talisman gold project€¦ · although heritage commissioned the geological information and mining...

15
Talisman Gold Project Talisman Gold Project hk hk l d l d Karangahake Karangahake, New Zealand , New Zealand © April 2011 Heritage Gold NZ Limited 1

Upload: others

Post on 20-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Talisman Gold Project€¦ · Although Heritage commissioned the geological information and mining data referred to in this presentation, Heritage does not guarantee orotherwise warrant

Talisman Gold ProjectTalisman Gold Projecth kh k l dl dKarangahakeKarangahake, New Zealand, New Zealand

© April 2011 Heritage Gold NZ Limited 1

Page 2: Talisman Gold Project€¦ · Although Heritage commissioned the geological information and mining data referred to in this presentation, Heritage does not guarantee orotherwise warrant

Board and ManagementBoard and ManagementggHeritage Gold NZ Limitedg

(New Talisman Gold Mines Limited, mid-May 2012)

Board

Chairman Robert PearceChairman Robert PearceDeputy Chairman Murray McKeeDirector Dr Ian PringleDirector Dr Ian PringleDirector Matthew HillDirector to be Appointed Doug BuergerDirector to be Appointed Doug Buerger

ManagementGeneral Manager Paul GriffinGeneral Manager Paul Griffin

Page 3: Talisman Gold Project€¦ · Although Heritage commissioned the geological information and mining data referred to in this presentation, Heritage does not guarantee orotherwise warrant

Regional OverviewRegional OverviewRegional OverviewRegional OverviewThe image part with relationship ID rId3 was not found in the file.

8Moz Au Martha

© 2012 Heritage Gold NZ Limited 3

Page 4: Talisman Gold Project€¦ · Although Heritage commissioned the geological information and mining data referred to in this presentation, Heritage does not guarantee orotherwise warrant

Summary Surface GeologySummary Surface Geology -- KarangahakeKarangahakeSummary Surface Geology Summary Surface Geology KarangahakeKarangahake

© 2012 Heritage Gold NZ Limited 4

Page 5: Talisman Gold Project€¦ · Although Heritage commissioned the geological information and mining data referred to in this presentation, Heritage does not guarantee orotherwise warrant

VisionVision -- New Talisman Gold MinesNew Talisman Gold MinesVision Vision -- New Talisman Gold MinesNew Talisman Gold Mines

Gold production ~ 50,000 (profitable) oz /year/ mine

Adopt modern mining technology to the mine scale

Pilot testing and staged development to reduce risk

150,000 tonnes per year of High Grade (6-10 g/t) Ore, p y g ( g/ )

© 2012 Heritage Gold NZ Limited 5

Page 6: Talisman Gold Project€¦ · Although Heritage commissioned the geological information and mining data referred to in this presentation, Heritage does not guarantee orotherwise warrant

SustainableSustainable PrinciplesPrinciplesSustainable Sustainable PrinciplesPrinciples

Reduce, Reuse and Recycle (Water, Rock, Energy)

Low energy consumption

No mullock rock dumps, no ore residue stockpiles

Workforce living locally

© 2012 Heritage Gold NZ Limited 6

Page 7: Talisman Gold Project€¦ · Although Heritage commissioned the geological information and mining data referred to in this presentation, Heritage does not guarantee orotherwise warrant

Project StrengthsProject StrengthsProject StrengthsProject Strengths

JORC mineral indicated and inferred resource 205,000oz Au, 800,000oz Ag*

Broken stocks of ore in the old mine

Existing access for investigative work via old workings

Good relationships with stakeholders

Very Good InfrastructureP (1k )- Power (1km)

- Container Port (80km via State Highway 2)- Sealed Roads (1km) - Fresh Water (On Site)- Services (Two large towns within 15km)

© 2012 Heritage Gold NZ Limited 7

Page 8: Talisman Gold Project€¦ · Although Heritage commissioned the geological information and mining data referred to in this presentation, Heritage does not guarantee orotherwise warrant

TechnologyTechnologyTechnologyTechnology

Technology can be matched to the mine to enhance profit

Examples of Technology Opportunities;Examples of Technology Opportunities;- Small portable diamond drills- Small Trucks, drills and loaders

Electric Monorail Trains- Electric Monorail Trains- Concrete pumping for mine void re-filling- Mineral Sorting machines (colour, metal detection, Xrays)

G it d fl t ti i (hi h l t t )- Gravity and flotation processing (high value concentrate)

© 2012 Heritage Gold NZ Limited 8

Page 9: Talisman Gold Project€¦ · Although Heritage commissioned the geological information and mining data referred to in this presentation, Heritage does not guarantee orotherwise warrant

Technology ExamplesTechnology ExamplesTechnology ExamplesTechnology Examples

Monorail Train, high gradient, 10-30 tonne payload

Small Loader

Small 8-10 T Truck for small decline 9

Page 10: Talisman Gold Project€¦ · Although Heritage commissioned the geological information and mining data referred to in this presentation, Heritage does not guarantee orotherwise warrant

Technology Examples ContinuedTechnology Examples ContinuedTechnology Examples ContinuedTechnology Examples Continued

Concrete Pumping for Mine Void BackfillingMineral Sorting Concrete Pumping for Mine Void BackfillingMineral Sorting

Gravity and Flotation Concentration – Modular Plant

10

Page 11: Talisman Gold Project€¦ · Although Heritage commissioned the geological information and mining data referred to in this presentation, Heritage does not guarantee orotherwise warrant

Mining ConceptsMining ConceptsMining ConceptsMining Concepts

Mine development “on ore”

- Confirm ore shoot extensions

- Provide positions to drill test parallel structures

- Partial cost recoveryy

Mining schedule will focus first on high-grade ore shoots

Cemented backfill using development mullock (non ore rock)Cemented backfill using development mullock (non ore rock)

© 2012 Heritage Gold NZ Limited 11

Page 12: Talisman Gold Project€¦ · Although Heritage commissioned the geological information and mining data referred to in this presentation, Heritage does not guarantee orotherwise warrant

Processing ConceptsProcessing ConceptsProcessing ConceptsProcessing Concepts

Process ore to produce high value gold/silver concentrate.

Low capital cost ore concentration plant

No residues on surface, return to mine as backfill

By-product opportunities.y p pp

© 2012 Heritage Gold NZ Limited 12

Page 13: Talisman Gold Project€¦ · Although Heritage commissioned the geological information and mining data referred to in this presentation, Heritage does not guarantee orotherwise warrant

Scoping Study Review OutcomeScoping Study Review OutcomeScoping Study Review OutcomeScoping Study Review OutcomeAssumptionsG ld i A$1 600 /Gold price: A$1,600 /ozSilver Price: A$30/ozOperating cost contingency: 25%

ResultsNet present value (7.5% disc): +A$150 millionp ( ) $Internal Rate of Return +70%.

$200,000,000

$100,000,000

$150,000,000

$ , ,

Discounted Cash Flow A$

$-

$50,000,000

Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11 Year 12

© 2012 Heritage Gold NZ Limited 13

$(50,000,000)

Page 14: Talisman Gold Project€¦ · Although Heritage commissioned the geological information and mining data referred to in this presentation, Heritage does not guarantee orotherwise warrant

Talisman Mine PortalTalisman Mine PortalTalisman Mine PortalTalisman Mine Portal

Discounted Cash Flow A$

© 2012 Heritage Gold NZ Limited 14

Page 15: Talisman Gold Project€¦ · Although Heritage commissioned the geological information and mining data referred to in this presentation, Heritage does not guarantee orotherwise warrant

*Competent Person StatementThe information in this report that relates to gold exploration results and resources is based on information compiled by or supervised by Mr Murray Stevens. Mr Stevens is an independent consulting geologist who is a corporate member of the AusIMMStevens is an independent consulting geologist who is a corporate member of the AusIMM.

Mr Stevens has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activities undertaken to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Stevens consents to the inclusion in this report of the matters based on their information in the form and context in which it appears.

DISCLAIMERAlthough Heritage commissioned the geological information and mining data referred to in this presentation, Heritage does notAlthough Heritage commissioned the geological information and mining data referred to in this presentation, Heritage does notguarantee or otherwise warrant the accuracy or currency of such information or data. Further, no representation is given orwarranty is made in respect of any future performance of the share price of shares in Heritage or any company associated with it.This document is not intended to, and does not, represent an offer of any securities. The terms target, potential and geologicalpotential should not be interpreted as mineral resources as defined in the JORC Code 2004. The terms refer to the potentialpotential should not be interpreted as mineral resources as defined in the JORC Code 2004. The terms refer to the potentialQuantity of metal that may be discovered with further exploration, and are conceptual in nature. There has beeninsufficient exploration to date to define Mineral Resources in these targets (except where reported as JORC‐compliant),and it is uncertain if further exploration will result in such determination. Technical information in this presentation wascompiled from reports released by Heritage prior to 17 April 2012.

© 2012 Heritage Gold NZ Limited 15

compiled from reports released by Heritage prior to 17 April 2012.