baseline Level Construction Noise LevelL eq L10 L 90 L eq L eq

2-Apr-12 9:10 Sunny 64.9 66.5 60.4 55.312-Apr-12 13:30 Sunny 63.1 64.3 62.1 63.1 Measured ≦ Baseline19-Apr-12 9:15 Cloudy 65.8 67.1 60.9 60.226-Apr-12 11:05 Sunny 64.1 68.8 62.0 64.1 Measured ≦ Baseline

Baseline Level Construction Noise LevelL eq L10 L 90 L eq L eq

2-Apr-12 10:00 Sunny 64.2 65.9 59.8 61.112-Apr-12 14:15 Sunny 64.5 65.7 62.7 61.719-Apr-12 10:05 Cloudy 66.3 68.1 62.0 64.626-Apr-12 11:00 Sunny 62.4 64.4 60.0 55.9

L eq L10 L 90

3-Apr-12 14:40 Sunny 72.1 75.8 70.011-Apr-12 14:30 Sunny 74.1 75.2 73.417-Apr-12 14:20 Cloudy 73.9 76.4 72.023-Apr-12 14:37 Cloudy 73.2 74.8 71.9

Baseline Level Construction Noise LevelL eq L10 L 90 L eq L eq

3-Apr-12 14:40 Sunny 63.5 63.7 59.5 63.5 Measured ≦ Baseline11-Apr-12 14:30 Sunny 62.7 63.6 61.1 62.7 Measured ≦ Baseline17-Apr-12 14:20 Cloudy 68.3 71.4 64.8 64.723-Apr-12 14:00 Cloudy 69.1 72.2 63.5 66.4

Baseline Level Construction Noise LevelL eq L10 L 90 L eq L eq

3-Apr-12 13:00 Sunny 71.8 72.8 69.8 71.8 Measured ≦ Baseline11-Apr-12 13:00 Sunny 68.3 68.7 65.2 68.3 Measured ≦ Baseline17-Apr-12 16:00 Cloudy 73.2 74.7 68.7 73.2 Measured ≦ Baseline23-Apr-12 13:17 Cloudy 73.6 74.9 70.4 73.6 Measured ≦ Baseline

Baseline Level Construction Noise LevelL eq L10 L 90 L eq L eq

2-Apr-12 13:00 Sunny 70.2 73.2 66.4 70.2 Measured ≦ Baseline12-Apr-12 15:30 Sunny 69.7 71.8 63.6 69.7 Measured ≦ Baseline19-Apr-12 11:30 Cloudy 71.7 73.5 66.8 65.526-Apr-12 10:08 Sunny 73.6 74.8 71.1 70.7

70.5

76.7

Location M6(A) - Kowloon City District Kaifong Association

Date Time WeatherUnit: dB (A) (30-min)

Measured Noise Level

65.8

Location M5 - Lee Kau Yan Memorial School

Date Time WeatherUnit: dB (A) (30-min)

Measured Noise Level

71.573.872.571.1

Location M4(A) - Kai Tak Operational Base

Date Time WeatherUnit: dB (A) (30-min)

Measured Noise Level

61.3

Location M3 - Rhythm Garden

Date Time WeatherUnit: dB (A) (30-min)

Measured Noise Level Background Noise Level during Noise MeasurementL eq

64.4

Location M2 - S.K.H. Kowloon Bay Kei Lok Primary School

Date Time WeatherUnit: dB (A) (30-min)

Measured Noise Level

Location M1 - Buddhist Chi King Primary School

Date Time WeatherUnit: dB (A) (30-min)

Measured Noise Level

MA0040/App G - Noise Cinotech

Page 106: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Appendix G - Noise Monitoring Results

Baseline Level Construction Noise LevelL eq L10 L 90 L eq L eq

2-Apr-12 13:50 Sunny 64.0 66.7 59.3 47.612-Apr-12 9:30 Sunny 66.8 68.4 64.9 63.719-Apr-12 13:00 Cloudy 66.4 68.8 62.7 62.826-Apr-12 9:20 Sunny 56.3 58.3 53.6 56.3 Measured ≦ Baseline

Location M8 - CCC Kei To Secondary School

Baseline Level Construction Noise LevelL eq L10 L 90 L eq L eq

2-Apr-12 16:25 Sunny 63.1 65.3 59.5 63.1 Measured ≦ Baseline12-Apr-12 10:25 Sunny 65.6 66.9 63.1 65.6 Measured ≦ Baseline19-Apr-12 14:00 Cloudy 67.0 68.1 64.2 67.0 Measured ≦ Baseline26-Apr-12 9:00 Sunny 68.0 71.4 63.5 68.0 Measured ≦ Baseline

Location M9 - Po Leung Kuk Ngan Po Ling College

Baseline Level Construction Noise LevelL eq L10 L 90 L eq L eq

3-Apr-12 9:00 Sunny 58.2 59.8 55.9 58.2 Measured ≦ Baseline11-Apr-12 9:30 Sunny 65.0 66.8 60.2 62.117-Apr-12 9:10 Cloudy 64.2 65.8 59.4 60.323-Apr-12 9:15 Cloudy 63.9 66.3 60.2 59.6

61.9

68.7

Date Time WeatherUnit: dB (A) (30-min)

Measured Noise Level

63.9

Date Time WeatherUnit: dB (A) (30-min)

Measured Noise Level

Location M7 - Holy Carpenter Primary School

Date Time WeatherUnit: dB (A) (30-min)

Measured Noise Level

MA0040/App G - Noise Cinotech

Page 107: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Noise Levels

30.0

40.0

50.0

60.0

70.0

80.0

Con

stru

ctio

n N

oise

Lev

el d

B(A

)

Date

M1 - Buddhist Chi King Primary School M1

Baseline NL, 64.4 dB(A)

Limit Level, 70 dB(A)

30 0

40.0

50.0

60.0

70.0

80.0

Con

stru

ctio

n N

oise

Lev

el d

B(A

)

M2 - S.K.H. Kowloon Bay Kei Lok Primary School M2

Baseline NL, 61.3 dB(A)

Limit Level, 70 dB(A)

Title Scale Project

N.T.S No. MA0040Date Appendix

Apr 12 G

Remarks: M1 and M2: The construction noise levels in the Tables in Appendix G were adopted for plotting the graphs M3: The measured noise levels in the Table in Appendix G were adopted for plotting the graphs

Contract No. KLN/2010/04Environmental Monitoring Works for Kai Tak Development

Graphical Presentation of Construction Noise MonitoringResults

30.0C

Date

30.0

40.0

50.0

60.0

70.0

80.0

Mea

sure

d N

oise

Lev

el d

B(A

)

Date

M3 - Rhythm GardenM3

Limit Level, 75 dB(A)

Page 108: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Noise Levels

40.0

50.0

60.0

70.0

80.0

Con

stru

ctio

n N

oise

Lev

el d

B(A

)

M5 - Lee Kau Yan Memorial School M5

Baseline NL, 76.7 dB(A)

Limit Level, 70 dB(A)

30.0

40.0

50.0

60.0

70.0

80.0

Con

stru

ctio

n N

oise

Lev

el d

B(A

)

Date

M4(A) - Kai Tak Operational Base M4(A)

Baseline NL, 65.8 dB(A)

Limit Level, 75 dB(A)

Remarks: The construction noise levels in the Tables in Appendix G were adopted for plotting the graphs

Title Scale Project

N.T.S No. MA0040Date Appendix

Apr 12 G

Contract No. KLN/2010/04Environmental Monitoring Works for Kai Tak Development

Graphical Presentation of Construction Noise MonitoringResults

30.0

40.0

50.0

60.0

70.0

80.0

Con

stru

ctio

n N

oise

Lev

el d

B(A

)

Date

M6(A) - Kowloon City District Kaifong Association M6(A)

Baseline NL, 70.5 dB(A)

Limit Level, 75 dB(A)

30.0C

Date

Page 109: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Noise Levels

30 0

40.0

50.0

60.0

70.0

80.0

onst

ruct

ion

Noi

se L

evel

dB

(A)

M8 - CCC Kei To Secondary School M8

Baseline NL, 68.7 dB(A)

Limit Level, 70 dB(A)

30.0

40.0

50.0

60.0

70.0

80.0

Con

stru

ctio

n N

oise

Lev

el d

B(A

)

Date

M7 - Holy Carpenter Primary School M7

Baseline NL, 63.9 dB(A)

Limit Level, 70 dB(A)

Remarks: The construction noise levels in the Tables in Appendix G were adopted for plotting the graphs

Title Scale Project

N.T.S No. MA0040Date Appendix

Apr 12 G

Contract No. KLN/2010/04Environmental Monitoring Works for Kai Tak Development

Graphical Presentation of Construction Noise MonitoringResults

30.0

40.0

50.0

60.0

70.0

80.0

Con

stru

ctio

n N

oise

Lev

el d

B(A

)

Date

M9 - Po Leung Kuk Ngan Po Ling College M9

Baseline NL, 61.9 dB(A)

Limit Level, 70 dB(A)

30.0C

Date

Page 110: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX H

SUMMARY OF EXCEEDANCE

Page 111: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Appendix H – Summary of Exceedance

MA0040\Exceedance\App H - Exceedance 1204 1

Exceedance Report for Contract No. KLN/2010/04

(A) Exceedance Report for Air Quality

(NIL in the reporting month)

(B) Exceedance Report for Construction Noise

(NIL in the reporting month)

(C) Exceedance Report for Landscape and Visual

(NIL in the reporting month)

Page 112: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX I

SITE AUDIT SUMMARY

Page 113: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Appendix I - Summary of Site Audit

Date Contract No. Observation Follow-up

13/4/2012 DC/2009/21 Stockpiles were not covered properly during rainy seasonRectification/improvement was observed during the

site inspection on 20 April 2012

27/4/2012 8/WSD/08 Chemical leakage is observed from the excavator. Rectification/improvement was observed during the

site inspection on 4 May 2012

DateSTT No./TGLA No./Unoccupied Area (Lands

Department)Observation Follow-up

3/4/2012 Dust generation from loading/unloading works

13/4/2012 Dust generation from loading/unloading works

20/4/2012 Dust generation from loading/unloading works

27/4/2012 Dust generation from loading/unloading works

As indicated in the Location Plan below.Follow-up action was needed for the item in the next

audit session

App I -1

Page 114: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX J

EVENT ACTION PLANS

Page 115: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Appendix J - Event Action Plans

J-1

Event/Action Plan for Air Quality

EVENT ACTION

ET IEC ER CONTRACTOR

Action Level being

exceeded by

one sampling

1. Identify source and investigate the

causes of exceedance;

2. Inform Contactor, IEC and ER;

3. Repeat measurement to confirm finding.

1. Check monitoring data submitted

by ET;

2. Check Contractor’s working

method.

1. Notify Contractor. 1. Rectify any unacceptable practice;

2. Amend working methods if

appropriate.

Action Level being

exceeded by

two or more

consecutive

sampling

1. Identify source and investigate the

causes of exceedance;

2. Inform Contractor, IEC and ER;

3. Increase monitoring frequency to daily;

4. Discuss with IEC and Contractor on

remedial actions required;

5. Assess the effectiveness of

Contractor’s remedial actions;

6. If exceedance continues, arrange

meeting with IEC and ER;

7. If exceedance stops, cease additional

monitoring.

1. Check monitoring data submitted

by ET;

2. Check Contractor’s working

method;

3. Discuss with ET and Contractor on

possible remedial measures;

4. Advise the ER on the effectiveness

of the proposed remedial measures.

1. Confirm receipt of notification

of exceedance in writing;

2. Notify Contractor;

3. In consolidation with the IEC,

agree with the Contractor on the

remedial measures to be

implemented;

4. Supervise implementation of

remedial measures;

5. Conduct meeting with ET and

IEC if exceedance continues.

1. Discuss with ET and IEC on proper

remedial actions;

2. Submit proposals for remedial

actions to ER and IEC within three

working days of notification;

3. Implement the agreed proposals;

4. Amend proposal if appropriate.

Limit Level being

exceeded by

one sampling

1. Identify source and investigate the

causes of exceedance;

2. Inform Contractor, IEC, ER, and EPD;

3. Repeat measurement to confirm finding;

4. Assess effectiveness of

Contractor’s remedial actions and keep

1. Check monitoring data submitted

by ET;

2. Check Contractor’s working

method;

3. Discuss with ET and Contractor on

possible remedial measures;

1. Confirm receipt of notification

of exceedance in writing;

2. Notify Contractor;

3. In consolidation with the IEC,

agree with the Contractor on the

remedial measures to be

1. Take immediate action to avoid

further exceedance;

2. Discuss with ET and IEC on proper

remedial actions;

3. Submit proposals for remedial

actions to ER and IEC within three

Page 116: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Appendix J - Event Action Plans

J-2

EPD, IEC and ER informed of

the results.

4. Advise the ER on the

effectiveness of the proposed

remedial measures.

implemented;

4. Supervise implementation of

remedial measures;

5. Conduct meeting with ET and

IEC if exceedance continues.

working days of notification;

4. Implement the agreed proposals.

Limit Level being

exceeded by

two or more

consecutive

sampling

1. Notify IEC, ER, Contractor and

EPD;

2. Repeat measurement to confirm

findings;

3. Carry out analysis of Contractor’s

working procedures to identify source and

investigate the causes of exceedance;

4. Increase monitoring frequency to

daily;

5. Arrange meeting with IEC, ER

and Contractor to discuss the

remedial actions to be taken;

6. Assess effectiveness of

Contractor’s remedial actions and

keep EPD, IEC and ER informed

of the results;

7. If exceedance stops, cease additional

monitoring.

1. Check monitoring data submitted

by ET;

2. Check Contractor’s working

method;

3. Discuss amongst ER, ET, and

Contractor on the potential remedial

actions;

4. Review Contractor’s remedial

actions whenever necessary to

assure their effectiveness and

advise the ER accordingly.

1. Confirm receipt of notification

of exceedance in writing;

2. Notify Contractor;

3. In consolidation with the IEC,

agree with the Contractor on the

remedial measures to be

implemented;

4. Supervise implementation of

remedial measures;

5. If exceedance continues,

consider stopping the Contractor

to continue working on that

portion of work which causes the

exceedance until the

exceedance is abated.

1. Take immediate action to avoid

further exceedance;

2. Discuss with ET, ER and IEC on

proper remedial actions;

3. Submit proposals for remedial

actions to IEC within three working

days of notification;

4. Implement the agreed proposals;

5. Submit further remedial actions if

problem still not under control;

6. Stop the relevant portion of works

as instructed by the ER until the

exceedance is abated.

Page 117: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Appendix J - Event Action Plans

J-3

Event/Action Plan for Construction Noise

EVENT ACTION

ET IEC ER CONTRACTOR

Action Level

being

exceeded

1. Notify ER, IEC and Contractor;

2. Carry out investigation;

3. Report the results of investigation

to the IEC, ER and Contractor;

4. Discuss with the IEC and

Contractor on remedial measures

required;

5. Increase monitoring frequency to

check mitigation effectiveness.

(The above actions should be taken

within 2 working days after the

exceedance is identified)

1. Review the investigation

results submitted by the ET;

2. Review the proposed remedial

measures by the Contractor and

advise the ER accordingly;

3. Advise the ER on the

effectiveness of the proposed

remedial measures.

(The above actions should be

taken within 2 working days after

the exceedance is identified)

1. Confirm receipt of

notification of failure in

writing;

2. Notify Contractor;

3. In consolidation with the

IEC, agree with the

Contractor on the remedial

measures to be implemented;

4. Supervise the

implementation of remedial

measures.

(The above actions should be

taken within 2 working days

after the exceedance is

identified)

1. Submit noise mitigation

proposals to IEC and ER;

2. Implement noise mitigation

proposals.

(The above actions should be

taken within 2 working days after

the exceedance is identified)

Limit Level

being

exceeded

1. Inform IEC, ER, Contractor and

EPD;

2. Repeat measurements to confirm

findings;

3. Increase monitoring frequency;

4. Identify source and investigate the

cause of exceedance;

1. Discuss amongst ER, ET, and

Contractor on the potential

remedial actions;

2. Review Contractor’s remedial

actions whenever necessary to

assure their effectiveness and

advise the ER accordingly.

1. Confirm receipt of

notification of failure in

writing;

2. Notify Contractor;

3. In consolidation with the

IEC, agree with the

Contractor on the remedial

1. Take immediate action to

avoid further exceedance;

2. Submit proposals for remedial

actions to IEC and ER within 3

working days of notification;

3. Implement the agreed

proposals;

Page 118: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Appendix J - Event Action Plans

J-4

5. Carry out analysis of Contractor’s

working procedures;

6. Discuss with the IEC, Contractor

and ER on remedial measures

required;

7. Assess effectiveness of

Contractor’s remedial actions and

keep IEC, EPD and ER informed of

the results;

8. If exceedance stops, cease

additional monitoring.

(The above actions should be taken

within 2 working days after the

exceedance is identified)

(The above actions should be

taken within 2 working days after

the exceedance is identified)

measures to be implemented;

4. Supervise the

implementation of remedial

measures;

5. If exceedance continues,

consider stopping the

Contractor to continue

working on that portion of

work which causes the

exceedance until the

exceedance is abated.

(The above actions should be

taken within 2 working days

after the exceedance is

identified)

4. Submit further proposal if

problem still not under control;

5. Stop the relevant portion of

works as instructed by the ER

until the exceedance is abated.

(The above actions should be

taken within 2 working days after

the exceedance is identified)

Page 119: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Appendix J - Event Action Plans

J-5

Event/Action Plan for Landscape and Visual

EVENT

ACTION

LEVEL

ACTION

ET

IEC

ER

CONTRACTOR

Design Check 1. Check final

design conforms to

the requirements

of EP and prepare

report.

1. Check report.

2. Recommend

remedial design if

necessary

1. Undertake remedial design if necessary

Non-conformity on one occasion 1. Identify Source

2. Inform IEC and

ER

3. Discuss remedial

actions with IEC,

ER and Contractor

4. Monitor remedial

actions until

rectification has

been completed

1. Check report

2. Check Contractor's

working method

3. Discuss with ET and

Contractor on possible

remedial measures

4. Advise ER on

effectiveness of

proposed remedial

measures.

5. Check implementation

of remedial measures.

1. Notify Contractor

2. Ensure remedial measures are properly

implemented

1. Amend working methods

2. Rectify damage and

undertake any necessary

replacement

Repeated Non-conformity 1. Identify Source

Inform IEC and

1. Check monitoring

report

1. Notify Contractor

2. Ensure remedial measures are properly

1. Amend working methods

2. Rectify damage and

Page 120: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Appendix J - Event Action Plans

J-6

ER

2. Increase

monitoring

frequency

3. Discuss remedial

actions with IEC,

ER and Contractor

4. Monitor remedial

actions until

rectification has

been completed

5. If non-conformity

stops, cease

additional

monitoring

2. Check Contractor's

working method

3. Discuss with ET and

Contractor on possible

remedial measures

4. Advise ER on

effectiveness of

proposed remedial

measures

5. Supervise

implementation of

remedial measures.

implemented undertake any necessary

replacement

Page 121: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX K

ENVIRONMENTAL MITIGATION

IMPLEMENTATION SCHEDULE (EMIS)

Page 122: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

K-1

Appendix K - Summary of Implementation Schedule of Mitigation Measures for Construction Phase

Types of Impacts Mitigation Measures

Status

Construction Dust

*

*

*

^

*

*

^

^

Page 123: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

K-2

^

^

^

^

N/A

Page 124: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

K-3

N/A

N/A

Page 125: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

K-4

^

N/A

^

Page 126: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

K-5

Construction Noise

^

^

N/A(1)

^

^

^

^

^

N/A

N/A

Page 127: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

K-6

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Page 128: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

K-7

N/A

N/A

N/A

N/A

N/A

Page 129: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

K-8

Construction Water

Quality

N/A

N/A

N/A

N/A

^

Page 130: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

K-9

*

^

^

N/A (1)

^

Page 131: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

K-10

^

^

^

Page 132: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

K-11

^

^

^

^

Page 133: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

K-12

^

^

^

^

Page 134: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

K-13

^

^

^

^

Page 135: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

K-14

^

^

^

^

*

*

^

Page 136: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

K-15

^

^

^

^

^

^

^

Page 137: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

K-16

^

^

^

^

^

Page 138: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

K-17

^

^

^

^

^

^

Page 139: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

K-18

^

Page 140: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

K-19

^

^

^

Page 141: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

K-20

^

*

*

^

^

^

*

*

Page 142: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

K-21

^

*

^

Page 143: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

K-22

Landscape and Visual

^

^

N/A(1)

^

Remarks:

^ Compliance of mitigation measure;

X Non-compliance of mitigation measure;

N/A Not Applicable at this stage;

N/A(1) Not observed; • Non-compliance but rectified by the contractor;

* Recommendation was made during site audit

but improved/rectified by the contractor.

Page 144: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX L

SUMMARIES OF ENVIRONMENTAL

COMPLAINT, WARNING, SUMMON

AND NOTIFICATION OF SUCCESSFUL

PROSECUTION

Page 145: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Appendix L – Summary of environmental complaint, warning, summon and notification of

successful prosecution

MA0040\App L 1

Reporting Month: April 2012

Contract No. KLN/2010/04

Log

Ref. Location

Received

Date

Details of

Complaint/warning/summon

and prosecution

Investigation/Mitigation

Action Status

N/A N/A N/A N/A N/A N/A

Remarks: No environmental complaint/warning/summon and prosecution were received in the reporting period.

Works Contract within KTD

KDO, CEDD projects

Contract No. Record of Complaint

(Yes/No)

Record of Warning

(Yes/No)

Notification of Summons and

Successful

Prosecutions(Yes/No)

KL/2009/01 No No No

KL/2008/09 No No No

KL/2008/07 No No No

KL/2010/02 No No No

KL/2010/03 No No No

CEO, CEDD project

Contract No. Record of Complaint

(Yes/No)

Record of Warning

(Yes/No)

Notification of Summons and

Successful

Prosecutions(Yes/No)

CV/2007/03 No No No

DSD project

Contract No. Record of Complaint

(Yes/No)

Record of Warning

(Yes/No)

Notification of Summons and

Successful

Prosecutions(Yes/No)

DC/2008/12 No No No

DC/2010/03 No No No

DC/2009/21 No No No

DC/2011/04 No No No

HD projects

Contract No. Record of Complaint

(Yes/No)

Record of Warning

(Yes/No)

Notification of Summons and

Successful Prosecutions

(Yes/No)

20090097 No No No

20090006 No No No

Page 146: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Appendix L – Summary of environmental complaint, warning, summon and notification of

successful prosecution

MA0040\App L 2

WSD project

Contract No. Record of Complaint

(Yes/No)

Record of Warning

(Yes/No)

Notification of Summons and

Successful Prosecutions

(Yes/No)

3/WSD/08 No No No

6/WSD/08 No No No

7/WSD/08 No No No

8/WSD/08 No No No

ArchSD project

Contract No. Record of Complaint

(Yes/No)

Record of Warning

(Yes/No)

Notification of Summons and

Successful Prosecutions

(Yes/No)

SS W 303 No information provided by the Contract

SS W 304 No No No

CLP projects

Contract No. Record of Complaint

(Yes/No)

Record of Warning

(Yes/No)

Notification of Summons and

Successful Prosecutions

(Yes/No)

Kai Tak Cruise

Terminal Cable

Tunnel

No No No

Eastern Road

Substation

No No No

CLPP (132kV

cable installation)

No No No

EMSD projects

Contract No. Record of Complaint

(Yes/No)

Record of Warning

(Yes/No)

Notification of Summons and

Successful Prosecutions

(Yes/No)

1016EM10 No No No

1017EM10 No No No

1049EM10 No No No

1050EM10 No No No

1140EM11M No No No

Page 147: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

APPENDIX M

WASTE GENERATED QUANTITY

Page 148: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Appendix M – Summary of Waste Generation and Disposal Records

MA0040\App M - Summary of Waste Records 1

KDO, CEDD projects

Contract No. Overloading record in the reporting month

(Yes/No)

Waste flow table/Disposal Records

Yes(as attached)/No

KL/2009/01 No Yes

KL/2008/09 No Yes

KL/2008/07 No Yes

KL/2010/02 No Yes

KL/2010/03 No No

CEO, CEDD project

Contract No. Overloading record in the reporting month

(Yes/No)

Waste flow table/Disposal Records

Yes(as attached)/No

CV/2007/03 No No

DSD project

Contract No. Overloading record in the reporting month

(Yes/No)

Waste flow table/Disposal Records

Yes(as attached)/No

DC/2008/12 No Yes

DC/2010/03 Yes (4 loads inert material to TKO137

overloaded not exceeding 105%)

Yes

DC/2009/21 Yes (4 overloaded records) Yes

DC/2011/04 No Yes

HD projects

Contract No. Overloading record in the reporting month

(Yes/No)

Waste flow table/Disposal Records

Yes(as attached)/No

20090097 No No

20090006 No Yes

WSD project

Contract No. Overloading record in the reporting month

(Yes/No)

Waste flow table/Disposal Records

Yes(as attached)/No

3/WSD/08 Yes (1case of overloading of less than 1% in

April 2012)

Yes

6/WSD/08 No Yes

7/WSD/08 No Yes

8/WSD/08 No Yes

ArchSD project

Contract No. Overloading record in the reporting month

(Yes/No)

Waste flow table/Disposal Records

Yes(as attached)/No

SS W 303 No information provided from the Contract

SS W 304 No Yes

Page 149: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Contract No. KLN/2010/04

Environmental Monitoring Works for Kai Tak Development

Appendix M – Summary of Waste Generation and Disposal Records

MA0040\App M - Summary of Waste Records 2

CLP projects

Contract No. Overloading record in the reporting month

(Yes/No)

Waste flow table/Disposal Records

Yes(as attached)/No

Kai Tak Cruise

Terminal Cable

Tunnel

No No

Eastern Road

Substation

CLPP (132kV

cable installation)

EMSD project

Contract No. Overloading record in the reporting month

(Yes/No)

Waste flow table/Disposal Records

Yes(as attached)/No

1016EM10 Yes (4 cases of overloading of not exceeding

105%)

Yes

1017EM10 No No 1049EM10 No No 1050EM10 No No 1140EM11M No No

Page 150: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Name of Department: CEDD Contract No. Site Formation for Kai Tak Cruise Terminal Development (KL/2009/01 )

Total Quantity

Generated

Hard Rocks

and Large

Broken

Concrete

Reused in the

Contract

Reused in

Other Projects

Disposed as

Public FillImported Fill Metal

Paper /

cardboard

packaging

Plastics

(see Note 1)

Chemical

Waste

Others, e.g.

general refuse

(in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000kg) (in '000kg) (in '000kg) (in '000kg) (in '000m3)

January 19.653 0.000 7.722 0.000 10.697 0.000 0.000 0.030 0.009 0.000 0.030

February 23.182 0.000 5.160 0.000 12.742 0.000 0.002 0.033 0.089 0.000 0.025

March 10.854 0.000 4.320 0.000 10.499 0.000 0.001 0.036 0.028 0.000 0.025

AprilAprilAprilApril 9.9719.9719.9719.971 0.0000.0000.0000.000 3.8693.8693.8693.869 0.0000.0000.0000.000 10.57810.57810.57810.578 0.0000.0000.0000.000 0.0030.0030.0030.003 0.0600.0600.0600.060 0.0130.0130.0130.013 0.0000.0000.0000.000 0.0400.0400.0400.040

May

June

Sub-totalSub-totalSub-totalSub-total 63.660 0.000 21.071 0.000 44.516 0.000 0.006 0.159 0.139 0.000 0.120

July

August

September

October

November

December

TotalTotalTotalTotal 63.660 0.000 21.071 0.000 44.516 0.000 0.006 0.159 0.139 0.000 0.120

Notes:

Monthly Summary Waste Flow Table for _Monthly Summary Waste Flow Table for _Monthly Summary Waste Flow Table for _Monthly Summary Waste Flow Table for _ 2012201220122012_ (year)_ (year)_ (year)_ (year)

Actual Quantities of Inert C&D Materials Generated Monthly Actual Quantities of C&D Waste Generated Monthly

Month

Page 151: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Name of Department: CEDD Contract No. Site Formation for Kai Tak Cruise Terminal Development (KL/2009/01 )

Total Quantity

Generated

Hard Rocks

and Large

Broken

Concrete

Reused in the

Contract

Reused in

Other Projects

Disposed as

Public FillImported Fill Metal

Paper /

cardboard

packaging

Plastics

(see Note 3)

Chemical

Waste

Others, e.g.

general refuse

(in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000m3) (in '000kg) (in '000kg) (in '000kg) (in '000kg) (in '000m3)

759.5 unknown 211.4 200 217.9 7 1,500 4 2 1 2

Notes:

(1) The performance targets are given in PS clause 6(14) above.

(2) The waste flow table shall also include C&D materials that are specified in the Contractor to be imported for use at the Site.

(3) Plastic refer to plastic bottles/containers, plastic sheets/foam from packaging material.

(4) The Contractor shall also submit the latest forecast of the total amount of C&D materials expected to be generated from the Works, together with a breakdown of the nature

where the total amount of C&D materials expected to be generated from the Works is equal to or exceeding 50,000 m 3. (PS clause 5(4)(b) above refers).

- Total Quantity Generated = (Materials obtained from removal of existing seawall 737,000m 3 [322,300m3 by dredging] + from general excavation 22,500m 3)= 759,500m3

- Hard Rocks and Large Broken Concrete = Cannot be defined at this stage

- Reused in the Contract = (Rock Fill 200,800m 3 + General Fill 10,600m3) = 211,400m3

- Reused in Other Projects = As much as possible (unknown at this stage)

- Disposed as Public Fill = (Total Quantity Generated 759,500m 3 - Reused in the Contract 211,400m3 + Stockpile for others 137,200m3 + Imported Fill 7,000m3) = 417,900m3

- Imported Fill = (According to PS 6.84) = 7,000cm 3

- Metal = Estimated by the Contractor

- Paper/cardboard packaging = Estimated by the Contractor

- Plastics = Estimated by the Contractor

- Chemical Waste = Estimated by the Contractor (Spent lubricating oil, assume density 0.9kg/L)

- Other, e.g. general refuse = Estimated by the Contractor

- Paper/cardboard packaging = Estimated by the Contractor

- Plastics = Estimated by the Contractor

- Chemical Waste = Estimated by the Contractor

- Other, e.g. general refuse = Estimated by the Contractor

Forecast of Total Quantities of C&D Materials to be Generated from the Contract (see Note 4)

Monthly Summary Waste Flow Table for _Monthly Summary Waste Flow Table for _Monthly Summary Waste Flow Table for _Monthly Summary Waste Flow Table for _ 2012201220122012_ (year)_ (year)_ (year)_ (year)

Page 152: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Name of Department : Civil Engineering and Development Department / Kowloon Development Office Contract No. : ________________KL/2008/09

JAN 1.258

FEB 0.028

MAR 0.017

APR 0.042

MAY

JUNE

SUB-

TOTAL1.345

JULY

AUG

SEPT

OCT

NOV

DEC

TOTAL 1.345

Notes : (1) The performance targets are given in PS Clause 6(14).

(2) The waste flow table shall also include C&D materials that are specified in the Contract to be imported for use at the site.

(3) Plastics refer to plastic bottles / containers, plastic sheets / foam from packaging material.

* (4) The contractor shall also submit the latest forecast of the total amount of C&D materials expected to be generated from the Works, together with a breakdown of the

nature where to total amount of C&D materials expected to be generated from the Works is equal to or exceeding 50,000m3. (PS Clause 5(4)(b) referes).

[Delete Note (4) and the table above on the forecast, where inapplicable].

0 0.9 0 1.8 1.50

[in '000kg] [in '000kg] [in '000kg] [in '000kg] [in '000m3]

27.972 26.472 0 0 0

[in '000m3] [in '000m

3] [in '000m

3] [in '000m

3] [in '000m

3] [in '000m

3]

Other, e.g.

general

refuse

Plastics (3)

Import Fill MetalsPaper /

Cardboard Plastics (3)

Chemical

Waste

Other, e.g.

general

[in '000m3][in '000kg]

Total

Quantity

Borken

Concrete (4)

Reused in the

Contract

Reused in

other

Disposal as

Public Fill

Forecast of Total Quantities of C&D materials to be Generated from the Contracts *

APPENDIX E MONTHLY SUMMARY WASTE FLOW TABLE FOR 2012 (YEAR)

Actual Quantities of Inert C&D Materials Generated Monthly Actual Quantities of C&D Wastes Generated Monthly

Total

Quantity

Generated

Borken

Concrete (4)

Reused in the

Contract

Reused in

other

Projects

Import Fill Metals

Paper /

Cardboard

Packaging

Month

[in '000m3] [in '000m

3] [in '000m

3] [in '000m

3] [in '000kg]

Disposal as

Public Fill

[in '000m3] [in '000kg][in '000m

3]

1.2882

0.0349

Chemical

Waste

[in '000kg]

0

0

0

0

0.02851

0.0495

1.4011

1.40111

0

0

0

0

0

0

0

0

0 0

0

0

0

0

0 0

0

0

0

0

0 0

0

0

0 0

0

0

0

0

0 0

0

0

0

0

0 0.45

0

0.45

0

0

0 0.45

0.0304

0.0074

0.01123

0.0072

0.05623

0.05623

Page 153: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

KL/2008/07 Kai Tak Development - Advance Infrastructure Works for Developments at the Southern Part of the Former Runway, Stage 1

Inert C & D

Materials (Soft

Public Fill)

Good Quality Rock

(with break - down)Low Quality Rock Broken Concrete

2.00 2.50 2.50 2.50

(t) (t) (t) (t)

2009/07 (Actual) 0.00 0.00 0.00 0.00

2009/08 (Actual) 0.00 0.00 0.00 0.00

2009/09 (Actual) 0.00 0.00 0.00 0.00

2009/10 (Actual) 0.00 0.00 0.00 0.00

2009/11 (Actual) 2069.75 0.00 0.00 0.00

2009/12 (Actual) 875.58 0.00 0.00 0.00

Sub-total 2945.32 0.00 0.00 0.00

2010/01 (Actual) 1465.81 0.00 0.00 0.00

2010/02 (Actual) 0.00 0.00 0.00 0.00

2010/03 (Actual) 0.00 0.00 0.00 0.00

2010/04 (Actual) 0.00 0.00 0.00 0.00

2010/05 (Actual) 14.27 0.00 0.00 0.00

2010/06 (Actual) 0.00 0.00 0.00 0.00

Sub-total 1480.08 0.00 0.00 0.00

2010/07 (Actual) 41.55 0.00 0.00 0.00

2010/08 (Actual) 9.74 0.00 0.00 0.00

2010/09 (Actual) 29.13 0.00 0.00 0.00

2010/10 (Actual) 246.30 0.00 0.00 0.00

2010/11 (Actual) 163.77 0.00 0.00 0.00

2010/12 (Actual) 293.83 0.00 0.00 0.00

Sub-total 784.31 0.00 0.00 0.00

2011/01 (Actual) 348.52 0.00 0.00 0.00

2011/02 (Actual) 43.78 0.00 0.00 0.00

2011/03 (Actual) II 975.44 0.00 0.00 0.00

2011/04 (Actual) I, II 10200.65 3480.00 0.00 0.00

2011/05 (Actual) 107.00 0.00 0.00 0.00

2011/06 (Actual) 0.00 0.00 0.00 0.00

Sub-total 11675.37 3480.00 0.00 0.00

2011/07 (Actual) 42.86 0.00 0.00 0.00

2011/08 (Actual) 227.16 0.00 0.00 0.00

2011/09 (Actual) 0.00 0.00 0.00 0.00

2011/10 (Actual) 359.58 0.00 0.00 0.00

2011/11 (Actual) 594.32 0.00 0.00 0.00

2011/12 (Actual) 161.43 0.00 0.00 0.00

Sub-total 1385.35 0.00 0.00 0.00

2012/01 (Actual) 0.00 0.00 0.00 0.00

2012/02 (Actual) 1899.90 0.00 0.00 0.00

2012/03 (Actual) 1140.22 0.00 0.00 0.00

2012/04 (Actual) 0.00 0.00 0.00 4953.07

Latest Programme

for Geneation of

Materials in each

Reporting Period

Programmed Quantity for Generation of Surpus C & D Materials

Density (t/m3)

Page 154: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

2012/05 (Forecast) 4500.00 0.00 0.00 4953.07

2012/06 (Forecast) 5988.48 0.00 0.00 4953.07

Sub-total 13528.59 0.00 0.00 14859.20

2012/07 (Forecast) 0.00 0.00 0.00 0.00

2012/08 (Forecast) 0.00 0.00 0.00 0.00

2012/09 (Forecast) 0.00 0.00 0.00 0.00

2012/10 (Forecast) 0.00 0.00 0.00 0.00

2012/11 (Forecast) 0.00 0.00 0.00 0.00

2012/12 (Forecast) 0.00 0.00 0.00 0.00

Sub-total 0.00 0.00 0.00 0.00

2013/01 (Forecast) 0.00 0.00 0.00 0.00

2013/02 (Forecast) 0.00 0.00 0.00 0.00

2013/03 (Forecast) 0.00 0.00 0.00 0.00

2013/04 (Forecast) 0.00 0.00 0.00 0.00

2013/05 (Forecast) 0.00 0.00 0.00 0.00

2013/06 (Forecast) 0.00 0.00 0.00 0.00

Sub-total 0.00 0.00 0.00 0.00

Overall Total (m3) 31799.00 3480.00 0.00 14859.20

Remark: I) 20,000 tonne soft fill and 8,700 tonne good quality rock generated was disposed of at HyD Contract No. HY/2009/11

II) Rock fill of 16,800 tonne in March 11 and 9,400 tonne in April 11 were imported from MTRC Conract 704 site and Zhu Hai, Mainland.

Footnote: 10,300 tonne surplus good quality rock stockpiled on site for re-use in Kai Tak Nullah Improvement Works

Page 155: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

KL/2008/07 Kai Tak Development - Advance Infrastructure Works for Developments at the Southern Part of the Former Runway, Stage 1

Bituminous

MaterialC & D Waste

Inert C & D

Materials (Soft

Public Fill)

Rock Sand Fill

2.00 0.25 1.80 2.00 2.00

(t) (t) (t) (t) (t)

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 983.24 0.00 0.00 0.00

0.00 1509.72 0.00 0.00 0.00

0.00 13.20 0.00 0.00 0.00

0.00 2506.16 0.00 0.00 0.00

0.00 10.64 0.00 0.00 0.00

0.00 7.12 0.00 0.00 0.00

0.00 89.56 0.00 0.00 0.00

0.00 5.68 0.00 0.00 0.00

0.00 23.96 0.00 0.00 0.00

0.00 28.88 0.00 0.00 0.00

0.00 165.84 0.00 0.00 0.00

0.00 223.80 0.00 0.00 0.00

0.00 102.72 0.00 0.00 0.00

0.00 33.48 0.00 0.00 0.00

0.00 85.36 0.00 0.00 0.00

0.00 103.20 0.00 0.00 0.00

0.00 92.84 0.00 0.00 0.00

0.00 641.40 0.00 0.00 0.00

0.00 124.88 0.00 0.00 0.00

0.00 43.28 0.00 0.00 0.00

0.00 250.76 0.00 8400.00 0.00

0.00 85.72 0.00 4700.00 0.00

0.00 85.76 0.00 0.00 0.00

0.00 185.08 0.00 0.00 0.00

0.00 775.48 0.00 13100.00 0.00

0.00 80.28 0.00 0.00 0.00

0.00 79.08 0.00 0.00 0.00

0.00 133.68 0.00 0.00 0.00

0.00 100.24 0.00 0.00 0.00

0.00 271.32 0.00 0.00 0.00

0.00 91.16 0.00 0.00 0.00

0.00 755.76 0.00 0.00 0.00

0.00 151.24 0.00 0.00 0.00

4369.48 148.60 0.00 0.00 0.00

2594.43 134.08 0.00 0.00 0.00

0.00 90.96 0.00 0.00 0.00

Programmed Quantity for Generation of Surpus C & D Materials Programmed Quantity for Imported of Fill

Page 156: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

0.00 80.00 0.00 0.00 0.00

0.00 80.00 0.00 0.00 0.00

6963.91 684.88 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

6963.91 5529.52 0.00 13100.00 0.00

I) 20,000 tonne soft fill and 8,700 tonne good quality rock generated was disposed of at HyD Contract No. HY/2009/11

II) Rock fill of 16,800 tonne in March 11 and 9,400 tonne in April 11 were imported from MTRC Conract 704 site and Zhu Hai, Mainland.

Footnote: 10,300 tonne surplus good quality rock stockpiled on site for re-use in Kai Tak Nullah Improvement Works

Page 157: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

KL/2010/02 Kai Tak development – Kai Tak approach channel and Kwun Tong typhoon shelter improvement works (Phase 1)

Inert C & D

Materials (Soft

Public Fill)

Good Quality

Rock (with break -

down)

Low Quality Rock Broken ConcreteBituminous

MaterialC & D Waste

Inert C & D

Materials (Soft

Public Fill)

Rock Sand Fill

2 2.5 2.5 2.5 2 0.25 1.8 2 2

(t) (t) (t) (t) (t) (t) (t) (t) (t)

2011/07 (Actual) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2011/08 (Actual) 0.00 0.00 0.00 0.00 0.00 88.60 0.00 0.00 0.00

2011/09 (Actual) 0.00 0.00 0.00 0.00 0.00 9.37 0.00 0.00 0.00

2011/10 (Actual) 0.00 0.00 0.00 0.00 0.00 12.71 0.00 0.00 0.00

2011/11 (Actual) 0.00 0.00 0.00 0.00 0.00 39.15 0.00 0.00 0.00

2011/12 (Actual) 0.00 0.00 0.00 0.00 0.00 29.39 0.00 0.00 0.00

2012/01 (Actual) 0.00 0.00 0.00 0.00 0.00 20.30 0.00 0.00 0.00

2012/02 (Actual) 0.00 0.00 0.00 0.00 0.00 20.11 0.00 0.00 0.00

2012/03 (Actual) 0.00 0.00 0.00 0.00 0.00 6.47 0.00 0.00 0.00

2012/04 (Actual) 0.00 0.00 0.00 0.00 0.00 15.79 0.00 0.00 0.00

Overall Total (t) 0.00 0.00 0.00 0.00 0.00 241.89 0.00 0.00 0.00

Overall Total (m3) 0.00 0.00 0.00 0.00 0.00 967.56 0.00 0.00 0.00

Latest Programme

for Geneation of

Materials in each

Reporting Period

Programmed Quantity for Generation of Surpus C & D Materials

Density (t/m3)

Programmed Quantity for Imported of Fill

Page 158: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Department: DSD

Contract No.: DC/2008/12

Project : Sewage Interception Scheme in Kowloon City - Pumping Stations, Rising Mains and Trunk Sewers

Broken

Concrete

(See Note

3)

Reused in

the Contract

Reused in

other

Projects

Disposed as

Public Fill

Imported

FillMetals

Paper/

Cardboar

d

packaging

Plastics

(see Note

2)

Others, e.g.

general

refuse

(in m³) (in m³) (in m³) (in m³) (in m³) (in m³) (in kg) (in kg) (in kg) Battery(No.) Oil(in L) (in m³)

Jan'2009

to

Jun'2009

Jul'2009 0 0 0 0 0 0 0 0 3 0 0 0

Aug'2009 1248 0 0 0 864.5 0 0 0 2 0 0 383.5

Sep'2009 3399.5 0 0 0 3347.5 0 50390 400 3 0 0 52

Oct'2009 2788.5 0 0 13 2730 0 0 0 3 0 0 45.5

Nov'2009 2392 0 0 0 2307.5 0 250 0 3 0 0 84.5

Month

Ending

Total

Quantity

Generated

Actual Quantities Inert C & D Materials Generated Monthly

Waste Flow Table As at 30 Apr 2012

Actual Quantities of C & D Wastes Generated Monthly

N/A

Chemical Waste

Penta-Ocean - Concentric Joint Venture

Nov'2009 2392 0 0 0 2307.5 0 250 0 3 0 0 84.5

Dec'2009 2588.1 0 0 176 2399.9 0 0 0 2 0 0 12.2

Jan'2010 3262.4 0 0 182 3054.1 0 150 1000 2 0 1000 26.3

Feb'2010 1091.7 0 0 286 803.7 0 0 0 2 0 0 2

Mar'2010 1227.6 0 0 579 633.1 0 30 0 3 0 0 15.5

Apr'2010 1835.1 0 0 573 1254.1 0 0 0 5 0 0 8

May'2010 1763.9 0 300 281 1174.4 0 100 0 2 0 0 8.5

June'2010 4363.5 0 80 250 4023 0 0 300 10 0 0 10.5

July'2010 2038.5 0 0 60 1968 0 310 0 11 100 428 10.5

Aug'2010 5998.5 0 0 3220 2768 0 0 0 10 0 0 10.5

Sep'2010 3163.5 0 0 875 2272 0 500 0 9 0 0 16.5

Oct'2010 5472.5 0 0 340 5113 0 0 500 9 0 0 19.5

Nov'2010 3976.5 0 0 880 3085 0 0 0 7 0 0 11.5

Dec'2010 2698.5 0 0 2215 473 0 10000 120 7 0 0 10.5

Appendix 2Appendix 2Appendix 2Appendix 2

Page 159: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Department: DSD

Contract No.: DC/2008/12

Project : Sewage Interception Scheme in Kowloon City - Pumping Stations, Rising Mains and Trunk Sewers

Broken

Concrete

(See Note

3)

Reused in

the Contract

Reused in

other

Projects

Disposed as

Public Fill

Imported

FillMetals

Paper/

Cardboar

d

packaging

Plastics

(see Note

2)

Others, e.g.

general

refuse

(in m³) (in m³) (in m³) (in m³) (in m³) (in m³) (in kg) (in kg) (in kg) Battery(No.) Oil(in L) (in m³)

Month

Ending

Total

Quantity

Generated

Actual Quantities Inert C & D Materials Generated Monthly

Waste Flow Table As at 30 Apr 2012

Actual Quantities of C & D Wastes Generated Monthly

Chemical Waste

Penta-Ocean - Concentric Joint Venture

Jan'2011 573 0 50 0 514 0 500 0 6 0 0 9

Feb'2011 490 0 50 0 431 0 600 0 6 0 0 9

Mar'2011 1673 0 1055 0 603 0 400 200 4 0 0 15

Apr'2011 1199 0 982 0 202 0 0 0 6 0 0 15

May'2011 974.5 0 300 0 652 0 100 300 10 0 0 22.5

Jun'2011 908 0 200 0 693 0 0 0 11 0 0 15

Jul'2011 881 0 100 340 429 0 50 0 12 0 0 12

Aug'2011 868.5 0 300 0 552 0 300 0 10 0 0 16.5Aug'2011 868.5 0 300 0 552 0 300 0 10 0 0 16.5

Sep'2011 668 0 100 20 530 0 510 500 20 0 0 18

Oct'2011 349.5 0 50 0 280 0 0 0 8 0 0 19.5

Nov'2011 307 0 150 0 130 0 100 0 4 0 0 27

Dec'2011 596 0 15 365 195 0 0 110 5 0 0 21

Jan'2012 771.5 0 10 465 280 0 100 0 2 0 0 16.5

Feb'2012 574.5 0 20 0 532 0 30 0 3 0 0 22.5

Mar'2012 490 0 50 0 425 0 50 200 5 0 0 15

Apr'2012 335 0 45 0 275 0 80 0 6 0 0 15

Total 60967 0 3857 11120 44994 0 64550 3630 211 100 1428 996

Notes: 1The waste flow table shall also include C & D materials that are specified in the Contract to be imported for use at the Site.

2 Plastics refer to plastic bottles/ containers, plastic sheets/ foam from packaging material.

3 Broken concrete for recycling into aggregates.

Appendix 2Appendix 2Appendix 2Appendix 2

Page 160: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located
Page 161: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Hsin Chong Construction Co., Ltd.

1/2

Name of Department: ArchSD/CEDD/DSD/EMSD/HyD/WSD Contract No.: DC/2009/21

Monthly Summary Waste Flow Table for 2012/04 (Year/Month)

Actual Quantities of Inert C&D Materials Generated Monthly Actual Quantities of C&D Wastes Generated Monthly

Total Quantity Generated

Hard Rock and Large Broken

Concrete

Reused in the Contract

Reused in other Projects

Disposed as Public Fill

Imported Fill Metals Paper/ cardboard

packaging Plastics

(see Note 3) Chemical Waste

Others, e.g. general refuse

Month

(in m3) (in m3) (in m3) (in m3) (in m3) (in m3) (in kg) (in kg) (in kg) (in kg) (in m3)

Jan 1,282.2 587.6 0 0 694.6 0 0 0 0 0 6.71

Feb 674.5 531.5 0 0 143.0 0 0 0 0 0 16.51

Mar 3,732.2 3,105.7 0 0 626.5 0 0 0 0 0 14.22

Apr 74.7 40.1 0 0 34.6 0 0 0 0 0 6.67

May

June

Sub-total 5763.6 4264.9 0 0 1498.7 0 0 0 0 0 44.11

July

Aug

Sept

Oct

Nov

Dec

Total

Page 162: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Hsin Chong Construction Co., Ltd.

2/2

Forecast of Total Quantities of C&D Materials to be Generated from the Contract*

Total Quantity Generated

Hard Rock and Large Broken

Concrete

Reused in the Contract

Reused in other Projects

Disposed as Public Fill

Imported Fill Metals Paper/ cardboard

packaging Plastics

(see Note 3) Chemical Waste

Others, e.g. general refuse

(in m3) (in m3) (in m3) (in m3) (in m3) (in m3) (in kg) (in kg) (in kg) (in kg) (in m3)

40,500

9,800 7,700 0 23,000 0 0 0 0 0 200

Notes: (1) The performance targets are given in PS Clause 1.34A5(4).

(2) The waste flow table shall also include C&D materials that are specified in the Contract to be imported for use at the Site.

(3) Plastics refer to plastic bottles/containers, plastic sheets/foam from packaging material

Page 163: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Name of Department : Drainage Service Department Contract No. : ________________DC/2011/04

JANFEBMARAPRMAYJUNESUB-

TOTALJULYAUGSEPTOCTNOVDEC

TOTAL

Notes : (1) The performance targets are given in PS Clause 6(14).(2) The waste flow table shall also include C&D materials that are specified in the Contract to be imported for use at the site.(3) Plastics refer to plastic bottles / containers, plastic sheets / foam from packaging material.

* (4) The contractor shall also submit the latest forecast of the total amount of C&D materials expected to be generated from the Works, together with a breakdown of thenature where to total amount of C&D materials expected to be generated from the Works is equal to or exceeding 50,000m3. (PS Clause 5(4)(b) referes).[Delete Note (4) and the table above on the forecast, where inapplicable].

0

0000

0

0 1.5 0 2.2 510[in '000kg] [in '000kg] [in '000kg] [in '000kg] [in '000m3]

30 15 0 0 0[in '000m3] [in '000m3] [in '000m3] [in '000m3] [in '000m3] [in '000m3]

Other, e.g.generalrefuse

Plastics (3)

Import Fill Metals Paper / Plastics (3) Chemical Other, e.g.

[in '000m3][in '000kg]

Total Borken Reused in the Reused in Disposal asForecast of Total Quantities of C&D materials to be Generated from the Contracts *

APPENDIX E MONTHLY SUMMARY WASTE FLOW TABLE FOR 2012 (YEAR)

Actual Quantities of Inert C&D Materials Generated Monthly Actual Quantities of C&D Wastes Generated Monthly

TotalQuantity

Generated

BorkenConcrete (4)

Reused in theContract

Reused inother

ProjectsImport Fill Metals

Paper /CardboardPackaging

Month

[in '000m3] [in '000m3] [in '000m3] [in '000m3] [in '000kg]

Disposal asPublic Fill

[in '000m3] [in '000kg][in '000m3]0

0.0026

ChemicalWaste

[in '000kg]00

00

0.00120.0334

0.0372

0.0372

0000

0

00

0

0 0

0000

0 0

0000

0 0

00

0 0

0000

0 0

0000

0 0

0000

0 0

00.00260.00120.0334

0.0372

0.0372

Page 164: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Title: Summary Waste Flow Table

Contract Title and No. : The Integrated Contract for Construction of Public Rental Housing Development at Kai Tak Site 1B (20090006)

Name of Department : Hong Kong Housing Authority Appendix III

Rev : 26

Monthly Summary Waste Flow Table for Year 2012 [to be submitted not later than the 5th day of each month for the past month report]

(All quantities shall be rounded off to 2 decimal places.)

Month

Est. Act. Est. Act. Est. Act. Est. Act. Est. Act. Est. Act. Est. Act. Est. Act. Est. Act. Est. Act.Jan 900.00 1,273.65 0.00 0.00 100.00 0.00 0.00 0.00 800.00 1,273.65 50.00 42.10 4.00 0.00 0.00 0.00 0.00 0.00 600.00 198.59Feb 8,300.00 1,012.00 0.00 0.00 8,000.00 0.00 0.00 0.00 300.00 1,012.00 50.00 31.69 4.00 0.00 0.00 0.00 0.00 0.00 600.00 378.46Mar 2,800.00 3,466.26 0.00 0.00 2,000.00 0.00 0.00 0.00 800.00 3,466.26 50.00 34.72 5.00 1.40 0.00 0.00 0.50 0.00 600.00 322.54

Apr 2,000.00 928.49 0.00 0.00 100.00 587.16 0.00 0.00 1,900.00 341.33 50.00 239.70 5.00 0.00 0.00 0.00 0.00 0.00 800.00 996.52

May 4,400.00 0.00 1,500.00 0.00 2,900.00 50.00 5.00 0.00 0.00 800.00

June 9,900.00 0.00 8,000.00 0.00 1,900.00 50.00 5.00 0.00 0.50 800.00

Sub-total 28,300.00 6,680.40 0.00 0.00 19,700.00 587.16 0.00 0.00 8,600.00 6,093.24 300.00 348.21 28.00 1.40 0.00 0.00 1.00 0.00 4,200.00 1,896.11

July 1,000.00 0.00 100.00 0.00 900.00 50.00 5.00 0.00 0.00 1,000.00

Aug 1,000.00 0.00 100.00 0.00 900.00 30.00 5.00 0.00 0.00 1,000.00

Sept 1,700.00 0.00 800.00 0.00 900.00 30.00 5.00 0.00 0.50 1,000.00

Oct 1,000.00 0.00 100.00 0.00 900.00 30.00 5.00 0.00 0.00 1,000.00

Nov 1,000.00 0.00 100.00 0.00 900.00 30.00 5.00 0.00 0.00 1,000.00

Dec 1,000.00 0.00 100.00 0.00 900.00 30.00 5.00 0.00 0.50 1,000.00

Total 35,000.00 6,680.40 0.00 0.00 21,000.00 587.16 0.00 0.00 14,000.00 6,093.24 500.00 348.21 58.00 1.40 0.00 0.00 2.00 0.00 10,200.00 1,896.11

Notes: (1) The waste reduction targets are stated in PRE.B8.1995.5(2) The waste flow table shall also include C&D materials that are specified in the Contract to be imported for use at the Site.(3) Plastics refer to plastic bottles/containers, plastic sheets/foram from packaging material,

Estimate / Actual Quantities of Inert C&D Materials Generated Monthly (in '000kg) Estimated / Actual Quantities of C&D Wastes Generated Monthly

(a) (b) (c) (d) (e=a-b-c-d) (f) (g) (h) (i) (j)

Total Quantity

Generated

Broken Concrete

suitable for recycling

Reused in the

Contract

Marine Mud

Reused in the

ContractDisposed as

Public Fill MetalsPaper / cardboard

Packaging

Plastics

(see Note 3)

(e) (in '000 kg) (in '000 kg) (in '000 kg)(a) (b) (c) (d) (in '000 kg) '(in '000 kg)

Chemical WasteOthers,

e.g. general refuse

4 of 5

Page 165: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Monthly WFT(revised July 2005)

3/WSD/08

Total Quantities

Generated

Broken Concrete(including rock for

recycling into

aggregates)

Reused in the

Contract

Reused in Other

Projects

Disposed as

Public Fill

Imported Fill

MaterialMetal

Paper/ Cardboard

Packaging

Plastic(bottles/containers,

plastic sheets/ foams

from package

material)

Chemical Waste

Others (e.g.

General Refuse

etc.)

[a+b+c+d) (a) (b) (c) (d) (in '000kg) (in '000kg) (in '000kg) (in '000kg) (in '000m3)

January 0.378 0.000 0.000 0.000 0.378 0.226 0.000 0.000 0.000 0.000 0.012

February 0.678 0.000 0.101 0.000 0.577 0.231 1.050 0.000 0.000 0.000 0.004

March 0.759 0.000 0.161 0.000 0.598 0.293 0.000 0.000 0.000 0.000 0.013

April 0.390 0.000 0.000 0.000 0.390 0.202 0.400 0.000 0.000 0.000 0.007

May 0.000

June 0.000

Half-year total 2.205 0.000 0.262 0.000 1.943 0.952 1.450 0.000 0.000 0.000 0.036

July 0.000

August 0.000

September 0.000

October 0.000

November 0.000

December 0.000

Yearly Total 2.205 0.000 0.262 0.000 1.943 0.952 1.450 0.000 0.000 0.000 0.036

Water Supplies Department

Monthly Summary Waste Flow Table

for Contract with Waste Management Plan under ETWB TCW No. 15/2003

Reporting Year: 2012

Actual Quantities of Other C&D Materials / Wastes Generated

(To be submitted to C&D MM Coordinator of Respective Division/Region via Engineer's Representative before 15th of the following month)

Contract No.

Actual Quantities of Inert C&D Materials Generated / Imported (in '000 m3)

Month

Page 166: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Monthly WFT(revised July 2005)

6/WSD/08

Total Quantities

Generated

Broken Concrete(including rock for

recycling into

aggregates)

Reused in the

Contract

Reused in Other

Projects

Disposed as

Public Fill

Imported Fill

MaterialMetal

Paper/ Cardboard

Packaging

Plastic(bottles/containers,

plastic sheets/ foams

from package

material)

Chemical Waste

Others (e.g.

General Refuse

etc.)

[a+b+c+d) (a) (b) (c) (d) 0 (in '000kg) (in '000kg) (in '000kg) (in '000kg) (in '000m3)

January 0.042 0.000 0.000 0.000 0.042 0.000 0.006 0.003 0.005 0.007 0.016

February 0.013 0.004 0.000 0.000 0.009 0.070 0.005 0.004 0.006 0.007 0.004

March 0.061 0.000 0.000 0.000 0.061 0.037 0.006 0.003 0.007 0.006 0.012

April 0.031 0.000 0.007 0.000 0.024 0.035 0.004 0.004 0.007 0.006 0.006

May 0.000

June 0.000

Half-year total 0.147 0.004 0.007 0.000 0.136 0.142 0.021 0.014 0.025 0.026 0.038

July 0.000

August 0.000

September 0.000

October 0.000

November 0.000

December 0.000

Yearly Total 0.147 0.004 0.007 0.000 0.136 0.142 0.021 0.014 0.025 0.026 0.038

Water Supplies Department

Monthly Summary Waste Flow Table

for Contract with Waste Management Plan under ETWB TCW No. 15/2003

Reporting Year: 2012

Actual Quantities of Other C&D Materials / Wastes Generated

(To be submitted to C&D MM Coordinator of Respective Division/Region via Engineer's Representative before 15th of the following month)

Contract No.

Actual Quantities of Inert C&D Materials Generated / Imported (in '000 m3)

Month

Page 167: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

Monthly WFT(revised July 2005)

7/WSD/08

Total Quantities

Generated

Broken

Concrete(including rock for

recycling into

aggregates)

Reused in the

Contract

Reused in Other

Projects

Disposed as

Public Fill

Imported C&D

MaterialMetal

Paper/

Cardboard

Packaging

Plastic(bottles/containers,

plastic sheets/

foams from

package material)

Chemical Waste

Others (e.g.

General Refuse

etc.)

(a+b+c+d) (a) (b) (c) (d) (in '000kg) (in '000kg) (in '000kg) (in '000kg) (in '000m3)

January 0.4089 0.0043 0.0130 0.0000 0.3916 0.0000 0.0000 0.0010 0.0010 0.0005 0.0110

February 0.8131 0.0087 0.0280 0.0000 0.7764 0.0000 0.0000 0.0010 0.0010 0.0000 0.0182

March 0.8004 0.0085 0.0260 0.0000 0.7659 0.0000 0.0000 0.0010 0.0010 0.0005 0.0074

April 0.5089 0.0032 0.0110 0.0000 0.4947 0.0000 0.0000 0.0010 0.0010 0.0005 0.0167

May

June

Half-year Total 2.5313 0.0247 0.0780 0.0000 2.4286 0.0000 0.0000 0.0040 0.0040 0.0015 0.0533

July

August

September

October

November

December

Yearly Total 2.5313 0.0247 0.0780 0.0000 2.4286 0.0000 0.0000 0.0040 0.0040 0.0015 0.0533

Water Supplies Department

Monthly Summary Waste Flow Table

for Contract with Waste Management Plan under ETWB TCW No. 15/2003

Reporting Year: 2012

Actual Quantities of Other C&D Materials / Wastes Generated

(To be submitted to C&D MM Coordinator of Respective Division/Region via Engineer's Representative before 15th of the following month)

Contract No.

Actual Quantities of Inert C&D Materials Generated / Imported (in '000 m3)

Month

Page 168: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

8/WSD/08

Total Quantities

Generated

Broken Concrete

(including rock

for recycling into

aggregates)

Reused in the

Contract

Reused in Other

Projects

Disposed as

Public Fill

Imported Fill

MaterialMetal

Paper/ Cardboard

Packaging

Plastic

(bottles/container

s, plastic sheets/

foams from

package material)

Chemical Waste

Others (e.g.

General Refuse

etc.)

[a+b+c+d) (a) (b) (c) (d) (in '000kg) (in '000kg) (in '000kg) (in '000kg) (in '000m3)

January 0.2257 0.0804 0.0148 0.0000 0.1305 0.0000 36.0400 0.0000 0.0000 0.0000 0.0050

February 0.4355 0.0124 0.0678 0.0000 0.3553 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

March 0.3990 0.0718 0.0330 0.0000 0.2942 0.0000 0.0000 0.0450 0.0000 0.0000 0.0000

April 0.3883 0.0932 0.0750 0.0000 0.2201 0.0000 0.0400 0.1900 0.0000 0.0000 0.0000

May

June

Half-year total 1.4484 0.2578 0.1906 0.0000 1.0001 0.0000 36.0800 0.2350 0.0000 0.0000 0.0050

July

August

September

October

November

December

Yearly Total 1.4484 0.2578 0.1906 0.0000 1.0001 0.0000 36.0800 0.2350 0.0000 0.0000 0.0050

Month

Actual Quantities of Inert C&D Materials Generated / Imported (in '000 m3) Actual Quantities of Other C&D Materials / Wastes Generated

Water Supplies Department

Monthly Summary Waste Flow Table

for Contract with Waste Management Plan under ETWB TCW No. 15/2003

Reporting Year: 2012

Contract No.

(To be submitted to C&D MM Coordinator of Respective Division/Region via Engineer's Representative before 15th of the following month)

Page 169: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located
Page 170: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located
Page 171: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located
Page 172: TABLE OF CONTENTS · • CV/2007/03 - Development at Anderson Road ... MA0040\Monthly\Rpt_120516_v.1.0 4 Cinotech 1. INTRODUCTION Background 1.1 The Kai Tak Development (KTD) is located

1016EM10 - Chilled Water Pipe Laying Works at North Apron Area

for District Cooling System at Kai Tak Development