×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [data paths total latency]
High-speed optical links and processors for the ATLAS Level-1 Calorimeter Trigger upgrade B.Bauss, V.Büscher, R.Degele, A.Ebling, W.Ji, C.Meyer, S.Moritz,
217 views
L1Calo – towards phase II
26 views
High-speed optical links and processors for the ATLAS Level-1 Calorimeter Trigger upgrade
42 views