×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [beamline equipment]
OUTLINE Introduction LHC Injector complex Conclusion R. Garoby
212 views
PEP-II Disassembly Technical Systems PEP-II D&D Review 6-Aug-2007 S.DeBarger S.Ecklund, A.Hill, D.Kharakh, M.Zurawel
214 views
Technical agreement n 3 New SC Magnets activities P. Fessia (G. De Rijk), D. Reynet, J.M Rifflet
215 views
Control Hardware Design Control Hardware Wiring IOC Software (Low Level) OPI Software (High Level) Final Test Front-End (Connection to SR1 Ring) Done Insertion
214 views
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration
42 views
LHC IR Upgrade - Phase I
31 views
LHC Insertion Region Upgrade Phase I
24 views
R. Ostojic, WAMSDO, 19 May 2008 LHC Insertion Region Upgrade Phase I 1.Upgrade goals and milestones 2.Review of IR systems: main findings 3.The emerging
215 views
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What
212 views