×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [l1 trigger]
HyperDAQ
15 views
L. Dodd, U. Wisconsin 12/2/14 Preliminary ExamL. Dodd, U. WisconsinPreliminary Exam MSSM Higgs Decays to Tau Leptons and Bottom Quarks using CMS at the
214 views
Background Physicist in Particle Physics. Data Acquisition and Triggering systems. Specialising in Embedded and Real-Time Software. Since 2000 Project
216 views
ATLAS upgrades Xmass meeting 2008. Current ATLAS Operations ATLAS has been working very well First beams in Sept recorded successfully by all sub- detectors
221 views
Electronics and Trigger developments for the Diffractive Physics Proposal at 220 m LHC-ATLAS
22 views
ATLAS Detector : status and upgrade plans
40 views
Overview. Test results of LOCs1, a 5 Gbps 16:1 serializer
25 views
PHENIX Silicon Pixel Detector Construction, Operation, and the first Results Atsushi Taketani RIKEN Nishina center RIKEN Brookhaven Research Center Outline
215 views
June 3, 2004Bill Wisniewski1 Run 3 End & Run 4 Progress System Status MDI, SVT, DCH & DCH electronics upgrade, DIRC, EMC, IFR-RPC, Trig IFR Barrel Upgrade
217 views
First CDF Run II Results
30 views
1: CERN , Geneva, Switzerland 2: INRNE-BAS , Sofia, Bulgaria
26 views
BESIII DAQ System BESIII Review Meeting IHEP · Beijing · China Sep. 16 - 17, 2002
49 views
< Prev
Next >