×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [hv connectors]
ABT Consolidation Review Electronics & Controls Etienne Carlier 18-03-2015
216 views
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP
217 views
MDC-II LVL-1 Trigger Khaled Teilab for the MDC Trigger Team
219 views
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna
214 views
GEM Panel for LP1
18 views
1 Test on RPC Veto Detector Model —— Anticoincidence Detector for Daya Bay Neutrino Exp. Speaker: Jiawen Zhang 5 June 2006
213 views
ISR Work Progress Report
48 views
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items
213 views
From Bare Chambers to Installable Chambers Muon Barrel Week Bologna April 11 th 2003 Alberto Benvenuti INFN Bologna
222 views
Control System Summary of Changes Since PDR
34 views
Test on RPC Veto Detector Model —— Anticoincidence Detector for Daya Bay Neutrino Exp
27 views