×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [long shutdown]
Ljubljana, 1-2/10/2009 Meeting of the High-Z SEWG of PWI TF ENEA-Frascati activities on high-Z materials G. Maddaluno Outline 1.Impurity seeding experiments
213 views
Chris Parkes 1 LHC The Energy Frontier Chris Parkes, GridPP 8, April 2012 ATLAS CMS ALICE LHCb
220 views
Alfa-Omega Team General information General information (Anna) W Bellows (Alain) DN200 (Andrea) A.A.A. - TE-MSC-CMI Section meeting Feb 19th, 2013
217 views
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13
214 views
Future of DIS Part II: “Europe” Paul Newman Birmingham University Summary Talk from DIS 2012 (Bonn) Fri 30 March 2012
216 views
LHC and R&D for High Luminosity Upgrade Frédérick Bordry TIARA - PP Final Meeting -. 27 th November 2013
212 views
Documento que sirvió de Bibligrafía de la Charla:Los Nuevos Descubrimientos en el Large Hadron Collider (LHC) del Counseil Europeen pour la Recherche Nucleaire (C.E.R.N) (Laboratorio
914 views
CERN Courier September 203
54 views
Preparation of Review R. Assmann et al CWG, 6.6.2011 CWG 6.6.2011 R. Assmann
231 views
Helge Meinhard CERN CERN Openlab Summer Student Lectures 2014 From Detectors to Publications
219 views
Complete failure of the roof membrane, as stated by GAF consultant from Trinity ERD Elastomeric roof material did not completely adhere
213 views
10/18/2005 FII in damping ring L Wang1 Smaller (vertical) beta function Long bunch spacing Both growth rate and tune-shift are small if there is a
213 views
Next >