×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [telescope requirements]
Phase II of the EVLA Rick Perley EVLA Project Scientist
225 views
1 SNAP Telescope Status M. Lampton & M. Sholl SNAP Collaboration Meeting October 2007
224 views
Large Infrared Telescope in a Lunar South Polar Crater - Motivation - - Design Considerations - - Commissioning - Yuki Takahashi 2002 Fall * Please refer
219 views
The Mission
37 views
DES FE Workshop at FNAL December 14-15, 2005 Vaidas Simaitis, University of Illinois at Urbana-Champaign 1 DHE Crate Design and Status The mechanical design
212 views
The Mission Explore the Dark Ages through the neutral hydrogen distribution Constrain the populations of the first stars and first black holes. Measure
215 views
DHE Crate Design and Status
29 views
Dr. Harald Kornmayer A distributed, Grid-based analysis system for the MAGIC telescope, CHEP 2004, Interlaken1 H. Kornmayer, IWR, Forschungszentrum Karlsruhe
220 views