October 2011 Pavement Type Selection Report
ID 6767-06-00 Kennedy Ave to USH 10 EB, CTH B, Portage County, Wisconsin
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\pav_type_select_rpt_jte.docx i
TABLE OF CONTENTS Section Page EXECUTIVE SUMMARY .............................................................................................. 1 PROJECT DESCRIPTION ............................................................................................ 2 Existing Facility ....................................................................................................... 2 Pavement Condition ................................................................................................ 2 TRAFFIC DATA ............................................................................................................ 3 SOIL PARAMETERS .................................................................................................... 3 ALTERNATIVES ........................................................................................................... 4 Alternative No. 1 – HMA Pavement ........................................................................ 4 Alternative No. 2 – PCC Pavement ......................................................................... 4 Existing Pavement Structure ................................................................................... 4 LIFE CYCLE COST ANALYSIS ................................................................................... 4 RECOMMENDATIONS AND CONSIDERATIONS ...................................................... 4 Pulverize and Relay Area ........................................................................................ 5 Reconstruction Area ................................................................................................ 5 Side Roads .............................................................................................................. 5
LIST OF EXHIBITS Exhibit 1 Project Location Map 2 Existing and Proposed Pavement Typical Sections 3 Traffic Forecast 4 Soils Analysis 5 WisPave Pavement Design Computations 6 WisPave LCCA Worksheets
October 2011 Pavement Type Selection Report
ID 6767-06-00 Kennedy Ave to USH 10 EB, CTH B, Portage County, Wisconsin
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\pav_type_select_rpt_jte.docx 1
PAVEMENT TYPE SELECTION REPORT
PROJECT I.D. 6767-06-00 STOCKTON - AMHERST
KENNEDY AVE TO USH 10 EB CTH B
PORTAGE COUNTY EXECUTIVE SUMMARY The proposed project involves reconditioning of approximately 6.3 miles of CTH B in the Towns of Stockton and Amherst, Portage County, from approximately 1,700 feet east of Kennedy Avenue to approximately 1,400 feet west of the eastbound USH 10 ramps. The intersection of CTH B and CTH J and the section of roadway between Lime Lake Road and Kubisiak Road are not included in this project (see Exhibit 1 - Project Location Map). Due to the varying soil types and traffic loadings, this project will have four separate typical sections: two pulverize and relay sections, which will be the majority of the project length, and two reconstruction sections. Two reconstruction areas within the project limits will be at the intersection of CTH B and Custer Road and the intersection of CTH B and CTH K. Each of these areas will have a separate typical section. We recommend the pulverize and relay area consist of removing a portion (approximately 2 inches) of the existing asphalt, pulverizing the remainder of the existing asphalt and 2 inches of the existing base course, and placing new HMA Pavement on top. The pavement sections are as follows: For the pulverize and relay section from Station 32+50 to Station 295+00, excluding the reconstruction area at Custer Road: • 6-inches HMA Pavement Type E-10
• 2.5-inch upper layer, PG 58-28 (nominal aggregate size: 12.5 mm) • 3.5-inch lower layer, PG 58-28 (nominal aggregate size: 19.0 mm)
• 2.0 inches existing base course, 10.0 inches existing asphalt; pulverized and relaid.
• 4.0 inches existing granular subgrade
• Shoulders will be 4 foot HMA paved to match mainline thickness, and 2 foot gravel.
For the pulverize and relay section from Station 321+00 to Station 478+00: • 5-inches HMA Pavement Type E-3
• 2.5-inch upper layer, PG 58-28 (nominal aggregate size: 12.5 mm) • 2.5-inch lower layer, PG 58-28 (nominal aggregate size: 19.0 mm)
October 2011 Pavement Type Selection Report
ID 6767-06-00 Kennedy Ave to USH 10 EB, CTH B, Portage County, Wisconsin
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\pav_type_select_rpt_jte.docx 2
• 2.0 inches existing base course, 10.0 inches existing asphalt; pulverized and relaid.
• 4.0 inches existing granular subgrade
• Shoulders will be 4 foot HMA paved to match mainline thickness, and 2 foot gravel. We recommend the reconstruction area consist of completely removing the existing asphalt pavement and base and reconstructing a new pavement structure. The pavement sections are as follows: For the reconstruction at Custer Road, this includes CTH B from Station 170+00 to Station 181+00, and the acceleration lane: • 6-inches HMA Pavement Type E-10
• 2.5-inch upper layer, o PG 58-28 (nominal aggregate size: 12.5 mm) o PG 70-28, HMA Pavement Type E-30, within intersection
• 3.5-inch lower layer, PG 58-28 (nominal aggregate size: 19.0 mm) • 15 inches Base Aggregate Dense 1¼ inch.
• Shoulders will be 4 foot HMA paved to match mainline thickness, and 2 foot gravel.
For the reconstruction at CTH K, this includes CTH B from Station 295+00 to Station 321+00: • 6.0-inches HMA Pavement Type E-10
• 2.5-inch upper layer, PG 58-28 (nominal aggregate size: 12.5 mm) • 3.5-inch lower layer, PG 58-28 (nominal aggregate size: 19.0 mm)
• 18 inches Base Aggregate Dense 1¼ inch.
• 6 inches Granular Sub-base
• Shoulders will be 4 foot HMA paved to match mainline thickness, and 2 foot gravel.
These sections were selected based on a life cycle cost analysis and to keep consistency of pavement layer thicknesses and type of construction throughout the project length.
The proposed rural typical section will consist of 12-foot travel lanes, with 6-foot shoulders (4-feet paved with HMA) in each direction (see Exhibit 2 - Existing and Proposed Pavement Typical Sections). During construction operations, the roadway will be open to local traffic only. Truck traffic and through traffic will be detoured during all phases of this project. A detour route has not been established at this time, as discussions with Portage County are still ongoing.
October 2011 Pavement Type Selection Report
ID 6767-06-00 Kennedy Ave to USH 10 EB, CTH B, Portage County, Wisconsin
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\pav_type_select_rpt_jte.docx 3
Currently, expected pavement-related special provisions include QMP Base Aggregate, QMP Ride, Incentive IRI Ride, QMP HMA Pavement Nuclear Density, and Incentive Density HMA Pavement, and HMA Pavement Intersections. The HMA Pavement Intersections special will only apply to the Custer Road and CTH B intersection. This special provision will be used to accommodate the high volume of truck traffic that turns through this intersection. This project is a rural local road project. CTH B has a posted speed limit of 55 mph, and a design year AADT of 6,550 vehicles per day between Kennedy Avenue and CTH K, and 4,350 vehicles per day between CTH K and USH 10. PROJECT DESCRIPTION The proposed project involves the reconditioning of approximately 6.8 miles of CTH B in the Towns of Stockton and Amherst, Portage County, from approximately 1,700 feet east of Kennedy Avenue to approximately 1,400 feet west of the eastbound USH 10 ramps. The intersection of CTH B and CTH J and the section of roadway between Lime Lake Road and Kubisiak Road are not included in this project. The purpose of the project is to recondition the roadway and replace the deteriorated pavement. The project will upgrade the roadway to rural 3R roadway standards. The road is functionally classified as a major collector. The proposed design class for the project is 3RC3. CTH B has a posted speed limit of 55 miles per hour (mph) (design speed 55 mph) through the project limits. Existing Facility The current two-lane roadway consists of a rural section with a roadway width of 36 feet. The original construction year for this section of roadway is 1956. There was a HMA Pavement overlay done in 2002. Project pavement coring logs indicate asphaltic thicknesses are approximately 10 - 12 inches. Sand and gravel fill was encountered below the asphalt. Pavement Condition CTH B has a 2009 Paser Rating of 6. The Concept Definition Report identifies the pavement as deteriorated. The pavement is failing and has reached the end of its serviceable life. TRAFFIC DATA The traffic forecast performed by the WisDOT Traffic Forecasting Section is included in Exhibit 3. Traffic values for pavement design are shown in the table below:
Roadway Section Year
2012 AADT (Construction Year)
2032 AADT (Design Year)
CTH B (Kennedy Ave. to CTH K) 5200 6550 CTH B (CTH K to USH 10) 3450 4350
October 2011 Pavement Type Selection Report
ID 6767-06-00 Kennedy Ave to USH 10 EB, CTH B, Portage County, Wisconsin
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\pav_type_select_rpt_jte.docx 4
Percent ADT Truck Type Kennedy Avenue to CTH K CTH K to USH 10
2D 7.6 7.4 3-SU 6.4 2.9
2S-1, 2S-2 6.2 4.0 3S-2 3.2 4.9
DBL BTM 0.0 0.0 Total 23.4 19.2
The directional factor (DF) is 0.6 and a lane distribution factor (LDF) is 1. The following table shows the design year (2032) equivalent single axle loads (ESALs) on CTH B.
HMA Pavement ESALs Concrete Pavement ESALs Sta. 32+50 –
Sta. 321+00 Sta. 321+00 – Sta. 478+00
Sta. 32+50 – Sta. 321+00
Sta. 321+00 – Sta. 478+00
Design Lane Daily ESALs 473 256 663 374 Design Lane Total Life ESALs 3,452,900 1,868,800 4,839,900 2,730,200
SOIL PARAMETERS The different types of soils expected to be found in this project and their respective lengths along the project were determined using the Soil Survey of Portage County (see Exhibit 4 – Soils Analysis). Using WisDOT Geotechnical Bulletin No. 1, the design group index (DGI) was determined for the appropriate horizon for each soil type. The soils were then grouped together based on location, DGI, and traffic loadings. The highest DGI was used to determine the Soil Support Value. The remainder of the soil parameters was derived using the WisDOT pavement design software, WisPAVE. Based on preliminary design and the soils analysis, no constructability concerns have been identified. The engineering pavement design parameters for native soils are as follows:
Sta. 32+50 – Sta. 295+00
CTH B & Custer Road Reconstruction
CTH B & CTH K Reconstruction
Sta. 321+00 – Sta. 478+00
Soil Support Value 3.9 5.4 4.2 3.9
Design Group Index 14 2 12 14
Frost Index F-3 F-2 F-3 F-3 Subgrade Modulus, K 125 300 150 125
October 2011 Pavement Type Selection Report
ID 6767-06-00 Kennedy Ave to USH 10 EB, CTH B, Portage County, Wisconsin
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\pav_type_select_rpt_jte.docx 5
ALTERNATIVES The objective of this pavement design is to recondition the pavement structure to a rural section with 6-foot shoulder. The intersections with Custer Road and CTH K will reconstructed because of the deficient vertical curves at these intersections. Both intersections currently have limited sight distances from the intersections, which have resulted in accidents. Two alternatives for each segment, one flexible and one rigid, were developed for the new pavement surface for the project; pavement design computations for each alternative are shown in Exhibit 5. The alternatives for each segment are described as follows: Station 32+50 – 295+00, excluding the reconstruction area at Custer Road:
Alternative No. 1 – HMA Pavement
• 6.0 inches HMA Pavement Type E-10 • 10.0 inches existing base course, 2.0 inches existing asphalt; pulverized and relaid. • 4.0 inches existing granular subbase • Shoulders will be 4 foot HMA paved to match mainline thickness, and 2 foot gravel.
Alternative No. 2 – PCC Pavement
• 9.0 inches Portland Cement Concrete • Existing asphalt pavement structure • Shoulders will be 4 foot PCC paved to match mainline thickness, and 2 foot gravel.
Station 321+00 – 478+00:
Alternative No. 1 – HMA Pavement
• 5.0 inches HMA Pavement Type E-3 • 10.0 inches existing base course, 2.0 inches existing asphalt; pulverized and relaid. • 4.0 inches existing granular subbase • Shoulders will be 4 foot HMA paved to match mainline thickness, and 2 foot gravel.
Alternative No. 2 – PCC Pavement
• 8.5 inches Portland Cement Concrete • Existing asphalt pavement structure • Shoulders will be 4 foot PCC paved to match mainline thickness, and 2 foot gravel.
October 2011 Pavement Type Selection Report
ID 6767-06-00 Kennedy Ave to USH 10 EB, CTH B, Portage County, Wisconsin
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\pav_type_select_rpt_jte.docx 6
Custer Road Intersection reconstruction:
Alternative No. 1 – HMA Pavement
• 6.0 inches HMA Pavement Type E-10 (Type E-30 for surface layer within intersection) • 15.0 inches Base Aggregate Dense 1 ¼ Inch. • Shoulders will be 4 foot HMA paved to match mainline thickness, and 2 foot gravel.
Alternative No. 2 – PCC Pavement
• 8.5 inches Portland Cement Concrete • 6.0 inches Base Aggregate Dense 1 ¼ Inch. • Shoulders will be 4 foot PCC paved to match mainline thickness, and 2 foot gravel.
CTH K Intersection reconstruction:
Alternative No. 1 – HMA Pavement
• 6 inches HMA Pavement Type E-10 • 18.0 inches Base Aggregate Dense 1 ¼ Inch. • 6 inches granular sub-base • Shoulders will be 4 foot HMA paved to match mainline thickness, and 2 foot gravel.
Alternative No. 2 – PCC Pavement
• 9.0 inches Portland Cement Concrete • 6.0 inches Base Aggregate Dense 1 ¼ Inch. • Shoulders will be 4 foot PCC paved to match mainline thickness, and 2 foot gravel.
Existing Pavement Structure WisDOT standard specifications allow the contractor to use recycled materials to produce base courses, asphalt, and concrete on all projects. The existing base does not meet the requirements for WisDOT base courses. Existing asphalt can be recycled for the project and incorporated into the new asphalt and base courses. LIFE CYCLE COST ANALYSIS A LCCA was performed for the CTH B project using Version 2.4.1 (the most current version) of WisDOT’s WisPAVE Software. The worksheets are included in Exhibit 6. Based on the LCCA, The HMA Pavement alternatives have a lower present worth cost than the PCC alternatives. The following is a LCCA breakdown:
Station 32+50 – 295+00, Excluding Custer Road Intersection
Alternative No. 1 HMA Pavement
Alternative No. 2 PCC Pavement
Initial Construction Costs $2,034,292.84 $3,394,951.20 Total Facility Costs $3,083,099.28 $3,805,361.70 Percent Difference from Lowest Cost 0.0% 23.43%
October 2011 Pavement Type Selection Report
ID 6767-06-00 Kennedy Ave to USH 10 EB, CTH B, Portage County, Wisconsin
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\pav_type_select_rpt_jte.docx 7
Station 321+00 – 478+00 Alternative No. 1
HMA Pavement Alternative No. 2 PCC Pavement
Initial Construction Costs $712,542.96 $1,128,406.41 Total Facility Costs $1,001,142.27 $1,279,541.80 Percent Difference from Lowest Cost 0.0% 27.81%
Custer Road Intersection Alternative No. 1
HMA Pavement Alternative No. 2 PCC Pavement
Initial Construction Costs $134,281.71 $117,735.56 Total Facility Costs $165,109.46 $134,033.09 Percent Difference from Lowest Cost 23.19% 0.0%
CTH K Intersection Alternative No. 1
HMA Pavement Alternative No. 2 PCC Pavement
Initial Construction Costs $342,221.44 $318,276.67 Total Facility Costs $415,234.54 $354,994.80 Percent Difference from Lowest Cost 16.97% 0.0%
RECOMMENDATIONS AND CONSIDERATIONS Based on the LCCAs of the alternatives, the flexible alternative is the most economical for the 6.5 miles of pulverize and relay and is also preferred by the Portage County Highway Department. The rigid alternative was eliminated for the 1,600 feet of intersection reconstruction to be consistent with the pavement type for CTH B and to facilitate construction. Four different pavement sections are recommended, two for the pulverize and relay areas and two for the reconstruction areas. The recommendations for the project are as follows: For the pulverize and relay section from Station 32+50 to Station 295+00, excluding the reconstruction area at Custer Road: • 6-inches HMA Pavement Type E-10
• 2.5-inch upper layer, PG 58-28 (nominal aggregate size: 12.5 mm) • 3.5-inch lower layer, PG 58-28 (nominal aggregate size: 19.0 mm)
• 2.0 inches existing base course, 10.0 inches existing asphalt; pulverized and relaid.
• 4.0 inches existing granular subgrade
• Shoulders will be 4 foot HMA paved to match mainline thickness, and 2 foot gravel.
October 2011 Pavement Type Selection Report
ID 6767-06-00 Kennedy Ave to USH 10 EB, CTH B, Portage County, Wisconsin
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\pav_type_select_rpt_jte.docx 8
For the pulverize and relay section from Station 321+00 to Station 478+00: • 5-inches HMA Pavement Type E-3
• 2.5-inch upper layer, PG 58-28 (nominal aggregate size: 12.5 mm) • 2.5-inch lower layer, PG 58-28 (nominal aggregate size: 19.0 mm)
• 2.0 inches existing base course, 10.0 inches existing asphalt; pulverized and relaid.
• 4.0 inches existing granular subgrade
• Shoulders will be 4 foot HMA paved to match mainline thickness, and 2 foot gravel. We recommend the reconstruction area consist of completely removing the existing asphalt pavement and base and reconstructing a new pavement structure. The pavement sections are as follows: For the reconstruction at Custer Road, this includes CTH B from Station 170+00 to Station 181+00, and the acceleration lane: • 6-inches HMA Pavement Type E-10
• 2.5-inch upper layer,
o PG 58-28 (nominal aggregate size: 12.5 mm) o PG 70-28, HMA Pavement Type E-30, within intersection
• 3.5-inch lower layer, PG 58-28 (nominal aggregate size: 19.0 mm) • 15 inches Base Aggregate Dense 1¼ inch.
• Shoulders will be 4 foot HMA paved to match mainline thickness, and 2 foot gravel.
For the reconstruction at CTH K, this includes CTH B from Station 295+00 to Station 321+00: • 6-inches HMA Pavement Type E-10
• 2.5-inch upper layer, PG 58-28 (nominal aggregate size: 12.5 mm) • 3.5-inch lower layer, PG 58-28 (nominal aggregate size: 19.0 mm)
• 17 inches Base Aggregate Dense 1¼ inch.
• 6 inches granular sub-base
• Shoulders will be 4 foot HMA paved to match mainline thickness, and 2 foot gravel.
October 2011 Pavement Type Selection Report
ID 6767-06-00 Kennedy Ave to USH 10 EB, CTH B, Portage County, Wisconsin
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\pav_type_select_rpt_jte.docx 9
Side Roads Several side road intersections within the project limits will be reconstructed as part of this project. All intersecting side roads will be adjusted vertically to match the proposed profile of CTH B. The pavement structure for all side road intersections, with the exception of Custer Road and CTH K will match the mainline pavement structure. The pavement structure for Custer Road and CTH K will be as follows: • 4-inches HMA Pavement Type E-1
• 1.75-inch upper layer, PG 58-28 (nominal aggregate size: 12.5 mm) • 2.25-inch lower layer, PG 58-28 (nominal aggregate size: 19.0 mm)
• 12 inches Base Aggregate Dense 1¼ inch.
EXHIBIT 1
PROJECT LOCATION MAP
PR
OJE
CT
LO
CA
TIO
N
1-I
NC
H =
1-M
ILE
ST
OC
KT
ON
J J
B
K
D
B
Q
D5
4
1
1
6
36
36
31
31
Bear
Cr.
Th
om
asL
.
BearA
dam
s
L.
L.
Ell L.
L.
L.
Juli
a
Em
ily
L.
Lim
e
EE
KP
OR
TE
R5T
H
OA
K D
R
4T
H
CUSTER
KENNEDYAVE
TOWER
ADAMS
PL
EA
SA
NT
ST
AN
DIN
G
RO
CK
S
PA
VE
LS
KI
MIL
L
LAKE DR
OLD
18
LU
TZ
LIME
LIME
FO
UN
TA
IN
RIV
ER
DA
MR
AU
SHULFER
JAC
KIE
S
ALM
MILL RD
ST
ON
EY
RD
1S
T S
T
NE
WB
Y
WIC
ZE
K R
D
LN
ED
GE
WA
TE
R D
R
WA
RD
RD
FO
X R
D
KUBISIAK DR
KELLY RD
SHADY DR
CUSTER RD
BL
AC
K
O’KEEFE CT
2N
D S
T
TOWNLINE
OA
K R
IDG
EC
T E
&W
SMOKEY RD
LK
LK
T
HO
MA
S
BEAR LK RD
DR
RD
DR
BLUFF RD
ST
ST
RD
RD
RD
LK
RD
RD
LK
RD
RD
LK
RD
RD
RD
RD
RD
LK EMILY
DR
RDA
MH
ER
ST
Am
hers
tJc
t.
Arn
ott
161
Plo
ver
R.
PR
OJE
CT
LO
CA
TIO
N M
AP
FIG
UR
E 1
1
CT
H B
M
AR
20
10
ST
OC
KT
ON
- A
MH
ER
ST
DR
ND
AT
EP
RO
JE
CT
NO
.F
IGU
RE
NO
.F
ILE
NA
ME
:
6767-0
6-7
0
PO
RT
AG
E C
OU
NT
Y
WIS
CO
NS
IN
locati
on
map
.dg
n
Filename:
Plo
t F
ile D
ate
Create
d:
Layout-
Sheet
Nam
e:
Plo
tted B
y:
kochl
1:5
0:0
0 P
M3
/2
3/2
01
0
Default
L:\work\Projects\60145536\gra\locationmap.dgn
EXHIBIT 2
EXISTING AND PROPOSED PAVEMENT TYPICAL SECTIONS
EXHIBIT 3
TRAFFIC FORECAST
TRAF
FIC
FO
REC
AST
REP
OR
TR
EGIO
N/C
OU
NTY
(IES)
: N
orth
Cen
tral
/ Po
rtag
e
PRO
JEC
T ID
(S):
676
7-06
-00
/ 70
LO
CA
TIO
N:
Ken
nedy
Ave
nue
to U
SH 1
0 EB
R
OU
TE(S
): C
TH B
C
OM
PLET
ED:
2-10
-10
Traf
fic F
orec
astin
g S
ectio
n; B
urea
u of
Sta
te H
ighw
ay P
rogr
ams;
Div
isio
n of
Tra
nspo
rtatio
n In
vest
men
t Man
agem
ent
Dev
elop
ed b
y: K
im T
ran
Pho
ne: (
608)
264
-726
5FA
X #:
(608
) 267
-185
6E-
Mai
l ID
: kim
.tran
@do
t.wi.g
ov
N
Stoc
kton
Amhe
rst
Plov
er
Plov
er
Plov
er
Amhe
rst J
unct
ion
Nelso
nville
Plov
er
Stev
ens P
oint
©̈HH ©̈B
©̈SS
©̈J
©̈K
©̈R
©̈KK5t
h St
6 th
St
4th
St
ine Rd
Rd
Bluff Rd
Porte
r Dr
Lake Rd
War
d R d
L utz
Ln
Smokey Rd
Burbank Rd
Pave
lski R
dOld
18 R
d
Tow e
Bl u ebird
D r
Lake Emily Rd
Lake Rd
US 10 Ramp
P ine D r
Lake
Tho
mas
Rd
Moor
e Rd
Blac
k Oak
Dr
O'Keefe Ct
Roos
evelt
Dr
Kelly Rd
Kjer Ward Dr
Wat
er W
ay
G ra y
Log
L n
R am p
§̈ ¦39
ST161
t u10
Des
ign
Valu
es (%
)R
oute
s
Des
ign
CTH
B
Volu
me(
s):
6550
----
K25
09.
6--
--K
100
10.3
----
Truc
k C
lass
%'s
K30
11.8
----
Cla
ssSe
g. 1
Seg.
2Se
g. 3
2D1.
9--
--T(
DH
V)
4.7
----
3AX
1.4
----
2S1+
2S2
0.9
----
D(D
sgn.
Hr.)
60/4
0--
--3-
S2
1.2
----
K8(
AD
T)D
BL
BTM
01
Dev
elop
ed b
y: K
im T
ran
Pho
ne: (
608)
264
-726
5FA
X #:
(608
) 267
-185
6E-
Mai
l ID
: kim
.tran
@do
t.wi.g
ov
3. T
ruck
cla
ssifi
catio
n pe
rcen
tage
s w
ere
take
n fro
m a
tabl
e re
pres
enta
tive
of s
imila
r fac
ilitie
s an
d lo
catio
ns th
roug
hout
the
stat
e of
Wis
cons
in.
N
NO
TES
ON
TH
E F
OR
EC
AS
T:
1. T
his
proj
ectio
n as
sum
es th
at n
o m
ajor
new
traf
fic
gene
rato
rs w
ill be
dev
elop
ed in
the
area
ser
ved
by th
e ro
adw
ay o
r int
erse
ctio
n ov
er th
e co
urse
of t
he p
lann
ing
perio
d.
2. C
TH B
is a
fact
or g
roup
IV ro
adw
ay in
dica
ting
low
to
mod
erat
e flu
ctua
tion
in tr
affic
thro
ugho
ut th
e ye
ar.
It is
co
nsid
ered
a ru
ral m
ajor
col
lect
or ro
adw
ay fo
r cou
nt
purp
oses
alo
ng th
is s
egm
ent o
f roa
dway
.
Last
Cou
nt/F
orec
ast Y
ears
:{0
00}
2002
CO
UN
T(0
00)
2012
AA
DT
-000
-20
22 A
AD
T00
0 2
032
AA
DT
Stoc
kton
Amhe
rst
Buen
a Vist
a
Plov
er
Plov
er
Lana
rk
Plov
er
Plov
er
Plov
er
Amhe
rst J
unct
ion
Nelso
nville
Plov
er
Stev
ens P
oint
©̈HH ©̈B
©̈SS
©̈Q
©̈D
©̈J
©̈K
©̈EE
©̈R
©̈KK
©̈K
5th
St
2nd
St
6 th
St
Shad
y Dr
4th
St
Elm
Dr
Town Line Rd
Old A
mish
Rd
Newb
y Rd
Rive
r Rd
Sta n
ding R
ocks
Rd
Custer Rd
Bluff Rd
Birc
h Dr
Porte
r Dr
1st S
t
Lake Rd
War
d R d
Mjelde Rd
Kennedy Ave
Ston
ey R
d
L utz
Ln
Oak DrSmokey Rd
Burbank Rd
Pave
lski R
d
R am p
Dam
rau
Rd
Old 18
Rd
Tow e r R d
Foun
t ai n
Grov
e Rd
B l u ebird
D r
Lake Emily Rd
Adams Lake Rd
US 10 Ramp
P ine D r
Lake
Tho
mas
Rd
Moor
e Rd
Blac
k Oak
Dr
O'Keefe Ct
Roos
evelt
Dr
Kelly Rd
Kjer Ward Dr
Wat
er W
ay
G ra y
Lo g
L n
R am p
Ramp
Old A
m ish
Rd
§̈ ¦39 §̈ ¦39
ST161
t u10
{450
0}(5
200)
-585
0-65
50
{300
0}(3
450)
-390
0-43
50
K8(
AD
T)--
----
DB
L-B
TM0.
1--
--T(
A8H
V)
----
--TO
TAL
5.5%
----
Dev
elop
ed b
y: K
im T
ran
Pho
ne: (
608)
264
-726
5FA
X #:
(608
) 267
-185
6E-
Mai
l ID
: kim
.tran
@do
t.wi.g
ov
3. T
ruck
cla
ssifi
catio
n pe
rcen
tage
s w
ere
take
n fro
m a
tabl
e re
pres
enta
tive
of s
imila
r fac
ilitie
s an
d lo
catio
ns th
roug
hout
the
stat
e of
Wis
cons
in.
N
NO
TES
ON
TH
E F
OR
EC
AS
T:
1. T
his
proj
ectio
n as
sum
es th
at n
o m
ajor
new
traf
fic
gene
rato
rs w
ill be
dev
elop
ed in
the
area
ser
ved
by th
e ro
adw
ay o
r int
erse
ctio
n ov
er th
e co
urse
of t
he p
lann
ing
perio
d.
2. C
TH B
is a
fact
or g
roup
IV ro
adw
ay in
dica
ting
low
to
mod
erat
e flu
ctua
tion
in tr
affic
thro
ugho
ut th
e ye
ar.
It is
co
nsid
ered
a ru
ral m
ajor
col
lect
or ro
adw
ay fo
r cou
nt
purp
oses
alo
ng th
is s
egm
ent o
f roa
dway
.
Last
Cou
nt/F
orec
ast Y
ears
:{0
00}
2002
CO
UN
T(0
00)
2012
AA
DT
-000
-20
22 A
AD
T00
0 2
032
AA
DT
Stoc
kton
Amhe
rst
Buen
a Vist
a
Plov
er
Plov
er
Lana
rk
Plov
er
Plov
er
Plov
er
Amhe
rst J
unct
ion
Nelso
nville
Plov
er
Stev
ens P
oint
©̈HH ©̈B
©̈SS
©̈Q
©̈D
©̈J
©̈K
©̈EE
©̈R
©̈KK
©̈K
5th
St
2nd
St
6 th
St
Shad
y Dr
4th
S t
Elm
Dr
Town Line Rd
Old A
mish
Rd
Newb
y Rd
Rive
r Rd
Sta n
ding R
ocks
Rd
Custer Rd
Bluff Rd
Birc
h Dr
Porte
r Dr
1st S
t
Lake Rd
War
d R d
Mjelde Rd
Kennedy Ave
Ston
ey R
d
L utz
Ln
Oak DrSmokey Rd
Burbank Rd
Pave
lski R
d
R am p
Dam
rau
Rd
Old 18
Rd
Tow e r R d
Foun
t ai n
Grov
e Rd
B l u ebird
D r
Lake Emily Rd
Adams Lake Rd
US 10 Ramp
P ine D r
Lake
Tho
mas
Rd
Moor
e Rd
Blac
k Oak
Dr
O'Keefe Ct
Roos
evelt
Dr
Kelly Rd
Kjer Ward Dr
Wat
er W
ay
G ra y
Lo g
L n
R am p
Ramp
Old A
m ish
Rd
§̈ ¦39 §̈ ¦39
ST161
t u10
{450
0}(5
200)
-585
0-65
50
{300
0}(3
450)
-390
0-43
50
Loc
atio
n:F
unct
. Cla
ss:
Cou
nty:
Sit
e N
ames
:
Wis
con
sin
Dep
artm
ent
of T
ran
spor
tati
on
4902
54, ,
NC
Por
tage
R M
ajor
Col
lect
orC
TH
B E
AS
T O
F C
TH
J S
TO
CK
TO
N T
NS
HP
344
Axl
e F
acto
r G
roup
:D
aily
Fac
tor
Gro
up:
Sea
sona
l F
acto
r G
roup
:
NA
Gro
wth
Fac
tor
Gro
up:
Dai
ly %
Cla
ss D
istr
ibu
tion
for
07/
12/2
011
Th
rou
gh 0
7/14
/201
1 (
48 h
ours
)
Roa
dw
ayN
eg D
IRP
os D
IR
MC
1.9
2.8
0.9
CA
R51
.2
52.3
50
.1
PU
23.6
22
.3
24.9
BU
S2.
2 3.
0 1.
3
2D5.
4 5.
9 4.
9
SU
36.
4 3.
2 9.
7
SU
4+
1.8
2.6
1.0
ST
4-
4.4
6.0
2.7
ST
53.
1 1.
7 4.
5
ST
6+
0.1
0.1
0.1
MT
5-
0.0
0.0
0.0
MT
60.
0 0.
0 0.
0
MT
7+
0.0
0.0
0.0
Tru
cks
23.3
22
.6
24.1
Com
bo
Tru
cks
7.6
7.8
7.3
Cla
ssif
ied
100.
0 10
0.0
100.
0
Vol
um
e8,
767
4,46
8 4,
299
Axl
e F
acto
r0.
420
0.42
4 0.
416
Pag
e 1
of 1
7/25
/201
1 7
:12:
29A
MD
C02
:
Loc
atio
n:F
unct
. Cla
ss:
Cou
nty:
Sit
e N
ames
:
Wis
con
sin
Dep
artm
ent
of T
ran
spor
tati
on
4903
67, ,
NC
Por
tage
R M
ajor
Col
lect
orC
TH
B W
ES
T O
F C
TH
Q A
MH
ER
ST
TN
SH
P344
Axl
e F
acto
r G
roup
:D
aily
Fac
tor
Gro
up:
Sea
sona
l F
acto
r G
roup
:
NA
Gro
wth
Fac
tor
Gro
up:
Dai
ly %
Cla
ss D
istr
ibu
tion
for
07/
12/2
011
Th
rou
gh 0
7/14
/201
1 (
49 h
ours
)
Roa
dw
ayN
eg D
IRP
os D
IR
MC
0.9
1.1
0.7
CA
R54
.2
53.0
55
.3
PU
25.7
25
.5
26.0
BU
S1.
6 1.
6 1.
5
2D5.
8 6.
5 5.
1
SU
32.
9 3.
7 2.
1
SU
4+
0.7
0.0
1.4
ST
4-
3.3
4.1
2.5
ST
54.
8 4.
5 5.
2
ST
6+
0.1
0.2
0.0
MT
5-
0.0
0.0
0.0
MT
60.
0 0.
0 0.
0
MT
7+
0.0
0.0
0.0
Tru
cks
19.2
20
.5
17.9
Com
bo
Tru
cks
8.2
8.7
7.8
Cla
ssif
ied
100.
0 10
0.0
100.
0
Vol
um
e6,
652
3,26
4 3,
388
Axl
e F
acto
r0.
425
0.42
5 0.
424
Pag
e 1
of 1
7/25
/201
1 7
:12:
32A
MD
C02
:
EXHIBIT 4
SOILS ANALYSIS
PR
OJE
CT
LOC
AT
ION
PR
OJE
CT
LOC
AT
ION
PR
OJE
CT
LOC
AT
ION
Soil
Soil
Start
End
Distance Alon
gDesign Group
Nam
eHorizon
Station
Station
Centerlin
eInde
xMeehan loam
y sand
B32
+50
34+00
150
0Richford loam
y sand
B34
+00
38+65
465
0Mosinee
sand
y loam
B38
+65
54+55
1,59
010
Point sandy
loam
B54
+55
60+30
575
12Mosinee
sand
y loam
B60
+30
73+40
1,31
010
Billett sa
ndy loam
B73
+40
89+80
1,64
012
Richford loam
y sand
B89
+80
93+30
350
0Billett sa
ndy loam
B93
+30
97+80
450
12Richford loam
y sand
B97
+80
99+60
180
0Billett sa
ndy loam
B99
+60
112+85
1,32
512
Richford loam
y sand
B11
2+85
114+00
115
0Billett sa
ndy loam
B13
6+50
150+60
1,41
012
Gravel Pit
B15
0+60
159+90
930
Billett sa
ndy loam
B15
9+90
163+55
365
12Richford loam
y sand
B16
3+55
171+00
745
0Richford loam
y sand
D17
1+00
172+35
135
0Re
constructio
n Section
Mecan
loam
y sand
D17
2+35
181+00
865
2Re
constructio
n Section
Rosholt sandy
loam
B18
1+00
190+65
965
14Mecan
loam
y sand
B19
0+65
205+55
1,49
014
Kranski loamy sand
B20
5+55
218+80
1,32
54
Wyocena
sand
y loam
B21
8+80
297+50
7,87
012
Wyocena
sand
y loam
B29
7+50
322+00
2,45
012
Reconstruct 2
97+50 ‐ 3
22+00
DGI 12
Wyocena
sand
y loam
B32
2+00
383+85
6,18
512
Change in
Traffic
Rosholt loam
B38
3+85
387+55
370
14Billett sa
ndy loam
B38
7+55
394+00
645
12Ro
sholt sandy
loam
B46
0+50
466+00
550
14Wyocena
sand
y loam
B46
6+00
472+45
645
12Ro
sholt loam
B47
2+45
478+00
555
14
DGI 12
AADT
(201
2) 520
0
AADT
(203
2) 655
0
DGI 2
AAD
T (201
2) 520
0
AADT
( 20
32) 6
550
DGI 14
AADT
(201
2) 520
0
AADT
(203
2) 655
0
DGI 14
AADT
(201
2) 345
0
AADT
(203
2) 435
0
Project ID 67
67‐06‐00
Stockton
‐ Am
herst
Kenn
edy Av
e to USH
10 EB
CTH B, Portage Cou
nty
Octob
er, 201
1
EXHIBIT 5
PAVEMENT DESIGN COMPUTATIONS
HMA Alternative #
LAYER MATERIAL TYPELAYER
COEFFICIENT
LAYERTHICKNESS
SN(in)
SURFACE
BASE
SUBBASE 1
SUBBASE 2
E-10
Pulverized AsphalticConcrete
Granular Subbase Course
None
0.44
0.18
0.06
0
6
12
4
0
2.64
2.16
0.24
0
5.04
1
HMA THICKNESS DESIGN
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
LOADING
Truck Type % of ADT DLT # of TrucksESAL Load
Factor ESAL's
2D
3-SU
2S-1, 2S-2
3S-2
DBL BTM
7.6
6.4
6.2
3.2
0.0
2,938
2,938
2,938
2,938
2,938
223
188
182
94
0.3
0.8
0.5
0.9
2.0
67
150
91
85
393
2,868,900
Design Lane Daily ESAL's
Design Lane Total Life ESAL's
SOILSDGI
Frost Index
Soil Support Value (SSV)
14
F-3
3.9
DESIGN CALCULATION Required SN 4.87
PCC THICKNESS DESIGN
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
LOADING
Truck Type % of ADT DLT # of TrucksESAL Load
Factor ESAL's
2D
3-SU
2S-1, 2S-2
3S-2
DBL BTM
7.6
6.4
6.2
3.2
0.0
2,938
2,938
2,938
2,938
2,938
223
188
182
94
0.3
1.2
0.6
1.6
2.1
67
226
109
150
552
4,029,600
Design Lane Daily ESAL's
Design Lane Total Life ESAL's
SOILS
DESIGN THICKNESS
Modulus of Subgrade Reaction (k) 125
Calculated Slab Thickness
PCC ALT.#1 Plan Slab Thickness
PCC ALT.#2 Plan Slab Thickness
8.7
9
9
(in)
(in)
(in)
HMA Alternative #
LAYER MATERIAL TYPELAYER
COEFFICIENT
LAYERTHICKNESS
SN(in)
SURFACE
BASE
SUBBASE 1
SUBBASE 2
E-3
Pulverized AsphalticConcrete
Granular Subbase Course
None
0.44
0.18
0.06
0
5
12
4
0
2.2
2.16
0.24
0
4.6
1
HMA THICKNESS DESIGN
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
LOADING
Truck Type % of ADT DLT # of TrucksESAL Load
Factor ESAL's
2D
3-SU
2S-1, 2S-2
3S-2
DBL BTM
7.4
2.9
4.0
4.9
0.0
1,950
1,950
1,950
1,950
1,950
144
57
78
96
0.3
0.8
0.5
0.9
2.0
43
46
39
86
214
1,562,200
Design Lane Daily ESAL's
Design Lane Total Life ESAL's
SOILSDGI
Frost Index
Soil Support Value (SSV)
14
F-3
3.9
DESIGN CALCULATION Required SN 4.45
PCC THICKNESS DESIGN
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
LOADING
Truck Type % of ADT DLT # of TrucksESAL Load
Factor ESAL's
2D
3-SU
2S-1, 2S-2
3S-2
DBL BTM
7.4
2.9
4.0
4.9
0.0
1,950
1,950
1,950
1,950
1,950
144
57
78
96
0.3
1.2
0.6
1.6
2.1
43
68
47
154
312
2,277,600
Design Lane Daily ESAL's
Design Lane Total Life ESAL's
SOILS
DESIGN THICKNESS
Modulus of Subgrade Reaction (k) 125
Calculated Slab Thickness
PCC ALT.#1 Plan Slab Thickness
PCC ALT.#2 Plan Slab Thickness
8.
8
8
(in)
(in)
(in)
HMA Alternative #
LAYER MATERIAL TYPELAYER
COEFFICIENT
LAYERTHICKNESS
SN(in)
SURFACE
BASE
SUBBASE 1
SUBBASE 2
E-10
CABC (crushed gravel)
None
None
0.44
0.1
0
0
6
15
0
0
2.64
1.5
0
0
4.14
1
HMA THICKNESS DESIGN
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B &
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
LOADING
Truck Type % of ADT DLT # of TrucksESAL Load
Factor ESAL's
2D
3-SU
2S-1, 2S-2
3S-2
DBL BTM
7.6
6.4
6.2
3.2
0.0
3,525
3,525
3,525
3,525
3,525
268
226
219
113
0.3
0.8
0.5
0.9
2.0
80
181
110
102
473
3,452,900
Design Lane Daily ESAL's
Design Lane Total Life ESAL's
SOILSDGI
Frost Index
Soil Support Value (SSV)
2
F-2
5.4
DESIGN CALCULATION Required SN 4.13
PCC THICKNESS DESIGN
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B &
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
LOADING
Truck Type % of ADT DLT # of TrucksESAL Load
Factor ESAL's
2D
3-SU
2S-1, 2S-2
3S-2
DBL BTM
7.6
6.4
6.2
3.2
0.0
3,525
3,525
3,525
3,525
3,525
268
226
219
113
0.3
1.2
0.6
1.6
2.1
80
271
131
181
663
4,839,900
Design Lane Daily ESAL's
Design Lane Total Life ESAL's
SOILS
DESIGN THICKNESS
Modulus of Subgrade Reaction (k) 300
Calculated Slab Thickness
PCC ALT.#1 Plan Slab Thickness
PCC ALT.#2 Plan Slab Thickness
8.5
8.5
8.5
(in)
(in)
(in)
HMA Alternative #
LAYER MATERIAL TYPELAYER
COEFFICIENT
LAYERTHICKNESS
SN(in)
SURFACE
BASE
SUBBASE 1
SUBBASE 2
E-10
CABC (crushed gravel)
Granular Subbase Course
None
0.44
0.1
0.06
0
6
18
6
0
2.64
1.8
0.36
0
4.8
1
HMA THICKNESS DESIGN
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B & CTH
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
LOADING
Truck Type % of ADT DLT # of TrucksESAL Load
Factor ESAL's
2D
3-SU
2S-1, 2S-2
3S-2
DBL BTM
7.6
6.4
6.2
3.2
0.0
3,525
3,525
3,525
3,525
3,525
268
226
219
113
0.3
0.8
0.5
0.9
2.0
80
181
110
102
473
3,452,900
Design Lane Daily ESAL's
Design Lane Total Life ESAL's
SOILSDGI
Frost Index
Soil Support Value (SSV)
12
F-3
4.2
DESIGN CALCULATION Required SN 4.82
PCC THICKNESS DESIGN
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B & CTH
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
LOADING
Truck Type % of ADT DLT # of TrucksESAL Load
Factor ESAL's
2D
3-SU
2S-1, 2S-2
3S-2
DBL BTM
7.6
6.4
6.2
3.2
0.0
3,525
3,525
3,525
3,525
3,525
268
226
219
113
0.3
1.2
0.6
1.6
2.1
80
271
131
181
663
4,839,900
Design Lane Daily ESAL's
Design Lane Total Life ESAL's
SOILS
DESIGN THICKNESS
Modulus of Subgrade Reaction (k) 150
Calculated Slab Thickness
PCC ALT.#1 Plan Slab Thickness
PCC ALT.#2 Plan Slab Thickness
8.9
9
9
(in)
(in)
(in)
EXHIBIT 6
LCCA WORKSHEETS
BID ITEM BID ITEM # UNITS UNITS COST
Asphalt Material for Tack Coat 40204 GAL $5.00
Asphaltic Material for Plant Mixes 40501 TONS $450.00
Asphaltic Concrete Pavement, Type HV (40712) TONS $0.00
Asphaltic Concrete Pavement, Type MV (40713) TONS $0.00
Asphaltic Concrete Pavement, Type LV (40714) TONS $0.00
ACITEMS
Asphaltic Concrete Pavement, E-0.3 40721 TONS $0.00
Asphaltic Concrete Pavement, E-1 40722 TONS $45.00
Asphaltic Concrete Pavement, E-3 40723 TONS $50.00
Asphaltic Concrete Pavement, E-10 40724 TONS $55.00
Asphaltic Concrete Pavement, E-30 40725 TONS $0.00
Asphaltic Concrete Pavement, E-30X 40726 TONS $0.00
Asphaltic Concrete Pavement, SMA 40727 TONS $0.00
PCCITEMS
Concrete Pavement, 6 inch 41506 SY $0.00
Concrete Pavement, 6.5 inch 41526 SY $0.00
Concrete Pavement, 7 inch 41507 SY $25.00
Concrete Pavement, 7.5 inch 41527 SY $0.00
Concrete Pavement, 8 inch 41508 SY $27.00
Concrete Pavement, 8.5 inch 41528 SY $28.00
Concrete Pavement, 9 inch 41509 SY $33.00
Concrete Pavement, 9.5 inch 41529 SY $0.00
Concrete Pavement, 10 inch 41510 SY $0.00
Concrete Pavement, 10.5 inch 41530 SY $0.00
Concrete Pavement, 11 inch 41511 SY $0.00
Concrete Pavement, 11.5 inch 41531 SY $0.00
Concrete Pavement, 12 inch 41512 SY $0.00
BID ITEM COSTS
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B & CTH
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
BID ITEM COSTS
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B & CTH
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
BASECOURSE
ITEMS
Crushed Aggregate Base Course 30404 TONS $10.00
Open Graded Base Course 30420 TONS $0.00
Asphalt Stabilized Open Graded BaseCourse
99999 TONS $0.00
Cement Stabilized Open Graded BaseCourse
99999 SY $0.00
Asphaltic Base Course 30601 TONS $0.00
Concrete Base Course 99999 SY $0.00
Breaker Run 30426 TONS $0.00
Granular Subbase Course 21201 CY $0.00
Shoulder Gravel 99999 TONS $13.00
BID ITEM BID ITEM # UNITS UNITS COST
MISCITEMS
Concrete Curb and Gutter, Type A 60123 L.F. $0.00
Concrete Curb and Gutter, Type D 60133 L.F. $0.00
Geotextile Fabric, Type DF 64503 SY $0.00
Pipe Underdrain 61201 L.F. $0.00
Pipe Underdrain, Unperforated 61211 L.F. $0.00
R.C. Apron Endwalls for Underdrain 61254 EACH $0.00
REHABITEMS
Salvaged Asphaltic Pavement, Milling 41020 TONS $9.00
Mill and Relay Asphaltic ConcretePavement
90358 SY $1.30
Base Patching, Asphaltic 30810 SY $30.00
Base Patching, Concrete 30820 SY $40.00
Concrete Pavement Repair 41660 CY $250.00
Pavement Ties 41653 EACH $6.00
Dowel Bars 41654 EACH $10.00
Continuous Diamond Grinding 41670 SY $3.00
Retro-fit Dowel Bars 99999 EACH $30.00
Sawing Existing Pavement 66501 L.F. $2.00
Sawing Concrete Pavement, Full Depth 66502 L.F. $3.00
BID ITEM COSTS
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B & CTH
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
RECONITEMS
Pulverizing Asphaltic Concrete Pavement 90357 SY $1.00
Rubblizing Concrete Pavement 90405 SY $2.00
Cracking and Seating Concrete Pavement 40901 SY $0.00
Breaking and Seating Concrete Pavement 99999 SY $0.00
Removing Pavement 20401 SY $2.70
BID ITEM BID ITEM # UNITS UNITS COST
HMA Alternate 1 CTH B - 6" HMA on 12" pulverize and relay
RDWY Width
Using English Units
Structure Width
Lt.Shld. Width
Lt. Lane Width
Rt. Lane Width
Rt. Shld. Width
Side Slope
36
24
4
12
12
4
4:1
ROADWAY
SHOULDERS
E-10
E-10
6
6
5.5
5.5
110
110
1
1
0.025
0.025
Mix Type
Pav'tThickness
% AC
UnitWeight
# of TackCoat
Layers
Tack CoatCoverage
Rate
BASE
SUBBASE 1
SUBBASE 2
Material TypeThickness
UnitWeight % of Length
with drainage
Pulverized Asphaltic Concrete
Granular Subbase Course
None
12
4
0
0
0
0
EXISTINGPAVEMENT
Existing PavementConstruction Process
% of ProjectLength
ExistingPavementThickness
ExistingPavement
Width
AC Pulverization 100 0 30
ft
ft
ft
ft
ft
ft
(in) (lbs/SY/in) (Gal/SY)
(in) (TONS/CY)
(in) (ft)
HMA ALTERNATE DESCRIPTION
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
ITEM UNITS QUANTITY COST
(RDWY) E-10 TONS 22,302.7 $1,226,649.64
(SHLD)
(AC OIL)
Tack Coat
Shoulder Gravel
(Base)
(Subbase 1)
(Subbase 2)
E-10
E-10
Pulverized Asphaltic Concrete
Granular Subbase Course
None
Pulverizing Asphaltic ConcretePavement
(Other)
TONS 7,434.2 $408,883.21
TONS 1,635.5 $735,989.78
GAL 2,252.8 $11,264.00
TONS 5,632.0 $73,216.00
0.0 $0.00
CY 0.0 $0.00
0.0 $0.00
SY 84,480.0 $84,480.00
0.0 $0.00
0.0 $0.00
0.0 $0.00
0.0 $0.00
0.0 $0.00
0.0 $0.00
$2,540,482.63TOTAL INITIAL COST
HMA Alternate 1
HMA ALTERNATE QUANTITIES & COSTS
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
HMA ALTERNATE
YEAR TYPE OF WORK ACTIVITY SERVICE LIFE COSTInitial Construction0 18 $2,540,482.63
AC Maintenance
AC Maintenance
AC Rehabilitaion
AC Maintenance
AC Maintenance
AC Rehabilitaion
AC Maintenance
AC Maintenance
AC Rehabilitaion
AC Maintenance
AC Maintenance
1st Cycle
2nd Cycle
1st Cycle
2nd Cycle
1st Cycle
2nd Cycle
1st Cycle
2nd Cycle
3
8
18 Mill & HMA Overlay 12
$9,600.00
$12,000.00
$1,110,912.04
21
26
$9,600.00
$12,000.00
12 $1,110,912.04Mill & HMA Overlay30
33
38
42
45
50
Mill & HMA Overlay 12
$9,600.00
$12,000.00
$1,110,912.04
54
1
$9,600.00
$12,000.00
HMA ALTERNATE REHABILITATIONSUMMARY
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B
6767-06-00
CTH B
Kennedy Avenue - USH 10 Portage County
ITEM UNITS QUANTITY COST
AC Pavement TONS 12,390.4 $681,472.02
Asphalt Cement TONS 681.5 $306,662.42
Tack Coat GAL 2,252.8 $11,264.00
Shoulder Gravel TONS 0.0 $0.00
Salvaged Asphaltic Pavement,Milling
TONS 12,390.4 $111,513.60
Overlay Thickness(in)
Asphalt MixType % AC
Tack CoatCoverage Rate
(Gal/SY)# of Tack Coat
Layers
HMA Alternate 1 Rehabilitation 1
2.50 E-10 5.5 1 0.025
$1,110,912.04
Overlay Limits Milling Limits
Milling Depth (in)
RDWY & SHLD's
2.50
RDWY & SHLD's
Other units 0.0 $0.00
MILL and ASPHALT OVERLAYREHABILITATION
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
MILL and ASPHALT OVERLAYREHABILITATION
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
ITEM UNITS QUANTITY COST
AC Pavement TONS 12,390.4 $681,472.02
Asphalt Cement TONS 681.5 $306,662.42
Tack Coat GAL 2,252.8 $11,264.00
Shoulder Gravel TONS 0.0 $0.00
Salvaged Asphaltic Pavement,Milling
TONS 12,390.4 $111,513.60
Overlay Thickness(in)
Asphalt MixType % AC
Tack CoatCoverage Rate
(Gal/SY)# of Tack Coat
Layers
HMA Alternate 1 Rehabilitation 2
2.50 E-10 5.5 1 0.025
$1,110,912.04
Overlay Limits Milling Limits
Milling Depth (in)
RDWY & SHLD's
2.50
RDWY & SHLD's
Other units 0.0 $0.00
MILL and ASPHALT OVERLAYREHABILITATION
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
ITEM UNITS QUANTITY COST
AC Pavement TONS 12,390.4 $681,472.02
Asphalt Cement TONS 681.5 $306,662.42
Tack Coat GAL 2,252.8 $11,264.00
Shoulder Gravel TONS 0.0 $0.00
Salvaged Asphaltic Pavement,Milling
TONS 12,390.4 $111,513.60
Overlay Thickness(in)
Asphalt MixType % AC
Tack CoatCoverage Rate
(Gal/SY)# of Tack Coat
Layers
HMA Alternate 1 Rehabilitation 3
2.50 E-10 5.5 1 0.025
$1,110,912.04
Overlay Limits Milling Limits
Milling Depth (in)
RDWY & SHLD's
2.50
RDWY & SHLD's
Other units 0.0 $0.00
PCC Alternate 1 CTH B - 9" PCC on puverize and relay
RDWY Width
Using English Units
Structure Width
Lt.Shld. Width
Lt. Lane Width
Rt. Lane Width
Rt. Shld. Width
Side Slope
36
24
4
12
12
4
4:1
ROADWAY
SHOULDERS PCC Shoulders
9
9
Mix Type
Pav'tThickness
BASE
SUBBASE 1
SUBBASE 2
Material TypeThickness
UnitWeight % of Length
with drainage
CABC
None
None
6
0
0
0
0
0
EXISTINGPAVEMENT
Existing PavementConstruction Process
% of ProjectLength
ExistingPavementThickness
ExistingPavement
Width
Pavement Removal 100 0 30
ft
ft
ft
ft
ft
ft
(in)
(in) (TONS/CY)
(in) (ft)
PCC ALTERNATE DESCRIPTION
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
ITEM UNITS QUANTITY COST
(RDWY)
(SHLD)
Tack Coat
Shoulder Gravel
(Base)
(Subbase 1)
(Subbase 2)
(Other)
TOTAL INITIAL COST
PCC Alternate 1
$3,742,933.36
Concrete Pavement, 9 inch
Concrete Pavement, 9 inch
CABC
None
None
Removing Pavement
Asphalt Cement
SY 67,584.0 $2,230,272.00
SY 22,528.0 $743,424.00
0.0 $0.00
0.0 $0.00
TONS 9,856.0 $128,128.00
TONS 41,301.3 $413,013.36
0.0 $0.00
0.0 $0.00
SY 84,480.0 $228,096.00
0.0 $0.00
0.0 $0.00
0.0 $0.00
0.0 $0.00
0.0 $0.00
0.0 $0.00
PCC ALTERNATE QUANTITIES & COSTS
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
PCC ALTERNATE
YEAR TYPE OF WORK ACTIVITY SERVICE LIFE COSTInitial Construction0 25 $3,742,933.36
PCC Maintenance
PCC Maintenance
PCC Rehabilitaion
PCC Maintenance
PCC Maintenance
PCC Rehabilitaion
PCC Maintenance
PCC Maintenance
PCC Rehabilitaion
PCC Maintenance
PCC Maintenance
1st Cycle
2nd Cycle
1st Cycle
2nd Cycle
1st Cycle
2nd Cycle
1st Cycle
2nd Cycle
10
15
25 Repair & Grind 8
$19,200.00
$38,400.00
$342,351.33
28
31
$19,200.00
$38,400.00
15 $1,366,324.58Repair & Overlay33
36
41
48
52
57
Mill, Repair & Overlay 15
$9,600.00
$12,000.00
$1,453,263.37
63
1
$9,600.00
$12,000.00
PCC ALTERNATE REHABILITATION SUMMARY
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
ITEM UNITS QUANTITY COST
Concrete Pavement Repair CY 901.3 $225,333.33
Pavement Ties EACH 575.0 $3,450.00
Dowel Bars EACH 8,112.0 $81,120.00
Sawing Concrete Pavement,Full Depth
L.F. 10,816.0 $32,448.00
Continuous Diamond Grinding SY 0.0 $0.00
PCC Alternate 1 Rehabilitation 1
$342,351.33
Other units 0.0 $0.00
# of STD PCCPatches
10.0 Percent Joint Repair
PCC Patch Width 32.00 (ft)
PCC Slab Thickness (in)
Grind Limits None
169
9.00
REPAIR and GRIND REHABILITATION
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
REPAIR and OVERLAY REHABILITATION
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
ITEM UNITS QUANTITY COST
AC Pavement TONS 12,390.4 $681,472.02
Asphalt Cement TONS 681.5 $306,662.42
Tack Coat GAL 2,252.8 $11,264.00
Concrete Pavement Repair CY 901.3 $225,333.33
Pavement Ties EACH 575.0 $3,450.00
PCC Alternate 1 Rehabilitation 2
$1,366,324.58
Overlay Limits
Dowel Bars EACH 8,112.0 $81,120.00
Overlay Thickness(in)
Asphalt MixType % AC
Tack CoatCoverage Rate
(Gal/SY)# of Tack Coat
Layers
E-10 1 0.025
# of STD PCCPatches
10.0 Percent Joint Repair
PCC Patch Width 32.00 (ft)
PCC Slab Thickness (in)
Sawing Concrete Pavement,Full Depth
L.F. 10,816.0 $32,448.00
Shoulder Gravel
Other
TONS
units
1,890.4
0.0
$24,574.81
$0.00
RDWY & SHLD's
169
9.00
5.52.50
ITEM UNITS QUANTITY COST
AC Pavement TONS 12,390.4 $681,472.02
Asphalt Cement TONS 681.5 $306,662.42
Tack Coat GAL 2,252.8 $11,264.00
Concrete Pavement Repair CY 901.3 $225,333.33
Pavement Ties EACH 575.0 $3,450.00
PCC Alternate 1 Rehabilitation 3
$1,453,263.37
Overlay Limits Milling Limits
Milling Depth (in)
RDWY & SHLD's
2.50
Dowel Bars EACH 8,112.0 $81,120.00
Overlay Thickness(in)
Asphalt MixType % AC
Tack CoatCoverage Rate
(Gal/SY)# of Tack Coat
Layers
2.50 E-10 5.5 1 0.025
# of STD PCCPatches 169
10.0 Percent Joint Repair
PCC Patch Width 32.00 (ft)
PCC Slab Thickness 9.00 (in)
Salvaged Asphaltic Pavement,Milling
TONS 12,390.4 $111,513.60
Sawing Concrete Pavement,Full Depth
Shoulder Gravel
Other
L.F.
TONS
units
10,816.0
0.0
0.0
$32,448.00
$0.00
$0.00
RDWY & SHLD's
MILL, REPAIR and ASPHALT OVERLAYREHABILITATION (PCC)
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
PRESENT WORTH COSTS
(CURRRENT YEAR)
Initial Construction Costs
Maintenance Costs
Rehabilitation Costs
Rehabilitation Salvage Value
Total Facility Costs
ALT 1 ALT 2 ALT 3 ALT 4 ALT 5 ALT 6
CTH B - 6"HMA on 12"pulverize and
relay
CTH B - 9"PCC on
puverize andrelay
PCC Alternate2
Field9 Field10 Field11
$2,304,292.84
$26,438.64
$781,657.56
($29,289.77)
$3,083,099.28
$3,394,951.20
$43,901.81
$466,130.38
($99,621.69)
$3,805,361.70
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
+ 0.00% + 23.43%
Current Year 2010
Construction Year 2012
Analysis Period 50 yr
Project Length
Analysis Basis
Discount Rate (%)
4.8
Project
5
LCCA RESULTS
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
HMA Alternate 1 K to 10 - 5" HMA on pulverize and relay
RDWY Width
Using English Units
Structure Width
Lt.Shld. Width
Lt. Lane Width
Rt. Lane Width
Rt. Shld. Width
Side Slope
36
24
4
12
12
4
4:1
ROADWAY
SHOULDERS
E-3
E-3
5
5
5.5
5.5
110
110
1
1
0.025
0.025
Mix Type
Pav'tThickness
% AC
UnitWeight
# of TackCoat
Layers
Tack CoatCoverage
Rate
BASE
SUBBASE 1
SUBBASE 2
Material TypeThickness
UnitWeight % of Length
with drainage
Pulverized Asphaltic Concrete
Granular Subbase Course
None
12
4
0
0
0
0
EXISTINGPAVEMENT
Existing PavementConstruction Process
% of ProjectLength
ExistingPavementThickness
ExistingPavement
Width
AC Pulverization 100 0 30
ft
ft
ft
ft
ft
ft
(in) (lbs/SY/in) (Gal/SY)
(in) (TONS/CY)
(in) (ft)
HMA ALTERNATE DESCRIPTION
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
ITEM UNITS QUANTITY COST
(RDWY) E-3 TONS 7,279.4 $363,967.99
(SHLD)
(AC OIL)
Tack Coat
Shoulder Gravel
(Base)
(Subbase 1)
(Subbase 2)
E-3
E-3
Pulverized Asphaltic Concrete
Granular Subbase Course
None
Pulverizing Asphaltic ConcretePavement
(Other)
TONS 2,426.5 $121,322.67
TONS 533.8 $240,218.87
GAL 882.3 $4,411.73
TONS 1,736.1 $22,569.28
0.0 $0.00
CY 0.0 $0.00
0.0 $0.00
SY 33,088.0 $33,088.00
0.0 $0.00
0.0 $0.00
0.0 $0.00
0.0 $0.00
0.0 $0.00
0.0 $0.00
$785,578.54TOTAL INITIAL COST
HMA Alternate 1
HMA ALTERNATE QUANTITIES & COSTS
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
HMA ALTERNATE
YEAR TYPE OF WORK ACTIVITY SERVICE LIFE COSTInitial Construction0 18 $785,578.54
AC Maintenance
AC Maintenance
AC Rehabilitaion
AC Maintenance
AC Maintenance
AC Rehabilitaion
AC Maintenance
AC Maintenance
AC Rehabilitaion
AC Maintenance
AC Maintenance
1st Cycle
2nd Cycle
1st Cycle
2nd Cycle
1st Cycle
2nd Cycle
1st Cycle
2nd Cycle
3
8
18 Mill & HMA Overlay 12
$3,760.00
$4,700.00
$410,842.68
21
26
$3,760.00
$4,700.00
12 $410,842.68Mill & HMA Overlay30
33
38
42
45
50
Mill & HMA Overlay 12
$3,760.00
$4,700.00
$410,842.68
54
1
$3,760.00
$4,700.00
HMA ALTERNATE REHABILITATIONSUMMARY
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B
6767-06-00
CTH B
Kennedy Avenue - USH 10 Portage County
ITEM UNITS QUANTITY COST
AC Pavement TONS 4,852.9 $242,645.34
Asphalt Cement TONS 266.9 $120,109.45
Tack Coat GAL 882.3 $4,411.73
Shoulder Gravel TONS 0.0 $0.00
Salvaged Asphaltic Pavement,Milling
TONS 4,852.9 $43,676.16
Overlay Thickness(in)
Asphalt MixType % AC
Tack CoatCoverage Rate
(Gal/SY)# of Tack Coat
Layers
HMA Alternate 1 Rehabilitation 1
2.50 E-3 5.5 1 0.025
$410,842.68
Overlay Limits Milling Limits
Milling Depth (in)
RDWY & SHLD's
2.50
RDWY & SHLD's
Other units 0.0 $0.00
MILL and ASPHALT OVERLAYREHABILITATION
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
MILL and ASPHALT OVERLAYREHABILITATION
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
ITEM UNITS QUANTITY COST
AC Pavement TONS 4,852.9 $242,645.34
Asphalt Cement TONS 266.9 $120,109.45
Tack Coat GAL 882.3 $4,411.73
Shoulder Gravel TONS 0.0 $0.00
Salvaged Asphaltic Pavement,Milling
TONS 4,852.9 $43,676.16
Overlay Thickness(in)
Asphalt MixType % AC
Tack CoatCoverage Rate
(Gal/SY)# of Tack Coat
Layers
HMA Alternate 1 Rehabilitation 2
2.50 E-3 5.5 1 0.025
$410,842.68
Overlay Limits Milling Limits
Milling Depth (in)
RDWY & SHLD's
2.50
RDWY & SHLD's
Other units 0.0 $0.00
MILL and ASPHALT OVERLAYREHABILITATION
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
ITEM UNITS QUANTITY COST
AC Pavement TONS 4,852.9 $242,645.34
Asphalt Cement TONS 266.9 $120,109.45
Tack Coat GAL 882.3 $4,411.73
Shoulder Gravel TONS 0.0 $0.00
Salvaged Asphaltic Pavement,Milling
TONS 4,852.9 $43,676.16
Overlay Thickness(in)
Asphalt MixType % AC
Tack CoatCoverage Rate
(Gal/SY)# of Tack Coat
Layers
HMA Alternate 1 Rehabilitation 3
2.50 E-3 5.5 1 0.025
$410,842.68
Overlay Limits Milling Limits
Milling Depth (in)
RDWY & SHLD's
2.50
RDWY & SHLD's
Other units 0.0 $0.00
PCC Alternate 1 K to 10 - 8" PCC on pulverize and relay
RDWY Width
Using English Units
Structure Width
Lt.Shld. Width
Lt. Lane Width
Rt. Lane Width
Rt. Shld. Width
Side Slope
36
24
4
12
12
4
4:1
ROADWAY
SHOULDERS PCC Shoulders
8
8
Mix Type
Pav'tThickness
BASE
SUBBASE 1
SUBBASE 2
Material TypeThickness
UnitWeight % of Length
with drainage
CABC
None
None
6
0
0
0
0
0
EXISTINGPAVEMENT
Existing PavementConstruction Process
% of ProjectLength
ExistingPavementThickness
ExistingPavement
Width
Pavement Removal 100 0 30
ft
ft
ft
ft
ft
ft
(in)
(in) (TONS/CY)
(in) (ft)
PCC ALTERNATE DESCRIPTION
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
ITEM UNITS QUANTITY COST
(RDWY)
(SHLD)
Tack Coat
Shoulder Gravel
(Base)
(Subbase 1)
(Subbase 2)
(Other)
TOTAL INITIAL COST
PCC Alternate 1
$1,244,067.95
Concrete Pavement, 8 inch
Concrete Pavement, 8 inch
CABC
None
None
Removing Pavement
Asphalt Cement
SY 26,470.4 $714,700.81
SY 8,823.5 $238,233.60
0.0 $0.00
0.0 $0.00
TONS 3,268.0 $42,483.36
TONS 15,931.3 $159,312.58
0.0 $0.00
0.0 $0.00
SY 33,088.0 $89,337.60
0.0 $0.00
0.0 $0.00
0.0 $0.00
0.0 $0.00
0.0 $0.00
0.0 $0.00
PCC ALTERNATE QUANTITIES & COSTS
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
PCC ALTERNATE
YEAR TYPE OF WORK ACTIVITY SERVICE LIFE COSTInitial Construction0 25 $1,244,067.95
PCC Maintenance
PCC Maintenance
PCC Rehabilitaion
PCC Maintenance
PCC Maintenance
PCC Rehabilitaion
PCC Maintenance
PCC Maintenance
PCC Rehabilitaion
PCC Maintenance
PCC Maintenance
1st Cycle
2nd Cycle
1st Cycle
2nd Cycle
1st Cycle
2nd Cycle
1st Cycle
2nd Cycle
10
15
25 Repair & Grind 8
$7,520.00
$15,040.00
$123,918.22
28
31
$7,520.00
$15,040.00
15 $500,709.88Repair & Overlay33
36
41
48
52
57
Mill, Repair & Overlay 15
$3,760.00
$4,700.00
$534,760.90
63
1
$3,760.00
$4,700.00
PCC ALTERNATE REHABILITATION SUMMARY
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
ITEM UNITS QUANTITY COST
Concrete Pavement Repair CY 312.9 $78,222.22
Pavement Ties EACH 224.0 $1,344.00
Dowel Bars EACH 3,168.0 $31,680.00
Sawing Concrete Pavement,Full Depth
L.F. 4,224.0 $12,672.00
Continuous Diamond Grinding SY 0.0 $0.00
PCC Alternate 1 Rehabilitation 1
$123,918.22
Other units 0.0 $0.00
# of STD PCCPatches
10.0 Percent Joint Repair
PCC Patch Width 32.00 (ft)
PCC Slab Thickness (in)
Grind Limits None
66
8.00
REPAIR and GRIND REHABILITATION
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
REPAIR and OVERLAY REHABILITATION
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
ITEM UNITS QUANTITY COST
AC Pavement TONS 4,852.9 $242,645.34
Asphalt Cement TONS 266.9 $120,109.45
Tack Coat GAL 882.3 $4,411.73
Concrete Pavement Repair CY 312.9 $78,222.22
Pavement Ties EACH 224.0 $1,344.00
PCC Alternate 1 Rehabilitation 2
$500,709.88
Overlay Limits
Dowel Bars EACH 3,168.0 $31,680.00
Overlay Thickness(in)
Asphalt MixType % AC
Tack CoatCoverage Rate
(Gal/SY)# of Tack Coat
Layers
E-3 1 0.025
# of STD PCCPatches
10.0 Percent Joint Repair
PCC Patch Width 32.00 (ft)
PCC Slab Thickness (in)
Sawing Concrete Pavement,Full Depth
L.F. 4,224.0 $12,672.00
Shoulder Gravel
Other
TONS
units
740.4
0.0
$9,625.14
$0.00
RDWY & SHLD's
66
8.00
5.52.50
ITEM UNITS QUANTITY COST
AC Pavement TONS 4,852.9 $242,645.34
Asphalt Cement TONS 266.9 $120,109.45
Tack Coat GAL 882.3 $4,411.73
Concrete Pavement Repair CY 312.9 $78,222.22
Pavement Ties EACH 224.0 $1,344.00
PCC Alternate 1 Rehabilitation 3
$534,760.90
Overlay Limits Milling Limits
Milling Depth (in)
RDWY & SHLD's
2.50
Dowel Bars EACH 3,168.0 $31,680.00
Overlay Thickness(in)
Asphalt MixType % AC
Tack CoatCoverage Rate
(Gal/SY)# of Tack Coat
Layers
2.50 E-3 5.5 1 0.025
# of STD PCCPatches 66
10.0 Percent Joint Repair
PCC Patch Width 32.00 (ft)
PCC Slab Thickness 8.00 (in)
Salvaged Asphaltic Pavement,Milling
TONS 4,852.9 $43,676.16
Sawing Concrete Pavement,Full Depth
Shoulder Gravel
Other
L.F.
TONS
units
4,224.0
0.0
0.0
$12,672.00
$0.00
$0.00
RDWY & SHLD's
MILL, REPAIR and ASPHALT OVERLAYREHABILITATION (PCC)
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
PRESENT WORTH COSTS
(CURRRENT YEAR)
Initial Construction Costs
Maintenance Costs
Rehabilitation Costs
Rehabilitation Salvage Value
Total Facility Costs
ALT 1 ALT 2 ALT 3 ALT 4 ALT 5 ALT 6
K to 10 - 5"HMA on
pulverize andrelay
K to 10 - 8"PCC on
pulverize andrelay
PCC Alternate2
Field9 Field10 Field11
$712,542.96
$10,355.14
$289,076.25
($10,832.08)
$1,001,142.27
$1,128,406.41
$17,194.88
$170,598.56
($36,658.04)
$1,279,541.80
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
+ 0.00% + 27.81%
Current Year 2010
Construction Year 2012
Analysis Period 50 yr
Project Length
Analysis Basis
Discount Rate (%)
1.88
Project
5
LCCA RESULTS
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
HMA Alternate 1 CTH B & Custer - 6" HMA on 15" CABC
RDWY Width
Using English Units
Structure Width
Lt.Shld. Width
Lt. Lane Width
Rt. Lane Width
Rt. Shld. Width
Side Slope
36
24
4
12
12
4
4:1
ROADWAY
SHOULDERS
E-10
E-10
6
6
5.5
5.5
110
110
1
1
0.025
0.025
Mix Type
Pav'tThickness
% AC
UnitWeight
# of TackCoat
Layers
Tack CoatCoverage
Rate
BASE
SUBBASE 1
SUBBASE 2
Material TypeThickness
UnitWeight % of Length
with drainage
CABC (crushed gravel)
None
None
15
0
0
2
0
0
EXISTINGPAVEMENT
Existing PavementConstruction Process
% of ProjectLength
ExistingPavementThickness
ExistingPavement
Width
Pavement Removal 100 0 30
ft
ft
ft
ft
ft
ft
(in) (lbs/SY/in) (Gal/SY)
(in) (TONS/CY)
(in) (ft)
HMA ALTERNATE DESCRIPTION
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B &
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
ITEM UNITS QUANTITY COST
(RDWY) E-10 TONS 882.8 $48,554.88
(SHLD)
(AC OIL)
Tack Coat
Shoulder Gravel
(Base)
(Subbase 1)
(Subbase 2)
E-10
E-10
CABC (crushed gravel)
None
None
Removing Pavement
(Other)
TONS 294.3 $16,184.96
TONS 64.7 $29,132.93
GAL 89.2 $445.87
TONS 222.9 $2,898.13
TONS 4,180.0 $41,800.00
0.0 $0.00
0.0 $0.00
SY 3,344.0 $9,028.80
0.0 $0.00
0.0 $0.00
0.0 $0.00
0.0 $0.00
0.0 $0.00
0.0 $0.00
$148,045.57TOTAL INITIAL COST
HMA Alternate 1
HMA ALTERNATE QUANTITIES & COSTS
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B &
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
HMA ALTERNATE
YEAR TYPE OF WORK ACTIVITY SERVICE LIFE COSTInitial Construction0 18 $148,045.57
AC Maintenance
AC Maintenance
AC Rehabilitaion
AC Maintenance
AC Maintenance
AC Rehabilitaion
AC Maintenance
AC Maintenance
AC Rehabilitaion
AC Maintenance
AC Maintenance
1st Cycle
2nd Cycle
1st Cycle
2nd Cycle
1st Cycle
2nd Cycle
1st Cycle
2nd Cycle
3
8
18 Mill & HMA Overlay 12
$380.00
$475.00
$43,973.60
21
26
$380.00
$475.00
12 $43,973.60Mill & HMA Overlay30
33
38
42
45
50
Mill & HMA Overlay 12
$380.00
$475.00
$43,973.60
54
1
$380.00
$475.00
HMA ALTERNATE REHABILITATIONSUMMARY
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B &
6767-06-00
CTH B
Kennedy Avenue - USH 10 Portage County
ITEM UNITS QUANTITY COST
AC Pavement TONS 490.5 $26,974.93
Asphalt Cement TONS 27.0 $12,138.72
Tack Coat GAL 89.2 $445.87
Shoulder Gravel TONS 0.0 $0.00
Salvaged Asphaltic Pavement,Milling
TONS 490.5 $4,414.08
Overlay Thickness(in)
Asphalt MixType % AC
Tack CoatCoverage Rate
(Gal/SY)# of Tack Coat
Layers
HMA Alternate 1 Rehabilitation 1
2.50 E-10 5.5 1 0.025
$43,973.60
Overlay Limits Milling Limits
Milling Depth (in)
RDWY & SHLD's
2.50
RDWY & SHLD's
Other units 0.0 $0.00
MILL and ASPHALT OVERLAYREHABILITATION
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B &
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
MILL and ASPHALT OVERLAYREHABILITATION
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B &
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
ITEM UNITS QUANTITY COST
AC Pavement TONS 490.5 $26,974.93
Asphalt Cement TONS 27.0 $12,138.72
Tack Coat GAL 89.2 $445.87
Shoulder Gravel TONS 0.0 $0.00
Salvaged Asphaltic Pavement,Milling
TONS 490.5 $4,414.08
Overlay Thickness(in)
Asphalt MixType % AC
Tack CoatCoverage Rate
(Gal/SY)# of Tack Coat
Layers
HMA Alternate 1 Rehabilitation 2
2.50 E-10 5.5 1 0.025
$43,973.60
Overlay Limits Milling Limits
Milling Depth (in)
RDWY & SHLD's
2.50
RDWY & SHLD's
Other units 0.0 $0.00
MILL and ASPHALT OVERLAYREHABILITATION
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B &
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
ITEM UNITS QUANTITY COST
AC Pavement TONS 490.5 $26,974.93
Asphalt Cement TONS 27.0 $12,138.72
Tack Coat GAL 89.2 $445.87
Shoulder Gravel TONS 0.0 $0.00
Salvaged Asphaltic Pavement,Milling
TONS 490.5 $4,414.08
Overlay Thickness(in)
Asphalt MixType % AC
Tack CoatCoverage Rate
(Gal/SY)# of Tack Coat
Layers
HMA Alternate 1 Rehabilitation 3
2.50 E-10 5.5 1 0.025
$43,973.60
Overlay Limits Milling Limits
Milling Depth (in)
RDWY & SHLD's
2.50
RDWY & SHLD's
Other units 0.0 $0.00
PCC Alternate 1 CTH B & Custer - 8.5" PCC
RDWY Width
Using English Units
Structure Width
Lt.Shld. Width
Lt. Lane Width
Rt. Lane Width
Rt. Shld. Width
Side Slope
36
24
4
12
12
4
4:1
ROADWAY
SHOULDERS PCC Shoulders
8.5
8.5
Mix Type
Pav'tThickness
BASE
SUBBASE 1
SUBBASE 2
Material TypeThickness
UnitWeight % of Length
with drainage
CABC
None
None
6
0
0
0
0
0
EXISTINGPAVEMENT
Existing PavementConstruction Process
% of ProjectLength
ExistingPavementThickness
ExistingPavement
Width
Pavement Removal 100 0 30
ft
ft
ft
ft
ft
ft
(in)
(in) (TONS/CY)
(in) (ft)
PCC ALTERNATE DESCRIPTION
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B &
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
ITEM UNITS QUANTITY COST
(RDWY)
(SHLD)
Tack Coat
Shoulder Gravel
(Base)
(Subbase 1)
(Subbase 2)
(Other)
TOTAL INITIAL COST
PCC Alternate 1
$129,803.44
Concrete Pavement, 8.5 inch
Concrete Pavement, 8.5 inch
CABC
None
None
Removing Pavement
Asphalt Cement
SY 2,675.2 $74,905.60
SY 891.7 $24,968.53
0.0 $0.00
0.0 $0.00
TONS 359.7 $4,675.92
TONS 1,622.5 $16,224.59
0.0 $0.00
0.0 $0.00
SY 3,344.0 $9,028.80
0.0 $0.00
0.0 $0.00
0.0 $0.00
0.0 $0.00
0.0 $0.00
0.0 $0.00
PCC ALTERNATE QUANTITIES & COSTS
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B &
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
PCC ALTERNATE
YEAR TYPE OF WORK ACTIVITY SERVICE LIFE COSTInitial Construction0 25 $129,803.44
PCC Maintenance
PCC Maintenance
PCC Rehabilitaion
PCC Maintenance
PCC Maintenance
PCC Rehabilitaion
PCC Maintenance
PCC Maintenance
PCC Rehabilitaion
PCC Maintenance
PCC Maintenance
1st Cycle
2nd Cycle
1st Cycle
2nd Cycle
1st Cycle
2nd Cycle
1st Cycle
2nd Cycle
10
15
25 Repair & Grind 8
$760.00
$1,520.00
$13,662.81
28
31
$760.00
$1,520.00
15 $54,195.08Repair & Overlay33
36
41
48
52
57
Mill, Repair & Overlay 15
$380.00
$475.00
$57,636.41
63
1
$380.00
$475.00
PCC ALTERNATE REHABILITATION SUMMARY
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B &
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
ITEM UNITS QUANTITY COST
Concrete Pavement Repair CY 35.3 $8,814.81
Pavement Ties EACH 24.0 $144.00
Dowel Bars EACH 336.0 $3,360.00
Sawing Concrete Pavement,Full Depth
L.F. 448.0 $1,344.00
Continuous Diamond Grinding SY 0.0 $0.00
PCC Alternate 1 Rehabilitation 1
$13,662.81
Other units 0.0 $0.00
# of STD PCCPatches
10.5 Percent Joint Repair
PCC Patch Width 32.00 (ft)
PCC Slab Thickness (in)
Grind Limits None
7
8.50
REPAIR and GRIND REHABILITATION
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B &
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
REPAIR and OVERLAY REHABILITATION
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B &
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
ITEM UNITS QUANTITY COST
AC Pavement TONS 490.5 $26,974.93
Asphalt Cement TONS 27.0 $12,138.72
Tack Coat GAL 89.2 $445.87
Concrete Pavement Repair CY 35.3 $8,814.81
Pavement Ties EACH 24.0 $144.00
PCC Alternate 1 Rehabilitation 2
$54,195.08
Overlay Limits
Dowel Bars EACH 336.0 $3,360.00
Overlay Thickness(in)
Asphalt MixType % AC
Tack CoatCoverage Rate
(Gal/SY)# of Tack Coat
Layers
E-10 1 0.025
# of STD PCCPatches
10.5 Percent Joint Repair
PCC Patch Width 32.00 (ft)
PCC Slab Thickness (in)
Sawing Concrete Pavement,Full Depth
L.F. 448.0 $1,344.00
Shoulder Gravel
Other
TONS
units
74.8
0.0
$972.75
$0.00
RDWY & SHLD's
7
8.50
5.52.50
ITEM UNITS QUANTITY COST
AC Pavement TONS 490.5 $26,974.93
Asphalt Cement TONS 27.0 $12,138.72
Tack Coat GAL 89.2 $445.87
Concrete Pavement Repair CY 35.3 $8,814.81
Pavement Ties EACH 24.0 $144.00
PCC Alternate 1 Rehabilitation 3
$57,636.41
Overlay Limits Milling Limits
Milling Depth (in)
RDWY & SHLD's
2.50
Dowel Bars EACH 336.0 $3,360.00
Overlay Thickness(in)
Asphalt MixType % AC
Tack CoatCoverage Rate
(Gal/SY)# of Tack Coat
Layers
2.50 E-10 5.5 1 0.025
# of STD PCCPatches 7
10.5 Percent Joint Repair
PCC Patch Width 32.00 (ft)
PCC Slab Thickness 8.50 (in)
Salvaged Asphaltic Pavement,Milling
TONS 490.5 $4,414.08
Sawing Concrete Pavement,Full Depth
Shoulder Gravel
Other
L.F.
TONS
units
448.0
0.0
0.0
$1,344.00
$0.00
$0.00
RDWY & SHLD's
MILL, REPAIR and ASPHALT OVERLAYREHABILITATION (PCC)
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B &
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
PRESENT WORTH COSTS
(CURRRENT YEAR)
Initial Construction Costs
Maintenance Costs
Rehabilitation Costs
Rehabilitation Salvage Value
Total Facility Costs
ALT 1 ALT 2 ALT 3 ALT 4 ALT 5 ALT 6
CTH B &Custer - 6"
HMA on 15"CABC
CTH B &Custer - 8.5"
PCC
PCC Alternate2
Field9 Field10 Field11
$134,281.71
$1,046.53
$30,940.61
($1,159.39)
$165,109.46
$117,735.56
$1,737.78
$18,510.74
($3,951.00)
$134,033.09
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
+ 23.19% + 0.00%
Current Year 2010
Construction Year 2012
Analysis Period 50 yr
Project Length
Analysis Basis
Discount Rate (%)
0.19
Project
5
LCCA RESULTS
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B &
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
HMA Alternate 1 CTH B & CTH K - 6" HMA on 18" CABC on
RDWY Width
Using English Units
Structure Width
Lt.Shld. Width
Lt. Lane Width
Rt. Lane Width
Rt. Shld. Width
Side Slope
36
24
4
12
12
4
4:1
ROADWAY
SHOULDERS
E-10
E-10
6
6.5
5.5
5.5
110
110
1
1
0.025
0.025
Mix Type
Pav'tThickness
% AC
UnitWeight
# of TackCoat
Layers
Tack CoatCoverage
Rate
BASE
SUBBASE 1
SUBBASE 2
Material TypeThickness
UnitWeight % of Length
with drainage
CABC (crushed gravel)
Granular Subbase Course
None
18
6
0
2
0
0
EXISTINGPAVEMENT
Existing PavementConstruction Process
% of ProjectLength
ExistingPavementThickness
ExistingPavement
Width
Pavement Removal 100 0 30
ft
ft
ft
ft
ft
ft
(in) (lbs/SY/in) (Gal/SY)
(in) (TONS/CY)
(in) (ft)
HMA ALTERNATE DESCRIPTION
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B & CTH
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
ITEM UNITS QUANTITY COST
(RDWY) E-10 TONS 2,090.9 $114,998.39
(SHLD)
(AC OIL)
Tack Coat
Shoulder Gravel
(Base)
(Subbase 1)
(Subbase 2)
E-10
E-10
CABC (crushed gravel)
Granular Subbase Course
None
Removing Pavement
(Other)
TONS 755.0 $41,527.20
TONS 156.5 $70,436.52
GAL 211.2 $1,056.00
TONS 587.9 $7,642.56
TONS 12,025.4 $120,254.43
CY 2,376.0 $0.00
0.0 $0.00
SY 7,920.0 $21,384.00
0.0 $0.00
0.0 $0.00
0.0 $0.00
0.0 $0.00
0.0 $0.00
0.0 $0.00
$377,299.10TOTAL INITIAL COST
HMA Alternate 1
HMA ALTERNATE QUANTITIES & COSTS
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B & CTH
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
HMA ALTERNATE
YEAR TYPE OF WORK ACTIVITY SERVICE LIFE COSTInitial Construction0 18 $377,299.10
AC Maintenance
AC Maintenance
AC Rehabilitaion
AC Maintenance
AC Maintenance
AC Rehabilitaion
AC Maintenance
AC Maintenance
AC Rehabilitaion
AC Maintenance
AC Maintenance
1st Cycle
2nd Cycle
1st Cycle
2nd Cycle
1st Cycle
2nd Cycle
1st Cycle
2nd Cycle
3
8
18 Mill & HMA Overlay 12
$900.00
$1,125.00
$104,148.00
21
26
$900.00
$1,125.00
12 $104,148.00Mill & HMA Overlay30
33
38
42
45
50
Mill & HMA Overlay 12
$900.00
$1,125.00
$104,148.00
54
1
$900.00
$1,125.00
HMA ALTERNATE REHABILITATIONSUMMARY
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B & CTH
6767-06-00
CTH B
Kennedy Avenue - USH 10 Portage County
ITEM UNITS QUANTITY COST
AC Pavement TONS 1,161.6 $63,888.00
Asphalt Cement TONS 63.9 $28,749.60
Tack Coat GAL 211.2 $1,056.00
Shoulder Gravel TONS 0.0 $0.00
Salvaged Asphaltic Pavement,Milling
TONS 1,161.6 $10,454.40
Overlay Thickness(in)
Asphalt MixType % AC
Tack CoatCoverage Rate
(Gal/SY)# of Tack Coat
Layers
HMA Alternate 1 Rehabilitation 1
2.50 E-10 5.5 1 0.025
$104,148.00
Overlay Limits Milling Limits
Milling Depth (in)
RDWY & SHLD's
2.50
RDWY & SHLD's
Other units 0.0 $0.00
MILL and ASPHALT OVERLAYREHABILITATION
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B & CTH
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
MILL and ASPHALT OVERLAYREHABILITATION
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B & CTH
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
ITEM UNITS QUANTITY COST
AC Pavement TONS 1,161.6 $63,888.00
Asphalt Cement TONS 63.9 $28,749.60
Tack Coat GAL 211.2 $1,056.00
Shoulder Gravel TONS 0.0 $0.00
Salvaged Asphaltic Pavement,Milling
TONS 1,161.6 $10,454.40
Overlay Thickness(in)
Asphalt MixType % AC
Tack CoatCoverage Rate
(Gal/SY)# of Tack Coat
Layers
HMA Alternate 1 Rehabilitation 2
2.50 E-10 5.5 1 0.025
$104,148.00
Overlay Limits Milling Limits
Milling Depth (in)
RDWY & SHLD's
2.50
RDWY & SHLD's
Other units 0.0 $0.00
MILL and ASPHALT OVERLAYREHABILITATION
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B & CTH
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
ITEM UNITS QUANTITY COST
AC Pavement TONS 1,161.6 $63,888.00
Asphalt Cement TONS 63.9 $28,749.60
Tack Coat GAL 211.2 $1,056.00
Shoulder Gravel TONS 0.0 $0.00
Salvaged Asphaltic Pavement,Milling
TONS 1,161.6 $10,454.40
Overlay Thickness(in)
Asphalt MixType % AC
Tack CoatCoverage Rate
(Gal/SY)# of Tack Coat
Layers
HMA Alternate 1 Rehabilitation 3
2.50 E-10 5.5 1 0.025
$104,148.00
Overlay Limits Milling Limits
Milling Depth (in)
RDWY & SHLD's
2.50
RDWY & SHLD's
Other units 0.0 $0.00
PCC Alternate 1 CTH B & CTH K - 9" PCC
RDWY Width
Using English Units
Structure Width
Lt.Shld. Width
Lt. Lane Width
Rt. Lane Width
Rt. Shld. Width
Side Slope
36
24
4
12
12
4
4:1
ROADWAY
SHOULDERS PCC Shoulders
9
9
Mix Type
Pav'tThickness
BASE
SUBBASE 1
SUBBASE 2
Material TypeThickness
UnitWeight % of Length
with drainage
CABC
None
None
6
0
0
0
0
0
EXISTINGPAVEMENT
Existing PavementConstruction Process
% of ProjectLength
ExistingPavementThickness
ExistingPavement
Width
Pavement Removal 100 0 30
ft
ft
ft
ft
ft
ft
(in)
(in) (TONS/CY)
(in) (ft)
PCC ALTERNATE DESCRIPTION
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B & CTH
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
ITEM UNITS QUANTITY COST
(RDWY)
(SHLD)
Tack Coat
Shoulder Gravel
(Base)
(Subbase 1)
(Subbase 2)
(Other)
TOTAL INITIAL COST
PCC Alternate 1
$350,900.00
Concrete Pavement, 9 inch
Concrete Pavement, 9 inch
CABC
None
None
Removing Pavement
Asphalt Cement
SY 6,336.0 $209,088.00
SY 2,112.0 $69,696.00
0.0 $0.00
0.0 $0.00
TONS 924.0 $12,012.00
TONS 3,872.0 $38,720.00
0.0 $0.00
0.0 $0.00
SY 7,920.0 $21,384.00
0.0 $0.00
0.0 $0.00
0.0 $0.00
0.0 $0.00
0.0 $0.00
0.0 $0.00
PCC ALTERNATE QUANTITIES & COSTS
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B & CTH
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
PCC ALTERNATE
YEAR TYPE OF WORK ACTIVITY SERVICE LIFE COSTInitial Construction0 25 $350,900.00
PCC Maintenance
PCC Maintenance
PCC Rehabilitaion
PCC Maintenance
PCC Maintenance
PCC Rehabilitaion
PCC Maintenance
PCC Maintenance
PCC Rehabilitaion
PCC Maintenance
PCC Maintenance
1st Cycle
2nd Cycle
1st Cycle
2nd Cycle
1st Cycle
2nd Cycle
1st Cycle
2nd Cycle
10
15
25 Repair & Grind 8
$1,800.00
$3,600.00
$28,324.00
28
31
$1,800.00
$3,600.00
15 $124,321.49Repair & Overlay33
36
41
48
51
56
Mill, Repair & Overlay 15
$900.00
$1,125.00
$132,472.00
63
1
$900.00
$1,125.00
PCC ALTERNATE REHABILITATION SUMMARY
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B & CTH
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
ITEM UNITS QUANTITY COST
Concrete Pavement Repair CY 80.0 $20,000.00
Pavement Ties EACH 54.0 $324.00
Dowel Bars EACH 512.0 $5,120.00
Sawing Concrete Pavement,Full Depth
L.F. 960.0 $2,880.00
Continuous Diamond Grinding SY 0.0 $0.00
PCC Alternate 1 Rehabilitation 1
$28,324.00
Other units 0.0 $0.00
# of STD PCCPatches
10.1 Percent Joint Repair
PCC Patch Width 30.00 (ft)
PCC Slab Thickness (in)
Grind Limits None
16
9.00
REPAIR and GRIND REHABILITATION
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B & CTH
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
REPAIR and OVERLAY REHABILITATION
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B & CTH
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
ITEM UNITS QUANTITY COST
AC Pavement TONS 1,161.6 $63,888.00
Asphalt Cement TONS 63.9 $28,749.60
Tack Coat GAL 211.2 $1,056.00
Concrete Pavement Repair CY 80.0 $20,000.00
Pavement Ties EACH 54.0 $324.00
PCC Alternate 1 Rehabilitation 2
$124,321.49
Overlay Limits
Dowel Bars EACH 512.0 $5,120.00
Overlay Thickness(in)
Asphalt MixType % AC
Tack CoatCoverage Rate
(Gal/SY)# of Tack Coat
Layers
E-10 1 0.025
# of STD PCCPatches
10.1 Percent Joint Repair
PCC Patch Width 30.00 (ft)
PCC Slab Thickness (in)
Sawing Concrete Pavement,Full Depth
L.F. 960.0 $2,880.00
Shoulder Gravel
Other
TONS
units
177.2
0.0
$2,303.89
$0.00
RDWY & SHLD's
16
9.00
5.52.50
ITEM UNITS QUANTITY COST
AC Pavement TONS 1,161.6 $63,888.00
Asphalt Cement TONS 63.9 $28,749.60
Tack Coat GAL 211.2 $1,056.00
Concrete Pavement Repair CY 80.0 $20,000.00
Pavement Ties EACH 54.0 $324.00
PCC Alternate 1 Rehabilitation 3
$132,472.00
Overlay Limits Milling Limits
Milling Depth (in)
RDWY & SHLD's
2.50
Dowel Bars EACH 512.0 $5,120.00
Overlay Thickness(in)
Asphalt MixType % AC
Tack CoatCoverage Rate
(Gal/SY)# of Tack Coat
Layers
2.50 E-10 5.5 1 0.025
# of STD PCCPatches 16
10.1 Percent Joint Repair
PCC Patch Width 30.00 (ft)
PCC Slab Thickness 9.00 (in)
Salvaged Asphaltic Pavement,Milling
TONS 1,161.6 $10,454.40
Sawing Concrete Pavement,Full Depth
Shoulder Gravel
Other
L.F.
TONS
units
960.0
0.0
0.0
$2,880.00
$0.00
$0.00
RDWY & SHLD's
MILL, REPAIR and ASPHALT OVERLAYREHABILITATION (PCC)
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B & CTH
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County
PRESENT WORTH COSTS
(CURRRENT YEAR)
Initial Construction Costs
Maintenance Costs
Rehabilitation Costs
Rehabilitation Salvage Value
Total Facility Costs
ALT 1 ALT 2 ALT 3 ALT 4 ALT 5 ALT 6
CTH B & CTHK - 6" HMA on18" CABC oncrushed agg
CTH B & CTHK - 9" PCC
PCC Alternate2
Field9 Field10 Field11
$342,221.44
$2,478.62
$73,280.39
($2,745.92)
$415,234.54
$318,276.67
$4,122.19
$41,676.94
($9,081.00)
$354,994.80
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
+ 16.97% + 0.00%
Current Year 2010
Construction Year 2012
Analysis Period 50 yr
Project Length
Analysis Basis
Discount Rate (%)
0.45
Project
5
LCCA RESULTS
Project ID:
Highway Name:
County Name:
Designer Name:
Project Termini:
10/28/2011
L:\work\Projects\60145536\400_Technical\406_Civil\406.2_Roadways\Pavement\CTH B & CTH
6767-06-00
CTH B
Kennedy Avenue - USH 10
Portage County