Page 1 of 52
TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section 82 (1) of the Electricity Act, 2003)
(Central Act 36 of 2003) PRESENT:
Thiru S.Akshayakumar …. Chairman Thiru G.Rajagopal …. Member
and Dr.T.Prabhakara Rao …. Member
M.P.No.28 of 2016
In the matter of: Approval of Capital Investment Plan for FY 2016-17 to FY 2018-19 for
generation and distribution function of Tamil Nadu Generation and Distribution
Corporation Limited (TANGEDCO)
Tamil Nadu Generation and Distribution Corporation Ltd.
(Represented by Chief Financial Controller/General
144, Anna Salai
Chennai – 600 002.
… Petitioner (Thiru M.Gopinathan Standing Counsel for TANGEDCO)
Vs. NIL …Respondent
.
Dates of hearing : 09.12.2016 and 29.12.2016 Date of Order : 31.07.2017
The Tamil Nadu Generation and Distribution Corporation Limited (hereinafter
referred to as “TANGEDCO” or “the Petitioner”) has filed the Capital Investment Plan
(hereinafter referred as “CIP”) for the MYT Control Period from FY 2016-17 to FY
2018-19 for the Generation and Distribution functions in M.P. No. 28 of 2016. The
Petition came up for hearing on 09.12.2016 and 29.12.2016. The Commission upon
![Page 2: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/2.jpg)
Page 2 of 52
perusing the above petition and after hearing the submissions of the Petitioner and
stakeholders hereby makes the following:-
ORDER
1. Prayer of the Petitioner:-
TANGEDCO has prayed to consider projections for the CIP for each year
of the MYT Control Period from FY 2016-17 to FY 2018-19 in respect of
generation projects and distribution and to approve the same as deemed fit by
the Commission.
2. Facts of the case:-
2.1. The Petitioner has submitted that the installed capacity of conventional energy
sources is 17,976.48 MW as on April 1, 2016, which includes Hydro (2307.90 MW),
Thermal (4660 MW), Gas Stations (516.08 MW), share from Central Generating
Stations (5464MW), Captive Power Plants (986.50 MW), Power purchase
(852.50MW), LTOA (2830 MW) and MTOA (359.50 MW). The installed capacity of
Renewable Energy sources as on April 1, 2016 (infirm power) is 9629.52 MW, which
includes generation from wind (7597.71MW), Solar (1142.41 MW), Biomass (230 MW)
and Co-generation plants (659.40 MW).
2.2. The distribution network of TANGEDCO comprises 33 kV, 22 kV and 11 kV
sub-transmission system. TANGEDCO owns and operates an extensive distribution
network consisting of HT line network and LT line network. It also owns 2,67,421
distribution transformers with a total capacity of 30,920 MVA as on June 30, 2016.
TANGEDCO served a total of 272.19 Lakh consumers as on September 30, 2016.
![Page 3: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/3.jpg)
Page 3 of 52
2.3. The Petitioner has submitted that Tamil Nadu met an all-time peak demand of
15,343 MW, making it the second ranked State in the country next to Maharashtra, in
terms of highest peak demand and energy consumption. The present demand of
power in the State is around 14,500 - 15,000 MW. The Petitioner has submitted the
Demand- Availability projections for the period FY 2015-16 to FY 2021-22 as under:
Table 1: Demand and Availability as submitted by TANGEDCO
Sl.
No. Particulars
FY
2015-16
FY
2016-17
FY
2017-18
FY
2018-19
FY
2019-20
FY
2020-21
FY
2021-22
1
Installed Capacity at the
beginning of the year
(MW)
13,231 14,786 15,613 16,308 17,295 21,655 26,095
2 Expected addition during
the year (MW) 741 827 695 987 4,360 4,440 7,640
3 Reduction of capacity
during the year (MW) 814 - - - - - -
4 Installed capacity at the
end of the year (MW) 14,786 15,613 16,308 17,295 21,655 26,095 33,735
5
Availability at the
beginning of the year
(MW)
10,023 11,318 11,548 12,059 12,898 16,452 19,622
6 Additional availability
during the year (MW) 619 703 591 839 3,706 3,349 4,794
7
Addition/(Reduction) of
availability during the
year (MW)
703 (446) - - - - -
8
Reduction due to ageing
of Thermal Stations as per
LGBR (MW)
27 27 80 - 152 179 27
9 Availability at the end of
the year (MW) 11,318 11,548 12,059 12,898 16,452 19,622 24,389
10 Power Purchase (MW) 3,190 3,830 3,730 3,330 3,330 3,330 3,330
11 Total Availability at the
end of the year (MW) 14,508 15,378 15,789 16,228 19,782 22,952 27,719
12 Projected Demand (MW) 14,538 15,566 16,577 17,679 18,841 20,065 21,348
13 Surplus/(deficit) (MW) (30) (188) (788) (1,451) 941 2,887 6,371
This demand will be met by generation from existing power stations, power
from projects planned to be commissioned in the coming years and also through
power purchase.
2.4. The Petitioner has submitted that though most of the existing generating
![Page 4: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/4.jpg)
Page 4 of 52
stations (Thermal and Hydro) have completed their life period and are performing well,
capital expenditure has been proposed to maintain the plant availability factor to meet
the projected demand. Based on the demand and availability projections for FY 2016-
17 to FY 2020-21 as per 19th Electric Power Survey (EPS) Projections, for meeting the
additional demand, it has proposed commissioning of new projects and strengthening
of distribution network as well, for which the capital expenditure has been proposed in
the CIP.
2.5. The Petitioner has further submitted that the CIP for the Generation and
Distribution function for the Control Period from FY 2016-17 to FY 2018-19 as shown
in the following Table:
Table 2: Proposed Capital Expenditure and Capitalisation submitted by TANGEDCO for the
Control Period from FY 2016-17 to FY 2018-19 (Rs. Crore)
Sl.
No. Particulars
Estimated
Cost FY 2016-17 FY 2017-18 FY 2018-19
Capital Expenditure
1 Generation 1,24,188.61 4,755.46 16,094.31 18,379.05
2 Distribution 10,694.79 5,577.12 3,016.39 2,101.28
Capitalisation
1 Generation 1,24,188.61 1,435.49 1,839.23 7,217.16
2 Distribution 10,694.79 5,298.47 3,073.03 2,173.32
2.6. The CIP proposal covers year-wise capital expenditure and capitalization for
the following existing generating stations and ongoing/new projects:
I Existing Generating stations:
a. Thermal Power Generating stations - ETPS, TTPS, MTPS, North Chennai Stage I, Mettur Stage III, North Chennai Stage II; b. Hydro power Generating Stations in Kundah, Tirunelveli, Kadamparai and Erode Circles; c. Gas Turbine Power stations at Valuthur, Thirumakottai, Kuttalam and Basin Bridge.
![Page 5: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/5.jpg)
Page 5 of 52
II Ongoing/New Generation projects a. Thermal Projects – Completed schemes – Mettur Stage III, NCTPS Stage II. b. Thermal Projects – On going schemes - ETPS Expansion (1x660 MW), Ennore SEZ (2x660 MW), NCTPS Stage III (1x800 MW), Uppur TPS (2x800 MW). c. Thermal Projects – New schemes – Ennore Replacement (660 MW), Udangudi
Stage I (2x660 MW), Cheyur UMPP (5x800 MW), Udangudi Stage II & III (2x660 MW each) and Kadaladi Super critical (5x800 MW)
d. Hydro Projects – Completed schemes - Periyar Vaigai IV (2x1.25 MW), Bhavani Kattalai Barrage I, II, III (2x15 MW each), Bhavani Barrage I & II
(2x 5 MW). e. Hydro Projects - New- Dam Rehabilitation and Improvement Project (DRIP) under World Bank funding, Kundah Pumped Storage (4x125MW), Sillahalla
Pumped Storage (4x500 MW), Mettur Pumped Storage (500 MW), Modified Moyar Ultimate Stage HEP Phase I (25 MW) and Kolli Hill Hydro Project (2x15 MW)
2.7. The Petitioner has submitted the details of existing generating Stations
including the year of commissioning and stated that even though most of the
thermal/hydro/gas generating stations are more than 25 years old, they are performing
well. The expenditure proposed for the existing generating stations are as follows:
Table 3: Capital Expenditure and Capitalisation for existing Generating
stations as submitted by TANGEDCO (Rs. Crore)
Sl.
No. Particulars
Estimated
Cost FY 2016-17 FY 2017-18 FY 2018-19
Capital Expenditure
1 Thermal Generating Stations 3264.62 1543.30 1102.36 618.96
2 Hydro Power Stations 442.06 227.60 73.81 140.65
3 Gas Turbine Power Stations 517.86 146.27 299.59 72.00
4 Total 4224.54 1917.17 1475.76 831.61
Capitalisation
1 Thermal Generating Stations 3264.62 1120.16 727.65 1416.81
2 Hydro Power Stations 442.06 188.97 29.29 223.80
3 Gas Turbine Power Stations 517.86 60.97 358.89 98.00
4 Total 4224.54 1370.1 1115.83 1738.61
2.8. The proposed Capital Expenditure in respect of the existing Thermal
![Page 6: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/6.jpg)
Page 6 of 52
Generating stations is towards schemes to replace the equipment that have served
their useful life during capital overhauling works, to reduce the Auxiliary Consumption,
to reduce the steam loss and to improve the Station Heat Rate (SHR) and thereby the
Station efficiency, Boiler maintenance, electrical modernisation, to meet the norms
prescribed by the Pollution Control Board and to reduce the downtime of the Units in
case of failures. Also, works related to Ash Handling system and Coal Handling
system have been proposed to be carried out to ensure trouble free coal unloading
work and to meet out the Coal Feeding requirement of the generating stations.
2.9. In respect of the existing Hydro stations, Comprehensive Renovation,
Modernisation and Uprating (RMU) works at Moyar power house, Periyar power
house, Kodayar power house and Sholayar power house, and modernisation works in
certain other power houses have been proposed by the Petitioner. In addition, works
related to governor upgradation, provision for turbine runner, protection system
upgradation, replacement of station transformer, etc., have been proposed by the
Petitioner.
2.10. As regards the existing Gas stations, the Capital works include mandatory
inspection of Hot Gas Path, mandatory inspection of Gas Turbine and Generator,
major overhauling works, mandatory combustion inspection and replacement of items
during mandatory inspections, construction of quarters, replacement of damaged
parts, etc.
2.11 The detailed justification for each of the proposed capital works along with
details of approval of the competent authority for the works and cost benefit analysis
![Page 7: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/7.jpg)
Page 7 of 52
have been furnished by the Petitioner.
2.12. The Capital Expenditure and Capitalisation for new generating stations as
submitted by TANGEDCO is shown in the Table below:
Table 4: Capital Expenditure for New Generation Projects as submitted by TANGEDCO
(Rs. Crore)
Sl.
No. Name of the Stations
Estimated
Cost
FY
2016-17
FY 2017-
18
FY 2018-
19
Thermal Power Projects
1 Mettur Thermal Power Project -
Stage-III (600MW) 4695.43 8.54 166.16 0.00
2 North Chennai Thermal Power
Project - Stage-II (1200MW) 8352.32 18.51 192.89 0.00
3 Ennore SEZ STPP (1320MW) 9800.00 573.90 1140.48 380.16
4 ETPS Expansion (660MW) 5421.00 750.00 1500.00 1979.33
5 ETPS Replacement Project
(660MW) 3600.00 2.00 500.00 1000.00
6 Uppur Thermal Power Project
(1600MW) 12778.00 250.00 5000.00 4000.00
7 North Chennai Thermal Power
Project - Stage-III (800MW) 6357.00 550.00 1500.00 1500.00
8
Udangudi Thermal Power
Project - Stage-I, II & III (3960
MW)
27300.00 257.50 3400.00 5100.00
9
Kadaladi Super Critical
Thermal Power Project
(5x800MW)
30000.00 54.00 500.00 3000.00
Total 108303.75 2464.45 13899.53 16959.49
Hydro Power Projects
1 Mettur Pumped Storage HEP
(500MW) 2200.00 1.00 2.00 3.00
2 Modified Moyar Ultimate
Stage HEP Phase-I (25MW) 156.91 0.25 1.75 2.00
3 Survey and Investigation of
works for new Hydro Schemes 7.00 1.00 2.00 4.00
4 Kundah Pumped HEP
(4x125MW) 1831.29 208.00 500.00 400.00
5 Sillahalla HEP (4x500MW) 7000.00 2.23 5.65 155.00
6 Periyar Vaigai - IV SHEP
(2x1.25MW) 66.26 1.26 0.00 0.00
7 DRIP works under World Bank
Funded 272.00 104.00 160.82 0.00
8 Bhavani Kattalai Barrage -I
(2x15MW) 4.15 2.10 2.05 0.00
9 Bhavani Kattalai Barrage -II
(2x15MW) 4.79 2.50 2.29 0.00
10 Bhavani Kattalai Barrage-III 23.03 15.03 5.05 2.95
![Page 8: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/8.jpg)
Page 8 of 52
Sl.
No. Name of the Stations
Estimated
Cost
FY
2016-17
FY 2017-
18
FY 2018-
19
(2x15MW)
11 Bhavani Barrage -I (2x15MW) 11.88 3.88 7.00 1.00
12 Bhavani Barrage -II (2x15MW) 17.43 5.88 11.55 0.00
13 Kolli Hill Hydro Project
(2x15MW) 65.58 26.71 18.87 20.00
Total 11660.32 373.84 719.02 587.95
Further, TANGEDCO submitted that it has taken up establishment of twelve
(12) Co-generation Plants with the capacity of 183 MW in the Co-operative and Public
Sector Sugar mills along with Sugar mill Modernization in Tamil Nadu at a total cost of
Rs.1,241.15 Crore. These projects are likely to be commissioned by the end of 2017.
2.13. The Petitioner has submitted that it has erected 33 Nos. of 33 kV Substations
during FY 2015-16 at a cost of Rs. 75.51 Crore, energizing 11,121 km of LT lines and
3,458 km of HT lines. The Petitioner has proposed the capital works for establishment
of 33 kV sub-stations, enhancement of power transformers in sub-stations, erection of
HT and LT feeders (overhead and underground), erection of distribution transformers
and erection of pillar boxes, conversion of Overhead line to underground cable and
Deposit Contribution Works (DCW), etc. The works are proposed to be carried out to
meet the load growth, reduce outages, enhance operational flexibility, improve the
quality of supply, increase the revenue and reduce the Aggregate Technical &
Commercial (AT&C) loss. The works are also proposed to be carried out under various
schemes of the Government of India, viz., Restructured Accelerated Power
Development & Reforms Programme (R-APDRP) [Part A and Part B], Integrated
Power Development Scheme (IPDS), and Deendayal Upadhyaya Gram Jyoti Yojana
(DDUGJY) besides own funded schemes and DCW schemes.
![Page 9: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/9.jpg)
Page 9 of 52
2.14. The Petitioner has submitted the region-wise allocation of capital expenditure
and capitalisation for the Distribution function for FY 2016-17 to FY 2018-19 as shown
in the Table below:
Table 5: Capital Expenditure for Distribution as submitted by TANGEDCO (Rs. Crore)
Sl. No. Name of the Region Estimated
Cost FY 2016-17 FY 2017-18 FY 2018-19
1 Chennai North 765.98 425.55 193.56 146.87
2 Chennai South 1783.72 1178.53 324.95 280.24
3 Coimbatore 1291.44 698.14 309.73 283.57
4 Erode 1392.95 625.88 487.87 279.20
5 Madurai 1146.82 712.52 215.33 218.97
6 Tirunelveli 747.98 422.79 203.42 121.77
7 Trichy 1332.86 670.04 452.61 210.21
8 Vellore 947.66 366.13 340.71 240.82
9 Villupuram 1285.38 477.54 488.21 319.63
10 Grand total 10694.79 5577.12 3016.39 2101.28
Table 6: Capitalisation for Distribution as submitted by TANGEDCO (Rs. Crore)
Sl. No. Name of the Region Estimated
Cost FY 2016-17 FY 2017-18 FY 2018-19
1 Chennai North 765.98 415.03 192.20 144.30
2 Chennai South 1783.72 1144.66 327.46 286.03
3 Coimbatore 1291.44 677.86 300.63 298.55
4 Erode 1392.95 568.34 506.70 297.53
5 Madurai 1146.82 693.84 222.19 215.64
6 Tirunelveli 747.98 402.30 212.08 127.79
7 Trichy 1332.86 621.96 469.15 228.91
8 Vellore 947.66 336.32 347.94 241.79
9 Villupuram 1285.38 438.16 494.68 332.78
10 Grand total 10694.79 5298.47 3073.03 2173.32
2.15. The Petitioner has submitted that a higher capitalisation amount for the FY
2016-17 are due to completion of works under RAPDRP schemes for an amount of
![Page 10: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/10.jpg)
Page 10 of 52
Rs.2275 crs., DDUGJY schemes for about Rs.165.51 crs. and other completed works
in distribution side for Rs.1800 crs.
3. AT&C Losses
The Petitioner has submitted that T&D losses are due to energy dissipated in
the conductors and equipment used for transmission, transformation, sub-transmission
and distribution of power. These technical losses are inherent in the system and can
be reduced to an optimum level. However, the Commercial losses are due to illegal
consumption of electrical energy, which is not correctly metered and billed, and
causes losses to the utility. The Petitioner further submitted that it has taken various
efforts for reduction of Aggregate Technical & Commercial (AT&C) losses. AT&C
losses have been reduced from 18.40% in FY 2012-13 to 17.96% in FY 2015-16. The
collection efficiency of 98.79% has been achieved in FY 2015-16. The Petitioner has
proposed the works under R-APDRP, IPDS and DDUGJY for reduction of AT&C
losses.
4. Relevant Policy/Regulations
The CIP submitted by TANGEDCO has to be approved as per the relevant
provision of Tariff Policy, Tariff Regulations and MYT Regulations.
4.1. The relevant provisions of the Tariff Policy notified by Government of India on
January 6, 2016 with respect to the CIP are reproduced below:
“5.11 Tariff policy lays down … …
a) Return on Investment
… … …
While allowing the total capital cost of the project, the Appropriate Commission would
ensure that these are reasonable and to achieve this objective, requisite benchmarks
![Page 11: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/11.jpg)
Page 11 of 52
on capital costs should be evolved by the Regulatory Commissions.
b) to (h)… … … …
g) Renovation and Modernization
… … …
A multi-year tariff (MYT) framework may be prescribed which should also cover
capital investments necessary for renovation and modernization and an incentive
framework to share the benefits of efficiency improvement between the utilities and the
beneficiaries with reference to revised and specific performance norms to be fixed by
the Appropriate Commission. Appropriate capital costs required for pre-determined
efficiency gains and/or for sustenance of high level performance would need to be
assessed by the Appropriate Commission. ……” (emphasis added)
4.2. Regulation 17 of the TNERC (Terms and Conditions for determination of Tariff)
Regulations, 2005 (hereinafter called Tariff Regulations, 2005) specifies as under:
“17. Capital Investment Plan
(1) The licensee shall file a detailed Capital Investment Plan every year showing
separately, ongoing projects that will spill into the year under review and new project
(along with justification) that will commence but may be completed within or beyond
the tariff period.
(2) The Commission may consider the licensee’s investment plan for approval and for
this purpose, may require the licensees to provide relevant technical and commercial
details. The costs corresponding to the approved investment plan of a licensee for a
given year shall normally be considered for its revenue requirement.
(3) In presenting the justification for new projects, the licensee shall detail the specific
nature of the works and the results to be achieved. The details must be shown in
physical parameter (e.g.) new capacity to be added, length of lines to be energised,
number of sub-stations / Bays to be added, meters to be added, replaced, etc. so that it
is amenable for physical verification. In case of significant shortfall in achieving
physical targets, the Commission may require the licensee to explain the reasons, and
may proportionately reduce the provision, including interest and return component
made towards revenue requirement, in the next tariff proposal.
(4) The licensee may, at any time, during the tariff year, seek provision for additional
capital expenditure to meet natural calamities involving substantial investment and the
Commission shall examine and review these provisions in the manner as given in this
regulation and approve their inclusion in the revenue requirement in the next period.
(5) The licensee shall get the Capital Investment Plan approved by the Commission
before filing ARR and Application for determination of tariff.”
4.3. Regulation 3 (v) of TNERC (Terms and conditions for determination of Tariff for
Intra-State Transmission/Distribution of Electricity under MYT framework) Regulations
2009 specifies as under:
![Page 12: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/12.jpg)
Page 12 of 52
“3. Multiyear Tariff Frame Work
x x x x
(.v). Capital Investment Plan: The licensee shall get the approval of the Capital Investment Plan for each
year of the initial control period in accordance with the Regulation 17 of TNERC Tariff
Regulations. It may be ensured that the approval of the Commission is obtained before
tariff filing under MYT framework. The capital investment plan shall have
capitalization schedules for each year of the control period.
The source of finance to meet the capital expenditure in each year of the
control period shall also be furnished along with Capital Investment Plan.”
4.4. Further, the Hon’ble APTEL in its Judgment dated October 18, 2014 in Appeal
No. 196 of 2013 filed by M/s. OPG Renewable Energy against the Tariff Order 1 of
2013 had given certain directions regarding the approval of CIP of TANGEDCO for FY
2014-15 and FY 2015-16. After taking cognizance of such directions, the Commission
in the Suo-motu Tariff Order dated December 11, 2014 directed TANGEDCO as
under:
“7: SUMMARY OF DIRECTIVES
7.1 The Commission directs TANGEDCO
a) … … …
b) … … …
c) The Commission likes to reiterate that TANGEDCO shall submit a well-structured
cohesive business plan and detailed individual schemes for the planned capacity
additions as well as system strengthening plans. All such plans and schemes shall be
submitted to the Commission in accordance with the Terms and Conditions of Tariff
Regulations 2005 and its amendment dated 09.04.2014, MYT Tariff Regulations 2009,
as well as Licensing Regulations 2005. The submission for approval in this regard so
far has been highly unsatisfactory. The Commission has been addressing the utilities by
way of letters as well as by way of directions. The compliance to such letters and
directions will have to be serious and without fail.”
4.5. TANGEDCO filed its CIP for FY 2014-15 and FY 2015-16 for approval of the
Commission through additional affidavits dated April 4, 2014, June 2, 2016 and
August 23, 2016 in M. P. No. 39 of 2012. After due verification and scrutiny of the
Petition, the Commission vide Order dated January 31, 2017 approved the CIP for
TANGEDCO for FY 2014-15 and FY 2015-16.
![Page 13: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/13.jpg)
Page 13 of 52
5. Procedure adopted:-
5.1. TANGEDCO has submitted its Petition for approval of CIP for Third Control
Period from FY 2016-17 to FY 2018-19 on November 21, 2016, which was admitted
by the Commission and registered as M.P. No. 28 of 2016. The Commission held a
preliminary hearing in the matter on December 9, 2016. During the hearing,
TANGEDCO was directed to re-submit the CIP Petition with details such as projected
demand, generation capacity addition, distribution load centres, energy loss trajectory,
etc., and schemes for the same.
5.2. The Commission vide Order dated December 29, 2016, directed TANGEDCO
to upload the Petition on its website for obtaining comments and suggestions from the
stake holders and file their reply thereafter along with the compilation of comments
and suggestions. TANGEDCO submitted its revised Capital Investment Plan on
January 5, 2017 with details such as projected demand, generation capacity addition,
distribution load centres, energy loss trajectory, etc., and the respective schemes for
the same. The revised CIP was also uploaded by TANGEDCO on its website on
January 5, 2017. The comments and suggestions provided by the stakeholders in
writing have been summarised issue-wise, along with TANGEDCO’s replies as
elaborated in Appendix of this Order.
5.3. Since, FY 2016-17 is already over, the Commission asked TANGEDCO to
submit the updated status of capital expenditure incurred and capitalisation achieved,
to facilitate a realistic estimate of capital expenditure and capitalisation for FY 2016-17
to FY 2018-19. The Commission has analysed the final proposals for the generation
and distribution functions for the Control Period from FY 2016-17 to FY 2018-19.
![Page 14: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/14.jpg)
Page 14 of 52
6. Findings of the Commission:-
6.1. The Demand and Energy projections made by TANGEDCO depicts deficit
scenario till the end of FY 2018-19. There would be surplus scenario after FY 2019-20
after taking into account the planned capacity addition from FY 2016-17 onwards. The
Commission is of the view that any slippage in the timelines for capacity addition may
lead to continued deficit scenario beyond the Control Period, if the demand increases
as per the projections which may have to be bridged through short term power
procurement.
6.2. While analysing the CIP, the Commission has taken into account the demand
and energy availability projections submitted by TANGEDCO. The Commission has
also taken into account the Stakeholders’ comments and TANGEDCO’s reply while
proceeding with CIP approval.
6.3. The Commission observes that many of the existing thermal stations viz. TTPS
Unit 1, II, III and MTPS Stage I have exceeded their life period and hence,
TANGEDCO has taken up Upgradation of the existing system, Renovation and
Modernisation, capital overhaul works, etc., to ensure availability of these low-cost
power plants. The Hydro stations are very old stations and some of them are in
service since as early as 1940s and the allocation of capital expenditure is largely
towards Renovation, Modernisation and Upgradation (RMU) works, other
modernization works, etc. The proposed capital expenditure for Gas stations is largely
towards statutory inspection that are to be carried out as per the recommendations of
Original Equipment Manufacturer (OEM).
![Page 15: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/15.jpg)
Page 15 of 52
6.4. The Commission has taken into account this aspect while approving the capital
expenditure for these schemes. The Commission has considered the capital
expenditure scheme towards Generation Stations/Units, which have surpassed their
useful life or are going to surpass their useful life during the Control Period from FY
2016-17 to FY 2018-19. As regards the existing Generating Stations, the Commission
notes that North Chennai Thermal Power Station-Stage I & II, Mettur Thermal Power
Station Stage -II will not surpass its useful life by the end of the Control Period. Hence,
for such Thermal Generating Stations, the Commission has considered only those
schemes, which are essential for their operation and which qualify under Regulation
19 of the Tariff Regulations.
6.5. Further, the Petitioner has proposed some schemes in FY 2016-17. Since FY
2016-17 is already over, the Commission sought the status of the schemes proposed
in FY 2016-17 from TANGEDCO and has accordingly considered the revised phasing
of capital expenditure for such schemes.
6.6. The Commission has not considered any capital expenditure and capitalisation
towards Ennore Thermal Power Station as the station is de-commissioned. As regards
the existing Thermal Power Station, the Commission has considered the schemes
towards Capital overhauling, replacement of economiser coil, commissioning of
Pressure Reducing De-superheating system, retrofitting of condenser, installation of
fire protection system, replacement of HP module assembly, replacement of IP/LP/HP
rotor, replacement of water wall tubes, revamping of internal coal handling,
replacement of electrical equipments, provision of wireless CCTV and surveillance
![Page 16: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/16.jpg)
Page 16 of 52
system, PAT schemes, civil works for ash dyke area, revamping of PDFAC system,
schemes for fulfilment of norms of Pollution Control Board, etc.
The petitioner shall also consider to phase out the old units which have
completed their life period by new high efficiency machines meeting new
environmental norms/policy of GoI.
6.7. As regards Hydro projects, the Commission has considered major capital
expenditure schemes towards Static excitation provision for Kundah Power house-2,
230/22 kV substation at Kundah Power House, RMU of Moyar Power house, Periyar
Power house, Kodayar Power house and Sholayar Power house, replacement of auto
sequencer panel at Kadamparai pumped storage Power house, supplying of barrage
gates at BPH-2, etc.
6.8. As regards Gas Stations, the Commission has considered the major capital
expenditure schemes towards installation of Gas booster, upgradation of equipment
as per OEM recommendations, commissioning of air cooled condenser, construction
of quarters, compressor discharge and turbine casing, etc.
Further, in respect to the capital expenditure proposed for Thirumakottai Gas
Thermal Station, which has completed its life period, the expenditure has been
admitted by the Commission under renovation and modernisation and life extension
programme as per Regulation 19 of Tariff Regulations, 2005. The petitioner is also
directed to submit a comprehensive Plan for Renovation & Modernisation and life
extension for its each of the gas stations as and when they complete their life period
for admitting the expenditure.
6.9. While admitting and approving the capital expenditure for existing Generating
![Page 17: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/17.jpg)
Page 17 of 52
Stations, the Commission has been guided by the provisions of the TNERC’s Tariff
Regulations 2005 and MYT Regulations, 2009 reproduced above.
6.10. Accordingly, the schemes proposed by the Petitioner for each of the above
existing Thermal, Hydro and Gas stations and the Commission’s approval of capital
expenditure and capitalisation considering the life period served by the asset
observations have been duly deliberated upon in Annexures 1 to 13.
6.11. For the investment proposals in the existing generating stations
commencing during the Control Period, i.e., April 1, 2016 onwards, the
Commission directs TANGEDCO to submit the year-wise actual capital
expenditure incurred along with detailed justification for delay, if any, at time of
approval of actual capital expenditure and capitalisation. Further, the
Commission directs the Petitioner to maintain the record for the scheme-wise
actual capital expenditure incurred and actual capitalisation done after April
2016 for each Generating Station separately and submit the same to the
Commission at the time of next Tariff Petition. The Commission will approve the
actual Capital expenditure and actual capitalisation based on such scheme-wise
information, subject to prudence check.
6.12. TANGEDCO has submitted that it has prepared the CIP for FY 2016-17 to FY
2018-19 based on the demand and energy availability projections for FY 2016-17 to
FY 2020-21 as per 19th Electric Power Survey (EPS) Projections. Accordingly, for
meeting the additional demand, it has proposed commissioning of new projects, for
which the capital expenditure has been proposed in the CIP.
![Page 18: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/18.jpg)
Page 18 of 52
6.13. The new Thermal and Hydro projects are as follows:
Thermal Projects – Ennore SEZ, ETPS Expansion, ETPS Replacement, Uppur
Thermal Project, North Chennai Thermal Power Project Stage III, Udangudi Stage I, II
& III, Kadaladi Super critical Project
Hydro Projects – Mettur Pumped Storage, Modified Moyar Ultimate Stage Phase I,
Kundah Pumped HEP, Sillahalla HEP, Kolli Hydro Project.
6.14. For admitting and approving the capital expenditure for the new Generation
Thermal and Hydro Projects, the Commission is guided by the provisions of
Regulation 6 (7) (i) (a) of the TNERC (Terms and Conditions for the determination of
the Tariff) Regulations,2005 which specifies as under:
“… … …
(7) In case of Generating Station or the Transmission system declared under
commercial operation on or after the date of notification of these Regulations, an
application for fixation of tariff shall be made in two stages as below:
(i) (a) A generation company or a licensee may make an application as per Appendix –
I to these regulations, for determination of provisional tariff in advance of the
anticipated date of completion of the project, based on the capital expenditure
actually incurred upto the date of making of the application or a date prior to making
of the application, duly audited and certified by the statutory auditors, and the
provisional tariff shall be charged from the date of commercial operation of the
respective units of the generation station or the line or sub-station of the transmission
system.
(b) Provisional tariff or provisional billing of charge, wherever allowed by the
Commission based on the application made by the generating company or the
transmission licensee or by the Commission on its own or otherwise, shall be adjusted
against the final tariff approved by the Commission:
Provided that where the provisional tariff charged exceeds the final tariff approved by
the Commission under these regulations, the generating company or the transmission
licensee, as the case may be, shall pay simple interest @ 6% per annum computed on
monthly basis, on the excess amount so charged from the date of payment of such
excess amount and upto the date of adjustment:
![Page 19: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/19.jpg)
Page 19 of 52
Provided further that where the provisional tariff charged is less than the final tariff
approved by the Commission, the beneficiaries shall pay simple interest at 6% per
annum, computed on monthly basis on the deficit amount from the date on which final
tariff will be applicable upto the date of billing of such deficit amount.
Provided also that excess/deficit amount along with simple interest at 6% shall be
adjusted within three months from the date of order failing which the defaulting
licensee / beneficiary shall be liable to pay penal interest on excess / deficit amount at
the rate as may be decided by the Commission].
(ii) A licensee shall make a fresh application in the same format as above, for the
determination of final tariff based on actual capital expenditure incurred upto the
date of commercial operation of the Generating Station or Transmission system duly
audited and certified by the Statutory Auditors.
(8). In case the licensee does not initiate tariff filings in time, the Commission shall
initiate tariff determination and regulatory scrutiny on suo motu basis.”
6.15. The above-said Regulations clearly specify that the Petitioner shall approach
the Commission for provisional tariff for new generating stations before the anticipated
date of COD based on capital expenditure actually incurred, duly audited and certified
by the Statutory Auditor. Also, after the achievement of COD of the project, the
Petitioner is required to approach the Commission for approval of capital cost and final
tariff based on actual capital expenditure incurred till COD, duly audited and certified
by the Statutory Auditor.
6.16. In view of the above Regulations, the Commission is of the opinion that it would
not be appropriate to allow the recovery of capital expenditure incurred by the
Petitioner towards new Generating Stations through tariff, without verifying prudency
of the actual capital expenditure incurred before COD of the project. At the same time,
it does not mean that the Commission has rejected the proposed capital expenditure
against these Projects. TANGEDCO is required to ensure that the new generation
projects are taken up on time, based on the projected demand-supply gap/surplus for
![Page 20: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/20.jpg)
Page 20 of 52
the future years and to ensure that the cost is optimised.
6.17. In light of the foregoing, the Commission in-principle approves the Capital
expenditure and funding of the new Generation projects as proposed by the
Petitioner. However, the Commission has not considered any capital
expenditure for these projects for recovery through tariff. The Petitioner shall
adhere to the original time lines for the completion of the projects as mentioned
in Detailed Project Report and duly approved by Board of Directors.
6.18. The Commission further directs the Petitioner to file the Petitions for
approval of provisional tariff and final tariff for new Generation projects in line
with the provisions of the Tariff Regulations. The Commission will take a final
view on the time overrun and related cost overrun and IDC component for
individual projects, after the new generation projects are commissioned, and the
actual audited capital cost including IDC are submitted to the Commission with
due justification for the increase in capital cost, if any.
6.19. The Petitioner has proposed capital expenditure for the following thermal and
hydro projects under New Generation projects for which COD has been achieved
earlier:
Thermal Projects (a) Mettur Stage III – COD achieved on 12.10.2013 (b) NCTPS Stage II - COD achieved for Unit 1 – 20.03.2014 and Unit II- 08.05.2014 Hydro Projects (a) Periyar Vaigai IV – COD achieved during Feb’2016 (b) Bhavani Kattalai Barrage I – COD achieved during 2006-07
![Page 21: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/21.jpg)
Page 21 of 52
(c) Bhavani Kattalai Barrage II – COD achieved for Unit 1-10.10.2011 & Unit 2 –14.10.2011
(d) Bhavani Kattalai Barrage III – COD achieved for Unit 1- 28.11.2012 & Unit 2 – 28.12.2012 (e) Bhavani Barrage I – COD achieved for Unit 1 – 29.05.2015 &
Unit 2 – 02.07.2015 (f) Bhavani Barrage II – COD achieved for Unit 1 & 2 -15.08.2013
6.20. The directions of the Commission in respect of new generating stations in the
Tariff Order dated June 20, 2013 on Determination of tariff for generation and
distribution is relevant here, and the same is reproduced below:
“3.124 The Commission observed that there are number of new generating stations for which
TANGEDCO had neither sought prior approval of their capital investment plan nor applied for
determination of tariff in advance for the new generating stations.
3.125 TANGEDCO is required to file separate Petitions for approval of the tariff for the new
generating stations along with accounts for these generating stations duly certified by statutory
auditor. On Commission’s directive, TANGEDCO has submitted partial information for new
thermal stations as per the formats prescribed by TNERC Tariff Regulations. However, the
information is not certified by statutory auditor. With respect to new hydro stations
TANGEDCO has not provided any information.
3.126 Regulation 6 (7) (i) (a) of the TNERC Tariff Regulations, 2005 specifies the following:
“A generation company or a licensee may make an application as per Appendix – I to these
Regulations, for determination of provisional tariff in advance of the anticipated date of
completion of the project, based on the capital expenditure actually incurred upto the date of
making of the application or a date prior to making of the application, duly audited and
certified by the statutory auditors, and the provisional tariff shall be charged from the date of
commercial operation of the respective units of the generation station or the line or sub-station
of the transmission system.”
3.127 Hence, the Commission directs TANGEDCO to file the separate petitions based on
TNERC Regulations, within 90 days of issuance of this Order. In failure of this compliance,
Commission may approve the capital cost based on industry norms and may disallow all
expenses allowed due to provisionally approved capital cost in its next tariff order.”
![Page 22: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/22.jpg)
Page 22 of 52
6.21. As per the above directions, the Petitioner has filed separate Petitions for
approval of the Capital Cost of NCTPS Stage II Unit I & II and MTPS Stage III in
M.A.P. Nos. 1, 2 and 3 of 2015 and for Periyar Vaigai I, Periyar Vaigai II, Bhavani
Barrage II and Bhavani Kattalai Barrage II in M.A.P. Nos. 1, 2, 3 and 4 of 2014. For
rest of the hydro projects, though COD has been achieved, separate Petitions are yet
to be filed.
6.22. For allowing the capital expenditure of such thermal and hydro projects for
which COD have been achieved and separate Petitions have also been filed for
capital cost approval, the orders of the Commission in the respective Petitions wherein
capital cost for such project were approved by the Commission need to be taken into
account. The observations of the Commission in this regard are detailed below:
I Thermal Projects
The thermal projects, viz., North Chennai Stage II Unit I & Unit II and Mettur
Stage III have been completed with time over-run and cost over-run thereby leading to
increase in the project cost by way of Interest During Construction, Fuel cost, etc. The
quantum of delay and the consequent closure of contract is yet to be taken up. The
Commission, therefore, in its order dated 29.12.2016 in M.A.P No. 1 of 2015,
M.A.P.No.2 of 2015 and in its Order dated 31.01.2017 in M.A.P. No 3 of 2015 of the
respective projects, after prudence check of the actual expenditure incurred by the
Petitioner, disallowed certain portion of the interest expenses and fuel expenses due
to delayed completion of the project and accordingly allowed the cost as on COD
provisionally. The Commission has also directed the Petitioner to file the Petition for
approval of final capital cost based on completed actual capital cost duly certified by
![Page 23: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/23.jpg)
Page 23 of 52
Auditors based on Audited Accounts of the project on finalization of the quantum of
Liquidated Damages and other penalties and closure of contract for admitting the
expenditure incurred beyond the COD of the project. Therefore, the capex allocation
for the said projects of NCTPS Stage Unit I & II and MTPS Stage III for the MYT
Control Period from FY 2016-17 to FY 2018-19 are not considered for the present.
II Hydro Projects
(a) With regard to Hydro projects, viz., Bhavani Kattalai Barrage II and Bhavani
Barrage II, which have achieved COD during FY 2011-12 and FY 2013-14,
respectively, and separate Petitions filed for approval of the capital cost under
M.A.P.Nos. 3 and 4 of 2014, the Commission has already restricted the capital
expenditure incurred by the Petitioner upto COD towards project work and IDC in line
with the norms stipulated by CERC in the CERC RE Tariff Regulations in view of the
cost overrun of the project and disallowed the expenditure incurred by the petitioner
beyond COD. However, the Capex allocation for the MYT Control Period from FY
2016-17 to FY 2018-19 are towards compensation value towards land acquired,
construction of protection wall, construction of boundary wall, river draining works, etc.
The Commission admits the expenditure as per Regulation 19 of Tariff Regulations,
2005 as it is towards land compensation and also on account of new works not in the
original scope of work.
(b) In respect of the other small hydro projects, viz., Periyar Vaigai IV, Bhavani
Barrage I, Bhavani Kattalai Barrage I & III, separate Petitions seeking approval of
capital cost have not been filed by the Utility. Further, as per the estimated cost
indicated in the present petition, the cost per MW of these projects are also in the
range of Rs.16 Crore/MW to Rs. 26.50 Crore/MW, which is extremely high when
![Page 24: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/24.jpg)
Page 24 of 52
compared with the norms specified in CERC RE Tariff Regulations. As separate
Petitions seeking approval of the capital cost of these Small Hydro projects have not
been filed by the Utility as already directed by this Commission in its order dated
31-01-2017 in M.P No.39 of 2012, the Commission has not considered the capital
allocation for these small hydro projects for the MYT Control Period from FY 2016-17
to FY 2018-19. The Petitioner is directed to file separate Petitions for approval of
the capital cost for the remaining Small Hydro projects for prudence check of
the Commission.
6.23. Dam Rehabilitation and Improvement Project (DRIP) works under World Bank
funded scheme for 38 dams have been taken up at an estimated cost of Rs. 272
Crore including IDC. Considering the progress of work, the capex allocation for this
project under progress is allowed.
6.24. The details of capital expenditure and capitalisation admitted by the
Commission for the DRIP works, Bhavani Kattalai Barrage II and Bhavani Barrage II
are furnished in Annexures 14-16.
6.25. The abstract of the overall capital expenditure and capitalisation proposed by
the Petitioner and approved by the Commission for Generation function for the
purpose of recovery through tariff, are shown in the Tables below:
![Page 25: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/25.jpg)
Page 25 of 52
Table 7: Approved Capital Expenditure for Generation function of TANGEDCO (Rs. Crore)
Capital Expenditure
Sl. No. Name of Stations/Projects Estimated
Cost
TANGEDCO Approved by the Commission
FY 2016-17 FY 2017-18 FY 2018-19 FY 2016-17 FY 2017-18 FY 2018-19
1 Ennore Thermal Power Station - - - - - - -
2 Tuticorin Thermal Power Station 904.64 443.27 264.97 196.40 84.20 265.60 466.10
3 Mettur Thermal Power Station – I 454.48 233.83 136.90 83.75 17.74 101.27 65.59
4 North Chennai Thermal Power Station - Stage - I 1,661.88 807.92 610.14 243.82 194.85 276.39 451.40
5 Mettur Thermal Power Station – II 145.33 44.80 75.03 25.50 34.20 31.03 20.00
6 North Chennai Thermal Power Station - Stage - II 98.29 13.48 15.32 69.49 5.67 1.00 65.00
A Thermal Power Stations 3,264.62 1,543.30 1,102.36 618.96 336.66 675.29 1,068.09
1 Kundah Generation Circle (843.65MW) 86.06 15.11 25.00 45.95 15.11 5.00 20.50
2 Tirunelveli Generation Circle (372.80MW) 174.08 174.08 - - 30.49 5.00 45.00
3 Kadamparai Generation Circle (595.45MW) 160.50 35.88 44.00 80.62 30.86 33.78 68.81
4 Erode Generation Circle (483.50MW) 21.42 2.53 4.81 14.08 0.50 2.78 14.08
B Hydro Electric Power Stations 442.06 227.60 73.81 140.65 76.96 46.56 148.39
1 Valuthur Gas Turbine Power Station 264.26 93.46 155.80 15.00 4.16 15.30 47.00
2 Thirumakkottai Gas Turbine Power Station 168.52 32.52 119.00 17.00 6.53 125.99 22.00
3 Kuttalam Gas Turbine Power Station 72.29 20.29 12.00 40.00 2.97 4.45 -
4 Basin Bridge Gas Turbine Power Station 12.79 - 12.79 - 3.50 8.29 1.00
C Gas Turbine Power Stations 517.86 146.27 299.59 72.00 17.16 154.03 70.00
D Thermal Power Projects 1,08,303.75 2,464.45 13,899.53 16,959.49 - - -
E Hydro Electric Power Projects 11,660.32 373.84 719.02 587.95 112.38 174.66 -
1 Drum Rehabilitation and Improvement Project works 272.00 104.00 160.82 - 104.00 160.82 -
2 Bhavani Kattalai Barrage-II 4.79 2.50 2.29 - 2.50 2.29 -
3 Bhavani Barrage-II 17.43 5.88 11.55 - 5.88 11.55 -
4 Other Hydro projects 11,366.10 261.46 544.36 587.95 - - -
F Grand Total 1,24,188.61 4,755.46 16,094.31 18,379.05 543.16 1,050.53 1,286.48
![Page 26: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/26.jpg)
Page 26 of 52
Table 8: Approved Capitalisation for Generation Function of TANGEDCO (Rs. Crore)
Capitalisation (Rs. Crore)
Sl.
No. Name of Stations/Projects
Estimated
Cost
TANGEDCO Approved by the Commission
FY 2016-17 FY 2017-18 FY 2018-19 FY 2016-17 FY 2017-18 FY 2018-19
1 Ennore Thermal Power Station - - - - - - -
2 Tuticorin Thermal Power Station 904.64 393.22 245.02 266.40 8.38 331.42 476.10
3 Mettur Thermal Power Station – I 454.48 217.61 127.67 109.20 3.08 113.77 57.75
4 North Chennai Thermal Power Station - Stage - I 1,661.88 483.24 260.82 917.82 128.07 191.17 323.40
5 Mettur Thermal Power Station – II 145.33 18.42 74.83 52.08 7.82 30.83 46.58
6 North Chennai Thermal Power Station - Stage - II 98.29 7.67 19.31 71.31 5.67 1.00 65.00
A Thermal Power Stations 3,264.62 1,120.16 727.65 1,416.81 153.02 668.19 968.83
1 Kundah Generation Circle (843.65MW) 86.06 11.21 7.50 67.35 11.21 7.50 1.90
2 Tirunelveli Generation Circle (372.80MW) 174.08 174.08 - - 30.49 - -
3 Kadamparai Generation Circle (595.45MW) 160.50 3.68 14.45 142.37 - 5.10 128.35
4 Erode Generation Circle (483.50MW) 21.42 - 7.34 14.08 - 3.28 14.08
B Hydro Electric Power Stations 442.06 188.97 29.29 223.80 41.70 15.88 144.33
1 Valuthur Gas Turbine Power Station 264.26 23.16 226.10 15.00 4.16 15.30 47.00
2 Thirumakkottai Gas Turbine Power Station 168.52 17.52 108.00 43.00 - 112.52 42.00
3 Kuttalam Gas Turbine Power Station 72.29 20.29 12.00 40.00 - - 7.42
4 Basin Bridge Gas Turbine Power Station 12.79 - 12.79 - - 11.79 1.00
C Gas Turbine Power Stations 517.86 60.97 358.89 98.00 4.16 139.61 97.42
D Thermal Power Projects 1,08,303.75 34.23 411.99 5,421.00 - - -
E Hydro Electric Power Projects 11,660.32 31.15 311.41 57.55 9.38 15.84 4.00
1 Drum Rehabilitation and Improvement Project works 272.00 - 272.00 - - 272.00 -
2 Bhavani Kattalai Barrage-II 4.79 2.50 2.29 - 2.50 2.29 -
3 Bhavani Barrage-II 17.43 5.88 11.55 - 5.88 11.55 -
4 Other Hydro Projects 11,366.10 22.77 25.57 57.55 - - -
F Grand Total 1,24,188.61 1,435.49 1,839.23 7,217.16 207.26 1,109.51 1,210.58
![Page 27: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/27.jpg)
Page 27 of 52
6.26. The Commission has scrutinised the details of various works submitted by the
Petitioner.
6.27. Provision has been made by the Petitioner for extension of LT, LT-CT and HT
supply to various service categories and establishment of new 33 kV sub stations and
improvement works in sub-stations.
6.28. The objectives of the R-APDRP Scheme are to provide quality and reliable
power supply to the consumers and to bring down the AT&C losses below 15%. The
Petitioner has taken up the project in two parts, viz., Part-A and Part-B.
6.29. For R-APDRP Part A, an amount of Rs.417 Crore for Information Technology
implementation in 100 towns and Rs.182.17 Crore for SCADA/DMS (Supervisory
Control and Data Acquisition System/Distribution Management System) implementation
in 7 towns have been sanctioned. The objective of Part A implementation is to achieve
reliable and verifiable baseline data system in all towns with population greater than
30,000 as per 2001 census (10,000 for Special Category States). The installation of
SCADA/DMS for towns with population greater than 4 lakhs and annual input energy
greater than 350 MU is also envisaged under Part-A.
6.30. TANGEDCO has submitted that 100% loan is provided under R-APDRP for
Part-A projects, which shall be converted to grant on completion and verification of the
same by Third Party Independent Evaluating agencies (TPIEA) appointed by
MoP/Nodal Agency.
![Page 28: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/28.jpg)
Page 28 of 52
6.31. Detail Project Reports (DPRs) for Part A-Information Technology implementation
have been sanctioned on February 27, 2009 for 27 towns amounting to Rs. 70.04 Crore
and on June 30, 2009 for 83 towns amounting to Rs. 346.96 Crore. DPRs for Part A-
SCADA implementation have been sanctioned on December 8, 2010 amounting to Rs.
182.17 Crore.
6.32. The Commission notes that as per sanction, Part A projects are to be completed
within 3 years from the date of sanction for getting the loan converted into grant.
Further, the extension had been given up to June 30, 2016 in the 6th meeting of the
Monitoring Committee for implementation of IPDS held on December 10, 2015.
Subsequently, the completion date has been further extended up to March 31, 2017 in
the 8th meeting of Monitoring Committee of IPDS implementation held on July 26, 2016.
6.33. As regards the present status of Part A-Information Technology implementation,
the Petitioner submitted that out of 110 towns, 102 towns have been made “Go Live”
and the balance 8 towns are proposed to be made “Go Live” in phases.
6.34. As regards the present status of implementation of Part A-SCADA
implementation, the Petitioner submitted that SCADA/DMS Control Centre equipments
have been commissioned in all the 7 towns, viz., Chennai, Madurai, Salem, Trippur,
Tirunelveli, Trichy and Coimbatore. SCADA/DMS including field equipments, viz., Sub-
station RTU (Remote Terminal Unit) and FRTU (Feeder Remote Terminal Unit) in
RMU’s (Ring Main Units) has been completed in Trichy and Tirunelveli. Installation and
![Page 29: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/29.jpg)
Page 29 of 52
commissioning of SCADA equipments and DMS will be completed in the balance
towns.
6.35. Part B schemes include regular distribution strengthening works aimed at actual
and demonstrable performance in terms of reduction of AT&C losses in the project area
to less than 15% on a sustained basis for five years commencing one year after the
completion of Part A works besides reduction of AT&C losses for entire utility at 1.5%
per year. Successful completion within the schedule time for Part B schemes subject to
above condition will entitle TANGEDCO for conversion of 50% of the loan amount into
grant.
6.36. TANGEDCO submitted that Part A towns with baseline AT&C losses of above
15%, which is to be verified by a TPIEA, have been considered for implementation of
Part B schemes. Also, SCADA/DMS is implemented in seven towns and SCADA
enabling components like Ring Main Units and Sectionalisers required for this
implementation are proposed in Part B schemes.
6.37. Because of delay in establishment of baseline AT&C Losses, DPRs for 87 towns
were submitted and got sanctioned, based on computed AT&C losses of the respective
towns. However, after the establishment of baseline AT&C losses, Ministry of Power
(MoP), Government of India (GoI) cancelled the sanction for 24 towns. Further, 12 more
towns became eligible and DPRs for those towns were sanctioned by MoP, GoI.
MoP/GOI issued fresh guidelines for SCADA towns with baseline AT&C losses of less
than 15%, as eligible under Part B schemes for provision of only SCADA enabling
![Page 30: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/30.jpg)
Page 30 of 52
components. Accordingly, DPRs for SCADA enablers only were got sanctioned in 5
towns, viz. Coimbatore, Madurai, Tiruchirapalli, Salem and Tiruppur. However, Board of
TANGEDCO accorded approval for execution of schemes covered in 24 towns
cancelled (Distribution Strengthening Works only). Subsequently, Monitoring Committee
of IPDS (R-APDRP subsumed) in its 8th Meeting held on July 26, 2016 has decided to
revoke cancellation of Part-B schemes for 9 out of 24 towns based on revalidated
baseline data, amounting to Rs. 363.61 Crore sanctioned value. Also, Part-B scheme
for SCADA enablers only in Salem for Rs. 28.12 Crore has been cancelled by
Monitoring Committee to avoid duplication, since Part-B schemes in full has been
reinstated for Salem for Rs. 296.29 Crore. Therefore, Part-B schemes are being
implemented in TANGEDCO in total 88 towns having a total sanction value of Rs.
2841.21 Crore. The cancellation of Part-B schemes in remaining 15 out of 24 towns has
been upheld by Monitoring Committee and GoI and upfront amount (15% of sanctioned
cost) received towards these towns of Rs. 109.42 Crore along with accrued interest
shall be refunded or adjusted from future releases from GoI / Counterpart funding of
PFC.
6.38. The Commission observes that the implementation of R-APDRP has been
delayed. This delay has in turn led to delay in improvement of distribution
network and services. Hence, the Commission is of view that TANGEDCO should
take proactive measures to ensure the timely implementation of R-APDRP Part A
and Part B projects. The Commission, for the purpose of approval of Capital
Investment Plan, has considered the Capital expenditure as proposed by the
Petitioner, subject to the condition that the Petitioner shall adhere to time lines
![Page 31: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/31.jpg)
Page 31 of 52
proposed for implementation. Any variation in case of actual capital expenditure
shall be taken into account at time of True-up for respective year.
6.39. The Petitioner has taken up certain works under IPDS, funded by MoP, GoI,
which is implemented with the objectives of 24x7 Power supply for all, reduction of
AT&C Losses, and electrification of all urban households. The scope of IPDS includes
strengthening of sub-transmission and distribution network, metering of feeders,
boundary points, Distribution Transformers and to all consumers, completion of missing
links under the establishment of National Optical Fiber Network (NOFN), and provision
of Solar panels in Government building and Net Metering. The funding for such works
has been considered as upfront grant of 60% by MoP, GoI, lending from Financial
Institutions of 30% and utility own funds of 10%.
6.40. TANGEDCO submitted that Detailed Project Reports (DPRs) of 37 Nos. of
distribution strengthening works including metering and roof top solar panels covering
522 towns across 37 Nos. EDC for a total value of Rs.1561.31 Crore were submitted to
M/s. Power Finance Corporation Ltd. (PFC). Formal sanction letter has been issued by
PFC on March 7, 2016 and accordingly the schemes have to be completed within 30
months, i.e., by September 6, 2018. Accordingly, the Tripartite Agreement was
executed between PFC, MoP, GoI and TANGEDCO in respect of implementation of
IPDS on July 19, 2016.
6.41. As per guidelines, a Project Management Agency (PMA) is to be appointed to
assist TANGEDCO in project management. The Grant component of about Rs.7.80
![Page 32: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/32.jpg)
Page 32 of 52
Crore (0.5% of Rs.1561.31 Crore) is also sanctioned by MoP, GoI. The Price bid was
opened on December 15, 2016 and negotiation is under process. The Petitioner
submitted the summary of Project cost for IPDS as shown in the following Table:
Table 9: Summary of Project Cost for IPDS
Sr.
No. Particulars Unit
Quantity
(Nos.)
Project Cost
(Rs. Crore)
1 New 33/11 kV Sub-stations Nos. 55 120.36
2 Additional Transformer at 33/11 kV Sub-stations Nos. 18 22.76
3 Transformer capacity enhancement at 33/11 kV SS Nos. 18 14.33
4 Renovation & Modernisation of 33/11 kV Sub-
stations Nos. 1 0.30
5 New 33 kV new feeders/Bifurcation of feeders Kms 461.28 36.90
6 33 kV feeders Reconductoring/Augmentation Kms 0.50 0.26
7 33 kV Line Bay Extension at EHV Sub-stations Nos 6 1.81
8 22/11 kV Line: New Feeder/ Feeder Bifurcation Kms 3839.85 273.29
9 11 kV Line: Augmentation/Reconductoring Kms 25.96 4.07
10 Arial Bunched Cable Kms 249.48 22.96
11 Underground Cable Kms 518.27 136.20
12 11 kV Bay Extension Kms 59 8.91
13 Installation of Distribution Transformers Nos. 392 12.10
14 LT Line: New Feeder/ Feeder Bifurcation Kms 2149.17 104.80
15 LT Line: Augmentation/ Reconductoring Kms 2701.80 89.35
16 Capacitor Bank Nos. 78 19.88
17 High Voltage Distribution System (HVDS) Nos. 14833 327.57
18 Metering Nos. 2315114 345.16
19 Provisioning of Solar panel Nos. 1972 13.80
20 Others (Provision for new street light switch point,
DPs, Railway Crossing etc.,) Lot 6.51
21 Grand Total
1,561.31
6.42. The Commission has scrutinised the circle-wise Capital expenditure
proposed by the Petitioner for IPDS schemes and finds it appropriate considering
the scope and time lines of work proposed by the Petitioner. Considering the
past experience of the Petitioner regarding the implementation of R-APDRP
works, the Commission is of view that TANGEDCO should take proactive
measures to ensure the timely implementation of IPDS schemes. The
Commission, for the purpose of approval of Capital Investment Plan, has
considered the Capital expenditure as proposed by the Petitioner, subject to the
![Page 33: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/33.jpg)
Page 33 of 52
condition that the Petitioner shall adhere to time lines proposed for
implementation. Any variation in actual capital expenditure shall be taken into
account at time of True-up for respective year.
6.43. GoI has launched (Deendayal Upadhyaya Gram Jyoti Yojana) DDUGJY for the
rural areas with separation of agriculture and non-agriculture feeders and strengthening
and augmentation of sub-transmission and distribution.
6.44. For rural electrification, the approval for scheme cost of Rs. 43,033 Crore has
been accorded, including budgetary support of Rs. 33, 453 Crore from GoI during the
entire implementation period for all States. DDUGJY scheme is proposed in 27 Districts
covering 29 Nos. of EDC. District Electricity Committee (DEC) has been formed for all
the 27 Districts. The Government of Tamil Nadu (GoTN) has been addressed to
constitute the State Level Standing Committee for the DDUGJY scheme.
6.45. As regards the progress of implementation, the Petitioner submitted that 108
nos. of new 33/11 kV Sub-stations had been proposed under DDUGJY. The
administrative approval has been accorded for 39 nos., and work has been handed
over to General Construction Circle (GCC) for execution. CEs/Distn. and SEs/EDC
have been asked to acquire land and submit proposal for sanction for the 69 nos.
proposed under DDUGJY.
Further, enhancement of 123 nos. of Power Transformers is proposed under
DDUGJY, out of which, 4 nos. have not been taken into account because of inadequate
Power Transformer Capacity. Out of remaining 119 nos., Sanction had been accorded
![Page 34: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/34.jpg)
Page 34 of 52
for 86 nos. and work handed over to GCC for execution. CEs/Distn. and SEs/EDC have
been asked to submit proposal for sanction for the 33 nos. proposed under DDUGJY.
6.46. Further, the replacement of Electro-mechanical (EM) meters, Rural electrification
and feeder segregation works are under progress. A consolidated administrative
approval has been accorded by the Board for the components covered under DDUGJY.
6.47. The Commission has scrutinised the circle-wise Capital Expenditure
proposed by the Petitioner for DDUGJY schemes and finds it appropriate
considering the scope and timelines of work proposed by the Petitioner. The
Commission, for the purpose of approval of CIP, has considered the Capital
expenditure as proposed by the Petitioner, subject to the condition that the
Petitioner shall adhere to time lines proposed for implementation. Any variation
in case of actual capital expenditure shall be taken into account at time of True-
up for respective year.
6.48. Further as regards the other capital works proposed by the Petitioner, the
Commission has duly scrutinised the scheme-wise details and approved the Capital
expenditure and capitalisation for the Control Period. In line with the approach adopted
in past Order, the Commission has not considered the capital expenditure towards
DCW.
6.49. The Commission took note of the submissions made by the petitioner for higher
capitalisation for distribution function for the FY 2016-17 and has taken into
![Page 35: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/35.jpg)
Page 35 of 52
consideration the provision made by the Petitioner.
6.50. The complete distribution circle-wise abstract of the capital expenditure and
capitalisation proposed by the Petitioner and approved by the Commission is shown in
the Tables below:
Table 10: Approved Capital Expenditure for Distribution Function for FY 2016-17 to FY 2018-19
(Rs. Crore)
Sl.
No. Name of the Circles
Estimated
Cost
Petition Approved by the Commission
FY 2016-
17
FY
2017-18
FY
2018-19
FY
2016-17
FY
2017-18
FY 2018-
19
I Region: Chennai
North
1 Chennai Central 406.02 204.10 108.22 93.70 198.40 108.22 93.70
2 Chennai West 145.02 99.34 27.18 18.50 99.34 27.18 18.50
3 Chennai North 214.94 122.11 58.16 34.67 122.11 58.16 34.67
Sub total 765.98 425.55 193.56 146.87 419.85 193.56 146.87
II Region: Chennai South
4 Chennai South 981.30 916.39 39.51 25.40 866.39 39.51 25.40
5 Kancheepuram 378.31 114.86 147.90 115.55 113.90 146.40 113.95
6 Chengalpattu 424.11 147.28 137.54 139.29 147.28 137.54 139.29
Sub total 1,783.72 1,178.53 324.95 280.24 1,127.57 323.45 278.64
III Region: Coimbatore
7 Coimbatore Metro 295.36 213.11 39.50 42.75 181.54 32.00 34.25
8 Coimbatore North 189.35 109.60 39.88 39.87 100.42 34.88 33.87
9 Coimbatore South 198.41 94.19 58.50 45.72 81.46 53.50 39.72
10 Tiruppur 319.52 132.50 96.00 91.02 113.91 86.00 79.02
11 Udumalpet 200.16 110.37 45.00 44.79 98.80 38.00 36.79
12 Nilgiris 88.64 38.37 30.85 19.42 37.73 30.35 18.42
Sub total 1,291.44 698.14 309.73 283.57 613.86 274.73 242.07
IV Region: Erode
13 Erode 388.85 214.74 143.77 30.34 201.28 131.61 19.24
14 Gobi 210.94 99.52 70.59 40.83 97.08 68.09 37.98
15 Mettur 224.62 97.45 69.62 57.55 90.25 63.97 54.55
16 Salem 303.37 126.39 102.41 74.57 119.96 95.83 67.33
17 Namakkal 265.17 87.78 101.48 75.91 71.79 93.75 71.00
Sub total 1,392.95 625.88 487.87 279.20 580.36 453.25 250.10
V Region: Madurai
18 Sivaganga 275.59 111.49 106.58 57.52 99.49 94.58 45.52
19 Theni 103.54 52.35 30.95 20.24 51.81 30.95 20.24
20 Madurai Metro 374.19 238.46 35.17 100.56 238.46 35.17 100.56
21 Ramnad 41.85 21.35 10.25 10.25 21.35 10.25 10.25
22 Dindigul 210.23 175.47 29.96 4.80 174.33 29.96 4.80
![Page 36: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/36.jpg)
Page 36 of 52
Sl.
No. Name of the Circles
Estimated
Cost
Petition Approved by the Commission
FY 2016-
17
FY
2017-18
FY
2018-19
FY
2016-17
FY
2017-18
FY 2018-
19
23 Madurai 141.42 113.40 2.42 25.60 113.40 2.42 25.60
Sub total 1,146.82 712.52 215.33 218.97 698.84 203.33 206.97
VI Region: Tirunelveli
24 Virudhunagar 100.99 42.82 39.99 18.18 42.82 39.99 18.18
25 Tirunelveli 316.15 207.45 70.84 37.86 196.95 70.84 37.86
26 Kanyakumari 223.23 113.73 71.16 38.34 98.73 55.16 21.34
27 Tuticorin 107.61 58.79 21.43 27.39 58.79 21.43 27.39
Sub total 747.98 422.79 203.42 121.77 397.29 187.42 104.77
VII Region: Trichy
28 Trichy Metro 240.21 121.00 76.31 42.90 121.00 76.31 42.90
29 Thiruvarur 123.73 53.69 39.17 30.87 50.75 36.23 27.93
30 Karur 110.39 64.13 36.48 9.78 63.62 36.48 9.78
31 Pudukkottai 305.74 134.55 99.83 71.36 104.55 90.33 63.86
32 Perambalur 95.16 57.97 27.79 9.40 57.97 27.79 9.40
33 Thanjavur 132.73 77.72 40.61 14.40 77.72 40.61 14.40
34 Nagapattinam 324.90 160.98 132.42 31.50 159.69 131.45 30.56
Sub total 1,332.86 670.04 452.61 210.21 635.30 439.20 198.83
VIII Region: Vellore
35 Vellore 242.55 89.21 98.04 55.30 81.21 89.04 45.30
36 Tirupattur 173.24 75.72 61.72 35.80 73.22 58.52 32.50
37 Dharmapuri 235.94 102.17 76.15 57.62 98.42 72.15 52.87
38 Krishnagiri 295.93 99.03 104.80 92.10 99.03 104.80 92.10
Sub total 947.66 366.13 340.71 240.82 351.88 324.51 222.77
IX Region: Villupuram
39 Cuddalore 589.26 202.80 206.86 179.60 200.55 204.36 176.85
40 Thiruvannamalai 281.57 91.77 138.18 51.62 91.77 138.18 51.62
41 Villupuram 252.73 95.22 93.51 64.00 94.61 93.51 64.00
42 Kallakurichi 161.82 87.75 49.66 24.41 86.48 48.27 22.87
Sub total 1,285.38 477.54 488.21 319.63 473.41 484.32 315.34
Grand total 10,694.79 5,577.12 3,016.39 2,101.28 5,298.36 2,883.77 1,966.36
Table 11 Approved Capitalisation for Distribution Function for FY 2016-17 to FY 2018-19 (Rs.
Crore)
Sl.
No. Name of the Circles
Petition Approved by the Commission
FY
2016-17
FY
2017-18
FY
2018-19
FY
2016-17
FY
2017-18
FY
2018-19
I Region: Chennai North
1 Chennai Central 199.32 106.82 90.51 193.62 106.82 90.51
2 Chennai West 97.00 27.67 18.50 97.00 27.67 18.50
3 Chennai North 118.71 57.71 35.29 118.71 57.71 35.29
Sub total 415.03 192.20 144.30 409.33 192.20 144.30
II Region: Chennai South
4 Chennai South 906.61 45.34 26.81 856.61 45.34 26.81
5 Kancheepuram 103.38 144.59 120.53 102.52 143.14 118.78
6 Chengalpattu 134.67 137.53 138.69 134.67 137.53 138.69
![Page 37: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/37.jpg)
Page 37 of 52
Sl.
No. Name of the Circles
Petition Approved by the Commission
FY
2016-17
FY
2017-18
FY
2018-19
FY
2016-17
FY
2017-18
FY
2018-19
Sub total 1,144.66 327.46 286.03 1,093.80 326.01 284.28
III Region: Coimbatore
7 Coimbatore Metro 209.93 38.73 43.40 178.96 31.38 34.15
8 Coimbatore North 106.41 39.48 41.66 97.73 34.48 35.16
9 Coimbatore South 91.31 55.53 49.54 79.08 50.53 43.04
10 Tiruppur 125.72 93.18 95.92 107.93 83.38 82.92
11 Udumalpet 108.09 42.78 46.99 97.02 35.98 38.29
12 Nilgiris 36.40 30.93 21.04 35.81 30.43 19.99
Sub total 677.86 300.63 298.55 596.53 266.18 253.55
IV Region: Erode
13 Erode 193.76 157.04 36.66 181.55 144.85 24.34
14 Gobi 90.60 72.75 44.73 88.38 70.28 41.63
15 Mettur 88.22 71.87 60.72 81.73 66.08 57.15
16 Salem 116.08 105.60 76.16 110.25 99.08 68.26
17 Namakkal 79.68 99.44 79.26 65.09 91.08 73.58
Sub total 568.34 506.70 297.53 527.00 471.37 264.96
V Region: Madurai
18 Sivaganga 102.86 109.34 59.78 92.06 97.34 46.58
19 Theni 49.24 30.96 23.34 48.70 30.96 23.34
20 Madurai Metro 236.24 37.39 90.50 236.24 37.39 90.50
21 Ramnad 20.32 10.25 10.28 20.32 10.25 10.28
22 Dindigul 172.02 31.59 6.14 170.88 31.59 6.14
23 Madurai 113.16 2.66 25.60 113.16 2.66 25.60
Sub total 693.84 222.19 215.64 681.36 210.19 202.44
VI Region: Tirunelveli
24 Virudhunagar 40.97 40.18 18.85 40.97 40.18 18.85
25 Tirunelveli 200.66 72.78 40.98 190.16 72.78 40.98
26 Kanyakumari 106.36 74.90 39.84 92.86 59.00 21.24
27 Tuticorin 54.31 24.22 28.12 54.31 24.22 28.12
Sub total 402.30 212.08 127.79 378.30 196.18 109.19
VII Region: Trichy
28 Trichy Metro 116.15 76.03 45.86 116.15 76.03 45.86
29 Thiruvarur 49.96 39.55 31.96 47.31 36.61 28.73
30 Karur 59.87 38.78 11.74 59.36 38.78 11.74
31 Pudukkottai 123.15 104.24 72.35 96.15 92.69 63.90
32 Perambalur 56.42 28.10 9.89 56.42 28.10 9.89
33 Thanjavur 71.53 43.53 16.87 71.53 43.53 16.87
34 Nagapattinam 144.88 138.92 40.24 143.72 137.92 39.20
Sub total 621.96 469.15 228.91 590.64 453.66 216.19
VIII Region: Vellore
35 Vellore 81.74 100.59 55.82 74.54 91.69 44.92
36 Tirupattur 69.64 64.49 36.07 67.39 61.36 32.45
37 Dharmapuri 93.74 78.22 59.02 90.37 74.24 53.87
38 Krishnagiri 91.20 104.64 90.88 91.20 104.64 90.88
Sub total 336.32 347.94 241.79 323.50 331.93 222.12
IX Region: Villupuram
![Page 38: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/38.jpg)
Page 38 of 52
Sl.
No. Name of the Circles
Petition Approved by the Commission
FY
2016-17
FY
2017-18
FY
2018-19
FY
2016-17
FY
2017-18
FY
2018-19
39 Cuddalore 182.51 207.92 192.46 180.49 205.44 189.46
40 Thiruvannamalai 87.51 137.28 52.08 87.51 137.28 52.08
41 Villupuram 87.51 94.92 63.90 86.90 94.92 63.90
42 Kallakurichi 80.63 54.56 24.34 79.49 53.18 22.66
Sub total 438.16 494.68 332.78 434.39 490.82 328.10
Grand total 5,298.47 3,073.03 2,173.32 5,034.85 2,938.54 2,025.13
6.51. The Commission notes that the investment proposals submitted by the
petitioner for the distribution function for FY 2017-18 and FY 2018-19 is
comparatively lesser than that stated for the FY 2016-17 and the Commission has
taken into consideration the provision made by petitioner. However, it is the
responsibility of the Petitioner to ensure that an efficient distribution system is
developed and maintained and that non-provision of capital expenditure shall not
be cited as a reason for not achieving the targeted distribution loss levels and
other key performance indicators.
6.52. Further, the Commission directs the Petitioner shall maintain the record for
the scheme-wise actual capital expenditure incurred and actual capitalisation
done for each Distribution Circle/Zone separately and submit the same to the
Commission at the time of the next Tariff Petition. The Commission will approve
the actual Capital expenditure and actual capitalisation based on these
information, subject to prudence check.
6.53. The Petitioner has submitted the scheme-wise cost benefit analysis for existing
Generating Stations. The schemes proposed for existing Generating Stations are
intended to improve and retain the performance of Thermal Generating Stations. It is
![Page 39: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/39.jpg)
Page 39 of 52
noted that Hydro stations have also served out their useful life and Petitioner has
proposed to take up Renovation, Modernisation and Upgradation works at Moyar power
house, Periyar power house, Kodayar power house and Sholayar power house. These
works are generally to avoid loss of generation/improved generation. For Gas stations,
the materials released during Combustion Inspection and Hot gas path inspection have
been refurbished for future use, cost of which is less than the original cost of the item.
Repair cost is not only economical but also ensures spares are available.
The new capacity addition has been taken up by the Petitioner considering the
increasing demand and projected increase in the demand-supply gap.
6.54. The Petitioner has submitted the scheme-wise cost benefit analysis for the
Distribution function. The Petitioner has submitted the intangible benefits towards the
proposed Capital works such as reduction of AT&C losses, to ensure reliability of
supply, towards system strengthening, to meet the load growth, to reduce HT:LT ratio,
to relieve higher loading of distribution transformer, to reduce the outage time and
enhance operation flexibility, to improve the metering and accurate recording of
consumption and to avoid the human errors, augmentation of current carrying capacity
of conductor, easy identification of fault and avoid electrical accidents, easy isolation of
11 kV faults and avoiding loss in consumption, improvement in power factor, to improve
voltage regulation, voltage stability and VAR compensation, etc. In view of the above,
though the Commission appreciates that the Petitioner’s primary duty is to ensure
reliable power supply to all categories of consumers, the Utility shall also ensure that it
is done in the most economical way.
![Page 40: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/40.jpg)
Page 40 of 52
6.55. The Petitioner in its CIP Petition has not proposed any funding for the capital
works proposed for the existing Generating Stations. The Commission directs the
Petitioner to ensure that the financial assistance is tied up for proposed schemes.
6.56. The Commission has not considered the Capital Expenditure for New Generating
projects for recovery through tariff. Hence, the funding of the same shall be considered
at time of approval of capital cost and tariff for the respective Generating Stations in line
with the provisions of the Tariff Regulations.
6.57. Most of the schemes are being executed as funded schemes of MoP, GoI.
Balance schemes are being executed through loan from Financial Institutions or the
Petitioner’s own funds. In the foregoing circumstances, the Petitioner needs to ensure
that the financial assistance is tied up for proposed schemes.
6.58. Summary of CIP for FY 2016-17 to FY 2018-19
TANGEDCO has submitted Capital Expenditure of Rs. 4,755.46 Crore, Rs. 16,094.31
Crore and Rs. 18,379.05 Crore for its Generation function for FY 2016-17, FY 2017-18
and FY 2018-19, respectively. Similarly, for Distribution function, it has submitted
Capital Expenditure of Rs. 5,577.12 Crore, Rs. 3,016.39 Crore and Rs. 2,101.38 Crore
for FY 2016-17, FY 2017-18 and FY 2018-19, respectively.
Based on the approval of Capital Expenditure and Capitalisation as discussed in
foregoing paras of this Order, the summary of approval of CIP is given in the following
Tables:
![Page 41: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/41.jpg)
Page 41 of 52
Table 12: Approved Capital Expenditure for the Control Period from FY 2016-17 to FY 2018-19
(Rs. Crore)
Table 13: Approved Capitalisation for the Control Period from FY 2016-17 to FY 2018-19 (Rs.
Crore)
6.59. Commission’s Directives
(a) The Commission directs the Petitioner to maintain the record of the scheme-wise
actual capital expenditure incurred and actual capitalisation done for each Generating
Station separately and submit the same to the Commission at the time of next Tariff
Petition. The Commission will approve the actual Capital expenditure and actual
capitalisation based on these information, subject to prudence check.
(b) The Commission directs the Petitioner for file the Petitions for approval of
Sl.
No. Particulars
FY 2016-17 FY 2017-18 FY 2018-19
Petition
Approved
by the
Commission
Petition Approved by
the Commission Petition
Approved
by the
Commission
1 Generation 4,755.46 543.16 16,094.31 1,050.53 18,379.05 1,286.48
2 Distribution 5,577.12 5,298.36 3,016.39 2,883.77 2,101.28 1,966.36
3 Total 10,332.58 5,841.52 19,110.70 3,934.30 20,480.33 3,252.84
Sl.
No. Particulars
FY 2016-17 FY 2017-18 FY 2018-19
Petition
Approved
by the
Commission
Petition
Approved
by the
Commission
Petition
Approved
by the
Commission
1 Generation 1,435.49 207.26 1,839.23 1,109.51 7,217.16 1,210.58
2 Distribution 5,298.47 5,034.85 3,073.03 2,938.54 2,173.32 2,025.13
3 Total 6,733.96 5,242.11 4,912.26 4,048.05 9,390.48 3,235.71
![Page 42: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/42.jpg)
Page 42 of 52
provisional tariff for new Generation projects in line with the provisions of the Tariff
Regulations. The Commission will take a final view on the time overrun and related cost
overrun and IDC component for individual projects, after the new generation projects
are commissioned, and the actual audited capital cost including IDC are submitted to
the Commission with due justification for the increase in capital cost.
(c) The Commission directs the Petitioner to maintain the record of the scheme-wise
actual capital expenditure incurred and actual capitalisation done for each Distribution
Circle/Zone separately and submit the same to the Commission at the time of next
Tariff Petition. The Commission will approve the actual Capital expenditure and actual
capitalisation based on these information, subject to prudence check.
7. Appeal
An appeal against this Order shall lie before the Appellate Tribunal for Electricity
under section 111 of the Electricity Act, 2003 within a period of 45 days from the date of
receipt of a copy of this Order by the aggrieved person.
(Sd…..)
(Dr. T. Prabhakara Rao) Member
(Sd….) (G. Rajagopal)
Member
(Sd….) (S. Akshayakumar)
Chairman
/ True Copy / Secretary Tamil Nadu Electricity Regulatory Commission
![Page 43: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/43.jpg)
Page 43 of 52
APPENDIX – I
STAKEHOLDERS’ COMMENTS, TANGEDCO’S REPLY
The following Section summarizes the key views/ objections/ suggestions and requests made by
stakeholders on the Capital Investment Plan (CIP) of TANGEDCO on the basis of the Hearing
held by the Commission on January 5, 2017. These include submissions received in writing as
well as submissions received and observations made at the Public Hearing. The Commission, in
order to accommodate maximum responses to the Public Notice had allowed the time for
submission of written comments till January 20, 2017.
In this Section, the Commission has addressed the views expressed by the stakeholders at a
single place. All comments received from the stakeholders by the Commission have been
provided to TANGEDCO, soliciting their responses. The responses so received have been
included under the relevant heads. Therefore, each view has been considered by the Commission
and appropriately addressed in this Order.
Regulatory Process
Stakeholder Comments
It is stated in the affidavit that the Chief Financial Controller (CFC) is well acquainted with the
facts of the case from records and is authorized to file the Petition. The Petition deals with
projects on the technical side of TANGEDCO whereas the CFC may be familiar with finance
and accounts. Hence, the CFC’s affidavit may not reflect the true situation.
The Petition for approval of the Capital Investment Plan (CIP) for FY 2014-15 and FY 2015-16
is still pending with the Commission. Hence, the filing of the present Petition may not be
appropriate as the previous CIP has not been approved by the Commission.
TANGEDCO’s Reply
TANGEDCO submitted that the projections for the CIP for FY 2016-17, FY 2017-18 and FY
2018-19 for Generation, Distribution and Projects is received in the office of (O/o) of
![Page 44: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/44.jpg)
Page 44 of 52
CFC/Regulatory Cell from the concerned circles. Then, the projections are scrutinised by both
Technical and Accounts wings functioning in the O/o of CFC/Regulatory Cell. After detailed
clarifications and discussions with the concerned circles, the CIP has been filed along with
relevant particulars in line with Regulation 17 of the TNERC Tariff Regulations, 2005 and
Regulation 3(v) of the TNERC MYT Regulations, 2009, for its approval.
As regards the comment on the pending CIP for FY 2014-15 and FY 2015-16, the Commission
has approved the CIP for FY 2014-15 and FY 2015-16 filed in M.P.No.39 of 2012.
Capital Investment Plan
Stakeholder Comments
The Petition has no mention about the huge outstanding loan of Rs. 82,444.24 Crore till FY
2015-16.
The Petition envisages abnormal capital expenditure amounting to Rs. 1,34,883.40 Crore, which
is not commensurate with the year-wise investment from FY 2016-17 to FY 2017-18 (FY 2018-
19). The proposed capital expenditure project cost in the Petition does not tally with the year-
wise expenditure, i.e., the year-wise thermal and hydro power projects expenditure works out to
Rs. 3,35,004.28 Crore, whereas the estimated cost is shown as Rs. 1,19,964.07 Crore. Further,
there is no mention about the source of funding for this huge investment in the Petition.
The project completion period being followed at present is 40 months, whereas the Petition
states the same as 84 months upto FY 2021-22.
The entire CIP now proposed by TANGEDCO is aimed solely at getting relief from the financial
crisis. For this reason, it is presumed that TANGEDCO is in a critical financial condition and has
proposed an exaggerated plan outlay exceeding the existing loan of more than Rs. 82,000 Crore.
TANGEDCO has a bad and illegal habit of obtaining huge loans even without getting proper
approval from the Commission. The Commission also remains a silent spectator to the offenses
committed by TANGEDCO for years together, which has caused a great damage not only to the
financial status of TANGEDCO but has also caused the collapse of the economy of Tamil Nadu.
The above aspects of abuse of managerial functions by TANGEDCO has been proved by the
performance of TANGEDCO during FY 2015-16 in which period, TANGEDCO was capable
enough to bring down the annual loss to around Rs. 5,000 Crore from the previous period losses
of more than Rs. 13,000 Crore per annum.
![Page 45: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/45.jpg)
Page 45 of 52
TANGEDCO’s Reply
TANGEDCO submitted that the projections for the CIP for FY 2016-17, FY 2017-18 and FY
2018-19 for Generation, Distribution and Projects, is received in the O/o of CFC/Regulatory Cell
from the concerned circles. Then, the projections are scrutinised by both Technical and Accounts
wing functioning in the O/o of CFC/Regulatory Cell. After detailed clarifications and discussion
with the concerned circles, the CIP has been filed along with relevant particulars in line with
Regulation 17 of the TNERC Tariff Regulations, 2005 and Regulation 3(v) of TNERC MYT
Regulations, 2009 for the Commission’s approval.
TANGEDCO submitted that while indicating the year-wise projections for FY 2016-17, FY
2017-18 and FY 2018-19 for all the capital works for Generation, Distribution and Projects, the
total estimated cost of the capital works and the source of funding is also required to be
indicated, as per the format prescribed by the Commission. Accordingly, the total estimated cost
of the works/project is distributed in the years under review in proportion to the probable
progress and capitalisation of capital works to be achieved, by duly mentioning the source of
funding in the Remarks column. Some of the projects started in the preceding years will spill-
over into the years under review and some of the new projects that will commence in the year
under review will be completed within or beyond FY 2018-19. Hence, the total estimated cost
and the year-wise projections will be commensurate only when the new projects discussed in the
Petition are started and completed within FY 2016-17, FY 2017-18 and FY 2018-19 under
review without any addition or deletion in the scope of capital works during the execution
period.
TANGEDCO submitted that it has sought the Commission’s approval only for the projected
year-wise capital expenditure and capitalisation for FY 2016-17, FY 2017-18 and FY 2018-19
for Generation, Distribution and Projects out of total estimated cost of the capital works.
TANGEDCO submitted that under normal conditions, the stipulated completion period for the
thermal power projects (i.e., 500 MW and above) is between 39 to 42 months from the date of
award of the EPC contract. This has been clearly indicated in Booklet-I of the Petition for some
of the EPC contracts already awarded. Some of the projects to be awarded in the years under
review will be awarded and completed within or beyond FY 2018-19. Hence, it may not be
construed that the project completion period for those projects will be 84 months upto
FY 2021-22.
![Page 46: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/46.jpg)
Page 46 of 52
Generation Projects
Stakeholder Comments
At present, Basin Bridge Gas Turbine Power Station (BBGTPS) is operated in open cycle mode,
resulting in wastage of heat. Instead of cheap natural gas, expensive naphtha is used as fuel. Due
to these reasons, the power generated from this power station is costly and finds a place in the
bottom of the merit order dispatch, and hence, this Power Station is seldom put into service. If
this Power Plant is upgraded as a combined cycle power plant, the exhaust gas from the turbine
can be further used to generate steam and additional power at the same cost of fuel. A proposal
to upgrade BBGTPS as combined cycle power plant should be included in the CIP. The existing
old dilapidated power house building may be demolished, if additional space for the upgradation
is required.
Naphtha is costly. A Gas Company like HPCL, who supplied fuel to erstwhile GMR IPP in the
same area, may be able to supply gas to BBGTPS. If the Power Station is upgraded to a
combined cycle power plant and gas is made available, the power from this station will become
cheaper and it will advance in the merit order list. The power from this power plant will be very
useful to supply power to Chennai City, as 230 kV transmission lines to the city substations got
damaged during the recent 'Vardha’ cyclone.
At present, TANGEDCO has the capability to generate thermal energy at the rate of
approximately Rs. 3 per unit. At the same time, the private generators are not capable enough
and experienced to generate thermal energy at less than Rs. 5.50 per unit. Because of the
incapability, huge quantity of coal is being wasted leading to loss of national wealth.
TANGEDCO may consider acquiring such high cost private thermal stations, thereby it can
enjoy a great relief in the expenditure towards purchase of high cost power from the private
thermal power generators.
The staggering of power supply by load shedding in the substations of TANGEDCO is being
continued (maintaining three-phase supply for 14 hours and two-phase supply for 10 hours) as
addition of generation capacity during the 1980’s and 1990’s was meagre as compared to the
growth and therefore generating capacity is not sufficient to meet the increasing demand. The
peak load of 15,343 MW on April 29, 2016 is only a restricted demand. Supplying three-phase
power supply on 24x7 could be possible only if the on-going projects are expedited on war-
footing, if everything goes as projected in the CIP.
![Page 47: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/47.jpg)
Page 47 of 52
Completion Reports should be closed for power generation plants. Penalties are not levied for
incomplete projects. This violation looms large in the case of EPC contracts, for e.g., the same
EPC contractor was awarded the 600 MW Mettur Thermal Power Station despite the debacle of
Valuthur Phase II (92 MW) power plant.
For Thermal Power Projects, avoidance of cost and time overruns, capacity addition, and growth
in net profit should be benchmarked. The practice of putting a CE/Civil in charge of projects
should be dispensed with.
Spinning Reserves, Equivalent Strategic Petroleum Reserve, Liquidity and Solvency are to be
maintained according to norms. Incursion of renewables (mainly wind energy) into the grid with
must-run status has led to backing down of thermal power stations, which hinders the merit order
(economic) dispatch operations. The base load power plants are not designed for operational
flexibility as they cannot be scaled back quickly and are inefficient at lower loads. This technical
specification is not indicated to the generating Units by designers and manufacturers for the
upcoming thermal projects.
TANGEDCO’s Reply
As regards BBGTPS, TANGEDCO submitted that the existing 4x30 MW Units utilize naphtha
as fuel and normally, two Units are put in synchronous condenser mode. The Units are seldom
used in Generation mode as per the requirements of State Load Despatch Centre (SLDC). Unit
III is under repair for the replacement of Compressor and Turbine casing at M/s. BHEL,
Hyderabad and is expected to be brought into service by the end of February 2017. All the three
Units are now in standby mode for generation mode / condenser mode of operation.
TANGEDCO clarified that as there is no natural gas connectivity available at Chennai presently,
the Units are running on naphtha with a variable cost of Rs. 15.79 per kWh. As regards the
comment on utilisation of natural gas, TANGEDCO submitted that M/s IOCL, Chennai has
proposed to install a new R-LNG terminal at Ennore by the end of 2018 and has agreed to supply
natural gas after regasification to BBGTPS by laying pipelines and sought the requirement for
generation. Accordingly, the required quantity of natural gas required for peak hour/base load
generation is furnished to M/s IOCL. Considering the present rate of 7.5 Dollars per MMBTU of
R-LNG, the approximate variable cost of generation for combined cycle would be Rs.4.61 per
kWh and for open cycle mode would be Rs.7.65 per kWh.
TANGEDCO also submitted that after getting confirmed allocation of R-LNG from M/s. IOCL
and analysing the cost of generation during that period of supply, proposal would be put up for
![Page 48: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/48.jpg)
Page 48 of 52
the conversion of open cycle to combined cycle mode at BBGTPS with the cost of conversion of
120 MW open cycle plant into combined cycle plant of 180 MW at Rs. 360 Crore.
TANGEDCO submitted that the CIP for FY 2016-17, FY 2017-18 and FY 2018-19 for
Generation, Distribution and Projects has been filed in accordance with Regulation 17 of the
TNERC Tariff Regulations, 2005 and Regulation 3(v) of TNERC MYT Regulations, 2009 for
the Commission’s approval.
AT&C Losses
Stakeholder Comments
The line loss reported by the Ministry of Power based on the State Distribution Utilities annual
integrated rating was 21.7 % during FY 2013-14 and 24.4% in FY 2014-15, whereas,
TANGEDCO’s Petition states AT&C loss during FY 2012-13 as 18.4 % and same is claimed to
have been brought down to 17.96 % during FY 2015-16. Hence, the loss indicated in the Petition
is totally untrue and false.
The line loss assessed by TANGEDCO does not reflect the actual loss as considerable quantum
of energy consumed and losses are not metered for years together.
TANGEDCO has caused a huge loss of investment by the installation of metering arrangements
and Automatic Power Factor Correction (APFC) equipment in all the distribution transformers,
which remain a total waste as the same are not in use from the date of installation.
The measures to prevent theft of energy are not implemented properly to reduce the commercial
losses. Meter readings are not taken properly and the existing meters ought to be replaced with
static meters to quickly reduce loss of energy.
TANGEDCO’s Reply
TANGEDCO submitted that the CIP for FY 2016-17, FY 2017-18 and FY 2018-19 for
Generation, Distribution and Projects has been filed in accordance with Regulation 17 of the
TNERC Tariff Regulations, 2005 and Regulation 3(v) of TNERC MYT Regulations, 2009 for
the Commission’s approval.
As regards the line losses, TANGEDCO submitted that the line losses reported by the Ministry
of Power based on the State Distribution Utilities annual integrated rating during the year 2014
![Page 49: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/49.jpg)
Page 49 of 52
and 2015 is inclusive of the transmission losses, while the AT&C losses in the distribution side
as indicated in the Petition by TANGEDCO excludes the transmission losses. TANGEDCO has
clearly submitted in the Petition that by implementing various schemes sponsored by the
MoP/GoI such as Restructured Accelerated Power Development and Reform Programme
(RAPDRP), Integrated Power Development Scheme (IPDS), Deendayal Upadhyaya Gram Jyoti
Yojana (DDUGJY), etc., the AT&C losses will be reduced to 15% by FY 2019-20.
As regards the utilisation of metering arrangements, TANGEDCO replied that the installation of
metering arrangements and APFC equipment in the distribution transformers under RAPDRP-
PART-B scheme in 88 towns is in progress and is expected to be completed by March 2017.
Demand Side Management and Distributed Generation
Stakeholder Comments
There is no mention in the Petition about Demand Side Management (DSM). TANGEDCO is
duty bound to educate the consumers about DSM. Though there is separate DSM Wing
functioning in TANGEDCO, the Wing remains a liability with its very poor performance.
TANGEDCO should provide solar panels at the consumer point, especially for independent
residential consumers with a reasonable capacity of about 0.5 KVA. By this process, the low
consuming services can store the electricity during day time in the battery of the inverter and the
stored energy can be utilized by the consumer during evening peak hours to curtail the evening
peak demand. This scheme may be implemented for a minimum of 20 lakh services at the rate of
about Rs. 40,000 per service. The entire cost of installation should be borne by TANGEDCO.
TANGEDCO’s Reply
TANGEDCO submitted that being one of the best Utilities in the country, it is a front-runner in
implementing cutting-edge concepts and has never lacked in educating the consumers about
DSM. TANGEDCO is very well aware of the fact that the Ministry of Power set up Bureau of
Energy Efficiency (BEE) at the Central level for implementing the provisions of the Energy
Conservation Act, 2001, which came into force with effect from March 1, 2002, and
TANGEDCO is spearheading the movement of energy conservation across the State by
implementing various measures listed below:
![Page 50: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/50.jpg)
Page 50 of 52
i. The DSM Wing is already creating awareness through “EC Day and Week” programme
to the general public across the State during the month of December every year in all distribution
circles.
ii. The Energy Conservation Day/Week is usually arranged to be celebrated from December
14th
to 20th
across the State every year in a grand manner by organizing various events.
However, during 2015, the “National Energy Conservation Day and Week” could not be
celebrated in a grand manner due to torrential rains and flood, which wrecked the entire State
during the first week of December 2015 and it was a low-key affair and during 2016 due to State
mourning, the National Energy Conservation day/week celebrations were cancelled.
iii. As a permanent measure, the slogan on Energy Conservation, i.e., “Save Electricity” is
being sent as SMS to about 2.6 Crore consumers along with the SMS alerts for payment of CC
charges thereby instilling awareness from grass root level to higher echelons of society.
iv. Energy conservation tips along with other suggestions have been displayed on the web-
site of TANGEDCO. Energy conservation slogans have been printed in EB cards and Calendars.
v. The training wing of TANGEDCO emphasizes the need for Energy Conservation and
also propagates the usage of energy efficient lights and star rated equipments in all training
programmes/ workshops/ seminars conducted for school children and public throughout the year.
vi. Among the general public, targeting the student community who form the future
generation will yield long-lasting results to the Utility as well as to the nation. As known by the
common adage “Catch Them Young”, the concept of energy conservation if sown in the young
minds, will be carried forward throughout their life and to all places wherever they go. They will
also help to spread this message to all those with whom they interact without hesitation unlike
adults. Hence, the programme of Energy Conservation awareness to school students has been
initiated across the State through the officers of the distribution network from October 2014
onwards. About 10 lakh students have been addressed so far.
vii. Flex boards with the message of energy conservation have been erected at TANGEDCO
headquarters and EDC offices at Chennai.
viii. Seminar/talk/lecture on Energy Conservation for disseminating the knowledge and the
latest technical knowhow is being taken up for Central Government sectors, micro / small /
medium enterprises, private / public sector, MNCs and higher educational institutions.
ix. TANGEDCO widely propagates and monitors the directives issued vide GO.126 dated
November 10, 2008 and GO.95 dated August 2, 2012 to adopt energy conservation measures in
![Page 51: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/51.jpg)
Page 51 of 52
all Government offices and buildings including Local Bodies, Public Sector Undertakings, etc.,
by using energy efficient lights and appliances stipulating the usage of LED lamps in locations
such as pathways, entrances, corridors, rest rooms, etc., of the buildings considering its
efficiency and life cycle cost.
x. TANGEDCO through Hello FM and Rainbow FM (radio programmes) has created
awareness among Chennai residents on issues related to general grievances, LT billing and
Energy Conservation during 2012.
xi. During 41st India Tourist and Industrial Fair 2014-15 at Island Grounds, Chennai,
TANGEDCO conducted a stage show (drama) named ‘Minsara Thiruvilayadal’ with the theme
of energy conservation awareness and theft of energy. The theme and script of the above show
was developed and performed by TANGEDCO’s officers/staff. The programme was performed
in four places successfully and reached more than 10,000 students and general public.
xii. TANGEDCO celebrated “Electricity Awareness Week” in all districts across the State
between 21st and 27
th of August 2012 with an aim to create awareness on electrical safety,
electricity theft and prevention and energy conservation by distributing a Handbook on the same.
Ujwal DISCOM Assurance Yojana (UDAY)
The decision of the Government of Tamil Nadu (GoTN) to join the Government of India’s
(GoI’s) UDAY on the condition that there would be no revision of tariff by TANGEDCO for
another two years and that the GoI would help TANGEDCO under UDAY to reduce the losses
incurred, is welcome.
CIP for each year of the MYT Control Period from FY 2016-17 to FY 2018-19 ought to be
modified incorporating the features of UDAY.
The UDAY scheme is not consistent with the CIP approved by the Commission. Further, under
the UDAY scheme, it has been stated that the tariff shall not be revised, which is inconsistent
with the Commission’s mandate to undertake suo-motu Tariff revision in case the Utility does
not file the Petition.
TANGEDCO’s Reply
TANGEDCO submitted that it is thankful for the suggestions to incorporate the features of
UDAY in the CIP and also the general comments on theft of energy, meter reading and
replacement of existing meters with static meters.
![Page 52: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/52.jpg)
Page 52 of 52
TANGEDCO also submitted that the features of UDAY scheme in Tamil version is readily
available on TANGEDCO’s website, viz., www.tangedco.gov.in.
![Page 53: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/53.jpg)
FY 2016-17 FY 2017-18 FY 2018-19
Ennore Thermal Power Station - - - -
Tuticorin Thermal Power Station 904.64 84.20 265.60 466.10
Mettur Thermal Power Station - I 454.48 17.74 101.27 65.59
North Chennai Thermal Power Station - Stage - I 1,661.88 194.85 276.39 451.40
Mettur Thermal Power Station - II 145.33 34.20 31.03 20.00
North Chennai Thermal Power Station - Stage - II 98.29 5.67 1.00 65.00
A Thermal Power Stations 3,264.62 1,543.30 1,102.36 618.96 336.66 675.29 1,068.09
Kundah Generation Circle (843.65MW) 86.06 15.11 5.00 20.50
Tirunelveli Generation Circle (372.80MW) 174.08 30.49 5.00 45.00
Kadamparai Generation Circle (595.45MW) 160.50 30.86 33.78 68.81
Erode Generation Circle (483.50MW) 21.42 0.50 2.78 14.08
B Hydro Electric Power Stations 442.06 227.60 73.81 140.65 76.96 46.56 148.39
Valuthur Gas Turbine Power Station (187MW) 264.26 4.16 15.30 47.00
Thirumakkottai Gas Turbine Power Station (107.88MW) 168.52 6.53 125.99 22.00
Kuttalam Gas Turbine Power Station (101MW) 72.29 2.97 4.45 -
Basin Bridge Gas Turbine Power Station (120MW) 12.79 3.50 8.29 1.00
C Gas Turbine Power Stations 517.86 146.27 299.59 72.00 17.16 154.03 70.00
D Thermal Power Projects 108,303.75 - - -
E Hydro Electric Power Projects 11,660.32 112.38 174.66 -
DRIP Works under World Bank Funded 272.00 104.00 160.82 - 104.00 160.82 -
Bhavani Kattalai Barrage -II (2x15MW) 4.79 2.50 2.29 - 2.50 2.29 -
Bhavani Barrage -II (2x5MW) 17.43 5.88 11.55 - 5.88 11.55 -
Other Hydro projects 11,366.10 261.46 544.36 587.95 - - -
F Grand Total 124,188.61 4,755.46 16,094.31 18,379.05 543.16 1,050.53 1,286.48
FY 2016-17 FY 2017-18 FY 2018-19
Ennore Thermal Power Station - - - - - - -
Tuticorin Thermal Power Station 904.64 393.22 245.02 266.40 8.38 331.42 476.10
Mettur Thermal Power Station - I 454.48 217.61 127.67 109.20 3.08 113.77 57.75
North Chennai Thermal Power Station - Stage - I 1,661.88 483.24 260.82 917.82 128.07 191.17 323.40
2.53 4.81 14.08
44.80
155.80
75.03 25.50
13.48 15.32 69.49
15.11 25.00 45.95
174.08 - -
35.88 44.00 80.62
233.83 136.90 83.75
807.92 610.14 243.82
- - -
443.27 264.97 196.40
ABSTRACT- GENERATION FUNCTION
S.No. Name of Stations/ProjectsEstimated Cost
(Rs. Crore)
Capital Expenditure (Rs. Crore)
FY 2016-17 FY 2017-18 FY 2018-19
CAPITAL EXPENDITURE
COMMISSION'S APPROVAL
15.00
32.52 119.00 17.00
20.29 12.00 40.00
93.46
- 12.79
2,464.45 13,899.53 16,959.49
-
373.84 719.02 587.95
S.No. Name of Stations/ProjectsEstimated Cost
(Rs. Crore) FY 2016-17 FY 2017-18 FY 2018-19
CAPITALISATION
COMMISSION'S APPROVALCapitalisation (Rs. Crore)
Page 1
![Page 54: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/54.jpg)
Mettur Thermal Power Station - II 145.33 18.42 74.83 52.08 7.82 30.83 46.58
North Chennai Thermal Power Station - Stage - II 98.29 7.67 19.31 71.31 5.67 1.00 65.00
A Thermal Power Stations 3,264.62 1,120.16 727.65 1,416.81 153.02 668.19 968.83
Kundah Generation Circle (843.65 MW) 86.06 11.21 7.50 67.35 11.21 7.50 1.90
Tirunelveli Generation Circle (372.80 MW) 174.08 174.08 - - 30.49 - -
Kadamparai Generation Circle (595.45 MW) 160.50 3.68 14.45 142.37 - 5.10 128.35
Erode Generation Circle (483.50 MW) 21.42 - 7.34 14.08 - 3.28 14.08
B Hydro Electric Power Stations 442.06 188.97 29.29 223.80 41.70 15.88 144.33
Valuthur Gas Turbine Power Station (187 MW) 264.26 23.16 226.10 15.00 4.16 15.30 47.00
Thirumakkottai Gas Turbine Power Station (107.88 MW) 168.52 17.52 108.00 43.00 - 112.52 42.00
Kuttalam Gas Turbine Power Station (101 MW) 72.29 20.29 12.00 40.00 - - 7.42
Basin Bridge Gas Turbine Power Station (120 MW) 12.79 - 12.79 - - 11.79 1.00
C Gas Turbine Power Stations 517.86 60.97 358.89 98.00 4.16 139.61 97.42
D Thermal Power Projects 108,303.75 34.23 411.99 5,421.00 - - -
E Hydro Electric Power Projects 11,660.32 31.15 311.41 57.55 8.38 285.84 -
DRIP Works under World Bank Funded 272.00 - 272.00 - - 272.00 -
Bhavani Kattalai Barrage -II (2x15MW) 4.79 2.50 2.29 - 2.50 2.29 -
Bhavani Barrage -II (2x5MW) 17.43 5.88 11.55 - 5.88 11.55 -
Other Hydro projects 11,366.10 22.77 25.57 57.55 - - -
F Grand Total 124,188.61 1,435.49 1,839.23 7,217.16 207.26 1,109.51 1,210.58
]
Page 2
![Page 55: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/55.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation
(Rs.
Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisat
ion (Rs.
Crore)
Capital
Expenditure (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
Capitalisat
ion (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisa
tion (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
I Division : Renovation and Modernisation ( Mechanical )
1 Eco Coil - Unit V Boiler Complete replacement of Economizer Coil Assembly, LTSH
supply Tubes and Straight tube panels for Super Heater Rear wall
near Economiser in Unit V Boiler.
The eco-coil failure rate is very high and it is essential to replace the
eco-coil assembly by new one to avoid frequent failure. By
replacement of economizer coil assembly in Unit-V, the loss of
generation due to eco coil failure will be reduced.
5.76
B.P.CMD
No. 65
dt.19.02.14
5.76 5.76 0.00 0.00 0.00 0.00 - 5.68 5.76 0.08 - -
2 Eco Coil - Unit-II Boiler Complete replacement of Economizer Coil Assembly, LTSH
supply Tubes and Straight tube panels for Super Heater Rear wall
near Economiser in Unit II Boiler
The eco-coil failure rate is very high and it is essential to replace the
eco-coil assembly by new one to avoid frequent failure. By
replacement of economizer coil assembly in Unit-II, the loss of
generation due to eco coil failure will be reduced.
4.39B.P.CMD No.155
dt.10.04.15 4.39 4.39 0.00 0.00 0.00 0.00 - 3.54 4.39 0.85 - -
3 Coutant bottom slope tubes & acute bends
in Unit II Boiler
Design, Manufacture, Supply, Erection, testing and
Commissioning of Coutant bottom slope tubes & acute bends for
Unit II Boiler of 210MW
Due to the usage of low calorific value of Vizag coal, the quantity of
coal used is 145 to 165 T/hr as against the designed quantity of 90 T /
hr which results in more ash content and mass flow leading to
increase in velocity and finally end up with high erosion. Due to the
usage of more quantity of high ash content Vizag coal and hot
clinkers falling over the slopped tubes, it got eroded and more prone
to puncture in this area and subsequent unit outages and generation
loss.
2.20B.P.CMD No.317
dt.29.07.15 2.20 2.20 0.00 0.00 0.00 0.00 - - 2.20 2.20 - -
4 Ammonia injection system in Unit- I Installation of Ammonia injection system in Unit- I The Pollution Control Board while issuing the renewal of consent
order is insisting to provide ammonia injection system especially in
the inlet of ESPs attached to Unit-I, so as to bring down the emission
level of 150 mg/NM³.
3.68B.P.CMD No.109
dt.25.03.14 3.68 3.68 0.00 0.00 0.00 0.00 - - 3.68 3.68 - -
5 Renewal of Flue gas duct from APH outlet
to ESP inlet in Unit 5
Dismantling the entire eroded FG ducts from APH outlet to ESP
inlet. Erection and commissioning of New Ducts from APH outlet
to ESP inlet with New insulation materials.
High air ingress takes place through the eroded opening of the FG
ducts in Unit 5, leading to overloading of ID current , loss of Power
generation and higher auxilary Power Consumption. Hence eroded
flue gas ducts are to be renewed to rectify the above problem.
3.75
B.P.CMD
No.500,dt
02.12.2013
3.75 3.75 0.00 0.00 0.00 0.00 - 3.50 3.75 0.25 - -
6 Replacement of ESP field internals and
controllers in Unit 5
Replacement of first 3 rows (ie), 12 Nos. ESP field internals and
overhauling of remaining 12 Nos. ESP fields Internals and
replacement of 24 Nos. High Voltage Transformer Rectifier & 24
Nos. Electronic Control panels alongwith latest technology
controllers.
Due to high ash content Coal, the internals are in eroded condition
which leads to failure of ESP fields and thereby increase in SPM level.
Hence, it is essentially required to be replaced to meet out the norms
prescribed by the Pollution Control Board. 7.32
B.P.CMD
No.192,dt
15.05.2014
3.11 3.11 0.00 0.00 0.00 0.00 - 6.15 7.32 1.17 - -
7 Double sealing modification in Unit 5
Airpreheater
Dismantling the existing 12 modules with hot intermediate and
cold and baskets. Supply, erection and commissioning of New
Modules with 24 sectors.
The APH leakage in Unit 5 is always more than 10% (Designed for
8%) which results in Overloading of ID, FD & PA Fan. Hence, it is
necessary to provide double sealing arrangement by modifying the 12
sectors into 24 sectors in the Air preheater, so as to reduce the air
leakage
6.33
B.P.CMD
No.436,dt
03.10.2013
6.33 6.33 0.00 0.00 0.00 0.00 - 0.09 6.33 6.24 - -
8 Hot Reheat coil assembly in Unit- V Boiler Complete replacement of Hot Reheat coil assembly in Unit-V Most of the tubes in Hot Reheat Coil Assembly are in overheated
condition which needs replacement of Hot Reheat Coil Assembly in
Unit V to reduce the failure of Hot Reheat Coil 7.00 Nil 7.00 7.00 0.00 0.00 0.00 0.00 - - 7.00 7.00 - -
9 Eco. coil - Unit I Boiler Replacement of Eco coil assembly, LTSH supply Tubes and
Straight tube panels for SH rear wall near Economier in Unit- I
Boiler
The eco-coil failure rate is very higher and it is essential to replace the
eco-coil assembly by new one to avoid frequent failure. By
replacement of economizer coil assembly in Unit-I, the loss of
generation due to eco coil failure will be reduced. 5.14 Nil 0.00 5.14 5.14 0.00 0.00 - - 5.14 5.14 - -
10 Design, Engineering, Manufacturing,
Supply, Erection and Commissioning of
Modified PRDS system in Unit 4 & 5
Design, Engineering, Manufacturing, Supply, Erection and
Commissioning of Modified PRDS system in Unit 4 & 5
Pressure Reducing De-superheating Steam is required at thermal
power station as a process requirement. Existing PRDS system gets
steam from main steam line and spray from Boiler feed pump
discharge during startup and normal running conditions.
Modification is proposed to take a tapping from CRH – Cold Reheat
line and this will be economical and energy saving solution.
2.00 Nil 0.00 2.00 2.00 0.00 0.00 - - - - 2.00 2.00
11 Water wall panel (Front and rear) in Unit
III Boiler.
Replacement of water wall panel (Front and rear) from ring header
7.48m to 16mtr elevation in unit-III. 362 Nos of tubes have to be
replaced along with acute bends
The Water wall tube thichkness got reduced to 3.5 mm and panels
have got bent at many location due to erosion and thermal stress. 5.00 Nil 0.00 0.00 0.00 5.00 5.00 - - - - 5.00 5.00
FY 2016-17
ANNEXURE 1
TUTICORIN THERMAL POWER STATION(5X210MW)
Approved by the Commission
FY 2017-18 FY 2018-19
Name of the SchemeSl. No. Details of work furnishing list of major items Technical justificationEstimated Cost
(Rs.in Crs.)
Details of Board
approval
TANGEDCO's Submission
FY 2016-17 FY 2017-18 FY 2018-19
Page 12
![Page 56: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/56.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation
(Rs.
Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisat
ion (Rs.
Crore)
Capital
Expenditure (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
Capitalisat
ion (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisa
tion (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY 2016-17
Approved by the Commission
FY 2017-18 FY 2018-19
Name of the SchemeSl. No. Details of work furnishing list of major items Technical justificationEstimated Cost
(Rs.in Crs.)
Details of Board
approval
TANGEDCO's Submission
FY 2016-17 FY 2017-18 FY 2018-19
12 Electrostatic Precipitators in Unit -III Modification of Electrostatic Precipitators in Unit -III To reduce the SPM (Suspended Particulate Matter) level below
150mg/Nm3 as per the statutory norms of Tamilnadu Pollution
Control Board.
10.00 Nil 0.00 0.00 0.00 10.00 10.00 - - - - 10.00 10.00
13 Super heater side walls in boiler II nd pass
in Unit III
Complete replacement of Super heater side walls in boiler II nd
pass in Unit III
The coil failure rate is very higher and it is essential to replace the coil
assembly by new one to avoid frequent failure. The loss of generation
due to coil failure will be reduced.
8.00 Nil 0.00 0.00 0.00 8.00 8.00 - - - - 8.00 8.00
14 Hot Reheat coil assembly Unit- IV Complete replacement of Hot Reheat coil assembly Unit- IV Most of the tubes in Hot Reheat Coil Assembly are in overheated
condition which needs replacement of Hot Reheat Coil Assembly in
Unit IV to reduce the failure of Hot Reheat Coil
7.00 Nil 0.00 0.00 0.00 7.00 7.00 - - 7.00 7.00 - -
15 Cast basalt pipe in Unit I, II & III of Ash
Dyke Area.
Replacement of 300 m straight portion of the M.S. pipe with cast
basalt pipe in Unit I, II & III of Ash Dyke Area.
MS pipes are serving for about 12000 hours only (1.5- 2 years ) due to
the highly abreassive and corrosive ash slurry. Replacing it with cast
basalt pipes which has a life span of about 15 years will be beneficial
for the Tamil Nadu Generation and Distribution Corporation Limited
6.20B.P.CMD No.191
dt.15.05.14 6.20 6.20 0.00 0.00 0.00 0.00 - - - - 6.20 6.20
16 Cast Basalt lined Pipes in Unit IV&V ash
dyke area
Renewal of 350NB Cast Basalt lined Pipes in Unit IV&V ash dyke
area
Cast basalt pipes for Ash slurry disposal lines in the ash dyke area
were erected during commissioning and are in service for more than
23 years. Delay in replacement may lead to frequent pipe failures,
leading to leakage of slurry into sea / cooling water outflow channel
and cause loss of generation.
4.00 Nil 4.00 4.00 0.00 0.00 0.00 0.00 - - - - 4.00 4.00
17 Bottom Ash System in Unit I Replacement of complete Bottom Ash System in Unit I The complete Bottom ash system in Unit I is in continuous service for
more than 33 years from the date of commissioning. Due to ageing
and use of sea water mixed with slurry application, the Bottom Ash
Hopper skin plates, support structures, refractory linings, platforms,
seal trough, drive systems, etc., got worn out to the maximum.
Hence, it is proposed to Refurbish Complete Bottom Ash system in
Unit I.
5.00
Proposal is being
processed for
obtaining
administrative
approval
0.00 5.00 5.00 0.00 0.00 - - - - 5.00 5.00
18 Ash slurry disposal system for Unit 1,2,&3 Modification of ash slurry disposal system for Unit 1,2,&3 The design capacity of the present pumps are based on the coal with
19% ash content, whereas the coal now being used contains ash
content of 40 to 45%. Due to more than 33 years of ash deposit, the
height of the ash dyke and length of the discharge pipe line has been
increased from 20m to 2000m respectively in main dyke. Existing
arrangement is not advisable in long term due to its proximity to the
cooling water outlet channel. Further, the VOC Port Trust has
requested to stop discharging of ash slurry in the periphery dyke, for
their proposed stack yard of North Cargo Berth – 3&4.
6.00
Proposal is being
processed for
obtaining
administrat ive
approval
0.00 6.00 6.00 0.00 0.00 - - - - 6.00 6.00
19 Condenser in Unit II Retrofitting of Condenser in Unit II Due to sea water applications and long service i.e more than 30 years'
the tube plates of condenser have corroded severely . Hence,
retrofitting of condensers by renewal of tube sheets and tubes is
necessarily required to avoid unforeseen forced shutdown of the units
leading to long outages. This work will enhance the residual life of the
condensers by 10 to 15 years.
27.00 Nil 27.00 27.00 0.00 0.00 0.00 0.00 - - - - 27.00 27.00
20 Condenser in Unit I Retrofitting of Condenser in Unit I Due to sea water applications and also it has served its life period i.e
more than 37 years, the tube plates of condenser have corroded
severely . Hence the retrofitting of condensers by renewal of tube
sheets and tubes is necessarily required to avoid unforeseen forced
outages of unit.
27.00 Nil 0.00 27.00 27.00 0.00 0.00 - - 27.00 27.00 - -
21 Condenser in Unit III Retrofitting of Condenser in Unit III Due to sea water applications and also it has served its life period i.e
more than 37 years the tube plates of condenser have corroded
severely . Hence the retrofitting of condensers by renewal of tube
sheets and tubes is necessarily required to avoid unforeseen forced
outages of unit.
27.00 Nil 0.00 0.00 0.00 27.00 27.00 - - - - 27.00 27.00
Page 13
![Page 57: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/57.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation
(Rs.
Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisat
ion (Rs.
Crore)
Capital
Expenditure (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
Capitalisat
ion (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisa
tion (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY 2016-17
Approved by the Commission
FY 2017-18 FY 2018-19
Name of the SchemeSl. No. Details of work furnishing list of major items Technical justificationEstimated Cost
(Rs.in Crs.)
Details of Board
approval
TANGEDCO's Submission
FY 2016-17 FY 2017-18 FY 2018-19
22 Condenser system in Unit IV. Renewal of condenser inlet and outlet pipes & Provision of debris
filter in condenser cooling water inlet line in Unit IV.
The condenser performance is dependent on cooling water
temperature and cooling water flow rate. The cooling water flow rate
is getting affected due to accumulation of considerable amount of
marine growths over the tubes of the condenser. In consequence,
temp. gets raised and vacuum lowered. This results in increasing of
Turbine heat rate and losses to Board. In order to clear the marine
growths and sea grass from the cooling water admitted into the
condenser and to maintain the rated cooling water flow, debris filter is
essential.
2.00 Nil 0.00 2.00 2.00 0.00 0.00 - - - - 2.00 2.00
23 ACW System Providing additional plate type heat exchanger unit for improving
efficiency of ACW system in Unit 4 & 5
During summer seasons the problem aggravates and the ACW
temperature could not be maintained within permissible limits
leading to reduction in power generation. As all the three available
heat exchangers are in service to keep the temperature under control
we can’t clean a particular heat exchanger when the unit is generating
to its full capacity.This will solves the problem of reducing the power
generation in case of raise in ACW temperature during summer
season while the grid warrants maximum power generation.
3.00 Nil 3.00 3.00 0.00 0.00 0.00 0.00 - - - - 3.00 3.00
24 Fire Fighting Installation of Fire Protection System including Erection &
Commissioning of Fire Hydrant System and Fire Annunciation
system exclusively for Coal Jetty area
In case of fire, to safeguard the board properties the fire protection is
necessarily required. 15.00 Nil 15.00 15.00 0.00 0.00 0.00 0.00 - - - - 15.00 15.00
25 Common Effluent treatment plant Common Effluent treatment plant To fulfil the norms of pollution control Board.
35.00 Nil 0.00 5.00 35.00 30.00 0.00 0.00 - - - 5.00 35.00 30.00
26 Ground Level Reservoir Strengthening works in GLR I & III & Improvement works
in unit I&III
All the outer side slopes of GLR IV are grown with unwanted bushes,
shrubs and small trees which affect the side bunds. The side drains
got filled up with earth and bushes. More leaks found throughout the
bund and pump room. To protect the bund, rectification work is
essentially required.
2.00 Nil 2.00 2.00 0.00 0.00 0.00 0.00 - - - - 2.00 2.00
27 10 ML per Day Desalination plant Installation of 10 MLD Desalination plant TTPS is now getting raw water from M/s. TWAD @ Rs. 15 per KL.
During summer months, getting water from M/s. TWAD is becoming
very difficult due to poor monsoon, shortage of water and farmers
agitation, etc., However TWAD pipe line have also become old and
are to be renewed involving huge expenditure
150.00B.P.CMD No.86
dt.06.03.14 35.00 35.00 150.00 80.00 - - - 5.00 150.00 145.00
28 Modification of Shuttle Feeder-2A/2B at
Secondary Crusher House-II
Dismantling of existing 1400mm Belt Shuttle Feeder along with all
accessories and design, engineering and supply of 1800mm belt
width shuttle feeder
The existing belt width of shuttle feeder-2A/2B are 1400mm and can
carry the load upto 800T/Hr. Much difficulties are being experienced
while handling higher discharge resulting in frequent stoppage of
shuttle feeders and ultimately cause higher ship demurrage charges.
In order to overcome the above, it is proposed to modify with belt
width of 1800mm
6.00
Will be
submitted for
Approval
3.00 3.00 3.00 3.00 0.00 0.00 - - - - - -
29 New conveyor to deliver its full capacity
after dismantling the existing structure of
conveyor 29B and bring back conveyor 55 to
running condition after changing necessary
spares
Design, Engineering, Fabrication, Supply, Erection and
Commissioning of new conveyor to deliver its full capacity after
dismantling the existing structure of conveyor 29B and bring back
conveyor 55 to running condition after changing necessary spares
Conveyors 49 &54 are the main conveyors for receiving coal from
Coal Jetty.1 & Coal Jetty.2. In case of any problem in these conveyors,
discharge from ship will get affected. Alternate for conveyor 49 &
conveyor 54 can be ensured by bringing back conveyor 29B into
service. Discharge from two coal jetties simultaneously will not get
affected in case of any problem in conveyor 49 & conveyor 54.
Existing structure is in damaged condition and conveyor 29B could
not discharge its full designed capacity and not in service since 2006.
Existing structure is to be strengthened , new conveyor to be erected
to ensure the capacity of 1100 T/Hr and bring back the conveyor 55 to
running condition after changing the necessary spares.
10.00
Will be
submitted for
Approval
5.00 5.00 5.00 5.00 0.00 0.00 - - - - 10.00 10.00
30 Static classifier with dynamic system in coal
mills of Units I,II & III
Replacement of the existing static classifier with dynamic system
in coal mills of Units I,II & III
Existing classifier system of the mills is not capable of grinding the
coal to its full capacity and required fineness. To improve the mill
performance and boiler efficiency dynamic system is essential. The
amount invested can be got back within 42 months.
24.00 To be obtained 24.00 24.00 0.00 0.00 0.00 0.00 - - - - 24.00 24.00
Page 14
![Page 58: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/58.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation
(Rs.
Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisat
ion (Rs.
Crore)
Capital
Expenditure (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
Capitalisat
ion (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisa
tion (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY 2016-17
Approved by the Commission
FY 2017-18 FY 2018-19
Name of the SchemeSl. No. Details of work furnishing list of major items Technical justificationEstimated Cost
(Rs.in Crs.)
Details of Board
approval
TANGEDCO's Submission
FY 2016-17 FY 2017-18 FY 2018-19
II - - - - - -
31 Ash Silo Erection of 1000 MT Silo for 5 nos of unit I to V. As per the requirement of TNPCB; TNPCB is extending conditional
clearance under the Section 31-A of Air (Prevention and control of
Pollution) Act (1981) for the operation of the plant
based on the assurance from TTPS for the early installation of the
silos. ( Provision is essential for the year 2015-16 for
the processing of the proposal though cash out flow will be only in
2016-17 i.e. after HQ apprval and tendering.)
65.00
Proposal is being
processed for
obtaining
administrat ive
approval.
75.00 75.00 60.00 60.00 0.00 0.00 - - 65.00 65.00 - -
III - - - - - -
32 Boiler Feed Pump Procurement of 200KHI.S model Boiler Feed Pump cartridge
assembly.
The Boiler Feed Pumps in Units I & III were upgraded to 200KHI.S
model in 2004 and 2007 respectively. Upgradation is going to be taken
up in unit II also during this year 2015-16 for which the BFP cartridge
assembly is required as spare.
2.75
Included in Bulk
spares
requiremnt of
M/s. BHEL.
2.75 2.75 0.00 0.00 0.00 0.00 - - - - - -
33 Main Turbine Capital overhauling of Unit II TG and Re-RLA study. As per OEM, TG set of 210MW LMW Turbine have to be capital
overhauled and undergone Re-RLA study once in 5 years. Already 7
years have passed since last capital overhaul of Unit II in the year
2008.2.00
per(TANGEDCO
)CMD
proceeding
No.109, dt
07.03.15
2.00 2.00 0.00 0.00 0.00 0.00 - 0.78 2.00 1.22 - -
34 HP Module complete assembly HP Module complete assembly To replace the aged HP module and to avoid outage of turbine and to
maintain generation 35.00Po No: 04/
14.05.14 35.00 35.00 0.00 0.00 0.00 0.00 - - 35.00 35.00 - -
35 IP Rotor IP Rotor To replace the aged IP Rotor and to avoid outage of turbine and to
maintain generation 22.00Po No: 04/
14.05.14 22.00 22.00 0.00 0.00 0.00 0.00 - - 22.00 22.00 - -
36 LP Rotor LP Rotor To replace the aged LP Rotor and to avoid outage of turbine and to
maintain generation 20.47Po No: 04/
14.05.14 20.00 20.00 0.00 0.00 0.00 0.00 - 20.47 20.47 - - -
37 Supply, Erection and commissioning of
LP/HP by pass upgratation system
Supply , Erection and commissioning of LP/HP by pass
upgradation system
The operation of control valve failed frequently due to the ageing and
difficulty in the out dated design of the equipment. Besides the
system became obsolete since the OEM have stopped the supply of
the existing equipment. So it is found difficult for maintain the
existing system and decided to go in for upgrading with new version
2.58
Per(TANGEDCO
) CMD
proceeding
No.470 dt
26.10.10
2.31 2.31 0.00 0.00 0.00 0.00 - 2.58 2.58 - - -
38 Vacuum pump in Unit II Replacement of Existing steam Main ejectors by vacuum pump for
augmenting the capacity of air evacuation system of condensers of
Unit II in TTPS.
Since the vacuum pump is a volumetric device, Hogging capacity is
much more than that of ejectors and reduces the evacuation time and
in turn reduces the total outage time of unit.
Considerable revenue gain towards saving of fuel by cutting out the
motive steam used for main and starting ejectors.4.05
Per(TANGEDCO
) CMD
proceeding
No.381 dt
28.08.10
0.15 0.15 0.00 0.00 0.00 0.00 - 4.03 4.05 0.02 - -
39 Vacuum pump in Unit I & III Replacement of existing steam Main ejectors and starting ejector by
vacuum pump for augmenting the capacity of air evacuation
system of condenser of Units I & III
Since the vacuum pump is a volumetric device, Hogging capacity is
much more than that of ejectors and reduces the evacuation time and
in turn reduces the total outage time of unit.
Considerable revenue gain towards saving of fuel by cutting out the
motive steam used for main and starting ejectors.
8.10
(Per)
TANGEDCO
Proceedings
(CMD) No.108
0.00 8.10 8.10 0.00 0.00 - - - - 8.10 8.10
40 Main Turbine capital overhauling of Unit I TG and Re-RLA study. As per OEM,TG set of 210MW LMW Turbine have to be capital
overhauled and undergone Re-RLA study once in 5 years.2.00
Administrative
approval has
been sought
from HQs.
0.00 2.00 2.00 0.00 0.00 - - 2.00 2.00 - -
41 Main Turbine Capital overhauling of Unit III TG and Re-RLA study. As per OEM, TG set of 210MW LMW Turbine have to be capital
overhauled and undergone Re-RLA study once in 5 years.2.00
Administrative
approval has
been sought
from HQs.
0.00 0.00 0.00 2.00 2.00 - - - - 2.00 2.00
IV - - - - - -
42 Air preheater in Unit II Conversion of existing conventional Airpreheaters Model 27VIT
72” (74”) in Unit II to Modular Airpreheater with 24 sectors Model
27VITM 2000 having double sealing arrangement in Unit II.
To absorb the extra amount of heat produced by burning excess coal
than the designed value, to reduce the air leakage across the
airpreheater there by reducing the auxiliary consumption of ID, FD &
PA fan current and also to comply the norms of BEE, this modification
have to be essentially carried out.
6.56
TANGEDCO
(CMD)
proceedings
No.93,
dt.02.03.2015
6.56 6.56 0.00 0.00 0.00 0.00 - 0.09 6.56 6.47 - -
Division : Boiler Maintenance
Division : Ash Handling Plant
Division : Turbine Maintenance I
Page 15
![Page 59: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/59.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation
(Rs.
Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisat
ion (Rs.
Crore)
Capital
Expenditure (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
Capitalisat
ion (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisa
tion (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY 2016-17
Approved by the Commission
FY 2017-18 FY 2018-19
Name of the SchemeSl. No. Details of work furnishing list of major items Technical justificationEstimated Cost
(Rs.in Crs.)
Details of Board
approval
TANGEDCO's Submission
FY 2016-17 FY 2017-18 FY 2018-19
43 ESP Unit II Revamping of Unit II ESP by replacing the internals in the first two
rows (8 fields) and overhauling of the remaining 12 fields in Unit
II.
The ESP internals (Except collecting electrodes) in the first two rows
(A1, A2, B1, B2, C1, C2, D1 &D2) are in service right from the date of
commissioning. Due to high ash content in the coal, the internals got
eroded, leading to tripping of ESP fields. This affects the collection
efficiency of the ESP leading to higher SPM level in the flue gas.
Hence, in order to solve the above problems, it has been proposed to
replace the ESP internals during the forthcoming capital overhaul for
the year 2016-17.
4.00 ––– 4.00 4.00 0.00 0.00 0.00 0.00 - 0.29 4.00 3.71 - -
44 ESP Unit I Improvement works in Unit I ESP Improvement works to be carried out to comply with the norms of
Ministry of Environment and Forest notification dated 07.12.2015 to
reduce the SPM level below 100 mg/Nm3
10.00 ––– 0.00 10.00 10.00 0.00 0.00 - - - - 10.00 10.00
45 Coutant bottom slope tubes & acute bends
for Unit I Boiler of 210MW
Design, Manufacture, Supply, Erection, testing and
Commissioning of Coutant bottom slope tubes & acute bends for
Unit I Boiler of 210MW
Due to the usage of low calorific value Vizag coal, the quantity of coal
used is 145 to 165 T/hr as against the designed quantity of 90 T / hr
which results in more ash content and mass flow leading to increase
in velocity and finally end up with high erosion. Due to the usage of
more quantity of high ash content Vizag coal and hot clinkers falling
over the slopped tubes, it got eroded and more prone to puncture in
this area and subsequent unit outages and generation loss.
1.40 ---- 0.00 1.40 1.40 0.00 0.00 - - - - 1.40 1.40
46 ESP Unit III Replacement of the ESP internals in the last three rows of B&D
path ( B3, B4, B5, D3, D4 & D5) in Unit III
The ESP internals in the last three rows of B&D path ( B3, B4, B5, D3,
D4 & D5) are in service right from the date of commissioning. Due to
high ash content in the coal, the internals got eroded, leading to
tripping of ESP fields. This affects the collection efficiency of the ESP
leading to higher SPM level in the flue gas. Hence, in order to solve
the above problems, it has been proposed to replace the ESP internals
during the forthcoming capital overhaul for the year 2018-19.
4.50 ––– 0.00 0.00 0.00 4.50 4.50 - - - - 4.50 4.50
47 Coutant bottom acute bend, 90º bend, &
Rear arch bends. Unit IV
Complete replacement of Coutant bottom acute bend, 90º bend, &
Rear arch bends. Unit IV
Thickness of the bends gradually reducing which warrants
replacement5.00 0.00 0.00 0.00 5.00 5.00 - - - - 5.00 5.00
48 Water wall tubes in high heat zone area.
Unit IV
Replacement of Water wall tubes in high heat zone area. Unit IV Erosion and internal deposits will be more in the high heat zone area
and needs replacement12.00 0.00 0.00 0.00 12.00 12.00 - - - - 12.00 12.00
V - - - - - -
49 Improvement works in drainage system at
Camp II
Improvement works in drainage system To avoid flooding of rain water in camp II quarters area and to
improve drainage system in camp II as it is nearer to sea area.1.49 Nil 0.00 0.49 1.49 1.00 0.00 0.00 - - - - - -
VI - - - - - -
50 Ground Level Reservoir Providing and Arresting the ground water leakage and
strengthening the impervious bottom layer of GLR IV bottom &
side embarkment, providing layers in the GLR IV including
rectification works
To prevent the percelation of Raw water into the ground and to avoid
wastage of Raw water.
3.00 Nil 3.00 3.00 0.00 0.00 0.00 0.00 - - 3.00 3.00 - -
51 RCC/PSC structures of coal jetty I conveyor
system of TTPS in Red gate area/ North
break water of VOC port at ECHS areas
conveyor-16
Remedial measures to RCC/PSC structures of coal jetty I conveyor
system of TTPS in Red gate area/ North break water of VOC port
at ECHS areas conveyor-16
To safeguard the converyor structures
1.77 Nil 1.50 1.50 0.00 0.00 0.00 0.00 - 1.77 1.77 - - -
52 RCC retaining wall with drain in the
peripheral zone area of ash dyke for
diverting ash slurry water to spillway.
Construction of RCC retaining wall with drain in the peripheral
zone area of ash dyke for diverting ash slurry water to spillway.
To retain ash and to drain the decanted water from bund.
2.00 Nil 2.00 2.00 0.00 0.00 0.00 0.00 - - 2.00 2.00 - -
VII - - - - - -
53 Coal bunker inclined walls East,West and
South direction in Unit I
Renewal of coal bunker inclined walls East, West and South
direction in Unit I during the period 2016-17
Existing bunker trapezoidal portions have served more than 37 years
and are found to be damaged. To avoid generation loss and to ensure
free flow of coal to mills the work is essential.
3.00 To be obtained 3.00 3.00 0.00 0.00 0.00 0.00 - - - - 3.00 3.00
54 Coal bunker inclined walls East,West and
South direction in Unit II
Renewal of coal bunker inclined walls East,West and South
direction in Unit II during the period 2016-17
Existing bunker trapezoidal portions have served more than 36 years
and are found damaged. To avoid generation loss and to ensure free
flow of coal to mills the work is essential.
3.00 To be obtained 3.00 3.00 0.00 0.00 0.00 0.00 - - 3.00 3.00 - -
55 Coal bunker inclined walls East,West and
South direction in Unit III
Renewal of coal bunker inclined walls East,West and South
direction in Unit III during the period 2016-17
Existing bunker trapezoidal portions have served more than 35 years
and are found damaged. To avoid generation loss and to ensure free
flow of coal to mills the work is essential.
3.00 To be obtained 3.00 3.00 0.00 0.00 0.00 0.00 - - - - 3.00 3.00
Division : Civil Maintenance I
Division : Civil Maintenance II
Division : Mill Plant Maintenance I
Page 16
![Page 60: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/60.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation
(Rs.
Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisat
ion (Rs.
Crore)
Capital
Expenditure (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
Capitalisat
ion (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisa
tion (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY 2016-17
Approved by the Commission
FY 2017-18 FY 2018-19
Name of the SchemeSl. No. Details of work furnishing list of major items Technical justificationEstimated Cost
(Rs.in Crs.)
Details of Board
approval
TANGEDCO's Submission
FY 2016-17 FY 2017-18 FY 2018-19
VIII - - - - - -
56 Secondary Crusher House-I Modification of Secondary Crusher House-I The wet coal discharge takes 5-6 days due to chocking problem in
Crusher. This will be eliminated after modification and the discharge
period is 4 days approximately. 7.33
Per.TANGEDCO
PROCEEDINGS
(CMD) No.5 /
06.01.11
0.00 5.56 6.89 1.33 0.00 0.00 - 7.33 7.33 - - -
57 ILMS along with structural at Head end
conveyor 56 & 63 Quantity 2 sets.
Supply , Erection & commissioning of ILMS along with structural
at Head end conveyor 56 & 63 Quantity 2 sets.
Whenever the sharp edged iron pieces/ferrous materials are coming
along with the coal it may tear the conveyor belts. Moreover, if it
enters into the coal mills, it will damage the mill internals, costly
bearings etc also leads to mill outage. To ensure boiler stability at
such times ,heavy oil is being introduced which inturn additional
revenue loss to TANGEDCO and also partial generation loss . Hence
this proposal is essential.
4.50Will be
submitted0.00 4.00 4.50 0.50 0.00 0.00 - - - - 4.50 4.50
58 PLC for CHS V control room PLC for CHS V control room The control desk at CHS.V is very vital one as it is the main operating
center for all main conveyors that is receving the coal from coal jetty.2,
stacking and feeding coal to the bunkers of Units IV & V. The existing
control desk has served for more than 25 years. Of recent days
frequent problems have been encountered. As the conveyors have to
be in service for 24 hrs, 365 days without any interruption, the system
down time should be decreased
3.00Will be
submitted2.50 2.50 0.50 0.50 0.00 0.00 - - 3.00 3.00 - -
59 Providing additional drive system in
stacker II machine
Providing additional drive system in stacker II machine Stacker-II machines are being used for receiving coal from jetty’s and
feeding to unit bunkers uninterruptly. There are only 2 drive systems
available. If anyone of the drive gets failed may lead to stoppage of
the machine affecting coal receiving from jetty’s. Hence by providing
additional drive system in the middle of stacker boom structure the
problem can be minimized.
1.60Will be
submitted1.60 1.60 0.00 0.00 0.00 0.00 - - 1.60 1.60 - -
60 Suspension Magnet for conveyor-47. Supply, Erection, Commission ing of Suspension Magnet for
conveyor-47.
The existing magnet served 21 years and also got burnt completely
during the fire incident on 03.07.2012. This magnet is very essential to
segregate the ferrous material coming along with coal for safe guard
the crushers. 1.50
Revised proposal
for seeking
administrative
approval subd
on 14.8.15
1.50 1.50 0.00 0.00 0.00 0.00 - - - - 1.50 1.50
61 LT switch gear 3A & 3B (3 ph, 415 V) at
CHS-III
Design, Supply, Erection, Commissioning LT switch gear 3A & 3B
(3 ph, 415 V) at CHS-III
The existing switch gear served more than 33 years and becomes
more weak condition. As per Ministry of Power, New Delhi
notification dt :29th march 1994 vide S.O 266(E) the life time assessed
in the schedule C(f) switch gear including cable connection has been
25 years only. Hence updated technology Switch Gear is proposed
3.00
Clarification
submitted for
obtain ing
administrative
approval on
24.11.15 &
Tender notice for
Press Publication
requested from
SE/MI/ TTPS to
CE/Civil
Design/ Chennai
on 21.1.16
3.00 3.00 0.00 0.00 0.00 0.00 - - 3.00 3.00 - -
62 New Freight cum passenger lift at PCH-II. Design, Engineering, Supply, Erection, Commissioning of New
Freight cum passenger lift at PCH-II.
The PCH I location are elevated upto 30 mtr height for safety
handling of the men & materils and economical completion of the
work in time. 3.00Will be submitt
ed for approval3.00 3.00 0.00 0.00 0.00 0.00 - - 3.00 3.00 - -
IX - - - - - -
63 Freight cum passanger lift at PCH II Supply of freight cum passanger lift at PCH II Height of PCH II is 30 mtrs.For safe handling of men and material lift
is necessary.And also for starting the breakdown / preventive work
lift is very necessary.3.00
Administrative
Approval
Awaited from
Head Quarters
3.00 3.00 0.00 0.00 0.00 0.00 - - 3.00 3.00 - -
Division : External Coal Handling -I
Division : External Coal Handling -II
Page 17
![Page 61: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/61.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation
(Rs.
Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisat
ion (Rs.
Crore)
Capital
Expenditure (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
Capitalisat
ion (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisa
tion (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY 2016-17
Approved by the Commission
FY 2017-18 FY 2018-19
Name of the SchemeSl. No. Details of work furnishing list of major items Technical justificationEstimated Cost
(Rs.in Crs.)
Details of Board
approval
TANGEDCO's Submission
FY 2016-17 FY 2017-18 FY 2018-19
64 15 Ton electric wire rope hoist with trolley
in conveyor 69,70,71 & 73
Supply, Erection, commissioning & Testing of 15 Ton electric wire
rope hoist with trolley in conveyor 69,70,71 & 73
For safe handling of men and material 15 Ton electric wire rope hoist
is necessary.And also for starting the breakdown / preventive work
15 Ton electric wire rope hoist is very necessary.
3.18
Will be
submitted for
approval
3.18 3.18 0.00 0.00 0.00 0.00 - - - - 3.18 3.18
65 ILMS at Conveyor 48A1/B1 at SCH II Supply, Erection, commissioning of ILMS at Conveyor 48A1/B1 at
SCH II
For picking-up iron and foreign materials coming along the coal
which will avoid cutting/damage the belt, chocking of chute. 2.02
Will be
submitted for
approval
2.02 2.02 0.00 0.00 0.00 0.00 - - - - 2.02 2.02
66 Passanger cum freight lift 1000 KG (IT) at JT
- 20
Passanger cum freight lift 1000 KG (IT) at JT - 20 Height of JT-20 is 30 mtrs. For safe handling of men and material, lift
is necessary. And also for starting the breakdown / preventive work
lift is very necessary.
3.20
Will be
submitted for
aproval
3.20 3.20 0.00 0.00 0.00 0.00 - - 3.20 3.20 - -
X - - - - - -
67 Yard conv.49 & 54 Revamping of yard conv.49 & 54 The conveyors 49 & 54 are vital trunk yard conveyors in the coal yard
for receiving the coal discharged from two coal jetties and feeding coal
to bunkers of all the five units of TTPS. These conveyors are in
continuous service for more than 19 years. Break down on these
conveyors affects the coal stacking process on receipt of coal from the
ships and coal feeding process in the units bunkers through
reclaimers in the yard. Monetory loss will occur if the coal handling
process is affected. Hence revamping of conv. 49 & 54 is essential
15.48
(per)
TANGEDCO
Proceeding
(CMD) No.135
dt. 07.04.14
6.88 6.88 0.00 0.00 - 14.01 15.48 1.47 - -
68 Additional bogie wheel drive assembly in
Stacker-I
Additional bogie wheel drive assembly in Stacker-I Stacker-I machine is being used for receiving coal from jetty’s and
feeding to unit bunkers uninterruptly. There are 4Nos. drive system
available in Reclaimer I machine provided at the front and middle
portion of the machine and hence travel problem does not occur even
in full load condition. But in Stacker I and II machines there are only 2
drive systems available. If anyone of the drive gets failed may lead to
stoppage of the machine affecting coal receiving from jetty’s. Hence
by providing additional drive system in the middle of stacker boom
structure the problem can be minimized.
2.10
(per)
TANGEDCO
Proceeding
(CMD) No.62, dt.
04.02.16
2.10 2.10 0.00 0.00 0.00 0.00 - - - - 2.10 2.10
XI - - - - - -
69 R&M of Man machine interface system in
Unit-IV
Supply of Latest windows based MMI system,Dismantling of old
system, Erection,Testing & commissioning of new system.
As the old Man Machine Interface system is in service for the past 15
years, the Man Machine Interface system has become obsolete, it has
been renovated. 3.74B.P.No.172, dt
30.04.2013.3.74 3.74 0.00 0.00 0.00 0.00 - - - - - -
70 6.6KV PILC Cable for HT Motors and HT
Transformers in Unit-I ( EM- I )
Replacement of various sizes of 6.6KV PILC Cable for HT Motors
and HT Transformers in Unit-I
The existing PILC Cables have served 34 years, much more than its
life period of 25 years. The insulation properties of the existing PILC
Cable are in deteriorated condition. Sudden failure of these cables will
lead to disturbance in the Electrical System thereby causing loss of
generations. Hence to maintain uninterrupted power supply to HT
Motors and HT Transformers in Unit-I, the essential existing PILC
Cables are proposed to be replaced by XLPE FRLS Aluminium
armored HT power Cables.
1.00Proposal sent for
approval.1.00 1.00 0.00 0.00 0.00 0.00 - - 1.00 1.00 - -
71 Replacement of various sizes of 6.6KV PILC
Cable by XLPE Cable for HT Motors and
HT Transformers in Unit-II.(EM- I )
Replacement of various sizes of 6.6KV PILC Cable by XLPE Cable
for HT Motors and HT Transformers in Unit-II.
The existing PILC Cables have served 34 years, much more than its
life period of 25 years. The insulation properties of the existing PILC
Cable are in deteriorated condition. Sudden failure of these cables will
lead to disturbance in the Electrical System thereby causing loss of
generations. Hence to maintain uninterrupted power supply to HT
Motors and HT Transformers in Unit-I, the essential existing PILC
Cables are proposed to be replaced by XLPE FRLS Aluminium
armored HT power Cables.
1.00Proposal to be
evolved.0.00 1.00 1.00 0.00 0.00 - - - - 1.00 1.00
Division : Internal Coal Handling -I
Division : Renovation and Modernisation (Electrical )
Page 18
![Page 62: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/62.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation
(Rs.
Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisat
ion (Rs.
Crore)
Capital
Expenditure (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
Capitalisat
ion (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisa
tion (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY 2016-17
Approved by the Commission
FY 2017-18 FY 2018-19
Name of the SchemeSl. No. Details of work furnishing list of major items Technical justificationEstimated Cost
(Rs.in Crs.)
Details of Board
approval
TANGEDCO's Submission
FY 2016-17 FY 2017-18 FY 2018-19
72 6.6KV PILC Cable by XLPE Cable for HT
Motors and HT Transformers in Unit-III
.(EM-I )
Replacement of various sizes of 6.6KV PILC Cable by XLPE Cable
for HT Motors and HT Transformers in Unit-iII . (R&M works)
The existing PILC Cables have served 34 years, much more than its
life period of 25 years. The insulation properties of the existing PILC
Cable are in deteriorated condition. Sudden failure of these cables will
lead to disturbance in the Electrical System thereby causing loss of
generations. Hence to maintain uninterrupted power supply to HT
Motors and HT Transformers in Unit-I, the essential existing PILC
Cables are proposed to be replaced by XLPE FRLS Aluminium
armored HT power Cables.
1.00Approval
Awaited 0.00 0.00 0.00 1.00 1.00 - - - - 1.00 1.00
73 Replacement of 20 Nos. High Voltage
Rectifier Transformers by new in ESP-1
(UNIT-I) .(EM-II)
Replacement of 20 Nos. High Voltage Rectifier Transformers by
new in ESP-1 (UNIT-I) (R&M works)
The Existing HVR transformers have served more than 35 years.
winding insulation are in deteriorated condition due to ageing and
continuous sparks emanated in the field, which results insufficient
Corona power supply to the ESP fields. Frequent winding failures
have occurred and rewinded repeatedly. Further if any trouble
occures, it will affects the performance of ESP. Besides the above, the
ID Fan impeller blades, shafts and outlet ducts are also subjected to
more erosion and also increase in the ID fan motor current.
1.00Awaited
Approval1.00 1.00 0.00 0.00 0.00 0.00 - - 1.00 1.00 - -
74 Replacement of existing NGEF make LT
switchgear panel by new switchgear panel
with necessary protection arrangements at
FOPH-I .(EM-II )
Replacement of existing NGEF make LT switchgear panel by new
switchgear panel with necessary protection arrangements at FOPH-
I
The existing 33 years old LT switchgear at FOPH-I requires suitable
modernization as the OEM M/S NGEF have withdrawn their service
support very long back. Further switchgear unit of M/S.NGEF
ceased function from 2002. More number of failure of modules /
breakers observed in the recent past. Multi repaired module / breaker
are not reliable for continuous operation.
1.20
TANGEDCO
proceedings
(CMD) No. 394,
Dt. 9.9.2015
1.20 1.20 0.00 0.00 0.00 0.00 - - 1.20 1.20 - -
75 Replacement of existing standard LT Ash
Slurry Pump Motor by energy saving LT
Motors at Ash Handling Pump House Stage
I&II. (EM-II )
Replacement of existing standard LT Ash Slurry Pump Motor by
energy saving LT Motors at Ash Handling Pump House Stage
I&II.
The existing motors have served more than 35 years. There is no
spares available due to absolescence. Frequent winding failure
occured due to long service. Ash slurry Pump Motor is essentially
required for effective disposal of Ash slurry.
1.00Proposal to be
evolved.1.00 1.00 0.00 0.00 0.00 0.00 - - - - - -
76 Replacing of 3nos 900KW, 6.6KV journal
bearing type PA fan motors by anti friction
bearing type motors in unit-I, II & III
(EM-II )
Replacing of 3nos 900KW, 6.6KV journal bearing type PA fan
motors by anti friction bearing type motors in unit-I, II & III
The motors have served more than 35 years. There is no spare
support from OEM M/s. BHEL. The design of existing old type
motors differ from readily available motors design. Failure of motor
due to ageing may cause loss of generation. 2.00Proposal to be
evolved.2.00 2.00 0.00 0.00 0.00 0.00 - - 2.00 2.00 - -
77 Retrofitting of 6.6 KV MOCB by Vaccum
Circuit breaker at AHP Stage -I .(EM-II )
Retrofitting of 6.6 KV MOCB by Vaccum Circuit breaker at AHP
Stage -I
The existing MOCB's are in continuous service for the past 35 years.
The OEM M/s. ALIND Ltd., have with drawn spare supports very
long back. Due to obsolescence, no spare is available. Hence any
problem in the breaker operation could not be rectified. The life
served breakers posses a threat to safety of men and material . Hence
replacement is essentially required.
2.25 Approval
Awaited2.25 2.25 0.00 0.00 0.00 0.00 - - 2.25 2.25 - -
78 Replacement of existing journal bearing of
ID fan motors (3Nos) into anti friction
bearing fan motors in unit- I. (EM-II)
Replacement of existing journal bearing of ID fan motors (3Nos)
into anti friction bearing fan motors in unit- I.
The motors have served more than 35 years. There is no spare
support from OEM M/s. BHEL. The design of existing motors differ
from readily available motors design. Failure of motor due to ageing
may cause loss of generation.
4.50Proposal to be
evolved.0.00 0.00 0.00 4.50 4.50 - - 4.50 4.50 - -
79 Replacement of existing 60KV/800m Amps
Rectifier Transformer in unit-II . (EM-II)
Replacement of existing 60KV/800m Amps Rectifier Transformer
in unit-II .
The Existing HVR transformers in ESP have served more than 35
years. winding insulation are in deteriorated condition due to ageing
and continuous sparks emanated in the field , which results
insufficient Corona power supply to the ESP fields. Frequent winding
failures have occurred and rewinded repeatedly . Any further trouble
will affect the performance of ESP. Besides the above, the ID Fan
impeller blades, shafts and outlet ducts are also subjected to more
erosion and also increase in ID fan motor current.
2.80Approval
Awaited 0.00 0.00 0.00 2.80 2.80 - - 2.80 2.80 - -
80 Replacement of existing HT Mill motors by
Energy efficient motors (7Nos) in unit-II
(EM-II)
Replacement of existing HT Mill motors by Energy efficient motors
(7Nos) in unit-II
The mill motor have served more than 35 years. The OEM M/s. BHEL
have stopped the spare support from the year 2000. Failure of
windings , rotor bars and rotor shaft occured frequently. Due to
obsolescence, replacement is required.
2.10Awaited
Approval0.00 0.00 0.00 2.10 2.10 - - - - 2.10 2.10
Page 19
![Page 63: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/63.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation
(Rs.
Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisat
ion (Rs.
Crore)
Capital
Expenditure (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
Capitalisat
ion (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisa
tion (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY 2016-17
Approved by the Commission
FY 2017-18 FY 2018-19
Name of the SchemeSl. No. Details of work furnishing list of major items Technical justificationEstimated Cost
(Rs.in Crs.)
Details of Board
approval
TANGEDCO's Submission
FY 2016-17 FY 2017-18 FY 2018-19
81 Replacement of existing journal bearing FD
fan 3Nos. motors into anti friction bearing
fan motors in Boiler area in unit-II. (EM-II)
Replacement of existing journal bearing FD fan 3Nos. motors into
anti friction bearing fan motors in Boiler area in unit-II.
The motors have served morethan 35years. There is no spare support
from OEM M/s. BHEL. The design of existing motors differ from
readily available motors design. Failure of motor due to ageing may
cause loss of generation.
3.00Proposal to be
evolved.0.00 0.00 0.00 3.00 3.00 - - - - 3.00 3.00
82 Replacement of existing old control system
in ESP by micro processor based control
panels in unit-II (EM-II)
Replacement of existing old control system in ESP by micro
processor based control panels in unit-II
The existing control system have served more than 15 years. There is
no spare support from OEM M/s.BHEL. To optimize the ESP
performane new version control panel is required. 1.00Awaited
Approval0.00 0.00 0.00 1.00 1.00 - - 1.00 1.00 - -
83 Procurement of One no.1500 KW ID Fan
Motor, One no.1250 KW FD Fan Motor and
One no.350 KW Mill Motor as spare motors
for Units IV & V. (EM-III)
Procurement of One no.1500 KW ID Fan Motor, One no.1250 KW
FD Fan Motor and One no.350 KW Mill Motor as spare motors for
Units IV & V.
The existing ID/FD/MILL Motors in units IV & V have served more
than 24 years. Any major defect in the Motor may lead to partial or
total outage of Generation from the unit. At present, the cooling tube
punctures are observed due to aging and wear / tear. In recent days,
the failure of cooling tubes are found increasing trend. 1.30
TANGEDCO
proceedings
(CMD) No. 562
Dt.31.12.2014
1.30 1.30 0.00 0.00 0.00 0.00 - - 1.30 1.30 - -
84 Modification of 15.75KV bus duct to suit for
3phase GT in unit-IV&V. (EM-III)
Modification of 15.75KV bus duct to suit for 3phase GT in unit-
IV&V.
For replacing the existing single phase Generator Transformers by 3
phase Generator Transformer, the existing delta connection formed
with the isolated bus ducts externally at LV winding side needs to be
dismantled and suitable modifications have to be carried out in the
bus duct arrangement to suit 3 phase transformer. Hence the proposal
is ssentially required.
2.00Proposal to be
evolved.2.00 2.00 0.00 0.00 0.00 - - - - - -
85 Procurement of one no. spare Three phase
Generator Transformer. (EM-III)
Procurement of one no. spare Three phase Generator Transformer. Since the Generator Transformers of Unit- III & Unit -IV are having
high furan value due to ageing and continuous service at full load, the
repairing / rewinding of the above transformers alone will not match
perfectly with the existing GTs. As some perennial problems
experienced with single phase transformers it is proposed to procure
three phase transformer.
10.00
TANGEDCO
proceedings
(CMD) No. 87,
Dt. 23.02.2015
10.00 10.00 0.00 0.00 0.00 - - - - - -
86 Microprocessor based Annunciation System
in Unit-V. (Instn.II)
Microprocessor based Annunciation System in Unit-V. The existing system is out dated and failure of the system observed
frequently which misguide the unit operations. Newly proposed
system is user friendly,compact, latest and facilitate easy fault
findings. It provides less energy consumption than the existing
obsolete system which has served around twenty five years. 1.50
Proposal to be
evolved.1.50 1.50 0.00 0.00 0.00 0.00 - - - - - -
87 Provision of Integrated Energy
Management System by means of
Intelligent Energy meters and OFC net
working components enriched with the
state- of- the art technology,
Provision of Integrated Energy Management System by means of
Intelligent Energy meters and OFC net working components
enriched with the state- of- the art technology,
Fulfilling CEA’s regulation on Energy metering norms. Real time
energy accounting & APC. Accuracy based payback is around 2
months 2.25CMD No.188 Dt.
02.05.20152.40 2.40 0.00 0.00 0.00 0.00 2.25 2.25 - - - -
88 R&M of the existing DOS based POSE 9010
MMI system to the latest windows based
MMI plant information system in Unit IV
R&M of the existing DOS based POSE 9010 MMI system to the
latest windows based MMI plant information system in Unit IV
Functional Block Diagram of Processor and Drive Control Module
with Real Time Values can be viewed, which will help fault finding
very easy.3.60
CMD No.172 Dt.
30.04.21033.60 3.60 0.00 0.00 0.00 0.00 - - - - - -
89 Up Gradation of Hitachi DCS in Unit-IV Supply of Latest windows based DCS with FDDI network system,
Dismantling of old system, Erection,Testing & commissioning of
new system.
Most of the vital components in the above system have become
obsolete that are in service for more than 20 years in Unit IV of TTPS
and no spares are available from the original supplier, M/s Keltron
Limited, who had also withdrawn their service support for these
systems. Frequent failures, interruptions occured in process data
display to the operators, making them an unreliable source of process
display for taking critical operation decisions,it has been renovated.
6.13B.P.No.45, dt
04.02.2013.7.06 7.06 0.00 0.00 0.00 0.00 6.13 6.13 - - - -
Page 20
![Page 64: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/64.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation
(Rs.
Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisat
ion (Rs.
Crore)
Capital
Expenditure (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
Capitalisat
ion (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisa
tion (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY 2016-17
Approved by the Commission
FY 2017-18 FY 2018-19
Name of the SchemeSl. No. Details of work furnishing list of major items Technical justificationEstimated Cost
(Rs.in Crs.)
Details of Board
approval
TANGEDCO's Submission
FY 2016-17 FY 2017-18 FY 2018-19
90 Up gradation of Turbine Control system
from Iskamatic based modules to newer
system in Unit-V.(Instn.II)
Up gradation of Turbine Control system from Iskamatic based
modules to newer system in Unit-V.
The existing Siemens based ISKAMATIC systems were supplied &
commissioned by M/s. BHEL, during 1991 in Unit 5 and are in service
till date. Due to obsolescence of the Iskamatic modules, no spares are
available from the original supplier (M/s. BHEL), who have also
withdrawn service support for the system long back.The failure of the
existing Iskamatic based controllers leads to loss of control of critical
equipments which results in damage to the main equipment and
hence results in loss of generation. Hence, to stave off the
obsolescence and derive benefits of advancement in technology, it is
essential to upgrade the existing EAST Iskamatic control system to a
newer version of Digital system.
5.66
TANGEDCO
proceedings
(CMD) No. 408
Dated .
16.09.2014.
5.20 5.20 0.00 0.00 0.00 0.00 - 5.51 5.66 0.15 - -
91 Up gradation of Pro-control system (STC,
SADC, PRDS & EAST ) & Iskamatic
(Turbine Control System) in Unit- V.
(Instn.II)
Up gradation of Pro-control system (STC, SADC, PRDS & EAST )
& Iskamatic (Turbine Control System) in Unit- V.
The exisiting sytem is in service since unit commissioning (1991). The
exisiting sytem is out dated, spare management is difficult. Failure of
the system occurs frequently which misguide the unit operations.
Newly proposed system is user frendly, compact, latest system,
faclitate easy fault findings better spares management. Hence it is
proposed to upgrade the outdated system.
10.00 _ 0.00 10.00 10.00 0.00 0.00 - - 10.00 10.00 - -
92 Up gradation of Pro-control system (STC,
SADC, PRDS & EAST ) & Iskamatic
(Turbine Control System) in unit-
IV.(Instn.II)
Up gradation of Pro-control system (STC, SADC, PRDS & EAST )
& Iskamatic (Turbine Control System) in unit-IV.
The exisiting sytem is in service since unit commissioning (1992).
Since the exisiting sytem is out dated, spare management is difficult.
Failure of the system occurs frequently which misguide the unit
operations. Newly proposed system is user frendly, compact, latest
system, faclitate easy fault findings better spares management. Hence
it is proposed to upgrade the outdated system.
16.00Awaited
Approval0.00 0.00 0.00 16.00 16.00 - - - - 16.00 16.00
93 Supply,erection, testing and commissioning
of Disturbance fault recorder including
sequential Event Recorder with GPS based
synchronization system for 230KV Indoor
switchyard-I. (MRT-I)
Supply,erection, testing and commissioning of Disturbance fault
recorder including sequential Event Recorder with GPS based
synchronization system for 230KV Indoor switchyard-I.
TTPS 230 KV Indoor Switchyard has 10 outgoing feeders, 5 Units
incoming feeders and 3 station Transformer feeder. The sequence of
feeder trips and study of fault analyzing (distrubance recorder)
essentially required. The existing SER and distrubance recorder are
defective. Hence it is proposed to procure the latest version of
Disturbance fault recorder including sequential Event Recorder with
GPS based synchronization system.
1.55Proposal to be
evolved.1.55 1.55 0.00 0.00 0.00 0.00 - - - - - -
94 Provision of new DCS in Unit-III.
(MRT-I & INST-I)
Replacement of existing open loop and lclosed loop control system
into a new DCS system in Unit- III
In Unit-III, the existing 34 years old CLCS, OLCS and FSSS control
system are of electromechanical based contactors and relays. There is
no SER feature. No facility to indicate permissive of equipments.
FSSS has only one MFT which is based on electromechanical relays.
These electromechanical relays have no watch dogs. For Boiler and
Turbine safty, the existing control systems should be renovated.22.00
Proposal to be
evolved.0.00 22.00 22.00 0.00 0.00 - - - - 22.00 22.00
95 Replacement of existing open loop and left
out closed loop control system into a new
DCS system in Unit- I. (MRT-I & INST-I)
Replacement of existing open loop and left out closed loop control
system into a new DCS system in Unit- I.
Furnace Safeguard Supervisory System (FSSS), Open Loop Control
System (OLCS) Turbine control system of unit-I are having old
version control systems & Protections which consists of
electromechanical type contactors and relays with no redundancy,
watch dog, disturbance recording feature etc and installed and
commissioned during 1979. Any sluggishness in the
electromechanical based protection system will lead to severe damage
to Boiler and turbine.
22.00
TANGEDCO
proceedings
(CMD) No. 553,
Dt 29.12.2015
0.00 22.00 22.00 0.00 0.00 - - - - 22.00 22.00
Page 21
![Page 65: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/65.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation
(Rs.
Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisat
ion (Rs.
Crore)
Capital
Expenditure (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
Capitalisat
ion (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisa
tion (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY 2016-17
Approved by the Commission
FY 2017-18 FY 2018-19
Name of the SchemeSl. No. Details of work furnishing list of major items Technical justificationEstimated Cost
(Rs.in Crs.)
Details of Board
approval
TANGEDCO's Submission
FY 2016-17 FY 2017-18 FY 2018-19
96 Replacement of existing outdated static
type FSSS and SBC (Soot Blower Controls)
system and its allied components into latest
vesion system in unit - V. (MRT-II)
Replacement of existing outdated static type FSSS and SBC (Soot
Blower Controls) system and its allied components into latest
vesion system in unit - V.
Due to Spares obsolescence, stoppage of service support, aging and
out dated technology, the system needs for upgration of the existing
procontrol system.
5.00Proposal to be
evolved.0.00 5.00 5.00 0.00 0.00 - - 5.00 5.00 - -
97 Replacement of existing outdated static
type FSSS and SBC (Soot Blower Controls)
system and its allied components into latest
version system in unit-IV. (MRT-II)
Replacement of existing outdated static type FSSS and SBC (Soot
Blower Controls) system and its allied components into latest
version system in unit-IV.
Due to Spares obsolescence, stoppage of service support, aging and
out dated technology, the system needs for upgration of the existing
procontrol system
5.50 Approval
Awaited0.00 0.00 0.00 5.50 5.50 - - - - 5.50 5.50
98 Coal handling switchgear room I & II
(ICHP)
Revamping the existing Coal handling switchgear room I & II These two control rooms had been constructed 35 years ago and the
equipments have completed their full life period of 25 years. The
building of both control rooms are situated below the ground level
and hence the cable trench is filled with water resulting in frequent
failures.
2.65Will be
submitted2.65 2.65 0.00 0.00 0.00 0.00 - - - - - -
XII - - - - - -
99 Replacement of Existing UAT 3A by a new
Transformer of Unit III
Replacement of Existing UAT 3A by a new Transformer of Unit III Poor IR value and Tan delta value the reliaability of Transformer can
be ensured 1.10CMD No.247 Dt.
24.06.21031.10 1.10 0.00 0.00 0.00 0.00 - - 1.10 1.10 - -
904.64 393.22 443.27 245.02 264.97 266.40 196.40 8.38 84.20 331.42 265.60 476.10 466.10
Division : Electrical Maintenance -I
Total amount..............
Page 22
![Page 66: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/66.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalis
ation (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY
2016-17
FY 2017-
18
FY 2018-
19
FY
2016-17
FY
2017-18
FY 2018-
19
I SE OPERATION CIRCLE
1 Capital Provision of Wireless CCTV
and Surveillance system in
MTPS-I
MTPS-I is a vital installation. As per IB
recommendations, CCTV Surveillance &
Monitoring system has to be installed.
1.00 To be Sought To be utilised for
security purpose.
0.00 0.50 1.00 0.50 0.00 0.00
- 1.00 - - 1.00 -
II - - - - - -
Division I - - - - - -
- - - - - -
2 MTPS-I- BM-Unit II- Renewal
of damaged / eroded ID fan 2A
& 2B casing. (Model: NDZV 31
SIDOR)
The flue gas leaking through the damaged
portion is hazardous in nature, it damages the
insulation material and due to acidic in nature
after condensation, resulting outside corrosion
and thin out of casing and damage to the duct.
It should be replaced before it reaches
catastrophic damage and subsequent huge
generation loss.
3.73 TANGEDCO
proceedings
(CMD) No:- 218
dated 16.05.2015
Replacement of Id
fan spiral casing is to
enhance its life
further period of 10
to 15 years.
3.73 3.73 0 0 0
- - 3.73 - - 3.73
Division II - - - - - -
I.Regular - - - - - -
3 Reconditioning of HP Rotor& IP
Rotor
To Replace the existing life served Rotors of
Unit-II during COH.
5.00 Proposal
submitted for
Administrative
approval.
To improve the
efficiency of the
turbine
5.00 5.00
- 5.00 - - 5.00 -
4 Procurement of New LP
Diaphragms.- 2Nos (27th & 31st
stage)
To Replace the existing life served Diaphragms
of Unit-I to IV during COH.
7.50 Indent given in
BHEL Bulk
spares for the
year 2015-16
To improve the
efficiency of the
turbine
7.50 7.50
- 7.50 - - 7.50 -
5 Procurement of New HP
Diaphragms 2nd to 12th stage.
To Replace the existing life served Diaphragms
of Unit-I to IV during COH.
5.00 Proposal
submitted for
Administrative
approval.
Reduction of steam
loss between stages
and hence the heat
rate and efficiency
will be improved.
5.00 5.00
- 5.00 - - 5.00 -
6 Reconditioning of LP Rotor To Replace the existing life served Rotors of
Unit-II during COH.
5.15 Proposal
submitted for
Administrative
approval.
To improve the
efficiency of the
turbine
5.15 5.15
- 5.15 - - 5.15 -
7 Procurement of 3 Nos. Boiler
feed pump Cartridge
assemblies
To Replace the existing life served for full life
period of nearly 25 years Boiler feed pump
Cartridge assemblies of Unit-II during COH
8.00 Proposal under
preparation
To improve
efficiency and
reduce the
downtime of Unit, in
case of failure
occurs.
8.00 8.00
- - - - - -
8 Procurement of New HP Rotor To Replace the existing HP rotor which has
served nearly 25 years.
10.45 proposal sent to
Head Quarters
to obtain
Administrative
approval.
Spare rotor is
essential for
immediated
replacement of failed
one and to bring the
unit without waiting
for the rotor to be
repaired.
10.45 10.45
- 10.45 - - 10.45 -
FY 2018-19FY 2016-17 FY 2017-18
TURBINE MAINTENANCE
SE/MECHANICAL CIRCLE I
BOILER MAINTENANCE
Renovation & Modernisation
Capital Expenditure Capitalisation
Details of Board
approval
Cost benefit
analysis
TANGEDCO's Submission Approved by the Commission
ANNEXURE 2
METTUR THERMAL POWER STATION-I(4X210MW)
S.
No.
Name of the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
Page 44
![Page 67: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/67.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalis
ation (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY
2016-17
FY 2017-
18
FY 2018-
19
FY
2016-17
FY
2017-18
FY 2018-
19
FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation
Details of Board
approval
Cost benefit
analysis
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
9 Reconditioning of HP, LP & IP
Rotors
Reconditioning the existing HP, LP & IP rotor
which has served nearly 25 years.
12.00 Proposal to be
evolved.
To improve
efficiency and
reduce the
downtime of Unit, in
case of failure
occurs.
12.00 12.00
- - 12.00 - - 12.00
- - - - - -
10 Replacement of existing 2 set of
steam ejector by vacuum pumps
for energy savings in Unit I &
II.
Since the Vacuum Pump is a Volumetric
device, hogging capacity is much larger than
that of Ejector, the evacuation time will get
reduced and in turn it will reduce the total
time required to bring back the system after
tripping.
8.10 (Per )
TANGEDCO
PROCEEDINGS(
CMD)No 125dt
01.04.14
Considerable
Revenue gains
towards saving of
fuel will be obtained
by cutting
motivation steam
used for the Ejectors
and the pay back
period will be two
years (max).
8.10 8.10
- - - - - -
11 Replacement of existing 3Nos.
BFP Voith couplings by
optimized voith couplings for
energy savings in Unit-I /
MTPS-I
Required for old / life served BFP Voith
couplings in Unit – I.
2.67 Revised
Proposal to be
sent with
recommendation
of R&M wing.
Optimisation of the
Voith Coupling in
BFP has been
proposed for Energy
savings by adopting
the optimized gear
system, so as to
reduce the slip with
actual scoop margin
of 85% at voith end.
Hence it is ensured
that the life period of
the voith Hydraulic
coupling will be
extended for another
20 Years.
2.67 2.67
- - - - - -
12 Replacement of existing 3Nos.
BFP Voith couplings by
optimized voith couplings for
energy savings in Unit-II
/MTPS-I
Required for old / life served BFP Voith
couplings in Unit – II.
3.00 Proposal under
preparation
Considerable
Revenue gains
towards saving of
fuel will be obtained
by cutting
motivation steam
used for the Ejectors
and the pay back
period will be two
years (max).
3.00 3.00
- - - - - -
II. Renovation & Modernisation
Page 45
![Page 68: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/68.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalis
ation (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY
2016-17
FY 2017-
18
FY 2018-
19
FY
2016-17
FY
2017-18
FY 2018-
19
FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation
Details of Board
approval
Cost benefit
analysis
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
13 Replacement of existing 2 set of
steam ejector by vacuum pumps
for energy savings in Unit III.
Since the Vacuum Pump is a Volumetric
device, hogging capacity is much larger than
that of Ejector, the evacuation time will get
reduced and in turn it will reduce the total
time required to bring back the system after
tripping.
4.50 Proposal under
preparation
Also it will facilitate
easy operation of the
system with a state
of art technology for
evacuation of air and
non-condensable
gases from the
system operation
under vacuum, since
the existing main
ejectors are not
efficient to expel the
increased quantity of
air ingress in the
system.
4.50 4.50
- - - - - -
14 Replacement of existing 2 set of
steam ejector by vacuum pumps
for energy savings in Unit IV
Since the Vacuum Pump is a Volumetric
device, hogging capacity is much larger than
that of Ejector, the evacuation time will get
reduced and in turn it will reduce the total
time required to bring back the system after
tripping.
5.00 Proposal under
preparation
Also it will facilitate
easy operation of the
system with a state
of art technology for
evacuation of Air
and non-
condensable gases
from the system
operation under
vacuum, since the
existing main
ejectors are not
efficient to expel the
increased quantity of
air ingress in the
system.
5.00 5.00
- - - - - -
15 Replacement of existing BFP
Voith couplings by optimized
voith couplings for energy
savings in Unit-III& IV/
MTPS-I.
Required for old / life served BFP Voith
couplings in Unit – III & IV.
9.00 Proposal under
preparation
Considerable
Revenue gains
towards saving of
fuel will be obtained
by cutting
motivation steam
used for the Ejectors
and the pay back
period will be two
years (max).
9.00 9.00
- - - - - -
- - - - - -
16 Capital Overhauling of Unit-II –
TG set & its auxiliaries.
The worn out Turbine Rotors will be replaced
with new items. The worn out tip seals of
diaphragms will be replaced with new one to
reduce steam loss between stages. Steam flow
path correction will be carried out.
1.90 Administrative
Approval
obtained.
T.P.No:161 dt
17.04.15
Reduction of steam
loss in between
stages quantity and
improving
Mechanical work
done and hence the
Turbine Efficiency
will be improved.
2.50 2.50
1.90 - 1.90 -
III. PAT Scheme
Page 46
![Page 69: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/69.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalis
ation (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY
2016-17
FY 2017-
18
FY 2018-
19
FY
2016-17
FY
2017-18
FY 2018-
19
FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation
Details of Board
approval
Cost benefit
analysis
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
17 Capital Overhauling of Unit-IV
– TG set & its auxiliaries.
The worn out Turbine Rotors will be replaced
with new items. The worn out tip seals of
diaphragms will be replaced with new one to
reduce steam loss between stages. Steam flow
path correction will be carried out.
3.00 Proposal under
preparation
Reduction of steam
loss in between
stages quantity and
improving
Mechanical work
done and hence the
Turbine Efficiency
will be improved.
3.00 3.00
- 3.00 - - 3.00 -
18 Capital Overhauling of Unit-III
– TG set & its auxiliaries.
The worn out Turbine Rotors will be replaced
with new items. The worn out tip seals of
diaphragms will be replaced with new one to
reduce steam loss between stages. Steam flow
path correction will be carried out.
3.50 Proposal under
preparation
Reduction of steam
loss in between
stages quantity and
improving
Mechanical work
done and hence the
Turbine Efficiency
will be improved.
3.50 3.50
- - 3.50 - - 3.50
Division III - - - - - -
19 a. Strengthening of Raw coal
Bunkers fabrication, supply
and erection in Unit –I to
IV-14Nos. x 100 L (IC, 2F, 3D &
4B )
The corners of trapezoidal portions bunkers
of all units of MTPS-1 is getting cracked and
coal spilled out often and rectification are
being done then and there. Hence the
trapezoidal portion strengthening work is
essentially required in ( IC, 2F, 3F & 4E )
bunkers to avoid trouble free operation and
loss of generation in the year 2015-16.
4.00 To be sub
mitted
Life Extension 4.00 4.00
- - - - - -
20 b. Modification of Raw coal
Bunkers Engg. Fabrication
supply and erection Unit –I to
IV 4 Nos. x 450 L ( 2E, 3E,4A &
4E )
The corners of trapezoidal portions bunkers of
all units of MTPS-1 is getting cracked and coal
spilled out often and rectification are being
done then and there. Hence the trapezoidal
portion strengthening work is essentially
required in ( IC, 2F, 3F & 4E ) bunkers to
avoid trouble free operation and loss of
generation in the year 2015-16.
18.00 Sanctioned
Tangedco
Proceedings.
CMD No. 75 /
dt. 11.02.15
Life Extension 18.00 18.00
14.66 2.58 - - 17.24 -
21 a) Supply and erection of coal
pipes in Unit - II b) Coal
pipes 200 mtrs - IV c)
Coal pipes 200 mtrs - III
Most of the coal pipes in service are in
wornout condition with reduced pipe
thickness. The original pipes in service are
Seamless Carbon Steel pipes with ø 508 X 12.7
mm thick which are all erected during erection
stage, but there after to attend leak by patch
welding / providing spool pieces mild steel
ERW pipe are being used and that too
thickness of 12mm only and could not
withstand even for a year. Hence this quantity
of seamless steel tubes pipes are required for
replacing the wornout coal pipes
13.59 Sanctioned
Tangedco
Proceedings.
CMD No. 555 /
dt. 30.12.2015
Life Extension 4.09 4.09 4.50 4.50 5.00 5.00
- - 4.09 - 4.09
22 a) Supply and erection of Mill
Separator body in any 2 unit
b) Supply and erection of Mill
Separator body in any one unit
c) Supply and erection of Mill
Separator body
Mill separator bodies and mill tops are in
service from the date of commissioning and
are in worn out condition. Patch up works
were carried out then and there. Hence, they
have to be renewed 2 Nos in the year 2016-17
and the remaining will be replaced in phased
manner for trouble free operation of Mills
(Requirements is given)
6.30 Proposal under
preparation
Life Extension 3.00 3.00 1.60 1.60 1.70 1.70
- - 1.60 - 1.60
MILL PLANT
Page 47
![Page 70: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/70.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalis
ation (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY
2016-17
FY 2017-
18
FY 2018-
19
FY
2016-17
FY
2017-18
FY 2018-
19
FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation
Details of Board
approval
Cost benefit
analysis
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
23 Supply of Mill Gear box only
without internals
The Mill Gear boxes were installed during
commissioning. The material for the box is
used to withstand temperature, heavy
operational loading, impact loading etc. It
should withstand to explosion if any fire
inside. The gear boxes losses its material
capacity. The flanges threaded holes are in
worn out condition and could not able to
withstand its internals hence it should be
replaced in a phased manner and 1 No will be
replaced .
1.50 Proposal under
preparation
Life Extension 1.50 1.50
- 1.50 - - 1.50 -
24 Fabrication, supply and
dismantling and erection of Hot
air ducts- 6Nos
The Hot air ducts for coal mills were erected
during commissioning of the unit III and
served more than 26 years( its life period ).
Due to handling of air duct , plate thickness
got reduced (to 2 mm / 3 mm) and makes
cracks and numerous pin hole puncture in the
duct plates which affects the performance of
Boiler in turn loss of Generation .
1.50 Proposal under
preparation
Life Extension 1.50 1.50
- 1.50 - - 1.50 -
25 Fabrication, supply and
erection of Guillotine Gate
assembly (Hot Air Gates) &
Hot Air Damper assy
The Hot air ducts and its accessories such as
Hot Air Gate & Hot air damper for coal mills
were erected during commissioning of the unit
III and served more than 27 years ( its
life period Due to handling of air duct plate
thickness got reduced (to 2 mm / 3 mm) and
makes cracks and numerous pin hole puncture
in the duct plates getting over loaded which
affects the performance of Boiler in turn loss of
Generation . Quantity of pipe line to be used in
Unit- II and the Quantity to be procured will
be used in Unit-III.
1.50 Proposal under
preparation
Life Extension 1.5 1.5
- 1.50 - - 1.50 -
26 a) Providing of dynamic
classifier in
Unit -I &II.
To improve the mill performance 25.20 Proposal under
preparation
Life Extension 12.40 12.40 12.80 12.80
- - - - - -
Division IV - - - - - - COMMON AUXILIARIES
Page 48
![Page 71: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/71.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalis
ation (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY
2016-17
FY 2017-
18
FY 2018-
19
FY
2016-17
FY
2017-18
FY 2018-
19
FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation
Details of Board
approval
Cost benefit
analysis
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
27 Supply of
Bowl
assembly for
64” VMF -
Mather &
Platt make
Unit-I
Cooling
Water Pumps
-3 Nos.
Supply of Bowl assembly for
64” VMF - Mather & Platt make
Unit-I Cooling Water Pumps -3
Nos.
The performance of the Unit-I Cooling water
pumps are getting deteriorated due to ageing
and also due to very old design. To improve
the performance of the Cooling water pumps,
it is essential to retro fit the pumps with
improved design to sustain the design
parameters.
3.92 Administrative
approval
accorded vide
(per)
TANGEDCO
Proceedings
(CMD) No:540
dt:17.12.2015
Cost benefit analysis
based on expected
improvement on
heat rate:
Expected heat rate
improvement
( by using Ebsilon
software ) =
10.10 Kcal/ Kwhr
Coal Saved for 1 day
= 15 tons
Cost of Mixed coal
( Indian + Foreign )
= 4433 / MT
Cost savings per day
= Rs 15.00 * 4433 =
Rs 66,495/-
Payback period =
4,11,41,100 / 66495
= 618.70 days
= 20.62 Months Or
say 1 year 9 Months
1.30 3.92 2.62
- 3.92 - - 3.92 -
28 Supply of
new 3
Nos. of
16,000 m3 /
Hr capacity
vertical
cooling water
pump
without
motor for
Unit - III
Dismantling of existing pumps
and supply and erection of new
pumps- 3 Nos.
The Cooling water flow of the Existing pumps
are in lesser value compared with the designed
one. The O/H of the pumps is due for long
period due to non-availability of spares
because the model is obsolete one.
8.60 Administrative
Approval
Accorded vide
(per)
TANGEDCO
Proceedings
(CMD) No:403
dt:15.09.2015
Cost benefit analysis
based on expected
improvement on
heat rate:
Expected heat rate
improvement( by
using Ebsilon
software ) = 10.10
Kcal/ Kwhr
Coal Saved for 1 day
= 15 tons
Cost of Mixed coal
( Indian + Foreign )
= 4794 / MT
Cost savings per day
= Rs 15.00 * 4794 =
Rs 71,910/-
Payback period =
86033000 / 71910 =
1196 Days
= 39 Months Or
say 3 years 3 Months
2.80 8.60 5.80
- - - - - -
Page 49
![Page 72: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/72.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalis
ation (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY
2016-17
FY 2017-
18
FY 2018-
19
FY
2016-17
FY
2017-18
FY 2018-
19
FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation
Details of Board
approval
Cost benefit
analysis
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
29 Supply of
PVC fill bars,
S.S. Grid,
drift
eliminator,
S.T. Nozzles
along with
accessories
for Cooling
Tower-I
Supply and erection of PVC fill
bars, S.S. Grid, drift eliminator,
S.T. Nozzles along with
accessories including
reconstruction of all fill support
RCC beam in Seven cells in
Cooling Tower-I
The existing cooling tower in Unit –I have
served more than 27 years. The performance of
the Cooling tower is getting deteriorated due
to ageing and warrants replacement. To
improve the condenser vacuum in stage –I, it
is proposed to retrofit the Cooling Tower
components like Splash fill bars, S.S. Grid
(improved version of GRP grid), Grid holder,
Saddles and HDPE Target Nozzles (Improved
version of conventional PVC nozzles) in Seven
cells ( Cell No. 4,5, 7,8, 9,10 & 11 of C.T.1)
5.24 i)Sent for
Administrative
approval on
26.09.2014
ii)Administrativ
e Approval
deferred and
resubmitted on
29.10.15.
Retrofitting of all the
spares / components
in the cells of cooling
tower is beneficial. 1
mm vacuum
improvement the
cost saving per year
is Rs 33,58,048/-
Anticipated
improvement in
Condenser Vacuum
is 3.7 mm
Cost saved per year
is =3.7 X 3358048 =
Rs. 1,24,24,777
Cost of the work =
Rs. 5,23,57,606
Payback period
= 5,23,57,606/
1,24,24,777
= 4.21 Years
2.62 5.24 2.62
- - - - - -
30 Supply of
Bowl
assembly for
64” VMF -
Mather &
Platt make
Cooling
Water Pumps
Unit-II -3
Nos.
Supply of Bowl assembly for
64” VMF - Mather & Platt make
Cooling Water Pumps Unit-II -
3 Nos.
The performance of the Cooling water pumps
of Unit-II / Stage I is getting deteriorated due
to ageing and also due to very old design. To
improve the performance of the cooling water
pumps, it is essential to retro fit the pumps
with improved design to sustain the design
parameters
5.0 Proposal to be
submitted
Cost benefit analysis
based on expected
improvement on
heat rate.
Expected heat rate
improvement ( by
using Ebsilon
software )
= 10.10 Kcal/ Kwhr
Coal Saved for 1 day
= 15 tons
Cost of Mixed coal(
Indian + Foreign ) =
4433 / MT
Cost savings per day
= Rs 15.00 * 4433 =
Rs 66,495/-
Payback period =
4,11,41,100 / 66495
= 618.70days
= 20.62 months or
say 1 year 9 months
1.60 5.00 3.40
- - - - - -
Page 50
![Page 73: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/73.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalis
ation (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY
2016-17
FY 2017-
18
FY 2018-
19
FY
2016-17
FY
2017-18
FY 2018-
19
FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation
Details of Board
approval
Cost benefit
analysis
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
31 Replacing of
worn out
Auxiliary
cooling water
pumps and
replacing of
Existing
weaken
motors-
2 Nos.
Supply, Erection, Testing and
commissioning of worn out
Auxiliary cooling water pumps
and replacing of Existing
weaken motors- 2 Nos.
To improve the performance of the Auxiliary
cooling water system it is necessary to replace
the above pumps with Motors.
1.50 Proposal to be
submitted
As per PCRA study
report, tests
conducted on the
ACWPs 1A & 1B,
pump efficiency
found very lower
than design
efficiency. Further
the ‘Jothi’ make
motor is design
obsolete and
rewound motors
with lesser efficiency
are running in above
pumps. The payback
period of investment
cost for replacing
pump with motor
will be around
approximately 7
years by increasing
the rated flow and
pressure and
efficiency.
0.75 1.50 0.75
- 0.66 0.84 - - 1.50
32 Additional 2 cells for
cooling tower-1 of MTPS-I
For improvement of condenser vacuum 4.00 Proposal to be
submitted
Expected heat rate
improvement( by
using Ebsilon
software )
= 9.0 Kcal/ Kwhr
Coal Saved for 1
day= 13 tons
Cost of Mixed coal
( Indian + Foreign )=
4794 / MT
Cost savings per day
= Rs 13.00 * 4794
= Rs 62,322/-
Payback period =
4,00,00,000 / 62322 =
642days
= 21months or say 1
year 9 months
2.00 4.00 2.00
- - 4.00 - - 4.00
Page 51
![Page 74: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/74.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalis
ation (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY
2016-17
FY 2017-
18
FY 2018-
19
FY
2016-17
FY
2017-18
FY 2018-
19
FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation
Details of Board
approval
Cost benefit
analysis
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
33 New 3Nos. of
16,000m3/Hr
. Capacity
vertical
cooling water
pump
complete
assembly
without
motor for
UNIT – IV/
MTPS-I
Dismantling of existing pumps
and supply and erection of new
pumps 3 Nos.
To retain the performance of Cooling water
system there by increasing the condenser
vacuum.
9.00 Proposal wiil be
submitted.
Cost benefit analysis
based on expected
improvement on
heat rate:
Expected heat rate
improvement( by
using Ebsilon
software ) = 10.10
Kcal/ Kwhr
Coal Saved for 1 day
= 15 tons
Cost of Mixed coal
( Indian + Foreign )
= 4794 / MT
Cost savings per day
= Rs 15.00 * 4794 =
Rs 71,910/-
Payback period =
86033000 / 71910 =
1196 Days
= 39 Months or
say 3 years 3months
9.00 9.00
- - - - - -
34 Supply,
Erection,
Testing and
commissioni
ng of worn
out Auxiliary
cooling water
pumps and
replacing of
Existing
weaken
motors- 2
Nos.
Supply, Erection, Testing and
commissioning of worn out
Auxiliary cooling water pumps
and replacing of Existing
weaken motors- 2 Nos.
At present the ACWP 2A and 2B have served
more than 25 years and the efficiency of the
pumps are found very low when compared
with design efficiency. Further the ‘Jothi’ make
motor is design obsolete and rewound motors
with lesser efficiency are running in above
pumps. To improve the performance of the
Auxiliary cooling water system, it is
necessary to replace the above pumps with
Motors.
1.70 Proposal to be
submitted
ACWPs 2A & 2B,
pump efficiency
found very lower
than design
efficiency. Further
the ‘Jothi’ make
motor is design
obsolete and
rewound motors
with lesser efficiency
are running in above
pumps. The payback
period of investment
cost for replacing
pump with motor
will be around
approximately 7
years by increasing
the rated flow and
pressure and
efficiency.
0.85 1.70 0.85
- - 1.70 - - 1.70
Page 52
![Page 75: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/75.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalis
ation (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY
2016-17
FY 2017-
18
FY 2018-
19
FY
2016-17
FY
2017-18
FY 2018-
19
FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation
Details of Board
approval
Cost benefit
analysis
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
35 Supply,
Erection,
Testing and
commissioni
ng of worn
out Auxiliary
cooling water
pumps and
replacing of
Existing
weaken
motors- 2
Nos.
Supply, Erection, Testing and
commissioning of worn out
Auxiliary cooling water pumps
and replacing of Existing
weaken motors- 2 Nos.
At present the ACWP 1C and2C have served
more than 25 years and the efficiency of the
pumps are found very low when compared
with design efficiency . Further the ‘Jothi’
make motor is design obsolete and rewound
motors with lesser efficiency are running in
above pumps. To improve the performance of
the Auxiliary cooling water system it is
necessary to replace the above pumps with
Motors.
1.80 Proposal to be
submitted
As per PCRA study
report, tests
conducted on the
ACWP 1C & 2C,
pump efficiency
found very lower
than design
efficiency. Further
the ‘Jothi’ make
motor is design
obsolete and
rewound motors
with lesser efficiency
are running in above
pumps. The payback
period of investment
cost for replacing
pump with motor
will be around
approximately 7
years by increasing
the rated flow and
pressure and
efficiency.
1.80 1.80
- - 1.80 - - 1.80
36 1 No of 3,800
m3/Hr.
Capacity
vertical Raw
water pump
complete
assembly
without
motor for
RWP
No: 1
1 No of 3,800 m3/Hr. Capacity
vertical Raw water pump
complete assembly without
motor for RWP No:1
At present the RWP No: 1 has served more
than 25 years and the efficiency of the pumps
are found very low when compared with
design efficiency as PCRA study report. To
improve the performance of the raw water
system, it is necessary to replace the above
pumps.
1.70 Proposal to be
submitted
As per PCRA study
report, tests
conducted on the
Raw water pumps
efficiency of RWP
No:1 found very
lower than design
efficiency. The
payback period of
investment cost for
replacing pump
without motor will
be around
approximately 8
years by increasing
the rated flow and
pressure and
efficiency.
1.70 1.70
- - 1.70 - - 1.70
37 1 No. of 3,800 m3/Hr. Capacity
vertical Raw water pump
complete assembly without
motor for RWP No:3
At present the RWP No: 3 has served more
than 25 years and the efficiency of the pumps
are found very low when compared with
design efficiency . To improve the performance
of the raw water system, it is necessary to
replace the above pumps.
1.80 Proposal to be
submitted
RWP No:3 found
very lower than
design efficiency.
The payback period
of investment cost
for replacing pump
without motor will
be around
approximately 8
years by increasing
the rated flow and
pressure and
efficiency.
1.80 1.80
- - 1.80 - - 1.80
- - - - - - Civil Division II
Page 53
![Page 76: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/76.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalis
ation (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY
2016-17
FY 2017-
18
FY 2018-
19
FY
2016-17
FY
2017-18
FY 2018-
19
FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation
Details of Board
approval
Cost benefit
analysis
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
38 Providing concrete road from the Ash dyke
view point location to the primary pond
location over the lower ash dyke western bund
for a length of 1800 m at MTPS-I
3.00 Proposal to be
submitted
For easy plying of
Ash laden vehicles
in Ash dyke area.
3.77 3.77 0.00 0.00 0.00
- 3.00 - - 3.00 -
39 Construction of compound wall in Ash dyke
area
11.58 Proposal to be
submitted
For easy plying of
Ash laden vehicles
in Ash dyke area.
0.00 11.58 11.58 0.00 0.00
- 1.50 10.08 - 1.50 10.08
40 Providing concrete road from the existing
Bituminous road at the sounthern end of
Lower Ash Dyke western Bunds to the
Existing Concrete road in front of Dry slo in
Ash Dyke area(800m)
1.18 Per .CMD /
TANGEDCO
Proceedimg
No:525
(Technical
Branch)
DT:06.12.14
For safe guarding
the Boards property.
1.36 1.36 0.00 0.00 0.00
1.18 - - 1.18 - -
- - - - - -
- - - - - -
- - - - - -
41 RAILWAY TRACK WORKS:
Removing of existing wornout
rails, removing coal powder on
the track lines, providing PCC
mix providing of check rails in
Wagon Tippler 1 & 2 inhaul
side track lines upto point and
crossings and removing of
wornout and damaged CST 9
sleepers by new PSC sleepers
from level crossing, Road No:3,
4, 5 and other track lines and
from WT-I, II, III, IV level
crossing. (8 Nos. works)
The existing tracklines 30,000 mtr
(approximately) were erected during the
Commissioning of the plant (i.e. 1985 to1986).
Railway authorities insisted to erect the pre-
stressed concrete sleepers (PSC Sleepers)
instead of CST9 Sleepers. Now it is
programmed to Strengthen about 1000mtrs
trackline with PSC Sleepers during the year
2015-16 in phased manner.
2.62 CE's Power To Strengthen about
1000 mtrs trackline
with PSC Sleepers
during the year 2015-
16 in phased manner
so as to improve the
handling of coal.
2.62 2.62 0.00 0.00 0.00
- - - - - -
42 PSC sleepers for 52Kg. point &
crossings, Check rails for CMS
crossings, Fitting, Cast
Manganese steel crossing
1X81/2” for 52Kg. rails in PSC
sleepers, Tonque rails, Stock
rails, Grooved rubber sole plate,
PSC sleepers Drg No: T 2496,
Combination Metal liner, Elastic
Rail Clip, grooved rubber pad,
40mm ballast, Various sizes of
bolt and nuts, Point box for
broad gauge Railway track,
Fish plate bolt and nuts, Fish
plate for 52 Kg. rails and Check
rails for level crossings
In MTPS-I siding Railway tracklines for a
length of about 30kms are being maintained by
MTPS-I. In that, 67 Nos. point & crossings are
utilized for changing of wagons from one line
to another line. The Railway authorities are
insisting to strengthen the MTPS trackline with
PSC sleepers for the safe operation of
Locomotives and coal wagons. If gauge level
is not maintained, then it will leads to
derailment of wagons and Locomotives to
huge demurrage payable to Railways.
2.87 CE's Power To avoid the
demurrage charges.
2.87 2.87 0.00 0.00 0.00
- - - - - -
Regular
SE/MECHANICAL II
Coal Handling Plant-I
Page 54
![Page 77: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/77.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalis
ation (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY
2016-17
FY 2017-
18
FY 2018-
19
FY
2016-17
FY
2017-18
FY 2018-
19
FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation
Details of Board
approval
Cost benefit
analysis
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
43 a) Spares for Wagon Tippler I to
IV (17 items) b)Primary Crusher
spares and conveyor spares
Frequent outage of coal unloading
equipments is primarily due to worn out
condition of machine part and failure of the
components due to aging and prolonged
usage. Hence, replacement of worn out parts
and overhauling of the existing parts are
essentially required to be carried out to
increase the coal handling capability of the
conveyor system and to reduce the frequent
breakdown of components in conveyor system
and to undertake trouble free coal unloading
work in round the clock for another 10 years
and to meet out the coal feeding requirement
to both existing and new 600 MW unit.
15.04 Board's Power.
B.P. yet to be
issued
To avoid payment of
demurrage charges
to Railways.
8.79 8.79 6.25 6.25 0.00 0.00
- - 6.25 - - 6.25
44 RAILWAY TRACK WORKS:
Removing of existing wornout
rails, removing coal powder on
the track lines, providing PCC
mix providing of check rails in
Wagon Tippler 1 & 2 inhaul
side track lines upto point and
crossings and removing of
wornout and damaged CST 9
sleepers by new PSC sleepers
from level crossing, Road No:3,
4, 5 and other track lines and
from WT-I, II, III, IV level
crossing(21 Nos. works)
The existing tracklines 30,000 mtr
(approximately) are erected during the
Commissioning of the plant (i.e. 1985 to1986).
These rails are mounted on cast steel with tie
bar sleepers (CST9); These sleepers have
served for more than 25 Years and now it is
found worn-out condition, and gauge, level
could not maintained properly. If gauge, level
not maintained properly it leads to derailment
of locomotives and coal wagons. Also CST9
sleepers are outdated nowadays and Railway
authorities insisted to erect the pre-stressed
concrete sleepers (PSC Sleepers) instead of
CST9 Sleepers. Now it is programmed to
Strengthen about 1000 mtrstrackline with PSC
Sleepers during the year 2016-17 in phased
manner.
5.90 Proposal to be
submitted to the
Board
In compliance with
the Railways
instruction and to
avoid demurrage
charges.
5.90 5.90 0.00 0.00 0.00
- - - - - -
45 PSC sleepers for 52Kg. point &
crossings, Check rails for CMS
crossings, Fitting, Cast
Manganese steel crossing
1X81/2” for 52Kg. rails in PSC
sleepers, Tonque rails, Stock
rails, Grooved rubber sole plate,
PSC sleepers Drg No: T 2496,
Combination Metal liner, Elastic
Rail Clip, grooved rubber pad,
40mm ballast, Various sizes of
bolt and nuts, Point box for
broad gauge Railway track,
Fish plate bolt and nuts, Fish
plate for 52 Kg. rails and Check
rails for level crossings
In MTPS-I siding Railway tracklines for a
length of about 30kms are being maintained by
MTPS-I. In that, 67 Nos. point & crossings are
utilized for changing of wagons from one line
to another line. These point & crossings are
mounted on wooden/ steel sleepers layout
and these sleepers are erected during the
commissioning of the plant. Straight tracklines
are mounted on CST 9 sleeper which was
outdated nowadays. The Railway authorities
are insisting to strengthen the MTPS trackline
with PSC sleepers for the safe operation of
Locomotives and coal wagons. The
expenditure incurred by MTPS-I will be
proportionately shared between MTPS-I & II.
5.18 Proposal to be
submitted to the
Board
In compliance with
the Railways
instruction and to
avoid demurrage
charges.
5.18 5.18 0.00 0.00 0.00
- - - - - -
Page 55
![Page 78: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/78.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalis
ation (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY
2016-17
FY 2017-
18
FY 2018-
19
FY
2016-17
FY
2017-18
FY 2018-
19
FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation
Details of Board
approval
Cost benefit
analysis
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
46 Repowering of Locomotive
Sl.No:3 including replacement
of all electrical wiring changing
modified torque arm, all valves
replacement, radiator water line
replacement (changing of flex
master coupling) and rebuild of
cabin hood.
The existing locomotive Sl.No:3 SAN
Locomotive have served for more than 23
years and crossed double the life period (as
per BP NO:26,2058, the life of locomotive is 10
years or 16,00 Hours.). The locomotive is
running with heavy vibration and not utilized
for its full capacity. The SAN Locomotives
company recommended for repowering of
locomotive to improve the capacity of
locomotive. If the locomotive repowering is
carried out thro the original manufacture,
M/s. SAN, Bangalore, the life of locomotive
can be extended for another 10 years. The total
cost of new locomotive is 300 lakhs. The cost of
repowering for one locomotive is only 150
lakhs which is advantages to the board.
0.80 Proposal to be
submitted to the
Board
For speedy
unloading of coal
from the wagon
tippler so as to avoid
the demurrage
charges.
0.80 0.80 0.00 0.00 0.00
- - - - - -
47 Supply and erection of Rail
table assembly Wagon
tippler I & II.
The rail table assembly fitted with Wagon
Tippler should be enough to withstand the
impact load caused during shunting of coal
wagons and unloading of coal wagons. The
rail table assemblies in Wagon tippler I & II
are in bend and wornout condition due to
hitting of loaded coal wagons during tipped
position and prolonged usage since its erection
in 1987. Due to wornout condition of this rail
tale assembly, the pivot locking gear and top
stop locking were failed frequently causing
damages to Wagon Tippler parts and
derailment of railway wagons. Hence the
wornout rail table assembly is required to be
replaced for trouble free and safe round the
clock coal unloading.
1.30 Proposal to be
submitted to the
Board
The rail table
assembly fitted with
Wagon Tippler
should be enough to
with stand the
impact load caused
during shunting of
coal wagons and
unloading of coal
wagons. The rail
table assemblies in
Wagon tippler I & II
are in bend and
wornout condition
due to hitting of
loaded coal wagons
during tipped
position and
prolonged usage
since its erection in
1987. Due to
wornout condition of
this rail tale
assembly the pivot
locking gear and top
stop locking were
failed frequently
causing damages to
Wagon Tippler parts
and derailment of
railway wagons.
1.30 1.30 0.00 0.00 0.00
- - - - - -
Page 56
![Page 79: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/79.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalis
ation (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY
2016-17
FY 2017-
18
FY 2018-
19
FY
2016-17
FY
2017-18
FY 2018-
19
FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation
Details of Board
approval
Cost benefit
analysis
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
48 Primary Crusher spares and
conveyor spares ( 7 Nos.)
These spares are required for emergency
replacement in the event of failure of Primary
Crusher A&B. These spares are not available in
the event of any failure of PCR A&B. hence it
is essentially required for keep as spare for
PCR A&B.
2.39 Proposal to be
submitted to the
Board
These spares are
required for
emergency
replacement in the
event of failure of
Primary Crusher
A&B. These spares
are not available in
the event of any
failure of PCR A&B.
Hence, it is
essentially required
to keep as spare for
PCR A&B.
2.39 2.39 0.00 0.00 0.00
- 2.39 - - 2.39 -
49 Provision of spare IMS & SMS In CHP-I, 2 Nos. Suspension Electro magnetic
separators (SMS) and 4 Nos. Inline Electro
magnetic separators (IMS) are in service in
Conveyor 7A, 7B, 8A1 & 8B1 from the period
of commissioning of CHP-I for continuous
separation of ferrous items, from large volume
of coal carried through conveyor belts. These
SMS & IMS have served more than 25 years
and its effectiveness got reduced. These SMS
are continuously working in dust prone areas.
Due to frequent failure of SMS & IMS, foreign
materials are entering into coal mills causing
damage to mill internals and bearings which
in turn leads to forced mill outages and causes
heavy generation loss. .
1.00 Proposal to be
submitted to the
Board
To avoid damages to
the conveyor belt
and mills due to the
presence of iron rods
and stones in the
coal. This will
improve the life of
the belt and mills.
1.00 1.00 0.00 0.00 0.00
- 1.00 - - 1.00 -
50 Supply and erection of 30 Ton
EOT crane in Loco shed.
In CHP-I loco shed EOT crane capacity 10 ton
have served more than 29 years from the date
of commissioning. The EOT crane is not
effectively in use for carrying out locomotive
maintenance and repair work. It is used for
locomotive under chasing work of wheel
bearings replacement, traction motor, final
drive replacement and repairing work. Each
and every time, loco is to sent to repair bay II
EOT crane of 125 T capacity for separating the
bogie and locomotive top. The locomotive
capacity of BHEL locomotive is 80 tons & SAN
loco 60 Tons capacity. If any overhauling work
in the turbine area, the 125 T TG floor crane
not available to carry out loco work. Hence in
order to repair the loco in the loco shed the
crane capacity has to be raised to 30 tons.
1.00 Proposal to be
submitted to the
Board
For speedy
repairing of
locomotives and put
into service
immediately so as to
avoid demurrage
charges.
1.00 1.00 0.00 0.00 0.00
- - - - - -
Page 57
![Page 80: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/80.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalis
ation (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY
2016-17
FY 2017-
18
FY 2018-
19
FY
2016-17
FY
2017-18
FY 2018-
19
FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation
Details of Board
approval
Cost benefit
analysis
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
51 Design, supply,erection testing
and commissioning of
motorized multi point
lubrication systems for wagon
tippler and apron feeder (8
units).
The multipoint lubrication system of wagon
tippler and apron feeders erected by
M/s.Elecon Engg. Co. Ltd Gujarat got wornout
due to long usages. To product the
components and improve the life of wagon
tippler and apron feeders and to avoid major
breakdown, the new multipoint lubrication
with new improved version has been erected
so as to supply the coal to bunkers for
uninterrupted power generation.
2.00 Proposal to be
submitted to the
Board
To avoid demurrage
charges.
2.00 2.00 0.00 0.00 0.00
- - - - - -
- - - - - -
52 Design, supply, site
modification erection and
commissioning of side arm
charger for Wagon Tippler 4
and 1
The side arm charger is used to shunt the coal
wagons to place the wagons on wagon tippler
table for coal unloading at wagon tippler, and
shunting the wagons from wagon tippler table
to out haul side, without using locomotives.
Shunting the coal wagons accurately in the
above operation, the time required to place the
wagons will be reduced considerably and the
number tipping can be improved. The idle
time of wagon tippler during coal wagon batch
movement from load track lines to wagon
tippler inhaul can be avoided.
30.00 Techno
commercial offer
requested from
firms. Offer yet
to received.
Proposal will be
prepared and
submitted after
field study and
submission of
Techno
commercial
offer.
To reduce the
locomotive operating
expenditure and
avoiding wagon
tippler idle time, and
to ensure
uninterrupted coal
unloading, more
number of coal
wagons with
economical
operation of
locomotives.
0.00 15.00 30.00 15.00
- - - - - -
- - - - - -
- - - - - -
COAL HANDLING PLANT Division II - works
REGULAR
Renovation & Modernization
Page 58
![Page 81: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/81.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalis
ation (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY
2016-17
FY 2017-
18
FY 2018-
19
FY
2016-17
FY
2017-18
FY 2018-
19
FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation
Details of Board
approval
Cost benefit
analysis
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
53 MTPS-I-CHP-II- Supply of 1No.
bucket wheel gear box Make
:DORSTENER, Model : AKVP
75/320, Shaft mounted, Ratio -
1:175.26, Oil capacity – 120
Litrs.
Two Nos. SCR machines are in service at
MTPS-I from 1987. These machines are used
for coal stacking in coal yard and reclaiming
the same for feeding to Unit bunkers these
machines have served more than 26 years due
to prolong usage for more than 26 years
frequent trouble in the gear box have occuring.
SCR machines for reclaiming the stacked coal
for maintaining the bunker levels of all 4 x 210
MW Units. The both gear box in SCR
machines have served for more than 26 years it
is customary to have one no. gear box to keep
as a spare for replacement during emergency.
2.09 (Per.)
CMD/TANGED
CO Proceedings
No.419,
dt.18.09.14
The bucket wheel
gear box is required
for one to one
replacement in SCR
machine-I & II
inorder to reduce the
down time of SCR
machines .
2.09 2.09
- 2.09 - - 2.09 -
54 Replacement of existing relay
logic panel by PLC system in
MCC-I SWGR of CHP-II
division.
The existing Relay Logic Control systems have
became obsolete and are outdated as on date.
This may end up with difficulty to find out
when the problem actually occurred or to trace
the malfunctioning at the particular field
location. In order to overcome these
difficulties, it is proposed to implement the
modernized Programmable Logic Control
systems with SCADA and operation station for
Coal Handling plant. The Programmable Logic
Control system will provide the operator with
the ability to perform all the control functions
from the operating station and control desk.
5.64 (Per.)
CMD/TANGED
CO Proceedings
No.433,
dt.05.10.15
Tender yet to be
floated
The system will
provide the facilities
for log reports,
system self
diagnostics, process
of engineering
analysis, process
modeling, trouble
shooting and include
advance controls in
future. The auxiliary
power consumption
will be reduced, due
to the usage of
minimum number of
contactors.
5.64 5.64
- 5.64 - - 5.64 -
55 Supply, erection testing and
commissioning of IMS complete
set without control and power
panel–2 Nos
In coal handling plant-II, four numbers of
Inline Magnetic Separators (IMS) 3A, 3B, 4A
and 4B are being utilized in the conveyors
10A, 10B, 15A and 15B respectively in Junction
Tower 2 (3A & 3B) and Transfer Tower 1B( 4A
& 4B).
The Inline Magnetic Separators have served
more than 25 years. Due to prolonged usage,
aging and normal wear & tear the performance
of the IMS found very low and in decreasing
trend. Hence it is very much essential to
replace the existing ineffective IMS – 2 Nos.
with new one to ensure the trouble free &
continuous operation
1.00 Proposal under
preparation
The Inline Magnetic
Separators are very
much essential to
remove the ferrous
materials from the
coal if any.
Otherwise, ferrous
materials will be fed
to unit bunkers
along with coal,
causing damage to
the bowl mill
resulting in outage
of the coal mill and
hence loss of unit
generation.
1.00 1.00
- - - - - -
Page 59
![Page 82: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/82.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalis
ation (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY
2016-17
FY 2017-
18
FY 2018-
19
FY
2016-17
FY
2017-18
FY 2018-
19
FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation
Details of Board
approval
Cost benefit
analysis
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
56 Replacement of wornout
slewing ring in SCR machines
and other allied works etc.,
The SCR machines are erected and
commissioned during the year 1988 and had
served more than 26 years. Further it is
evident that if any failure occur in slew
bearing ring of SCR machine, it would affect
normal operation of machine besides the coal
feeding to unit. Therefore it is proposed to
renew the slewing ring available at Central
stores in SCR machine–I / II as and when
required.
2.00 Proposal under
preparation
The slew ring
bearing plays and
important role in
distributing and
with standing
inordinate load
during reclaiming of
coal and therefore
the availability of the
machines through
out the year have to
be constantly
monitored.
2.00 2.00 0.00
- - - - - -
- - - - - -
57 Supply, erection and
commissioning of Hydraulic
brake in Travelling Trippers in
conveyor 11A / 11B - 2 Nos.
The Travelling Tripper in conveyor 11A /11B
are equipped with electro magnetic brake and
hence while operation if any problem occurs, it
will not stop immediately. Due to the weight
of the coal in the discharge chutes it leads to
move forward. To avoid such problem it is
proposed to install hydraulic brake in the
Travelling Tripper 11A/11B in a phased
manner to ensure trouble free operation of
travelling tripper.
1.60 Proposal under
preparation
To ensure trouble
free operation of coal
handling.
1.6 1.6 0.00
- - - - - -
58 Slew gear box for SCR
machines – 1 No.
There are 4 Nos of slew gear box in service at
SCR Machines from the commissioning period,
at present there is no spare available for
gearbox. Hence, 1 No gearbox is
required to meet out emergency replacement
in order to reduce the down time period of
SCR machines.
2.00 Proposal under
preparation
To ensure trouble
free operation of coal
handling.
2.00 2.00
- 2.00 - - 2.00 -
II. - - - - - -
59 Pull chord status mointoring
system with wire less
transmitter and all other
accessories
At present great difficulties are being
experienced to identfy the operated pull chord
switches and lot of time is being consumed to
reset the switches operated, since the location
staff have to go around both sides of conveyor
systems to identify the operated pull chord
switches. Practically much hardships are
being experienced and hence to avoid these
diffculties and reduce the down time of
conveyor systems it is essential to provide
pullchord status indications in MCC-I through
wireless type.
2.00 Proposal to be
submitted for
approval of
Board
Downtime of the
conveyor system is
reduced .
2.00 2.00
- 2.00 - - 2.00 -
Renovation & Modernization
MATERIALS
Page 60
![Page 83: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/83.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalis
ation (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY
2016-17
FY 2017-
18
FY 2018-
19
FY
2016-17
FY
2017-18
FY 2018-
19
FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation
Details of Board
approval
Cost benefit
analysis
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
60 Supply, erection and
commissioning of DXT bag
filter in M-I sub division - 10
Nos.
Due to prolonged usage for more than 25 years
these dust extraction systems became
ineffective and the ambient air quality in CHP-
I&II working area are beyond the norms
stipulated by pollution control board. The
vibration is very high in the dust extraction
blower due to worn out of impeller, and
imbalance in dynamic balancing. Hence the
bearings used in the drive shaft has failed and
the drive shaft became bend. This problems
creating hardship in running the dust
extraction system continuously.Due to this the
entire working area of CHP-I&II has been
polluted and whole area became dusty. Hence
neat working atmosphere could not be
maintained.
4.00 Proposal under
preparation
The dust extraction
system fitted in the
main stream
conveyors are used
to extract coal dust
emanated from the
coal transfer chutes
which are situated in
elevated area,
required to be
operated
continuously
without fail to
minimize the dust
density. In order to
comply with the
norms prescribed by
the TNPCB, it is
proposed to go for
bag filter in the DEs
system.
4.00 4.00
- 4.00 - - 4.00 -
61 Supply, erection and
commissioning of 1 No. BFD in
JT-2
It is proposed to install an interconnection belt
feeder before con 10A&10B at the discharge
chute of con 9A & 9B wherein there will be an
additional flexibility of interchangeability of
conveyor streams if any problem is
experienced in con.10A&10B apart from
minimizing the damage caused to the
discharge chute of con.9A&9B, idlers, skirt
board assembly in con. 10A & 10B due to the
high impact load and hence will improve the
system availability and reduce coal powder
accumulation in con.10A&10B tail end area.
Also the OEM M/s.ELECON ENGG CO LTD
Vide their letter Ref.No: CB: SD: MTPS: 08-09:
1415 dt.10-09-08 had recommended
interconnection of conveyors in Stream A to
Stream B and removal of sampling unit in JT 2.
4.00 Proposal under
preparation
The cost benefit /
pay back period
cannot be evolved as
this is a component
that forms a part of
the coal conveying
system, which does
the regular operation
of conveying coal to
the bunkers.
4.00 4.00
- - - - - -
62 Supply, erection, testing and
commissioning of VVVF Drive
system for all LT motors of coal
handling plant
It is proposed to provide variable voltage
variable frequency drive for all LT motors of
coal handling plant to reduce the consumption
of auxiliary power. (under PAT scheme)
4.00 Proposal under
preparation
Provision of
variable voltage
variable frequency
drive for all LT
motors of coal
handling plant to
reduce the
consumption of
auxiliary power
under PAT scheme.
4.00 4.00 0.00
- - - - - -
Page 61
![Page 84: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/84.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalis
ation (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY
2016-17
FY 2017-
18
FY 2018-
19
FY
2016-17
FY
2017-18
FY 2018-
19
FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation
Details of Board
approval
Cost benefit
analysis
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
63 Supply, erection, testing and
commissioning of VVVF Drive
system for all HT motors of coal
handling plant
It is proposed to provide variable voltage
variable frequency drive for all HT motors of
coal handling plant to reduce the consumption
of auxiliary power. (under PAT scheme)
6.00 Proposal under
preparation
Provision of
variable voltage
variable frequency
drive for all HT
motors of coal
handling plant to
reduce the
consumption of
auxiliary power
under PAT scheme.
6.00 6.00 0.00
- - - - - -
64 Supply, erection and
commissioning of coal sampling
unit in conveyor 9A & 9B
The existing coal sampling unit at JT-2, which
is not in service will be dismantled to carryout
the improvement work of interconnection belt
feeder system. As per IS 436 (Part-I / Section –
I) – 1964 The coal sampling unit for coal
sampling and analysis will be erected in
conveyor 9A & 9B.
2.50 Proposal under
preparation
The existing coal
sampling unit at JT-
2, which is not in
service will be
dismantled to
carryout the
improvement work
of interconnection
belt feeder system.
As per IS 436 (Part-I
/ Section – I) – 1964
The coal sampling
unit for coal
sampling and
analysis will be
erected in conveyor
9A & 9B.
2.50 2.50 0.00
- 2.50 - - 2.50 -
DIVISION -
III- - - - - -
65 Supply, erection, testing &
commissioning of scrapper
feeder assembly complete set
for Bottom Ash Hopper, Stage-I
&II, Qty : 2 nos.
The existing scrapper feeder has served more
than 25 years in corrosive & erosive area at
Bottom Ash Hopper location. The structure
and parts of the scrapper feeders have got
severely damaged and could not be
reconditioned further. Hence, it has been
decided to replace the SFs in a phased manner.
Accordingly for the year 2015-16, 2 nos. SF are
to be replaced in Stage-I & II
2.00 1) (Per.) CMD /
TANGEDCO
Proc. No. 271, dt.
01.07.15 2) (Per.)
CMD /
TANGEDCO
Proc. No. 334, dt.
04.08.15
The cost benefit /
pay back period
cannot be evolved as
this is a equipment
for the safe disposal
of the hot ash as
slurry at the Bottom
Ash Hopper
2.00 2.00
- - - - - -
66 Supply of Cast basalt pipes
from AHPH, Stage-I & II to XY
column inclusive of all
accessories such as flanges,
bends, bolt & nuts, gaskets,
sleeve couplings and other tools
& plants, etc.
Qty - 1100 mtr.
The Ash slurry pipe line streams from AHPH,
Stage-I & II to XY column to a length of 1100
mtr M.S.ERW Pipe lines in service which is
located in hilly terrain area. Now, it is decided
to replace the MS ERW Pipes by Cast basalt
pipes to get better life to reduce the failures in
that area. In this reach the ash slurry pipe lines
are located very nearer to the switch yard area
of 1x600 MW (MTPS-II/ Stage-III). In case of
any puncture or leakage occurs in this area, the
ash slurry water directly affects the above area.
In order to avoid this, it is decided to replace
‘U’ column to ‘XY’ column and AHPH, Stage-I
& II to B1 bend location by Cast basalt pipes
4.00 Proposal under
preparation
The Ash slurry pipe
line streams from
AHPH, Stage-I & II
to XY column to a
length of 1100 mtr
M.S.ERW Pipe lines
in service which is
located in hilly
terrain area. Now, it
is decided to replace
the MS ERW Pipes
by Cast basalt pipes
to get better life to
reduce the failures in
that area
0.00 1.00 0.00 2.00 4.00 1.00
- - - - - -
OIL &AHS
Page 62
![Page 85: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/85.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalis
ation (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY
2016-17
FY 2017-
18
FY 2018-
19
FY
2016-17
FY
2017-18
FY 2018-
19
FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation
Details of Board
approval
Cost benefit
analysis
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
67 Mixing Apparatus with
accessories
(i) Mettalic bellows
(ii) HP nozzles
(iii) Distance pieces with poking
hole & flanges
(iv) Fixing fasteners
(v) Gaskets & Gland ropes
(vi) 40 NB Valves
of capacity 10 ton/ hr. for ESP
hoppers of Units I to IV
Qty – 40 nos.
ESP Hopper - Qty. in service
10 ton/hr = 24 nos./Unit x 4 Units = 96 nos.
5 ton/hr.= 24 nos./Unit x 4 Units = 96 nos.
There are 96 nos. 10 ton / hr. capacity Mixing
Apparatus available in ESP Hoppers in Unit-I
to IV since 1994. As the inner sides of these
Mixing Apparatus are completely immersed in
the hot ash slurry, they have got worn-out and
punctured frequently due to normal wear &
tear and the same being reconditioned and
reused. At present, Mixing Apparatus in the
first & second rows of Unit I to IV ESP
Hoppers (where the ash collection is more) are
in thinned-out and beyond repairable
condition as they are subjected to continuous
highly abrasive ash slurry environment.
Hence, it is decided to replace the existing
damaged / thinned-out Mixing Apparatus by
new one in phased manner.
2.40 Proposal under
preparation
The material of
construction is
changed from MS to
SS 304 to avoid
frequent
reconditioning
works and to reduce
the down time if
any.
2.40 2.40
- 2.40 - - 2.40 -
68 Supply, erection, testing and
commissioning of scrapper
feeder assembly complete set
for Bottom Ash Hopper, Stage-I
& II
Qty - 4 nos.
The existing scrapper feeder has served more
than 25 years in corrosive & erosive area at
Bottom Ash Hopper location. The structure
and parts of the scrapper feeders have got
severely damaged and could not be
reconditioned further. Hence, it has been
decided to replace the SFs in phased manner.
Accordingly for the year 2016-17, 4 nos. SF are
proposed to be replaced in Stage-I & II.
4.50 Proposal under
preparation
The cost benefit /
pay back period
cannot be evolved as
this is a equipment
for the safe disposal
of the hot ash as
slurry at the Bottom
Ash Hopper
0.00 2.25 4.50 2.25
- - - - - -
- - - - - - RENOVATION & MODERNISATION
Page 63
![Page 86: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/86.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalis
ation (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY
2016-17
FY 2017-
18
FY 2018-
19
FY
2016-17
FY
2017-18
FY 2018-
19
FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation
Details of Board
approval
Cost benefit
analysis
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
69 Revamping of existing PDFAC
System consisting of Conveying
Air Compressors, Inst. Air
Compressors, PLC System, Ash
Conveying Vessels, all
associated valves such as Dome
valves, Dome valve seals,
Switch valves, Switch valve
seals, Pipe in pipe arrangement
for Ash conveying pipe lines
and their supporting structures,
flushing water liners and
related valves in ESP in Unit-I
to IV for Rs. 5 CRS. x 4 Units =
Rs. 20CRS.
Silo allotted Cement Companies M/s Ultratech
Cement Ltd, M/s ACCL, M/s MCL & M/s
CCCL have erected / existing PDFAC System
of Unit - I to IV during 2002–03 as per the
MoU. MoU in respect of Unit III & IV has
already been terminated. Similarly MoU of
Unit I & II are likely to be terminated. On
termination of MoU, PDFACS have to be
maintained by TANGEDCO.
These PDFACS have served 12 years already.
These system handle the abrasive nature of dry
fly ash. These system have been in continuous
service since its commissioning. Hence erosion
and corrosion is more in these equipments due
to normal wear and tear. Hence R&M of
PDFACS is essentially required to improve the
ash collection & ambient air quality & revenue
to the TANGEDCO.
20.00 Proposal under
preparation
On expiry of the
MoU between
TANGEDCO &
Cement Companies,
the existing PDFAC
systems have to be
maintained by
TANGEDCO.
In this juncture, it is
proposed to carryout
the revamping of
PDFAC System since
the existing PDFAC
system has served
beyond the life
period. The
equipments are
conveying abrasive
nature dry fly ash
continuously
throughout the year.
Also due to aging,
erosion and
corrosion and hot
ash & ash slurry
atmosphere most of
the equipments are
getting frequently
worn-out and also
getting frequent
failures. Hence
0.00 5.00 20.00 15.00
- - 10.00 - - -
70 Supply, Erection, testing and
commissioning of PDFACS
system (additional compressor,
ash conveying pipe lines,
pneumatic pipe lines, ash
conveying pressure vessels and
its related pneumatic
equipments & modification of
PLC system programme, etc.)
and down-comers like mixing
apparatus, distance pieces,
bellows, pipe lines, etc. for the
additional fields proposed to be
installed in ESP
In order to reduce the emission in the flue gas
as per the Pollution Control norms, the
renovation & modification work is proposed to
be carried out by Boiler Maintenance division
by increasing the additional ESP fields. This
provision is made for providing PDFACS
System for evacuating the ash from the
additional fields.
6.00 Proposal under
preparation
In order to reduce
the emission in the
flue gas as per the
Pollution Control
norms
6.00 6.00
- - - - - -
- - - - - -
- - - - - -
SE/ELECTRICAL SYSTEM
C&I
Page 64
![Page 87: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/87.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalis
ation (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY
2016-17
FY 2017-
18
FY 2018-
19
FY
2016-17
FY
2017-18
FY 2018-
19
FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation
Details of Board
approval
Cost benefit
analysis
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
71 R&M Replacement of existing Eddy
current clutch drive into
Various frequency Drive at
R.C.Feeders in Unit 1 & 2.
There are 12 Nos R.C. Feeders with eddy
current clutch drive to feed the coal to
pulveriser in Unit 1 & 2. Present system is in
service from the date of commissioning of the
units. (Unit-1- 07.01.1987 & Unit 2 -01.12.1987).
Now the feeders are running in volumetric
mode only. If the feeders are changed to
gravimetric mode accurate weighing will be
achieved. At present due to obsolescence of
electronic modules the gravimetric mode could
not be attained. Also the present eddy current
clutch drive involves more components like
eddy current clutch, Tacho generator are
complex in nature. The physical size of the
motor is very high when comparing the VFD
motor. If the eddy current drives are modified
to VFD the energy consumption will be very
less. Due to on line calibration the calibration
time is very less.
9.16 Proposal
submitted.
Cost of running a
7.5HP motor full
speed for 20hours
per day for 300
days.= Rs.1,92,020.40
per year.Cost of
running a VFD Drive
Motor is Rs.
48,389.14 per year.
Savings of Rs.
1,43,631.26 per year
per feeder.
9.16 9.16
- - - - - -
72 R&M Replacement of existing Eddy
current clutch drive into
Various frequency Drive at
R.C.Feeders in Unit 3 & 4.
There are 12 Nos R.C. Feeders with eddy
current clutch drive to feed the coal to
pulveriser in Unit 3 & 4. Present system is in
service from the date of commissioning of the
units. (Unit-3- 22.03.1989 & Unit-4 -27.03.1990)
Now the feeders are running in volumetric
mode only. If the feeders are changed to
gravimetric mode accurate weighing will be
achieved. At present due to obsolescence of
electronic modules the gravimetric mode could
not be attained. Also the present eddy current
clutch drive involves more components like
eddy current clutch, Tacho generator are
complex in nature. The physical size of the
motor is very high when comparing the VFD
motor. If the eddy current drives are modified
to VFD the energy consumption will be very
less. Due to on line calibration the calibration
time is very less.
10.00 Proposal
submitted.
Cost of running a
7.5HP motor full
speed for 20hours
per day for 300
days.= Rs.1,92,020.40
per year.Cost of
running a VFD Drive
Motor is Rs.
48,389.14 per year.
Savings of Rs.
1,43,631.26 per year
per feeder.
10.00 10.00
- - - - - -
Page 65
![Page 88: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/88.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalis
ation (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY
2016-17
FY 2017-
18
FY 2018-
19
FY
2016-17
FY
2017-18
FY 2018-
19
FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation
Details of Board
approval
Cost benefit
analysis
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
73 R&M Upgradation of existing Tata
Honeywell make GUS based
system to Experion based DCS
system and renovation &
integration of Turbovisory
System, Turbine protection,
HP/LP bypass system,
Vibration system and
Annunciation system by add on
controller and I/O cards in the
upgraded system on
proprietary basis in Unit-II of
MTPS-1
In unit-II, the existing TPS DCS system was
supplied by M/s Tata Honeywell Automation
India limited, Pune and commissioned during
2003. In Unit II, Turbovisory system, Turbine
Protection, HP/LP bypass system , Vibration
system and Annunciation system were
supplied by M/s Philips, M/s. BHEL and
M/s CML. These systems are in service since
1987.Now OEM M/s.BHEL and M/s Philips
stopped manufacturing of these types of
electronic cards and more over these cards are
not available in open market. The
manufacturer is not ready to repair any of the
defective electronic cards, due to technology
advancement and non availability of spares.it
is important that the existing deteriorated
system has to be replaced necessarily and
immediately.
7.74 Board's approval
to be obtained.
Cost of investment
for the renovation
can be realized by
avoiding the
tripping of the unit
for one time, due to
mal function of
existing Turbovisory
and Turbine
protection system.
Approximate loss
due to shutdown
for1.5 days
(cost of realization
per unit is Rs.
5.65)=5.04 Million
Units x 1.5 days x Rs.
5.65 = Rs 4.27 Crs..
7.74 7.74
- 7.74 - - 7.74 -
74 R&M Renovation & Modernization of
Unit –II Furnace Safeguard and
Supervisory System into new
distributed control system in
Unit II Mettur thermal Power
station-1.Supply , Installation,
Commissioning of hardware
and software Materials for new
DCS which includes
FSSS,PRDS and SADC System.
2) Supply , Installation,
Commissioning of Flame
scanners system.
In Unit II, the existing FSSS, PRDS, SADC, and
SCANNERS systems were supplied and
commissioned by M/s. BHEL during
1987.These systems have served more than 25
years. It has become aged and obsolete. he
frequency of failure of electronic cards now
has increased & unexpected failure of these
cards may take place in future which may
cause GENERATION loss. Hence it is
important that the existing deteriorated system
has to be replaced necessarily and
immediately. Due to technological
advancement it is economical to have FSSS,
PRDS, SCANNER, SOOTBLOWING
CONTROLS, ERV & SADC system in a single
system.
7.68 Approved.
TANGEDCO
Proceedings No:
432 dt
27.09.2014.
Cost of investment
for the renovation
can be realized by
avoiding the
tripping of the unit
for one time, due to
mal function of
existing FSS
System.Approximate
loss due to
shutdown for1.5
days
(cost of realization
per unit is Rs.
5.65)=5.04 Million
Units x 1.5 days xRs.
5.65 = Rs 4.27Crs..
7.68 7.68
- 7.68 - - 7.68 -
Page 66
![Page 89: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/89.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalis
ation (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY
2016-17
FY 2017-
18
FY 2018-
19
FY
2016-17
FY
2017-18
FY 2018-
19
FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation
Details of Board
approval
Cost benefit
analysis
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
75 R&M Supply, Erection, Testing and
Commissioning of Integration
of Turbine Supervisory
Instrumentation and Vibration
monitoring system into DCS
system by Replacing the
existing Philips make Turbine
Supervisory system & VMS
System for Unit-I.
The existing Philips make Turbine supervisory
Instrument System (Sl.No:1) and Vibration
Monitoring System (Sl.No:2&3) was
commissioned in Unit-I during 1987.These
electronic modules in the above system have
served more than its life period. . The OEM
M/s PHILIPHS (system A& B) & M/s CML
(system C) have stopped manufacturing these
modules and the company M/s PHILIPHS
Electronics itself does not exist now. Hence
spare modules could not be procured and the
failed modules also could not be repaired.
Without this system the Turbine cannot be put
into service. Hence it is important that the
existing detoriated system has to be replaced
necessarily and immediately.
It is proposed to completely revamp the
complete Turbo supervisory instrumentation
system and VMS system
1.54 Approval of
Board is
Awaited
Cost of investment
for the renovation
can be realized by
avoiding the
tripping of unit for
one time, due to
malfunction of
existing Turbovisory
and Turbine
protection system.
(i.e.) If unit trips due
to malfunction, it
may require 1.5 days
to 2 days or more for
investigation, tracing
and rectification of
existing system.
Approximate loss
due to shut down for
1.5 days at
Rs.5.65/per unit =
5.04 MU× 1.5 days ×
Rs.5.65 =Rs.4.27 Crs.
1.54 1.54
- 1.54 - - 1.54 -
76 R&M Unit-III - Proposal for R&M of
C&I FSS system into new DCS
system.
1. FSS System has involved thousands of
different types of electronic cards. This system
has served more than 25 years. It has become
aged and obsolete. Due to ageing of the
system it has developed so many operational
problems 2. Now, M/s. BHEL stopped
manufacturing of these types of electronic
cards and more over these cards are not
available in open market. Even, M/s. BHEL is
not ready to repair any of the defective
electronic cards, due to non availability of
spares and technology advancement. 3. The
frequency of failure of electronic cards now
has increased & unexpected failure of these
cards may take place in future which may
cause generation loss. Hence, it is important
that the existing deteriorated system has to be
replaced necessarily and immediately.
8.00 Approval of
Board is
Awaited
Cost of investment
for the renovation
can be realized by
avoiding the
tripping of the unit
for one time, due to
mal function of
existing FSS
System.Approximate
loss due to
shutdown for1.5
days
(cost of realization
per unit is Rs.
5.65)=5.04 Million
Units x 1.5 days xRs.
5.65 = Rs 4.27Crs..
8.00 8.00
- - - - - -
Page 67
![Page 90: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/90.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalis
ation (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY
2016-17
FY 2017-
18
FY 2018-
19
FY
2016-17
FY
2017-18
FY 2018-
19
FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation
Details of Board
approval
Cost benefit
analysis
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
77 R&M Update/Upgrade of Server, C-
Net to computer
communication interface,
network, Workstation, MIS and
control system software of ABB
DCS system in Unit-1
M/s. ABB make Symphony Harmony DCS
system (Client-Server system of architecture)
was supplied and commissioned during 2007
in 210MW Unit-1 of MTPS-1. Existing Servers
and Engineering Work Stations (EWS) are
connected through SCSI interface and are
working with Windows Server 2003 (32 Bit) as
operating system.
Now, the SCSI interface and Windows Server
2003 Operating System are obsolete and not
available in open market.
Also latest available servers and OS
(Windows server 2008 or above) in open
market could not be interfaced with the
existing ABB DCS system. Hence, updation of
M/s. ABB make Symphony Harmony DCS
system is absolutely necessary.
1.00 Proposal yet to
be submitted.
Any failure occurs in
the existing system,
the restoration could
not be possible due
to the obsolescence
of SCSI interface and
Windows 2003
operating system.
Cost of investment
for the updation can
be realized by
avoiding the
tripping/ delay in
bringing back the
unit for one time.
Approximate loss
due to shutdown for
1.5 days
(cost of realization
per unit is Rs.
5.65)=5.04 Million
Units x 1.5 days xRs.
5.65 = Rs 4.27 Crs..
1.00 1.00
- - 1.00 - - 1.00
78 R&M Stage-II – Turbovisory
Renovation including HP/LP
Bypass system, Vibration &
Turbine Supervisory
Instrumentation.
In Unit III & IV Turbovisory including HP/LP
Bypass system, Vibration & Turbine
Supervisory Instrumentation were
commissioned during the year 1989-90 by
M/s. Philips and the original supplier is M/s.
BHEL. The Bypass system plays a vital role
during unit lightup and shutdown period. The
vibration system gives the healthiness of the
Turbine bearings. The Turbine supervisory
instruments includes the expansion of Turbine,
speed of turbine, Eccentricity, etc. which gives
the performance & protection of the Turbine.
Now, frequent problems occur in the above
system due to ageing. Hence, it is necessary to
renovate the above systems.
5.00 Approval of
Board is
Awaited
Cost of investment
for the renovation
can be realized by
avoiding the
tripping of the unit
for one time, due to
mal function of
existing Turbovisory
and Turbine
protection system.
Approximate loss
due to shutdown for
1.5 days
(cost of realization
per unit is Rs.
5.65)=5.04 Million
Units x 1.5 days xRs.
5.65 = Rs 4.27 Crs..
5.00 5.00
- - - - - -
Page 68
![Page 91: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/91.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalis
ation (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY
2016-17
FY 2017-
18
FY 2018-
19
FY
2016-17
FY
2017-18
FY 2018-
19
FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation
Details of Board
approval
Cost benefit
analysis
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
79 R&M Supply, testing and
commissioning of SOX/NOX
analyzer – 4 sets for unit-I to IV
of MTPS-1.
As per environmental norms, SOX/NOX
needs to be monitored and controlled
continuously. Online SOX/NOX monitors are
used for closely monitoring, giving feed back
and quantifying the contents of SOX and NOX
in the flue gas. Based on the feed back, the
quality of coal and corrective action such as
controlling the combustion and furnace
temperature and feeding better quality of coal
to the boilers from among available stock can
be taken. It is a statutory provisions as
insisted by TNPCB
1.18 Approved vide
CMD
(TANGEDCO)
Proceedings
No.512.
dt.10.12.13.
Indent No.65,
Dt.28.01.2015.
Online SOX/NOX
monitors are used
for closely
monitoring, giving
feed back and
quantifying the
contents of SOX and
NOX in the flue gas.
Only based on the
feed back, the
quality of coal and
corrective action
such as controlling
the combustion and
furnace temperature
and feeding better
quality of coal to the
boilers from among
available stock can
be taken. Hence the
provision of online
SOX/NOX monitors
are essential and is
inevitable and also
to meet the
requirement of
statutory provisions
as insisted by
TNPCB
1.18 1.18
- 1.18 - - 1.18 -
- - - - - - EM-I
Page 69
![Page 92: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/92.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalis
ation (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY
2016-17
FY 2017-
18
FY 2018-
19
FY
2016-17
FY
2017-18
FY 2018-
19
FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation
Details of Board
approval
Cost benefit
analysis
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
80 Regular Procurement of one number
Spare HV/LV Coils for AREVA
make Generator Transformer.
The vital spare coils have to be procured from
the OEM M/s.AREVA which is required
for Unit-4. There is no spare HV/LV Coils
available at MTPS-1 to meet out any
emergencies, which may causes huge
generation loss. Hence, it is proposed to
procure a spare coils to be kept as spare at
MTPS-1, to minimize the down time of
equipment and to avoid generation loss.
1.43 Board If there is a spare
HV /LV Coils for
Generating
transformer
maintained
minimum time
required for rection
and commissioning
will be 25 days only.
But the Original
manufacturers (
OEM) of Generating
ransformer required
minimum 24 months
time from the clear
P.O for design
manufacture &
supply of stator.
Generation loss per
day= 5.04MU x
Rs.5.0 =Rs.252 lakhs
(the above values
only Generation
loss excluding spares
cost). The
replacement cost is
meager while
comparing with
generation loss/Day.
This provision is
made to minimize
1.434 1.434
- - - - - -
Page 70
![Page 93: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/93.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalis
ation (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY
2016-17
FY 2017-
18
FY 2018-
19
FY
2016-17
FY
2017-18
FY 2018-
19
FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation
Details of Board
approval
Cost benefit
analysis
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
81 Regular Procurement of one number
Spare HV/LV Coils for BHEL
make Generator Transformer.
These vital spare coils have to be procured
from the OEM M/s. BHEL which are
required for new spare Generator
Transformer. There is no spare HV/LV Coils
available at MTPS-1 to meet out any
emergencies, which may causes huge
generation loss. Hence, it is proposed to
procure a spare coils to be kept as spare at
MTPS-1, to minimize the down time of
equipment and to avoid generation loss.
1.80 Board If there is a spare
HV /LV Coils for
Generating
Transformer
maintained
minimum time
required for rection
and commissioning
will be 25 days only.
But the Original
manufacturers(OEM
) of Generating
ransformer required
minimum 24 months
time from the clear
P.O for design
manufacture &
supply of stator.
Generation loss per
day= 5.04MU x
Rs.5.0 =Rs.252 lakhs
(the above values
only Generation
loss excluding spares
cost). The
replacement cost is
meager while
comparing with
generation loss/Day.
This provision is
made to minimize
1.796 1.796
- 1.80 - - 1.80 -
82 PAT Replacement of existing ABB
& “ALIND” make VCB panels
in 6.6KV 1A,1B, 2A,2B,C1 & C2
buses and RWPH 6.6KV Switch
Gear system in MTPS-I
The ALIND make breakers have served for
more than 25 years, frequent failures of
operating mechanism, vacuum interrupters
etc. arises due to aging and normal wear and
tear which required adequate quantity of
spares and necessary services from the
company. But it is reliably learnt that the
company M/s. ALIND is either sick or
discontinued manufacturing of this type of
6.6KV VCB panels now existing at MTPS.
Because of this, spares and service for the
breakers are not available from the company,
which results in loss of generation whenever
there is any abnormality in the breakers.
10.76 Board In the event of
failure of 1A, 1B,
2A2B,C1 & C2 buses,
Generation loss per
day= 5.04MU x
Rs.4.51 =Rs.225 lakhs
(the above values
only Generation loss
excluding spares
cost).
The replacement cost
is only 1000 lakhs.
The payback period
is 4 days (approx.) of
Generation / Unit.
10.76 10.76
- - - - - -
- - - - - - EM-II
Page 71
![Page 94: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/94.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalis
ation (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY
2016-17
FY 2017-
18
FY 2018-
19
FY
2016-17
FY
2017-18
FY 2018-
19
FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation
Details of Board
approval
Cost benefit
analysis
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
83 Regular Replacement of 30 Nos.
existing 230 KV SCT make
Current Transformers by new
proven make Current
Transformers at 230 KV switch
yard.
It is essential to replace the existing SCT
make CTs due to steep rising of TAN-DELTA
values within a short period which may cause
failure of CTs. If any mishap happens it will
lead to secondary damages to other electrical
equipments in the 230 KV Switch yard which
will affect the power generation of 4 X 210 MW
MTPS.I and stall the power evacuation & thus
resulting heavy loss to TANGEDCO. .It is
essential to replace the existing CTs having 40
KA / 3 seconds to 50 KA/ 3 seconds due to
increasing of fault level due to commissioning
of New generating station and substations in
the forthcoming years.
1.15 After getting
budget
approval, this
work will be
taken up
The work is essential
due to increase in
fault level.
1.50 1.50
- 1.15 - - 1.15 -
84 Regular Replacement of existing 48 Nos
of 40 KA 230 KV Current
Transformers by 50 KA / 3
seconds short time current
rating CTs in 16 No bays at 230
KV Switch yard.
It is essential to replace the existing CTs
having 40 KA / 3 seconds to
50 KA/ 3 seconds due to increasing of fault
level due to commissioning of New generating
station and substations in the forthcoming
years.
3.00 After getting
budget
approval, this
work will be
taken up
The work is essential
due to increase in
fault level.
1.50 3.00 1.50
- - - - - -
85 Regular Replacement of existing
‘ALIND’ Make 6.6 KV MOCB
Panels in Ash handling pump
house stage-I Switch gear
system by new vacuum circuit
breaker panels.
At AHPH Stage-I there are 17 Nos. ‘ALIND’
make MOCBs in service for more than 25
years. These types of breakers have become
obsolete and the spares are not available.
These breakers are for HT motors which are
used for disposal of Unit I & II Ash slurry
water from the ash slurry sump to ash dyke.
Failure of the existing system will lead to
tripping of two units of Stage-I.Hence, it is
very much essential to replace the existing 6.6
KV MOCB Panel by new version VCB Panels.
Cost of investment for the renovation can be
realized by avoiding the forced outages due to
the breakdown of existing old MOCB HT
Breakers because of non-availability of spares
3.00 After getting
budget
approval, this
work will be
taken up
The 6.6KV ALIND
make MOCB HT
switchgear panels at
AHPH-I, which were
erected &
commissioned in the
year 1987 has served
their life period of 25
years and hence
couldn’t be expected
to perform trouble
free operations for
the further years due
to the non-
availability of the
spares & services
from the company.
Due to the usage of
oils, frequent
occurrences of oil
spillages and leaks
warranted
shutdown/forced
outages of the
breakers which
needs almost
maintenances
attention to avoid
flashovers/loss of
generation.
1.50 3.00 1.50
- 1.50 1.50 - - 3.00
MRT - - - - - -
Page 72
![Page 95: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/95.jpg)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Capitalis
ation (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalis
ation (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
FY
2016-17
FY 2017-
18
FY 2018-
19
FY
2016-17
FY
2017-18
FY 2018-
19
FY 2018-19FY 2016-17 FY 2017-18 Capital Expenditure Capitalisation
Details of Board
approval
Cost benefit
analysis
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
86 R&M Replacement of the existing
Static version Generator
Protection Relay panel by latest
version of Numerical Generator
Protection Relay panel in Unit-
II & III.
In Unit-II & III of MTPS-I, the Static version
Generator Relay panels of version GSX5e
supplied by M/s.ABB Ltd, Vadodara during
the years 1987 and 1989 respectively, while
commissioning the units. The panels are in
service for more than 25 years. The Generator
Relay panel protects the 210 MW Generator,
250MVA Generator Transformer, 16MVA Unit
Auxiliary Transformers etc., M/s.ABB has
phased out the GSX5e model and it is not in
their manufacturing scope. The existing system
is functioning with old version of relays and
has become obsolete and requires urgent
refurbishment.
1.40 Administrative
approval
accorded vide
TANGEDCO
proceedings
(CMD) No.394
dated 05.09.14.
Any breakdown in
the existing
Generator Protection
Relay panel of Units-
II & III may lead to
tripping of
Generating units.
The loss of
generation due to
forced outage of one
210 MW for one day
is 5.04 million units.
Loss of revenue is
Rs.2.52 Crs. (5.04
million units @ Rs.5
per unit). The cost of
replacement of
existing Generator
protection Relay
panel is Rs.0.7 crore
for one generating
Unit. Hence the
payback period is
less than one day.
1.4 1.4 0.00 0.00 0.00
- 1.40 - - 1.40 -
87 R&M Provision of Integrated Energy
Management System (IEMS) in
MTPS-I with replacement of
existing 28 Nos 110V, 1Amps,
class 0.5 accuracy energy meters
of various make by new high
accuracy 110V, 1Amps, class 0.2
accuracy with Availability
Based Tariff (ABT) features
meters having necessary
communication ports suitable
for energy management system.
In MTPS-I, Static Trivector meters are there
with 110V, 1Amps class 0.5 Accuracy without
any communication between the meters or to
the existing LAN system. For higher accuracy,
existing meters have to be replaced by new
high accuracy meters of class 0.2 having
necessary communication ports suitable for
energy management system to analyze and to
take remedial action to reduce auxiliary
consumption.
2.80 Administrative
approval to be
obtained from
the competent
authority.
Cost of investment
for the Provision of
Integrated Energy
Management System
can be realized by
the way of analyzing
the auxiliary
consumption of all
the four units and in
turn reducing the
auxiliary power
consumption.
2.80 2.80
- - - - - -
454.48 217.61 233.83 127.67 136.90 109.20 83.75 17.74 101.27 65.59 3.08 113.77 57.75 Grand Total .................
NOTE:- The Capital works are to be done by Board's own fund.
Page 73
![Page 96: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/96.jpg)
Capitalisation
(Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisation
(Rs. Crore)
Capital
Expenditur
e (Rs.
Crore)
FY 2016-17FY 2017-
18FY 2018-19
FY 2016-
17
FY 2017-
18FY 2018-19
1 CAP/ Supply
Design, Engg, supply and erection of
new 1000 MT capacity silos and
compressor room, supply, erection,
testing & Commissioning of fly ash pipe
lines & structures from ESP-I, II & III to
new silos.
The existing silos are in worn out condition . To avoid
pollution and to increase the storage capacity of the silo
and to avoid wet sluicing of fly ash.
28.24Board already
approved
To meet the Pollution Control Board's
Norms.28.240 28.240 28.24 - - 28.24 - -
2 C&I/CAP SupplyProcurement of Microprocessor based
Gravimetric feeder system
Currently, the coal fed to boilers is measured in
volumetric mode. Gravimetric mode provides a more
accurate measurement of coal and better control over
coal feeding. Coal being the biggest input to the
thermal power process, accurate measurement shall
result in exact measurement of heat rate, used to
evaluate the station performance under PAT scheme.
3.00Proposal under
preparation
Gravimetric feeding system on
implementation will result in precise
measurement of the coal input to
boiler. Coal being the major cost
component in unit cost of generation,
accurate measurement will result in
exact calculation of heat rate and
assessment of generation cost.
3.000 3.000 3.00 - - 3.00 - -
3 C&I/CAP Supply
Up gradation of Analog based controls -
Iskamatic panels-EAST & ATRS etc., for
three 210 MW KWU Turbine control
systems
Several modules of existing Analog Based control
system of more than 30 years old technology have been
declared as obsolete by M/s.BHEL, EDN, Bangalore. In
case of failure of non available electronic module, the
unit will be in long shutdown for replacement.
Upgradation of this vital turbine control system to
latest Digital based Turbine Control System has to be
carried out for all the three units of NCTPS.
15.43
Board
App.No.483.
DT.06.11.2014
Unit trippings and turbine control
system disturbances due to failure of
aged and obsolete electronic modules
shall be eliminated. Estimated on the
disturbances that occurred due to
EAST system during the last three
years, the monetary savings in respect
of reduction of forced ouatges shall be
Rs.6 Crs. per annum. Saving on costly
spares procurement will be Rs.1 Crore
per annum
15.430 15.430 15.43 - - 15.43 - -
4 C&I/CAP Supply
Up gradation of Honeywell's TDC 3000
System in one 210 MW unit used for
controlling the 210 MW Unit process
systems & auxiliaries.
Several modules of existing Honeywell's TDC 3000
System have been declared as obsolete. More than 40%
of modules have been declared as obsolete. K2LCN
modules have been decalred as obsolete in the year of
2006 and since then this system is being maintained.
To overcome the obsolete problem declared by OEM,
the system require renovation and also to utilsie the
electronic modules retrieved from renovated unit as
very essential spares in the other two units.
10.00Proposal under
preparation
Savings due to elimination of
procurement of costly Honeywell
spares would be Rs.1.5 Crs. per
annum. Savings due to elimination of
forecasted unit trips due to TDC 3000
system failure would be Rs.2.5 Crs.
per annum
10.000 10.000 10.00 - - 10.00 - -
5MRT/CAP
SUP&WORKS
Design,Engg., supply, installation,
testing and commissioning of Generator
Relay Protection Panel for Unit 1 & 2
Since the existing static generator protection system has
become obsolete, it is proposed to install numerical
protection system. The numerical protection is in
accordance with current protection standards dictated
by the CIGRE and CBIP. This system will ensure
reliable protection for the generator and associated
systems.
2.50Proposal under
preparation
The advanced numerical protection
system will ensure reliability and
safeguard the 210 MW generator and
associated systems. Unit trippings due
to faulty protection system shall be
eliminated, resulting in savings of
Rs.50 Lakhs per each cycle of tripping
and resynchronizing.
2.500 2.500 2.50 - - 2.50 - -
ANNEXURE 3
NORTH CHENNAI THERMAL POWER STATION - STAGE-I(3x210MW)
FY 2016-17 FY 2017-18 FY 2018-19
S.
No.
Name of the
Scheme
Details of work furnishing list of major
itemsTechnical justification
Estimated
Cost (Rs.
Crore)
Details of
Board
approval
Cost benefit analysis
TANGEDCO's Submission Approved by the Commission
Capital Investment Plan for control period from FY 2016-17 to 2018-19
CapitalisationCapital Expenditure
Page 79
![Page 97: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/97.jpg)
Capitalisation
(Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisation
(Rs. Crore)
Capital
Expenditur
e (Rs.
Crore)
FY 2016-17FY 2017-
18FY 2018-19
FY 2016-
17
FY 2017-
18FY 2018-19
FY 2016-17 FY 2017-18 FY 2018-19
S.
No.
Name of the
Scheme
Details of work furnishing list of major
itemsTechnical justification
Estimated
Cost (Rs.
Crore)
Details of
Board
approval
Cost benefit analysis
TANGEDCO's Submission Approved by the Commission
Capital Investment Plan for control period from FY 2016-17 to 2018-19
CapitalisationCapital Expenditure
6MRT/CAP
SUP&WORKS
Design,Engg,Supply,Erection, Testing
and Commissioning of integrated energy
monitoring system
The energy generated, spent as APC and exported are
measured currently using static meters and the daily
energy data are collected manually. The proposal aims
are installing numerical high accuracy smart energy
meters at all critical energy nodes and consolidate the
energy information using software tools for energy
management. This project has already been
implemented in TTPS
2.50Proposal under
preparation
This project shall ensure that the
energy generated, consumed inhouse
and exported to grid are measured
accurately in real time, eliminating
manual errors and providing
analytical tools for assessing energy
consumption in targeted load points
for reduction of auxiliary power
consumption.
2.500 2.500 2.50 - - 2.50 - -
7
Providing of additional fire hydrant
system for conveyors at higher elevation
for effective fire fighting.
At present the fire hydrant system for conveyors at
higher elevations is linked to common plant hydrant
Network and much difficulty is being faced in uplifting
of fire water to conveyors at higher elevation due to
ageing of the existing network in emergency situation.
Hence this work is vital in the fire safety point of view.
3.00Proposal to be
sent
In order to have speedy and effective
fire quenching operation for the
conveyors at higher elevation,
providing additional network is vital
in the fire safety point of view.
3.000 3.000 3.00 - - 3.00 - -
8Cap/ Sup&W/
O&E
Procurement & Installation of Continous
Ambient Air Quality Monitoring Station
complete set (with shelter,Air
conditioners, accessories, furnitures,data
transfer facility from locations of around
5 Km.) - 2 Nos.
TNPCB has directed to provide 4 Nos. CAAQMS with
data uploading facility vide their Lr.dt:31.12.09. 2nos.
Has been already procured and the remaining 2 nos.
need to be procured now.
1.50 To be obtainedStatutoary provision to be made as per
TNPCB norms1.500 1.500 1.50 - - 1.50 - -
9Cap/ Sup&W/
O&E
Surveillance System with HD camera at
various location in NCTPS-I campus on
Security aspects (IP based CCTV
cameras)
For installation and commissioning of HD remote
surveillance with with HD camera at various location
in NCTPS-I campus on Security aspects
2.00 To be obtained
Surveillance System with HD camera
at various location in NCTPS-I is vital
in the security point of view
2.000 2.000 2.00 - - 2.00 - -
10
Capital
modification of
existing Gas
Chlorination
system by new
Electrochlorination
system.
Supply and Erection and commissioning
of new Electrochlorination system
including all the materials required
In order to eliminate unsafe operating hazards in
existing gas chlorination and dependency on
outsourced agency for liquid chlorine, totally safe and
environmentally non hazardous, self contained new
electrochlorination system is essential.
30.00
Proposal
submitted for
obtaining
Administrative
Approval is
Under process.
The operating cost of Gas chlorination
system is double the operating cost of
Electro Chlorination System. Hence,
Electro Chlorination is advantageous
to TANGEDCO , as it is totally safe
and environmentally non hazardous.
As the proposal is a capital
modification of existing system of gas
chlorination, pay back cannot be
envisaged.
20.000 30.000 10.000 - 20.00 10.00 - - 30.00
11
Provision of 1 No.
Spare 25 Ton
Capacity EOT
Crane for CWPH
Supply, Erection Spare 25 Ton Capacity
EOT Crane in the existing Rails for
CWPH
In order to carryout emergency breakdown in CWPs, to
minimise the shut down period of CWPs and to carry
out maintenance activities of any of the CWPs,
simultaneously during OH of other pumps, without
loss of time, to avoid loss generation.
1.30 Under process.
The standby pump availability can be
ensured by avoiding major loss of
generation during emergencies such as
simultaneous failure of more than 1
no. of CWP out of 9 nos. of all the
three Units.
1.000 1.300 0.300 - 1.00 0.30 - - 1.30
12
Provision of 1 No.
Spare 15 Ton
Capacity Gantry
Crane for forebay
of CWPH.
Supply and Erection Spare 15 Ton
Capacity Gantry Crane in the existing
Rails of Forebay for CWPH.
In order to maintain as emergency for carryout
breakdowns in all CWPs, to restore the generation loss.1.10 Under process.
The standby pump, Suction bay and
TWS availability can be ensured by
avoiding major loss of generation
during emergencies such as
simultaneous failure of more than 1
no. out of 9 nos. of CWP and its
equipments in Suction bays of all the
three Units.
1.000 1.100 0.100 - 1.00 0.10 - - 1.10
13
Procurement of 3
Nos of Pull out
Assembly for
Cooling Water
Pumps from the
OEM M/ s. BHEL
Pull out Assembly Complete set for
Cooling Water Pump Model: CW 1Q
In order to improve the performance of the existing
pumps which are now running with worn out
components during the past 20 years, replacement of
total Pull out assembly at the rate of 1 set per Unit per
year for all the three units is essential for quality
maintenance planning.
20.00 Under process. For quality maintenance planning. 6.000 7.000 20.000 7.000 - - - - - -
Page 80
![Page 98: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/98.jpg)
Capitalisation
(Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisation
(Rs. Crore)
Capital
Expenditur
e (Rs.
Crore)
FY 2016-17FY 2017-
18FY 2018-19
FY 2016-
17
FY 2017-
18FY 2018-19
FY 2016-17 FY 2017-18 FY 2018-19
S.
No.
Name of the
Scheme
Details of work furnishing list of major
itemsTechnical justification
Estimated
Cost (Rs.
Crore)
Details of
Board
approval
Cost benefit analysis
TANGEDCO's Submission Approved by the Commission
Capital Investment Plan for control period from FY 2016-17 to 2018-19
CapitalisationCapital Expenditure
14AHP/CAP Sup&
Works
NCTPS- I - MI-AHP- Renewal of
damaged Recovery Water Line 1 from
Recovery water Pump house to Ash
Handling Pump House with fabricated
MS pipes of 12mm thickness including
erection, testing and commissioning
along with all necessary accessories to
transfer ash water to Ash handling pump
house sump
The existing recovery water line which served its life
may not be put into continuous service since at various
locations it is found in weak condition and it is getting
burst out frequently. As per TNPCB norms, the
Recovery water line should be run continuously so as
to avoid stagnation of water in the dyke and the
overflowing of the same to nearby village areas.
2.93
TANGEDCO
Proceeding
(CMD) No.148,
dt.08.04.15.
Effective utilization of decanted water
from the Ash Dyke to Ash handling
Pump House.Minimizing the
consumption of sea water
2.930 2.930 - - - - - -
15 AHP/CAP SuPSS 316L complete assembly of scrapper
feeder including spares
The existing scrapper feeders were completely worn
out since the same were installed during the
commissioning of the Unit.The structural assembly of
the feeders were dislodged and requires
replacement.The bottom plates got corroded leading to
inadequate sealing to the feeder trough which inturn
leads to the air ingress in to the boiler affecting the
performance of the Boiler.
3.16
Scrapper feeder will avoid hindrance
to the normal evacuation of the ash
from boiler and the air ingress into the
system will be avoided. This will
increase the performance of the Boiler
and to maintain uninterrupted ash
evacuation and to sustain maximum
capacity of power generation which
will beneficial to TANGEDCO.
3.160 3.160 - - - - - -
16AHP/Cap Sup&
works Erection of PDFACS for Units I,II & III
The existing PDFAC system is in worn out condition
due to ageing and saline atmosphere. This leads to
unsafe working condition. At present the PDFACS
vessels are beyond the stage of reconditioning and
requires replacement. The replacement of the PDFACS
vessels will be carried out in the phased manner.
Further the PDFACS are not installed in the 4th ,5th
and sixth rows of Unit III, 5th and 6th rows of unit II
and 3rd, 4th, 5th and 6th rows of unit I.
35.00Estimate to be
submitted
To comply with the TNPCB norms of
100% fly ash evacuation.17.500 35.000 17.500 - - - - - -
17 AHPSupply, Erectiion & commissioning of
RWL - 3
The existing recovery water line which served its life
may not be put into continuous service since at various
locations it is found in weak condition and it is getting
burst out frequently. As per TNPCB norms, the
Recovery water line should be run continuously so as
to avoid stagnation of water in the dyke and the
overflowing of the same to nearby village areas.
3.50Estimate to be
submitted
Effective utilization of decanted water
from the Ash Dyke to Ash handling
Pump House.Minimizing the
consumption of sea water
1.200 3.500 2.300 - - - - - -
18 AHP
Supply, Erection & commissioning of
ASDL phase I - AHPH to Stage -2
Compund wall
The existing cast basalt lined pipes which were
commissioned during the project are in worn out,
eroded condition. Ash slurry pipe line leakes are to be
arrested and should be made fit for discharging slurry
to the ash dyke and no ash water shall be let out in the
back waters as per TNPCB norms. Hence it is essential
to renew the damaged / worn out pipes in a phased
manner.
10.00
Approval
awaited from
Head Quarters
for supply and
erection of cast
basalt pipesfor
a value of Rs3.5
Crs..
Other indents
to be submitted
To comply with the TNPCB norms. 4.000 10.000 6.000 - - - - - -
Page 81
![Page 99: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/99.jpg)
Capitalisation
(Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisation
(Rs. Crore)
Capital
Expenditur
e (Rs.
Crore)
FY 2016-17FY 2017-
18FY 2018-19
FY 2016-
17
FY 2017-
18FY 2018-19
FY 2016-17 FY 2017-18 FY 2018-19
S.
No.
Name of the
Scheme
Details of work furnishing list of major
itemsTechnical justification
Estimated
Cost (Rs.
Crore)
Details of
Board
approval
Cost benefit analysis
TANGEDCO's Submission Approved by the Commission
Capital Investment Plan for control period from FY 2016-17 to 2018-19
CapitalisationCapital Expenditure
19AHP/ R&M/
SupplySpares for Ash Slurry Disposal Pump
The SAM make model ARN 200/550 Ash consists of
more than 34 part such as impeller, Inner casing, Wear
plates, Gland housing etc. and whenever the
breakdown occurs in ASDP, it will affect the Ash slurry
mixture pumping and the slurry level in the trench will
increase which leads to stoppage of scrapper feeder and
clinker grinder and slag level increases in boiler and
thereby loss of power generation. Some of the spares
which are not readily available have to be procured
from the OEM only. Hence it is essential to procure
the spares for ASDP on proprietary basis only.
1.10Indent to be
submitted
The procurement of spares will sustain
Maximum power generation by
effectively evacuating the ash slurry
mixture to Ash dyke.
1.100 1.100 - - - - - -
20BM/CAP
Sup&WorksRenewal of eroded / damaged RH coil
In unit II RH coil are found to be eroded due to flue
gas. The existing reheater coil served more than 19
years. Nowdays frequent boiler tube puncture is
occuring in Reheater area resulting in loss of generation
and outage of boiler
6.50
Proposal sent
on 05.02.2016
awaiting for
HQ approval
Boiler outage will be reduced, PLF
will be improved by avoiding the cost
of repair Rs.6.00 Crs. and total
amount of Rs.4.7 Crs. towards
generation loss per no of boiler outage
of 01 time.
6.500 6.500 - - - - - -
21BM/CAP
Sup&Works
Renewal of damaged Sky climber for
boiler pressure parts
Existing sky climber is in wornout condition. The same
has to be renewed with new one . At present no sky
climber available at NCTPS - I to attend the breakdown
work in boiler Ist pass.
1.50
Proposal sent
on 05.02.2016
awaiting for
HQ approval
Boiler Down time will be reduced
during water wall puncture and
attending work in boiler first pass by
avoiding the cost of repair Rs. 1.00 Crs.
and total amount of Rs.4.3 Crs.
towards generation loss per no of
boiler outage of 01 time.
1.500 1.500 - - - - - -
22BM/CAP
Sup&Works
Painting of Epoxy/Anti corrosive over
the Boiler structures
To prevent further damage / failure of boiler sturcture
due to corrosion of saline atsomphere. The proposal
submitted approved by CMD / TANGEDCO and
tender in process.
5.25
Tender
specification
sent to HQ.
After approval
of the tender
specification,
tender will be
floated.
To improve the life of boiler structure.
To avoid loss of generation. If boiler
structure is failed it will take atleast 10
days for rectification. The generation
loss works out to Rs.31.00 Crs..
5.250 5.250 - - - - - -
23BM/CAP
Sup&Works
Revamping of Air pre heater for one Unit
including providing double sealing
arrangements in Unit-II
Due to supply of low colorific value of coal, more
quantity of is being consumed to attain the full load
and correspondingly more quantity of primary and
secondary air is fed to the boiler. Hence, the leakage
percentage is always more than 10% in the Air pre
heater which is more than the designed allowable
leakage percentage of 8% which result in overloading
of ID,PA & FD fans. Therefore, it is proposed to
provide double sealing arrangement in Unit II Air pre
heater during the forth coming overhaul.
6.50Approved by
CMD
To reduce air leakage and air
ingression in air preheater and
improve boiler efficieny. Loading of
ID & FD fan will be minimised
including reduced auxiliary power
consumption by avoiding the cost of
repair Rs6.50 Crs. and total amount of
pay back period of Rs1.87 Crs. / year
6.500 6.500 - - - - - -
24BM/Cap Sup &
Works
Renewal of damaged radiant roof in Unit-
I Boiler
During unit I overhaul it was observed that the radiant
roof tubes are found in damaged condition. Hence it is
essential to renewe the damaged radiant roof tubes to
avoid breakdown and loss of generation.
2.00Proposal to be
sent
Boiler outage will be reduced, PLF
will be improved by avoiding the cost
of repair Rs. 2.00 Crs. and total
amount of Rs.4.7 Crs. towards
generation loss per no of boiler outage
of 01 time.
2.000 2.000 - - - - - -
Page 82
![Page 100: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/100.jpg)
Capitalisation
(Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisation
(Rs. Crore)
Capital
Expenditur
e (Rs.
Crore)
FY 2016-17FY 2017-
18FY 2018-19
FY 2016-
17
FY 2017-
18FY 2018-19
FY 2016-17 FY 2017-18 FY 2018-19
S.
No.
Name of the
Scheme
Details of work furnishing list of major
itemsTechnical justification
Estimated
Cost (Rs.
Crore)
Details of
Board
approval
Cost benefit analysis
TANGEDCO's Submission Approved by the Commission
Capital Investment Plan for control period from FY 2016-17 to 2018-19
CapitalisationCapital Expenditure
25BM/Cap Sup &
Works
Renewal of damaged / leaky flue gas
duct APH out let to VGV area in unit-II
The ducting system is provided for flow of exit flue gas
from boiler to chimney through ESP. Due to continuous
flow of abrasive nature of ash, the duct wall, diversion
bends and pipe supports gets eroded, punctured and
damaged.The air ingress through the damaged parts
into the flue gas system causes overloading of ID fan
inturn positive furnace pressure in boiler.
1.50
Proposal sent
on 09.02.2016
awaiting for
HQ approval
To reduce air ingress and to avoid ID
fan overloading in turn avoding cost
of Repair of Rs.1.50 Crs., total amount
of cost benefit is Rs.31.23 lakhs / year
1.500 1.500 - - - - - -
26BM/Cap Sup &
Works
Renewal of damaged insulation from
VGV area to mechanical hopper and
renewal of insulation in Unit-II
Over a period and due to normal wear and tear, most
of the insulated area in Flue gas got damaged. The
damaged insulation areas are to be re-insulated to
avoid heat loss for better efficiency of the equipments
and also for human safety.
2.00Proposal to be
sent
To reduce air ingress and to avoid ID
fan over loading.2.000 2.000 - - - - - -
27BM/Cap Sup &
Works
Renewal of damaged / leaky FG duct at
mechanical hopper to ESP inlet in unit-II
Over a period and due to normal wear and tear, most
of the insulated area in Flue gas got damaged. The
damaged insulation areas are to be re-insulated to
avoid heat loss for better efficiency of the equipments
and also for human safety.
1.50
Proposal sent
on 09.02.2016
awaiting for
HQ approval
To reduce air ingress and to avoid ID
fan over loading in turn avoding cost
of Repair of Rs.1.50 Crs., total amount
of cost benefit is Rs.31.23 lakhs / year
1.500 1.500 - - - - - -
28BM/Cap Sup &
Works
Renewal of damaged part of air noise
attenuate assembly for PA/FD fans for
unit I,II& III.
In Primary air fans the existing attenuate is severely
damaged condition, causing chocking of air flow and
the damages in the wool catridge may fell down and
will damage the impeller during fan in service. Hence,
it is necessary to renew the attenute assembly during
overhaul.
1.50Proposal to be
sentTo avoid overload to PA fan. 1.500 1.500 - - - - - -
29BM/Cap Sup &
Works
Renewal of damaged ESP collecting &
emitting electrodes in unit II.
It was found that the most of the collecting Electrodes
in unit II ESP are in wornout condition and dislocated
from its orginal position due to collection of heavy ash
and fields fail frequently. Hence, it is proposed to
renew the collecting & emitting electrodes during
forthcomig capital overhaul in order to keep the field in
healthy condition to maintian the rated efficiency and
pollution control board norms.
8.00Proposal to be
sent
To improve ESP collection efficiency
inturn reduce the ID fan loading to
mainting the SPM level.
8.000 8.000 - - - - - -
30BM/Cap Sup &
Works
Renewal of damaged PA fan spiral
casing for unit-II
The existing spiral casing in PA fans are in severely
damaged & corroded condition due to normal ageing
and saline atmosphere.This has to be renewed to avoid
breakdown of equipments.
1.50Proposal to be
sent
To avoid air leakage and overloading
of PA fan1.500 1.500 - - - - - -
31BM/Cap Sup &
Works
Renewal of damaged / leaky PA hot air
duct in unit II.
The existing PA hot air ducts are in eroded condition
and needs replacement during capital overhaul of
Unit.
1.50Proposal to be
sent
To avoid PA header air leakage and
overloading of PA fan1.500 1.500 - - - - - -
32BM/Cap Sup &
Works
Renewal of damaged ESP internals at
first three rows for unit II.
The Collection efficiency is higer in first three rows,
due to abrassive nature of ash, the internals are in worn
out condition. Inturn reduce the ID fan load current to
maintain the SPM level of ESP. Hence, it need
replacement during capital overhaul of Unit.
2.00Proposal to be
sent
To improve ESP collection efficiency
and to reduce the ID fan load current.2.000 2.000 - - - - - -
Page 83
![Page 101: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/101.jpg)
Capitalisation
(Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisation
(Rs. Crore)
Capital
Expenditur
e (Rs.
Crore)
FY 2016-17FY 2017-
18FY 2018-19
FY 2016-
17
FY 2017-
18FY 2018-19
FY 2016-17 FY 2017-18 FY 2018-19
S.
No.
Name of the
Scheme
Details of work furnishing list of major
itemsTechnical justification
Estimated
Cost (Rs.
Crore)
Details of
Board
approval
Cost benefit analysis
TANGEDCO's Submission Approved by the Commission
Capital Investment Plan for control period from FY 2016-17 to 2018-19
CapitalisationCapital Expenditure
33BM/Cap Sup &
Works
Renewal of damaged / leaky APH casing
and connecting plates
The APH casing are found in thinout condition. To
avoid air leakage and ingress in flue gas path and to
maintain the negative pressure.
1.70Proposal to be
sent
To improve the APH performance by
reducing air leakages and air
ingression and to maintain the
negative pressure and total amount of
pay back period Rs.1.16 Crs. / year 1.700 1.700 - - - - - -
34 CAP/SP/ BMRenewal of eroded / damaged RH tube
and bends for RH coil for Unit I
The existing RH tube served more than 19 years. Due to
frequent failure occuring in Reheater area, it need
replacement.
6.50
Proposal sent
on 09.02.2016
awaiting for
HQ approval
Boiler outage will be reduced, PLF
will be improved by avoiding the cost
of repair Rs. 6.00 Crs. and total
amount of Rs.4.7 Crs. towards
generation loss per no of boiler outage
of 01 time.
6.500 6.500 - - - - - -
35 CAP/SP/ BMRenewal of eroded / damaged RH tube
and bends for RH coil for Unit III
The existing RH tube served more than 18 years. Due to
frequent failure occuring in Reheater area, it need
replacement.
2.00Proposal to be
sent
Boiler outage will be reduced, PLF
will be improved by avoiding the cost
of repair Rs. 2.00 Crs. and total
amount of Rs.4.7 Crs. towards
generation loss per no of boiler outage
of 01 time.
2.000 2.000 - - - - - -
36 CAP/SP/ BMRenewal of damaged various sizes of
Wear resistant plate for flue gas duct.
To fix the wear resistant plates in the flue gas duct
diversion areas to avoid erosion of ducts.1.50
Proposal to be
sent
To avoid erosion of duct and to
improve the life of duct1.500 1.500 - - - - - -
37 CAP/SP/ BMRenewal of damaged 'FD fan shaft,
housing & impellers
To renewe the fan spares , these critical spares are
esstentially required. 1.50
Proposal to be
sent
Boiler outage will be reduced, PLF
will be improved by avoiding the cost
of repair Rs. 1.00 Crs. and total
amount of Rs.4.7 Crs. towards
generation loss per no of boiler outage
of 01 time.
1.500 1.500 - - - - - -
38BM/CAP
Sup&Works
Rectification/Renewal of damaged ESP
collecting & emitting electrodes for Unit
I, II & III
It was found that most of the collecting Electrodes in
unit I,II & III ESP are in wornout condition and
dislocated from its orginal position due to collection of
heavy ash and fields fail frequently. Hence it is
proposed to renew the collecting & emitting electrodes
in a phased manner during forth coming capital
overhaul in order to keep the field in healthy condition
to maintian the rated efficiency and pollution control
board norms.
2.00Proposal to be
sent
To improve ESP collection efficiency,
inturn reduce the ID fan loading to
mainting the SPM level as instructed
by the Pollution board.
2.000 2.000 - - - - - -
39BM/CAP
Sup&Works
Renewal/Rectification of damaged flue
gas duct Unit I & II
The ducting system is provided for flow of exit flue gas
from boiler to chimney through ESP. Due to continuous
flow of abrassive nature of ash, the duct wall, diversion
bends and pipe supports gets eroded, punctured and
damaged.The air ingresses through the damaged part
into the flue gas system causes overload the ID fan
inturn positive furnace pressure in boiler.These
damages are to be rectified during scheduled overhaul
in every year.
3.00Proposal to be
sent
To reduce air ingress and to avoid ID
fan over loading in turn avoding. cost
of Rs.3.00 Crs. total amount of cost
benefit of Rs.31.23 lakhs / year
3.000 3.000 - - - - - -
Page 84
![Page 102: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/102.jpg)
Capitalisation
(Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisation
(Rs. Crore)
Capital
Expenditur
e (Rs.
Crore)
FY 2016-17FY 2017-
18FY 2018-19
FY 2016-
17
FY 2017-
18FY 2018-19
FY 2016-17 FY 2017-18 FY 2018-19
S.
No.
Name of the
Scheme
Details of work furnishing list of major
itemsTechnical justification
Estimated
Cost (Rs.
Crore)
Details of
Board
approval
Cost benefit analysis
TANGEDCO's Submission Approved by the Commission
Capital Investment Plan for control period from FY 2016-17 to 2018-19
CapitalisationCapital Expenditure
40BM/CAP Sup&
Works
Renovation of APH from flange to flange
by providing double sealing
arrangements and by improving heating
element profile in Unit-I
Due to supply of low colorific value of coal, more
quantity of is being consumed to attain the full load
and correspondingly more quantity of primary and
secondary air is fed to the boiler. Hence, the leakage
percentage is always more than 10% in the Air pre
heater which is more than the designed allowable
leakage percentage of 8% which result in overloading
of ID,PA & FD fans. Therefore, it is proposed to
provide double sealing arrangement in Unit II Air pre
heater during the forth coming overhaul.
20.00
Proposal to be
sent for
Approval
To reduce air leakage and air
ingression in air preheater and
improve boiler efficiency. Loading of
ID & FD fan will be minimised
including reduced auxiliary power
consumption by avoiding the cost of
repair Rs6.50 Crs. and total amount of
pay back period Rs1.87 Crs. / year
20.000 20.000 20.00 - - 20.00 - -
41BM/Cap Sup &
Works
Renewal of eroded / worn out LTSH
coil assembly in Unit I & II
LTSH coils are installed at the second pass of boiler.
They are subjected to erosion caused by high velocity of
flue gas and they have served more than 15 years. The
most eroded areas may lead to failure of LTSH tubes
resulting in tube puncture. To avoid tripping of unit
due to this kind of puncture in LTSH coil, these eroded
coils have to be renewed by new coils is essentially
required
10.00
Proposal sent
on 09.02.2016
awaiting for
HQ approval
Boiler outage will be reduced, PLF
will be improved by avoiding the cost
of repair Rs. 10.00 Crs. for both Units
and total amount of Rs.4.7 Crs.
towards generation loss per no of
boiler outage of 01 time/ unit
10.000 10.000 - - - - - -
42BM/Cap Sup &
Works
Renewal of wornout / damaged ESP
collecting & emitting electrodes in unit
I,II & III.
It was found that the most of the collecting Electrodes
in unit I,II & III ESP are in wornout condition and
dislocated from its orginal position due to collection of
heavy ash and fields fail frequently. Hence it is
proposed to renew the collecting & emitting electrodes
in a phased manner during forth coming capital
overhaul in order to keep the field in healthy condition
to maintian the rated efficiency and pollution control
board norms.
8.00Proposal to be
sent
To improve ESP collection efficiency
inturn reduce the ID fan loading to
mainting the SPM level as instructed
by Pollution board.
8.000 8.000 - - - - - -
43BM/Cap Sup &
Works
Renewal of eroded / worn out
Economizer coil assembly in Unit I & II
Economiser coils are installed at the second pass of
boiler. They are subjected to erosion caused by high
velocity of flue gas and they have served more than 15
years. The most eroded areas may lead to failure of
Economiser tubes resulting in tube puncture. To avoid
tripping of unit due to this kind of puncture in
Economiser coil, these eroded coils have to be renewed
by new coils is essentially required
8.00
Proposal sent
on 09.02.2016
awaiting for
HQ approval
Boiler outage will be reduced, PLF
will be improved by avoiding the cost
of repair Rs. 8.00 Crs. for both Units
and total amount of Rs.4.7 Crs.
towards generation loss per no of
boiler outage of 01 time/ unit
8.000 8.000 - - - - - -
44BM/Cap Sup &
Works
Renewal of ID fan spiral casing for unit-
I,II&III.
Over a period and due to normal wear and tear, the
existing spiral casing got severely in damaged
condition.It has to be renewed during forth coming
overhaul for better efficiency of the fans and also for
human safety.
4.00Proposal to be
sent NA 4.000 4.000 - - - - - -
45BM/Cap Sup &
WorksRenewal of wornout/ damaged FD fans
Supply , Erection of FD fans spares to reduce the power
consumption of fans during capital overhaul of Unit.2.00
Proposal to be
sent
Energy conservation of FD fan by
speed reduction to reduce the auxliary
power consumtion 40.00 lakhs/year
(approx)
2.000 2.000 - - - - - -
Page 85
![Page 103: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/103.jpg)
Capitalisation
(Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisation
(Rs. Crore)
Capital
Expenditur
e (Rs.
Crore)
FY 2016-17FY 2017-
18FY 2018-19
FY 2016-
17
FY 2017-
18FY 2018-19
FY 2016-17 FY 2017-18 FY 2018-19
S.
No.
Name of the
Scheme
Details of work furnishing list of major
itemsTechnical justification
Estimated
Cost (Rs.
Crore)
Details of
Board
approval
Cost benefit analysis
TANGEDCO's Submission Approved by the Commission
Capital Investment Plan for control period from FY 2016-17 to 2018-19
CapitalisationCapital Expenditure
46BM/Cap Sup &
Works
Renewal of wornout / damaged Hot end
centre section and its connecting plates
etc.,in either Unit-I or II
The existing APH Hot End Centre section are found
thinned / weakened condition. Air leaks and
ingression found in centre section and guide bearing
area. It has to be renewed during capital overhaul to
improve the APH performance by reducing air
leakages and air ingression .
1.50Proposal to be
sent
To improve the APH performance by
reducing air leakages and air
ingression and If any punctures/
damages occurs in weak portion of
centre section , it will take 4 days to
rectify.The generation loss works out
to Rs.6.55 Crs..
1.500 1.500 - - - - - -
47BM/Cap Sup &
Works
Renewal of wornout / damaged SADC
damper in Unit II.
The existing secondary air damper are in wornout
condition and its has served more than 19 years.1.50
Proposal to be
sent
Boiler outage will be reduced, PLF
will be improved by avoiding the cost
of repair Rs. 1.5Crs. for both Units
and total amount of Rs.4.7 Crs.
towards generation loss per no of
boiler outage of 01 time/ unit
1.500 1.500 - - - - - -
48BM/Cap Sup &
Works
Complete renewal of damaged /
chocked Heating Elements for Unit III
The existing heating elements are found
chocked/eroded condition.It leads to increase in FG
pressure drop across APH causing poor heat transfer
across APH. Hence it needs replacement.
3.75Proposal to be
sent
To improve the APH performance by
perfect heat transfer and also
improving efficiency of boiler and to
maintain the negative pressure and
total amount of pay back period Rs1.87
Crs. / year
3.750 3.750 - - - - - -
49BM/Cap Sup &
Works
Renewal of wornout / damaged various
sizes of Spring seal assembly.
The existing Spring seal assembly are found in
damaged condition due to erosion and normal wear
and tear .This damages will result in air leakage and air
ingression and leads to over loading of ID and PA fans.
Hence it needs repalcement.
1.19Proposal to be
sent
To reduce air leakage and air
ingression in Gullotine gates and
improve boiler efficiency. Loading of
ID & PA fan wil be minimised and
total amount of pay back period Rs1.16
Crs. / year
1.190 1.190 - - - - - -
50 Cap/S/ MPMComplete gear box assembly for HP803
bowl mill-12 Sets.
Existing Gear Box Assemblies in all the Mills are in
Service above 20 years since from the date of
installation and are running with excessive vibrations
leading to frequent mill breakdowns and loss of
generation. When each mill trips, about 40 MW of load
reduction occurs. This loss of generation cannot be
compensated. Hence replacing complete gear boxes is
essential.
22.80
Proposal for
obtaining
administrative
approval sent
for 6 Sets.
Proposal for
balance 6 Sets
to be sent.
Savings per year is 3.74 crore.
Considering 40MW reduction in load
for one mill trip and a down time of 96
Hrs for gearbox works and 3
occurances per year
11.400 22.800 11.400 - - - - - -
Page 86
![Page 104: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/104.jpg)
Capitalisation
(Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisation
(Rs. Crore)
Capital
Expenditur
e (Rs.
Crore)
FY 2016-17FY 2017-
18FY 2018-19
FY 2016-
17
FY 2017-
18FY 2018-19
FY 2016-17 FY 2017-18 FY 2018-19
S.
No.
Name of the
Scheme
Details of work furnishing list of major
itemsTechnical justification
Estimated
Cost (Rs.
Crore)
Details of
Board
approval
Cost benefit analysis
TANGEDCO's Submission Approved by the Commission
Capital Investment Plan for control period from FY 2016-17 to 2018-19
CapitalisationCapital Expenditure
51 CAP/SW /MPM
Supply, erection testing and
commissioning of dynamic classifier
system for 18 Nos of HP 803 Bowl Mills
for three Units in NCTPS I-18 Sets.
The existing static classifier system served more than 20
years. The designed coal finess can be controlled only
to certain extent by manual operation of deflector
plates.The proposed dynamic classifier will improve
the finess of the coal and thereby the unburnt will be
reduced and the boiler efficiency will be improved.
38.67Proposal sent
for approval
Savings per year is 38.16 Crore
considering the reduction from 5 mill
operation to 4 mill operation.
25.780 38.670 12.890 25.78 12.89 - - 38.67 -
52 CAP/SP/ MPM Mill Separator body-3Nos
Existing Separator body in all the mills are more than
25 years old and in wornout condition due to its
continous usage. Coal powder leakages occurs through
the fastening holes. The mill seperator body and the
journal doors are made of hardened materials and
attending the wornouts and damages will not stand for
long. Hence it is proposed to replace the seperator
body in 3 mills in this year
1.20Proposal to be
sent
Savings per year is 2.5 crore.
Considering 40MW reduction in load
for one mill trip and a down time of
96 Hrs for separator body problem
and 2 occurances per year
1.200 1.200 - - - - - -
53CAP/Works/
MPM
MILLS-Painting of entire column of
structurals for all the units
The entire column and sturctures in the mill floor and
in feeder floor incuding bunker are in saline
atmosphere and is in erroded condition. These
structures have to be painted inorder to protect the
sturctures from getting weakened.
3.25Approval to be
obtained
To improve the life of mill structures
in turn avoid loss of generation. If
structure fails, it will take atleast 10
days to rectify. The generation loss
works out to Rs.31.00 Crs..
3.250 3.250 - - - - - -
54 CAP/SW/MPM
Revamping of Air conditioning system
including chiller pipes CWP's,
compressors and Air Handling Units
The Existing AC Plant system served more than 20
years and working with less efficiency. Frequent
breakdown occurs in the compressors, chill water and
condenser water pumps etc., Due to this required temp.
could not be maintained in the unit controll rooms
where the temp. sense instrumentation panels are in
service. Hence the revamping of existing old air
conditioning system and privision of AC package Units
are essential.
6.30
Approval
obtained for 3
Nos screw
chiller and
chilled water
pipe lines.
Approval for
balance
quantities to be
obtained.
Savings per year is 3.28 crore.
Considering 210MW/ Unit reduction
in generation and a down time of min
24 Hrs attending A/C system B/D ,
and 2 occurances per year
6.300 6.300 - - - - - -
55Cap/Sup&W/MP
M
Supply, Erection & commissioning Hot
air gate assembly with pneumatic power
cylinder- 6 Nos.
To replace the Hot air gate assembly with pneumatic
power cylinder in 2 mills in each unit1.05
Proposal to be
sent
Savings per year is 0.94 crore.
Considering 40MW reduction in load,
and a down time of min 6 Hrs for
HAG problems and 12 occurances per
year
1.050 1.050 - - - - - -
56 Cap/Spare/ MPMWorm gear & Worm shaft assembly -8
Sets
8 Sets of gearboxes have to be assembled for
replacement of damaged gearbox & keeping minimum
essential critical spares.
5.40
Approval
obtained for 4
Sets and for the
balance,
approval to be
obtained.
Savings per year is 5.62 crore.
Considering 40MW reduction in load,
and a down time of min 72 Hrs for
Worm gear & Worm shaft assembly
problems and 6 occurances per year
5.400 5.400 - - - - - -
57 Cap/Spare/MPMRoller Journal Assembly without
grinding roller-21 Nos.
Out of 54 Journal assemblies 27 are running with old
bearing and some of the shafts are reconditioned.
Hence 6 Nos. journal assemblies are to be kept as
critical spares for each unit.
4.30
Approval
obtained for 9
Nos, approval
for the balance
quantities to be
obtained.
Savings per year is 2.5 crore.
Considering 40MW reduction in load
for one mill trip and a down time of 8
Hrs for Roller Journal problems and 24
occurances per year
1.800 4.300 2.500 - - - - - -
58 Cap/Spare/MPMHPMS Rollers, BRS and Air Port
Assemblies -18 Sets.
To be used during renewal of worn out rollers and Bull
Ring Segments after guaranteed hours in the mills for 5
mills.
4.60
Approval
obtained for 12
Sets and for the
balance,
approval to be
obtained.
Savings per year is 2.5 crore.
Considering 40MW reduction in load
on one mill trip and down time of 8
Hrs for HPMS Rollers, BRS and Air
Port Assemblies problem and 24
occurances per year
2.800 4.600 1.800 - - - - - -
Page 87
![Page 105: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/105.jpg)
Capitalisation
(Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisation
(Rs. Crore)
Capital
Expenditur
e (Rs.
Crore)
FY 2016-17FY 2017-
18FY 2018-19
FY 2016-
17
FY 2017-
18FY 2018-19
FY 2016-17 FY 2017-18 FY 2018-19
S.
No.
Name of the
Scheme
Details of work furnishing list of major
itemsTechnical justification
Estimated
Cost (Rs.
Crore)
Details of
Board
approval
Cost benefit analysis
TANGEDCO's Submission Approved by the Commission
Capital Investment Plan for control period from FY 2016-17 to 2018-19
CapitalisationCapital Expenditure
59 Cap/Spare/MPM Various types of Gear box bearings Required for replacement of worn out bearings in gear
box running with High vibration in all three units1.20
Proposal to be
sent
Savings per year is 3.74 crore.
Considering 40MW reduction in load
for one mill trip and a down time of 96
Hrs for gearbox bearing works and 3
occurances per year
0.200 1.200 1.000 - - - - - -
60 CAP/SW/MPMMiscellaneous capital supply & works of
Mill Plant Maintenance Division
To ensure continuous service of all the mills and avoid
loss of generation and oil consumption these spares are
essentially required as and when maintenance
problems arises in the 18 Nos mills in all the three
units.
35.00Approval to be
obtained.
If adequate spares are not avialable in
time , loss of generation of 10 days is
considereded and the loss would be to
Rs.31.00 Crs.
35.000 35.000 - - - - - -
61TM/CAP (carry
over) SupplyBHEL Spares for Turbine & Auxiliaries
Spares for Turbine can be procurred only from the
OEM, M/S BHEL on proprietary basis - to ensure
quality, reliability. Timely procurement of the spares
will ensure execution of Overhauls within the
scheduled period.
3.00PO to be
placed at HQs
1). Can avoid prolonged downtime for
want of spares and COH schedule can
be adhered.
2). PLF will improve.
3). Genuine spares from OEM will
ensure long service life of the spares
and minimum forced outage of the
Turbine.
3.000 3.000 - - - - - -
62TM/CAP (carry
over) SupplyPHE Plates assembly
PHEs are the heat exchangers with the cooling medium
as sea water. Due to salinity, the end plates of MS
material got eroded and corroded and frequent
leakages of DM water noticed. The PHE is cooling the
ACW water which in turn cools the bearings of Main
Turbine, BFP, CEP, Vaccum Pumps, Boiler Fans etc.
The damaged plates of all the 9 nos PHE's are to be
renewed for effective cooling which will ensure
generation and high PLF of the station.
2.00Yet to be
obtained
1). Effective cooling of ACW ensure
optimum loading of the critical / vital
equipments. 2). This will
ensure high PLF. 3). Will
reduce the generation cost by way of
minimum wastage of DM water.
2.000 2.000 - - - - - -
63TM/CAP (carry
over)
Miscellaneous works - Less than 1 Cr.
value - Works - 1.00 Cr.; Supply - 3.77
Cr; Supply & works - 0.35 Cr; Spare -
1.05 Cr.
All the proposed allocation is essentially required for
renewal of equipments / spares that had already
served for more than 20 years and to be replaced in
phased manner for maintaining sustained generation in
forthcoming years.
6.17Yet to be
obtained
Will improve the heat rate, avoid
prolonged forced outage period and
efficiency of the Units.
6.170 6.170 - - - - - -
64TM/CAP works
(new schemes)
COH/AOH of Turbine axial key
correction works, HP module, IP inner
casing replacement work in unit-II.
Unit-II of NCTPS was commissioned on 27.08.1995.
Right from the commissioning of the unit, the axial shift
is increasing in the positive direction. M/s.BHEL
recommended to replace the HP module along with IP
inner casing. The last COH of unit-II was done during
the month of Oct'2007 as per the OEM
recommendations the COH of turbine to be carried out
after 50,000 running hours of turbine. Since unit-II
crossed 50,000 running hours during the year 2013-14.
5.00Yet to be
obtained
Within six months period of axial key
correction work, the unit is being
shutdown for another correction. This
permenant measure suggested by
M/s.BHEL will avoid such forced
outage every six months once and
result in savings of Rs.11.5 Cr. per
outage. Also, this mandatary COH
will result in trouble free operation of
the Turbine for further 50,000 hrs. or 7
yrs.
5.000 5.000 - - - - - -
65TM/CAP works
(new schemes)COH of Turbine in unit-I.
In unit-I of NCTPS-I capital overhauling of turbine was
completed on 21.06.2010. As per the OEM
recommendations the COH of turbine to be carried out
after 50,000 running hours of turbine.
5.00Yet to be
obtained
This mandatary COH will result in
trouble free operation of the Turbine
for further 50,000 hrs or 7 yrs. of
operation.
5.000 5.000 - - - - - -
66TM/CAP Supply
(new schemes)
procurement of condenser outlet bend
pipes 1600 mm dia. – 2 nos. for unit- II of
NCTPS-stage- I
In unit 2, the pipe bends at condenser CW outlet are in
much eroded condition, with patch welding done over
the entire perimeter of the pipe and no more patch
welding is possible. If not replaced in the immediate
next opportunity, it may puncture to an extent that the
unit will have to be shut down for a long period.
1.60Yet to be
obtained
Improvement of efficiency of the Unit
by increase in Vaccum for full load
operation. Improved Net
Heat Rate due to operation of the Unit
with increased vaccum. 0.005 Ksc
improvement of vaccum will result in
savings of Rs. 3.5 Cr/yr.
1.600 1.600 - - - - - -
Page 88
![Page 106: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/106.jpg)
Capitalisation
(Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisation
(Rs. Crore)
Capital
Expenditur
e (Rs.
Crore)
FY 2016-17FY 2017-
18FY 2018-19
FY 2016-
17
FY 2017-
18FY 2018-19
FY 2016-17 FY 2017-18 FY 2018-19
S.
No.
Name of the
Scheme
Details of work furnishing list of major
itemsTechnical justification
Estimated
Cost (Rs.
Crore)
Details of
Board
approval
Cost benefit analysis
TANGEDCO's Submission Approved by the Commission
Capital Investment Plan for control period from FY 2016-17 to 2018-19
CapitalisationCapital Expenditure
67
TM/CAP Supply &
works (new
schemes)
Renewal of complete SCS assembly with
auto electrical drive system – 3 Nos. one
each in the three units of NCTPS 1
The internal mechanical parts along with the screen
basket got deformed beyond repairable condition,
leading to carry over of lot of debris in the sea water
discharged to the PHE. Also, much difficulties
experienced in the fabrication of quality screen basket
to withstand the back pressure that is created due to
severe chocking of debris, without auto cleaning
system. This causes raise in ACW temperature which in
turn result in reduction in Unit generation and
generation loss. Hence, this proposal is evolved for the
replacement of SCS with auto electrical drive system.
1.00Yet to be
obtained
Maintenance of the ACW temperature
within the operating limits will
improve the operation of the HT
equipments at its optimum capacity,
which will increase the generation of
the unit and in turn the Auxiliary
Power consumption will decrease.
1.000 1.000 - - - - - -
68
TM/CAP Supply &
works (new
schemes)
Renovation / refurbishment of complete
PHE assembly 2 sets including erection &
commissioning in Unit 1 & 2
Due to continuous service in saline water, the pressure
& end plates got rusted and the titanium plates got
deformed along with the erosion of gasket seating
portions, beyond repairable condition, leading to
leakage of ACW or mixing of ACW with sea water.
This causes shutdown of the Unit and wastage of entire
ACW water. Hence, it is proposed to renovate /
refurbishment one complete PHE assembly in units 1 &
2 during the COH 2016.
1.35Yet to be
obtained
Partial loss of generation due to raise
in H2 gas temperature and bearing
temperatures of Turbine & Boiler
auxiliaries is considerably reduced
due to proper maintenance of ACW
temperature. Cost of generation is
reduced due to avoidance of wastage
of ACW (DM water).
1.350 1.350 - - - - - -
69TM/CAP Supply
(new schemes)
Condensate Extraction Pump. Model: EN
5J40. Suitable for 210 MW KWU Set.
Spare Pump is required for immediate replacement,
common spare for the six nos. CEP in service in all the
three units. If any major breakdown /failure occurs in
the running pump, spare pump can be replaced with in
the minimum down time period.
2.00Yet to be
obtained
1)Can reduce the forced outage
downtime period to maximum extent
possible. 2). Very vital
equipment. Ensures availability of
standby. 3)Common spare for
the six nos. pumps in service in all
three units.
2.000 2.000 - - - - - -
70TM/CAP Supply
(new schemes)Procurement of LP Heater assembly
Due to prolonged service, puncture developed in the
LP heater shell and managed by patch welding. These
sort of punctures will lead to drop in vaccum and
isolation of the heater from service resulting in increase
in Heat Rate and in higher Generation cost. This spare
heater will require a lead time of min. of 4 years for
procurement from OEM M/S BHEL.
3.00Yet to be
obtained
Timely procurement of this spare will
enable replacement within a short
span of failure of the heater. This will
improve the Heat Rate and reduction
in generation cost.
3.000 3.000 - - - - - -
71TM/CAP Supply
(new schemes)Procurement of HP Heater assembly
Due to prolonged service, partition plate of FW passage
of the HP heaters got damaged and managed by patch
welding. This will lead to drop in FW temperature to
Economiser inlet, resulting in generation loss, increase
in Heat Rate and in higher Generation cost. This spare
heater will require a lead time of min. of 4 years for
procurement from OEM M/S BHEL.
4.00Yet to be
obtained
Timely procurement of this spare will
enable replacement within a short
span of failure of the heater. This will
improve the Heat Rate and reduction
in generation cost and generation loss.
4.000 4.000 - - - - - -
72TM/CAP Supply
(new schemes)BHEL Spares for Turbine & Auxiliaries
During COH of the Turbine, after dismantling of the
internals of HPT, IPT and LPT certain unanticipated
spares need to be replaced that can be procured only
from the OEM, M/S BHEL. Hence, to avoid Generation
loss for want of spares and to get genuine spare from
OEM this provision is given.
50.00Yet to be
obtained
1)Can avoid prolonged downtime for
want of spares and COH schedule can
be adhered. 2)PLF will
improve.
3)Genuine spares from OEM will
ensure long service life of the spares
and minimum forced outage of the
Turbine.
50.000 50.000 - - - - - -
73TM/CAP Spare
(new schemes)
1600 NB Inlet spool pipes for debris
filter with TIE rods, connecting bolts and
nuts for unit-1 &2
Due to saline atmosphere and frequent contact with sea
water the inlet spool pieces of the Condenser CW inlet
pipelines got eroded and corrded and need to be
replaced at the earliest to avoid permanent damage
beyond repairable condition and long shut down of the
Unit
1.20Yet to be
obtained
Can avoid generation loss for a
prolonged period for the replacement
of the inlet pipes, by way of timely
replacement in the scheduled COH
period.
1.200 1.200 - - - - - -
Page 89
![Page 107: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/107.jpg)
Capitalisation
(Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisation
(Rs. Crore)
Capital
Expenditur
e (Rs.
Crore)
FY 2016-17FY 2017-
18FY 2018-19
FY 2016-
17
FY 2017-
18FY 2018-19
FY 2016-17 FY 2017-18 FY 2018-19
S.
No.
Name of the
Scheme
Details of work furnishing list of major
itemsTechnical justification
Estimated
Cost (Rs.
Crore)
Details of
Board
approval
Cost benefit analysis
TANGEDCO's Submission Approved by the Commission
Capital Investment Plan for control period from FY 2016-17 to 2018-19
CapitalisationCapital Expenditure
74ECHS/MII/CAP
Works
i) ST-2000 Steel cord Conveyor Belt 2000
mm Belt width, Qty - 4000Metrs
ii)ST-1600 Steel cord Conveyor Belt 2000
mm Belt width, Qty-1800 meters
iii)ST-1400 Steel cord Conveyor Belt 2000
mm Belt width.Qty-1000 meters
iv)ST-1150 Steel cord Conveyor Belt 1600
mm Belt width, Qty-1200 meters (BCN-
59)
Quantity are Required for Replacement as and when
required to restore the conveyor system in operating
condition.
9.75 BLTC
For coal unloading from ship and coal
feeding to NCTPS-II(1 Unit) in
addition to Wagon Loading &
Transportation to ETPS/MTPS
9.750 9.750 - - - - - - - -
75ECHS/MII/CAP
WorksED Screen shaft & Disc pack Qty-1Set
Quantity are Required for Replacement required to
restore the equipment in EDS 3A for Revamping . 3.19
Administrative
Approval
obtained from
BLTC
To feed crushed coal to stage II units
for maintaining the generation.3.190 3.190 - - - - - -
76ECHS/MII/CAP
Works
Design, Engineering, Fabrication,
Supply, Erection, Testing,
Commissioning of two stream of
conveyors from JTB1at KPL CB-3 to JNT
61A at NCTPS and interlink with existing
ECHS including Operation &
Maintenance for the period of 5 years
To cater the coal requirement of ETPS Super critical
expansion project (1 x 660MW)291.00 Full Board
In order to ensure coal unloading from
ship at CB-III and coal feeding to
NCTPS-II(1 Unit) IN addition to the
coal feeding ETPS super critical Project
(1x660MW)
- 150.000 99.000 291.000 42.000 - 100.00 191.00 - - 291.00
77 ECHS/R&M
Improvement and modification in the
existing Dust Extraction System DE-2 at
JNT 50
To meet the statuary norms issued by TNPCB 1.50 BLTCTo meet the statutory norms isued by
TNPCB1.500 1.500 - - - - - - - -
78 ECHS/R&M
Revamping of conveyor structures,
renewal of purlin strctures and providing
metal sheet in BCN 45.
The existing Gallery, purlin structurals are severely
corroded conditon and the roof sheets also in damaged
condition. This single stream conveyor catering coal
feeding to stage-I and and also stage- II for units, the
work is essential
6.56 BLTCTo feed crushed coal to stage I &II
units for maintaining the generation6.560 6.560 - - - - - -
79 ECHS/R&MRenovation of existing Railway tracks of
NCTPS & AIP sidings
The existing Railway track in various locations are
provided with old version CST-9 sleepers. It has to be
replaced with new version of PSC sleepers as per the
railway norms for healthy track and movement of
wagon. Hence the above works are essentially required.
2.00 CE/NCTPS
For uninterupted coal transportation
to ETPS/MTPS for maintaining power
generation
2.000 2.000 2.00 - - 2.00 - -
80 ECHS/R&M
Design, supply, erection, testing and
commissioning of additional standby
parallel conveyor for BCN-45.
The existing BCN-45 is the single stream conveyor to
convey the crushed coal for ICHS/ECHS. Any
breakdown in this conveyor will affect the coal feeding
to stage I & II units. In order to avert this problem, the
proposal is evolved and it is essentially required.
80.00 Full Board
For coal unloading from ship and coal
feeding to NCTPS-I & II in addition to
& transportation to ETPS/MTPS.
40.000 80.000 40.000 40.00 40.00 - - 80.00 -
81 ECHS/R&M
Revamping of existing corroded
conveyor structure / JNT's/ hydrant
lines / DS lines in Conveyors BCN
43A/B, 45, 52 & 53.
To meet the statutory norms isued by TNPCB 1.50 CE/NCTPSTo meet the statutory norms issued by
TNPCB1.500 1.500 - - - - - -
82 ECHS/R&M
Design, Engineering, Supply,
Fabrication, Erection, testing and
Commissioning of Inter- Link Belt
Conveyors 3A/ 3B, Connecting ECHS
yards and ICHS yards.including
operation and maintenance for the period
of 3Years.
Increase the turn around of ships 55.10 Full Board Increase the turn around of ship 55.100 55.100 - - - 55.10 - - 55.10 -
83 ECHS/R&MSpares for Dust Exraction system DE-3,
DE-9, & DE-10,DE -11To meet the statuary norms issued by TNPCB 1.00 CE/NCTPS
To meet the statutory norms isued by
TNPCB1.000 1.000 - - - - - -
84 ECHS/R&M
Anti Wear plates for conveyors BCN 40
A/B , 41 A/B, 42 A/B, 44, 46 A/B &
51,52,53 & 45 & SCH-II
Essential spares to minimize breakdown 1.75 CE/NCTPS
For coal unloading from ship and coal
feeding to NCTPS-I & II in addition to
& transportation to ETPS/MTPS.
1.750 1.750 - - - - - -
Page 90
![Page 108: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/108.jpg)
Capitalisation
(Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisation
(Rs. Crore)
Capital
Expenditur
e (Rs.
Crore)
FY 2016-17FY 2017-
18FY 2018-19
FY 2016-
17
FY 2017-
18FY 2018-19
FY 2016-17 FY 2017-18 FY 2018-19
S.
No.
Name of the
Scheme
Details of work furnishing list of major
itemsTechnical justification
Estimated
Cost (Rs.
Crore)
Details of
Board
approval
Cost benefit analysis
TANGEDCO's Submission Approved by the Commission
Capital Investment Plan for control period from FY 2016-17 to 2018-19
CapitalisationCapital Expenditure
85 ECHS/R&MConveyor mesh guard for BCN 40 A/B,
41 A/B & 42 A/BEssential spares to minimize breakdown 1.30 CE/NCTPS 1.300 1.300 - - - - - -
86 ECHS/R&MRailway track spares and PSC set of
crossing sleepersRequired for Emergency replacement 2.00 CE/NCTPS For movement of coal to other TPS 2.000 2.000 - - - - - -
87 ECHS/R&M Supply of ballast, moorum Required for Emergency replacement 1.00 CE/NCTPS 1.000 1.000 - - - - - -
88 ECHS/R&MSteel Cord Conveyor Belt of various sizes
for ECHS Conveyors
Quantity are Required for Replacement as and when
required to restore the conveyor system in operating
condition.
9.75 BLTC
For coal unloading from ship and coal
feeding to NCTPS-II(1 Unit) IN
addition TO Wagon Loading &
Transportation TO ETPS/MTPS
9.750 9.750 - - - - - -
89 ECHS/R&M
Design, Engineering, supply and
Erection of Electrical operated Hoist to
lift counter weight in BCN 42A/B
To reduce the down time of equipment during the
breakdown of Conveyor/Equipment.1.20 BLTC
For coal unloading from ship and coal
feeding to NCTPS-II(1 Unit) IN
addition TO Wagon Loading &
Transportation TO ETPS/MTPS
1.200 1.200 1.20 - - 1.20 - -
90 ECHS/R&M
Design,Engineering,supply and Erection
of Electrical operated Hoist to liftr
counter weight in BCN 57
To reduce the down time of eqipment during
breakdown of Conveyor/Equipment.1.20 BLTC
For coal unloading from ship and coal
feeding to NCTPS-II(1 Unit) IN
addition TO Wagon Loading &
Transportation TO ETPS/MTPS
1.200 1.200 1.20 - - 1.20 - -
91 ECHS/R&M Strengthening of conveyor BCN 41A/B
The existing Conveyor Structurals erected 14 Years
Back. Some portion of structurals are showing sign of
corrosion. Hence the proposal is evolved.
1.50 BLTC
For coal unloading from ship and coal
feeding to NCTPS-II(1 Unit) IN
addition TO Wagon Loading &
Transportation TO ETPS/MTPS
1.500 1.500 - - - - - -
92 ECHS/R&M
Revamping of conveyor structures ,
renewal of purlin structures and
providing metal sheet in BCN 45.
The existing Conveyor Structurals erected 14 Years
Back. Some portion of structurals are showing sign of
corrosion. Hence the proposal is evolved.
6.70 BLTC
For coal unloading from ship and coal
feeding to NCTPS-II(1 Unit) IN
addition TO Wagon Loading &
Transportation TO ETPS/MTPS
3.000 6.700 3.700 - - - - - -
93ICHS/MII/ Capital
Works
Renovation of BFD -1A & 1B
technological structures, Chutes of
conveyor 4A/B, 5A/B & modification
sector gate at JT-8
The technological structures of BFD-1A/B, Chutes of
conveyor 4A/B, 5A/B are in wornout condition and
needs complete replacement & modification sector gate
into flap gate at JT-8
4.65 NIL
It is replacement of wornout
technological structures, Chutes of
conveyor 4A/B, 5A/B & modification
sector gate at JT-8 and to ensure
uninterrupted coal stacking
4.650 4.650 - - - - - -
94ICHS/MII/ Capital
Works
Renovation of Dust Extraction system
5A&5B at SCH - I
The equipments of Dust Extraction System 5A&5B at
SCH-I is in wornout condition and has to be completely
renovated and bring it to operation for containing the
coal dust emanating from the discharge chutes at SCH-I
1.00 NIL
To reduce pollution at SCH-I and to
meet the statutory norms issued by
TNPCB
1.000 1.000 - - - - - -
95ICHS/MII/Capital
Works
Design, Supply, Erection, Testing and
Commissioning of new DS pump house
with tank, pumps, pipes and valves @ JT-
4 including Mechanical, Elecrical & Civil
works
Construction of new tank for storage of raw water for
effective operation of dust suppression, sprinkler and
hydrant system to contain coal fires due to spontaneous
combustion of coal in the coal yards of ICHS
2.30 NIL
To reduce the loss of coal properties
and shortage of coal due to windage
and spontaneous combustion
2.300 2.300 - 2.30 - - 2.30 -
96ICHS/MII/Capital
Works
Supply of gear boxes, wheel bogies and
bucket wheel assy. for reclaimer and
stacker
The gear boxes, wheel bogies and bucket wheel assy. of
stacker and reclaimers are in wornout condition and
needs replacement with new ones to ensure Un-
interrupted coal feeding to the units of stage - I & II
3.25 NIL
To reduce the outage of the conveyor
system and ensure uninterrupted coal
stacking & feeding and sustain
continuous power generation
3.250 3.250 - - - - - -
97ICHS/MII/Capital
Works
Design, supply, erection, testing and
commmissioning of ILMS in conveyor
12A/B.
Provision of new ILMS at conveyor 12A/B drive end
before bunker conveyor is to reduce / prevent entry of
foreign materials into the mills and avoid breakdown
of mills for Un-interrupted coal feeding to the units of
stage - I & II
2.80 NIL Pay back period is 13 months 2.800 2.800 - - - 2.80 - - 2.80 -
98ICHS/MII/Capital
Works
Design, supply, erection, testing and
commmissioning of Flow divider at
conv.11A/B discharge chute
Provision of new flow divider at 11A/B discharge
chute is proposed for flexibilitiy routing for conveyor
12A/B, and to ensure Un-interrupted coal feeding to
the units of stage - I & II
3.30 NIL Pay back period is 1 to 2 years 3.300 3.300 - 3.30 - - 3.30 -
Page 91
![Page 109: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/109.jpg)
Capitalisation
(Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisation
(Rs. Crore)
Capital
Expenditur
e (Rs.
Crore)
FY 2016-17FY 2017-
18FY 2018-19
FY 2016-
17
FY 2017-
18FY 2018-19
FY 2016-17 FY 2017-18 FY 2018-19
S.
No.
Name of the
Scheme
Details of work furnishing list of major
itemsTechnical justification
Estimated
Cost (Rs.
Crore)
Details of
Board
approval
Cost benefit analysis
TANGEDCO's Submission Approved by the Commission
Capital Investment Plan for control period from FY 2016-17 to 2018-19
CapitalisationCapital Expenditure
99ICHS/MII/Capital
WorksStrengthening of conv.11A/B. and JT-I
The technological structures of conveyor 11A/B and
junction tower-1 structures are badly corroded and
need strengthening to prolong its life priod for another
10 years and ensure Un-interrupted coal feeding to the
units of stage - I & II
4.80 NIL
It is replacement of wornout
technological structures and to ensure
uninterrupted coal feeding
4.800 4.800 - - - - - -
100ICHS/MII/Capital
Works
Supply, Erection, Testing and
Commissioning of Hydraulic Brake
System for Reclaimer-I & Travelling
Tripper - B.
The Reclaimer-I and Travelling Tripper-B are in
continuous service and also due to normal wear & tear
the Electro Hydraulic Thrust Brakes which arrest the
movement of the machine is wornout condition.
Because of this the reclaimers / Travelling Tripper-B
tend to move backwards while reclaiming/feeding
causing decrease in loading of coal and also move
forward or backwards. Because of this movement the
Reclaimers have overshot the stoppers and causes
heavy damage to the structures. In order to arrest this
movement of the machines it has been proposed to
replace by a new Hydraulic Braking System.
1.55 NIL Pay back period is 2 months 1.550 1.550 - - - - - -
101ICHS/MII/Capital
Works
Replacement of the existing damaged
rails for Travelling Tripper-B with new
one at bunker floor.
The Travelling Tripper rails are in service for more
than 19 years. The prolonged service of this rails leads
to misalignment and change in rails surface level, due
to normal wear and tear and ageing of rails.This causes
to Tripper collision with stopper and leads to more
damage on rails. Hence it is essential to change the
rails set to avoid break down of the Travelling Tripper
and to maintain uninterrupted coal feeding to Stage-I
& Stage-II Unit bunkers.
1.40 NIL
It is a replacement of wornout rails
and to ensure uninterrupted coal
feeding to Stage-I & II units
1.400 1.400 - - - - - -
102ICHS/MII/Capital
Works
Renovation ,testing and commiissioning
of Dust Extraction System at bunker floor
for 3 units
The Dust Extraction System was erected 20 years back
at bunker floor for prevent the coal pollution at bunker
floor while coal feeding.It is essential to renovate the
wornout / damaged pipe lines, structures, bag filters ,
pumps etc., for bring back the Dust Extraction System
effective operative condition.
3.30 NILAs it comes under the pollution
control measures required by TNPCB3.300 3.300 - - - - - -
103ICHS/MII/Capital
Works
Design, Supply, Erection and
commissioning of Electrical Hoist for
lifting of counter weight of horizontal
gravity takeup of conveyor 7 & 9
For lifting of counter weight of 40MT while carrying
out any break down works in con-7 & 9 and thereby
reducing the down time of conveyors and bring back
the system in the shortest time.
2.00 NIL Pay back period is 2 years 2.000 2.000 - 2.00 - - 2.00 -
104ICHS/MII/ Capital
Works
Renovation of the Reclaimer Bucket
wheel Assy. of Reclaimer I and drive
system of stacker I & reclaimer I boom
conveyor
The bucket wheel assy., Drive system of stacker-I and
Boom conveyor of stacker and reclaimers are in
wornout condition and needs replacement with new
ones to ensure Un-interrupted coal feeding to the units
of stage - I & II
4.50 NIL
It is a replacement of wornout spares
and to ensure uninterrupted coal
feeding to Stage-I & II units
4.500 4.500 - - - - - -
105ICHS/MII/ Capital
Works
Renovation of conveyor equipments of
ICHS conveyors.
The various conveyor equipments are in wornout
condition and needs replacement with new ones to
ensure Un-interrupted coal feeding to the units of
stage - I & II
14.00 NIL
It is a replacement of wornout spares
and to ensure uninterrupted coal
feeding to Stage-I & II units
14.000 14.000 - - - - - -
106ICHS/MII/Capital
Works
Renovation of HFO return pipeline from
Unit -I
The HFO Pipelines are in wornout condition and needs
replacement with new ones to ensure Un-interrupted
coal feeding to the units of stage - I & II
1.00 NIL
It is a replacement of wornout
pipelines and to ensure uninterrupted
power generation at Stage-I units
1.000 1.000 - - - - - -
107ICHS/MII/Capital
Works
Modification of DFC 1040 model fluid
coupling to sc- 14 for Ring granulator A1
& B1
The existing DFC 1040 Fluid coupling have to be
modified with SC-14 coupling for Ring Granulator
A1&B1. To ensure uninterraped coal stacking to stage I
& II units
1.00 NIL Pay back period is 2 years 1.000 1.000 - 1.00 - - 1.00 -
Page 92
![Page 110: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/110.jpg)
Capitalisation
(Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisation
(Rs. Crore)
Capital
Expenditur
e (Rs.
Crore)
FY 2016-17FY 2017-
18FY 2018-19
FY 2016-
17
FY 2017-
18FY 2018-19
FY 2016-17 FY 2017-18 FY 2018-19
S.
No.
Name of the
Scheme
Details of work furnishing list of major
itemsTechnical justification
Estimated
Cost (Rs.
Crore)
Details of
Board
approval
Cost benefit analysis
TANGEDCO's Submission Approved by the Commission
Capital Investment Plan for control period from FY 2016-17 to 2018-19
CapitalisationCapital Expenditure
108ICHS/MII/Capital
Works
Design, supply, Erection and
commissioning of Electrical Hoist for
conveyors 11A/B, 12A/B & 13 A/B
For lifting of counter weight and other equipments
while carrying out any break down works in con-
11A/B, 12A/B & 13A/B thereby reducing the down
time of conveyors and bring back the system in the
shortest time.
3.00 NIL Pay back period is 2 years 3.000 3.000 - 3.00 - - 3.00 -
109ICHS/MII/Capital
Works
Renovation of Reclaimer and stacker
Drive systems.
The Drive system of stacker and reclaimers are in
wornout condition and needs replacement with new
ones to ensure Un-interrupted coal feeding to the units
of stage - I & II
5.00 NIL
It is a replacement of wornout spares
and to ensure uninterrupted coal
feeding to Stage-I & II units
5.000 5.000 - - - - - -
110ICHS/MII/Capital
Works
Renovation of HFO return pipeline form
Unit 2 & 3
The HFO Pipelines are in wornout condition and needs
replacement with new ones to ensure Un-interrupted
coal feeding to the units of stage - I & II
2.00 NIL
It is a replacement of wornout
pipelines and to ensure uninterrupted
power generation at Stage-I units
2.000 2.000 - - - - - -
111ICHS/MII/Capital
Works
Renovation of conveyor structurals and
junction towers
The structures of ICHS Conveyor and junction towers
are in wornout condition and needs complete
replacement to ensure Un-interrupted coal feeding &
stacking to the units of stage - I & II
15.00 NIL
It is a replacement of wornout
structures, of ICHS Conveyor and
junction towers to ensure
uninterrupted coal stacking and
feeding
15.000 15.000 - - - - - -
112ICHS/MII/Capital
Works
Renovation of Dust Extraction System
DE-5B, 5C and DE-7
The Dust Extraction System was erected 20 years back
at SCH-I for prevent the coal pollution at SCH-I while
coal feeding. It is essential to renovate the wornout /
damaged pipe lines, structures,bag filters , pumps etc.,
for bring back the Dust Extraction System effective
operative condition.
3.00 NIL
To reduce pollution at SCH-I and to
meet the statutory norms issued by
TNPCB
3.000 3.000 - - - - - -
113EM-CHP/MII/
Capital Works
procurement of 3 phase Squirrel cage HT
Induction motors for coal crushers
available in ECHS and ICHS
Spare motors for coal crushers for emergency
replacement1.07
TANGEDCO
Proceedings
No.65/Dt.
06.02.2015
For immediate replacement during
breakdown of the existing BHEL
motors in the crushers of ECHS and
ICHS and to ensure uninterrupted
operation in connection with
unloading of coal ships, coal stacking
and feeding to NCTPS Stage-I & II
Unit Bunkers
1.070 1.070 - - - - - -
114 CM I/CAP Construction of effluent treatment plant
for stage-I As per TNPCB norms 20.00
Estimate will
be sent after
consultancy
study
As per the TNPCB norms this work
has to be carried out20.000 20.000 20.00 - - 20.00 - -
115 CM I/CAP Construction of sewage treatment plant
for stage-I As per TNPCB norms 8.00
Estimate will
be sent.
As per the TNPCB norms this work
has to be carried out8.000 8.000 8.00 - - 8.00 - -
116 CM I/CAP Construction of motor repair bay and
stage building near switch yard
Inadiquate space for storing vital equipments in the
existing repair bay and reconditioning the motors in
time during overhaul
4.00Estimate to be
sent
Inadiquate space for storing vital
equipments in the existing repair bay
and reconditioning the motors in time
during overhaul
4.000 4.000 4.00 - - 4.00 - -
117 CMII/CAPImprovement to the ash dyke road & ash
slurry pipe line road.
This road formation is regard for safe mainteance of
ash dyke.1.50
Estimate to be
sent
This road formation is regard for safe
mainteance of ash dyke.1.500 1.500 1.50 - - 1.50 - -
118 CMII/CAP
Additional school building with other
improvement works to the existing
school building at Vallur camp.
This for the benefit of Vallur camp residents. 1.00 AwaitedThis for the benefit of Vallur camp
residents.1.000 1.000 1.00 - - 1.00 - -
119
Establishing a
desalination plant
of 10MLD capacity
inside NCTPS Stage-
I premises to meet
the raw water
requirement of
NCTPS Stage-I & II.
Establishing a desalination plant
including pipe lines for intake and brine
disposal.
To meet out the requirement of Raw water for the
power Generation.219.42
Proposal to be
submitted- 50.000 - 150.000 219.420 19.420 - 20.00 150.00 - - -
Page 93
![Page 111: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/111.jpg)
Capitalisation
(Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
Capitalisation
(Rs. Crore)
Capital
Expenditur
e (Rs.
Crore)
FY 2016-17FY 2017-
18FY 2018-19
FY 2016-
17
FY 2017-
18FY 2018-19
FY 2016-17 FY 2017-18 FY 2018-19
S.
No.
Name of the
Scheme
Details of work furnishing list of major
itemsTechnical justification
Estimated
Cost (Rs.
Crore)
Details of
Board
approval
Cost benefit analysis
TANGEDCO's Submission Approved by the Commission
Capital Investment Plan for control period from FY 2016-17 to 2018-19
CapitalisationCapital Expenditure
120
Improvement to
the roads in ICHS
& ECHS area
Hydrogen plant
sides & CWPH area
formation of RCC roads and drains To reach the site in time to attend the works. 10.00Proposal to be
submitted10.000 10.000 - - - - - -
121
Extension of Ware
house building by
Constructing
Compound wall,
Formation of Yard
and other Civil
works
Consuction of Compound wallTo stack the essential spares now at central stores near
ADM building.1.00
Proposal to be
submitted1.000 1.000 1.00 - - 1.00 - -
122
Colour washing
and other civil
works all junction
towers, Control
rooms, LCSS and
crusher rooms at
ICHS and ECHS
area
Replacing alu. Windows, brick work and
other civil works.To maintain the Coal handling system. 1.30
Proposal to be
submitted1.300 1.300 - - - - - -
123
Improvement
works around New
Ash silo including
providing vehicles
parking platforms,
widening of
existing road and
other civil works.
widening of RCC road, plot form for
vechiles and other civil works.
As per the TNPCB instruction Ash silo has to be
shiflied to outer area from Power House.2.00
Proposal to be
submitted1.000 2.000 1.000 1.00 1.00 - - 2.00 -
124
Construction of
cooling towers for
power house.
construction of cooling tower. As per the TNPCB instruction. 300.00Proposal to be
submitted- 170.000 300.000 130.000 - 10.00 100.00 - - -
125
Improvement to the
peripheral
compound wall
Compound wall work For security 1.00Proposal to be
submitted1.000 1.000 - 1.00 - - 1.00 -
126Miscellaneous
PaymentsAll SE's of NCTPS below 1 Crore Misc. Payments 30.00
Proposal to be
submitted10.000 10.000 30.000 10.000 - - - - - -
1661.88 483.24 807.92 260.82 610.14 917.82 243.82 194.85 276.39 451.40 128.07 191.17 323.40 Grand total............
Page 94
![Page 112: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/112.jpg)
Capitalisatio
n (Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisation
(Rs. Crore)
Capital
Expendit
ure (Rs.
Crore)
Capitalisatio
n (Rs. Crore)
Capital
Expenditure
(Rs. Crore)
FY 2016-
17
FY 2017-
18
FY 2018-
19FY 2016-17 FY 2017-18 FY 2018-19
1 Division Oil & Ash
Handling division fly
ash conveying lines
Providing spare line for ash
conveying lines from ESP to
fly ash silos
There are two lines available for fly ash conveying from
ESP (A,B,C,D passes) buffer hopper to fly ash silo. These
lines are getting punctured frequently due to errosion.
There is no standby or spare line available due to which
the ash conveying is stopped frequently for attending the
damaged portions causing the raise of level in ESP hoppers
due to which the fields are got shot. Hence this spare line
is essentially required for continuous evacuation of fly ash
from ESP hoppers and to maintain a sustained
generation.
4.75 Approved vide
CMD No: 395 dt
30.08.16
The amount spent for
new additional fly
ash conveying lines
will be recovered in
34 days.
4.75 4.75
4.75 - - 4.75 - -
2 Mill Plant Division
Providing of
maintenance platform
Providing of maintenance
platform approach at mill
area, providing of sun shield
roof platform over the mill
repair bay, Extension of hoist
moving rails at mill repair
bay etc.,
Hoist approach repair bay (Half area) area is not sufficient
while keeping of mill retrieved spares during mill
overhauling. Hence it is proposed to cover the unroofed
repair bay and extension of Hoist moving rails for
handling of heavy weight mill retrieved spares during
overhauling of coal mills. Hot air gates, Hot air dampers,
cold air gates and cold air dampers were provided at
various levels. Necessary approach platforms are not
provided by the M/s.EPC contractor during erection.
Much difficulties are being faced for maintenance of above
said gates and dampers while unit is in service condition.
1.00 1.00 1.00
1.00 - - 1.00 - -
3 Mill Plant Division -
Milling system
Procurement of coal mill
roller tyre complete
assembly – 1 set. Complete
set: Roller shaft – 3 No’s
Roller tyre – 3 No’s., Hub - 3
No’s Thrust piece - 3 No’s,
Yoke assembly – 3 No’s Two
types of bearing – 3 No’s.,
Rotary shaft seal – 3 No’s.
This proposal is for procurement of 1 set of roller tyre
complete assembly complete set(1 set consists of 3 Nos
Roller assemblies) for keeping the assemblies as ready for
replacing the wornout roller assembly, to be retrived from
any mill which will be taken up for overhaul within the
shortest possible time and hence the period of overhaul
could be minimised from 30 days to 15 days and thus
increasing the availability of the mills for trouble free
operation and sustained generation for which the
proposed 1 set of Roller Tyre complete assembly (1 set
consists of roller assemblies ie., for 1 mill requirement) is
very much essential. This type of coal mills are not in
service in TANGEDCO Thermal Power Plant.
2.60 TANGEDCO pro
(CMD) No. 153
dt.24.05.16
2.60 2.60
- - - - - -
4 Boiler Maintenance
division, Boiler water
heating system
Procurement of spares for
Boiler Water Wall Auxiliary
steam Heating system
To Preheat the water in water walls of boiler during light
up periods to bring the unit early for generation. This will
reduce the light up time by 3 to 4 hours
2.00 To be approved
since it is a new
one.
2.00 2.00
- - - - - -
5 Boiler Maintenance
division Boiler water
system
Procurement of spares for
Modification of Super Heater
Drain
Existing line sizes are in smaller due to that draining of
water process takes large duration. To reduce the time
duration modification is essential.
2.00 To be approved
since it is a new
one.
2.00 2.00
- - - - - -
Sl.
No.
Details of Board
approval
MECHANICAL-I CIRCLE
Cost benefit analysis
TANGEDCO's Submission Approved by the Commission
CAPITAL INVESTMENT PLAN FOR THE CONTROL PERIOD - 2016-17 TO 2018-19 (AFTER COD 12.10.2013)
METTUR THERMAL POWER STATION-II(1 X 600MW)
ANNEXURE 4
Capital Expenditure Capitalisation FY 2018-19FY 2016-17 FY 2017-18
Name of the schemeDetails of work furnishing
list of major itemsTechnical Justification
Estimated Cost
(Rs.in Crs.)
Page 114
![Page 113: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/113.jpg)
Capitalisatio
n (Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisation
(Rs. Crore)
Capital
Expendit
ure (Rs.
Crore)
Capitalisatio
n (Rs. Crore)
Capital
Expenditure
(Rs. Crore)
FY 2016-
17
FY 2017-
18
FY 2018-
19FY 2016-17 FY 2017-18 FY 2018-19
Sl.
No.
Details of Board
approvalCost benefit analysis
Capital Expenditure Capitalisation FY 2018-19FY 2016-17 FY 2017-18
Name of the schemeDetails of work furnishing
list of major itemsTechnical Justification
Estimated Cost
(Rs.in Crs.)
- - - - - -
6 EM Division HV
Breaker and EHV
Insulator of SAB type
230 kV GIS HV Breaker
Compartment (Single pole)
Essentially required for failure replacement in case of
emergency. SABs transfer power from GIS to
Transmission lines. Failures are susceptible in joints.
Hence, availability of spare SABs are required to ensure
continuous evacuation of power. Failure of breaker pole
will result in the non-availability of 230 kV circuit. If spare
active part is available, the downtime can be minimized to
restore the circuit early.
2.50 Proposal is being
evolved for
obtaining
administrative
approval
2.50 2.50
- - - - - -
7 TGM & CA Dn
Procurement of Spare
cartridge
Procurement of 1 No
cartridge for TDBFP
To maintain generation of 600 MW, 2 Nos. TDBFPs will
have to be in service. If any problem arises in any one of
the TDBFP, MDBFP will be put into service which
increases the auxiliary consumption by 8 MW and also the
unit will be in service without standby Feed pump. In that
condition if any problem arises in the running TDBFP, the
unit load has to be reduced to 300MW and in case of any
problem in MDBFP the unit could not be lit up which will
further result in forced outage of the unit. Hence
procurement of 1 No TDBFP as spare is very much
essential.
5.50 Request for
Admininstrative
approval has been
sent already and
approval awaited
5.50 5.50
- - - - - -
8 TGM & CA Dn
Procurement of LP
Turbine blades
LP Turbine Last 3 Stage fixed
and moving blades including
fasteners – 1 set
In LP Turbine there is a probability that the last three
stage blades may fail in long run. Failure of LP Turbine
blades will result in shutdown of the unit. Hence spare
blades are necessary for replacement in case of failure of
the last three stage blades.
15.00 To be approved
since it is new one
15.00 15.00
- - - - - -
9 TGM & CA
DnProcurement of
Generator rotor
Generator Rotor -1 No In Case of failure of Generator rotor, repair of the rotor
will take long time. For emergency replacement to bring
back the unit early spare rotor is necessary.
25.00 To be approved
since it is new one
25.00 25.00
- - - - - -
10 TGM & CA
DnProcurement of Spare
cartridge
Procurement of Motor driven
Boiler Feed Pump Cartridge
One No. MDBFP will be in service during lit up and as
auto standby for Feed pumps during full load. Incase of
any failure of MDBFP the unit could not be lit up. Hence
spare cartridge for
5.50 To be approved
since it is new one
5.50 5.50
- - - - - -
- - - - - -
11 Coal Conveying System Design, Engineering,
Manufacture, Supply,
Erection, testing and
Commissioning of a New
Single Conveyor connecting
the Existing Junction Tower
#6 and Junction Tower # 2
At present, the feeding of coal from wagon tipplers are
being carried out through a series of Conveyors 1A/B, 2
A/B ,3 A/B , 4 A/B , 5 A/B , 6 A/B , 8 A/B , 10 A/B , 11
A/B, 12 A/B and 13 A/B, RBF by introducing the
proposed new Conveyors, the running of the following
equipments could be avoided. Conveyor 6 A/B, 8 A/B, 10
A/B, 11 A/B and RBF 8 to 12, which results i) savings in
energy consumption, ii) reduction in wear and tear of
equipments, iii)minimzing downtime due to the
breakdown of the above equipments, iv)reduced risk of
fire due to non-spillage of coal, v)better working
environment due to non-spillage of coal.
18.83 To be approved
since it is a new
proposal
Yet to be awarded 13.80 18.83 5.03
13.80 5.03 - - 18.83 -
12 Project & Environment Continuous Ambient Air
Quality monitoring station
To meet out the statutory requirement of TNPCB Norms 2.07 To be approved
since it is a new
proposal
statutory requirement
of TNPCB Norms
2.07 2.07
2.07 - - 2.07 - -
ELECTRICAL SYSTEM/MTPS-II
MECHANICAL-II/MTPS-II
Page 115
![Page 114: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/114.jpg)
Capitalisatio
n (Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisation
(Rs. Crore)
Capital
Expendit
ure (Rs.
Crore)
Capitalisatio
n (Rs. Crore)
Capital
Expenditure
(Rs. Crore)
FY 2016-
17
FY 2017-
18
FY 2018-
19FY 2016-17 FY 2017-18 FY 2018-19
Sl.
No.
Details of Board
approvalCost benefit analysis
Capital Expenditure Capitalisation FY 2018-19FY 2016-17 FY 2017-18
Name of the schemeDetails of work furnishing
list of major itemsTechnical Justification
Estimated Cost
(Rs.in Crs.)
- - - - - -
13 Construction of 2 blocks
of ‘U’ type and 2 blocks
of ‘T’ type 6 Blocks of ‘R’
type Residential
Quarters including
internal Electrification
water supply, protection
wall and Sewage and
Drainage arrangements
Construction of new quarters For the accommodation of MTPS II officers and Staff 12.00 B.P (FB) No: 158
(TB) dt.
For the
accommodation of
MTPS II officers and
Staff
6.00 12.00 6.00
6.00 6.00 - - 12.00 -
14 Construction of balance
P, Q, R, S, T, U and V
Type permanent
Residential quarters
(168 tenements)
including internal
electrification works,
Sewage, Drainage, Water
line and Compound wall
arrangements.
Construction of new quarters For the accommodation of MTPS II officers and Staff 46.58 TANGEDCO
P.No: 34 (TB)
dt 7.6.16
For the
accommodation of
MTPS II officers and
Staff
6.58 20.00 46.58 20.00
6.58 20.00 20.00 - - 46.58
145.33 18.42 44.80 74.83 75.03 52.08 25.50 34.20 31.03 20.00 7.82 30.83 46.58 Grand total..........
Civil circle/MTPS-II
Page 116
![Page 115: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/115.jpg)
Capitalisatio
n (Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisation
(Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisatio
n (Rs. Crore)
Capital
Expenditure
(Rs. Crore)
FY 2016-17 FY 2017-18 FY 2018-19 FY 2016-17 FY 2017-18 FY 2018-19
Operation
1
Procurement: Installation & Commissioning of
4Nos Continuous Ambient Air Quality Monitoring
Station with data uploading facility to TNPCB.
To ensure compliance of conditions stipulated
by TNPCB/CPCB3.00 yet to be obtained 2.00 2.00 1.00 1.00 0.00 0.00 2.00 1.00 - 2.00 1.00 -
- - - - - -
2Exciter set for 600MW
Generator
Spare for Unit-I & II incase of failure of existing
one.20.00 Anticipated 0.00 0.00 20.00 20.00 - - 20.00 - - 20.00
3 Boiler circulating water pump with motorSpare for Unit-I & II incase of failure of existing
one.3.67 FB No:4 Dt: 29.01.2016 3.67 3.67 0.00 0.00 3.67 - - 3.67 - -
4 Rotor for 600 MW Generation Spare for Unit-I & II 45.00 0.00 0.00 45.00 45.00 - - 45.00 - - 45.00
- - - - - -
5Impeller Blades and its accessories for PA Fan
(PAF 20/10-6-2)
Expert Committee approval has been accorded
vide Page No,94, Sl.No.25 of CE/MTS
Lr.No.D.2002/ 13,dated 18.10.2013
2.00
Note approved by the
CMD/ TANGEDCO ON
11.09.2014
PROCEEDINGS (cmd)
No.405 )
Spares to avoid the loss of
Generation (Loss= Rs.6 Crs per
day as per Generation cost Rs.4
per Unit
2.00 2.00 0.00 0.00 - - - - - -
6
Hot Air Dampers for PA Fan (PAF 20/10.06-2) and
FD fan (FAF24.5/11-2) and FD Fan Impeller Blades
and its accessories.
Expert Committee approval has been accorded
vide item No.2 of CE/MTS Dt. 18.09.15, 19.09.15,
22.09.15, 23.09.15 & 29.09.15.
2.50Proposal sent for HQ
approval
Spares to avoid the loss of
generation (Loss-Rs. 6 Crs per
day as per generation Cost Rs. 4
per Unit).
0.00 2.50 2.50 0.00 - - - - - -
7Complete Fan rotor assembly for PA Fan (PAF
20/10.6-2) and FD fan (FAF 24.5/11-2).
Expert Committee approval has been accorded
vide item No.2 of CE/MTS Dt. 18.09.15, 19.09.15,
23.09.15 & 29.09.15.
6.00
Spares to avoid the loss of
generation (Loss= Rs. 6 Crs per
day as per generation cost Rs. 4
per Unit).
0.00 6.00 6.00 0.00 - - - - - -
8 Mill Planetary Gear Box for XRP 1043 Bowl Mill
NCTPS-II is the first 600MW units of BHEL
make in the TANGEDCO, Hence, interchanged
possibility could not be carried out.
3.00 Under Progress
In order to avoid loss of
generation due to planetary gear
box.
0.00 0.00 3.00 3.00 - - - - - -
- - - - - -
9
Bottom Ash Handling System - Modification work
(Phase-I) of the existing bottom ash handling
system with new primary clinker grinder and
modified hydro ejection (jet pump) to improve the
efficiency and performance of unit - II including
supply, erection, Commissioning and complete
design in a phased Manner
1st Phase: 1) Providing one new primary
clinker grinder/crusher to reduce the 150 to
200mm lumps into (-) 25mm size.
2) The existing clinker grinder to be placed
under the bottom ash silo to act as secondary
crusher. 3)The new jet
pump/hydro ejectors to be erected for faster
formation and disposal of slurry
3.31
Per. TANGEDCO Pro.
(CMD) No. 401 Dt.
11.09.15
Pay Back Period 5 month 0.00 0.91 0.00 0.91 3.31 1.49 - - - - - -
10
Carrying out modification work in BCN 48A/B by
providing mechanical drive instead of existing
hydraulic drive for tube free operation and
maintenance. (Tech pro (800 T/Hr) incomplete to
be modified for (2000 T/Hr)
Coupling, resilient coupling, structural
materials, civil works, all pulley, conveyor belts,
drive frames, HT motor 650KW, Electrical
HT3.3kV cables for scoops 50sq and cooler fan.
IDB for JN, structural materials and other civil
materials to achieve the conveying capacity of
2000TPH
9.81
Per. TANGEDCO Pro.
(CMD) No. 486 Dt.
06.11.15
Pay Back Period 2.01 Years 0.00 4.90 9.81 4.91 0.00 - - - - - -
98.29 7.67 13.48 19.31 15.32 71.31 69.49 5.67 1.00 65.00 5.67 1.00 65.00
Capital Investment Plan for control period from FY 2016-17 to 2018-19(After COD 20.03.2014 & 08.05.2014)
NORTH CHENNAI THERMAL POWER STATION-STAGE-II(2X600MW)
ANNEXURE 5
Approved by the Commission
Sl. No. Technical justification
Estimated
Cost
(Rs.in Crs)
Details of Board approval Cost benefit analysis
Capital Expenditure Capitalisation
TANGEDCO's Submission
FY 2018-19
Electrical System
Mechanical - I
Mechanical - II
Grand Total
FY 2016-17 FY 2017-18Name of the
CircleDetails of work furnishing list of major items
Page 122
![Page 116: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/116.jpg)
Capitalisat
ion (Rs.
Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expendit
ure (Rs.
Crore)
Capitalisat
ion (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
FY 2016-
17
FY 2017-
18
FY 2018-
19
FY 2016-
17
FY 2017-
18FY 2018-19
1 Power House
2
Static excitation provision to all
Units
At present all the units of Kundah Power House-2 are being
operated with conventional rotating Excitation system.
Whenever the voltage varies in the grid, the terminal
voltage of the Generator to be adjusted automatically to
avoid over voltage in the stator winding. In order to
establish safe operation, the entire excitation to be modified
to static excitation system.
3.00 To be obtained By avoiding the outage of the
units and cost of new winding
of 35 MW, the incurred cost
will be made good within 3
years.
0.00 1.00 3.00 2.00 0.00
1.00 2.00 - - 3.00 -
2 Power House
2
Providing steel barriguard
supporting arrangements on the
upstream side of switchyard at
KPH-2.
Huge mass of boulders and debris slided from the upstream
of switch yard and damaged most of the equipment in
230kV switch yard of KPH-2. This barricade is essential to
avoid similar incident in future.
1.20 M.No.CE/H/SE/H(E)/Sec NI/
AEE2/F.EST/D.81/2013 Dt.16.04.13
The entire cost shall be
realeased within 2 years by
way of outages and
replacement of equipments.
1.20 1.20 0.00 0.00
1.20 - - 1.20 - -
3 Power House
3
Providing 230/22 kV SS at switch
yard
At present the outdoor L.T.supply of Kundah PH.2, PH.3, &
PH.4 is fed from Mettupalayam SS. If any breakdown ocurrs
in 22 kV feeder which is passing through several K.M in the
dense forest, the outdoor L.T. supply will not be available
in these Power Houses at that time the units cannot be
started in cases of blackout of the entire grid. Hence for
reliability a new 230 kV/22kV is proposed at Kundah Power
House-3.
7.51 M.No.CE/H/SE/H(E)EEH/AEE6/F.
EST/KPH3/D.2114/15 Dt.07.11.15
The entire amount can be
realised with in 5 years.
7.51 7.51 0.00 0.00
7.51 - - 7.51 - -
4 Moyar Power
House
Conversion of existing Leopard
conductor of 110 kV Moyar to
Singara DC feeder by panther
conductor
At present both the 110kV feeders of Moyar to Singara are
over loaded and the replacement of existing leopard
conductor with panther conductor is necessary
2.15 Proposal is being evolved. Amount can be realised with
in 5 years.
0.00 1.00 2.15 1.15 0
1.00 1.15 - - 2.15 -
5 RMU of Moyar Power House, i.e.
uprating the existing 3x12 MW
Units to 3x14 MW Units.
The uprating of all the 12 MW units by 14 MW is possible to
meetout the peak demand of the grid by the additional
6MW .
65.45 To be obtained. The proposal is yet
be evolved
The expenditure can be
realised with in 2 years.
0.00 0.00 0.00 20.00 65.45 45.45
- - 20.00 - - -
6 Providing 110/11 kV substation at
moyar for power evacuation and
OSS supply to the Moyar,
PUSHEPH and Singara
At present the Moyar winch and the power evacuation of
Maravakandy Mini Power House depend on 11kV Singara
to Moyar feeder. Also several loads of Nilgiris Distn. Circle
were connected in this feeder. Several breakdown occurs in
this feeder regularly causing interruption in operation of
winch & Maravakandy Power House. Hence a 110kV/11kV
S.S. is proposed at Moyar switchyard.
2.35 To be obtained. The proposal is
under process.
The expenditure can be
realised with in 5 years.
0.00 1.00 2.35 1.35 0.00
1.00 1.35 - - 2.35 -
7 Provision of 1 No new 18,000hp
Pelton turbine runner
At present the released runner 2Nos have served more than
60 years and could not be reconditioned further for trouble
free operation of all 3 Units a new spare runner is essential
2.50 Estimate submitted to head quarters
vide Lr. No. SE/ G/ K/ AEE/ GL/
HD/ F.MOYAR PH/ PR.39/ 16,
DTD. 25.01.2016.
By reducing the outage of the
units the expenditure could be
released with in 2yrs.
2.50 2.50 0.00 0.00
2.50 - - 2.50 - -
DIVISION-I
ANNEXURE 6
KUNDAH GENERATION CIRCLE(843.65 MW)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
FY 2016-17 FY 2017-18 FY 2018-19
Cost benefit analysis
TANGEDCO's Submission Approved by the Commission
S. No.Name of the
Scheme
Details of work furnishing list of
major itemsTechnical justification
Estimated Cost
(Rs.in Crs.)Details of Board approval
Capital Expenditure Capitalisation
Page 127
![Page 117: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/117.jpg)
Capitalisat
ion (Rs.
Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expendit
ure (Rs.
Crore)
Capitalisat
ion (Rs.
Crore)
Capital
Expenditu
re (Rs.
Crore)
FY 2016-
17
FY 2017-
18
FY 2018-
19
FY 2016-
17
FY 2017-
18FY 2018-19
FY 2016-17 FY 2017-18 FY 2018-19
Cost benefit analysisS. No.Name of the
Scheme
Details of work furnishing list of
major itemsTechnical justification
Estimated Cost
(Rs.in Crs.)Details of Board approval
Capital Expenditure Capitalisation
8 Common to
all Power
House
Provision of multifunctional relays
in major power house ( 28 Units)
and other relays a.Numerical
Distance Protection Relay 230kV
class =9 Nos b.Numerical
Distance Protection Relay 110kV
class =15 Nos c.Directional over
current Relay =10 Nos.
D.Check Synchronizing relay = 5
Nos e.Earth Fault Relay
=5 Nos.
All the old version relays of Power House's are to be
replaced with latest version protection system for safety to
the equipments of Power House's
1.90 Obtained periodically By ensuring safety of costly
equipments of Power House's
the amount can be realised
with in 5 years.
0.00 0.90 0.00 0.50 1.90 0.50
0.90 0.50 0.50 - - 1.90
86.06 11.21 15.11 7.50 25.00 67.35 45.95 15.11 5.00 20.50 11.21 7.50 1.90 Sub total.......
Page 128
![Page 118: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/118.jpg)
Capitalisation
(Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisation
(Rs. Crore)
Capital
Expenditure (Rs.
Crore)
Capitalisation
(Rs. Crore)
Capital
Expenditure
(Rs. Crore)
FY 2016-17 FY 2017-18 FY 2018-19 FY 2016-17 FY 2017-18 FY 2018-19
1 PERIYAR RMU Works
Periyar PH
Periyar PH machine 1, 2 & 3
commissioned during 1958 and
4th machine during 1965.
Since the machine served more
than 50 years, RMU for all the
4 old machines has been taken
up and works under progress.
29.17 CE/POH/ 688 Considering
Generaion loss
from the outage
of aged old
machines, the
revenue can be
realised through
RMU of old
machines
29.17 29.17
29.17 - - 29.17 - -
2 RMU Works of
Kodayar PH I
78.59 After getting
approval from the
Board
Payback period
is 1.91 years
78.59 78.59
- 5.00 25.00 - - -
3 RMU Works of
Kodayar PH II
60.00 After getting
approval from the
Board
Payback period
is 1.91 years
60.00 60.00
- - 20.00 - - -
4 PAPANASAM Upgradation of
governor at
Servalar Power
House
Existing governor is outdated
and hence, it is proposed to
upgrade the governor.
5.00 After getting
approval from the
Board
Payback period
is 1.91 years
5.00 5.00
- - - - - -
5 83 schemes which
are below the
monetory limit of
Rs.1crore
Essential for smooth
functioning of Power House
1.32 1.32 1.32
1.32 - - 1.32 - -
174.08 174.08 174.08 0.00 0.00 0.00 0.00 30.49 5.00 45.00 30.49 - - Sub total............
ANNEXURE 7
TIRUNELVELI GENERATION CIRCLE(372.80 MW)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
TANGEDCO's Submission
DIVISION-I
KODAYAR
Since the machines have
served more than 45 years, it is
proposed to improve the
efficiency of the machines so as
to increase the generation with
the same quantity of water
inflow.
FY 2018-19FY 2017-18FY 2016-17
Approved by the Commission
S. No.Name of the
Scheme
Details of work
furnishing list
of major items
Technical justificationEstimated Cost
(Rs.in Crs.)
Details of Board
approval
Cost benefit
analysis
Capital Expenditure Capitalisation
Page 129
![Page 119: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/119.jpg)
Capitalisation
(Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisation
(Rs. Crore)
Capital
Expenditure (Rs.
Crore)
Capitalisation
(Rs. Crore)
Capital
Expenditure
(Rs. Crore)
FY 2016-17 FY 2017-18 FY 2018-19 FY 2016-17 FY 2017-18 FY 2018-19
Capital Investment Plan for control period from FY 2016-17 to 2018-19
TANGEDCO's Submission
FY 2018-19FY 2017-18FY 2016-17
Approved by the Commission
S. No.Name of the
Scheme
Details of work
furnishing list
of major items
Technical justificationEstimated Cost
(Rs.in Crs.)
Details of Board
approval
Cost benefit
analysis
Capital Expenditure Capitalisation
Page 130
![Page 120: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/120.jpg)
Capitalisation
(Rs. Crore)
Capital
Expenditure (Rs.
Crore)
Capitalisation
(Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisatio
n (Rs. Crore)
Capital
Expenditure (Rs.
Crore)
FY 2016-17 FY 2017-18 FY 2018-19 FY 2016-17 FY 2017-18 FY 2018-19
1 Kadamparai
Pumped
Storage PH
Rectification works in stator and
rotor colis and re-insulation of
entire stator coils with class'F'
Insulation,and Rotor coils with
Class'H' insulation, mechanical
works, re-fixing, dynamic
balancing, including
supervision, erection, testing
and commissioning of UnitIV
Generator.
To bring the Unit.4 into
service for Generator
and pump mode
operation
3.68 Lr.No.CE/H/SE/H(
E)/EH/A8/F.HE231
3/WCT.No.80/D.52
7/18.dt.10.03.15
3.68 3.68
- - - - - -
2 Aliyar Power
House
Provision of 1 no. 3 MVA 110/22
KV Station Transformer to
Aliyar PH
Maintaining
uninterupted Power
Supply to Aliyar Power
House (1x60MW) and
230/110KV Aliyar Sub
Station
2.50 1.00 2.50 1.50
1.00 1.50 - - 2.50 -
3 Kadamparai
Pumped
Storage PH
Replacing & Commissioning of
existing GSX - 5e (Generator
protection system) by numerical
relay system for generator Unit-
I, III & IV at Kadamparai PH
To prevent unnecessary
tripping during
generation
1.50 0.60 1.50 0.90
0.60 0.90 - - 1.50 -
4 Kadamparai
Pumped
Storage PH
Replacing of existing Auto
sequencer panel by new digital
version and governer for unit
I,II,III,IV supply, erection,
testing and commissioning work
For upgrading the PLC
from Hardware to
software operation to
avoid frequent failure
in the old system and to
operate the unit
without any
interruption due to old
system
40.00 12.00 12.00 40.00 16.00
12.00 12.00 16.00 - - 40.00
5 Kadamparai
Pumped
Storage PH
Refurbishment , Fabrication,
Supply Installation,Testing and
Commissiong of Air Ventilation
System, after dismantling of the
existing damaged & deteriorated
HVAC - Equipments from the
Cavern and switchyard of
Kadamparai Power House
To maintain air
temperature humidity
inside the cavern for
efficient operation of
control and relay panels
3.35 1.34 3.35 2.01
- - - - - -
6 Kadamparai
Pumped
Storage PH
Mandatory spares to
Microprocessor based digital
static frequency converter with
associated static excitation
system for four Units at
Kadamparai Power House
To run the machine
without interruption
1.10 0.44 1.10 0.66
0.44 0.66 - - 1.10 -
7 Kadamparai
Pumped
Storage PH
Procurement of BHEL Turbine
spares for 100MW Unit-1 to 4 of
kadamparai Power House.
Kept as spare for
emergency
7.02 2.21 7.02 4.81
- - - - - -
8 Kadamparai
Pumped
Storage PH
Provision of 1 no. 230 KV/ 22
KV, 12.5 MVA Station Service
Transformer for alternate supply
at 230 KV Switch yard,
Kadamparai PH.
For alternate
arrangements
2.25 0.90 2.25 1.35
- 0.90 1.35 - - 2.25
ANNEXURE 8
KADAMPARAI GENERATION CIRCLE(595.45 MW)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
FY 2016-17 FY 2017-18 FY 2018-19
TANGEDCO's Submission
Details of Board
approval
Estimated Cost
(Rs.in Crores)Technical justification
Details of work furnishing list
of major items
Name of the
Scheme
S.
No.
Capital Expenditure Capitalisation
Approved by the Commission
Page 130
![Page 121: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/121.jpg)
Capitalisation
(Rs. Crore)
Capital
Expenditure (Rs.
Crore)
Capitalisation
(Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisatio
n (Rs. Crore)
Capital
Expenditure (Rs.
Crore)
FY 2016-17 FY 2017-18 FY 2018-19 FY 2016-17 FY 2017-18 FY 2018-19
FY 2016-17 FY 2017-18 FY 2018-19
Details of Board
approval
Estimated Cost
(Rs.in Crores)Technical justification
Details of work furnishing list
of major items
Name of the
Scheme
S.
No.
Capital Expenditure Capitalisation
9 Kadamparai
Pumped
Storage PH
Estimate for providing lighting
arrangements from 501 entry to
power house cavern by new
bright lights at KPH( LED
Energy Saving)
To save energy 2.00 1.00 2.00 1.00
- 1.00 1.00 - - 2.00
10 Kadamparai
Pumped
Storage PH
KGC- KPH - EM-I Estimate for
the replacement of transformer
oil for 3 Nos. (U.V.W Phases)
45MVA 11/230 KV Single Phase
Power Transformer of Unit-3&4
at KPH -sanctioned -Regarding.
To replace aged oil by
new oil
1.00 1.00 1.00
- - - - - -
11 Kadamparai
Pumped
Storage PH
KGC-KPH-EM-I-Estimate for
Unit - 3 stator Coils with F Class
insulation & rotor pole Coils
with H class insulation
improvement works at KPH
To replace aged coil by
new higher insulated
coil
5.00 5.00 5.00
- - - - - -
12 Kadamparai
Pumped
Storage PH
KGC-KPH-EM-I-Estimate for
Unit - 1 stator Coils with F
Class insulation improvement
works at KPH
To replace aged coil by
new higher insulated
coil
3.00 3.00 3.00
- - - - - -
13 Kadamparai
Pumped
Storage PH
KGC-KPH-EM-I-Estimate for
Spare New stator Coil with F
Class insulation for 1 No Unit
works at KPH (396 Nos )
To be kept as spares 2.00 2.00 2.00
- - - - - -
14 Kadamparai
Pumped
Storage PH
KGC-KPH-EM-I-Estimate for
Spare New Rotor Coil with H
Class insulation for 1 No Unit
works at KPH (12 Nos )
To be kept as spares 2.00 2.00 2.00
- - - - - -
15 Sholayar.
PH's
Renovation, Modernisation
and Uprating(RMU) of Sholayar
Power House.I From 2x35 MW
to 2x42 MW
Upgradation the
machine 35 MW to 42
MW
84.10 1.(Rt) CMD
TANGEDCO
Proceedings No.23
dt.26.02.2015
2. FB TANGEDCO
Proceedings No.22
dt.16.02.2015
Rs.90.44Rt CMD
TANGEDCO
Proceedings No.5
dt.19.01.2015
Rs.2.47
16.82 16.82 84.10 50.46
16.82 16.82 50.46 - - 84.10
160.50 3.68 35.88 14.45 44.00 142.37 80.62 30.86 33.78 68.81 - 5.10 128.35
Note:- For Sl.Nos.5,7,11,12,13,14, the capital expenditure has not been allowed as it is to covered under Repairs and Maintenance since this station has not covered its full life period .
Sub total...........
Page 131
![Page 122: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/122.jpg)
Capitalisation (Rs.
Crore)
Capital
Expenditure (Rs.
Crore)
Capitalisation
(Rs. Crore)
Capital
Expenditure (Rs.
Crore)
Capitalisatio
n (Rs. Crore)
Capital
Expenditure (Rs.
Crore)
FY 2016-
17
FY 2017-
18
FY 2018-
19
FY 2016-
17
FY 2017-
18
FY 2018-
19
1 Procurement of materials
for 230 KV switchyard as
per CEA's task force at
TUNNEL PH.
5 Core CT CVT &
LAS.
As per CEA's task
force
recommendation.
1.25 M.No.CE/H/SE/H(E
)/EE/HP/AEE9/F.TP
H/ESST/D.2291/15,D
T.18.12.15
CR.No:194/ 2015-16
dt 16.12.15
For protection of Power
Transformer of
switchyard equipments.
0.50 1.25 0.75 0.00
0.50 0.75 - - 1.25 -
2 RLA Study at Tunnel PH. Proposal
submitted.
To improve the
Generation
2.00 ---- Since the machines have
served more than 15
years. If RLA study has
been done the
equipment can be
served further 30 years
and the capacity can be
increased to about 5 to
10 MW with available
resources.
2.00 2.00
- - 2.00 - - 2.00
- - - - - -
3 Provision of ATRCM at
BPH-1 / CKR.
ATRCM Grabler
and other
accessories.
To reduce the loss of
generation due to
chocking.
3.50 ---- While considering the
generation loss due to
chocking the erection of
ATRCM will impove
the generation.
0.00 0.00 3.50 3.50
- - 3.50 - - 3.50
4 Two nos. of lift type barrage
gates ( 15m x 9m) and
dismantling of old barrage
gates , erection and
commissioning of new
barrage gates at gate no. 3&
14 at BPH-1 / CKR.
Design ,
manufacturing &
supplying of
barrage gates - 2
nos.
The gates 3 & 14 had
suddenly broken &
collapsed on
24.06.2015 and
01.08.2015
respectively.
2.03 TANGEDCO
Proceeding no.512 dt.
28.11.2015.
For generation of power
and to regulate the flow
during surplus and
flood condition.
Replacement of new
gates is must for good
operation conditions.
0.00 2.03 2.03 0.00
- 2.03 - - 2.03 -
5 Strengthening ,
Reconditioning and
painting of 7 nos. of barrage
gates at BHP-2 / NPT.
Replacement of 3
bottom three ducts
& strengthening of
top 3 ducts , rollers
, bearings & seals.
duct
The gates are in
corroded condition
due to continuously
immersed in water
and needs
replacement
&strengthening to
ensure good operating
conditions.
4.06 TANGEDCO
Proceeding no.422 dt
26.09.2015
For generation of power
and to regulate the flow
during surplus and
flood condition.
Strengthening and
reconditioning of gates
must for good operation
conditions.
2.03 4.06 2.03 0.00
- - - - - -
6 5 nos. of lift type barrage
gates ( 15m x 9m) and
dismantling of old barrage
gates , erection and
commissioning of new
barrage gates at BPH-2 /
NPT.
Design ,
manufacturing &
supplying of
barrage gates - 5
nos.
The gates are in
corroded condition
due to continuously
immersed in water
and needs
replacement to ensure
good operating
conditions.
5.08 ---- For generation of power
and to regulate the flow
during surplus and
flood condition.
Replacement of new
gates is must for good
operation conditions.
0.00 0.00 5.08 5.08
- - 5.08 - - 5.08
- - - - - -
Division Mettur PHS
DIVISION BPH-1/Chekkanur
DivisionBKB-II/Vendipalayam
ANNEXURE 9
ERODE GENERATION CIRCLE(483.50 MW)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
FY 2016-17 FY 2017-18 FY 2018-19
TANGEDCO's Submission Approved by the Commission
S. No. Name of the Scheme
Details of work
furnishing list of
major items
Technical
justification
Estimated Cost
(Rs.in Crs.)
Details of Board
approvalCost benefit analysis
Capital Expenditure Capitalisation
Page 134
![Page 123: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/123.jpg)
Capitalisation (Rs.
Crore)
Capital
Expenditure (Rs.
Crore)
Capitalisation
(Rs. Crore)
Capital
Expenditure (Rs.
Crore)
Capitalisatio
n (Rs. Crore)
Capital
Expenditure (Rs.
Crore)
FY 2016-
17
FY 2017-
18
FY 2018-
19
FY 2016-
17
FY 2017-
18
FY 2018-
19
Capital Investment Plan for control period from FY 2016-17 to 2018-19
FY 2016-17 FY 2017-18 FY 2018-19
TANGEDCO's Submission Approved by the Commission
S. No. Name of the Scheme
Details of work
furnishing list of
major items
Technical
justification
Estimated Cost
(Rs.in Crs.)
Details of Board
approvalCost benefit analysis
Capital Expenditure Capitalisation
7 provision of ATRCM at BKB
PH-2/ Vendipalayam
Design ,
procurment
manufacturing, site
erection of ATRCM
with Hydraulic
grabler and trash
disposal vehicle.
Civil structure for
trash unloading
and tractor placing
area
Trash rack chocking
creates heavy loss
and the load could be
increased to the rated
capacity. Also
underneath chocking
could be removed
only with help of
TRCM
3.50
----
While considering
generation loss due to
trash rack chocking,
erection of ATRCM will
improve generation
0.00 0.00 3.50 3.50
- - 3.50 - - 3.50
21.42 0.00 2.53 7.34 4.81 14.08 14.08 0.50 2.78 14.08 - 3.28 14.08 Sub total....
Page 135
![Page 124: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/124.jpg)
Capitalisatio
n (Rs. Crore)
Capital
Expenditur
e (Rs.
Crore)
Capitalisation
(Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisatio
n (Rs. Crore)
Capital
Expendit
ure (Rs.
Crore)
FY
2016-
17
FY 2017-
18
FY 2018-
19
FY 2016-
17
FY 2017-
18FY 2018-19
1 Capital Fuel Nozzle Assemblies, Combustion Liners, Cross Fire
Tubes & Retainers in Combustion chamber are to be
inspected & damaged parts if any will be replaced.
Combustion Inspection is a Mandatory inspection & it has to be
done for every 8000hours of running to improve efficiency of GT.
12.87 To be obtained Due to overhauling of combustion chambers
specific gas Consumption will be reduced
thereby Heat rate will be reduced.
12.87 12.87
- - - - - -
2 Capital Refurbishement of the damaged Turbine Parts so as to
bring back the Gas Turbine and the Steam Turbine of
Phase-II into service.
Major Parts to be replaced . Turbine Stator Blades -
Stage- 1 , Turbine Stator Blades - Stage 2 , Turbine
Stator Blades - Stage 3, Turbine Rotor Blades - Stage 1,
Turbine Rotor Blades - Stage- 2, Turbine Rotor Blades -
Stage- 3 & Hub Assembly
Repair of major used parts : Blade Carrier, Diagonal
Swirlers & Oil Boxes
The unit is under shutdown from 23.1.15 due to high vibration in
GT. Hence the damaged turbine parts are to be refurbished.
78.30 B.P.16/ dt
9.2.16
To bring back the unit which is under long shut
down therby avoiding loss of generation & MGO
charges payable for nonusage of gas.
70.30 78.30 8.00
- - - - - -
3 Capital TWAD Water Storage Reservoir RCC Additional raw water to be collected from TWAD Board & stored in
the storage tank for use in HRSG so as to reduce the cost of
chemical which is being used in the water treatment and also
reduce the ground water conservation .
1.75 This raw water is used in HRSG so as to reduce
the cost of chemical which is being used in
water treatment and also reduce the ground
water conservation
1.75 1.75
1.75 - - 1.75 - -
4 Capital TWAD Board Water initial deposit Additional raw water to be collected from TWAD Board & stored in
the storage tank for use in HRSG so as to reduce the cost of
chemical which is being used in the water treatment and also
reduce the ground water conservation .
2.25 This raw water used in HRSG so as to reduce
the cost of chemical which is being used in
water treatment and also reduce the ground
water conservation
2.25 2.25
- - - - - -
5 Capital GT and Generator Major Overhauling work of Phase-II It is a Mandatory inspection to be carried out after every 50,000
firing hours recommended by OEM. During that inspection the
combustion chamber,Fuel Nozzle , Nozzle arrangements, Buckets
and shrouds are being inspected and the deteriorated items will be
replaced with the refurbished/ New items, as the combustion
chambers & internals were overhauled specific gas consumption is
reduced thereby Heat rate is also improved. Further, Major
overhauling was carried out in 2014-15 at the first time in VGTPS-II
from the date of commissioning in the year 2008.
2.70 Board. Vide
B.P.32/dt
1.3.14
Improvement in Power generation at GTG . 2.70 2.70
- - - - - -
6 Capital Security Deposit, Advance water charges for 6 months
and Infra structure charges to be paid in respect of TWAD
Water scheme.
Additional raw water to be collected from TWAD Board & stored in
the reservoir for Plant usage .
1.18 This raw water is used in HRSG so as to reduce
the cost of chemical which is being used in
water treatment and also reduce the ground
water conservation
1.18 1.18
- - - - - -
7 Capital Solar Evaporation Pond (SEP) SEP is Mandatory as per TNPCB norms and this amount was
already recovered from M/s.BGR while closing the P.O.
2.41 Effulent from DM Plant, Boiler & Neutralising pit
are to be disposed off after treatment as per
TNPCB Norms.
2.41 2.412.41 - - 2.41 - -
8 Capital Entire GT comprising of Combustion chamber, Hot Gas
path zone and Gas Turbine is to be inspected in Major
inspection and damaged parts if any will be replaced.
Major Inspection is a Mandatory inspection & it has to be
carriedout every 48000 hours of opeartion
96.00 To be obtained Less Gas Consumption which will reflect in the
cost of gas
96.00 96.00
- - - - - -
9 Capital Installation of new Gas Booster Compressor The compressor at Phase-I is being used in Phase-II. Hence there
will be no standby GBC for both units. Hence it is proposed to
provide a new Centrifugal type compressor thereby reducing the
loss of generation for want of standby GBC.
30.00 To be obtained GBC is a Critical item and standby GBC is very
much essential to avoid loss of generation in
the case of breakdown due to problem in GBC.
30.00 30.00
- - 30.00 - - 30.00
10 Capital Overhauling of Steam Turbine and replacement of
damaged parts.
Overhauling of Steam Turbine is Mandatory as per OEM
recommendation. For ensuring healthiness and for better
performance of the Steam Turbine, it is to be overhauled.
5.00 To be obtained Efficiency of ST will improve thereby generation
will inCrs.ease.
5.00 5.00- - 5.00 - - 5.00
11 Capital GTG Mark V Operating system upgradation DOS to
Windows in Phase-I
Existing system CPU spares obsolete 1.00 To be obtained Upgradation of system resulted in reducing the
trip due to failure of cards which was obsolete
and irrepairable condition .
1.00 1.00- 1.00 - - 1.00 -
12 Capital GT and GBC I,II Upgradation of GT and GBC I, II-
Vibration and temperature monitoring and control panel
in Phase-I
Existing electronic cards obsolete 1.20 To be obtained 1.20 1.20- 1.20 - - 1.20 -
13 Capital STG and BOP Upgradation of DCS WS POSE Server
I,II,HMI system in Phase-I
Existing system obsolete-Upgradation as per OEM recommendation 5.80 To be obtained 5.80 5.80 - 5.80 - - 5.80 -
ANNEXURE 10
VALUTHUR GAS TURBINE POWER STATION(187MW)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
2018-192016-17 2017-18
TANGEDCO's Submission Approved by the Commission
Cost benefit analysis
Details of
Board
approval
Estimated
Cost
(Rs.in Crs.)
S.
No.
Name of
the
Scheme
Details of work furnishing list of major items Technical justification
Capital Expenditure Capitalisation
Page 139
![Page 125: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/125.jpg)
Capitalisatio
n (Rs. Crore)
Capital
Expenditur
e (Rs.
Crore)
Capitalisation
(Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisatio
n (Rs. Crore)
Capital
Expendit
ure (Rs.
Crore)
FY
2016-
17
FY 2017-
18
FY 2018-
19
FY 2016-
17
FY 2017-
18FY 2018-19
2018-192016-17 2017-18
Cost benefit analysis
Details of
Board
approval
Estimated
Cost
(Rs.in Crs.)
S.
No.
Name of
the
Scheme
Details of work furnishing list of major items Technical justification
Capital Expenditure Capitalisation
14 Capital Configuration of DCS control for GBC k4 and GBC k2 in
existing Siemens DCS system including spares
Instrumentation interface panels in Phase-II
for smooth operation of Gas Turbine 1.50 To be obtained The compressor at Phase-I is being used in
Phase-II. Hence there will no standby GBC for
both units. Hence it is proposed to provide new
standby Centrifugal type compressor for
continuous running of both units thereby
reduction in loss of generation. Hence the
exsiting DCS is to be configurated.
1.50 1.50
- - - - - -
15 Capital UPS-I, UPS-II Battery Bank for Steam Turbine Battery
Bank containing 277 X2Cells
For smooth operation of Plant 1.30 To be obtained To reduce the outages thereby reduction in loss
of generation.
1.30 1.30 - 1.30 - - 1.30 -
16 Capital Land for K4 GBC building For erection of new GBC K4 3.00 To be obtained To accommodate new GBC,land is necessary 3.00 3.00 - 3.00 - - 3.00 -
17 Capital Construction of buildings for K4 GBC and auxilliaries For erection of new GBC K4 3.00 To be obtained 3.00 3.00 - 3.00 - - 3.00 -
18 Capital Fuel Nozzle Assemblies, Combustion Liners, Cross Fire
Tubes & Retainers in Combustion chamber are to be
inspected & damage parts if any will be replaced.
Mandatory inspection to be done for every 8000hours of running to
improve efficiency of GT.
10.00 To be obtained Due to overhauling of combustion chambers
specific gas Consumption will be reduced
thereby Heat rate will be reduced.
10.00 10.00
- - 10.00 - - 10.00
19 Capital Minor inspection in Combustion chamber and the
damaged if any will be replaced
Minor Inspection is a Mandatory inspection & it has to be done for
every 8000hours of running to improve efficiency of GT.
2.00 To be obtained Due to overhauling of combustion chambers
specific gas Consumption will be reduced
thereby Heat rate will be reduced.
2.00 2.00- - 2.00 - - 2.00
20 Capital Spare Steam Turbine Generator overhauling in Phase-I at
VGTPS.
Overhauling of Steam Turbine Generator is Mandatory as per OEM
recommendation. For ensuring healthiness and for better
performance the Steam Turbine Generator,it is to be overhauled.
3.00 To be obtained There will be improve-ment in the STG power
output thereby inCrs.ease in revenue .
3.00 3.00
- - - - - -
264.26 23.16 93.46 226.1 155.8 15 15 4.16 15.30 47.00 4.16 15.30 47.00 Sub total...........
Page 140
![Page 126: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/126.jpg)
Capitalisatio
n (Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisatio
n (Rs. Crore)
Capital
Expenditur
e (Rs.
Crore)
Capitalisatio
n (Rs. Crore)
Capital
Expenditure (Rs.
Crore)
FY 2016-
17FY 2017-18 FY 2018-19 FY 2016-17 FY 2017-18 FY 2018-19
1 Capital Upgradation of MMI
System of pro control p13
DCS system
The existing DCS system is
obsolete & hence the company
suggested for upgradation of
MMI system
2.50 To be
obtained
The frequent trips due to card
failure will be reduced thereby loss
of generation will be reduced.
2.50 2.50
- 2.50 - - 2.50 -
2 Capital Fuel Nozzle Assemblies,
Combustion Liners, Cross
Fire Tubes & Retainers in
Combustion chamber are
to be inspected &
damaged parts if any will
be replaced.
Combustion Inspection is a
Mandatory inspection & it has to
be done for every 8000hours of
running to improve efficiency of
GT.
12.87 To be
obtained
Due to overhauling of combustion
chambers specific gas
Consumption will be reduced
thereby Heat rate will be reduced.
12.87 12.87
- - - - - -
3 Capital Replacement of inlet air
filter house.
Major parts to be replaced
Inlet air filtration system,
Evaporative cooler,
Transition piece.
The existing inlet air filter house
is in corroded condition and
many holes have developed due
to corrosion. At present these
holes are covered by providing
metal patches. The air admitted
into the Gas Turbine should be
free from any dust and other
solid particles, otherwise would
cause severe physical damages
to the rotating Gas Turbine parts.
The OEM authorised Service
Agency, M/s.BHEL-GE Gas
Turbine Services Pvt.Ltd., have
also advised to replace the inlet
air filter house with a new one.
Hence, the replacement is
essential.
6.87 To be
obtained.
Avoidance of unexpected damage
to the Gas Turbine Parts due to
entry of foreign material thereby
reducing forced outages and loss
of generation.
6.53 6.87 0.34
6.53 0.34 - - 6.87 -
4 Capital Supply, Erection &
commissioning of Air
Cooled condensor
The STG is having surface water
cooled condenser to condense
126.8 TPH exhaust steam flow at
a pressure of 0.115 bar.The
surface condenser cooling
medium is ground water drawn
through deep bore well, whose
conductivity is in the order of
3000µS /cm, as against
1000µS/cm during the
commissioning of the plant
during 2001.Frequent condenser
tube failures is experienced. To
avoid frequent tube failure, it is
proposed to replace the existing
worn out water cooled surface
condenser by new Air Cooled
Condenser.
32.00 B.P.No.401/
dt 9.9.14
The Condenser Tube puncture will
be reduced after commissioning of
ACC thereby reduction in loss of
generation . Further effective
cooling result in increase in
generation
0.00 20.00 32.00 12.00
- 20.00 12.00 - - 32.00
ANNEXTURE 11THIRUMAKKOTTAI GAS TURBINE POWER STATION(107.88MW)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
2018-192016-17 2017-18
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of
the
Scheme
Details of work
furnishing list of major
items
Technical justification
Estimated
Cost
(Rs.in Crs.)
Details of
Board
approval
Cost benefit analysis
Capital Expenditure Capitalisation
Page 144
![Page 127: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/127.jpg)
Capitalisatio
n (Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisatio
n (Rs. Crore)
Capital
Expenditur
e (Rs.
Crore)
Capitalisatio
n (Rs. Crore)
Capital
Expenditure (Rs.
Crore)
FY 2016-
17FY 2017-18 FY 2018-19 FY 2016-17 FY 2017-18 FY 2018-19
2018-192016-17 2017-18S.
No.
Name of
the
Scheme
Details of work
furnishing list of major
items
Technical justification
Estimated
Cost
(Rs.in Crs.)
Details of
Board
approval
Cost benefit analysis
Capital Expenditure Capitalisation
5 Capital Entire GT comprising of
Combustion chamber, Hot
Gas path zone and Gas
Turbine is to be inspected
in Major inspection and
damaged parts if any will
be replaced.
Combustion Inspection is a
Mandatory inspection & it has to
be carriedout every 48000 hours
of opeartion
96.00 To be
obtained
Less Gas Consumption which will
reflect in the cost of gas .
96.00 96.00
- 96.00 - - 96.00 -
6 Capital Overhauling of Steam
Turbine and replacement
of damaged parts.
Overhauling of Steam Turbine is
Mandatory. For ensuring
healthiness and for better
performance of the Steam
Turbine, it is to be overhauled.
5.00 To be
obtained
Efficiency of ST will improve
thereby generation will increase.
5.00 5.00
- 5.00 - - 5.00 -
7 Capital Fuel Nozzle Assemblies,
Combustion Liners, Cross
Fire Tubes & Retainers in
Combustion chamber are
to be inspected & damage
parts if any will be
replaced/ refurbished.
Mandatory inspection to be done
for every 8000hours of running
to improve efficiency of GT.
10.00 To be
obtained
Due to overhauling of combustion
chambers specific gas
Consumption will be reduced
thereby Heat rate will be reduced.
10.00 10.00
- - 10.00 - - 10.00
8 Capital Major overhauling of STG
Generator
STG Overhauling is Mandatory as
per OEM recommendation. It was
made in Dec'15. However, STG
rotor blades are to be replaced
with new one during 2018-19
since the existing blades are
slightly damaged condition &
generation at STG is slightly
lesser than the previous
generation. Hence the repairing
works will be carriedout in FY
2018-19 after procuring the new
blades.
1.00 To be
obtained
There is vibration in STG. Full load
in STG could not be reached.After
replacing the STG rotor new
blades there will be improvement
in STG generation
1.00 1.00
- - - - - -
9 Capital Stage-III Bucket Combustion Inspection is a
Mandatory inspection & it has to
be carriedout after every 8000
Hours as per OEM
recommendation. During that
inspection the combustion
chambers are being inspected
and the deteriorated items will
be replaced with the refurbished/
New items. Further, these items
were released during Hot Gas
Path Inspection held in Sep'14
and the same was sent to BHEL-
GE for refurbishment. The same
will be used as common spare
for T(K)GTPS, KGTPS &VGTPS-I.
2.15 Board
approved
BP:25 dt
04.03.15
Refurbished item will be 77.956%
lesser than the original cost of this
item.
2.15 2.15
- 2.15 - - 2.15 -
168.52 17.52 32.52 108.00 119.00 43.00 17.00 6.53 125.99 22.00 - 112.52 42.00 Sub total...........
Page 145
![Page 128: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/128.jpg)
Capitalisati
on (Rs.
Crore)
Capital
Expenditur
e (Rs.
Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisati
on (Rs.
Crore)
Capital
Expenditure
(Rs. Crore)
FY 2016-
17
FY 2017-
18
FY 2018-
19
FY 2016-
17
FY 2017-
18
FY 2018-
19
1 Capital Fuel Nozzle Assemblies,
Combustion Liners, Cross Fire
Tubes & Retainers in
Combustion chamber are to
be inspected & damaged
parts if any will be replaced.
Combustion Inspection is a
Mandatory inspection & it
has to be done for every
8000hours of running to
improve efficiencyof GT.
12.87 To be obtained Due to overhauling of
combustion chambers
specific gas Consumption
will be reduced thereby
Heat rate will be reduced.
12.87 12.87
- - - - - -
2 Capital Construction of quarters Due to non-availability of
quarters, operating
personnel are coming from
the nearby towns. Normally
1 hour to 2 hour will be
taken for pooling the
operating personnels when
the outage occurs in odd
hours and Holidays.
7.42 Adm. approval
obtained vide
(Per) (F.B)
TANGEDCO
PROCEEDING
NO:47 Dated
02.04.2014 for
Rs.8.42 Crs..
The loss of generation will
be reduced as the outage
will be attended at the
earliest possible time.
7.42 2.97 4.45 7.42
2.97 4.45 - - - 7.42
3 Capital Fuel Nozzle Assemblies,
Combustion Liners, Cross Fire
Tubes & Retainers in
Combustion chamber are to
be inspected & damage parts
if any will be replaced.
Combustion Inspection is a
Mandatory inspection & it
has to be done for every
8000hours of running to
improve efficiency of GT.
12.00 To be obtained Due to overhauling of
combustion chambers
specific gas Consumption
will be reduced thereby
Heat rate will be reduced.
12.00 12.00
- - - - - -
4 Capital Entire GT comprising of
Combustion chamber, Hot Gas
path zone and Gas Turbine is
to be inspected in Major
inspection and damaged parts
if any will be replaced.
Major inspection is a
Mandatory inspection & it
has to be carriedout every
48000 hours of opeartion
35.00 To be obtained Less Gas Consumption
which will reflect in the
cost of gas .
35.00 35.00
- - - - - -
5 Capital Overhauling of Steam Turbine
and replacement of damaged
parts.
Overhauling of Steam
Turbine is Mandatory as
per OEM recommendation.
For ensuring healthiness
and for better performance
of the Steam Turbine, it is
to be overhauled.
5.00 To be obtained Efficiency of ST will
improve thereby
generation will increase.
5.00 5.00
- - - - - -
72.29 20.29 20.29 12.00 12.00 40.00 40.00 2.97 4.45 - - - 7.42 Sub total.........
ANNEXTURE 12
KUTTALAM GAS TURBINE POWER STATION(101 MW)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
TANGEDCO's Submission Approved by the Commission
2016-17 2017-18 2018-19
S.
No.
Name of
the
Scheme
Details of work furnishing
list of major itemsTechnical justification
Estimated
Cost
(Rs.in
Crs.)
Details of Board
approvalCost benefit analysis
Capital Expenditure Capitalisation
Page 147
![Page 129: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/129.jpg)
Capitalisatio
n (Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisation
(Rs. Crore)
Capital
Expenditure
(Rs. Crore)
Capitalisation
(Rs. Crore)
Capital
Expenditure
(Rs. Crore)
FY 2016-17 FY 2017-18FY 2018-
19
FY 2016-
17
FY 2017-
18
FY 2018-
19
1 Capital Procurement of 1 set of III stage
shroud & Nozzle for Hot Gas Path
Inspection in Unit-IV at BBGTPS
Hot Gas Path Inspection is a Mandatory & it
has to be carriedout at every 1200 starts as
per OEM recommendation. During that
inspection , the Combustion chambers &
internal parts of the Gas Turbine (All
shrouds & Nozzles) will be inspected and
the deteriorated items will be replaced with
the refurbished/ New items
1.00 Administrative
approval is to
be obtained.
Due to overhauling of
Combustion chambers
specific gas Consumption
will be reduced thereby
Heat rate will be reduced.
1.00 1.00
- - 1.00 - - 1.00
2 Capital Procurement of 1 set of III stage
shroud & Nozzle for Hot Gas Path
Inspection in Unit-I at BBGTPS
These spares are to be replaced during the
above inspection.
1.00 Administrative
approval is to
be obtained
Less Naphtha Consum-
ption which will reflect in
the cost of generation
1.00 1.00
- 1.00 - - 1.00 -
3 Capital Compressor discharge casing &
Turbine casing of Gas Turbine of
Unit-III
As there is a crack in the Turbine casing this
unit could not be operated under Genration
mode. In order to use this unit for real
power generation this work has to be
carried out.
10.79 Administrative
approval is to
be obtained
As the units at BBGTPS re
to kept standby to meet
any emeregency tomaintain
Grid Stability.
10.79 10.79
3.50 7.29 - - 10.79 -
12.79 0.00 0.00 12.79 12.79 0.00 0.00
517.86 60.97 146.27 358.89 299.59 98.00 72.00 3.50 8.29 1.00 - 11.79 1.00 Sub total.....
Grand total(Annexures-I to IV).....
ANNEXTURE 13
BASIN BRIDGE GAS TURBINE POWER STATION(120 MW)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
2018-192016-17 2017-18
TANGEDCO's Submission Approved by the Commission
S.
No.
Name of
the
Scheme
Details of work furnishing list
of major itemsTechnical justification
Estimated
Cost
(Rs.in Crs.)
Details of
Board
approval
Cost benefit analysis
Capital Expenditure Capitalisation
Page 149
![Page 130: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/130.jpg)
Capitalis
ation
(Rs.in
Crs.)
Capital
Expendit
ure
(Rs.in
Crs.)
Capitalisat
ion
(Rs.in
Crs.)
Capital
Expendit
ure
(Rs.in
Crs.)
Capitalis
ation
(Rs.in
Crs.)
Capital
Expendit
ure
(Rs.in
Crs.)
FY 2016-
17
FY 2017-
18
FY 2018-
19
FY 2016-
17
FY 2017-
18
FY 2018-
19
1
DRIP
WORKS
UNDER
WORLD
BANK
FUNDED
Dam Rehabilitation and
Improvement Project
Works Under World
Bank Funded Scheme
(38 Dams)
General Improvement
Works and
E & M Works
272.00
G.O.(MS)
No.341.,
dated
26.11.2010
B.P. (F-B)
No.126
(Tech
Branch)
dt.11.09.
2008
Does not arise 0.00 104.00 272.00 160.82 0.00 104.00 160.82 0.00 0.00 272.00 0.00
272.00 0.00 104.00 272.00 160.82 0.00 0.00 104.00 160.82 0.00 0.00 272.00 0.00
1
2
3
4
Approved by the Commission
Capital Expenditure Capitalisation
Cost benefit
analysis
ANNEXURE 14
DAM REHABILITATION AND IMPROVEMENT PROJECT
Capital Investment Plan 2016-17 & FY 2017 - 18
FY 2016-17 FY 2017-18 FY 2018-19
Sl.
No.
Details of
Board
approval
Estimated
Cost
(Rs.in Crs.)
Technical
justification
Details of work
furnishing list of
major items
TANGEDCO's Submission
Sub total.......
Avalanche dam CE/CD/Chennai/accept No. 01/D.348/Dt.12.12.2014
Name of
the
Scheme
Glenmorgan dam CE/CD/Chennai/accept No.02/D.349, dt.12.12.2014
Kadamparai dam CE/CD/Chennai/accept No. 04/D.16/Dt.12.01.2015
Mukkurthy dam CE/CD/Chennai/D.384, dt.30.01.2015
Page 170
![Page 131: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/131.jpg)
Page 172
![Page 132: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/132.jpg)
Capitalisatio
n
(Rs.in Crs.)
Capital
Expenditure
(Rs.in Crs.)
Capitalisat
ion
(Rs.in Crs.)
Capital
Expenditure
(Rs.in Crs.)
Capitalisatio
n
(Rs.in Crs.)
Capital
Expenditure
(Rs.in Crs.)
FY 2016-
17FY 2017-18 FY 2018-19 FY 2016-17 FY 2017-18 FY 2018-19
1 Land AcquisitionCompensation value
towards land acquired3.54
Per BP
TANGEDCO
Proc. No. 16
(TB) dt. 10.12.10
1.75 1.75 1.79 1.79 0.00 0.00 1.75 1.79 0.00 1.75 1.79 0.00
2
Construction of boundary
pillars at submergible
lands at LF & RF
To demarcate the
boundary of land0.55 0.05 0.05 0.50 0.50 0.00 0.00 0.05 0.50 0.00 0.05 0.50 0.00
3Improvement work to
railway pump works
To increase the water level
on the upstream side to
FRL
0.60 0.60 0.60 0.00 0.00 0.00 0.00 0.60 0.00 0.00 0.60 0.00 0.00
4
Providing protection
arrangement in the
upstream side of left Flank
To increase the water level
on the upstream side to
FRL
0.10 0.10 0.10 0.00 0.00 0.00 0.00 0.10 0.00 0.00 0.10 0.00 0.00
4.79 2.50 2.50 2.29 2.29 0.00 0.00 2.50 2.29 0.00 2.50 2.29 0.00
Approved by the Commission
Capital Expenditure Capitalisation
All works are
completed
satisfactorily and
both units are
put into
commercial
operation in
generation
continuously
TANGEDCO
Proceeding
No:16 DT
10.12.2010
ANNEXURE 15
Bhavani Kattalai Barrage-II, Hydro Project (2x15MW)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
FY 2018-19
S.NoName of
the scheme
Details of work
Furnishing list of Major
items
Technical justification
Estimated
Cost
(Rs.in Crs.)
Details Board
approval
Cost benefit
analysis
TANGEDCO's Submission
Total
FY 2016-17 FY 2017-18
Page 173
![Page 133: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/133.jpg)
Page 174
![Page 134: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/134.jpg)
Page 175
![Page 135: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/135.jpg)
Page 176
![Page 136: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/136.jpg)
Capitalisatio
n
(Rs.in Crs.)
Capital
Expenditure
(Rs.in Crs.)
Capitalisat
ion
(Rs.in Crs.)
Capital
Expenditure
(Rs.in Crs.)
Capitalisatio
n
(Rs.in Crs.)
Capital
Expenditure
(Rs.in Crs.)
FY 2016-
17FY 2017-18 FY 2018-19 FY 2016-17 FY 2017-18 FY 2018-19
1 Land Acquisition Compensation value
towards land acquired13.15
Per FB
TANGEDCO
Proc. No. 55
(TB) dt. 09.05.11
3.15 3.15 10.00 10.00 0.00 0.00 3.15 10.00 0.00 3.15 10.00 0.00
2
Construction of protection
wall at BB-II (Machine
nagar +Head race channel
73 to 103)
To protect the lands from
getting submerged1.70
Awaiting for
administrative
approval
0.70 0.70 1.00 1.00 0.00 0.00 0.70 1.00 0.00 0.70 1.00 0.00
3Removal of Rock
projection at BB-II
To increase power
generation1.45
Awaiting for
administrative
approval
1.00 1.00 0.45 0.45 0.00 0.00 1.00 0.45 0.00 1.00 0.45 0.00
4
Protection wall to
submergible land
( court case )
To protect the lands from
getting submerged0.38 Under progress 0.38 0.38 0.00 0.00 0.00 0.00 0.38 0.00 0.00 0.38 0.00 0.00
5 Survey work FRL 295To identify the lands that
will get submerged0.25 Under progress 0.15 0.15 0.10 0.10 0.00 0.00 0.15 0.10 0.00 0.15 0.10 0.00
6
Construction of protection
wall to the seerangarayan
oadai at
Chikathasampalayam/
mettupalayam
To protect the lands from
getting submerged0.50 Under progress 0.50 0.50 0.00 0.00 0.00 0.00 0.50 0.00 0.00 0.50 0.00 0.00
17.43 5.88 5.88 11.55 11.55 0.00 0.00 5.88 11.55 0.00 5.88 11.55 0.00
Approved by the Commission
Capital Expenditure Capitalisation
TANGEDCO's Submission
Cost benefit
analysis
Details Board
approval
ANNEXURE 16
Bhavani Barrage-II, Hydro Project (2x5MW)
Capital Investment Plan for control period from FY 2016-17 to 2018-19
Estimated
Cost
(Rs.in Crs.)
Technical justification
Details of work
Furnishing list of Major
items
Name of
the scheme S.No
Total
FY 2016-17 FY 2017-18 FY 2018-19
Page 177
![Page 137: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/137.jpg)
Page 178
![Page 138: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/138.jpg)
ABSTRACT -DISTRIBUTION FUNCTION
FY 2016-
17
FY 2017-
18
FY 2018-
19
FY 2016-
17
FY 2017-
18
FY 2018-
19
FY 2016-
17
FY 2017-
18
FY 2018-
19
FY 2016-
17
FY 2017-
18FY 2018-19
I Region :Chennai North
1 Chennai Central 406.02 204.10 108.22 93.70 199.32 106.82 90.51 198.40 108.22 93.70 193.62 106.82 90.51
2 Chennai West 145.02 99.34 27.18 18.50 97.00 27.67 18.50 99.34 27.18 18.50 97.00 27.67 18.50
3 Chennai North 214.94 122.11 58.16 34.67 118.71 57.71 35.29 122.11 58.16 34.67 118.71 57.71 35.29
Sub total 765.98 425.55 193.56 146.87 415.03 192.20 144.30 419.85 193.56 146.87 409.33 192.20 144.30
II Region : Chennai South
4 Chennai South 981.30 916.39 39.51 25.40 906.61 45.34 26.81 866.39 39.51 25.40 856.61 45.34 26.81
5 Kancheepuram 378.31 114.86 147.90 115.55 103.38 144.59 120.53 113.90 146.40 113.95 102.52 143.14 118.78
6 Chengalpattu 424.11 147.28 137.54 139.29 134.67 137.53 138.69 147.28 137.54 139.29 134.67 137.53 138.69
Sub total 1,783.72 1,178.53 324.95 280.24 1,144.66 327.46 286.03 1,127.57 323.45 278.64 1,093.80 326.01 284.28
III Region : Coimbatore
7 Coimbatore Metro 295.36 213.11 39.50 42.75 209.93 38.73 43.40 181.54 32.00 34.25 178.96 31.38 34.15
8 Coimbatore North 189.35 109.60 39.88 39.87 106.41 39.48 41.66 100.42 34.88 33.87 97.73 34.48 35.16
9 Coimbatore South 198.41 94.19 58.50 45.72 91.31 55.53 49.54 81.46 53.50 39.72 79.08 50.53 43.04
10 Tiruppur 319.52 132.50 96.00 91.02 125.72 93.18 95.92 113.91 86.00 79.02 107.93 83.38 82.92
11 Udumalpet 200.16 110.37 45.00 44.79 108.09 42.78 46.99 98.80 38.00 36.79 97.02 35.98 38.29
12 Nilgiris 88.64 38.37 30.85 19.42 36.40 30.93 21.04 37.73 30.35 18.42 35.81 30.43 19.99
Sub total 1,291.44 698.14 309.73 283.57 677.86 300.63 298.55 613.86 274.73 242.07 596.53 266.18 253.55
IV Region : Erode
13 Erode 388.85 214.74 143.77 30.34 193.76 157.04 36.66 201.28 131.61 19.24 181.55 144.85 24.34
14 Gobi 210.94 99.52 70.59 40.83 90.60 72.75 44.73 97.08 68.09 37.98 88.38 70.28 41.63
15 Mettur 224.62 97.45 69.62 57.55 88.22 71.87 60.72 90.25 63.97 54.55 81.73 66.08 57.15
16 Salem 303.37 126.39 102.41 74.57 116.08 105.60 76.16 119.96 95.83 67.33 110.25 99.08 68.26
17 Namakkal 265.17 87.78 101.48 75.91 79.68 99.44 79.26 71.79 93.75 71.00 65.09 91.08 73.58
Sub total 1,392.95 625.88 487.87 279.20 568.34 506.70 297.53 580.36 453.25 250.10 527.00 471.37 264.96
V Region : Madurai
18 Sivaganga 275.59 111.49 106.58 57.52 102.86 109.34 59.78 99.49 94.58 45.52 92.06 97.34 46.58
19 Theni 103.54 52.35 30.95 20.24 49.24 30.96 23.34 51.81 30.95 20.24 48.70 30.96 23.34
20 Madurai Metro 374.19 238.46 35.17 100.56 236.24 37.39 90.50 238.46 35.17 100.56 236.24 37.39 90.50
21 Ramnad 41.85 21.35 10.25 10.25 20.32 10.25 10.28 21.35 10.25 10.25 20.32 10.25 10.28
22 Dindigul 210.23 175.47 29.96 4.80 172.02 31.59 6.14 174.33 29.96 4.80 170.88 31.59 6.14
23 Madurai 141.42 113.40 2.42 25.60 113.16 2.66 25.60 113.40 2.42 25.60 113.16 2.66 25.60
Sub total 1,146.82 712.52 215.33 218.97 693.84 222.19 215.64 698.84 203.33 206.97 681.36 210.19 202.44
VI Region : Tirunelveli
24 Virudhunagar 100.99 42.82 39.99 18.18 40.97 40.18 18.85 42.82 39.99 18.18 40.97 40.18 18.85
25 Tirunelveli 316.15 207.45 70.84 37.86 200.66 72.78 40.98 196.95 70.84 37.86 190.16 72.78 40.98
26 Kanyakumari 223.23 113.73 71.16 38.34 106.36 74.90 39.84 98.73 55.16 21.34 92.86 59.00 21.24
27 Tuticorin 107.61 58.79 21.43 27.39 54.31 24.22 28.12 58.79 21.43 27.39 54.31 24.22 28.12
Sub total 747.98 422.79 203.42 121.77 402.30 212.08 127.79 397.29 187.42 104.77 378.30 196.18 109.19
VII Region : Trichy
28 Trichy Metro 240.21 121.00 76.31 42.90 116.15 76.03 45.86 121.00 76.31 42.90 116.15 76.03 45.86
29 Thiruvarur 123.73 53.69 39.17 30.87 49.96 39.55 31.96 50.75 36.23 27.93 47.31 36.61 28.73
30 Karur 110.39 64.13 36.48 9.78 59.87 38.78 11.74 63.62 36.48 9.78 59.36 38.78 11.74
31 Pudukkottai 305.74 134.55 99.83 71.36 123.15 104.24 72.35 104.55 90.33 63.86 96.15 92.69 63.90
32 Perambalur 95.16 57.97 27.79 9.40 56.42 28.10 9.89 57.97 27.79 9.40 56.42 28.10 9.89
33 Thanjavur 132.73 77.72 40.61 14.40 71.53 43.53 16.87 77.72 40.61 14.40 71.53 43.53 16.87
34 Nagapattinam 324.90 160.98 132.42 31.50 144.88 138.92 40.24 159.69 131.45 30.56 143.72 137.92 39.20
Total Amount 1,332.86 670.04 452.61 210.21 621.96 469.15 228.91 635.30 439.20 198.83 590.64 453.66 216.19
VIII Region : Vellore
35 Vellore 242.55 89.21 98.04 55.30 81.74 100.59 55.82 81.21 89.04 45.30 74.54 91.69 44.92
Sl.
No.
Capital Expenditure Capitalisation CapitalisationName of the Circles
Estimated
Cost (Rs.
Crore)
TANGEDCO PETITION COMMISSION'S APPROVAL
Capital Expenditure
Page 1
![Page 139: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/139.jpg)
FY 2016-
17
FY 2017-
18
FY 2018-
19
FY 2016-
17
FY 2017-
18
FY 2018-
19
FY 2016-
17
FY 2017-
18
FY 2018-
19
FY 2016-
17
FY 2017-
18FY 2018-19
Sl.
No.
Capital Expenditure Capitalisation CapitalisationName of the Circles
Estimated
Cost (Rs.
Crore)
Capital Expenditure
36 Tirupattur 173.24 75.72 61.72 35.80 69.64 64.49 36.07 73.22 58.52 32.50 67.39 61.36 32.45
37 Dharmapuri 235.94 102.17 76.15 57.62 93.74 78.22 59.02 98.42 72.15 52.87 90.37 74.24 53.87
38 Krishnagiri 295.93 99.03 104.80 92.10 91.20 104.64 90.88 99.03 104.80 92.10 91.20 104.64 90.88
Sub total 947.66 366.13 340.71 240.82 336.32 347.94 241.79 351.88 324.51 222.77 323.50 331.93 222.12
IX Region : Villupuram
39 Cuddalore 589.26 202.80 206.86 179.60 182.51 207.92 192.46 200.55 204.36 176.85 180.49 205.44 189.46
40 Thiruvannamalai 281.57 91.77 138.18 51.62 87.51 137.28 52.08 91.77 138.18 51.62 87.51 137.28 52.08
41 villupuram 252.73 95.22 93.51 64.00 87.51 94.92 63.90 94.61 93.51 64.00 86.90 94.92 63.90
42 Kallakurichi 161.82 87.75 49.66 24.41 80.63 54.56 24.34 86.48 48.27 22.87 79.49 53.18 22.66
Sub total 1,285.38 477.54 488.21 319.63 438.16 494.68 332.78 473.41 484.32 315.34 434.39 490.82 328.10
Grand total 10,694.79 5,577.12 3,016.39 2,101.28 5,298.47 3,073.03 2,173.32 5,298.36 2,883.77 1,966.36 5,034.85 2,938.54 2,025.13
Page 2
![Page 140: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/140.jpg)
Capitalisati
on (Rs.
Crore)
Capital
Ependiture
(Rs. Crore)
Capitalis
ation (Rs.
Crore)
Capital
Ependi
ture
(Rs.
Crore)
Capitalisa
tion (Rs.
Crore)
Capital
Ependitur
e (Rs.
Crore)
FY 2016-
17
FY 2017-
18
FY 2018-
19
FY 2016-
17
FY 2017-
18
FY
2018-19
1Chennai
North
Chennai
Central EDCCapital
Extension of LT & LT CT, HT Supply to
53130 Nos various tariff servicesNew service connections effected 28.01
Based on the application from
the consumers, approval was
accorded by the competent
authorities
Adding consumers 28.01 28.01 - - - - 28.01 - - 28.01 - -
2Chennai
North
Chennai
Central EDCCapital
Anticipated Extension of LT & LT CT
Supply to 47067 Nos. various tariff
services
New service connections 66.64 To be approved by the
competent authoritiesAdding consumers 9.06 10.07 25.89 27.65 28.80 28.92 10.07 27.65 28.92 9.06 25.89 28.80
3Chennai
North
Chennai
Central EDCCapital
Anticipated Extension of HT Supply
(New & Additional loads)New service connections 1.34
To be approved by the
competent authoritiesAdding consumers 0.37 0.41 0.44 0.45 0.48 0.48 0.41 0.45 0.48 0.37 0.44 0.48
4Chennai
North
Chennai
Central EDCImprovement
Old Jail 110/11 kV SS, 2x16 MVA Pr.Trs,
11kV, VCB -8nos. 11kV, BC-1 nos
(anticipated)
To meet out load growth 8.00
Proposal under preparation.
Approximate estimated value
indicated.
To meet out load
growth - - 3.60 4.00 4.00 4.00 - 4.00 4.00 - 3.60 4.00
5Chennai
North
Chennai
Central EDCImprovement
Establishment of 33/11kV, Indoor SS at
Wall tax Raod. 2x8 MVA Pr.Trs,
33kV VCB -5 nos. (HV+IC)
11kV VCB -10nos. (LV+Feeder)
33kV & 11kV BC-2 nos (anticipated)
To give load relief to 33kV East GT
SS and 33 kV West GT SS to improve
the voltage regulation of the feeders and
to accommodate future load growth
8.70
Proposal under preparation.
Approximate estimated value
indicated.
To be done while
submission of
proposal
- - - - 7.83 8.70 - - 8.70 - - 7.83
6Chennai
North
Chennai
Central EDCImprovement
Establishment of 33/11kV, Indoor SS at
Pudupet. 2x16 MVA Pr.Trs,
33kV VCB -5 nos. (HV+IC)
11kV VCB -10nos. (LV+Feeder)
33kV & 11kV BC-2 nos (anticipated )
To give load relief to 110/33/11kV
Chindadripet SS to improve the
voltage regulation of the transformers
and to accommodate future load growth
9.30
Proposal under preparation.
Approximate estimated value
indicated.
To be done while
submission of
proposal
- - - - 8.37 9.30 - - 9.30 - - 8.37
7Chennai
North
Chennai
Central EDCImprovement
Erection of new 33 kV # from 110/ 33kV,
Govt Estate SS to 33/11 kV Port trust SS.
33 kV, 1x630 Sq.mm XLPE Cable R.L.:
3.8 KM
For providing reliable 33 kV alternate
source to Port trust SS 1.76
Proposal Submitted to CE/
Planning
For Providing
Reliable Source - - 1.76 1.76 - - - 1.76 - - 1.76 -
8Chennai
North
Chennai
Central EDCImprovement
Enhancement of Pr.Tr. at East GT 33kV
SS. 2x16MVA Power transformerLoad growth 2.42
Per CMD TANGEDCO
Proc.No. 330dt 04.08.15
To meet out load
Growth 2.42 2.42 - - - - 2.42 - - 2.42 - -
9Chennai
North
Chennai
Central EDCImprovement
Enhancement of Pr. Tr. at Govt. Esate 110
kV GIS SS 2x50MVA Power transformerTo meet out Load growth 5.50 Proposal under preparation.
To meet out load
Growth - - 5.50 5.50 - - - 5.50 - - 5.50 -
10Chennai
North
Chennai
Central EDCImprovement
Addl. Pr. Tr. at Flower Bazaar 33kV SS.
1x8MVA Power transformerTo meet out Load growth 1.31 Proposal under preparation.
To meet out load
Growth - - - - 1.18 1.31 - - 1.31 - - 1.18
11Chennai
North
Chennai
Central EDCImprovement Erection of DT's. -165 no. DT's To meet out load Growth 19.80
Approved by the competent
authority as per the field
proposal
To meet out load
Growth 5.94 6.60 6.60 6.60 6.60 6.60 6.60 6.60 6.60 5.94 6.60 6.60
12Chennai
North
Chennai
Central EDCImprovement HT Improvement works, 150 Kms
Strengthening of Network and
replacement of aged conductor 54.92
Approved by the competent
authority as per the field
proposal
To meet out load
growth 16.90 18.78 18.14 18.07 18.07 18.07 18.78 18.07 18.07 16.90 18.14 18.07
13Chennai
North
Chennai
Central EDCImprovement
LT Impt Works 370Kms and erection of
pillar boxes.
Strengthening of Network and
replacement of aged conductor 14.70
Approved by the competent
authority as per the field
proposal
To meet out load
growth 4.41 4.90 4.90 4.90 4.90 4.90 4.90 4.90 4.90 4.41 4.90 4.90
14Chennai
North
Chennai
Central EDCImprovement
Establishment of 33/11kV Indoor SS at
Mandaveli. 2x16 MVA Pr.Trs, 33kV
VCB -5 nos(HV+IC)
11kV VCB -10 nos. (LV+ Feeder) 33kV
&11kV BC- 2 nos (anticipated)
To give load relief to 33 kV Luz SS to
improve the voltage regulation of the
feeders and to accommodate future load
growth
9.30
Proposal under preparation.
Approximate estimated value
indicated.
To be done while
submission of
proposal
- - - - 8.37 9.30 - - 9.30 - - 8.37
FY 2016-17 FY 2017-18 FY 2018-19
ANNEXURE - 17
DISTRIBUTION CAPITAL EXPENDITURE SCHEMES
TANGEDCO's Submission Approved by the Commission
Sr.
No.Region Area
Name of the
Scheme
Details of work furnishing list of major
itemsTechnical justification
Estimated
Cost
(Rs.in Crs.)
Details of Board approvalCost benefit
analysis
Capital Expenditure Capitalisation
![Page 141: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/141.jpg)
15Chennai
North
Chennai
Central EDCImprovement
Additional Pr.Tr. at EDC 33kV SS.
1x8MVA Power transformerTo meet out Load growth 1.25 Proposal under preparation
To meet out load
growth - - 1.25 1.25 - - - 1.25 - - 1.25 -
16Chennai
North
Chennai
Central EDCImprovement
Establishment of 33/11 kV Indoor SS at
Sarathy Nagar (West Jones
Road,Saidapet).2x16 MVA Pr.Trs,
33kV VCB -5 nos(HV+IC)
11kV VCB -10nos (LV+Feeder)
33kV &11kV BC-2 nos (anticipated )
To give load relief to 33kV Saidapet
SS to improve the voltage regulation of
the feeders and to accommodate future
load growth
8.70
Proposal under preparation.
Approximate estimated value
indicated.
To be done while
submission of
proposal
- - 8.70 8.70 - - - 8.70 - - 8.70 -
17Chennai
North
Chennai
Central EDCImprovement
Establishment of 33/11 kV Indoor SS at
Muthu Rangan Salai (Kannamapet).2x16
MVA Pr.Trs, 33kV VCB -5 nos
(HV+IC) 11kV VCB -10nos(LV+Feeder)
33kV &11kV BC-2 nos (anticipated )
To give load relief to 33kV West
Mambalam SS to improve the voltage
regulation of the feeders and to
accommodate future load growth
8.90
Proposal under preparation.
Approximate estimated value
indicated.
To be done while
submission of
proposal
- - 8.90 8.90 - - - 8.90 - - 8.90 -
18Chennai
North
Chennai
Central EDCImprovement
Additional Pr.Tr. at DMS 33kV SS.
1x16MVA Power transformerTo meet out Load growth 1.63
Per CMD TANGEDCO
Proceedings No. 455 dt
08.10.14
To meet out load
growth 1.63 1.63 - - - - 1.63 - - 1.63 - -
19Chennai
North
Chennai
Central EDCImprovement
Additional Pr.Tr.at Nandanam 33kV SS.
1x16MVA Power transformerTo meet out Load growth 1.67
Per CMD TANGEDCO
Proceedings No.483, dt
4.11.15
To meet out load
growth 1.67 1.67 - - - - 1.67 - - 1.67 - -
20Chennai
North
Chennai
Central EDCImprovement
Establishment of 33/11kV Indoor SS at
George Town. 2x16 MVA Pr.Trs,
33kV VCB -5 nos(HV+IC)
11kV VCB -10nos(LV+Feeder)
33kV &11kV BC-2 nos (anticipated )
To give load relief to 110/33/11 kV
Seven wells SS and 33 kV Flower
Bazzar SS to improve the voltage
regulation of the feeders and to
accommodate future load growth
8.30
Proposal under preparation.
Approximate estimated value
indicated.
To be done while
submission of
proposal
- - 8.30 8.30 - - - 8.30 - - 8.30 -
21Chennai
North
Chennai
Central EDCImprovement
Erection of new 33 kV feeder from 110/33-
11kV Cooks Road SS to 33/11 kV Kilpauk
SS & accessaries. 33 kV 1x630 Sq.mm
XLPE Cable R.L.: 3.5 K.m
For providing reliable 33 kV alternate
source to Kilpauk SS 2.30
B.P.(Per ) CMD
TANGEDCO Procedings
no.269 dt.29.06.15
For Providing
Reliable Source - - 2.30 2.30 - - - 2.30 - - 2.30 -
22Chennai
North
Chennai
Central EDCImprovement
Additional Pr.Tr.at Kilpauk 33kV SS.
1x16MVA Power transformerTo meet out Load growth 1.84
Per CMD TANGEDCO
Proceedings No. 524 dt
05.12.14
To meet out load
growth - - 1.84 1.84 - - - 1.84 - - 1.84 -
23Chennai
North
Chennai
Central EDCImprovement
Additional Pr.Tr.at Spurtank road 33kV
SS. 1x16MVA Power transformerTo meet out Load growth 2.12
Proposal under preparation.
Appr.est. value indicated.
To meet out load
growth - - - - 1.91 2.12 - - 2.12 - - 1.91
24Chennai
North
Chennai
Central EDCImprovement
Enhancement of Power Transformer at
Mambalam 33kV SS, 3rd 8 MVA to
16MVA Power transformer
To meet out load growth 1.22
Per CMD TANGEDCO
Proceedings No. 29 dt
23.01.15
To meet out load
growth 1.22 1.22 - - - - 1.22 - - 1.22 - -
25Chennai
North
Chennai
Central EDCRAPDRP
Establishment of 33/11kV indoor SS with
2x8MVA, 33/11kV Power Transformers at
Ammaiyappan lane. 33 kV 1x630 Sq.mm
XLPE cable (SC) RL: 2.5Km from 230/
33kV Mylapore SS & Ammaiyap pan lane
SS
To meet out Load growth 21.07 CED/CNR No.1524/13-14 dt
17.12.2013
Anticipated revenue
due to sale of energy
Rs.56 lakh on capital
revenue
21.07 21.07 - - - - 21.07 - - 21.07 - -
26Chennai
North
Chennai
Central EDCRAPDRP
Establishment of 33/11kV indoor SS with
2x8MVA, 33/11kV Power Transformers at
Woods Road- 33 kV 1x630 Sq.mm XLPE
Cable (Double Circuit) RL : 1.56 Km by
making In and Out of existing 33kV 1x630
sq mm Mylapore Express Avenue # cable
at Woods Rd SS
To meet out Load growth 5.09 CED/CNR No.21/11-12
dt16.11.11
Anticipated revenue
due to sale of energy
Rs.45 lakh on capital
revenue
5.09 5.09 - - - - 5.09 - - 5.09 - -
27Chennai
North
Chennai
Central EDCRAPDRP
Erection of new11kV feeders (3x300 sq
mm cable-26.56Km)
Load bifurcation and to reduce outages
and enhance operation flexibility 3.47
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
Reduction of AT&C
Loss 3.47 3.47 - - - - 3.47 - - 3.47 - -
28Chennai
North
Chennai
Central EDCRAPDRP
Laying of new 11kV, 3x120 sq mm cable-
4.8Km
Load bifurcation and to reduce outages
and enhance operation flexibility 0.63
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
Reduction of AT&C
Loss 0.63 0.63 - - - - 0.63 - - 0.63 - -
![Page 142: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/142.jpg)
29Chennai
North
Chennai
Central EDCRAPDRP
11kV Strengthening - 3x300 sq mm
Replacement of existing 11kV lower size
cable-4.78Km
To improve current carrying capacity of
the conductor to meet load growth 0.35
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
Reduction of AT&C
Loss 0.35 0.35 - - - - 0.35 - - 0.35 - -
30Chennai
North
Chennai
Central EDCRAPDRP
11kV Strengthening - 3x120 sq mm.
Replacement of existing 11kV lower size
cable-12.11Km
To improve current carrying capacity of
the conductor, to meet load growth 1.39
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
Reduction of AT&C
Loss 1.39 1.39 - - - - 1.39 - - 1.39 - -
31Chennai
North
Chennai
Central EDCRAPDRP
Erection of conventional structure 250kVA-
209 nos.To meet out load growth 6.15
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
Reduction of AT&C
Loss 6.15 6.15 - - - - 6.15 - - 6.15 - -
32Chennai
North
Chennai
Central EDCRAPDRP
Erection of conventional structure 100kVA-
249 nos.To improve HT: LT ratio. 3.78
CMD TANGEDCO
proceedings No:124
dt 8.04.2011
Reduction of AT&C
Loss 3.78 3.78 - - - - 3.78 - - 3.78 - -
33Chennai
North
Chennai
Central EDCRAPDRP Erection of (HVDS) 63kVA-100 nos. To improve HT: LT ratio. 5.25
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
Reduction of AT&C
Loss 5.25 5.25 - - - - 5.25 - - 5.25 - -
34Chennai
North
Chennai
Central EDCRAPDRP
Conversion of Existing Structure to RMU
and Erection of new RMU-765 nos.
To improve reliable supply and
operational flexibility 32.34
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
Reduction of AT&C
Loss 32.34 32.34 - - - - 32.34 - - 32.34 - -
35Chennai
North
Chennai
Central EDCRAPDRP
Erection of Type - B FRTU (3 way)
Panels-470 nos., To monitor and control the network 0.52
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
Reduction of AT&C
Loss 0.52 0.52 - - - - 0.52 - - 0.52 - -
36Chennai
North
Chennai
Central EDCRAPDRP
Erection of Type - A FRTU (5 way) Panels-
295 nos.To monitor and control the network 4.07
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
Reduction of AT&C
Loss 4.07 4.07 - - - - 4.07 - - 4.07 - -
37Chennai
North
Chennai
Central EDCRAPDRP
Replacement of single phase meters 5-20A
consumer meters-365023 nos.
Accurate Measurement of Energy
Consumption 14.23
CMD TANGEDCO
Proceedings No:124 dt
8.04.2011
Reduction of AT&C
Loss 14.23 14.23 - - - - 14.23 - - 14.23 - -
38Chennai
North
Chennai
Central EDCRAPDRP
Replacement of 3phase meters 10-60A
consumer meters 211819 nos.
Accurate Measurement of Energy
Consumption 11.04
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
To improve the
revenue to
TANGEDCO
(Acurate Billing)
11.04 11.04 - - - - 11.04 - - 11.04 - -
39Chennai
North
Chennai
Central EDCRAPDRP
33kV cable & accessories
From OCF 230/33 kV SS to
Ammaiyappan Lane
To meet out the load growth 3.29 255/ dt.16.7.11
To improve the
revenue to
TANGEDCO
(Accurate Billing)
3.29 3.29 - - - - 3.29 - - 3.29 - -
40Chennai
North
Chennai
Central EDCREC
RMU Conversion
(REC Funding). 150nosTo improve reliable supply 15.00
B.P.(Per ) FB TANGEDCO
Proc. no.15 dt.9.02.16
To improve reliable
supply 6.30 7.00 8.70 8.00 - - 7.00 8.00 - 6.30 8.70 -
41Chennai
North
Chennai
Central EDCREC
Enhancement of Pr.Tr. at Lady Wellington
33kV SS.2x 16MVA Power transformerTo meet out Load growth 2.35
Per CMD TANGEDCO Proc
No. 367, dt 24.08.15Load growth 2.35 2.35 - - - - 2.35 - - 2.35 - -
42Chennai
North
Chennai
Central EDCDCW
Shifting of HT/LT cables, Pillars,
Distribution Transformers, RMUs,
Conversion of DT to RMU, replacement of
RMG etc.,at the request of consumer.
As per Consumer request for
convenience 5.70
Approved by the competent
authority as per the field
proposal
As per Consumer
request for
convenience
5.70 5.70 - - - - - - - - - -
43Chennai
North
Chennai
Central EDCOthers
Computer operated chairs- Office
Automation and Replacement of HHDs-
Office Automation and Computer, Thin
Clients, DOT Matrix printers, Lasejet
Printers, LED Monitors
Office Automation and quick service to
consumers 0.67
Approved by the competent
authority as per the field
proposal
Quick service to
consumers 0.67 0.67 - - - - 0.67 - - 0.67 - -
1Chennai
North
Chennai West
EDCCapital
Extension of LT & LT CT, HT Supply to
64709 Nos various tariff servicesNew service connections effected 29.72
Based on the application from
the consumers, approval was
accorded by the competent
authorities
Adding consumers 8.75 9.72 9.97 10.00 10.00 10.00 9.72 10.00 10.00 8.75 9.97 10.00
2Chennai
North
Chennai West
EDCCapital
Establishment of 33 kV sub stations at
……… - - - - - - - - - - - - -
3Chennai
North
Chennai West
EDCImprovement
Improvement works- SS, Enhancement of
Pr.Trs in sub stations, sub station
related works.
To improve the network and Load
growth - - - - - - - - - - - - -
![Page 143: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/143.jpg)
4Chennai
North
Chennai West
EDCImprovement
Improvement works- Erection of DT, New
HT feeders, strengthening of HT cables,
Laying LT cable and erection of pillar
boxes.
To improve the network and Load
growth 25.12
Approved by the competent
authority as per the field
proposal
To reduce the Line
Loss, etc 7.31 8.12 8.46 8.50 8.50 8.50 8.12 8.50 8.50 7.31 8.46 8.50
5Chennai
North
Chennai West
EDC
RAPDRP
Scheme I (Part
A)
DT meteringTo measure energy consumed by the
consumer fed by the DT to data centre 15.79 To Energy audit 15.79 15.79 - - - - 15.79 - - 15.79 - -
6Chennai
North
Chennai West
EDC
Fixing of CAMR in DTs, Ring fencing &
HT serviceTo transfer data to data centre 2.38
Per. BP (TANGEDCO) No.
53, dt. 04.05.2012To Energy audit 2.38 2.38 - - - - 2.38 - - 2.38 - -
7Chennai
North
Chennai West
EDC
RAPDRP B
Schemes
Vaigai Colony 33/11kV SS
Construction of control room building,
inclusive of cost of 33& 11 kV Breakers,
33 kV &
11kV, 1x630 sq mm Cable, Battery and
Control cable and other Elecl. accessories
To meet out load growth 2.95 255/16.7.11To meet out load
growth 2.95 2.95 - - - - 2.95 - - 2.95 - -
8Chennai
North
Chennai West
EDC
RAPDRP B
Schemes
Mitnamallee 33/11 kV SS Construction of
control room building, 33& 11 kV
Breakers,33 kV & 11kV 1x630 sq mm
Cable,Battery and Control cable and other
Elecl accessories
To meet out load growth 2.75 255/
16.7.11
To meet out load
growth 1.57 1.75 1.18 1.00 - - 1.75 1.00 - 1.57 1.18 -
9Chennai
North
Chennai West
EDC
RAPDRP
Schemes
Adayalampattu 33/11 kV SS Construction
of control room building, 33& 11 kV
Breakers, 33 kV & 11kV, 1x630 sq mm
Cable,Battery and Control cable and other
Elecl accessories
To meet out load growth 6.66 11/
9.01.15
To meet out load
growth 1.57 1.75 5.09 4.91 - - 1.75 4.91 - 1.57 5.09 -
10Chennai
North
Chennai West
EDC
RAPDRP B
Schemes
33kV cable & accessories
LILO of Korattur-Periyar Nagar feeder II at
Annai Nagar
To meet out load growth 0.90 To meet out load
growth 0.90 0.90 - - - - 0.90 - - 0.90 - -
11Chennai
North
Chennai West
EDC
RAPDRP B
Schemes
33kV cable & accessories
From Alamathy-MitnamalleeTo meet out load growth 0.81
255/
16.7.11
To meet out load
growth 0.81 0.81 - - - - 0.81 - - 0.81 - -
12Chennai
North
Chennai West
EDC
RAPDRP B
Schemes
33kV cable & accessories
From Ambattur 3rd main Road SS to
Adayalampattu
To meet out load growth 2.32 255/
16.7.11
To meet out load
growth 2.32 2.32 - - - - 2.32 - - 2.32 - -
13Chennai
North
Chennai West
EDC
RAPDRP B
Schemes
33kV cable & accessories
From Thiruverkadu 110 kV SS to
Adayalampattu
To meet out load growth 5.30 11/
9.01.15
To meet out load
growth 5.30 5.30 - - - - 5.30 - - 5.30 - -
14Chennai
North
Chennai West
EDC
RAPDRP B
Schemes
Replacement of 11 kV Breaker
JJ Nagar SSTo meet out load growth 0.19
CMD Proceedings No.413
dt.21.9.15
To meet out load
growth 0.19 0.19 - - - - 0.19 - - 0.19 - -
15Chennai
North
Chennai West
EDC
RAPDRP B
Schemes
18 kVAR, 36 kVAR & 72 kVAR, APFC
panels installed and commissioned in 100
kVA, 250 kVA & 500 kVA DTs
Power factor improvement 1.81
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
1.81 1.81 - - - - 1.81 - - 1.81 - -
16Chennai
North
Chennai West
EDCRAPDRP
Erection of FRTU panels at RMUs and
sectionalisers locationsRemote operation 0.61
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
0.61 0.61 - - - - 0.61 - - 0.61 - -
17Chennai
North
Chennai West
EDC
RAPDRP -
DSW
New 11 kV UG Cable feeder for New
33/11 kV Indoor SS
Load bifurcation to reduce outages and
to enhance operation flexibility 4.38
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
4.38 4.38 - - - - 4.38 - - 4.38 - -
18Chennai
North
Chennai West
EDC
RAPDRP -
DSW
New 11kV OH line for new 33/11kV
Indoor SS with ACSR Raccoon 1.02 1.02 1.02 - - - - 1.02 - - 1.02 - -
19Chennai
North
Chennai West
EDC
RAPDRP -
DSW
(i) New feeders with 11kV 3x300 sqmm
XLPE 11.04 11.04 11.04 - - - - 11.04 - - 11.04 - -
![Page 144: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/144.jpg)
20Chennai
North
Chennai West
EDC
RAPDRP -
DSW
(ii) New feeders 11kV 3x120 sqmm
XLPE(Rs. 7.05 crs), 11kV 3x120 sqmm
XLPE - Segregation of industrial loads at
Ambattur IE areas involving (Rs. 0.93 crs)
4.30 4.30 4.30 - - - - 4.30 - - 4.30 - -
21Chennai
North
Chennai West
EDC
RAPDRP -
DSW
(iii) New feeders 11kV 7/3.35 mm OH
(ACSR Rabbit) 3.25 3.25 3.25 - - - - 3.25 - - 3.25 - -
22Chennai
North
Chennai West
EDC
RAPDRP -
DSW
Erection of new 11 kV, ACSR 3.35 mm
conductor for new DTs
Load bifurcation to reduce outages and
to enhance operation flexibility 0.48
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
0.48 0.48 - - - - 0.48 - - 0.48 - -
23Chennai
North
Chennai West
EDC
RAPDRP -
DSW
Erection of new 11kV ACSR 3.35 mm
conductor for new HVDS 2.00 2.00 2.00 - - - - 2.00 - - 2.00 - -
24Chennai
North
Chennai West
EDC
RAPDRP -
DSW
Strengthening of existing 11 kV OH feeder
from ACSR 7/2.59 mm to 7/3.35 mm
To augument the current carrying
capacity of the conductor 0.95 0.95 0.95 - - - - 0.95 - - 0.95 - -
25Chennai
North
Chennai West
EDC
RAPDRP -
DSW
Strengthening of existing 11 kV UG cable
from lower size to 11kV 3* 300 sqmm 0.54 0.54 0.54 - - - - 0.54 - - 0.54 - -
26Chennai
North
Chennai West
EDC
RAPDRP -
DSW
Strengthening of existing 11 kV UG cable
from lower size to 11kV 3* 120 sqmm 1.00 1.00 1.00 - - - - 1.00 - - 1.00 - -
27Chennai
North
Chennai West
EDC
RAPDRP -
DSW
Erection of New 100 kVA DTs OH
connectivityTo offer load relief to the existing DTs 2.59
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
2.59 2.59 - - - - 2.59 - - 2.59 - -
28Chennai
North
Chennai West
EDC
RAPDRP -
DSW
Erection of New 250 kVA DTs (Rs. 4.52
crs), Erection of New 500 kVA DTs (Rs.
0.95 crs) OH connectivity
1.75 1.75 1.75 - - - - 1.75 - - 1.75 - -
29Chennai
North
Chennai West
EDC
RAPDRP -
DSW
Erection of New 100 kVA DTs UG
connectivity To offer load relief to the existing DTs 1.10
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
1.10 1.10 - - - - 1.10 - - 1.10 - -
30Chennai
North
Chennai West
EDC
RAPDRP -
DSW
Erection of New 250 kVA DTs UG
Connectivity 1.50 1.50 1.50 - - - - 1.50 - - 1.50 - -
31Chennai
North
Chennai West
EDC
RAPDRP -
DSW
Strengthening of existing LT OH feeder
from ACSR 7/2.59 mm to ACSR 7/3.35
mm
To augument the current carrying
capacity of the conductor 1.50 1.50 1.50 - - - - 1.50 - - 1.50 - -
32Chennai
North
Chennai West
EDC
RAPDRP -
DSW Laying LT AB cable
Easy identification of fault and to avoid
electrical accident. 2.50 2.50 2.50 - - - - 2.50 - - 2.50 - -
33Chennai
North
Chennai West
EDC
RAPDRP -
DSW
Erection of New 25 kVA DTs (Rs. 4.32
crs), Erection of New 16 kVA DTs
(Rs.0.41 crs)
To reduce HT - LT ratio to ensure
reduction of 0.20
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
0.20 0.20 - - - - 0.20 - - 0.20 - -
34Chennai
North
Chennai West
EDC
RAPDRP -
DSW Erection of New 40 kVA DTs 0.80 0.80 0.80 - - - - 0.80 - - 0.80 - -
35Chennai
North
Chennai West
EDC
RAPDRP -
DSW Erection of New 60 kVA DTs 0.50 0.50 0.50 - - - - 0.50 - - 0.50 - -
36Chennai
North
Chennai West
EDC
RAPDRP -
DSW Erection of 6 way pillar boxes
Easy isolation of LT cable fault and
reduce the duration of outage. 1.24
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
1.24 1.24 - - - - 1.24 - - 1.24 - -
37Chennai
North
Chennai West
EDC
RAPDRP -
DSW
Erection of 4 way pillar boxes(Rs.1.78 crs)
, Erection of Mini pillar boxes (Rs. 0.08
crs)
0.30 0.30 0.30 - - - - 0.30 - - 0.30 - -
38Chennai
North
Chennai West
EDC
RAPDRP
Scheme II - - - - - - - - - - - - -
39Chennai
North
Chennai West
EDC
RAPDRP
Scheme III etc - - - - - - - - - - - - -
40Chennai
North
Chennai West
EDC
RGGVY
Schemes - - - - - - - - - - - - -
41Chennai
North
Chennai West
EDCDDUGJY - - - - - - - - - - - - -
42Chennai
North
Chennai West
EDCIPDS - - - - - - - - - - - - -
![Page 145: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/145.jpg)
43Chennai
North
Chennai West
EDC
Others
(REC/PFC)
Nelson Manickam Road 33/11 kV SS.
Construction of control room building,
33& 11 kV Breakers, 33 kV & 11kV,
1x630 sq mm Cable, Battery and Control
cable and other Elecl accessories
To meet out load growth 4.77 445/11.10.13To meet out load
growth 1.80 2.00 2.97 2.77 - - 2.00 2.77 - 1.80 2.97 -
44Chennai
North
Chennai West
EDCDCW - - - - - - - - - - - - -
45Chennai
North
Chennai West
EDC
Any other related
works including
less than one
crore works
totally
- - - - - - - - - - - - -
1Chennai
North
Chennai North
EDCCapital EOS to 651 HT/LT service connection New service connections effected 3.16
Based on the application from
the consumers, approval was
accorded by the competent
authorities
Adding consumers 3.16 3.16 - - - - 3.16 - - 3.16 - -
2Chennai
North
Chennai North
EDCCapital EOS to 651 HT/LT service connection New service connections to be effected 23.38
Based on the application from
the consumers, approval was
accorded by the competent
authorities
Adding consumers 5.83 6.48 7.56 7.68 9.07 9.22 6.48 7.68 9.22 5.83 7.56 9.07
3Chennai
North
Chennai North
EDCCapital CD Hospital To meet out load growth 8.00 74/3.11.15
To meet out load
growth - - 3.60 4.00 4.00 4.00 - 4.00 4.00 - 3.60 4.00
4Chennai
North
Chennai North
EDCCapital Establishment of 33 kV sub stations . - - - - - - - - - - - - -
5Chennai
North
Chennai North
EDCImprovement
Improvement works- SS,Enhancement of
Pr.Trs in sub stations & sub station related
works.
To improve the network and Load
growth - - - - - - - - - - - - -
6Chennai
North
Chennai North
EDC
Estimate for
enhancement of
Power
Transformer 8
MVA to 16
MVA at 33/11
kV Thiruvottiyur
SS.
33/11 kV, 16 MVA Power Transformer To accommodate future load growth 1.06 Proposal under scrutiny. 1.06 1.06 - - - - 1.06 - - 1.06 - -
7Chennai
North
Chennai North
EDC
Estimate for
enhancement of
Power
Transformer 8
MVA to 16
MVA at 33/11
kV CMBTT SS.
33/11 kV 16 MVA Power Transformer To accommodate future load growth 1.10 Proposal under scrutiny. 1.10 1.10 - - - - 1.10 - - 1.10 - -
8Chennai
North
Chennai North
EDC
Estimate for
enhancement of
Power
Transformer 8
MVA to 16
MVA at 33/11
kV Periyar SS.
33/11 kV 16 MVA Power Transformer To accommodate future load growth 1.06
Proposal under preparation.
Approximate estimated value
indicated.
1.06 1.06 - - - - 1.06 - - 1.06 - -
![Page 146: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/146.jpg)
9Chennai
North
Chennai North
EDC
Estimate for
enhancement of
Power
Transformer 8
MVA to 16
MVA at 33/11
kV ICF SS.
33/11 kV 16 MVA Power Transformer To accommodate future load growth 1.06
Proposal under preparation.
Approximate estimated value
indicated.
1.06 1.06 - - - - 1.06 - - 1.06 - -
10Chennai
North
Chennai North
EDC
Estimate for
enhancement of
Power
Transformer 8
MVA to 16
MVA at 33/11
kV OHP SS.
33/11 kV 16 MVA Power Transformer To accommodate future load growth 1.06
Proposal under preparation.
Approximate estimated value
indicated.
1.06 1.06 - - - - 1.06 - - 1.06 - -
11Chennai
North
Chennai North
EDC
Estimate for
enhancement of
Power
Transformer 8
MVA to 16
MVA at 33/11
kV Kaladipet
SS.
33/11 kV 16 MVA Power Transformer To accommodate future load growth 1.06
Proposal under preparation.
Approximate estimated value
indicated.
1.06 1.06 - - - - 1.06 - - 1.06 - -
12Chennai
North
Chennai North
EDC
Estimate for
enhancement of
Power
Transformer 8
MVA to 16
MVA at 33/11
kV Napalayam
SS.
33/11 kV 16 MVA Power Transformer To accommodate future load growth 1.06
Proposal under preparation.
Approximate estimated value
indicated.
1.06 1.06 - - - - 1.06 - - 1.06 - -
13Chennai
North
Chennai North
EDC
Estimate for
enhancement of
Power
Transformer 8
MVA to 16
MVA at 33/11
kV Ennore SS.
33/11 kV 16 MVA Power Transformer To accommodate future load growth 1.06
Proposal under preparation.
Approximate estimated value
indicated.
1.06 1.06 - - - - 1.06 - - 1.06 - -
14Chennai
North
Chennai North
EDC
Estimate for
enhancement of
Power
Transformer 8
MVA to 16
MVA at 33/11
kV Irulipattu SS
REG
33/11 kV 16 MVA Power Transformer To accommodate future load growth 1.06 Proposal under scrutiny.
To be done while
submission of
proposal
1.06 1.06 - - - - 1.06 - - 1.06 - -
15Chennai
North
Chennai North
EDC
Improvement
estimate for
enhancement of
existing 33/11
kV, 8 mva pwer
transformer II
into 33/11 kV,
16 MVA power
transformer at
110/33/11 kV
Melur SS in
respect of 110
kV Melur SS.
33/11 kV 16 MVA Power Transformer To accommodate future load growth 1.42 Proposal under scrutiny
To be done while
submission of
proposal
1.42 1.42 - - - - 1.42 - - 1.42 - -
![Page 147: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/147.jpg)
16Chennai
North
Chennai North
EDC
Establishment of
new 33/11 kV
SS at Elavoor
2x8MVA Pr.Trs,
33kV VCB -4 nos(HV+IC)
11kV VCB -10nos(LV+Feeder)
11kV BC-1 no (anticipated)
To improve the voltage regulation of
the feeders and for accommodating
future load growth
9.85 Land acquisition under
processing - - 9.85 9.85 - - - 9.85 - - 9.85 -
17Chennai
North
Chennai North
EDC
Establishment of
new 33/11 kV
SS at
Arambakkam
2x8MVA Pr.Trs,
33kV VCB -4 nos(HV+IC)
11kV VCB -10nos(LV+Feeder)
11kV BC-1 no (anticipated)
To improve the voltage regulation of
the feeders and for accommodating
future load growth
9.85 Land acquisition under
processing - - 9.85 9.85 - - - 9.85 - - 9.85 -
18Chennai
North
Chennai North
EDC
Replacement of 11 kV Breaker
Stanley SSTo meet out load growth 0.27 0.27 0.27 - - - - 0.27 - - 0.27 - -
19Chennai
North
Chennai North
EDC
Replacement of 11 kV Breaker
Vyasarpadi Industrial Estate SSTo meet out load growth 0.21 0.21 0.21 - - - - 0.21 - - 0.21 - -
20Chennai
North
Chennai North
EDCImprovement
Improvement works- Erection of DT, New
HT feeders, strengthening of HT cables,
Laying LT cable and erection of pillar
boxes.
To improve the network and Load
growth - - - - - - - - - - - - -
21Chennai
North
Chennai North
EDCImprovement
Improvement works in certain HT/LT
Lines, Provision of DTs in required area &
Upgradation of DTs
Improving network strength & Quality,
Replacement of aged conductors, poles,
etc
2.22
Approved by the competent
authority as per the field
proposal
To reduce the Line
Loss, etc 2.22 2.22 - - - - 2.22 - - 2.22 - -
22Chennai
North
Chennai North
EDCImprovement
Improvement works in certain HT/LT
Lines, Provision of DTs in required area &
Upgradation of DTs
Improving network strength & Quality,
Replacement of aged conductors,
poles,etc
52.15 To be approved by the
competent authorities
To reduce the Line
Loss, etc 14.17 15.75 17.15 17.30 18.92 19.10 15.75 17.30 19.10 14.17 17.15 18.92
23Chennai
North
Chennai North
EDC
RAPDRP
Scheme I
AIR Land 33/11kV SS
Construction of control room building,
inclusive of cost of 33 & 11 kV
Breakers,33 kV & 11kV, 1x630 sq mm
Cable, Battery and Control cable and other
Elecl accessories
To meet out load growth 3.60 255/16.7.11To meet out load
growth 3.60 3.60 - - - - 3.60 - - 3.60 - -
24Chennai
North
Chennai North
EDC
Distribution
Strengthening
Works
(RAPDRP)
Erection of New DTs, Strengthening of
HT/LT lines, Convertion of OH line into
UG cable,etc.
To reduce AT&C loss of the project
towns 45.71
To reduce AT&C
loss of the project
towns
45.71 45.71 - - - - 45.71 - - 45.71 - -
25Chennai
North
Chennai North
EDC
APFC(RAPDRP
)
Erection of APFC panel to improve the
voltageTo improve the distribution network 7.57
To improve the
distribution network 7.57 7.57 - - - - 7.57 - - 7.57 - -
26Chennai
North
Chennai North
EDC
Sectionalisers
(RAPDRP)
Erection of Sectionaliser for Power
Distribution monitoring & digitalized
control room
Easy identification of break down
location 0.56
Easy identification of
break down location 0.56 0.56 - - - - 0.56 - - 0.56 - -
27Chennai
North
Chennai North
EDC
FRTU
(RAPDRP)
Erection of FRTU for Power Distribution
monitoring & digitalized control room
Easy identification of break down
location 10.89
Easy identification of
break down location 10.89 10.89 - - - - 10.89 - - 10.89 - -
28Chennai
North
Chennai North
EDC
RGGVY
Schemes - - - - - - - - - - - - -
29Chennai
North
Chennai North
EDCDDUGJY - - - - - - - - - - - - -
30Chennai
North
Chennai North
EDCIPDS
Strengthening of sub transmission and
distribution net works 23.52
B.P.No.31 dt.14.05.2015 &
B.P.No.15 dt. 08.01.2016 10.52 11.69 9.70 9.48 3.30 2.35 11.69 9.48 2.35 10.52 9.70 3.30
31Chennai
North
Chennai North
EDC
Others
(REC/PFC) - - - - - - - - - - - - -
32Chennai
North
Chennai North
EDCDCW - - - - - - - - - - - - -
33Chennai
North
Chennai North
EDC
Any other related
works including
less than one
crore works
totally
- - - - - - - - - - - - -
![Page 148: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/148.jpg)
34Chennai
North
Chennai North
EDCNEFS
Reconductoring the existing damaged OH
line & replacement & insertion of RCC
poles
To improve the distribution network 3.00 B.P.No.100 dt.08.03.2013To improve the
distribution network 3.00 3.00 - - - - 3.00 - - 3.00 - -
1Chennai
South
Chennai South
EDCCapital
Extension of LT & LT CT, HT Supply to
2,06,444 Nos various tariff servicesNew service connections effected 193.07
Based on the application from
the consumers, approval was
accorded by comp authorities
Adding consumers 193.07 193.07 - - - - 193.07 - - 193.07 - -
2Chennai
South
Chennai South
EDCCapital Establishment of 33 kV Substations Purchase of land cost 8.84
To meet out load
growth 8.84 8.84 - - - - 8.84 - - 8.84 - -
3Chennai
South
Chennai South
EDCImprovement
Improvement works- SS, Enhancement of
Pr.Trs in subs tations, sub station related
works.(including CDC)
To improve the network and Load
growth 162.75
Approved by the competent
authority
To meet out load
growth 88.06 97.84 45.34 39.51 26.81 25.40 97.84 39.51 25.40 88.06 45.34 26.81
4Chennai
South
Chennai South
EDCImprovement
Improvement works- Erection of DT, New
HT feeders, strengthening of HT cables,
Laying LT cable and erection of pillar
boxes.
To improve the network and Load
growth 350.93
Approved by the competent
authority as per the field
proposal
To reduce the Line
Loss, etc 350.93 350.93 - - - - 350.93 - - 350.93 - -
5Chennai
South
Chennai South
EDC
RAPDRP
Scheme I (Part
A/Part B)
Work executed by TKC & Board 215.71
CMD TANGEDCO
Proceedings No:124 dt:
08.04.2011
215.71 215.71 - - - - 215.71 - - 215.71 - -
6Chennai
South
Chennai South
EDC
RAPDRP
Scheme II - - - - - - - - - - - - -
7Chennai
South
Chennai South
EDC
RAPDRP
Scheme III etc - - - - - - - - - - - - -
8Chennai
South
Chennai South
EDC
RGGVY
Schemes - - - - - - - - - - - - -
9Chennai
South
Chennai South
EDCDDUGJY - - - - - - - - - - - - -
10Chennai
South
Chennai South
EDCIPDS - - - - - - - - - - - - -
11Chennai
South
Chennai South
EDC
Others
(REC/PFC) - - - - - - - - - - - - -
12Chennai
South
Chennai South
EDCDCW 50.00
Based on the application from
the consumers, approval was
accorded by comp authorities
50.00 50.00 - - - - - - - - - -
1Chennai
South
Kanchipuram
EDCCapital
Extension of LT & LT CT, HT Supply to
26000 Nos various tariff servicesNew service connections effected 74.66
Based on the application from
the consumers, approval was
accorded by the competent
authorities
To meet the growing
demand of the
consumers
13.19 14.66 27.12 28.50 31.20 31.50 14.66 28.50 31.50 13.19 27.12 31.20
2Chennai
South
Kanchipuram
EDCCapital Establishment of 33 kV Substations Improving network strength & Quality 89.23
Based on the application from
the consumers, Substation
sanction approval was
accorded by the competent
authority
To meet the growing
demand of the
consumers
26.31 29.23 28.57 28.50 31.20 31.50 29.23 28.50 31.50 26.31 28.57 31.20
3Chennai
South
Kanchipuram
EDCImprovement
Improvement works, SS enhancement of
Pr.Trs in Substations in Substation related
works.
Improving network strength & Quality, 8.59
Based on the application from
the consumers, approval was
accorded by the competent
authority
To meet the growing
demand of the
consumers
1.48 1.64 3.22 3.40 3.53 3.55 1.64 3.40 3.55 1.48 3.22 3.53
4Chennai
South
Kanchipuram
EDCImprovement
Improvement works in certain HT/LT
Lines, Provision of DTs in required area &
Upgradation of DTs
Improving network strength & Quality,
Replacement of aged conductors,
poles,etc
89.23
Based on the application from
the consumers, approval was
accorded by the competent
authority
To meet the growing
demand of the
consumers
26.31 29.23 28.57 28.50 31.20 31.50 29.23 28.50 31.50 26.31 28.57 31.20
5Chennai
South
Kanchipuram
EDC
RAPDRP
Scheme I (Part
A/Part B)
Erection of New DTs, Strengthening of
HT/LT lines, Convertion of OH line in to
UG cable,etc.
To reduce AT&C loss of the project
towns 15.03
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
For eneregy
accounting and to
reduce AT&C loss of
the project towns
6.33 7.03 6.10 6.00 2.60 2.00 7.03 6.00 2.00 6.33 6.10 2.60
6Chennai
South
Kanchipuram
EDC
RAPDRP
Scheme II - - - - - - - - - - - - - - -
![Page 149: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/149.jpg)
7Chennai
South
Kanchipuram
EDC
RAPDRP
Scheme III etc - - - - - - - - - - - - - - -
8Chennai
South
Kanchipuram
EDC
RGGVY
Schemes - - - - - - - - - - - - - - -
9Chennai
South
Kanchipuram
EDCDDUGJY
Erection of New 33 /11 kV SS and
enhancement of Power Transfomer
To reduce AT&C loss of the project in
rural areas 51.00 During 2015
Reduction of AT&C
Loss 18.00 20.00 25.40 26.00 7.60 5.00 20.00 26.00 5.00 18.00 25.40 7.60
10Chennai
South
Kanchipuram
EDCIPDS
Erection of New 33 /11 kV SS and
enhancement/ addition of Power
Transfomer, HVDS,new 11 kV & 33 kV &
LT line work
To reduce AT&C loss of the project in
Town Panchayat 33.00
CMD TANGEDCO
proceedings No:15 dt
8.01.2016
Reduction of AT&C
Loss 8.10 9.00 18.90 20.00 6.00 4.00 9.00 20.00 4.00 8.10 18.90 6.00
11Chennai
South
Kanchipuram
EDC
Others
(REC/PFC) - - - - - - - - - - - - -
12Chennai
South
Kanchipuram
EDCDCW Shifting of equipments/lines
On request from consumers and as per
norms in force 4.06
Based on the application from
the consumers, approval was
accorded by the competent
authority
To meet the growing
demand of the
consumers
0.86 0.96 1.45 1.50 1.75 1.60 - - - - - -
13Chennai
South
Kanchipuram
EDC
Any other related
works including
less than one
crore works
totally
Vehicles,T&P,Civil works,ComputerFor the improvement of Board
infratructure 13.51
Based on the infrastructure
needs
For the improvement
of Board infratruc
ture
2.80 3.11 5.26 5.50 5.45 4.90 3.11 5.50 4.90 2.80 5.26 5.45
1Chennai
South
Chengalpattu
EDCCapital
Extension of LT & LTCT, HT supply to
71500 Nos at various tariff servicesNew service connection effected 212.19
Based on the application from
the consumers, approval was
accorded by the competent
authorities
Adding consumers 60.62 67.36 70.40 70.73 73.76 74.10 67.36 70.73 74.10 60.62 70.40 73.76
2Chennai
South
Chengalpattu
EDCImprovement
Improvement works in certain HT/LT
Lines, Provision of DTs in required area &
Upgradation of DTs
Improving network strength & Quality,
Replacement of aged conductors and
poles
166.56
Approved by the competent
authority as per the field
proposal
To reduce the Line
Loss, etc 47.63 52.92 55.26 55.52 57.86 58.12 52.92 55.52 58.12 47.63 55.26 57.86
3Chennai
South
Chengalpattu
EDC
Other
Transmission
Enhancement of power Transformer at
Guduvanchery 33/11 kV SS (3X8MVA
into 2X16MVA)
To meet out Load growth 1.44
CMD TANGEDCO
Proceedings No:365/
20.08.2014
To meet out Load
growth 1.44 1.44 - - - - 1.44 - - 1.44 - -
4Chennai
South
Chengalpattu
EDC
Other
Transmission
Enhancement of power Transformer at
Maduranthakam 33/11 kV SS (Additional
1X8MVA pr.Tr)
To meet out Load growth 0.79
CMD TANGEDCO
Proceedings No:168/
30.04.2013
To meet out Load
growth 0.79 0.79 - - - - 0.79 - - 0.79 - -
5Chennai
South
Chengalpattu
EDC
Other
Transmission
Establishment of Pudupakkam 33/11 kV
(Cosmo city)To meet out Load growth 6.84
CMD TANGEDCO
Proceedings No:224/
30.05.2014
To meet out Load
growth 3.08 3.42 3.76 3.42 - - 3.42 3.42 - 3.08 3.76 -
6Chennai
South
Chengalpattu
EDC
Other
Transmission
Enhancement of power Transformer at
Nerumbur 33/11 kV SS (1X8MVA into
2X8MVA)
To meet out Load growth 0.72
CMD TANGEDCO
Proceedings No:427/
26.09.2014
To meet out Load
growth 0.72 0.72 - - - - 0.72 - - 0.72 - -
7Chennai
South
Chengalpattu
EDC
Other
Transmission
Enhancement of power Transformer at
Orathy 33/11 kV SS (2X5MVA into
2X8MVA)
To meet out Load growth 1.44
CMD TANGEDCO
Proceedings No:245/
18.06.2015
To meet out Load
growth 0.65 0.72 0.79 0.72 - - 0.72 0.72 - 0.65 0.79 -
8Chennai
South
Chengalpattu
EDC
Other
Transmission
Enhancement of power Transformer at
Palayanur 33/11 kV SS(1X8MVA into
2X8MVA)
To meet out Load growth 1.12 To meet out Load
growth 1.12 1.12 - - - - 1.12 - - 1.12 - -
9Chennai
South
Chengalpattu
EDC
Other
Transmission
Enhancement of power Transformer at
Veerapuram 33/11 kV SS(2X8MVA into
1X8MVA+1X16)
To meet out Load growth 1.02 To meet out Load
growth 1.02 1.02 - - - - 1.02 - - 1.02 - -
10Chennai
South
Chengalpattu
EDC
Other
Transmission
Enhancement of power Transformer at
Poonchery 33/11 kV SS(1X8MVA into
2X8)
To meet out Load growth 1.12 To meet out Load
growth 1.12 1.12 - - - - 1.12 - - 1.12 - -
11Chennai
South
Chengalpattu
EDC
Other
TransmissionEstablishment of Vallanchery 33/11 kV To meet out Load growth 2.71
To meet out Load
growth 2.71 2.71 - - - - 2.71 - - 2.71 - -
12Chennai
South
Chengalpattu
EDC
Other
TransmissionProposed VGN 33/11 kV SS To meet out Load growth 2.71
To meet out Load
growth - - 2.71 2.71 - - - 2.71 - - 2.71 -
13Chennai
South
Chengalpattu
EDC
Other
Transmission
Establishment of Sembarambakkam
(Godraj) 33/11 kVTo meet out Load growth 2.71
To meet out Load
growth - - 2.71 2.71 - - - 2.71 - - 2.71 -
![Page 150: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/150.jpg)
14Chennai
South
Chengalpattu
EDC
Other
Transmission
Establishment of Ramapuram 33/11 kV SS
(2X8 MVA)To meet out Load growth 1.65 97/08.03.2013
To meet out Load
growth - - - - 1.65 1.65 - - 1.65 - - 1.65
15Chennai
South
Chengalpattu
EDC
Other
Transmission
Establishment of Mambakkam ETA 33/11
kVTo meet out Load growth 2.71
To meet out Load
growth - - - - 2.71 2.71 - - 2.71 - - 2.71
16Chennai
South
Chengalpattu
EDC
Other
TransmissionEstablishment of Urapakkam 33/11 kV To meet out Load growth 2.71
To meet out Load
growth - - - - 2.71 2.71 - - 2.71 - - 2.71
17Chennai
South
Chengalpattu
EDCRAPDRP
33kV OH Line with 6/4.72 and 7/1.75
DOG ConductorTo improve network strength 0.34
CMD TANGEDCO
Proceedings No.124,
dt:08.04.2011
0.34 0.34 - - - - 0.34 - - 0.34 - -
18Chennai
South
Chengalpattu
EDCRAPDRP 1 Phase tamper proof meters
Accurate recording of consumption and
also to avoid human error in taking
reading
0.38
CMD TANGEDCO
Proceedings
No.124,dt:08.04.2011
0.38 0.38 - - - - 0.38 - - 0.38 - -
19Chennai
South
Chengalpattu
EDCRAPDRP
New HT line with ACSR Raccoon
conductor for HVDS & DTsTo avoid low voltage problem 1.15
CMD TANGEDCO
Proceedings No.124,
dt:08.04.2011
1.15 1.15 - - - - 1.15 - - 1.15 - -
20Chennai
South
Chengalpattu
EDCRAPDRP
Erection of 11kV line for new DTs with
ACSR Racoon conductorTo avoid low voltage problem 0.15
CMD TANGEDCO
Proceedings No.124,
dt:08.04.2011
0.15 0.15 - - - - 0.15 - - 0.15 - -
21Chennai
South
Chengalpattu
EDCRAPDRP
Strengthening of Existing Conductor
ACSR weasel(7/3.35) in to Racoon(7/4.09)
to a distance of (0.635+8.05)KM
0.19
CMD TANGEDCO
Proceedings No.124,
dt:08.04.2011
0.19 0.19 - - - - 0.19 - - 0.19 - -
22Chennai
South
Chengalpattu
EDCRAPDRP
New Double pole mounted 100kVA-
11000/433V Distribution TransformerTo offer load relief to the existing Dt's 0.08
CMD TANGEDCO
Proceedings No.124,
dt:08.04.2011
0.08 0.08 - - - - 0.08 - - 0.08 - -
23Chennai
South
Chengalpattu
EDCRAPDRP
New Double pole mounted 250kVA-
11000/433V Distribution Transformer 0.34
CMD TANGEDCO
Proceedings No.124,
dt:08.04.2011
0.34 0.34 - - - - 0.34 - - 0.34 - -
24Chennai
South
Chengalpattu
EDCRAPDRP
New LT Line: New feeder for 1.6KM with
ACSR Rabbit wherever new DT is
proposed
To avoid low voltage problem 0.05
CMD TANGEDCO
Proceedings
No.124,dt:08.04.2011
0.05 0.05 - - - - 0.05 - - 0.05 - -
25Chennai
South
Chengalpattu
EDCRAPDRP Single Pole Mounted 25 kVA To reduce HT-LT ratio 0.48
CMD TANGEDCO
Proceedings No.124,
dt:08.04.2011
0.48 0.48 - - - - 0.48 - - 0.48 - -
26Chennai
South
Chengalpattu
EDCRAPDRP
Erection of Wedge connector and Lugs for
for DT structure 0.12
CMD TANGEDCO
Proceedings No.124,
dt:08.04.2011
0.12 0.12 - - - - 0.12 - - 0.12 - -
27Chennai
South
Chengalpattu
EDCRAPDRP
Wedge Connectors for LT Cut Point
locatrion 0.25
CMD TANGEDCO
Proceedings No.124,
dt:08.04.2011
0.25 0.25 - - - - 0.25 - - 0.25 - -
28Chennai
South
Chengalpattu
EDCIPDS
Establishment of 2Nos of new 33-11 kV
SS at Maraimalai nagar and GuduvancheriTo meet out load growth 7.35
(Per) CMD TANGEDCO
Proceedings No. 15(T.B)
dt.08.01.2016
7.35 7.35 - - - - 7.35 - - 7.35 - -
29Chennai
South
Chengalpattu
EDCIPDS
Enhancement of 1 x 8 MVA Additional
Transformer in 33/11kV Poonjeri SS with
2 Feeders
To improve network strength 1.27
(Per) CMD TANGEDCO
Proceedings No. 15(T.B)
dt.08.01.2019
1.27 1.27 - - - - 1.27 - - 1.27 - -
30Chennai
South
Chengalpattu
EDCIPDS
Enhancement of 8MVA to 16MVA in
33/11kV SIDCO SS(Indoor)To improve network strength 1.48
(Per) CMD TANGEDCO
Proceedings No. 15(T.B)
dt.08.01.2022
0.67 0.74 0.81 0.74 - - 0.74 0.74 - 0.67 0.81 -
31Chennai
South
Chengalpattu
EDCIPDS New 33 kV feeders for newly proposed SS To improve network strength 0.30
(Per) CMD TANGEDCO
Proceedings No. 15(T.B)
dt.08.01.2023
0.13 0.15 0.17 0.15 - - 0.15 0.15 - 0.13 0.17 -
32Chennai
South
Chengalpattu
EDCIPDS
Bay extension for 33kV line in 110/141kV
MMN SSTo improve network strength 0.28
(Per) CMD TANGEDCO
Proceedings No. 15(T.B)
dt.08.01.2028
0.13 0.14 0.15 0.14 - - 0.14 0.14 - 0.13 0.15 -
33Chennai
South
Chengalpattu
EDCIPDS
Erection of 11 kV Line : New Feeder/
Feeder BifurcationTo avoid low voltage problem 0.24
(Per) CMD TANGEDCO
Proceedings No. 15(T.B)
dt.08.01.2029
0.11 0.12 0.13 0.12 - - 0.12 0.12 - 0.11 0.13 -
![Page 151: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/151.jpg)
34Chennai
South
Chengalpattu
EDCIPDS Arial Bunched Cable - HT & LT To avoid low voltage problem 0.18
(Per) CMD TANGEDCO
Proceedings No. 15(T.B)
dt.08.01.2033
0.08 0.09 0.10 0.09 - - 0.09 0.09 - 0.08 0.10 -
35Chennai
South
Chengalpattu
EDCIPDS UG Cable - HT & LT To avoid low voltage problem 0.74
(Per) CMD TANGEDCO
Proceedings No. 15(T.B)
dt.08.01.2036
0.33 0.37 0.41 0.37 - - 0.37 0.37 - 0.33 0.41 -
36Chennai
South
Chengalpattu
EDCIPDS
New 100kVA DT only for rerating existing
1 no 250kVATransformersTo avoid low voltage problem 0.02
(Per) CMD TANGEDCO
Proceedings No. 15(T.B)
dt.08.01.2041
0.01 0.01 0.01 0.01 - - 0.01 0.01 - 0.01 0.01 -
37Chennai
South
Chengalpattu
EDCIPDS
Erection of LT Line : New Feeder/ Feeder
BifurcationTo avoid low voltage problem 0.14
(Per) CMD TANGEDCO
Proceedings No. 15(T.B)
dt.08.01.2042
0.06 0.07 0.08 0.07 - - 0.07 0.07 - 0.06 0.08 -
38Chennai
South
Chengalpattu
EDCIPDS LT Line : Augmentation/Reconductoring To avoid low voltage problem 0.08
(Per) CMD TANGEDCO
Proceedings No. 15(T.B)
dt.08.01.2047
0.04 0.04 0.04 0.04 - - 0.04 0.04 - 0.04 0.04 -
39Chennai
South
Chengalpattu
EDCIPDS Erection of HVDS Dt's To offer load relief to the existing Dt's 0.03
(Per) CMD TANGEDCO
Proceedings No. 15(T.B)
dt.08.01.2051
0.03 0.03 - - - - 0.03 - - 0.03 - -
40Chennai
South
Chengalpattu
EDCIPDS Metering
Accurate recording of consumption and
also to avoid human error in taking
reading
0.01
(Per) CMD TANGEDCO
Proceedings No. 15(T.B)
dt.08.01.2055
0.01 0.01 - - - - 0.01 - - 0.01 - -
41Chennai
South
Chengalpattu
EDCIPDS
Boundry Meters for Ring Fencing of Non -
RAPDRP Towns with population more
than 5000
0.01
(Per) CMD TANGEDCO
Proceedings No. 15(T.B)
dt.08.01.2056
0.01 0.01 - - - - 0.01 - - 0.01 - -
42Chennai
South
Chengalpattu
EDCIPDS Provisioning of solar panel 0.01
(Per) CMD TANGEDCO
Proceedings No. 15(T.B)
dt.08.01.2063
0.01 0.01 - - - - 0.01 - - 0.01 - -
1 CoimbatoreCoimbatore
Metro EDC
Capital (Balance
work from 2015-
16)
Extension of LT & LT CT, HT Supply to
19600 Nos various tariff servicesNew service connections effected 12.39
Based on the application from
the consumers, approval
accorded by comptent
authorities
Adding consumers 12.39 12.39 - - - - 12.39 - - 12.39 - -
2 CoimbatoreCoimbatore
Metro EDCCapital
Extension of LT & LT CT, HT Supply to
30000 nos various tariff servicesNew service connections effected 38.00
To be approved by the
competent authorityAdding consumers 10.80 12.00 14.70 15.00 11.40 11.00 12.00 15.00 11.00 10.80 14.70 11.40
3 CoimbatoreCoimbatore
Metro EDCCapital
Establishment of 33 kV sub stations at
Gandhimaanagar & Ganapathy in 2016-17
& Pappampatty Privu , Kalangal in 18-19
Improvement in Distribution network 16.00 To be proposedReduction of AT & C
Loss 3.60 4.00 4.00 4.00 7.60 8.00 4.00 4.00 8.00 3.60 4.00 7.60
4 CoimbatoreCoimbatore
Metro EDC
Improvement
(Balance work
from 2015-16)
Improvement works- Erection of DT, New
HT feeders, strengthening of HT cables,
Laying LT cable and erection of pillar
boxes.
To improve the network and Load
growth 16.27
To be approved by the
competent authority
To reduce Line Loss,
etc 16.27 16.27 - - - - 16.27 - - 16.27 - -
5 CoimbatoreCoimbatore
Metro EDCImprovement
Improvement works- SS, Enhancement of
Pr.Trs in sub stations, sub station related
works.
To improve the network and Load
growth - - - - - - - - - - - - -
6 CoimbatoreCoimbatore
Metro EDCImprovement
Improvement works- Erection of DT, New
HT feeders, strengthening of HT cables,
Laying LT cable and erection of pillar
boxes.
To improve the network and Load
growth 35.00
To be approved by the
competent authority
To reduce Line Loss,
etc 8.10 9.00 11.70 12.00 13.80 14.00 9.00 12.00 14.00 8.10 11.70 13.80
7 CoimbatoreCoimbatore
Metro EDC
RAPDRP
Scheme I (Part
B) - Balance
work from 2015-
16
Erection of New DTs, Strengtheing of
HT/LT lines, Conversion of OH Line in to
UG Cable, etc
To reduce AT & C Loss in Coimbatore
UA 127.13
CMD TANGEDCO
Proceedings No.124, dt.
08.04.2011
Reduction of AT & C
Loss 127.13 127.13 - - - - 127.13 - - 127.13 - -
8 CoimbatoreCoimbatore
Metro EDC
RAPDRP
Scheme-II (Part-
B)
- - - - - - - - - - - - -
9 CoimbatoreCoimbatore
Metro EDC
RAPDRP
Scheme III etc - - - - - - - - - - - - -
![Page 152: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/152.jpg)
10 CoimbatoreCoimbatore
Metro EDC
RGGVY
Schemes - - - - - - - - - - - - -
11 CoimbatoreCoimbatore
Metro EDCDDUGJY - - - - - - - - - - - - -
12 CoimbatoreCoimbatore
Metro EDCIPDS - - - - - - - - - - - - -
13 CoimbatoreCoimbatore
Metro EDC
Others
(REC/PFC) - - - - - - - - - - - - -
14 CoimbatoreCoimbatore
Metro EDC
DCW (Balance
work from 2015-
16)
Shifting of HT/LT Lines, Structures,etc,
(Including road widening projects) and
Dedicated Feeder
Infrastrcture development by the
Highways, Local authorities and
Consumer request
25.57
Based on the application from
the consumers, NHAI,
Highways, Local Bodies
approval accorded by
comptent authorities
Renewals &
Replacements 25.57 25.57 - - - - - - - - - -
15 CoimbatoreCoimbatore
Metro EDCDCW
Shifting of HT/LT Lines, Structures, etc,
(Including road widening projects) and
Dedicated Feeder
Infrastrcture development by the
Highways, Local authorities and
Consumer request
22.00
Based on the application from
the consumers, NHAI,
Highways, Local Bodies
approval accorded by
comptent authorities
Renewals &
Replacements 5.40 6.00 7.35 7.50 9.25 8.50 - - - - - -
16 CoimbatoreCoimbatore
Metro EDC
Any other related
works including
less than one
crore works
totally
Civil Works, IT Procurement, Purchase of
new vehicle
Improvement works in internal
efficiency 3.00
Certain improvement taken in
the required areaImproving efficiency 0.67 0.75 0.98 1.00 1.35 1.25 0.75 1.00 1.25 0.67 0.98 1.35
1 CoimbatoreCoimbatore
North EDC
Capital (Balance
work from 2015-
16)
Extension of LT & LT CT, HT Supply to
12150 Nos various tariff servicesNew service connections effected 27.04
Based on the application from
the consumers, approval
accorded by comptent
authorities
Adding consumers 27.04 27.04 - - - - 27.04 - - 27.04 - -
2 CoimbatoreCoimbatore
North EDCCapital
Extension of LT & LT CT, HT Supply to
19000 nos various tariff servicesNew service connections effected 25.00
To be approved by the
competent authorityAdding consumers 5.85 6.50 7.40 7.50 10.65 11.00 6.50 7.50 11.00 5.85 7.40 10.65
3 CoimbatoreCoimbatore
North EDCCapital
Establishment of 33 kV sub stations at
Thondamuthur 2016-17 & Vedapatty 17-
18
Improvement in Distribution network 8.00 To be proposedReduction of AT & C
Loss 3.60 4.00 4.40 4.00 - - 4.00 4.00 - 3.60 4.40 -
4 CoimbatoreCoimbatore
North EDC
Improvement
(Balance work
from 2015-16)
Improvement works- Erection of DT,
New HT feeders, strengthening of HT
cables, Laying LT cable and erection of
pillar boxes.
To improve the network and Load
growth 13.08
Approved by the competent
authority as per the field
proposal
To reduce Line Loss,
etc 13.08 13.08 - - - - 13.08 - - 13.08 - -
5 CoimbatoreCoimbatore
North EDCImprovement
Improvement works- SS, Enhancement of
Pr.Trs in sub stations, sub station related
works.
To improve the network and Load
growth - - - - - - - - - - - - -
6 CoimbatoreCoimbatore
North EDCImprovement
Improvement works- Erection of DT, New
HT feeders, strengthening of HT cables,
Laying LT cable and erection of pillar
boxes.
To improve the network and Load
growth 20.00
To be approved by the
competent authority
To reduce Line Loss,
etc 5.40 6.00 6.90 7.00 7.00 7.00 6.00 7.00 7.00 5.40 6.90 7.00
7 CoimbatoreCoimbatore
North EDC
RAPDRP
Scheme I (Part
B) - Balance
work from 2015-
16
Erection of New DTs, Strengtheing of
HT/LT lines, Conversion of OH Line in to
UG Cable, etc
To reduce AT & C Loss in Coimbatore
UA 33.48
CMD TANGEDCO
Proceedings No 124, dt.
08.04.2011
Reduction of AT & C
Loss 33.48 33.48 - - - - 33.48 - - 33.48 - -
8 CoimbatoreCoimbatore
North EDC
RAPDRP
Scheme-II (Part-
B)
- - - - - - - - - - - - -
9 CoimbatoreCoimbatore
North EDC
RAPDRP
Scheme III etc - - - - - - - - - - - - -
10 CoimbatoreCoimbatore
North EDC
RGGVY
Schemes - - - - - - - - - - - - -
11 CoimbatoreCoimbatore
North EDCDDUGJY - - - - - - - - - - - - -
![Page 153: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/153.jpg)
12 CoimbatoreCoimbatore
North EDCIPDS
Erection of HVDS DTs, LT line
reconductoring and agumentation ,
replacement of electro mechanical meter
To reduce AT & C Loss in project
towns 39.57
CMD TANGEDCO
Proceedings No 15, dt.
08.01.2016
Reduction of AT & C
Loss 8.61 9.57 14.80 15.38 16.16 14.62 9.57 15.38 14.62 8.61 14.80 16.16
14 CoimbatoreCoimbatore
North EDC
DCW (Balance
work from 2015-
16)
Shifting of HT/LT Lines, Structures,etc,
(Including road widening projects) and
Dedicated Feeder
Infrastrcture development by the
Highways, Local authorities and
Consumer request
4.18
Based on the application from
the consumers, NHAI,
Highways, Local Bodies
approval accorded by
comptent authorities
Renewals &
Replacements 4.18 4.18 - - - - - - - - - -
15 CoimbatoreCoimbatore
North EDCDCW
Shifting of HT/LT Lines, Structures,etc,
(Including road widening projects) and
Dedicated Feeder
Infrastrcture development by the
Highways, Local authorities and
Consumer request
16.00
Based on the application from
the consumers, NHAI,
Highways, Local Bodies
approval accorded by
comptent authorities
Renewals &
Replacements 4.50 5.00 5.00 5.00 6.50 6.00 - - - - - -
16 CoimbatoreCoimbatore
North EDC
Any other related
works including
less than one
crore works
totally
Civil Works, IT Procurement, Purchase of
new vehicle
Improvement works in internal
efficiency 3.00
Certain improvement taken in
the required areaImproving efficiency 0.67 0.75 0.98 1.00 1.35 1.25 0.75 1.00 1.25 0.67 0.98 1.35
1 CoimbatoreCoimbatore
South EDC
Capital (Balance
work from 2015-
16)
Extension of LT & LT CT, HT Supply to
10250 Nos various tariff servicesNew service connections effected 32.57
Based on the application from
the consumers, approval
accorded by comptent
authorities
Adding consumers 32.57 32.57 - - - - 32.57 - - 32.57 - -
2 CoimbatoreCoimbatore
South EDCCapital
Extension of LT & LT CT, HT Supply to
17000 nos various tariff servicesNew service connections effected 21.50
To be approved by the
competent authorityAdding consumers 7.20 8.00 6.65 6.50 6.95 7.00 8.00 6.50 7.00 7.20 6.65 6.95
3 CoimbatoreCoimbatore
South EDCCapital
Establishment of 33 kV sub stations at
Elachipalayam, Karumathampatty, Anna
Indl Park (2016-17) & Vadavalli
(NegamamDn) 2018-19
Improvement in Distribution network 18.30 To be proposedReduction of AT & C
Loss 3.60 4.00 7.60 8.00 6.47 6.30 4.00 8.00 6.30 3.60 7.60 6.47
4 CoimbatoreCoimbatore
South EDC
Improvement
(Balance work
from 2015-16)
Improvement works- Erection of DT,New
HT feeders, strengthening of HT cables,
Laying LT cable and erection of pillar
boxes.
To improve the network and Load
growth 15.71
Approved by the competent
authority as per the field
proposal
To reduce Line Loss,
etc 15.71 15.71 - - - - 15.71 - - 15.71 - -
5 CoimbatoreCoimbatore
South EDCImprovement
Improvement works- SS,Enhancement of
Pr.Trs in sub stations, sub station related
works.
To improve the network and Load
growth - - - - - - - - - - - - -
6 CoimbatoreCoimbatore
South EDCImprovement
Improvement works- Erection of DT,New
HT feeders, strengthening of HT cables,
Laying LT cable and erection of pillar
boxes.
To improve the network and Load
growth 20.00
To be approved by the
competent authority
To reduce Line Loss,
etc 5.40 6.00 6.90 7.00 7.00 7.00 6.00 7.00 7.00 5.40 6.90 7.00
7 CoimbatoreCoimbatore
South EDC
RAPDRP
Scheme I (Part
B) - Balance
work from 2015-
16
Erection of New DTs, Strengtheing of
HT/LT lines, Conversion of OH Line in to
UG Cable, etc
To reduce AT & C Loss in Coimbatore
UA 9.43
CMD TANGEDCO
Proceedings No 124, dt.
08.04.2011
Reduction of AT & C
Loss 9.43 9.43 - - - - 9.43 - - 9.43 - -
8 CoimbatoreCoimbatore
South EDC
RAPDRP
Scheme-II (Part-
B)
- - - - - - - - - - - - -
9 CoimbatoreCoimbatore
South EDC
RAPDRP
Scheme III etc - - - - - - - - - - - - -
10 CoimbatoreCoimbatore
South EDC
RGGVY
Schemes - - - - - - - - - - - - -
11 CoimbatoreCoimbatore
South EDCDDUGJY - - - - - - - - - - - - -
12 CoimbatoreCoimbatore
South EDCIPDS
Erection of HVDS DTs, LT line
reconductoring and agumentation ,
replacement of electro mechanical meter,
etc & 33kv SS @ Kalipalayam
To reduce AT & C Loss in project
towns 54.17
CMD TANGEDCO
Proceedings No 15, dt.
08.01.2016
Reduction of AT & C
Loss 4.50 5.00 28.40 31.00 21.27 18.17 5.00 31.00 18.17 4.50 28.40 21.27
13 CoimbatoreCoimbatore
South EDC
Others
(REC/PFC) - - - - - - - - - - - - -
![Page 154: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/154.jpg)
14 CoimbatoreCoimbatore
South EDC
DCW (Balance
work from 2015-
16)
Shifting of HT/LT Lines, Structures,etc,
(Including road widening projects) and
Dedicated Feeder
Infrastrcture development by the
Highways, Local authorities and
Consumer request
7.73
Based on the application from
the consumers, NHAI,
Highways, Railways, Local
Bodies approval accorded by
comptent authorities
Renewals &
Replacements 7.73 7.73 - - - - - - - - - -
15 CoimbatoreCoimbatore
South EDCDCW
Shifting of HT/LT Lines, Structures,etc,
(Including road widening projects) and
Dedicated Feeder
Infrastrcture development by the
Highways, Local authorities and
Consumer request
16.00
Based on the application from
the consumers, NHAI,
Highways, Local Bodies
approval accorded by
comptent authorities
Renewals &
Replacements 4.50 5.00 5.00 5.00 6.50 6.00 - - - - - -
16 CoimbatoreCoimbatore
South EDC
Any other related
works including
less than one
crore works
totally
Civil Works, IT Procurement, Purchase of
new vehicle
Improvement works in internal
efficiency 3.00
Certain improvement taken in
the required areaImproving efficiency 0.67 0.75 0.98 1.00 1.35 1.25 0.75 1.00 1.25 0.67 0.98 1.35
1 Coimbatore Tiruppur EDC
Capital (Balance
work from 2015-
16)
Extension of LT & LT CT, HT Supply to
23360 Nos various tariff servicesNew service connections effected 26.93
Based on the application from
the consumers, approval
accorded by comptent
authorities
Adding consumers 26.93 26.93 - - - - 26.93 - - 26.93 - -
2 Coimbatore Tiruppur EDC CapitalExtension of LT & LT CT, HT Supply to
33000 nos various tariff servicesNew service connections effected 40.00
To be approved by the
competent authorityAdding consumers 9.00 10.00 13.60 14.00 15.80 16.00 10.00 14.00 16.00 9.00 13.60 15.80
3 Coimbatore Tiruppur EDC Capital
Establishment of 33 kV sub stations at
Kallapalayam,
Amravathipalayam,Uthukuli, Padiyur,
Ayyampalayam, Nallathupalayam (
2016-17), Kongunagar, Koolipalayam,
Pappampatty, Nochipalayam,
Panapalayam, Aavin, Chengapalli,
Pudupai, Vellamadai, Palayakottai Road,
Thayampalayam ( 2017-18) RK
Palayam, Neruperichal, Avinashipalayam,
Pappini, Padiyandipalayam,
Kuttapalayam(2018-19)
Improvement in Distribution network 96.00 To be proposedReduction of AT & C
Loss 36.00 40.00 36.40 36.00 21.60 20.00 40.00 36.00 20.00 36.00 36.40 21.60
4 Coimbatore Tiruppur EDC
Improvement
(Balance work
from 2015-16)
Improvement works- Erection of DT, New
HT feeders, strengthening of HT cables,
Laying LT cable and erection of pillar
boxes.
To improve the network and Load
growth 23.25
Approved by the competent
authority as per the field
proposal
To reduce Line Loss,
etc 23.25 23.25 - - - - 23.25 - - 23.25 - -
5 Coimbatore Tiruppur EDC Improvement
Improvement works- SS,Enhancement of
Pr.Trs in sub stations, sub station related
works.
To improve the network and Load
growth - - - - - - - - - - - - -
6 Coimbatore Tiruppur EDC Improvement
Improvement works- Erection of DT,New
HT feeders, strengthening of HT cables,
Laying LT cable and erection of pillar
boxes.
To improve the network and Load
growth 30.00
To be approved by the
competent authority
To reduce Line Loss,
etc 8.10 9.00 9.90 10.00 10.90 11.00 9.00 10.00 11.00 8.10 9.90 10.90
7 Coimbatore Tiruppur EDC
RAPDRP
Scheme I (Part
B) - Balance
work from 2015-
16
Erection of New DTs, Strengtheing of
HT/LT lines, Conversion of OH Line in to
UG Cable, etc
To reduce AT & C Loss in Coimbatore
UA 3.98
CMD TANGEDCO
Proceedings No 124, dt.
08.04.2011
Reduction of AT & C
Loss 3.98 3.98 - - - - 3.98 - - 3.98 - -
8 Coimbatore Tiruppur EDC
RAPDRP
Scheme-II (Part-
B)
- - - - - - - - - - - - -
9 Coimbatore Tiruppur EDCRAPDRP
Scheme III etc - - - - - - - - - - - - -
10 Coimbatore Tiruppur EDCRGGVY
Schemes - - - - - - - - - - - - -
11 Coimbatore Tiruppur EDC DDUGJY - - - - - - - - - - - - -
![Page 155: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/155.jpg)
12 Coimbatore Tiruppur EDC IPDS
Erection of HVDS DTs, LT line
reconductoring and agumentation ,
replacement of electro mechanical meter,
etc
To reduce AT & C Loss in project
towns 55.77
CMD TANGEDCO
Proceedings No 15, dt.
08.01.2016
Reduction of AT & C
Loss - - 22.50 25.00 33.27 30.77 - 25.00 30.77 - 22.50 33.27
13 Coimbatore Tiruppur EDCOthers
(REC/PFC) - - - - - - - - - - - - -
14 Coimbatore Tiruppur EDC
DCW (Balance
work from 2015-
16)
Shifting of HT/LT Lines, Structures,etc,
(Including road widening projects) and
Dedicated Feeder
Infrastrcture development by the
Highways, Local authorities and
Consumer request
10.59
Based on the application from
the consumers, NHAI,
Highways, Railways, Local
Bodies approval accorded by
comptent authorities
Renewals &
Replacements 10.59 10.59 - - - - - - - - - -
15 Coimbatore Tiruppur EDC DCW
Shifting of HT/LT Lines, Structures,etc,
(Including road widening projects) and
Dedicated Feeder
Infrastrcture development by the
Highways, Local authorities and
Consumer request
30.00
Based on the application from
the consumers, NHAI,
Highways, Local Bodies
approval accorded by
comptent authorities
Renewals &
Replacements 7.20 8.00 9.80 10.00 13.00 12.00 - - - - - -
16 Coimbatore Tiruppur EDC
Any other related
works including
less than one
crore works
totally
Civil Works, IT Procurement, Purchase of
new vehicle
Improvement works in internal
efficiency 3.00
Certain improvement taken in
the required areaImproving efficiency 0.67 0.75 0.98 1.00 1.35 1.25 0.75 1.00 1.25 0.67 0.98 1.35
1 CoimbatoreUdumalpet
EDC
Capital (Balance
work from 2015-
16)
Extension of LT & LT CT, HT Supply to
8060 Nos various tariff servicesNew service connections effected 29.40
Based on the application from
the consumers, approval
accorded by comptent
authorities
Adding consumers 29.40 29.40 - - - - 29.40 - - 29.40 - -
2 CoimbatoreUdumalpet
EDCCapital
Extension of LT & LT CT, HT Supply to
13000 nos various tariff servicesNew service connections effected 30.00
To be approved by the
competent authorityAdding consumers 7.20 8.00 9.80 10.00 11.80 12.00 8.00 10.00 12.00 7.20 9.80 11.80
3 CoimbatoreUdumalpet
EDCCapital Establishment of 33 kV sub stations Not Proposed - - - - - - - - - - - - -
4 CoimbatoreUdumalpet
EDC
Improvement
(Balance work
from 2015-16)
Improvement works- Erection of DT, New
HT feeders, strengthening of HT cables,
Laying LT cable and erection of pillar
boxes.
To improve the network and Load
growth 33.79
Approved by the competent
authority as per the field
proposal
To reduce Line Loss,
etc 33.79 33.79 - - - - 33.79 - - 33.79 - -
5 CoimbatoreUdumalpet
EDCImprovement
Improvement works- SS, Enhancement of
Pr.Trs in sub stations, sub station related
works.
To improve the network and Load
growth - - - - - - - - - - - - -
6 CoimbatoreUdumalpet
EDCImprovement
Improvement works- Erection of DT,New
HT feeders, strengthening of HT cables,
Laying LT cable and erection of pillar
boxes.
To improve the network and Load
growth 30.00
To be approved by the
competent authority
To reduce Line Loss,
etc 8.10 9.00 9.90 10.00 10.90 11.00 9.00 10.00 11.00 8.10 9.90 10.90
7 CoimbatoreUdumalpet
EDC
RAPDRP
Scheme I (Part
B) - Balance
work from 2015-
16
Erection of New DTs, Strengtheing of
HT/LT lines, Conversion of OH Line in to
UG Cable, etc
To reduce AT & C Loss in Coimbatore
UA 17.86
CMD TANGEDCO
Proceedings No 124, dt.
08.04.2011
Reduction of AT & C
Loss 17.86 17.86 - - - - 17.86 - - 17.86 - -
8 CoimbatoreUdumalpet
EDC
RAPDRP
Scheme-II (Part-
B)
- - - - - - - - - - - - -
9 CoimbatoreUdumalpet
EDC
RAPDRP
Scheme III etc - - - - - - - - - - - - -
10 CoimbatoreUdumalpet
EDC
RGGVY
Schemes - - - - - - - - - - - - -
11 CoimbatoreUdumalpet
EDCDDUGJY - - - - - - - - - - - - -
12 CoimbatoreUdumalpet
EDCIPDS
Erection of HVDS DTs, LT line
reconductoring and agumentation ,
replacement of electro mechanical meter,
etc
To reduce AT & C Loss in project
towns 29.54
CMD TANGEDCO
Proceedings No 15, dt.
08.01.2016
Reduction of AT & C
Loss - - 15.30 17.00 14.24 12.54 - 17.00 12.54 - 15.30 14.24
![Page 156: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/156.jpg)
13 CoimbatoreUdumalpet
EDC
Others
(REC/PFC) - - - - - - - - - - - - -
14 CoimbatoreUdumalpet
EDC
DCW (Balance
work from 2015-
16)
Shifting of HT/LT Lines, Structures,etc,
(Including road widening projects) and
Dedicated Feeder
Infrastrcture development by the
Highways, Local authorities and
Consumer request
6.57
Based on the application from
the consumers, NHAI,
Highways, Railways, Local
Bodies approval accorded by
comptent authorities
Renewals &
Replacements 6.57 6.57 - - - - - - - - - -
15 CoimbatoreUdumalpet
EDCDCW
Shifting of HT/LT Lines, Structures,etc,
(Including road widening projects) and
Dedicated Feeder
Infrastrcture development by the
Highways, Local authorities and
Consumer request
20.00
Based on the application from
the consumers, NHAI,
Highways, Local Bodies
approval accorded by
comptent authorities
Renewals &
Replacements 4.50 5.00 6.80 7.00 8.70 8.00 - - - - - -
16 CoimbatoreUdumalpet
EDC
Any other related
works including
less than one
crore works
totally
Civil Works, IT Procurement, Purchase of
new vehicle
Improvement works in internal
efficiency 3.00
Certain improvement taken in
the required areaImproving efficiency 0.67 0.75 0.98 1.00 1.35 1.25 0.75 1.00 1.25 0.67 0.98 1.35
1 Coimbatore Nilgiis EDC
Capital (Balance
work from 2015-
16)
Extension of LT & LT CT, HT Supply to
3040 Nos various tariff servicesNew service connections effected 6.24
Based on the application from
the consumers, approval
accorded by comptent
authorities
Adding consumers 6.24 6.24 - - - - 6.24 - - 6.24 - -
2 Coimbatore Nilgiis EDC CapitalExtension of LT & LT CT, HT Supply to
5000 nos various tariff servicesNew service connections effected 3.65
To be approved by the
competent authorityAdding consumers 0.90 1.00 1.00 1.00 1.58 1.65 1.00 1.00 1.65 0.90 1.00 1.58
3 Coimbatore Nilgiis EDC Capital
Establishment of 33 kV sub stations in
Keradamattam ( 2016-17),
Contonment (2017-18), M.Pallada &
Doddabetta ( 2018-19)
Improvement in Distribution network 28.88 To be proposedReduction of AT & C
Loss 15.19 16.88 13.69 12.00 - - 16.88 12.00 - 15.19 13.69 -
4 Coimbatore Nilgiis EDC
Improvement
(Balance work
from 2015-16)
Improvement works- Erection of DT, New
HT feeders, strengthening of HT cables,
Laying LT cable and erection of pillar
boxes.
To improve the network and Load
growth 0.59
Approved by the competent
authority as per the field
proposal
To reduce Line Loss,
etc 0.59 0.59 - - - - 0.59 - - 0.59 - -
5 Coimbatore Nilgiis EDC Improvement
Improvement works- SS, Enhancement of
Pr.Trs in sub stations, sub station related
works.
To improve the network and Load
growth - - - - - - - - - - - - -
6 Coimbatore Nilgiis EDC Improvement
Improvement works- Erection of DT, New
HT feeders, strengthening of HT cables,
Laying LT cable and erection of pillar
boxes.
To improve the network and Load
growth 3.00
To be approved by the
competent authority
To reduce Line Loss,
etc 0.90 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.90 1.00 1.00
7 Coimbatore Nilgiis EDC
RAPDRP
Scheme I (Part
B) - Balance
work from 2015-
16
Erection of New DTs, Strengtheing of
HT/LT lines, Conversion of OH Line in to
UG Cable, etc
To reduce AT & C Loss in Coimbatore
UA 11.77
CMD TANGEDCO
Proceedings No 124, dt.
08.04.2011
Reduction of AT & C
Loss 11.77 11.77 - - - - 11.77 - - 11.77 - -
8 Coimbatore Nilgiis EDC
RAPDRP
Scheme-II (Part-
B)
- - - - - - - - - - - - -
9 Coimbatore Nilgiis EDCRAPDRP
Scheme III etc - - - - - - - - - - - - -
10 Coimbatore Nilgiis EDCRGGVY
Schemes - - - - - - - - - - - - -
11 Coimbatore Nilgiis EDC DDUGJY - - - - - - - - - - - - -
12 Coimbatore Nilgiis EDC IPDS
Erection of HVDS DTs, LT line
reconductoring and agumentation ,
replacement of electro mechanical meter,
etc
To reduce AT & C Loss in project
towns 31.37
CMD TANGEDCO
Proceedings No 15, dt.
08.01.2016
Reduction of AT & C
Loss - - 14.40 16.00 16.97 15.37 - 16.00 15.37 - 14.40 16.97
13 Coimbatore Nilgiis EDCOthers
(REC/PFC) - - - - - - - - - - - - -
![Page 157: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/157.jpg)
14 Coimbatore Nilgiis EDC
DCW (Balance
work from 2015-
16)
Shifting of HT/LT Lines, Structures, etc,
(Including road widening projects) and
Dedicated Feeder
Infrastrcture development by the
Highways, Local authorities and
Consumer request
0.14
Based on the application from
the consumers, NHAI,
Highways, Local Bodies
approval accorded by
comptent authorities
Renewals &
Replacements 0.14 0.14 - - - - - - - - - -
15 Coimbatore Nilgiis EDC DCW
Shifting of HT/LT Lines, Structures etc,
(Including road widening projects) and
Dedicated Feeder
Infrastrcture development by the
Highways, Local authorities and
Consumer request
2.00
Based on the application from
the consumers, NHAI,
Highways, Local Bodies
approval accorded by
comptent authorities
Renewals &
Replacements 0.45 0.50 0.50 0.50 1.05 1.00 - - - - - -
16 Coimbatore Nilgiis EDC
Any other related
works including
less than one
crore works
totally
Civil Works, IT Procurement, Purchase of
new vehicle
Improvement works in internal
efficiency 1.00
Cetain improvement taken in
the required areaImproving efficiency 0.22 0.25 0.34 0.35 0.44 0.40 0.25 0.35 0.40 0.22 0.34 0.44
1 Erode Erode EDC Capital Extension of LT & LT CT Supply to
20675 Nos various tariff servicesEffecting new services 1.00
Approval was accorded by the
relevant competent authorities
for effecting new service
connections.
To meet the growing
demand of the
consumers
1.00 1.00 - - - - 1.00 - - 1.00 - -
2 Erode Erode EDC Capital Extension of HT Supply to 30 Nos.
( New & Additional loads)Effecting new & addl load services 1.00
Approval was accorded by the
relevant competent authorities
for effecting new and addl.
service connections.
To meet the growing
demand of the
consumers
1.00 1.00 - - - - 1.00 - - 1.00 - -
3 Erode Erode EDC Improvement
Improvement works in certain HT/LT
Lines, Provision of DTs in the required
area & Upgradation of DTs
To reduce the line losses 1.00 Approval was accorded by the
relevant competent authorities
To meet the growing
demand of the
consumers
1.00 1.00 - - - - 1.00 - - 1.00 - -
4 Erode Erode EDC RAPDRP
Erection of New DTs, Strengthening of
HT/LT lines, Conversion of OH line into
UG Cable, etc.
To reduce the AT&C losses 0.02 Scheme is funded by the
MOP/GOI
To reduce the AT&C
Losses 0.02 0.02 - - - - 0.02 - - 0.02 - -
5 Erode Erode EDC DCW DCW Connected works To comply the consumer's obligation 1.00 Approval was accorded by the
relevant competent authorities
To comply the
consumer's obligation 1.00 1.00 - - - - - - - - - -
6 Erode Erode EDC
Operation and
Maintenance
work
Estimated 50 Nos of checkmeters each
2.75 lakhs & 1200 Nos damaged poles
each 0.15 lakh (per year)
To reduce AT&C losses 1.00 Approval was accorded by the
relevant competent authorities
To reduce AT&C
losses 1.00 1.00 - - - - 1.00 - - 1.00 - -
7 Erode Erode EDC CapitalAnticipated Extension of LT & LT CT
Supply to 20675 Nos various tariff servicesEffecting new services 31.98
To be Approved by the
relevant competent authorities
To meet the growing
demand of the
consumers
16.16 17.96 12.51 11.90 3.10 2.12 17.96 11.90 2.12 16.16 12.51 3.10
8 Erode Erode EDC CapitalAnticipated Extension of HT Supply to 30
Nos ( New & Additional loads)Effecting new services 35.97
To be Approved by the
relevant competent authorities
To meet the growing
demand of the
consumers
18.23 20.26 14.09 13.40 3.42 2.31 20.26 13.40 2.31 18.23 14.09 3.42
9 Erode Erode EDC Improvement
Anticipated Improvement works in certain
HT/LT Lines, Provision of DTs in the
required area & Upgradation of DTs
To reduce AT&C losses 64.14 To be Approved by the
relevant competent authorities
To meet the growing
demand of the
consumers
28.28 31.42 24.00 23.18 10.91 9.54 31.42 23.18 9.54 28.28 24.00 10.91
10 Erode Erode EDC DDUGJY
New 33/11 kV SS in Kullampalayam,
Karattupudur, Aval poondurai, Anjur,
K.B.Gramam (2016-17), Static meter, HT
& LT line
New 33/11 kV sub-stations-
2 Nos and Enhancement of 33/11 kV
Sub-stations - 3Nos, Replacement of
Static meter 34794 Nos , Line
conversion-25.28 Kms,
15.06 To be Approved by the
relevant competent authorities
To avoid overloading
of existing Power
Transformers
8.12 9.02 6.94 6.04 - - 9.02 6.04 - 8.12 6.94 -
11 Erode Erode EDC DDUGJY Kodumanal, Vallipuram, Karattupudur,
Perundurai, Nallampatti, Nanjai Uthukuli,
Land cost for each Sub-station
Rs.11.10 lakhs Approximately 0.67
To be Approved by the
relevant competent authorities
To avoid overloading
of existing Power
Transformers
0.31 0.34 0.24 0.23 0.12 0.10 0.34 0.23 0.10 0.31 0.24 0.12
12 Erode Erode EDC IPDS
Erection of 33/11 kV SS , 33 kV lines,
22/11 kV Lines, New LT lines, HVDS
DTs, UG cables,& Provision of Bay
extension, capacitor bank, Metering, Solar
panels, & conversion of LT lines
CMD TANGEDCO proceedings No:15
dt 8.01.2016 155.70
To be Approved by the
relevant competent authorities
To reduce the over
loading of lines &
Line Loss and
improve the revenue
augmentation etc
85.50 95.00 70.20 60.70 - - 95.00 60.70 - 85.50 70.20 -
![Page 158: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/158.jpg)
13 Erode Erode EDC DCW DCW Connected works To achieve Consumer satisfaction 35.72 To be Approved by the
relevant competent authorities
To comply the
consumer's obligation 11.21 12.46 12.19 12.16 12.32 11.10 - - - - - -
14 Erode Erode EDC Civil works
Solar system, Division offices, Section
offices, Community Hall, Manufacturing of
RCC ploes, weathering course in circle
office, Supplying 20 mm metal for all sub-
stations, Supplying precast slab for all sub-
station,
Anticipated cost for execution of the
improvement civil work 16.60
To be Approved by the
relevant competent authorities
To minimise the
Revenue Expenditure 6.84 7.60 5.93 5.75 3.83 3.25 7.60 5.75 3.25 6.84 5.93 3.83
15 Erode Erode EDC
Operation and
Maintenance
work
Provision of Check meters and
Replacement of Damaged poles
Estimated 50 Nos of checkmeters each
2.75 lakhs & 1200 Nos damaged poles
each 0.15 lakh (per year)
27.99 To be Approved by the
relevant competent authorities
To reduce AT&C
losses 14.09 15.66 10.94 10.41 2.96 1.92 15.66 10.41 1.92 14.09 10.94 2.96
1 Erode Gobi EDC CapitalExtension of LT & LT CT Supply to
15120 Nos various tariff servicesEffecting of new service connections 2.00
Approval was accorded by the
relevant competent authorities
for effecting new and addl.
service connections.
To meet the growing
demand of the
consumers
2.00 2.00 - - - - 2.00 - - 2.00 - -
2 Erode Gobi EDC CapitalExtension of HT Supply(New : 4 Nos &
Additional loads:13 Nos)Effecting of new service connections 0.24
Approval was accorded by the
relevant competent authorities
for effecting new and addl.
service connections.
To meet the growing
demand of the
consumers
0.24 0.24 - - - - 0.24 - - 0.24 - -
3 Erode Gobi EDC Capital New 33/11 kVSS at ChimtahalliTo reduce line loss and to improve the
tailend voltage regulation 0.22
Tangedco Proceeding No.347
dt: 03.11.12
To meet the growing
demand of the
consumers
0.22 0.22 - - - - 0.22 - - 0.22 - -
4 Erode Gobi EDC Improvement
Improvement works in certain HT/LT
Lines, Provision of DTs in the required
areas & Upgradation of DTs.
For reduction of AT&C Loss & to
improve the voltage level 1.00
Approval was accorded by the
relevant competent authorities
To reduce the Line
Loss, etc 1.00 1.00 - - - - 1.00 - - 1.00 - -
5 Erode Gobi EDCRAPDRP
Scheme I
Erection of 7 Nos 100 kVA DT, 19 Nos 25
kVA DT , Strengthening of HT/LT lines in
Bhavani Town, Gobi EDC
To improve voltage regulation of
existing feeders, to reduce the line loss
and to provide quality power supply to
the consumers
1.37 TANGEDCO proceedings
434/29.9.14
To reduce the AT&C
Losses 1.37 1.37 - - - - 1.37 - - 1.37 - -
6 Erode Gobi EDCRAPDRP
Scheme II
Erection of 33/11 kV SS, Erection of DTs,
63 kVA -5 Nos, 100 kVA -13 Nos, 250
kVA , 500 kVA -1 No, conversion of lines
16.36 Km, New HT OH lines 23 Kms, LT
line strengthening 24 Kms, HVDS Dt -152
Nos in Sathyamangalam town, Gobi Edc
To improve voltage regulation of
existing feeders , to reduce the line
loss and to provide quality power
supply to the consumers
5.26 TANGEDCO proceedings
123/01.04.14
To reduce the AT&C
Losses 5.26 5.26 - - - - 5.26 - - 5.26 - -
7 Erode Gobi EDC DCWDeviation of existing HT/LT lines and
structuresAs per the request of consumer 0.29
Approval was accorded by the
relevant competent authorities
for effecting new service
connections.
To comply the
consumer's obligation 0.29 0.29 - - - - - - - - - -
8 Erode Gobi EDC CapitalAnticipated Extension of LT & LT CT
Supply to 24000 Nos various tariff servicesNew SCs 110.97
Approval was accorded by the
relevant competent authorities
To meet the growing
demand of the
consumers
50.32 55.91 39.79 38.00 19.15 17.06 55.91 38.00 17.06 50.32 39.79 19.15
9 Erode Gobi EDC CapitalAnticipated Extension of HT Supply(New-
7 Nos & Additional loads-20Nos)New SCs 6.91
Approval was accorded by the
relevant competent authorities
To meet the growing
demand of the
consumers
3.14 3.49 2.48 2.37 1.18 1.05 3.49 2.37 1.05 3.14 2.48 1.18
10 Erode Gobi EDC CapitalNew 33/11 kV SS proposed at Elur in
Sathy Division.
To avoid low voltage problems and
reduce 11 kV line loss 4.00 Sanction to be obtained
To meet the growing
demand of the
consumers
- - 2.52 2.80 1.36 1.20 - 2.80 1.20 - 2.52 1.36
11 Erode Gobi EDC CapitalNew 33/11 kV SS proposed at
Punjaiduraiyam palayam in Gobi Division
To avoid low voltage problems and
reduce 11 kV line loss 4.00 Sanction to be obtained
To meet the growing
demand of the
consumers
- - 1.80 2.00 2.00 2.00 - 2.00 2.00 - 1.80 2.00
12 Erode Gobi EDC CapitalNew 33/11 kV SS proposed at
N.Mettupalayam in Gobi Division.
To avoid low voltage problems and
reduce 11 kV line loss 4.00 Sanction to be obtained
To meet the growing
demand of the
consumers
- - - - 3.60 4.00 - - 4.00 - - 3.60
![Page 159: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/159.jpg)
13 Erode Gobi EDC Improvement
Anticipated Improvement works in certain
HT/LT Lines, Provision of DTs in required
area & Upgradation of DTs
To avoid overloding of exisiting
Transformers and lines 20.81
Approval was accorded by the
relevant competent authorities
To reduce the over
loading of lines &
Line Loss, etc
9.44 10.49 7.46 7.12 3.59 3.20 10.49 7.12 3.20 9.44 7.46 3.59
14 Erode Gobi EDC DDUGJY
Erection of 1 No. new 33/11 kV SS at
Periyakallipatty in Sathy division and
enhancement of power transformer
capacity at Ganapathy Nagar, Perumpallam
and Erankattur 33 kV SSs and replacement
of Electromechanical meters etc.,
To avoid low voltage problems, to
provide quality supply and reduce 11
kV line loss and to improve the revenue
of the TANGEDCO by replacement of
EM meters.
10.50 REC/Chennai/DDUGJY/201
5-16/702/ Dt.05.01.2016
To avoid overloading
of existing Power
Transformers
6.75 7.50 3.75 3.00 - - 7.50 3.00 - 6.75 3.75 -
15 Erode Gobi EDC IPDS
Erection of 33/11 kV SS at
Makkainakombai , Section of HVDS
DTs , LT line reconductoring and
Agumentation, Replacement of electro
mechanical meters, Arial bunched cable ,
UG Cable, etc.
To reduce the line loss and to provide
quality supply to the consumers. 31.87 B.P.No:15 Dt.08.01.16
To reduce the over
loading of lines &
Line Loss and
improve the revenue
augmentation etc
8.64 9.60 12.48 12.80 10.75 9.47 9.60 12.80 9.47 8.64 12.48 10.75
16 Erode Gobi EDC DCWDeviation of existing HT/LT lines and
structuresAs per the request of consumer 7.50
Approval was accorded by the
relevant competent authorities
for effecting new service
connections.
To comply the
consumer's obligation 1.93 2.15 2.47 2.50 3.10 2.85 - - - - - -
1 Erode Mettur EDC CapitalExtension of LT & LT CT Supply to
40190 nos various tariff servicesEffecting of New Services 0.50
Approval was accorded by the
relevant competent authorities
for effecting new service
connections.
To meet the growing
demand of the
consumers
0.50 0.50 - - - - 0.50 - - 0.50 - -
2 Erode Mettur EDC Capital
Extension of HT Line, Line Materials,
Conductors/ UG Cable, Metering set and
HT Meter FOR 31 services
Effecting of New Services 0.10
Approval was accorded by the
relevant competent authorities
for effecting new and addl.
service connections.
To meet the growing
demand of the
consumers
0.10 0.10 - - - - 0.10 - - 0.10 - -
3 Erode Mettur EDC Improvement
Improvement of LT distribution lines &
erection of New & Enhancement of
existing DTs.
To improve the voltage level, and
reduce AT&C loss 0.20
Approval was accorded by the
relevant competent authorities
To reduce the line
loss. 0.20 0.20 - - - - 0.20 - - 0.20 - -
4 Erode Mettur EDCR-APDRP,
Part-B
R-APDRP, Part-B Distribution
Strengthening works in all in Mettur
Division
To arrive AT&C Loss and to reduce the
loss 1.00
Schemes were funded by the
MOP/GOI
To reduce the AT&C
Loss below 15%. 1.00 1.00 - - - - 1.00 - - 1.00 - -
5 Erode Mettur EDC DCWWidening of Roads, Deviation LT/HT
Lines,shifting of DT StructureTo comply the consumer's obligations 0.10
Approval was accorded by the
relevant competent authorities
To comply the
consumer's
obligations
0.10 0.10 - - - - - - - - - -
6 Erode Mettur EDC othersConstruction of Division offices, Store
room and other civil worksTo minimise the Revenue Expenditure 0.10
Approval was accorded by the
relevant competent authorities
To minimise the
Revenue Expenditure 0.10 0.10 - - - - 0.10 - - 0.10 - -
7 Erode Mettur EDC CapitalAnticipated Extension of LT & LT CT
Supply to 55000 Nos various tariff services Effecting of New Service connections 105.50
To be Approved by the
relevant competent authorities
To meet the growing
demand of the
consumers
31.95 35.50 37.07 37.25 33.20 32.75 35.50 37.25 32.75 31.95 37.07 33.20
8 Erode Mettur EDC CapitalAnticipated Extension of HT Supply to 45
services( New & Additional loads) Effecting of New Services 3.55
To be Approved by the
relevant competent authorities
To meet the growing
demand of the
consumers
0.99 1.10 1.14 1.15 1.29 1.30 1.10 1.15 1.30 0.99 1.14 1.29
9 Erode Mettur EDC Improvement
Improvement of LT distribution lines &
erection of New & Enhancement of
existing DTs.
To improve the voltage level, and
reduce AT&C loss 31.50
To be Approved by the
relevant competent authorities
To meet the growing
demand of the
consumers
17.10 19.00 9.55 8.50 4.45 4.00 19.00 8.50 4.00 17.10 9.55 4.45
10 Erode Mettur EDC R-APDRP
Erection of New DTs, Strengthening of
HT/LT lines, Convertion of OH line in to
UG cable,etc.
To reduce AT&C loss of the project
towns 3.20
Approved by the relevant
competent authorities
Reduction of AT&C
Loss 3.20 3.20 - - - - 3.20 - - 3.20 - -
11 Erode Mettur EDC DDUGJY
Establishment of 33/11 kV Substations at
Sathiya Nagar, Pottneri, Selavadai &
Vanavasi
To avoid overloading of existing Power
Transformers 13.40
To be Approved by the
relevant competent authorities
To avoid overloading
of existing Power
Transformers
3.81 4.23 5.09 5.19 4.50 3.98 4.23 5.19 3.98 3.81 5.09 4.50
![Page 160: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/160.jpg)
12 Erode Mettur EDC IPDS
Eection of HVDS DTs , LT line
reconductoring and Agumentation,
Replacement of electro mechanical meters,
etc.
To reduce AT&C loss of the project
towns 42.22
CMD TANGEDCO
proceedings No:15 dt
8.01.2016
Reduction of AT&C
Loss and improve the
revenue
augmentation.
19.50 21.67 10.11 8.82 12.61 11.73 21.67 8.82 11.73 19.50 10.11 12.61
13 Erode Mettur EDC DCWWidening of Roads, Deviation LT/HT
Lines,shifting of DT StructureTo comply the consumer's obligations 15.75
Approval was accorded by the
relevant competent authorities
To comply the
consumer's
obligations
6.39 7.10 5.79 5.65 3.57 3.00 - - - - - -
14 Erode Mettur EDC othersConstruction of Division offices, Store
room and other civil worksTo minimise the Revenue Expenditure 7.50
Approval was accorded by the
relevant competent authorities
To minimise the
Revenue Expenditure 3.28 3.65 3.12 3.06 1.10 0.79 3.65 3.06 0.79 3.28 3.12 1.10
1 Erode Salem EDC Capital
(i) Extension of new LT & LT CT Supply
to 63515 nos effected to various tariff
services ( 2014-15-33821 no's &2015-
2016-29694 no's); (ii) Extension of HT
line, Line materials, Conductors/UG Cable
& LT Metering
Effecting new service connections 1.50 Approval was accorded by the
relevant competent authorities
To meet the growing
demand of the
consumers
1.50 1.50 - - - - 1.50 - - 1.50 - -
2 Erode Salem EDC Capital
Extension of HT supply to 20 nos HT Line,
Line Materials, Conductors/UG Cable,
Metering set and HT Meter(2014-2015-14
nos & 2015-2016 - 6 nos)
Effecting new service connections 0.50 Approval was accorded by the
relevant competent authorities
To meet the growing
demand of the
consumers
0.50 0.50 - - - - 0.50 - - 0.50 - -
3 Erode Salem EDC Improvement
Improvement of LT distribution lines &
erection of New & Enhancement of
existing DTs.
To improve the voltage level, and
reduce AT&C loss 0.60
Approval was accorded by the
relevant competent authorities
To meet the growing
demand of the
consumers
0.60 0.60 - - - - 0.60 - - 0.60 - -
4 Erode Salem EDC RAPDRP
Erection of New DTs, strenghthening of
lines, conversion of OH by UG cable,
replacement of meters, Provision of DT
Metering and conversion of OH by AB
cable
For reduction of AT&C loss and
Consumer satisfaction 19.84 06.04.2013
Reduction of AT&C
Loss 19.84 19.84 - - - - 19.84 - - 19.84 - -
5 Erode Salem EDC DCWDeviation and Shifting of LT Line,HT Line
, Poles, DT structures and DP structures
As per Consumer request Existing
LT,HT line,DT's , DP's shifted from
Exiating location to new location.
0.45 Approval was accorded by the
relevant competent authorities
To comply the
consumer's
obligations
0.45 0.45 - - - - - - - - - -
6 Erode Salem EDC Others
Civil works, etc., (like construction of
section office, compound wall of Stores,
etc.,)
Accommodate the Board's offices &
safeguard the Stores,etc., 0.50
Approval was accorded by the
relevant competent authorities
To minimise the
Revenue Expenditure 0.50 0.50 - - - - 0.50 - - 0.50 - -
7 Erode Salem EDC Capital
(i) Extension of new LT & LT CT Supply
to 96034 nos effected to various tariff
services (2016-17-32182 no's & 2017-
2018-31694 no's); 2018-19 32158 (ii)
Extension of HT line, Line materials,
Conductors/UG Cable & LT Metering
Effecting new service connections 111.48 Approval was accorded by the
relevant competent authorities
To meet the growing
demand of the
consumers
33.62 37.36 36.85 36.79 37.28 37.33 37.36 36.79 37.33 33.62 36.85 37.28
8 Erode Salem EDC Capital
Extension of HT supply to 23 nos HT Line,
Line Materials, Conductors/UG Cable,
Metering set and HT Meter(2016-17-8 nos;
2017-18-7 nos. & 2018-19 - 8 nos)
Effecting new service connections 4.91 Approval was accorded by the
relevant competent authorities
To meet the growing
demand of the
consumers
1.39 1.55 1.38 1.36 1.94 2.00 1.55 1.36 2.00 1.39 1.38 1.94
9 Erode Salem EDC Improvement
Improvement of LT distribution lines &
erection of New & Enhancement of
existing DTs.
To improve the voltage level, and
reduce AT&C loss 46.69
Approval was accorded by the
relevant competent authorities
To meet the growing
demand of the
consumers
13.68 15.20 15.44 15.47 15.97 16.02 15.20 15.47 16.02 13.68 15.44 15.97
10 Erode Salem EDC DDUGJY
Electrification of rural households by
effecting of 1191 SC under 3 phase & 1
phase extension
Improvement of rural infrastructure 5.01 REC/CHN/DDUGJY/ 2015-
16/ 702/5.1.16
To avoid overloading
of existing Power
Transformers
2.71 3.01 2.30 2.00 - - 3.01 2.00 - 2.71 2.30 -
11 Erode Salem EDC IPDS
HVDS, New DTs, Line strengthening,
Bifurcation of feeders, Meter replacement,
provision of capacitor bank & DT
metering.
For reduction of AT&C loss and
Consumer satisfaction 59.32 8.1.16 ; B.P.no.15
Reduction of AT&C
Loss and improve the
revenue
augmentation.
27.00 30.00 32.32 29.32 - - 30.00 29.32 - 27.00 32.32 -
12 Erode Salem EDC DCWDeviation and Shifting of LT Line,HT Line
, Poles, DT structures and DP structures
As per Consumer request Existing
LT,HT line,DT's , DP's shifted from
Exiating location to new location.
19.80 Approval was accorded by the
relevant competent authorities
To comply the
consumer's
obligations
5.38 5.98 6.52 6.58 7.90 7.24 - - - - - -
![Page 161: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/161.jpg)
13 Erode Salem EDC Others
Civil works, etc.,(like construction of
section office, compound wall of Stores,
etc.,)
Accommodate the Board's offices &
safeguard the Stores,etc., 32.77
Approval was accorded by the
relevant competent authorities
To minimise the
Revenue Expenditure 8.91 9.90 10.79 10.89 13.07 11.98 9.90 10.89 11.98 8.91 10.79 13.07
1 ErodeNamakkal
EDCCapital
Extension of LT & LT CT Supply to
36164 Nos various tariff servicesEffecting of New SC 2.00
Approval was accorded by the
relevant competent authorities
for effecting new service
connections.
To meet the growing
demands of the
consumer
2.00 2.00 - - - - 2.00 - - 2.00 - -
2 ErodeNamakkal
EDCCapital
Extension of HT Supply ( New 10 Nos &
Additional loads16 Nos ) -26 Nos.Effecting of New SC 1.00
Approval was accorded by the
relevant competent authorities
To meet the growing
demands of the
consumer
1.00 1.00 - - - - 1.00 - - 1.00 - -
3 ErodeNamakkal
EDCImprovement
Improvement of HT/LT line, enhancement,
New & Addl DTs/Lines etc
To improve the voltage level and
reduce the line loss 1.00
Approval was accorded by the
relevant competent authorities
To reduce the Line
Loss, etc 1.00 1.00 - - - - 1.00 - - 1.00 - -
4 ErodeNamakkal
EDCAPDRP
Erection of New DTs, Strengthening of
HT/LT lines,etc.Erection of New DTs, Strengthening 0.50
To be Approved by the
relevant competent authorities
Reduction of AT&C
Loss and improve the
revenue
augmentation.
0.50 0.50 - - - - 0.50 - - 0.50 - -
5 ErodeNamakkal
EDCDDUGJY
Electrification of Unelectrified House
Holds and alternate HT supply to Kolli
Hills
To improve the voltage level and
reduce the line loss & improve the
revenue
9.44 To be Approved by the
relevant competent authorities
To meet the growing
demands of the
consumer
3.46 3.85 5.09 5.22 0.89 0.37 3.85 5.22 0.37 3.46 5.09 0.89
6 ErodeNamakkal
EDCIPDS
Erection of HVDS DTs , LT line
reconductoring and Augmentation,
Replacement of electro mechanical meters,
etc.
To improve the voltage level and
reduce the line loss & improve the
revenue
36.59 To be Approved by the
relevant competent authorities
Reduction of AT&C
Loss and improve the
revenue
augmentation.
15.90 17.67 18.62 18.72 2.07 0.20 17.67 18.72 0.20 15.90 18.62 2.07
7 ErodeNamakkal
EDCDCW
Widening of Roads, Deviation LT/HT
Lines, shifting of DT StrcutureTo comply the conasumer cost 2.00
Approval was accorded by the
relevant competent authorities
To comply the
consumer's
obligations
2.00 2.00 - - - - - - - - - -
8 ErodeNamakkal
EDCCivil works
Construction of Division offices, Store
room and other civil worksTo minimise the Revenue Expenditure 0.50
Approval was accorded by the
relevant competent authorities
To minimise the
Revenue Expenditure 0.50 0.50 - - - - 0.50 - - 0.50 - -
9 ErodeNamakkal
EDCCapital
Anticipated Extension of LT & LT CT
Supply to 47500 Nos various tariff
services
Effecting of New SC 120.22 Approval was accorded by the
relevant competent authorities
To meet the growing
demands of the
consumer
25.34 28.16 44.19 45.97 46.08 46.09 28.16 45.97 46.09 25.34 44.19 46.08
10 ErodeNamakkal
EDCCapital
Anticipated Extension of HT Supply 30
Nos. ( New 15& Additional -15loads)Effecting of New SC 18.78
To be Approved by the
relevant competent authorities
To meet the growing
demands of the
consumer
4.45 4.95 8.59 8.99 5.26 4.84 4.95 8.99 4.84 4.45 8.59 5.26
11 ErodeNamakkal
EDCImprovement
Improvement of HT/LT line,enhancement,
New & Addl DTs/Lines etc
To improve the voltage level and
reduce the line loss 35.29
To be Approved by the
relevant competent authorities
To meet the growing
demands of the
consumer
5.20 5.78 11.86 12.53 16.53 16.98 5.78 12.53 16.98 5.20 11.86 16.53
12 ErodeNamakkal
EDCDCW
Widening of Roads, Deviation LT/HT
Lines, shifting of DTStrcutureTo comply the consumer cost 26.63
To be Approved by the
relevant competent authorities
Operational
convenience 12.59 13.99 8.36 7.73 5.68 4.91 - - - - - -
13 ErodeNamakkal
EDCCivil works
Construction of Division offices, Store
room and other civil worksTo minimse the Revenue Expenditure 11.22
To be Approved by the
relevant competent authorities
Operational
convenience 5.74 6.38 2.73 2.32 2.75 2.52 6.38 2.32 2.52 5.74 2.73 2.75
1 MaduraiSivaganga
EDCCapital
Extension of LT & LT CT, HT Supply to
17650 Nos various tariff servicesNew service connections effected 61.81
To be approved by the
competent authoritiesAdding consumers 18.56 20.62 21.13 21.19 20.12 20.00 20.62 21.19 20.00 18.56 21.13 20.12
2 MaduraiSivaganga
EDCCapital
Establishment of 33 kV sub stations at
Keelasevalpatty and PoovanthiTo meet out the load growth 24.00
To be approved by the
competent authorities
To reduce the Line
Loss, etc - - 24.00 24.00 - - - 24.00 - - 24.00 -
3 MaduraiSivaganga
EDCImprovement
Improvement works- SS, Enhancement of
Pr.Trs in subs tations, sub station related
works.
To improve the network and Load
growth - - - - - - - - - - - - -
4 MaduraiSivaganga
EDCImprovement
Improvement works- Erection of DT, New
HT feeders, strengthening of HT cables,
Laying LT cable and erection of pillar
boxes.
To improve the network and Load
growth 47.44
To be approved by the
competent authorities
To reduce the Line
Loss, etc 13.68 15.20 16.03 16.12 16.12 16.12 15.20 16.12 16.12 13.68 16.03 16.12
![Page 162: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/162.jpg)
5 MaduraiSivaganga
EDC
RAPDRP
Scheme I
(Part A/Part B)
Erection of New DTs, Strengthening of
HT/LT lines, Implementation of IT
activities, HVDS erection works,
replacement of EM & HQ
Meters(Sivagangai & Devakottai Town)
To reduce AT&C loss of the project
towns 0.50
DPR sanction No: SIVA
001/V1/ 23.07.2010,DEVI
001/V1 / 0507.2010
Reduction of AT&C
Loss 0.50 0.50 - - - - 0.50 - - 0.50 - -
6 MaduraiSivaganga
EDC
RAPDRP
Scheme II
Erection of New DTs, Strengthening of
HT/LT lines, Implementation of IT
activities, HVDS erection works,
replacement of EM&HQ Meters(Karaikudi
UA)
To reduce AT&C loss of the project
towns 39.35
DPR sanction No: SIVA
001/V4/25.02.2014
Reduction of AT&C
Loss 18.00 20.00 21.35 19.35 - - 20.00 19.35 - 18.00 21.35 -
7 MaduraiSivaganga
EDC
RAPDRP
Scheme III etc - - - - - - - - - - - - -
8 MaduraiSivaganga
EDC
RGGVY
Schemes - - - - - - - - - - - - -
9 MaduraiSivaganga
EDCDDUGJY
450 Nos New service connections are to be
effected New service connections 0.57
To be approved by the
competent authoritiesAdding consumers 0.57 0.57 - - - - 0.57 - - 0.57 - -
10 MaduraiSivaganga
EDCDDUGJY 33/11kV Pottapalayam SS Improvement of system network 12.60
To be approved by the
competent authorities
Reduction of AT&C
Loss 12.60 12.60 - - - - 12.60 - - 12.60 - -
11 MaduraiSivaganga
EDCDDUGJY
13317 Nos Single phase and 544 Nos
Three EM meters are to be replaced by
static meters in services where the
consumption is more than 200 units.
Reduction of commercial Loss 11.50 To be approved by the
competent authorities
Reduction of AT&C
Loss 11.50 11.50 - - - - 11.50 - - 11.50 - -
12 MaduraiSivaganga
EDCIPDS
Erection of New DTs, Strengthening of
HT/LT lines, Implementation of IT
activities, HVDS erection works,
replacement of EM & High quality meters
To reduce AT&C loss of the project
towns 14.52 CMD.No.15/8.1.2016
Reduction of AT&C
Loss 9.00 10.00 5.52 4.52 - - 10.00 4.52 - 9.00 5.52 -
13 MaduraiSivaganga
EDC
Others
(REC/PFC)
Erection of New DTs, HT/LT lines, Agri.
New Service connection.New service connections effected 26.10
Approval was accorded by the
relevent competent authoritiesAdding consumers 7.29 8.10 8.91 9.00 9.90 9.00 8.10 9.00 9.00 7.29 8.91 9.90
14 MaduraiSivaganga
EDCDCW Due to Road widening and party request Line shifting work 36.00
Approval was accorded by the
relevent competent authorities
Line Deviation
Works 10.80 12.00 12.00 12.00 13.20 12.00 - - - - - -
15 MaduraiSivaganga
EDC
Any other related
works including
less than one
crore works
totally
Civil works Construction and Repair works 1.20 Approval was accorded by the
relevent competent authorities
Construction and
Repair works 0.36 0.40 0.40 0.40 0.44 0.40 0.40 0.40 0.40 0.36 0.40 0.44
1 Madurai Theni EDC CapitalExtension of LT & LT CT, HT Supply to
23427 Nos various tariff servicesNew service connections effected 5.92 5.92 5.92 - - - - 5.92 - - 5.92 - -
2 Madurai Theni EDC CapitalEstablishment of 33 kV sub stations at
……… - - - - - - - - - - - - -
3 Madurai Theni EDC Improvement
Improvement works- SS, Enhancement of
Pr.Trs in subs tations, sub station related
works.
To improve the network and Load
growth - - - - - - - - - - - - -
4 Madurai Theni EDC Improvement
Improvement works- Erection of DT, New
HT feeders, strengthening of HT cables,
Laying LT cable and erection of pillar
boxes.
To improve the network and Load
growth 4.94
Approved by the competent
authority as per the field
proposal
To reduce the Line
Loss, etc 4.94 4.94 - - - - 4.94 - - 4.94 - -
5 Madurai Theni EDC
RAPDRP
Scheme I (Part
A/Part B)
(i) New feeders 22kV , 7/4.09 mm OH
with breaker, ii) Erection of new 22kV,
ACSR 3.35 mm conductor for new HVDS,
iii)Strengthening of existing 22 kV OH
feeder , iv)Erection of New 100 kVA DTs
, v)Strengthening of existing LT OH
feeder from ACSR 7/2.59 mm to ACSR
7/3.35 mm , vi)Erection of New 25 kVA
DTs , 40 kVA DTs, 63 kVA DTs
8.86 To meet out load
growth 8.86 8.86 - - - - 8.86 - - 8.86 - -
![Page 163: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/163.jpg)
6 Madurai Theni EDCRAPDRP
Scheme II - - - - - - - - - - - - -
7 Madurai Theni EDCRAPDRP
Scheme III etc - - - - - - - - - - - - -
8 Madurai Theni EDCRGGVY
Schemes - - - - - - - - - - - - -
9 Madurai Theni EDC DDUGJY Electrification of 421 Nos Rural House
Holds New service connections effected 0.96 ….
Adding Rural
Consumer 0.96 0.96 - - - - 0.96 - - 0.96 - -
10 Madurai Theni EDC IPDSErection of DT's, H.T Line, LT Line
Replacement of Meters 42.38
CMD Proceeding No 15 Dt
08.01.16Adding consumers 19.07 21.19 17.37 16.95 5.94 4.24 21.19 16.95 4.24 19.07 17.37 5.94
11 Madurai Theni EDC NEFS
Conductor (ACSR/AAAC)
7/4.09 -95 KM
7/3.15 - 4719.449 KM
7/2.59 - 4036.12 KM
Poles
RCC- 9.14 Mtr-2530 Nos
RCC- 8.00 Mtr-3601 Nos
PSC- 7.50 Mtr-1778 Nos
To avoid accidents and to avoid public
complaints the aged and detoriated
conductor and poles are identified and
to be replaced . Also in lengthy spans
insertion of poles are to be provided
39.94
Per CMD /TANGEDCO
proceeding no.100,
dt.08.03.13
To avoid the
possibility of
accident and to
maintain the quality
of power supply.
8.95 9.94 13.59 14.00 17.40 16.00 9.94 14.00 16.00 8.95 13.59 17.40
12 Madurai Theni EDC DCWDeviation of HT & LT lines, providing
22kV dedicated feeder and shifting of SC's
As per TANGEDECO norms based on
the request of consumer 0.54
As per the request of
the consumers 0.54 0.54 - - - - - - - - - -
13 Madurai Theni EDC
Any other related
works including
less than one
crore works
totally
- - - - - - - - - - - - -
1 MaduraiMadurai Metro
EDCCapital
Extension of LT & LT CT, HT Supply to
44350 Nos various tariff servicesNew service connections effected 35.75
Based on the application from
the consumers, approval was
accorded by the competent
authorities
Adding consumers 12.40 13.78 23.35 21.97 - - 13.78 21.97 - 12.40 23.35 -
2 MaduraiMadurai Metro
EDCCapital
Establishment of New SS - Sellur, Anna
Nagar & Ponmeni, Muthupatti, TNHB,
Iravathanallur 33/11kV SS, Purchase of
Land, Construction of control room
building, inclusive of cost of 33& 11 kV
Breakers,33 kV &
11kV, 1x 630 sq mm Cable, Battery and
Control cable and other Elecl accessories
To meet out load growth 100.56 To be proposedTo meet out load
growth - - - - 90.50 100.56 - - 100.56 - - 90.50
3 MaduraiMadurai Metro
EDCImprovement
Improvement works in certain HT/LT
Lines, provision of DTs in required area &
Upgradation of DTs
Improving network strength & Quality,
Replacement of aged conductors,
poles,etc
21.43
Approved by the competent
authority as per the field
proposal
To reduce the Line
Loss, etc 7.45 8.28 13.98 13.15 - - 8.28 13.15 - 7.45 13.98 -
4 MaduraiMadurai Metro
EDCRAPDRP
18 kVAR, 36 kVAR & 72 kVAR, APFC
panels installed and commissioned in 100
kVA, 250 kVA & 500 kVA DTs
Power factor improvement 5.52
CMD TANGEDCO
proceedings No:124 dt
8.04.11
To improve the
voltage stability and
to improve the VAR
Compensation
5.52 5.52 - - - - 5.52 - - 5.52 - -
5 MaduraiMadurai Metro
EDCRAPDRP
Establishment of SCADA Control system
in Madurai UA Town with 19 Nos RTU
To minimize the supply outage by
remote operation at SCADA end. 18.69
CMD TANGEDCO
proceedings No:124 dt
8.04.11
To improve the
voltage stability and
to improve the VAR
compensation
18.69 18.69 - - - - 18.69 - - 18.69 - -
6 MaduraiMadurai Metro
EDCRAPDRP
Erection of RMU at 100 kVA , 250 kVA &
500 kVA DT locations
Reduction of outages and ensuring
consumer satisfaction 27.56
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
To mainitain the
Uninterrupted power
supply to the
consumers and to
Maintain the GRID
network
27.56 27.56 - - - - 27.56 - - 27.56 - -
![Page 164: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/164.jpg)
7 MaduraiMadurai Metro
EDCRAPDRP
Erection of FRTU panels at RMUs and
sectionalisers locationsRemote operation 3.87
CMD TANGEDCO
proceedings No:124 dt
8.04.11
For remote
controlling the RMU
and Sectionalizer to
maintain
Uninerrupted power
supply
3.87 3.87 - - - - 3.87 - - 3.87 - -
8 MaduraiMadurai Metro
EDCRAPDRP Erection of 11kV sectionalisers
Easy isolation of 11 kV fault portion
and reduce the duration of outage. 18.86
CMD TANGEDCO
proceedings No:124 dt
8.04.11
To mainitain the
Uninterrupted power
supply to the
consumers and to
Maintain the GRID
network
18.86 18.86 - - - - 18.86 - - 18.86 - -
9 MaduraiMadurai Metro
EDCRAPDRP
Replacement of single phase and three
phase EM/HQ meter with static meters
Accurate recording of consumption and
also to avoid human error in taking
reading
35.96
CMD TANGEDCO
proceedings No:124 dt
8.04.11
For improving the
Revenue
Augumentation
35.96 35.96 - - - - 35.96 - - 35.96 - -
10 MaduraiMadurai Metro
EDC
RAPDRP -
DSW
i) New feeders 11kV, ACSR 7/4.09mm
Conductor, ii) New feeders 11kV
7/3.35 mm OH (ACSR Rabbit), iii)
Strengthening of existing 11 kV OH feeder
from ACSR 7/2.59 mm to 4.09 mm ,
iv)Strengthening of existing 11 kV OH
feeder from ACSR 7/2.59 mm to 7/3.35
mm , v) New LT feeders with ACSR
7/3.35 mm Conductor,
vi) Strengthening of existing LT OH kV
OH feeder from ACSR 7/2.59 mm to
7/3.35 mm , vii)
Conversion of Existing LT 2 Wire in to 4
Wire and 5 Wire System with ACSR
7/3.35 Conductor
Load bifurcation to reduce over loading
and to reduce the Line losses 16.22
CMD TANGEDCO
proceedings No:124 dt
8.04.11
To improve the
voltage stability and
to minimize the
AT&C Losses
16.22 16.22 - - - - 16.22 - - 16.22 - -
11 MaduraiMadurai Metro
EDC
RAPDRP -
DSW
Derating with 63 kVA , 100kVA &
250kVA DTs and New feeders with 11kV,
3x300 sqmm XLPE , Laying of AB cables
HT & LT.
To offer load relief to the existing DTs 12.75
CMD TANGEDCO
proceedings No:124
dt 8.04.11
To reduce LT Long
lines and to minimize
the AT&C losses
12.75 12.75 - - - - 12.75 - - 12.75 - -
12 MaduraiMadurai Metro
EDC
RAPDRP -
DSW
Erection of New 16 kVA , 40 kVA ,63
kVA ,100kVA DTs
To reduce HT - LT ratio Transmission
losses 65.43
CMD TANGEDCO
proceedings No:124
dt 8.04.11
To Minimize the
AT&C Losses and to
improve the Power
quality
65.43 65.43 - - - - 65.43 - - 65.43 - -
13 MaduraiMadurai Metro
EDC
RAPDRP
Schemes
Enhancement of Existing 2 X 8 MVA,
33/11 kV Power transformer in to 2 X 16
MVA Power Transformer in Anna Bus
stand SS, K.Pudur SS,Theppam SS,
Mahalipatty SS, Erection of Additional
Power Transformer Koil SS, Replacement
of Existing KIOSK type 33 kV & 11 kV
Breakers and CTs.
To meet out load growth 11.42 To meet out load
growth 11.42 11.42 - - - - 11.42 - - 11.42 - -
14 MaduraiMadurai Metro
EDCImprovement
Replacement of 11 kV Breaker, battery set
and battery charger.Obsolete items replacement 0.17
Obsolete items
replacement 0.11 0.12 0.06 0.05 - - 0.12 0.05 - 0.11 0.06 -
1 Madurai Ramnad EDC RAPDRP
18 kVAR, 36 kVAR & 72 kVAR, APFC
panels installed and commissioned in
100kVA, 250 kVA & 500 kVA DTs
Power factor improvement 0.07
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
0.07 0.07 - - - - 0.07 - - 0.07 - -
2 Madurai Ramnad EDCRAPDRP -
DSW
New feeders 11kV, 7/3.35 mm OH (ACSR
Rabbit) 3.83 -do- 3.83 3.83 - - - - 3.83 - - 3.83 - -
3 Madurai Ramnad EDCRAPDRP -
DSW
Erection of new 11 kV ACSR 3.35 mm
conductor for new DTs and HVDS 0.61 -do- 0.61 0.61 - - - - 0.61 - - 0.61 - -
4 Madurai Ramnad EDCRAPDRP -
DSW
Strengthening of existing 11 kV OH feeder
from ACSR 7/2.59 mm to 7/3.35 mm
To augument the current carrying
capacity of the conductor 0.15 -do- 0.15 0.15 - - - - 0.15 - - 0.15 - -
![Page 165: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/165.jpg)
5 Madurai Ramnad EDCRAPDRP -
DSW
Strengthening of existing LT OH feeder
from ACSR 7/2.59 mm to ACSR 7/3.35
mm
To augument the current carrying
capacity of the conductor 0.95
CMD TANGEDCO
proceedings No:15 dt
08.01.2016
0.95 0.95 - - - - 0.95 - - 0.95 - -
6 Madurai Ramnad EDC IPDS - DSW Erection of New 25 kVA & 40 kVA DTs 0.95 0.95 0.95 - - - - 0.95 - - 0.95 - -
7 Madurai Ramnad EDC IPDS - DSW
Providing Addl.Pr.Tr in 33/11 kV
Abiramam SS & Mudukulathur SS with
breakers
To meet out load growth 1.83 255/16.7.11To meet out load
growth 1.83 1.83 - - - - 1.83 - - 1.83 - -
8 Madurai Ramnad EDC T & D Plan Establishment of 33/11 kV SS at Erwadi To improve voltage profile 1.10
CMD TANGEDCO
proceedings No:67 dt
22.07.14
To improve voltage
profile 1.10 1.10 - - - - 1.10 - - 1.10 - -
9 Madurai Ramnad EDC DDUGJY
Enhancement of power Transformer from
1*5 MVA to 1*8 MVA at 33/11 kV
Devipattinam SS
To avoid over loading of Power
Transformer 0.66 655/c/43/14-15dt:03.01.2015
To avoid over
loading of Power
Transformer
0.66 0.66 - - - - 0.66 - - 0.66 - -
10 Madurai Ramnad EDC Effecting new services adding consumers 0.30 sanction to be accorded by
competent authorityadding consumers 0.30 0.30 - - - - 0.30 - - 0.30 - -
11 Madurai Ramnad EDC
Replacement of Electromechanical metres
to static metres, Single phase -6018,Three
phase -215V.
To improve ocuracy of metering 0.65 sanction to be accorded by
competent authority
To improve occuracy
of metering 0.65 0.65 - - - - 0.65 - - 0.65 - -
12 Madurai Ramnad EDC O&M
Replacement of damaged pole and
reconductoring
7/2.15-821 KM
7/2.59-1283 KM 9.14 mtr
pole-793 Nos 8.0 mtr pole-
2420 Nos 7.5 mtr pole-721 Nos
System Strengthening 0.75 sanction to be accorded by
competent authoritySystem Strengthening 0.22 0.25 0.25 0.25 0.28 0.25 0.25 0.25 0.25 0.22 0.25 0.28
13 Madurai Ramnad EDC Capital Effecting new services adding consumers 30.00 sanction to be accorded by
competent authorityadding consumers 9.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 9.00 10.00 10.00
1 Madurai Dindigul EDC CapitalExtension of LT & LT CT, HT Supply to
44350 Nos various tariff servicesNew service connections effected 38.93
Based on the application from
the consumers, approval was
accorded by the competent
authorities
Adding consumers 14.34 15.93 17.97 18.20 6.14 4.80 15.93 18.20 4.80 14.34 17.97 6.14
2 Madurai Dindigul EDC Capital
Establishment of New SS - Viruveedu,
D.Gudalur 33/11 kV SS purchase of Land,
Construction of control room building,
inclusive of cost of 33& 11 kV Breakers,
33 kV &
11kV 1x630 sq mm Cable,
Battery and Control cable and other Elecl
accessories
To meet out load growth 12.46 To be proposedTo meet out load
growth 5.31 5.90 7.15 6.56 - - 5.90 6.56 - 5.31 7.15 -
3 Madurai Dindigul EDC Improvement
Improvement works in certain HT/LT
Lines, provision of DTs in required area &
Upgradation of DTs
Improving network strength & Quality,
Replacement of aged conductors,
poles,etc
17.93
Approved by the competent
authority as per the field
proposal
To reduce the Line
Loss, etc 11.46 12.73 6.47 5.20 - - 12.73 5.20 - 11.46 6.47 -
4 Madurai Dindigul EDC
RAPDRP Part A
under Dindigul,
Palani &
Kodaikkanal
Towns
IT ImplementationTo Collect the Geographical
information and computerised 3.66
PER CMD TangedGo
Proceding No 123 dt1.4.11
To Collect the
Geographical
information and
computerised
3.66 3.66 - - - - 3.66 - - 3.66 - -
5 MaduraiPart - B
Palani TownRAPDRP DSW
i) 18 kVAR APFC for 100 kVA DT
ii) 27 kVAR APFC for 250 kVA DTs
iii) 36 kVAR APFC for 250 kVA DTs
To reduce AT&C loss of the project
towns 0.25 255/16.7.11
To reduce AT&C
loss of the project
towns
0.25 0.25 - - - - 0.25 - - 0.25 - -
6 MaduraiPart - B
Palani TownRAPDRP DSW
i) Replacement of existing 1 Ph meters by
tamper proof 1 Ph static meters &
ii) Replacement of existing 3 Ph- 60A,
meters by tamper proof 3 Ph 10-60 A,
static meters
Accurate recording of consumption and
also to avoid human error in taking
reading
1.44 255/16.7.11
Accurate recording of
consumption and also
to avoid human error
in taking reading
1.44 1.44 - - - - 1.44 - - 1.44 - -
![Page 166: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/166.jpg)
7 MaduraiPart - B
Palani TownRAPDRP DSW
i) 22 kV HT line with ACSR 7/4.09 mm
(Raccoon) Feeder,
ii) 22 kV HT line with ACSR 7/3.35 mm
(Rabbit) for HVDS DT's,
iii)ACSR 7/2.59 mm (Weasel) to ACSR
7/3.35 mm (Rabbit)
Load bifurcation to reduce outages and
to enhance operation flexibility 1.17 255/16.7.11
Load bifurcation to
reduce outages and to
enhance operation
flexibility
1.17 1.17 - - - - 1.17 - - 1.17 - -
8 MaduraiPart - B
Palani TownRAPDRP DSW
i) Erection of new 200kVA/22kV DT's
ii)Erection of new 100 kVA/22kV DT's for
derating existing 250kVA/22kV DT by
introduction of HVDS
To offer load relief to the existing DTs 1.10 255/16.7.11To offer load relief to
the existing DTs 1.10 1.10 - - - - 1.10 - - 1.10 - -
9 MaduraiPart - B
Palani TownRAPDRP DSW
i) Proposed conversion of existing LT
Single Phase 3 Wire line into LT 3 Phase 5
Wire Line with ACSR (7/3.35 mm &
7/2.59mm) Rabbit and Weasel.
ii) LT ABC Cable 3x70+1x16+1x50 Sq
mm
To augument the current carrying
capacity of the conductor 0.98 255/16.7.11
To augment the
current carrying
capacity of the
conductor
0.98 0.98 - - - - 0.98 - - 0.98 - -
10 MaduraiPart - B
Palani TownRAPDRP DSW
i) Erection of single pole mounted DT
structure with 25 Kva
ii)Erection of Double pole mounted DT
structure with 40 kVA
iii) Erection of Double pole mounted DT
structure with 63 kVA
iv) Erection of Double pole mounted DT
structure with 100 kVA
To reduce HT - LT ratio. 2.82 255/16.7.11To reduce HT - LT
ratio. 2.82 2.82 - - - - 2.82 - - 2.82 - -
11 MaduraiPart - B
Palani TownRAPDRP DSW
i) Wedge connector for DTs
ii) Wedge connector for LT Cut PointTo reduce HT - LT ratio. 0.06 255/16.7.11
To reduce HT - LT
ratio. 0.06 0.06 - - - - 0.06 - - 0.06 - -
12 MaduraiPart - B
Palani TownRAPDRP DSW
i) Renovation of DT Earthing ii) E-
Provision of Railway Crossing Structure
iii) DP Structure with AB Switch
To reduce HT - LT ratio. 0.72 255/16.7.11To reduce HT - LT
ratio. 0.72 0.72 - - - - 0.72 - - 0.72 - -
13 MaduraiPart - B
Palani TownRAPDRP DSW Bay Extensions To meet out load growth 0.16 255/16.7.11
To meet out load
growth 0.16 0.16 - - - - 0.16 - - 0.16 - -
14 MaduraiPart - B
Palani TownRAPDRP DSW
i) 18 kVAR APFC for 100 kVA DT
ii) 27 kVAR APFC for 250 kVA DTs iii)
36 kVAR APFC for 250 kVA DTs
To reduce AT&C loss of the project
towns 0.31 255/16.7.11
To reduce AT&C
loss of the project
towns
0.31 0.31 - - - - 0.31 - - 0.31 - -
15 MaduraiPart - B
Palani TownRAPDRP DSW
i) Replacement of existing 1 Ph meters by
tamper proof 1 Ph static meters
ii) Replacement of existing 3 Ph- 60 A
meters by tamper proof 3 Ph 10-60 A
static meters
Accurate recording of consumption and
also to avoid human error in taking
reading
2.17 255/16.7.11
Accurate recording of
consumption and also
to avoid human error
in taking reading
2.17 2.17 - - - - 2.17 - - 2.17 - -
16 MaduraiPart - B
Palani TownRAPDRP DSW
i) 22 kV HT line with ACSR 7/4.09 mm
(Raccoon) for TV Station Feeder
ii) 22 kV HT line with ACSR 7/3.35 mm
(Rabbit) for HVDS DT's
Load bifurcation to reduce outages and
to enhance operation flexibility 4.25 255/16.7.11
Load bifurcation to
reduce outages and to
enhance operation
flexibility
4.25 4.25 - - - - 4.25 - - 4.25 - -
17 MaduraiPart - B
Palani TownRAPDRP DSW Erection of new 200kVA/22kV DT's To offer load relief to the existing DTs 0.10 255/16.7.11
To offer load relief to
the existing DTs 0.10 0.10 - - - - 0.10 - - 0.10 - -
18 MaduraiPart - B
Palani TownRAPDRP DSW
i) Erection of new 200kVA/22kV DT's for
derating existing 500kVA/ 22kV DT by
introduction of HVDS
ii) Erection of new 100 kVA/ 22kV DT's
for derating existing 250kVA/22kV DT by
introduction of HVDS iii)
Erection of new 63 kVA/22kV DT's for
derating existing 100 kVA/22kV DT by
introduction of HVDS iv)
Erection of new 40 kVA/ 22kV DT's for
derating existing 100 kVA/22kV DT by
introduction of HVDS
To offer load relief to the existing DTs 2.10 255/16.7.11To offer load relief to
the existing DTs 2.10 2.10 - - - - 2.10 - - 2.10 - -
![Page 167: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/167.jpg)
19 MaduraiPart - B
Palani TownRAPDRP DSW
Proposed conversion of existing LT Single
Phase 3 Wire line into LT 3 Phase 5 Wire
Line with ACSR (7/3.35 mm & 7/2.59mm)
Rabbit and Weasel.
To augument the current carrying
capacity of the conductor 1.23 255/16.7.11
To augument the
current carrying
capacity of the
conductor
1.23 1.23 - - - - 1.23 - - 1.23 - -
20 MaduraiPart - B
Palani TownRAPDRP DSW
i) Erection of single pole mounted DT
structure with 25 kVA
ii) Erection of Double pole mounted DT
structure with 40 kVA, 63kVA, 100kVA
To reduce HT - LT ratio 2.71 255/16.7.11To reduce HT - LT
ratio 2.71 2.71 - - - - 2.71 - - 2.71 - -
21 MaduraiPart - B
Palani TownRAPDRP DSW
i) Wedge connector for DTs ii)Wedge
connector for LT Cut PointTo reduce HT - LT ratio 0.09 255/16.7.11
To reduce HT - LT
ratio 0.09 0.09 - - - - 0.09 - - 0.09 - -
22 MaduraiPart - B
Palani TownRAPDRP DSW
i) Replacement of existing 1 Ph meters by
tamper proof 1 Ph static meters
ii) Replacement of existing 3 Ph- 60 A
meters by tamper proof 3 Ph 10-60 A
static meters iii) Replacement of existing
3 Ph- 100 A meters by tamper proof 3 Ph
50-100 A static meters
Accurate recording of consumption and
also to avoid human error in taking
reading
0.66 255/16.7.11
Accurate recording of
consumption and also
to avoid human error
in taking reading
0.66 0.66 - - - - 0.66 - - 0.66 - -
23 MaduraiPart - B
Palani TownRAPDRP DSW
22 kV HT line with ACSR 7/4.09 mm
(Raccoon)
Load bifurcation to reduce outages and
to enhance operation flexibility 0.39 255/16.7.11
Load bifurcation to
reduce outages and to
enhance operation
flexibility
0.39 0.39 - - - - 0.39 - - 0.39 - -
24 MaduraiPart - B
Palani TownRAPDRP DSW
i) 22 kV HT line with ACSR 7/3.35 mm
(Rabbit) for HVDS DT's,
ii)ACSR 7/3.35 mm (Rabbit) to ACSR
7/4.09 mm (Raccon)
Load bifurcation to reduce outages and
to enhance operation flexibility
Improving network strength & Quality,
Replacement of aged conductors,
poles,etc
2.71 255/16.7.11
Load bifurcation to
reduce outages and to
enhance operation
flexibility
2.71 2.71 - - - - 2.71 - - 2.71 - -
25 MaduraiPart - B
Palani TownRAPDRP DSW
i) Erection of new 200kVA/22kV DT's for
derating existing 500kVA/22kV DT by
introduction of HVDS ii)Erection of new
100 kVA/22kV DT's for derating existing
250kVA/22kV DT by introduction of
HVDS iii) Erection of new
63 kVA/ 22kV DT's for derating existing
200 kVA/22kV DT by introduction of
HVDS iv)Erection of new 40 kVA/ 22kV
DT's for derating existing 100 kVA/22kV
DT by introduction of HVDS
To offer load relief to the existing DTs 1.03 255/16.7.11To offer load relief to
the existing DTs 1.03 1.03 - - - - 1.03 - - 1.03 - -
26 MaduraiPart - B
Palani TownRAPDRP DSW
Proposed conversion of existing LT Single
Phase 3 Wire line into LT 3 Phase 5 Wire
Line with ACSR (7/3.35 mm & 7/2.59mm)
Rabbit and Weasel.
To augument the current carrying
capacity of the conductor 0.28 255/16.7.11
To augument the
current carrying
capacity of the
conductor
0.28 0.28 - - - - 0.28 - - 0.28 - -
27 MaduraiPart - B
Palani TownRAPDRP DSW LT ABC Cable 3x70+1x16+1x50 Sq mm
Easy identification of fault and to avoid
electrical accident. 2.81 255/16.7.11
Easy identification of
fault and to avoid
electrical accident.
2.81 2.81 - - - - 2.81 - - 2.81 - -
28 MaduraiPart - B
Palani TownRAPDRP DSW
i) Erection of single pole mounted DT
structure with 25 kVA,
ii)Erection of Double pole mounted DT
structure with 40 kVA,
iii) Erection of Double pole mounted DT
structure with 63 kVA,
iv)Erection of Double pole mounted DT
structure with 100 kVA
To reduce HT - LT ratio 6.08 255/16.7.11To reduce HT - LT
ratio 6.08 6.08 - - - - 6.08 - - 6.08 - -
29 MaduraiPart - B
Palani TownRAPDRP DSW DP Structure with AB Switch
Easy isolation of 11 kV fault portion
and reduce the duration of outage. 0.27 255/16.7.11
Easy isolation of 11
kV fault portion and
reduce the duration of
outage.
0.27 0.27 - - - - 0.27 - - 0.27 - -
![Page 168: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/168.jpg)
30 MaduraiPart - B
Palani TownRAPDRP DSW
i)22 kV HT line with ACSR 7/4.09 mm
(Raccoon) for TV Station Feeder
ii)22 kV HT line with ACSR 7/3.35 mm
(Rabbit) for HVDS DT's
Load bifurcation to reduce outages and
to enhance operation flexibility 4.25 255/16.7.11
Load bifurcation to
reduce outages and to
enhance operation
flexibility
4.25 4.25 - - - - 4.25 - - 4.25 - -
31 MaduraiPart - B
Palani TownRAPDRP DSW
i) Erection of new 200kVA / 22kV DT's
ii) Erection of new 200kVA/22kV DT's for
derating existing 500kVA/ 22kV DT by
introduction of HVDS
iii) Erection of new 100 kVA/22kV DT's
for derating existing 250kVA/ 22kV DT by
introduction of HVDS iv)
Erection of new 63 kVA/22kV DT's for
derating existing 100 kVA/22kV DT by
introduction of HVDS v)Erection of new
40 kVA/22kV DT's for derating existing
100 kVA/22kV DT by introduction of
HVDS
To offer load relief to the existing DTs 2.20 255/16.7.11To offer load relief to
the existing DTs 2.20 2.20 - - - - 2.20 - - 2.20 - -
32 MaduraiPart - B
Palani TownRAPDRP DSW
Proposed conversion of existing LT Single
Phase 3 Wire line into LT 3 Phase
5 Wire Line with ACSR (7/3.35 mm &
7/2.59mm) Rabbit and Weasel.
To augument the current carrying
capacity of the conductor 1.23 255/16.7.11
To augument the
current carrying
capacity of the
conductor
1.23 1.23 - - - - 1.23 - - 1.23 - -
33 MaduraiPart - B
Palani TownRAPDRP DSW
i)Erection of single pole mounted DT
structure with 25 kVA
ii)Erection of Double pole mounted DT
structure with 40 kVA
iii) Erection of Double pole mounted DT
structure with 63 kVA
iv)Erection of Double pole mounted DT
structure with 100 kVA
To reduce HT - LT ratio 2.71 255/16.7.11To reduce HT - LT
ratio 2.71 2.71 - - - - 2.71 - - 2.71 - -
34 MaduraiPart - B
Palani TownRAPDRP DSW
i) Wedge connector for DTs ii)Wedge
connector for LT Cut PointTo reduce HT - LT ratio 0.09 255/16.7.11
To reduce HT - LT
ratio 0.09 0.09 - - - - 0.09 - - 0.09 - -
35 MaduraiPart - B
Palani TownRAPDRP DSW
22 kV HT line with ACSR 7/4.09 mm
(Raccoon) for TV Station Feeder
Load bifurcation to reduce outages and
to enhance operation flexibility 0.39 255/16.7.11
Load bifurcation to
reduce outages and to
enhance operation
flexibility
0.39 0.39 - - - - 0.39 - - 0.39 - -
36 MaduraiPart - B
Palani TownRAPDRP DSW
i) 22 kV HT line with ACSR 7/3.35 mm
(Rabbit) for HVDS DT's
ii)ACSR 7/3.35 mm (Rabbit) to ACSR
7/4.09 mm (Raccon)
Load bifurcation to reduce outages and
to enhance operation flexibility 1.80 255/16.7.11
Load bifurcation to
reduce outages and to
enhance operation
flexibility
1.80 1.80 - - - - 1.80 - - 1.80 - -
37 MaduraiPart - B
Palani TownRAPDRP DSW
i) Erection of new 200kVA/22kV DT's for
derating existing 500kVA/22kV DT by
introduction of HVDS ii)
Erection of new 100 kVA/22kV DT's for
derating existing 250kVA/22kV DT by
introduction of HVDS iii)
Erection of new 63 kVA/22kV DT's for
derating existing 200 kVA/22kV DT by
introduction of HVDS iv)Erection of new
40 kVA/22kV DT's for derating existing
100 kVA/22kV DT by introduction of
HVDS
To offer load relief to the existing DTs 1.03 255/16.7.11To offer load relief to
the existing DTs 1.03 1.03 - - - - 1.03 - - 1.03 - -
38 MaduraiPart - B
Palani TownRAPDRP DSW
Proposed conversion of existing LT Single
Phase 3 Wire line into LT 3 Phase 5 Wire
Line with ACSR (7/3.35 mm & 7/2.59mm)
Rabbit and Weasel.
To augument the current carrying
capacity of the conductor 0.28 255/16.7.11
To augument the
current carrying
capacity of the
conductor
0.28 0.28 - - - - 0.28 - - 0.28 - -
39 MaduraiPart - B
Palani TownRAPDRP DSW LT ABC Cable 3x70+1x16 + 1x50 Sq mm
Easy identification of fault and to avoid
electrical accident. 2.81 255/16.7.11
Easy identification of
fault and to avoid
electrical accident.
2.81 2.81 - - - - 2.81 - - 2.81 - -
![Page 169: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/169.jpg)
40 MaduraiPart - B
Palani TownRAPDRP DSW
i) Erection of single pole mounted DT
structure with 25 kVA
ii)Erection of Double pole mounted DT
structure with 40 kVA
iii)Erection of Double pole mounted DT
structure with 63 kVA
iv)Erection of Double pole mounted DT
structure with 100 kVA
To reduce HT - LT ratio 6.08 255/16.7.11To reduce HT - LT
ratio 6.08 6.08 - - - - 6.08 - - 6.08 - -
41 MaduraiPart - B
Palani TownRAPDRP DSW DP STRUCTURE WITH AB SWITCH
Easy isolation of 11 kV fault portion
and reduce the duration of outage. 0.27 255/16.7.11
Easy isolation of 11
kV fault portion and
reduce the duration of
outage.
0.27 0.27 - - - - 0.27 - - 0.27 - -
42 MaduraiPart - B
Palani Town33 / 11 kV New SS 1.52 CMD no:15(T.B) dt:8.1.16
To reduce HT - LT
ratio 1.52 1.52 - - - - 1.52 - - 1.52 - -
43 MaduraiPart - B
Palani TownSS Works New 33 kV feeder Erection 0.44 CMD no:15(T.B) dt:8.1.16
To reduce HT - LT
ratio 0.44 0.44 - - - - 0.44 - - 0.44 - -
44 MaduraiPart - B
Palani Town
RAPDRP
Schemes
i) 22 kV / 11 kV new feeder / feeder
bifrication ii)Arial
bunched cable iii)UG Cable
To meet out load growth 16.93 CMD no:15(T.B) dt:8.1.16To reduce HT - LT
ratio 16.93 16.93 - - - - 16.93 - - 16.93 - -
45 MaduraiPart - B
Palani TownDDUGJY 2.49
To reduce the HT and
LT Losses 2.49 2.49 - - - - 2.49 - - 2.49 - -
46 MaduraiPart - B
Palani TownIPDS
33 / 11 kV New SS , New 33 kV feeder
Erection, 22 kV / 11 kV new feeder /
feeder bifrication , Arial bunched cable ,
UG Cable, LT Line new feeder / feeder
bifrication , LT Line new feeder
augumentation / Re conductoring,
Capacitor bank, 22 kV / 11 kV HVDS,
Metering, Provision of solar panal etc.,
To reduce the system line loss and to
improve system stability. 55.70 CMD no:15(T.B) dt:8.1.16
To reduce HT - LT
ratio 55.70 55.70 - - - - 55.70 - - 55.70 - -
47 MaduraiPart - B
Palani Town
Others
(REC/PFC) - - - - - - - - - - - - -
48 MaduraiPart - B
Palani TownDCW Erection of HT and LT lines 1.14 Sanction by CE/SE/EE/AEE 1.14 1.14 - - - - - - - - - -
49 MaduraiPart - B
Palani Town
Any other related
works including
less than one
crore works
totally
- - - - - - - - - - - - -
1 Madurai Madurai EDCRevised 12th
Master plan New 33 /11 kV Nattarmangalam ss
To improve the Poor voltage regulation
of ex.11kV , Vaibhav # of 110/11kV
Uranganpatty SS
3.76 TANTRANSCO Proceedings
No.53 dt. 27.06.14
To improve the Poor
voltage regulation of
ex.11kV Vaibhav #
of 110/11kV
Uranganpatty SS
3.76 3.76 - - - - 3.76 - - 3.76 - -
2 Madurai Madurai EDCRevised 12th
Master plan New 33/11kV Valandhur SS
To improve the Poor voltage regulation
of ex.11kV Valandhur # of 110/11kV
Usilampatty SS
2.54 TANTRANSCO proceedings
no 21. dt. 13.01.14
To meet out load
growth 2.54 2.54 - - - - 2.54 - - 2.54 - -
3 Madurai Madurai EDCRevised 12th
Master plan
Establishment of 33/11kV Melavalavu
SS, Solankuruni SS, Kondayampatty SS,
Kailampatty SS, Kalyanipatty
(Theppathupatty) SS, Thadayampatty SS,
Karadipatty SS, Nilaiyur SS, Maravapatty
SS,Virathanur SS, Sakkimangalam SS,
Vappadapu SS,Ramianpatty SS,
Chokkanathanpatty SS, Mannadimangalam
SS, Melakkal SS, Mangulam SS,
Pappapattyl SS, Kanbur SS, Keelavalavu
SS, k.s.kotta iSS, Kumaram SS,
Nedukulam SS
To improve the Poor voltage regulation
of ex.11kV AV Rural # of 110/11kV
Narasingampatty SS
84.36 To Be approved by BoardTo improve the Poor
voltage regulation. 84.36 84.36 - - - - 84.36 - - 84.36 - -
![Page 170: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/170.jpg)
4 Madurai Madurai EDC DDUGJY Establishment of 33/11 kV Panaiyur ss
To improve the Poor voltage regulation
of ex.11kV Panaiyur # of 110/11kV
Anuappnadi SS
3.89
CMD/ TANGEDCO
proceedings no. 172 Dt.
25.04.15
To improve the Poor
voltage regulation of
ex.11kV Panaiyur #
of 110/11kV
Anuappnadi SS
3.89 3.89 - - - - 3.89 - - 3.89 - -
5 Madurai Madurai EDC DDUGJY
Establishment of 33/11kV Thiruvathavur
ss, Kottanathampatty SS, T.Krishnapuram
(M.kallupatty SS), Mangalrevu SS,
A.Kokkulam(Checkanurai SS),Edayapatty
SS, Nagari (Ayyankottai) SS, Alanganallur
SS
To improve the Poor voltage regulation
of ex.11kV Amoor r# of 110/11kV
Narasingampatty SS and 11kV
Thiruvathavur of 110/11kV Melur SS
- To Be approved by BoardTo improve the Poor
voltage regulation. - - - - - - - - - - - -
6 Madurai Madurai EDC DDUGJY
i) To Errect LT Over head line (3Ph 4 wire
Line- 6.26 KM) ii)To Errect New 11 kV
link Line work( Line- 15.35 KM)
iii)Errection of New 33 kV Pay & 33 kV
Line
To improve the Voltage Regulation 9.77 Approved DPRTo improve the
Voltage Regulation 9.77 9.77 - - - - 9.77 - - 9.77 - -
7 Madurai Madurai EDC NEFS Reconducting of aged conductors To reduce the line loss 4.84 Approved by RECTo reduce the line
loss 2.18 2.42 2.66 2.42 - - 2.42 2.42 - 2.18 2.66 -
8 Madurai Madurai EDCRevised 12th
Master plan
To Errect New11 kV OH Line & UG
Cabel Work at Various SS To Improve the Voltage Regulation 2.76 Approved By TANGEDCO
To Improve the
Voltage Regulation 2.76 2.76 - - - - 2.76 - - 2.76 - -
9 Madurai UsilampattyRAPDRP -
DSW
i) New feeders 11kV, ACSR 7/4.09mm
Conductor, ii)New
feeders 11kV 7/3.35 mm OH (ACSR
Rabbit)
Load bifurcation to reduce over loading
and to reduce the Line losses 0.92
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
To improve the
voltage stability and
to minimize the
AT&C Losses
0.92 0.92 - - - - 0.92 - - 0.92 - -
10 Madurai UsilampattyRAPDRP -
DSW
i)Strengthening of existing 11 kV OH
feeder from ACSR 7/2.59 mm to 7/4.09
mm with DP Structures ii)Strengthening of
existing 11 kV OH feeder from ACSR
7/2.59 mm to 7/3.35 mm iii)New LT
feeders with ACSR 7/3.35 mm Conductor
To strengthen the existing conductor to
improve the Line stability and to reduce
IR losses
0.42
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
To improve the
voltage stability and
to minimize the
AT&C Losses
0.42 0.42 - - - - 0.42 - - 0.42 - -
11 Madurai UsilampattyRAPDRP -
DSW
Derating with 40 kVA, 63kVA, 250kVA
DTs To offer load relief to the existing DTs 0.06
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
To reduce LT Long
lines and to minimize
the AT&C losses
0.06 0.06 - - - - 0.06 - - 0.06 - -
12 Madurai UsilampattyRAPDRP -
DSW Erection of New 25, 40, 63, 100 kVA DTs 2.50 2.50 2.50 - - - - 2.50 - - 2.50 - -
13 Madurai Usilampatty IPDS
i) Establishment of 2 X 8 MVA, 33/11 kV
SS in Alanganallur with land cost
ii)Extension of 33 kV HT Line from
110kV Manickampatty SS to Proposed
Alanganallur SS
iii)Erection of 1 No 11 kV Capacitor Bank
with a capacity of 2.47 MVAR
To meet out the load growth and to
reduce the over loading of nearby Sub-
stations
3.90
(Per.) CMD TANGEDCO
Proceedings No:15 Dt:
08.01.2016.
To improve the
voltage stability, to
minimize the AT& C
Losses and to
improve the
efficiency of the
Power system and
Capacitor bank for
VAR Compensation
- - - - 3.90 3.90 - - 3.90 - - 3.90
14 Madurai Usilampatty IPDSReplacement of single phase and three
phase EM/HQ meter with static meters
Accurate recording of consumption and
also to avoid human error in taking
reading
4.82
(Per.) CMD TANGEDCO
Proceedings No:15 Dt:
08.01.2016.
For improving the
Revenue
Augumentation
- - - - 4.82 4.82 - - 4.82 - - 4.82
15 Madurai Usilampatty IPDS - DSW
i)11 kV New feeders ACSR 7/4.09mm &
7/3.35mm Conductor
ii)New LT feeders with ACSR 7/3.35 mm
Conductor iii)
Strengthening of existing LT OH kV OH
feeder from ACSR 7/2.59 mm to 7/3.35
mm
Load bifurcation to reduce over loading
and to reduce the Line losses 11.14
(Per.) CMD TANGEDCO
Proceedings No:15 Dt:
08.01.2016.
To improve the
voltage stability and
to minimize the
AT&C Losses
- - - - 11.14 11.14 - - 11.14 - - 11.14
16 Madurai Usilampatty IPDS - DSW Derating with 100 kVA DTs 0.32
(Per.) CMD TANGEDCO
Proceedings No:15 Dt:
08.01.2016.
To reduce LT Long
lines and to minimize
the AT&C losses
- - - - 0.32 0.32 - - 0.32 - - 0.32
![Page 171: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/171.jpg)
17 Madurai Usilampatty IPDS - DSW Laying of AB cables HT & LT 1.02
(Per.) CMD TANGEDCO
Proceedings No:15 Dt:
08.01.2016.
To Maintain the
safety and to
minimize the theft of
Energy
- - - - 1.02 1.02 - - 1.02 - - 1.02
18 Madurai Usilampatty IPDS - DSW Erection of New 25 , 40, 63 kVA DTs 3.49
(Per.) CMD TANGEDCO
Proceedings No:15 Dt:
08.01.2016.
- - - - 3.49 3.49 - - 3.49 - - 3.49
19 Madurai Usilampatty IPDSErection of 7 No 11 kV Breaker with bay
extension
To meet out the load growth and to
reduce the over loading in VCB 0.91
(Per.) CMD TANGEDCO
Proceedings No:15 Dt:
08.01.2016.
- - - - 0.91 0.91 - - 0.91 - - 0.91
1 TirunelveliVirudhunagar
EDCCapital
Extension of LT & LT CT, HT Supply to
9200 Nos various tariff services during 16-
17
New service connections effected 2.40 Various approval from
CE/Dist, SE/Dist & EE/Dist
Rev from Sale of
Power will be
increased by 120
crores
2.40 2.40 - - - - 2.40 - - 2.40 - -
2 TirunelveliVirudhunagar
EDCCapital
Extension of LT & LT CT, HT Supply to
10000 Nos various tariff services during 17-
18
New service connections effected 2.50 Various approval from
CE/Dist, SE/Dist & EE/Dist
Rev from Sale of
Power will be
increased by 130
crores
- - 2.50 2.50 - - - 2.50 - - 2.50 -
3 TirunelveliVirudhunagar
EDCCapital
Extension of LT & LT CT, HT Supply to
11000 .Nos various tariff services during
18-19
New service connections effected 2.75 Various approval from
CE/Dist, SE/Dist & EE/Dist
Rev from Sale of
Power will be
increased by 140
crores
- - - - 2.47 2.75 - - 2.75 - - 2.47
4 TirunelveliVirudhunagar
EDCCapital
33 kV and 11 kV link line with
Velayauthapuram 110/33 kV New SS at
Sivakasi Division
To improve HT Regulation and line
loss 12.38 BP NO 10 dt 10.1.2014
To improve
distribution capacity
and to reduce line
loss
12.38 12.38 - - - - 12.38 - - 12.38 - -
5 TirunelveliVirudhunagar
EDCCapital
Feeder bifurcation of 11 kV Boomalaipatty
feeder at Aruppukottai Division
To improve HT Regulation and line
loss 0.80 Yet to be sanctioned
To improve HT
Regulation and line
loss
0.80 0.80 - - - - 0.80 - - 0.80 - -
6 TirunelveliVirudhunagar
EDCCapital
New 11kV and 33 kV link line with
Naranapuram 33/11kV New SS at Sivakasi
Division
To improve HT Regulation and line
loss 3.08 Yet to be sanctioned
To improve
distribution capacity
and to reduce line
loss
- - 3.08 3.08 - - - 3.08 - - 3.08 -
7 TirunelveliVirudhunagar
EDCCapital
New 11kV and 33 kV link line with
Nallamanaickenpatty 33/11kV New SS at
Sivakasi Division
To improve HT Regulation and line
loss 1.11 Yet to be sanctioned
To improve
distribution capacity
and to reduce line
loss
- - 1.11 1.11 - - - 1.11 - - 1.11 -
8 TirunelveliVirudhunagar
EDCCapital
33 kV link line with Nenmeni 33/11 kV
New SS at Sivakasi Division
To improve HT Regulation and line
loss 0.58 BP NO 10 dt 10.1.2014
To improve
distribution capacity
and to reduce line
loss
- - 0.58 0.58 - - - 0.58 - - 0.58 -
9 TirunelveliVirudhunagar
EDCCapital
Feeder bifurcation of 11 kV
Venkateshwarapuram feeder at
Srivilliputhur Division
To improve HT Regulation and line
loss 0.70 Yet to be sanctioned
To improve
distribution capacity
and to reduce line
loss
- - - - 0.63 0.70 - - 0.70 - - 0.63
10 TirunelveliVirudhunagar
EDCCapital
New 11kV and 33 kV link line with
A.Thulukapatty 33/11kV New SS at
Srivilliputhur Division
To improve HT Regulation and line
loss 3.93 Yet to be sanctioned
To improve
distribution capacity
and to reduce line
loss
- - 3.93 3.93 - - - 3.93 - - 3.93 -
11 TirunelveliVirudhunagar
EDCImprovement
To improve regulation of 33 kV line Aged
conductor G.N.Patty feeder
To improve HT Regulation and line
loss 0.63 Yet to be sanctioned
To improve
distribution capacity
and to reduce line
loss
- - - - 0.57 0.63 - - 0.63 - - 0.57
12 TirunelveliVirudhunagar
EDCImprovement
Replacement & Enhancement of Dist
Transformers during 16-17To improve & stabilise voltage 0.75 Yet to be sanctioned
To stabilise the
voltage and to initiate
new LT & HT
services
0.75 0.75 - - - - 0.75 - - 0.75 - -
![Page 172: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/172.jpg)
13 TirunelveliVirudhunagar
EDCImprovement
Replacement & Enhancement of Dist
Transformers during 17-18To improve & stabilise voltage 0.80 Yet to be sanctioned
To stabilise the
voltage and to initiate
new LT & HT
services
- - 0.80 0.80 - - - 0.80 - - 0.80 -
14 TirunelveliVirudhunagar
EDCImprovement
Replacement & Enhancement of Dist
Transformers during 18-19To improve & stabilise voltage 0.80 Yet to be sanctioned
To stabilise the
voltage and to initiate
new LT & HT
services
- - - - 0.72 0.80 - - 0.80 - - 0.72
15 TirunelveliVirudhunagar
EDCImprovement
Replacement and strengthening of old
conductors during 16-17
To avoid line loss and to improve
voltage regulation 5.00 Yet to be sanctioned
To stabilise the
voltage and to initiate
new LT & HT
services
5.00 5.00 - - - - 5.00 - - 5.00 - -
16 TirunelveliVirudhunagar
EDCImprovement
Replacement and strengthening of old
conductors during 17-18
To avoid line loss and to improve
voltage regulation 5.00 Yet to be sanctioned
To stabilise the
voltage and to initiate
new LT & HT
services
- - 5.00 5.00 - - - 5.00 - - 5.00 -
17 TirunelveliVirudhunagar
EDCImprovement
Replacement and strengthening of old
conductors during 18-19
To avoid line loss and to improve
voltage regulation 5.00 Yet to be sanctioned
To stabilise the
voltage and to initiate
new LT & HT
services
- - - - 4.50 5.00 - - 5.00 - - 4.50
18 TirunelveliVirudhunagar
EDCDDUGJY
Establishment of 33 kV sub stations at
Sivakasi ESI SS
To improve HT Regulation and line
loss 3.08 BP no 63 dt 25.7.2015
To improve
distribution capacity
and to reduce line
loss
3.08 3.08 - - - - 3.08 - - 3.08 - -
19 TirunelveliVirudhunagar
EDCDDUGJY
Establishment of 33 kV sub stations at
A.Thullukapatty (Srivilliputhur Divisiopn)
To improve HT Regulation and line
loss 3.88 BP no 202 dt 31.5.2016
To improve
distribution capacity
and to reduce line
loss
- - 3.88 3.88 - - - 3.88 - - 3.88 -
20 TirunelveliVirudhunagar
EDCDDUGJY
Additional 1 No 8 MVA Power
Transformer at Palayampatty 33/11 kV SSTo adjust over load in SS 0.78
CE Sanctioon No 29 dt
29.10.2013
To adjust over load
in SS - - 0.78 0.78 - - - 0.78 - - 0.78 -
21 TirunelveliVirudhunagar
EDCDDUGJY
Additional 1 No 8 MVA Power
Transformer at Narikudi 33/11 kV SSTo adjust over load in SS 1.71
CE Sanctioon No 29 dt
13.11.2015
To adjust over load
in SS - - 1.71 1.71 - - - 1.71 - - 1.71 -
22 TirunelveliVirudhunagar
EDCDDUGJY
Enhancement of Power Transformer 5
MVA to 8 MVA at Mallipudur 33/11 kV
SS
To adjust over load in SS 1.71 Yet to be sanctionedTo adjust over load
in SS - - - - 1.71 1.71 - - 1.71 - - 1.71
23 TirunelveliVirudhunagar
EDCDDUGJY
Enhancement of Power Transformer 5
MVA to 8 MVA at Vembakottai 33/11 kV
SS
To adjust over load in SS 1.71 Yet to be sanctionedTo adjust over load
in SS - - - - 1.71 1.71 - - 1.71 - - 1.71
24 TirunelveliVirudhunagar
EDCIPDS
New SS & DT erection at Aruppukottai
Division
To improve distribution capacity and to
reduce line loss 1.60
(Per) CMD TANGEDCO
Proceedings No.15 dt.
08.01.16
To improve
distribution capacity
and to reduce line
loss
0.72 0.80 0.66 0.64 0.22 0.16 0.80 0.64 0.16 0.72 0.66 0.22
25 TirunelveliVirudhunagar
EDCIPDS
New SS & DT erection at Virudhunagar
Division
To improve distribution capacity and to
reduce line loss 2.96
(Per) CMD TANGEDCO
Proceedings No.15 dt.
08.01.16
To improve
distribution capacity
and to reduce line
loss
1.34 1.49 1.21 1.18 0.41 0.29 1.49 1.18 0.29 1.34 1.21 0.41
26 TirunelveliVirudhunagar
EDCIPDS
New SS & DT erection at Sivakasi
Division
To improve distribution capacity and to
reduce line loss 8.90
(Per) CMD TANGEDCO
Proceedings No.15 dt.
08.01.16
To improve
distribution capacity
and to reduce line
loss
4.00 4.45 3.65 3.56 1.25 0.89 4.45 3.56 0.89 4.00 3.65 1.25
27 TirunelveliVirudhunagar
EDCIPDS
New SS & DT erection at Rajapalayam
Division
To improve distribution capacity and to
reduce line loss 9.02
(Per) CMD TANGEDCO
Proceedings No.15 dt.
08.01.16
To improve
distribution capacity
and to reduce line
loss
4.06 4.51 3.70 3.61 1.26 0.90 4.51 3.61 0.90 4.06 3.70 1.26
28 TirunelveliVirudhunagar
EDCIPDS
New SS & DT erection at Srivilliputhur
Division
To improve distribution capacity and to
reduce line loss 14.32
(Per) CMD TANGEDCO
Proceedings No.15 dt.
08.01.16
To improve
distribution capacity
and to reduce line
loss
6.44 7.16 5.88 5.73 2.00 1.43 7.16 5.73 1.43 6.44 5.88 2.00
![Page 173: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/173.jpg)
29 TirunelveliVirudhunagar
EDC
Others
(REC/PFC) - - - - - - - - - - - - -
30 TirunelveliVirudhunagar
EDC
Any other related
works including
less than one
crore works
totally
Land cost for Perianaickenpatty,
Rajapalayam, Mudukkankulam,
Veeracholam, Iyankollankondan,
Rajapalayam Urban 33/11 kV SS
To improve distribution capacity and to
reduce line loss 3.11 Yet to approved
To improve
distribution capacity
and to reduce line
loss
- - 1.71 1.90 1.40 1.21 - 1.90 1.21 - 1.71 1.40
1 TirunelveliTirunelveli
EDCCapital
Extension of LT & LT CT, HT Supply to
59806 Nos various tariff services
[except Agri]
New service connections effected 58.00 To be approved by the
competent authority
To improve
distribution capacity
and reduce line loss
58.00 58.00 - - - - 58.00 - - 58.00 - -
2 TirunelveliTirunelveli
EDCCapital New SC's Agriculture Normal Perioty New service connections effected 4.00
To be approved by the
competent authority
To improve
distribution capacity
and reduce line loss
4.00 4.00 - - - - 4.00 - - 4.00 - -
3 TirunelveliTirunelveli
EDCCapital
Establishment of 33 kV sub stations at 37
of 7 Division New service connections effected 3.72
To be approved by the
competent authority
To improve
distribution capacity
and reduce line loss
3.72 3.72 - - - - 3.72 - - 3.72 - -
4 TirunelveliTirunelveli
EDCCapital
Proposed for STatIC Meter [ Singl Phase &
Three Phase] for 7 division New service connections effected 30.69
To be approved by the
competent authority
To improve
distribution capacity
and reduce line loss
30.69 30.69 - - - - 30.69 - - 30.69 - -
5 TirunelveliTirunelveli
EDCCapital
HT New feeder from SS
[11kV/22kV/33kV] , Feeder Bifurcation
HT link line works
New service connections effected 8.93 To be approved by the
competent authority
To improve
distribution capacity
and reduce line loss
8.93 8.93 - - - - 8.93 - - 8.93 - -
6 TirunelveliTirunelveli
EDCCapital
proposed for 2 x 8 MVA power
Transformer of various sub station of 7
division [Master plan ]
Essentially needed to bring the 11 kV
Kadamadai feeder of Valliyoor SS
Regulation within limit, low voltage
packets removal and line loss reduction
51.80 To be approved by the
competent authority
To improve
distribution capacity
and reduce line loss
15.53 17.26 17.26 17.26 17.28 17.28 17.26 17.26 17.28 15.53 17.26 17.28
7 TirunelveliTirunelveli
EDCImprovement
Improvement works- SS, Enhancement of
DT & Pr.Trs in sub station, sub station
related works.
To improve the network and Load
growth 10.00
To be approved by the
competent authority
To improve
distribution capacity
and reduce line loss
10.00 10.00 - - - - 10.00 - - 10.00 - -
8 TirunelveliTirunelveli
EDCImprovement
Improvement works- Erection of DT, New
HT feeders, strengthening of HT cables,
Laying LT cable and erection of pillar
boxes of various sub station
To improve the network and Load
growth 14.00
To be approved by the
competent authority
To improve
distribution capacity
and reduce line loss
14.00 14.00 - - - - 14.00 - - 14.00 - -
9 TirunelveliTirunelveli
EDCRGGVY
Erection of HVDS with HT & LT line
25kVA at 7 divisionTo improve village infra structure 12.77
[BP] TANGEDCO Pro No 63
Dt 05-06-2012
To improve
distribution capacity
and reduce line loss
2.57 2.86 10.20 9.91 - - 2.86 9.91 - 2.57 10.20 -
10 TirunelveliTirunelveli
EDCDDUGJY
Erection of 33/11kV New ss of
Moodraaippu Parappadi & Vellankulam ,
Enhancement of Power transformer of
MOOLakaraipatti , Reddiyarpatti and
provision for additional Power transformer
at Mangammasali
To improve the network and Load
growth 9.90
SE/RE&I[D]/EE/PCI-1/AEE-
1/FDDUGJY/D62/15 DT 08-
04-2015
To improve
distribution capacity
and reduce line loss
4.45 4.95 5.45 4.95 - - 4.95 4.95 - 4.45 5.45 -
11 TirunelveliTirunelveli
EDCDDUGJY
Erection of 11kV line 7/4/09 ACSR
conductor for new feeder , Erection of
33kV line with 7/4.09 DOG and consumer
meters
To improve the network and Load
growth 11.45
SE/RE&I[D]/EE/PCI-1/AEE-
1/FDDUGJY/D62/15 DT 08-
04-2015
To improve
distribution capacity
and reduce line loss
5.16 5.73 6.29 5.72 - - 5.73 5.72 - 5.16 6.29 -
12 TirunelveliTirunelveli
EDCIPDS
33kV OH Line New feeder with ACSR
Dog conuctor from 110/33/11kV various
33/11kV sub Station of 7 Division of this
circle
To improve the network and Load
growth 5.75
[Per] CMD BP No 13 Dt 08-
01-2016
To improve
distribution capacity
and reduce line loss
1.80 2.00 2.00 2.00 1.95 1.75 2.00 2.00 1.75 1.80 2.00 1.95
13 TirunelveliTirunelveli
EDCIPDS
33/11 Alwarkurichi manned outdoor SS
with 2 X 8 MVA power transformer
at Alwarkuruchi & Chermadevi
[Kallidaikuruchi division] Nanguneri
[Rural division] Keelpavoor and S.PV
karai [ Tenkasi division and Pangudi [
Valliyoor]
To Improve the T & D losses
to the maximum extent and improve
the infra structure of the system
17.94 [Per] CMD BP No 13 Dt 08-
01-2016
To improve
distribution capacity
and reduce line loss
8.07 8.97 7.37 7.19 2.50 1.78 8.97 7.19 1.78 8.07 7.37 2.50
![Page 174: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/174.jpg)
14 TirunelveliTirunelveli
EDCIPDS
Erection of 11kV new line for HVDS
erection , New feeders link the line work
To Improve the T & D losses
to the maximum extent and improve
the infra structure of the system
17.04 [Per] CMD BP No 13 Dt 08-
01-2016
To improve
distribution capacity
and reduce line loss
7.80 8.67 6.85 6.64 2.39 1.73 8.67 6.64 1.73 7.80 6.85 2.39
15 TirunelveliTirunelveli
EDCIPDS
Erection of 11kV AB cable with 3 x
95sq.mm, Erection of LT AB cable with
1.1 kV class 3 phase aerial bunched cable
of size 3 x 70 +1x16+1x50 sq mm and
Laying cable 11kV UG cable with 3 x 630
& 3x 300 sq mm for HVDS erection in
religious important places
To Improve the T & D losses to
the maximum extent and improve the
infra structure of the system
3.72 [Per] CMD BP No 13 Dt 08-
01-2016
To improve
distribution capacity
and reduce line loss
1.67 1.86 2.05 1.86 - - 1.86 1.86 - 1.67 2.05 -
16 TirunelveliTirunelveli
EDCIPDS
11kV New feeder breaker at existing
110/11kV all 33kV ss, Erection of
100kVA DT , Ltnew line HVDS with
feeder bifurcation , conversion of existing
single phase 2wire line into three phase 4
wire line with rabbit condut and provision
for 2.4 MVAR capacitor bank with 11kV
bay extension in 110/11kV at 34 towns in 7
division
To Improve the T & D losses to the
maximum extent and improve the
infra structure of the system
10.44 [Per] CMD BP No 13 Dt 08-
01-2016
To improve
distribution capacity
and reduce line loss
3.13 3.48 3.48 3.48 3.83 3.48 3.48 3.48 3.48 3.13 3.48 3.83
17 TirunelveliTirunelveli
EDCIPDS
Erection of Single pole mounted DT
structure with 16kVA and 25kVA and
erection of double pole mounted DT
structure with 40kVA and 63kVA at 34
Towers in 7 divisiom
To Improve the T & D losses to the
maximum extent and improve the
infra structure of the system
25.06 [Per] CMD BP No 13 Dt 08-
01-2016
[Per] CMD BP No
13 Dt 08-01-2016 7.51 8.35 8.35 8.35 9.20 8.36 8.35 8.35 8.36 7.51 8.35 9.20
18 TirunelveliTirunelveli
EDCIPDS
Consumer for existing unmetered
connection replacement of faulty meteres
electro mechanical meter of Single phase
and three phase , Erection of Solar panel in
CE/SE / office proposed new SS and EE
office with own building
10.44 [Per] CMD BP No 13 Dt 08-
01-2016
To improve
distribution capacity
and reduce line loss
3.13 3.48 3.48 3.48 3.83 3.48 3.48 3.48 3.48 3.13 3.48 3.83
19 TirunelveliTirunelveli
EDCDCW
New Agriculture SC's [SFS] No of service
875New service connections effected 10.50
To be approved by the
competent authority
To improve
distribution capacity
and reduce line loss
10.50 10.50 - - - - - - - - - -
1 TirunelveliKanyakumari
EDCCapital
Extension of LT & LT CT, HT Supply to
1,50,000 Nos various tariff servicesNew service connections effected 40.00 Increase in revenue 11.25 12.50 13.40 13.50 13.95 14.00 12.50 13.50 14.00 11.25 13.40 13.95
2 TirunelveliKanyakumari
EDCCapital
Establishment of 33 kV sub stations at
Aloor
Due to Load growth in and around
Aloor area 7.83 Approved in 12th master plan 4.35 4.83 3.48 3.00 - - 4.83 3.00 - 4.35 3.48 -
3 TirunelveliKanyakumari
EDCCapital
Establishment of 33 kV sub stations at
Suralacode
Due to Load growth in and around
Suralacode area 2.40 Approved in 12th master plan 0.72 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.72 0.80 0.80
4 TirunelveliKanyakumari
EDCImprovement
Improvement works- SS, Enhancement of
Pr.Trs in sub station, sub station related
works.
To improve the network and Load
growth 5.36 Estimate submitted
to meet out load
growth 5.36 5.36 - - - - 5.36 - - 5.36 - -
5 TirunelveliKanyakumari
EDCImprovement
Improvement works- Erection of DT, New
HT feeders, strengthening of HT cables,
Laying LT cable and erection of pillar
boxes.
To improve the network and Load
growth 18.00
to avoid line loss &
to initiate new HT &
LT services
4.91 5.46 5.95 6.00 6.49 6.54 5.46 6.00 6.54 4.91 5.95 6.49
6 TirunelveliKanyakumari
EDC
RAPDRP
Scheme I
(Part B)
Enhancement of power transformer in
Valankumaravilai 33kVSSAdm.Appl. Accorded by CMD 0.51
CMD TANGEDCO
Proceedings PB.No.123 dt
1.4.14
To improve infra
structure of the
distribution system
0.51 0.51 - - - - 0.51 - - 0.51 - -
7 TirunelveliKanyakumari
EDC
RAPDRP
Scheme I (Part
A)
Provision of IT equipments , metering of
DTs, Feeders and ring fencing
locations(Part-A).
Adm.Appl. Accorded by CMD 4.09 Loan no 36133011 dt
27.02.09
To improve infra
structure of the
distribution system
4.09 4.09 - - - - 4.09 - - 4.09 - -
8 TirunelveliKanyakumari
EDC
RAPDRP
Scheme I (Part
A)
Erection of new33 kV line, new 11 kV line,
provision of new HVDS, Wedge
Connectors. Part-B Nagercoil Distribution
Strengthening Works
Adm.Appl. Accorded by CMD 23.68
CMD TANGEDCO
Proceedings PB.No.123 dt
1.4.14
To improve
distribution System
and to reduce line
loss
23.68 23.68 - - - - 23.68 - - 23.68 - -
![Page 175: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/175.jpg)
9 TirunelveliKanyakumari
EDC
RAPDRP
Scheme I (Part
A)
Provision of IT equipments , metering of
DTs, Feeders and ring fencing locations.
Kollencode PartA Project Area
Adm.Appl. Accorded by CMD 0.80 Loan no 36133009 dt
27.02.09
To improve infra
structure of the
distribution system
0.80 0.80 - - - - 0.80 - - 0.80 - -
10 TirunelveliKanyakumari
EDC
RAPDRP
Scheme I (Part
A)
Erection of new 11 kV line, provision of
new HVDS, Lt strengthening &
Conversion Kollencode PartA Distribution
Strengthening Works
Adm.Appl. Accorded by CMD 1.56 TANGEDCO Proceedings
NO.124 dt 8.4.11
To improve
distribution system
and to reduce line
loss
1.56 1.56 - - - - 1.56 - - 1.56 - -
11 TirunelveliKanyakumari
EDC
RAPDRP
Scheme I (Part
B)
Establishment of 33 kV sub stations at
VadaseryTransformers & Other civil works 2.13
TANGEDCO Proceedings
NO.123 Dated 01.04.14
To improve infra
structure of the
distribution system
2.13 2.13 - - - - 2.13 - - 2.13 - -
12 TirunelveliKanyakumari
EDCDDUGJY
Introduction of 33kV source at
Thengampudur SS
For 33/11kV indoor cap SS under
DDUGJY scheme 3.00
Reduction of AT&C
Loss 1.80 2.00 1.20 1.00 - - 2.00 1.00 - 1.80 1.20 -
13 TirunelveliKanyakumari
EDCDDUGJY Rajakkamangalam 33/11kV Sub-Station 2.12
REC/CHN/DDUGJY/2015-
16/ dt.05.01.16
Reduction of AT&C
Loss 1.01 1.12 1.11 1.00 - - 1.12 1.00 - 1.01 1.11 -
14 TirunelveliKanyakumari
EDCIPDS
Introduction of 33kV source at
Kanyakumari SS
For 33/11kV indoor cap SS under IPDS
scheme 3.00
Reduction of AT&C
Loss 1.80 2.00 1.20 1.00 - - 2.00 1.00 - 1.80 1.20 -
15 TirunelveliKanyakumari
EDCIPDS
Introduction of 33kV source at
cheramangalam SS
For 33/11kV muttom SS under IPDS
scheme 1.89 1.89 1.89 - - - - 1.89 - - 1.89 - -
16 TirunelveliKanyakumari
EDCIPDS
Erection of New 33/11 kV sub stations,
New 33 kV & 11 kV line, HVDS
Distribution Strengthening Works
Adm.Appl. Accorded by CMD 58.86 TANGEDCO Proceedings
No. 15, DT..08.01.2016 27.00 30.00 31.86 28.86 - - 30.00 28.86 - 27.00 31.86 -
17 TirunelveliKanyakumari
EDCDCW
Consumer contribution for extension of
lines, erection of poles, line materials,
vehicle dashing of poles etc
48.00 13.50 15.00 15.90 16.00 18.60 17.00 - - - - - -
1 Tirunelveli Tuticorin EDC CapitalExtension of LT & LT CT, HT Supply to
35807 .Nos various tariff services
New service connections effected
32.13 (Estimate cost for the 2014to
2016)
3.90 3.90 3.90 - - - - 3.90 - - 3.90 - -
2 Tirunelveli Tuticorin EDC Capital
EO HT Supply to M/s.Power Grid at
Ettayapuram for a demand of 150 kVA at
33kV level.
0.49 Pro.No.238 /02.09.14
Separate feeder from
Eppodum-vendran to
Ettayapuram.
0.49 0.49 - - - - 0.49 - - 0.49 - -
3 Tirunelveli Tuticorin EDC Capital Baba atomic (expected) 3.50 New HT demand. - - 3.50 3.50 - - - 3.50 - - 3.50 -
4 Tirunelveli Tuticorin EDC Capital KITCO Ltd. (expected) 4.00 New HT demand. - - - - 3.60 4.00 - - 4.00 - - 3.60
5 Tirunelveli Tuticorin EDC Capital 33/11kV Vemboor (Vilathikulam)To improve the voltage and reduce line
loss . 0.42
(Per) CMD Pro.No. 479/
4.11.2013
Improve the H.T.
regulation and reduce
line loss.
0.42 0.42 - - - - 0.42 - - 0.42 - -
6 Tirunelveli Tuticorin EDC Capital Vallanadu 33/11kV SSTo improve the voltage and reduce line
loss 3.40
(Per) CMD TAN-GEDCO
Pro.No. 447/ 9.10.15
New SS/New HT
service 3.40 3.40 - - - - 3.40 - - 3.40 - -
7 Tirunelveli Tuticorin EDC Capital Chettikurichi 33/11kV SSTo improve the voltage and reduce line
loss 2.88
New SS. to Elimate
66/11kV Line Tap
SS.
- - - - 2.59 2.88 - - 2.88 - - 2.59
8 Tirunelveli Tuticorin EDC Capital Padukkapathu 33/11kV SS To improve the voltage and reduce line
loss 2.30
New SS. to improve
voltage. - - - - 2.07 2.30 - - 2.30 - - 2.07
9 Tirunelveli Tuticorin EDC Improvement
Improvement works- Erection of DT, New
HT feeders, strengthening of HT cables,
Laying LT cable and erection of pillar
boxes.
To improve the network and Load
growth 0.38 - - - - 0.34 0.38 - - 0.38 - - 0.34
10 Tirunelveli Tuticorin EDC
RAPDRP
Scheme I
(Part A/
Part B)
- - - - - - - - - - - - -
![Page 176: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/176.jpg)
11 Tirunelveli Tuticorin EDC
110/22KVSS Enhancement Transformer
from 16MVA to 25MVA, and Erection of
2 Nos. 33/11KV new unmaned SS,
Erection of New DTs 100KVA&250KVA,
New 33 & 11KV line line feeders, APFC
panels, metering, 22KV line feeder,
strengthning conductor, Augmentation,
HVDS, wedge connectiors, mobile service
center and Auto reclosure and FPIs.
Distribution box at DTs & Poles .
Adm. Appl. Accorded by CMD 49.41 LOAN Ref. No. 36334015,
36334023 & 36133016
To improve
distribution capacity
and to reduce line
loss
26.68 29.65 7.41 4.93 15.32 14.83 29.65 4.93 14.83 26.68 7.41 15.32
12 Tirunelveli Tuticorin EDCRAPDRP
Scheme II - - - - - - - - - - - - -
13 Tirunelveli Tuticorin EDCRAPDRP
Scheme III etc - - - - - - - - - - - - -
14 Tirunelveli Tuticorin EDCRGGVY
Schemes - - - - - - - - - - - - -
15 Tirunelveli Tuticorin EDC DDUGJY
Enhancment of 33/11KV PT capacity from
1*5MVA to 1*8MVA at Kulathur
33/11KV SS - 1 No.
To avoid over loading 0.50 (Per)CMDTANGEDCO
No.357/ dt.23.08.13. 0.50 0.50 - - - - 0.50 - - 0.50 - -
16 Tirunelveli Tuticorin EDC DDUGJY
Enhancment of 33/11KV PT capacity from
2*5MVA to 2*8MVA at Srivaikundam
33/11KV SS - 2 Nos.
To avoid over loading 1.00 (Per)CMDTANGEDCO
No.356/ dt.23.08.2013 - - 1.00 1.00 - - - 1.00 - - 1.00 -
17 Tirunelveli Tuticorin EDC DDUGJY
Enhancment of 33/11KV PT capacity from
2*5MVA to 2*8MVA at Tiruchendur
33/11KV SS - 2 Nos.
To avoid over loading 1.00 (Per)CMDTANGEDCO
No.161/ dt.29.04.2014. 1.00 1.00 - - - - 1.00 - - 1.00 - -
18 Tirunelveli Tuticorin EDC DDUGJY
Enhancment of 33/11KV PT capacity from
1*3MVA to 1*8MVA at Ottanatham
33/11KV SS - 1 No.
To avoid over loading 0.57 (Per)CMDTANGEDCO
No.367/ dt.30.8.13. 0.57 0.57 - - - - 0.57 - - 0.57 - -
19 Tirunelveli Tuticorin EDC DDUGJY
Conversion of Single phase
Electromechanical meter to static meter. -
50000 Nos.
To fetch correct revenue 3.85 3.85 3.85 - - - - 3.85 - - 3.85 - -
20 Tirunelveli Tuticorin EDC DDUGJY
Conversion of Three phase
Electromechanical meter to static meter. -
27049 Nos.
To fetch correct revenue - - - - - - - - - - - - -
21 Tirunelveli Tuticorin EDC DDUGJY
33/11KV Nazareth SS to bifurcation of
existing Mill feeder & Enhancement of PT
& HVDS&Replacement of meters.
Adm.Appl.Accorded by CMD 3.08 (Per)CMD TAN-
GEDCO/Pro.No.15/dt. 8.1.16
To improve
distribution capacity
and to reduce line
loss
1.39 1.54 1.26 1.23 0.43 0.31 1.54 1.23 0.31 1.39 1.26 0.43
22 Tirunelveli Tuticorin EDC DDUGJY Erection of HVDS and Replacement of
Meters
To improve the HT Regulation and line
loss 16.70
(Per)CMD TANGEDCO
Pro.No.15/ dt. 8.1.16
To improve
distribution capacity
and to reduce line
loss
7.51 8.35 6.85 6.68 2.34 1.67 8.35 6.68 1.67 7.51 6.85 2.34
23 Tirunelveli Tuticorin EDC DDUGJY
33/11KV Kurumbur SS to bifurcation of
existing feeder & Addl. Power Transformer
& HVDS & Replacement of meters
To improve the HT Regulation and line
loss 2.70
(Per)CMD TANGEDCO
Pro.No.15/ dt. 8.1.16
To improve
distribution capacity
and to reduce line
loss
1.21 1.35 1.11 1.08 0.38 0.27 1.35 1.08 0.27 1.21 1.11 0.38
24 Tirunelveli Tuticorin EDC DDUGJY New SS & HVDSTo improve the HT Regulation and line
loss 4.50
(Per)CMD TAN-GEDCO
Pro.No.15/ dt. 8.1.16
To improve
distribution capacity
and to reduce line
loss
2.02 2.25 1.85 1.80 0.63 0.45 2.25 1.80 0.45 2.02 1.85 0.63
25 Tirunelveli Tuticorin EDC DDUGJY Enhancement of Power Transformer &
HVDS
To improve the HT Regulation and line
loss 3.03
(Per)CMD TAN-GEDCO
Pro.No.15/dt. 8.1.16
To improve
distribution capacity
and to reduce line
loss
1.37 1.52 1.24 1.21 0.42 0.30 1.52 1.21 0.30 1.37 1.24 0.42
![Page 177: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/177.jpg)
26 Tirunelveli Tuticorin EDC
Any other related
works including
less than one
crore works
totally
- - - - - - - - - - - - -
1 TrichyTrichy Metro
EDCCapital
Extension of LT & LT CT, HT Supply to
various tariff services 2016-19
1,00,000scs
To provide new scs 40.00
Based on the application from
consumer and approved by
the competent authorities
Increase the revenue
to Tangedco 11.70 13.00 13.90 14.00 13.10 13.00 13.00 14.00 13.00 11.70 13.90 13.10
2 TrichyTrichy Metro
EDC
CAPITAL -
National
Electricity Fund
Scheme (NEFS)
Replacement of aged conductor Capital works for system improvement 16.38
(Per) CMD TANGEDCO
Proceedings No.100 dt
08.03.2013 and tecnically
sanctioneded as
14.645/C.72/2015-16
To avoid accident 4.91 5.46 5.46 5.46 6.01 5.46 5.46 5.46 5.46 4.91 5.46 6.01
3 TrichyTrichy Metro
EDC
CAPITAL -
National
Electricity Fund
Scheme (NEFS)
Replacement of damaged poles Capital works for system improvement 9.03
(Per) CMD TANGEDCO
Proceedings No.100 dt
08.03.2013 and tecnically
sanctioneded as
14.645/C.72/2015-17
To avoid accident 2.71 3.01 3.01 3.01 3.31 3.01 3.01 3.01 3.01 2.71 3.01 3.31
4 TrichyTrichy Metro
EDCCapital
Erection of 2 Nos 8 MVA Power
Transformer at Pannankombu 33/11 kV SST& D Plan 6.31
Land available.Proposal sent
on 29.07.15To reduce line loss 6.31 6.31 - - - - 6.31 - - 6.31 - -
5 TrichyTrichy Metro
EDCCapital
Indoor compact 33 kV SS atMalaikoil
33/11 kV SST& D Plan 6.00
Land available. Proposal sent
on 30.05.2016To reduce line loss 6.00 6.00 - - - - 6.00 - - 6.00 - -
6 TrichyTrichy Metro
EDCCapital
Proposed new 33 kV SS at Elurpatty 33/11
kV SST& D Plan 5.00
Land acquisition under
progress & proposal yet to be
submitted to Head quarters
To reduce line loss - - 5.00 5.00 - - - 5.00 - - 5.00 -
7 TrichyTrichy Metro
EDCCapital
Proposed new 33 kV SS at Sethurapatty
33/11 kV SST& D Plan 5.00
Land acquisition under
progress & proposal yet to be
submitted to Head quarters
To effect more
number of industrial
services
- - 5.00 5.00 - - - 5.00 - - 5.00 -
8 TrichyTrichy Metro
EDCCapital
Proposed new 33 kV SS at Pachamalai
33/11 kV SST& D Plan 5.00
Land acquisition under
progress & proposal yet to be
submitted to Head quarters
To avoid breakdown
& line loss - - 5.00 5.00 - - - 5.00 - - 5.00 -
9 TrichyTrichy Metro
EDCCapital
Proposed new 33 kV SS AT UKT malai
33/11 kV SS
T& D
Plan 10.00
Land acquisition under
progress & proposal yet to be
submitted to Head quarters
to avoid low
voltage& line loss - - 10.00 10.00 - - - 10.00 - - 10.00 -
10 TrichyTrichy Metro
EDCImprovement
Improvement works- SS, Enhancement of
Pr.Trs in sub stations, sub station related
works.
To improve the network and Load
growth 6.82
Based on the necessity and
approved by the competent
authorities
To improve the
network 2.89 3.21 2.12 2.00 1.65 1.61 3.21 2.00 1.61 2.89 2.12 1.65
11 TrichyTrichy Metro
EDCImprovement
Improvement works- Erection of DT, New
HT feeders, strengthening of HT cables,
Laying LT cable and erection of pillar
boxes.
To improve the network and Load
growth 15.95
Based on the necessity and
approved by the competent
authorities
To improve the
network 2.64 2.93 5.60 5.90 7.00 7.12 2.93 5.90 7.12 2.64 5.60 7.00
12 TrichyTrichy Metro
EDCRAPDRP
33/11kV New Sub Station at
Mainguardgate (Devadhanam) with 2*8
MVA Power Transformers
To meet out load growth 0.30
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
To meet out load
growth 0.30 0.30 - - - - 0.30 - - 0.30 - -
13 TrichyTrichy Metro
EDCRAPDRP
33/11kV New Sub Station at
Edamalaipattipudur with 2 *8 MVA Power
Transformers (instead of Cholanparai)
To meet out load growth 1.12
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
To meet out load
growth 1.12 1.12 - - - - 1.12 - - 1.12 - -
14 TrichyTrichy Metro
EDCRAPDRP
33/11kV New Sub Station at Varaganeri
with 2*8 MVA Power transformersTo meet out load growth 0.87
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
To meet out load
growth 0.87 0.87 - - - - 0.87 - - 0.87 - -
![Page 178: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/178.jpg)
15 TrichyTrichy Metro
EDCRAPDRP
Provision of 33 kV Bay extensions at 110
kV SS for the Sub stations & 11 kV Bay
extension for SCADA feeder in
Mannarpuram SS
Source for the new SS 0.39
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
For provision of
source 0.39 0.39 - - - - 0.39 - - 0.39 - -
16 TrichyTrichy Metro
EDCRAPDRP
Extension of new 33 kV Line with ACSR
6/4.72mm and 7/1.57 mm DOG
Conductor & Laying of 33 kV UG cable
Source line for the newly proposed 33
kV SS 5.95
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
Reduction of AT&C
loss 5.95 5.95 - - - - 5.95 - - 5.95 - -
17 TrichyTrichy Metro
EDCRAPDRP
Extension of new 11 kV feeder using
ACSR conductors & ABC cable and laying
of 11 kV UG cable
To meet out load growth 3.99
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
Reduction of AT&C
loss 3.99 3.99 - - - - 3.99 - - 3.99 - -
18 TrichyTrichy Metro
EDCRAPDRP
Strengthening of 1 Km of 11kV
Line from lower size conductors to ACSR
Raccoon 7/4.09 mm with insertion of poles
Load bifurcation to reduce outages and
to enhance operation flexibility 3.63
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
Reduction of AT&C
loss 3.63 3.63 - - - - 3.63 - - 3.63 - -
19 TrichyTrichy Metro
EDCRAPDRP
Strengthening of existing LT 3 phase 4
wire line with lower size conductor to
7/3.35 ACSR Rabbit
Load bifurcation to reduce outages and
to enhance operation flexibility 6.17
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
Reduction of AT&C
loss 6.17 6.17 - - - - 6.17 - - 6.17 - -
20 TrichyTrichy Metro
EDCRAPDRP Erection of new DTs and HVDS DTs To offer load relief to the existing DTs 29.34
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
Reduction of AT&C
loss 29.34 29.34 - - - - 29.34 - - 29.34 - -
21 TrichyTrichy Metro
EDCRAPDRP
Replacement of 3 phase & single phase
electromechanical meters by static meters
Accurate recording of consumption and
also to avoid human error in taking
reading
6.97
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
Reduction of AT&C
loss 6.97 6.97 - - - - 6.97 - - 6.97 - -
22 TrichyTrichy Metro
EDCRAPDRP
18 kVAR, 36 kVAR & 72 kVAR APFC
panels installed and commiSSioned in 100
kVA, 250 kVA & 500 kVA DTs
Power factor improvement 1.05
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
Reduction of AT&C
loss 0.28 0.31 0.31 0.31 0.46 0.43 0.31 0.31 0.43 0.28 0.31 0.46
23 TrichyTrichy Metro
EDCRAPDRP Erection of 141 nos of RMU
Reduction of outages and ensuring
consumer satisfaction 0.29
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
Remote operation for
back feeding purpose 0.29 0.29 - - - - 0.29 - - 0.29 - -
24 TrichyTrichy Metro
EDCRAPDRP
XLPE UG cable & acceSSories required
for 11kV RMU
Reduction of outages and ensuring
consumer satisfaction 0.07
CMD TANGEDCO
proceedings No:124 dt
8.04.2012
Remote operation for
back feeding purpose 0.07 0.07 - - - - 0.07 - - 0.07 - -
25 TrichyTrichy Metro
EDCRAPDRP Erection of 241 nos of Sectionalisers
Easy isolation of 11 kV fault portion
and reduce the duration of outage. 1.05
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
Remote operation for
back feeding purpose 1.05 1.05 - - - - 1.05 - - 1.05 - -
26 TrichyTrichy Metro
EDCIPDS
Erection of 1 no new 33 kV SS
Vidhathilampatty at Manaparai To meet out load growth 2.12
CMD TANGEDCO
proceedings No:15 dt
8.01.2016
To meet out load
growth 0.90 1.00 1.00 1.00 0.22 0.12 1.00 1.00 0.12 0.90 1.00 0.22
27 TrichyTrichy Metro
EDCIPDS
Erection of 1 no new 33 kV Kallakudy SS
at Kallakudy To meet out load growth 1.46
CMD TANGEDCO
proceedings No:15 dt
8.01.2016
To meet out load
growth 0.45 0.50 0.50 0.50 0.51 0.46 0.50 0.50 0.46 0.45 0.50 0.51
28 TrichyTrichy Metro
EDCIPDS
Erection of 1 no new 33 kV Sirugamani SS
at Sirugamani town panchayat To meet out load growth 2.12
CMD TANGEDCO
proceedings No:15 dt
8.01.2016
To meet out load
growth 0.90 1.00 1.00 1.00 0.22 0.12 1.00 1.00 0.12 0.90 1.00 0.22
29 TrichyTrichy Metro
EDCIPDS
Erection of 1 no new 33 kV
Balakrishanampatty SS at
Balakrishnampatty town panchayat
To meet out load growth 1.46
CMD TANGEDCO
proceedings No:15 dt
8.01.2016
To meet out load
growth 0.45 0.50 0.50 0.50 0.51 0.46 0.50 0.50 0.46 0.45 0.50 0.51
30 TrichyTrichy Metro
EDCIPDS
Renovation & modernisation of 33 kV
Kattuputhur SSAged breaker replacement 0.30
CMD TANGEDCO
proceedings No:15 dt
8.01.2016
Reduction of AT&C
loss 0.09 0.10 0.10 0.10 0.11 0.10 0.10 0.10 0.10 0.09 0.10 0.11
31 TrichyTrichy Metro
EDCIPDS
Erection of new 33 kV feeders with ACSR
conductor & laying of UG cable
Source line for the newly proposed 33
kV SS 1.83
CMD TANGEDCO
proceedings No:15 dt
8.01.2016
Reduction of AT&C
loss 0.54 0.60 0.60 0.60 0.69 0.63 0.60 0.60 0.63 0.54 0.60 0.69
32 TrichyTrichy Metro
EDCIPDS
Erection of new 11 kV feeders with ACSR
conductor
Load bifurcation to reduce outages and
to enhance operation flexibility 9.99
CMD TANGEDCO
proceedings No:15 dt
8.01.2016
Reduction of AT&C
loss 2.70 3.00 3.00 3.00 4.29 3.99 3.00 3.00 3.99 2.70 3.00 4.29
33 TrichyTrichy Metro
EDCIPDS
Replacement of existing OH line by Aerial
Bunched Cable (Both HT & LT)
Easy identification of fault and to avoid
electrical accident. 2.24
CMD TANGEDCO
proceedings No:15 dt
8.01.2016
Reduction of AT&C
loss 0.90 1.00 1.00 1.00 0.34 0.24 1.00 1.00 0.24 0.90 1.00 0.34
![Page 179: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/179.jpg)
34 TrichyTrichy Metro
EDCIPDS
Replacement of existing LT OH line by
UG Cable
Easy identification of fault and to avoid
electrical accident. 0.73
CMD TANGEDCO
proceedings No:15 dt
8.01.2016
Reduction of AT&C
loss 0.18 0.20 0.20 0.20 0.35 0.33 0.20 0.20 0.33 0.18 0.20 0.35
35 TrichyTrichy Metro
EDCIPDS
22/11 kV Bay Extension at 110 kV SS for
the newly proposed feeders
Load bifurcation to reduce outages and
to enhance operation flexibility 0.56
CMD TANGEDCO
proceedings No:15 dt
8.01.2016
Reduction of AT&C
loss 0.18 0.20 0.20 0.20 0.18 0.16 0.20 0.20 0.16 0.18 0.20 0.18
36 TrichyTrichy Metro
EDCIPDS
Erection of new LT line using ACSR
conductor
Load bifurcation to reduce outages and
to enhance operation flexibility 1.55
CMD TANGEDCO
proceedings No:15 dt
8.01.2016
Reduction of AT&C
loss 0.45 0.50 0.50 0.50 0.60 0.55 0.50 0.50 0.55 0.45 0.50 0.60
37 TrichyTrichy Metro
EDCIPDS
Strengthening of LT line of lower size to
7/3.55 mm ACSR conductor
To augument the current carrying
capacity of the conductor 1.95
CMD TANGEDCO
proceedings No:15 dt
8.01.2016
Reduction of AT&C
loss 0.63 0.70 0.70 0.70 0.62 0.55 0.70 0.70 0.55 0.63 0.70 0.62
38 TrichyTrichy Metro
EDCIPDS
Erection of 5 nos 1 X 2.4 MVAR
capacitor bank in the newly proposed 33
kV SS & in the existing 33 kV Kattupudur
SS
Power factor improvement 1.23
CMD TANGEDCO
proceedings No:15 dt
8.01.2016
Reduction of AT&C
loss 0.45 0.50 0.50 0.50 0.28 0.23 0.50 0.50 0.23 0.45 0.50 0.28
39 TrichyTrichy Metro
EDCIPDS
Erection of 179 nos of HVDS Distribution
Transformers
To reduce HT - LT ratio to ensure
reduction of 4.03
CMD TANGEDCO
proceedings No:15 dt
8.01.2016
Reduction of AT&C
loss 1.35 1.50 1.50 1.50 1.18 1.03 1.50 1.50 1.03 1.35 1.50 1.18
40 TrichyTrichy Metro
EDCIPDS
Replacement of Three phase & single
phase electromechanical meters by static
meters
Accurate recording of consumption and
also to avoid human error in taking
reading
8.37
CMD TANGEDCO
proceedings No:15 dt
8.01.2016
Reduction of AT&C
loss 2.70 3.00 3.00 3.00 2.67 2.37 3.00 3.00 2.37 2.70 3.00 2.67
41 TrichyTrichy Metro
EDCIPDS
Provision of Solar panel on roof top of
TNEB buildings wirthin project area & on
roof top of proposed SS and exisiting
Kattupudur SS
To meet out load growth 0.88
CMD TANGEDCO
proceedings No:15 dt
8.01.2016
Reduction of AT&C
loss 0.30 0.33 0.33 0.33 0.25 0.22 0.33 0.33 0.22 0.30 0.33 0.25
42 TrichyTrichy Metro
EDCIPDS
Others (Such as 33 kV Railway
croSSing,33 kV DP & 11 kV DP)To meet out load growth 2.55
CMD TANGEDCO
proceedings No:15 dt
8.01.2016
Reduction of AT&C
loss 0.90 1.00 1.00 1.00 0.65 0.55 1.00 1.00 0.55 0.90 1.00 0.65
43 TrichyTrichy Metro
EDCIPDS
Land to be purchased for the newly
proposed 3 nos 33 kV substationsTo meet out load growth 10.16
CMD TANGEDCO
proceedings No:15 dt
8.01.2016
Reduction of AT&C
loss 4.50 5.00 5.00 5.00 0.66 0.16 5.00 5.00 0.16 4.50 5.00 0.66
1 Trichy
Thiruvarur
EDC -
Thiruvarur
CapitalExtension of LT & LT CT, HT Supply to
27900 Nos various tariff servicesNew service connections effected 45.22
TANGEDCO, Thiurvarur
Circle
Adding of
Consumers 13.56 15.07 15.07 15.07 15.08 15.08 15.07 15.07 15.08 13.56 15.07 15.08
2 Trichy
Thiruvarur
EDC -
Thiruvarur
Improvement
Improvement works- Erection of DT, New
HT feeders, strengthening of HT cables,
Laying LT cable and erection of pillar
boxes.
To improve the network and Load
growth 11.16
TANGEDCO, Thiurvarur
Circle
To reduce line loss
and improve system
voltage
3.35 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.72 3.35 3.72 3.72
3 Trichy
Thiruvarur
EDC -
Thiruvarur
NEFS Reconductoring of LT/HT line under NEFS
Scheme
To improve the tail end voltage and
reduce the line loss 9.83
TANGEDCO, Thiurvarur
Circle
To improve the tail
end voltage and
reduce the line loss
2.95 3.28 3.28 3.28 3.60 3.27 3.28 3.28 3.27 2.95 3.28 3.60
4 Trichy
Thiruvarur
EDC -
Thiruvarur
ImprovementEstablishment of 33 kVsub stations at
Edamelaiyur
To improve the tail end voltage and
reduce the line loss 2.50 To be sanctioned by board
To improve the tail
end voltage and
reduce the line loss
2.50 2.50 - - - - 2.50 - - 2.50 - -
5 Trichy
Thiruvarur
EDC -
Thiruvarur
ImprovementEstablishment of additional power
transformer in Sitheri 33 kV SS
To improve the tail end voltage and
reduce the line loss 1.25 To be sanctioned by board
To improve the tail
end voltage and
reduce the line loss
- - 1.25 1.25 - - - 1.25 - - 1.25 -
6 Trichy
Thiruvarur
EDC -
Thiruvarur
ImprovementEstablishment of 33 kV sub stations at
Arasavanakadu
To improve the tail end voltage and
reduce the line loss 2.50 To be sanctioned by board
To improve the tail
end voltage and
reduce the line loss
- - 2.50 2.50 - - - 2.50 - - 2.50 -
7 Trichy
Thiruvarur
EDC -
Thiruvarur
ImprovementEstablishment of additional power
transformer in Tiruvarur 33 kV urban SS
To improve the tail end voltage and
reduce the line loss 1.25 To be sanctioned by board
To improve the tail
end voltage and
reduce the line loss
- - - - 1.12 1.25 - - 1.25 - - 1.12
8 Trichy
Thiruvarur
EDC -
Thiruvarur
ImprovementEstablishment of 33 kV sub stations at
Katchanam SS
To improve the tail end voltage and
reduce the line loss 2.50 To be sanctioned by board
To improve the tail
end voltage and
reduce the line loss
- - - - 2.25 2.50 - - 2.50 - - 2.25
![Page 180: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/180.jpg)
9 Trichy
Thiruvarur
EDC-
Mannargudi
Town
RAPDRP -
DSW
40.3 KM Extension of 11 kV line with
7/4.09 mm ACSR
Load Bifurcation to reduce outages and
to enhance operation flexibility 1.28
CMD TANGEDCO
Proceedings No.124
dt.08.04.11
To reduce the Line
loss, etc 1.28 1.28 - - - - 1.28 - - 1.28 - -
10 Trichy
Thiruvarur
EDC-
Mannargudi
Town
RAPDRP -
DSW
6.6 KM Strengthening of 11 kV line from
lower size conductor to 7/4.09 mm ACSR
with insertion of poles
System strengthening works 0.15
CMD TANGEDCO
Proceedings No.124
dt.08.04.11
To reduce the Line
loss, etc 0.15 0.15 - - - - 0.15 - - 0.15 - -
11 Trichy
Thiruvarur
EDC-
Mannargudi
Town
RAPDRP -
DSW
30.04 KM Strengthening of LT 3 phase
4wire line with lower size/equivalent
conductor into 7/3.35 mm ACSR
conductor on same supports.
System strengthening works 0.58
CMD TANGEDCO
Proceedings No.124
dt.08.04.11
To reduce the Line
loss, etc 0.58 0.58 - - - - 0.58 - - 0.58 - -
12 Trichy
Thiruvarur
EDC-
Mannargudi
Town
RAPDRP -
DSW
8.0 KM conversion of LT single phase to
three phase 4 wire lineSystem strengthening works 0.21
CMD TANGEDCO
Proceedings No.124
dt.08.04.11
To reduce the Line
loss, etc 0.21 0.21 - - - - 0.21 - - 0.21 - -
13 Trichy
Thiruvarur
EDC-
Mannargudi
Town
RAPDRP -
DSW
74 No erection of 25 kVA , 11 kV /433V,
Single pole mounted transformer on 9 Mtrs
RCC pole(square section)
To reduce HT/LT ratio to ensure
reduction of affecting consumers during
outages.
1.07
CMD TANGEDCO
Proceedings No.124
dt.08.04.11
To reduce the Line
loss, etc 1.07 1.07 - - - - 1.07 - - 1.07 - -
14 Trichy
Thiruvarur
EDC-
Mannargudi
Town
RAPDRP -
DSW
88 Nos erection of double pole Distribution
transformer structure with 40 kVA , 11 kV
/433 v Distribution transformer
To reduce HT/LT ratio 1.10
CMD TANGEDCO
Proceedings No.124
dt.08.04.11
To reduce the Line
loss, etc 1.10 1.10 - - - - 1.10 - - 1.10 - -
15 Trichy
Thiruvarur
EDC-
Mannargudi
Town
RAPDRP -
DSW
20 Nos erection of 100 kVA distribution
transformer
Replacing of existing higher capacity
DT(Degrading) 0.31
CMD TANGEDCO
Proceedings No.124
dt.08.04.11
To reduce the Line
loss, etc 0.31 0.31 - - - - 0.31 - - 0.31 - -
16 Trichy
Thiruvarur
EDC-
Mannargudi
Town
RAPDRP -
DSW
Provision of wedge connectors for DT
structure -99 Nos.
To reduce contact resistance and ensure
proper connection at joints 0.11
CMD TANGEDCO
Proceedings No.124
dt.08.04.11
To reduce the Line
loss, etc 0.11 0.11 - - - - 0.11 - - 0.11 - -
17 Trichy
Thiruvarur
EDC-
Mannargudi
Town
RAPDRP -
DSW
Provision of wedge connectors at LT
cutpoints and joints - 1350 Nos
To reduce contact resistance and ensure
proper connection at joints 0.14
CMD TANGEDCO
Proceedings No.124
dt.08.04.11
To reduce the Line
loss, etc 0.14 0.14 - - - - 0.14 - - 0.14 - -
18 Trichy
Thiruvarur
EDC-
Mannargudi
Town
RAPDRP -
DSW 25 Nos. Renovation of DT earthing For effective earthing 0.02
CMD TANGEDCO
Proceedings No.124
dt.08.04.11
For effective earthing 0.02 0.02 - - - - 0.02 - - 0.02 - -
19 Trichy
Thiruvarur
EDC-
Mannargudi
Town
RAPDRP -
DSW APFC Pannel For power factor Improvement 0.04
CMD TANGEDCO
Proceedings No.124
dt.08.04.11
For power factor
improvement 0.04 0.04 - - - - 0.04 - - 0.04 - -
20 Trichy
Thiruvarur
EDC-
Thiruvarur
town
RAPDRP -
DSW
19.55 KM Extension of 11 kV line with
7/4.09 mm ACSR
Load Bifurcation to reduce outages and
to enhance operation flexibility 0.51
CMD TANGEDCO
Proceedings No.124
dt.08.04.11
To reduce the Line
loss, etc 0.51 0.51 - - - - 0.51 - - 0.51 - -
21 Trichy
Thiruvarur
EDC-
Thiruvarur
town
RAPDRP -
DSW
11.75 KM Strengthening of 11 kV line
from lower size conductor to 7/4.09 mm
ACSR with insertion of poles
System strengthening works 0.25
CMD TANGEDCO
Proceedings No.124
dt.08.04.11
To reduce the Line
loss, etc 0.25 0.25 - - - - 0.25 - - 0.25 - -
22 Trichy
Thiruvarur
EDC-
Thiruvarur
town
RAPDRP -
DSW
18.005 KM Strengthening of LT 3 phase
4wire line with lower size/equivalent
conductor into 7/3.35 mm ACSR
conductor on same supports.
System strengthening works 0.35
CMD TANGEDCO
Proceedings No.124
dt.08.04.11
To reduce the Line
loss, etc 0.35 0.35 - - - - 0.35 - - 0.35 - -
![Page 181: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/181.jpg)
23 Trichy
Thiruvarur
EDC-
Thiruvarur
town
RAPDRP -
DSW
28 No erection of 25 kVA , 11 kV /433 V
,Single pole mounted transformer on 9
Mtrs RCC pole (square section)
To reduce HT/LT ratio to ensure
reduction of affecting consumers during
outages.
0.35
CMD TANGEDCO
Proceedings No.124
dt.08.04.11
To reduce the Line
loss, etc 0.35 0.35 - - - - 0.35 - - 0.35 - -
24 Trichy
Thiruvarur
EDC-
Thiruvarur
town
RAPDRP -
DSW
62 Nos erection of double pole Distribution
transformer structure with 40 kVA , 11 kV
/433V Distribution transformer
To reduce HT/LT ratio 0.58
CMD TANGEDCO
Proceedings No.124
dt.08.04.11
To reduce the Line
loss, etc 0.58 0.58 - - - - 0.58 - - 0.58 - -
25 Trichy
Thiruvarur
EDC-
Thiruvarur
town
RAPDRP -
DSW
Provision of wedge connectors for DT
structure -90 Nos.
To reduce contact resistance and ensure
proper connection at joints 0.10
CMD TANGEDCO
Proceedings No.124
dt.08.04.11
To reduce the Line
loss, etc 0.10 0.10 - - - - 0.10 - - 0.10 - -
26 Trichy
Thiruvarur
EDC-
Thiruvarur
town
RAPDRP -
DSW
Provision of wedge connectors at LT
cutpoints and joints - 1000 Nos
To reduce contact resistance and ensure
proper connection at joints 0.11
CMD TANGEDCO
Proceedings No.124
dt.08.04.11
To reduce the Line
loss, etc 0.11 0.11 - - - - 0.11 - - 0.11 - -
27 Trichy
Thiruvarur
EDC-
Thiruvarur
town
RAPDRP -
DSW
Replacement of electromechanical meters
single phase 5-20 Amps.For accurate assessment 0.30
CMD TANGEDCO
Proceedings No.124
dt.08.04.11
For effective energy
audit 0.30 0.30 - - - - 0.30 - - 0.30 - -
28 Trichy
Thiruvarur
EDC-
Thiruvarur
town
RAPDRP -
DSW APFC Pannel For power factor Improvement 0.06
CMD TANGEDCO
Proceedings No.124
dt.08.04.11
For power factor
improvement 0.06 0.06 - - - - 0.06 - - 0.06 - -
29 Trichy
Thiruvarur
EDC-
Thiruvarur
town
DDUGJY Consumer metering TANGEDCO Revenue augumentation 3.96 As per DPR
TANGEDCO
Revenue
augmentation
1.78 1.98 2.18 1.98 - - 1.98 1.98 - 1.78 2.18 -
30 Trichy
Thiruvarur
EDC-
Thiruvarur
town
DDUGJY Establishment of 33 kV new Neelakudi SS 11 kV line loss savings 2.50
Per TANTRANSCO
Proceedings No.44 dt
19.05.2015
11 kV line loss
savings 2.50 2.50 - - - - 2.50 - - 2.50 - -
31 Trichy
Thiruvarur
EDC-
Thiruvarur
town
DDUGJY Establishment of 33 kV new Kottur SS 11 kV line loss savings 3.58
Per TANGEDCO
Proceedings No.538 dt
17.12.2015
3.58 3.58 - - - - 3.58 - - 3.58 - -
32 Trichy
IPDS - (8
Nos.Town
Panchayat)
IPDS1 No 33/11 kV SS: New SS at
Thiruthuraipoondi.System strengthening works 2.12
CMD TANGEDCO
Proceedings No.15dt.8.1.16
To reduce the Line
loss, etc 0.95 1.06 0.87 0.85 0.30 0.21 1.06 0.85 0.21 0.95 0.87 0.30
33 Trichy
IPDS - (8
Nos.Town
Panchayat)
IPDS1*8MVA Additional Power Transformer at
33/11 kV SS Koothanallur.System strengthening works 1.26
CMD TANGEDCO
Proceedings No.15dt.8.1.16
To reduce the Line
loss, etc 0.57 0.63 0.52 0.51 0.17 0.12 0.63 0.51 0.12 0.57 0.52 0.17
34 Trichy
IPDS - (8
Nos.Town
Panchayat)
IPDS6.0 KM 33 kV new feeders/Bifurcation of
feedersSystem strengthening works 0.48
CMD TANGEDCO
Proceedings No.15dt.8.1.16
To reduce the Line
loss, etc 0.22 0.24 0.19 0.19 0.07 0.05 0.24 0.19 0.05 0.22 0.19 0.07
35 Trichy
IPDS - (8
Nos.Town
Panchayat)
IPDS63.5 KM 11 kV Line New Feeder/ Feeder
BifurcationSystem strengthening works 4.49
CMD TANGEDCO
Proceedings No.15dt.8.1.16
To reduce the Line
loss, etc 2.02 2.24 1.84 1.80 0.63 0.45 2.24 1.80 0.45 2.02 1.84 0.63
36 Trichy
IPDS - (8
Nos.Town
Panchayat)
IPDS 1 KM Arial Bunched Cable System strengthening works 0.07 CMD TANGEDCO
Proceedings No.15dt.8.1.16
To reduce the Line
loss, etc 0.03 0.03 0.03 0.03 0.01 0.01 0.03 0.03 0.01 0.03 0.03 0.01
37 Trichy
IPDS - (8
Nos.Town
Panchayat)
IPDS UG Cable (LT -1KM & HT- 1.2 KM) System strengthening works 0.48 CMD TANGEDCO
Proceedings No.15dt.8.1.16
To reduce the Line
loss, etc 0.22 0.24 0.19 0.19 0.07 0.05 0.24 0.19 0.05 0.22 0.19 0.07
38 Trichy
IPDS - (8
Nos.Town
Panchayat)
IPDS24.75 KM LT Line : New Feeder/ Feeder
Bifurcation
To reduce AT&C loss in Town
panchayat area. 1.22
CMD TANGEDCO
Proceedings No.15dt.8.1.16
To reduce the Line
loss, etc 0.55 0.61 0.50 0.49 0.17 0.12 0.61 0.49 0.12 0.55 0.50 0.17
![Page 182: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/182.jpg)
39 Trichy
IPDS - (8
Nos.Town
Panchayat)
IPDS67.0 KM LT Line Augmentation/
Reconductoring
To reduce AT&C loss in Town
panchayat area. 2.14
CMD TANGEDCO
Proceedings No.15dt.8.1.16
To reduce the Line
loss, etc 0.96 1.07 0.88 0.86 0.30 0.21 1.07 0.86 0.21 0.96 0.88 0.30
40 Trichy
IPDS - (8
Nos.Town
Panchayat)
IPDS
HVDS - 143 Nos.Distribution Transformer
(63 kVA - 30 , 40kVA - 42 & 25 kVA -
71)
To reduce HT - LT ratio to ensure
reduction of Affecting consumers
during outages
2.92 CMD TANGEDCO
Proceedings No.15dt.8.1.16
To reduce the Line
loss, etc 1.31 1.46 1.20 1.17 0.41 0.29 1.46 1.17 0.29 1.31 1.20 0.41
41 Trichy
IPDS - (8
Nos.Town
Panchayat)
IPDS
Metering - 37274 Nos.(Feeder ,
Ringfencing,DT,Single phase & Three
phase meters).
For accurate assessment 5.07 CMD TANGEDCO
Proceedings No.15dt.8.1.16
For accurate
assessment 2.28 2.53 2.08 2.03 0.71 0.51 2.53 2.03 0.51 2.28 2.08 0.71
42 Trichy
IPDS - (8
Nos.Town
Panchayat)
IPDS Provision of solar panel - 40 KW For alternate source 0.28 CMD TANGEDCO
Proceedings No.15dt.8.1.16For alternate source 0.13 0.14 0.11 0.11 0.04 0.03 0.14 0.11 0.03 0.13 0.11 0.04
43 Trichy
IPDS - (8
Nos.Town
Panchayat)
IPDSProvision of Deposited Bank (1*2.4
MVAR)To Improve Power Factor 0.25
CMD TANGEDCO
Proceedings No.15dt.8.1.16
To Improve Power
Factor 0.11 0.12 0.10 0.10 0.04 0.03 0.12 0.10 0.03 0.11 0.10 0.04
44 Trichy
IPDS - (8
Nos.Town
Panchayat)
IPDSOther Works (Street control switches &
Railway croSSings)For Safety 0.26
CMD TANGEDCO
Proceedings No.15dt.8.1.16To Provide Safety 0.12 0.13 0.10 0.10 0.04 0.03 0.13 0.10 0.03 0.12 0.10 0.04
45 Trichy
IPDS - (8
Nos.Town
Panchayat)
DCWShifting of HT/LT line, poles, strcutrue on
party requestRoad infrastructure development 8.82
TANGEDCO, Thiurvarur
Circle
Road infrastructure
development 2.65 2.94 2.94 2.94 3.23 2.94 - - - - - -
1 Trichy Karur EDC CapitalExtension of LT & LT CT, HT Supply to
15000 Nos various tariff servicesNew service connections effected 2.80
Based on the application from
the consumers, approval was
accorded by the competent
authorities
Adding consumers 2.80 2.80 - - - - 2.80 - - 2.80 - -
2 Trichy Karur EDC Capital
Establishment of 33 kV sub stations at
S.Vellalapatty & Vairamadai and Karur
Town North
To improve the network and Load
growth 22.20
Approved by the competent
authority as per the field
proposal
To reduce the Line
loss, etc 12.69 14.10 9.51 8.10 - - 14.10 8.10 - 12.69 9.51 -
3 Trichy Karur EDC Improvement
Improvement works- SS, Enhancement of
Pr.Trs in sub stations, sub station related
works.
To improve the network and Load
growth 4.52
Approved by the competent
authority as per the field
proposal
To reduce the Line
loss, etc 4.52 4.52 - - - - 4.52 - - 4.52 - -
4 Trichy Karur EDC Improvement
Improvement works- Erection of DT, New
HT feeders, strengthening of HT cables,
Laying LT cable and erection of pillar
boxes.
To improve the network and Load
growth 4.09
Approved by the competent
authority as per the field
proposal
To reduce the Line
loss, etc 4.09 4.09 - - - - 4.09 - - 4.09 - -
5 Trichy Karur EDC
RAPDRP
Scheme I (Part
A/Part B)
Erection of New DTs-100, HVDS 345,
APFC, Capacitor Bank etc.
To reduce AT&C loss of the project
towns 9.72
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
Reduction of AT&C
loss 9.72 9.72 - - - - 9.72 - - 9.72 - -
6 Trichy Karur EDC DDUGJY
D.connection/ Unconnecting Households
by erection of LT lines, E.Metering,
replacement of Electromechanical meter by
Static meter
Improvement in Distribution network 3.31 REC/Chn/DDUGJY/215-
16/702 dt 05.01.2016
Reduction of AT&C
loss 1.49 1.66 1.82 1.65 - - 1.66 1.65 - 1.49 1.82 -
7 Trichy Karur EDC DDUGJY
System strengthening, New 33/11 kV SS
Proposed in Kosur, Kuppuchiplayam and
Renganathapuram , capacitor Bank,
Erection of 33 kV and 11 kV associated
lines etc
Improvement in Distribution network 14.34 REC/Chn/DDUGJY/215-
16/702 dt 05.01.2016
Reduction of AT&C
loss 6.45 7.17 7.89 7.17 - - 7.17 7.17 - 6.45 7.89 -
8 Trichy Karur EDC IPDS
New 33/11 kV SS Proposed in
Aravakuruchi, Kulithalai and
Uppidamangalam , feeder bifurcation, HT
line augmentation etc.
Improvement in Distribution network 32.88
CMD TANGEDCO
proceedings No:15 dt
08.01.16
Reduction of AT&C
loss 11.83 13.15 13.15 13.15 7.90 6.58 13.15 13.15 6.58 11.83 13.15 7.90
9 Trichy Karur EDC NEFSReplacement of damaged poles &
conductorsImprovement in Distribution network 16.02
CMD TANGEDCO
proceedings No:90 dt
04.03.2013
Reduction of AT&C
loss 5.77 6.41 6.41 6.41 3.84 3.20 6.41 6.41 3.20 5.77 6.41 3.84
10 Trichy Karur EDC DCWShifting of HT/LT lines as per party's
request
Shifting of HT/LT lines as per party's
request 0.51
Approved by the competent
authority as per the field
proposal
As per party's request 0.51 0.51 - - - - - - - - - -
1 TrichyPudukkottai
EDCCapital
Extension of LT & LTCT, HT Supply to
Nos. various tariff servicesNew service connections effected 105.83 NA 27.75 30.83 34.58 35.00 39.50 40.00 30.83 35.00 40.00 27.75 34.58 39.50
![Page 183: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/183.jpg)
2 TrichyPudukkottai
EDCImprovement
Improvement works- SS,Enhancement of
Pr.Trs in sub stations, sub station related
works.
To improve the network to meetout the
Load growth 15.70 NA 4.50 5.00 5.63 5.70 5.07 5.00 5.00 5.70 5.00 4.50 5.63 5.07
3 TrichyPudukkottai
EDCImprovement
Improvement works- Erection of DT,New
HT feeders, strengthening of HT cables,
Laying LT cable and erection of pillar
boxes.
To improve the network to meet out the
Load growth 35.22 NA 7.40 8.22 11.62 12.00 14.70 15.00 8.22 12.00 15.00 7.40 11.62 14.70
4 TrichyPudukkottai
EDC
RAPDRP -
DSW
Installation of 63kVA/11kV Distribution
transformers to replace higher capacity DTsTo offer load relief to the existing DTs 0.17 0.17 0.17 - - - - 0.17 - - 0.17 - -
5 TrichyPudukkottai
EDC
RAPDRP -
DSW
Installation of 100kVA/11kV Distribution
transformers to replace higher capacity DTsTo offer load relief to the existing DTs 0.18 0.18 0.18 - - - - 0.18 - - 0.18 - -
6 TrichyPudukkottai
EDC
RAPDRP -
DSW
Extension of 1 km of 11kV line with
7/3.35mm ACSR at 45m span on 9m PSC
poles 400 kg.working load and 75kg/sq.m
wind preSSure
Load bifurcation to reduce outages and
to enhance operation flexibility 0.85 0.85 0.85 - - - - 0.85 - - 0.85 - -
7 TrichyPudukkottai
EDC
RAPDRP -
DSW
Conversion of 1km of LT single phase,2
wire line into 3 phase 4 wire line on the
same support with ACSR Rabbit 7/3.35mm
conductor for both phase and neutral
To augument the current carrying
capacity of the conductor 0.17 0.17 0.17 - - - - 0.17 - - 0.17 - -
8 TrichyPudukkottai
EDC
RAPDRP -
DSW
Conversion of 1km of LT 3 phase 4 wire
line with lower size conductor to ACSR
Rabbit 7/3.35mm with insertion of 7 nos.
8m poles with 200kg working load
To augument the current carrying
capacity of the conductor 0.17 0.17 0.17 - - - - 0.17 - - 0.17 - -
9 TrichyPudukkottai
EDC
RAPDRP -
DSW
Erection of Double pole Distribution
Transformer structure with 40kVA,11kV
Distribution transformer
To reduce HT - LT ratio to ensure
reduction of Affecting consumers
during outages
0.66 0.66 0.66 - - - - 0.66 - - 0.66 - -
10 TrichyPudukkottai
EDC
RAPDRP -
DSW
Erection of Double pole Distribution
Transformer structure with 63kVA,11kV
Distribution transformer
To reduce HT - LT ratio to ensure
reduction of Affecting consumers
during outages
0.87 0.87 0.87 - - - - 0.87 - - 0.87 - -
11 TrichyPudukkottai
EDC
RAPDRP -
DSW
Erection of Double pole Distribution
Transformer structure with 100kVA, 11kV
star rated Distribution transformer on
structure with 9.14M G201 special RCC
poles
To reduce HT - LT ratio to ensure
reduction of Affecting consumers
during outages
0.64 0.64 0.64 - - - - 0.64 - - 0.64 - -
12 TrichyPudukkottai
EDC
RAPDRP -
DSW
Provision of wedge connectors per DT
structure (New D.Tr.)
To reduce contact resistance and ensure
proper connection at joints 0.06 0.06 0.06 - - - - 0.06 - - 0.06 - -
13 TrichyPudukkottai
EDC
RAPDRP -
DSW
Provision of wedge connectors at LT
cutpoints and joints per cutpoint
To reduce contact resistance and ensure
proper connection at joints 0.03 0.03 0.03 - - - - 0.03 - - 0.03 - -
14 TrichyPudukkottai
EDC
RAPDRP -
DSW Erection of 11kV double pole structure
To attend breakdown quikly &
minimise the affecting consumers due
to outages
0.05 0.05 0.05 - - - - 0.05 - - 0.05 - -
15 TrichyPudukkottai
EDC
RAPDRP -
DSW
Erection of 1 no.100 kVA 22kV/433V
Distribution transformer on structure with
9.14m G201 special RCC poles
To offer load relief to the existing DTs 0.31 0.31 0.31 - - - - 0.31 - - 0.31 - -
16 TrichyPudukkottai
EDC
RAPDRP -
DSW
Erection of new 63kVA/22kV distribution
transformers alone for derating existing
higher capacity DTs by introduction of
HVDS
To reduce HT - LT ratio to ensure
reduction of Affecting consumers
during outages
0.15 0.15 0.15 - - - - 0.15 - - 0.15 - -
17 TrichyPudukkottai
EDC
RAPDRP -
DSW
Erection of new 100kVA/22kV distribution
transformers alone for derating existing
higher capacity DTs by introduction of
HVDS
To reduce HT - LT ratio to ensure
reduction of Affecting consumers
during outages
0.66 0.66 0.66 - - - - 0.66 - - 0.66 - -
18 TrichyPudukkottai
EDC
RAPDRP -
DSW
Extension of 1 km of 22 kV line with
7/3.35mm ACSR at 45m span on 9m PSC
poles 400 kg.working load and 75kg/sq.m
wind preSSure
Load bifurcation to reduce outages and
to enhance operation flexibility 2.03 2.03 2.03 - - - - 2.03 - - 2.03 - -
![Page 184: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/184.jpg)
19 TrichyPudukkottai
EDC
RAPDRP -
DSW
Conversion of 1km of 22kV line with
7/2.59 mm ACSR Rabbit 7/3.35mm on the
same supports
To improve votage regulation, reduce
outages and to enhance operation
flexibility
0.05 0.05 0.05 - - - - 0.05 - - 0.05 - -
20 TrichyPudukkottai
EDC
RAPDRP -
DSW
Conversiom of 1km of 22kV line with
lower size/equivalent conductors toACSR
Racoon 7/4.09 mm on same supports
To improve votage regulation, reduce
outages and to enhance operation
flexibility
0.35 0.35 0.35 - - - - 0.35 - - 0.35 - -
21 TrichyPudukkottai
EDC
RAPDRP -
DSW
Conversion of 1km of LT single phase,2
wire line into 3 phase 4 wire line on the
same support with P-7/2.59mm ACSR
weasel and N-7/2.59mm ACSR weasel
To improve votage regulation, reduce
outages and to enhance operation
flexibility
0.57 0.57 0.57 - - - - 0.57 - - 0.57 - -
22 TrichyPudukkottai
EDC
RAPDRP -
DSW
Conversion of 1km of LT 3 phase 4 wire
line with lower size conductor to ACSR
Rabbit 7/3.35mm with insertion of 7 nos.
8m poles with 200kg working load
To improve votage regulation, reduce
outages and to enhance operation
flexibility
0.32 0.32 0.32 - - - - 0.32 - - 0.32 - -
23 TrichyPudukkottai
EDC
RAPDRP -
DSW
Conversion of 1km of LT 3 phase 4 wire
line with lower size/equivalent conductor to
ACSR Weasel 7/2.59mm with insertion of
poles
To improve votage regulation, reduce
outages and to enhance operation
flexibility
0.21 0.21 0.21 - - - - 0.21 - - 0.21 - -
24 TrichyPudukkottai
EDC
RAPDRP -
DSW
Erection of Double pole Distribution
Transformer structure with 40kVA,22kV
Distribution transformer(HVDS)
To reduce HT - LT ratio to ensure
reduction of Affecting consumers
during outages
1.13 1.13 1.13 - - - - 1.13 - - 1.13 - -
25 TrichyPudukkottai
EDC
RAPDRP -
DSW
Erection of conventional double pole DT
structure with 63kVA,22kV distribution
transformer(HVDS)
To reduce HT - LT ratio to ensure
reduction of Affecting consumers
during outages
3.07 3.07 3.07 - - - - 3.07 - - 3.07 - -
26 TrichyPudukkottai
EDC
RAPDRP -
DSW
Erection of double pole distribution
transformer structure with 100kVA,22kV
distribution transformer(HVDS)
To reduce HT - LT ratio to ensure
reduction of Affecting consumers
during outages
1.28 1.28 1.28 - - - - 1.28 - - 1.28 - -
27 TrichyPudukkottai
EDC
RAPDRP -
DSW
Running of 1 km single circuit 1.1kV 3
phase 5 wire power line on 9 mtr supports
with average span of 40 mtrs using
3*70+1*16+1*50 sqmm Aerial Bunched
Cables(ABC)
To avoid outages 1.93 1.93 1.93 - - - - 1.93 - - 1.93 - -
28 TrichyPudukkottai
EDC
RAPDRP -
DSW
Provision of wedge connectors per DT
structure
To reduce contact resistance and ensure
proper connection at joints 0.16 0.16 0.16 - - - - 0.16 - - 0.16 - -
29 TrichyPudukkottai
EDC
RAPDRP -
DSW
Provision of wedge connectors at LT
cutpoints and joints per cutpoint
To reduce contact resistance and ensure
proper connection at joints 0.04 0.04 0.04 - - - - 0.04 - - 0.04 - -
30 TrichyPudukkottai
EDC
RAPDRP -
DSW
Provision of wedge connector DB boxes at
LT poles for termination of SC per LT pole
To reduce contact resistance and ensure
proper connection at joints 4.12 4.12 4.12 - - - - 4.12 - - 4.12 - -
31 TrichyPudukkottai
EDC
RAPDRP -
DSW
Renovation of earthing in Distribution
TransformersTo ensure the protection and safety. 0.12 0.12 0.12 - - - - 0.12 - - 0.12 - -
32 TrichyPudukkottai
EDC
RAPDRP -
DSW Erection of 22kV double pole structure
To attend breakdown quikly &
minimise the affecting consumers due
to outages
0.13 0.13 0.13 - - - - 0.13 - - 0.13 - -
33 TrichyPudukkottai
EDCDDUGJY
Establishemnt of new 33/11kV SS,
Enhancement of Pr Tr capacity and system
strengthening
System strengthening works in rural
areas 46.77
DPR approved by monitoring
committee 21.05 23.39 25.72 23.38 - - 23.39 23.38 - 21.05 25.72 -
34 TrichyPudukkottai
EDCIPDS 33/11 kV SS: New SS System strengthening works 2.12 0.76 0.85 0.85 0.85 0.51 0.42 0.85 0.85 0.42 0.76 0.85 0.51
35 TrichyPudukkottai
EDCIPDS 33/11 kV SS : Additional Transformer System strengthening works 1.27 0.46 0.51 0.51 0.51 0.30 0.25 0.51 0.51 0.25 0.46 0.51 0.30
36 TrichyPudukkottai
EDCIPDS
New 33 kV new feeders/Bifurcation of
feedersSystem strengthening works 1.91 0.68 0.76 0.76 0.76 0.47 0.39 0.76 0.76 0.39 0.68 0.76 0.47
37 TrichyPudukkottai
EDCIPDS 33 kV Line Bay Extension at EHV station System strengthening works 0.28 0.10 0.11 0.11 0.11 0.07 0.06 0.11 0.11 0.06 0.10 0.11 0.07
![Page 185: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/185.jpg)
38 TrichyPudukkottai
EDCIPDS
11/22 kV Line : New Feeder/ Feeder
BifurcationSystem strengthening works 3.94 1.42 1.58 1.58 1.58 0.94 0.78 1.58 1.58 0.78 1.42 1.58 0.94
39 TrichyPudukkottai
EDCIPDS 22/11 kV Bay Extension System strengthening works 0.34 0.13 0.14 0.14 0.14 0.07 0.06 0.14 0.14 0.06 0.13 0.14 0.07
40 TrichyPudukkottai
EDCIPDS Installation of Distribution Transformer
To reduce HT - LT ratio to ensure
reduction of Affecting consumers
during outages
0.05 0.02 0.02 0.02 0.02 0.01 0.01 0.02 0.02 0.01 0.02 0.02 0.01
41 TrichyPudukkottai
EDCIPDS LT Line : New Feeder/ Feeder Bifurcation
To reduce AT&C loss in Town
panchayat area. 0.87 0.31 0.35 0.35 0.35 0.21 0.17 0.35 0.35 0.17 0.31 0.35 0.21
42 TrichyPudukkottai
EDCIPDS LT Line : Augmentation/ Reconductoring
To reduce AT&C loss in Town
panchayat area. 0.59 0.22 0.24 0.24 0.24 0.13 0.11 0.24 0.24 0.11 0.22 0.24 0.13
43 TrichyPudukkottai
EDCIPDS HVDS
To reduce HT - LT ratio to ensure
reduction of Affecting consumers
during outages
3.59 1.29 1.43 1.43 1.43 0.87 0.73 1.43 1.43 0.73 1.29 1.43 0.87
44 TrichyPudukkottai
EDCIPDS Metering For accurate assessment 4.08 1.47 1.63 1.63 1.63 0.98 0.82 1.63 1.63 0.82 1.47 1.63 0.98
45 TrichyPudukkottai
EDCIPDS Provisioning of solar panel For alternate source 0.32 0.12 0.13 0.13 0.13 0.07 0.06 0.13 0.13 0.06 0.12 0.13 0.07
46 TrichyPudukkottai
EDC
Others
(REC/PFC)Replacement of all aged HT & LT lines Replacement of all aged HT & LT lines 15.38
Memo.No.SE/RE&I(D)/EE/R
GGVY/A2/ F.Recond./D.
148/14 dt.26.09.14
7.99 8.88 7.39 6.50 - - 8.88 6.50 - 7.99 7.39 -
47 TrichyPudukkottai
EDCDCW
Deviation of HT / LT lines & Erection of
dedicated feeders
Shifting of lines which stands in the
consumer premises & Erection of
dedicated feeders for the new / Exg
services
47.00 Case by case approval by
competent authority 27.00 30.00 11.55 9.50 8.45 7.50 - - - - - -
1 TrichyPerambalur
EDCCapital
Extension of LT & LT CT, HT Supply to
37590 Nos various tariff servicesNew service connections effected 15.00
Based on the application from
the HT/LT consumers,
aprroval is accorded by
competent authorities
To adding consumers 15.00 15.00 - - - - 15.00 - - 15.00 - -
2 TrichyPerambalur
EDCImprovement
Enhancement of Power Transformer
Capacity on 33/11kV Side from 1x5MVA
into 2x 5MVA and Conversion of
unmanned Existing Thelur 33/11kV SS
into manned SS -Master Plan (T&D)
Improvement in Distribution Networks 1.02 BP No. 280 Dt.05-07-2014To reduce the Line
loss, etc 1.02 1.02 - - - - 1.02 - - 1.02 - -
3 TrichyPerambalur
EDCImprovement
Establisment of new 33/11kV sub station at
Venmani village - Master Plan (T&D)Improvement in Distribution Networks 4.21 To be submitted
To reduce the Line
loss, etc - - 1.51 1.68 2.45 2.53 - 1.68 2.53 - 1.51 2.45
4 TrichyPerambalur
EDCImprovement
Establisment of new 33/11kV sub station at
Mettupalayam Village - Master Plan
(T&D)
Improvement in Distribution Networks 4.21 To be submittedTo reduce the Line
loss, etc - - 1.51 1.68 2.45 2.53 - 1.68 2.53 - 1.51 2.45
5 TrichyPerambalur
EDCImprovement
Establisment of new 33/11kV sub station at
Elakurichy Village - Master Plan (T&D)Improvement in Distribution Networks 4.21 To be submitted
To reduce the Line
loss, etc - - 1.51 1.68 2.45 2.53 - 1.68 2.53 - 1.51 2.45
6 TrichyPerambalur
EDCNEFS
Replacement of aged conductor &
damaged poles
Improving network strength & Quality,
Replacement of aged conductors,
poles,etc
21.11 B.P.NO .(FB) No.90 dated
4.3.13 & No.100, dt.8.3.2013
To Improve
Distribution
Networks
21.11 21.11 - - - - 21.11 - - 21.11 - -
7 TrichyPerambalur
EDCImprovement
4 Nos. of 22 kV new feeders from 110/22
kV Esanai SSImprovement in Distribution Networks 0.20 BP No. 106 Dt. 09.12.2013
To reduce the Line
loss, etc 0.20 0.20 - - - - 0.20 - - 0.20 - -
8 TrichyPerambalur
EDCImprovement
4 Nos. of 22 kV new feeders from 110/22
kV Perali SSImprovement in Distribution Networks 0.20 BP No. 20 Dt. 03.05.2013
To reduce the Line
loss, etc 0.20 0.20 - - - - 0.20 - - 0.20 - -
9 TrichyPerambalur
EDCImprovement
4 Nos. of 22 kV new feeders from 110/22
kV A Mettur SSImprovement in Distribution Networks 0.36 BP No. 12 Dt. 07.01.2015
To reduce the Line
loss, etc 0.14 0.16 0.22 0.20 - - 0.16 0.20 - 0.14 0.22 -
10 TrichyPerambalur
EDCImprovement
4 Nos. of 22 kV new feeders from 110/22
kV Pudu kurichi SSImprovement in Distribution Networks 0.41 BP No. 11 Dt. 07.01.2015
To reduce the Line
loss, etc 0.14 0.16 0.27 0.25 - - 0.16 0.25 - 0.14 0.27 -
![Page 186: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/186.jpg)
11 TrichyPerambalur
EDCImprovement
1 No. feeder with breaker at 33/11 kV
Andimadam SSImprovement in Distribution Networks 0.12
CE/D/try's Sn No.
14.645/C/185 Dt.05.11.2014
To reduce the Line
loss, etc - - 0.12 0.12 - - - 0.12 - - 0.12 -
12 TrichyPerambalur
EDCImprovement
1 No. feeder with breaker at 33/11 kV
Keela Perambalur SSImprovement in Distribution Networks 0.10
SE/PEDC/PBLR's Sn No.
14.655/S/01/ Dt.23.05.2016
To reduce the Line
loss, etc 0.10 0.10 - - - - 0.10 - - 0.10 - -
13 TrichyPerambalur
EDCImprovement
2 Nos. feeder with 2 Nos. of breaker at
33/11 kV T Palur SS Improvement in Distribution Networks 0.70
CE/D/Try's Sn No. 14.696/C
222 Dt.22.01. 2010 & C/269
Dt.11.01.2012
To reduce the Line
loss, etc 0.70 0.70 - - - - 0.70 - - 0.70 - -
14 TrichyPerambalur
EDCRAPDRP
18 kVAR, 36 kVAR & 72 kVAR APFC
panels installed and commiSSioned in 100
kVA, 250 kVA & 500 kVA DTs
Power factor improvement 0.10
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
To improve quality
of power 0.10 0.10 - - - - 0.10 - - 0.10 - -
15 TrichyPerambalur
EDCRAPDRP
Replacement of single phase and three
phase EM/HQ meter with static meters
Accurate recording of consumption and
also to avoid human error in taking
reading
0.38
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
To improve revenue
to the board 0.38 0.38 - - - - 0.38 - - 0.38 - -
16 TrichyPerambalur
EDC
RAPDRP -
DSW
22 kV Line & 11 kV Line : New Feeder/
Feeder Bifurcation
Load bifurcation to reduce outages and
to enhance operation flexibility 0.42
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
To reduce the Line
loss, etc 0.42 0.42 - - - - 0.42 - - 0.42 - -
17 TrichyPerambalur
EDC
RAPDRP -
DSW
11kV Breaker for Jayankondam Town
Feeder
Load bifurcation to reduce outages and
to enhance operation flexibility 0.02
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
To reduce the Line
loss, etc 0.02 0.02 - - - - 0.02 - - 0.02 - -
18 TrichyPerambalur
EDC
RAPDRP -
DSW
Erection of New 100 kVA DTs & 250
kVA DTs To offer load relief to the existing DTs 0.18
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
To bifurcate load of
DT's 0.18 0.18 - - - - 0.18 - - 0.18 - -
19 TrichyPerambalur
EDC
RAPDRP -
DSW
Strengthening of existing LT OH feeder
from ACSR 7/2.59 mm to ACSR 7/3.35
mm and from ACSR 7/3.35 mm to
ACSR 7/4.09 mm
To augument the current carrying
capacity of the conductor 0.08
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
To reduce the Line
loss, etc 0.08 0.08 - - - - 0.08 - - 0.08 - -
20 TrichyPerambalur
EDC
RAPDRP -
DSW Laying LT AB cable
Easy identification of fault and to avoid
electrical accident. 0.15
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
Easy identification of
fault and to avoid
electrical accident.
0.15 0.15 - - - - 0.15 - - 0.15 - -
21 TrichyPerambalur
EDC
RAPDRP -
DSW
Erection of HVDS New 25 kVA,40
kVA& 63 kVA DTs To offer load relief to the existing DTs 1.48
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
To bifurcate load of
DT's 1.48 1.48 - - - - 1.48 - - 1.48 - -
22 TrichyPerambalur
EDCRAPDRP DSW
Wedge Connectors and Revamping of DT
earthingTo protect DT 0.05
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
To protect DT's and
equipments 0.05 0.05 - - - - 0.05 - - 0.05 - -
23 TrichyPerambalur
EDCDDUGJY
Establisment of new 33/11kV sub station at
Ayyur villageImprovement in Distribution Networks 3.98
(Per.)CMD TANGEDCO
Proceedings No.56 Dated : 02-
02-16
To reduce the Line
loss, etc 1.43 1.59 2.55 2.39 - - 1.59 2.39 - 1.43 2.55 -
24 TrichyPerambalur
EDCDDUGJY
Establisment of new 33/11kV sub station at
Ambabur VillageImprovement in Distribution Networks 4.21 Proposal submitted to HQ
To reduce the Line
loss, etc 1.51 1.68 2.70 2.53 - - 1.68 2.53 - 1.51 2.70 -
25 TrichyPerambalur
EDCDDUGJY
Establisment of new 33/11kV sub station at
Thaluthalaimedu VillageImprovement in Distribution Networks 4.18 BP No. 203 dt.31.05.2016
To reduce the Line
loss, etc 1.51 1.68 2.67 2.50 - - 1.68 2.50 - 1.51 2.67 -
26 TrichyPerambalur
EDCDDUGJY
Establisment of new 33/11kV sub station at
Nannai VillageImprovement in Distribution Networks 4.21 Proposal submitted to HQ
To reduce the Line
loss, etc 1.51 1.68 2.70 2.53 - - 1.68 2.53 - 1.51 2.70 -
27 TrichyPerambalur
EDCDDUGJY
Enhancement of Power Transformer
Capacity on Existing Keelapalur 33/11kV
SS from 1x8MVA into 2x 8MVA
Improvement in Distribution Networks 0.84 BP No. 345 dt.11.08.2015To reduce the Line
loss, etc - - 0.84 0.84 - - - 0.84 - - 0.84 -
28 TrichyPerambalur
EDCDDUGJY
Enhancement of Power Transformer
Capacity on Existing T.Palur 33/11kV SS
from 1x8MVA into 2x 8MVAand
Conversion of unmanned SS into manned
SS
Improvement in Distribution Networks 1.96 BP No. 01 Dt.
02-01-2016
To reduce the Line
loss, etc 0.50 0.56 1.46 1.40 - - 0.56 1.40 - 0.50 1.46 -
29 TrichyPerambalur
EDCDDUGJY
Enhancement of Power Transformer
Capacity on Existing Olaiyur 33/11kV SS
from 1x8MVA into 2x 8MVAand
Conversion of unmanned SS into manned
SS
Improvement in Distribution Networks 1.77 BP No. 221 Dt. 21.05-2015To reduce the Line
loss, etc 0.47 0.52 1.30 1.25 - - 0.52 1.25 - 0.47 1.30 -
![Page 187: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/187.jpg)
30 TrichyPerambalur
EDCDDUGJY
Enhancement of Power Transformer
Capacity on Existing Naduvalur 33/11kV
SS from 1x8+1x5MVA into 2x 8MVA
Improvement in Distribution Networks 0.98 BP No. 189 Dt. 28.05-2016To reduce the Line
loss, etc - - 0.98 0.98 - - - 0.98 - - 0.98 -
31 TrichyPerambalur
EDCDDUGJY
Enhancement of Power Transformer
Capacity on Existing Thenoor 33/11kV SS
from 1x8+1x5MVA into 2x 8MVA
Improvement in Distribution Networks 0.53 Proposal submitted to HQTo reduce the Line
loss, etc - - 0.53 0.53 - - - 0.53 - - 0.53 -
32 TrichyPerambalur
EDCIPDS
Establishment of 33/11 kV Substations in
Ariyalur, Udayarpalayam and additional 8
MVA, 33/11 kV Power transformer in
extg.33/11 kV Kalanivasal SS
To meet out load growth 5.40
(Per.) CMD TANGEDCO
Proceedings No. 15
Dt.08.01.16
To meet out load
growth 2.16 2.40 2.40 2.40 0.84 0.60 2.40 2.40 0.60 2.16 2.40 0.84
33 TrichyPerambalur
EDCIPDS Erection of new DT's & HVDS DT's To offer load relief to the existing DTs 2.84
(Per.) CMD TANGEDCO
Proceedings No. 15
Dt.08.01.16
To bifurcate load of
DT's 1.13 1.26 1.26 1.26 0.45 0.32 1.26 1.26 0.32 1.13 1.26 0.45
34 TrichyPerambalur
EDCIPDS Erection of new OH lines
To augument the current carrying
capacity of the conductor 7.67
(Per.) CMD TANGEDCO
Proceedings No. 15
Dt.08.01.16
To reduce the Line
loss, etc 3.07 3.41 3.41 3.41 1.19 0.85 3.41 3.41 0.85 3.07 3.41 1.19
35 TrichyPerambalur
EDCIPDS Aerial Bunched Cables
Easy identification of fault and to avoid
electrical accident. 0.36
(Per.) CMD TANGEDCO
Proceedings No. 15
Dt.08.01.16
Easy identification of
fault and to avoid
electrical accident.
0.14 0.16 0.16 0.16 0.06 0.04 0.16 0.16 0.04 0.14 0.16 0.06
36 TrichyPerambalur
EDCCivil works
Construction of additional control
room,collection centres, toilet and allied
works etc.,
To improve easy operation at
Substations and acceSS to the
consumers
1.52
To improve easy
operation at
Substations and
acceSS to the
consumers
1.52 1.52 - - - - 1.52 - - 1.52 - -
1 TrichyThanjavur
EDCCapital
Extension of LT & LT CT, HT Supply to
various tariff servicesNew service connections effected 12.65
Based on the application from
the consumers, approval was
accorded by the competent
authorities
Adding consumers 3.78 4.20 4.29 4.30 4.16 4.15 4.20 4.30 4.15 3.78 4.29 4.16
2 TrichyThanjavur
EDCCapital Establishment of 33 kV sub stations
To improve the network and Load
growth 3.30
Approved by the competent
authority as per the field
proposal
To reduce the Line
loss, etc 1.98 2.20 1.32 1.10 - - 2.20 1.10 - 1.98 1.32 -
3 TrichyThanjavur
EDCImprovement
Improvement works- Erection of DT,New
HT feeders, strengthening of HT cables,
Laying LT cable and erection of pillar
boxes.
To improve the network and Load
growth 10.48
Approved by the competent
authority as per the field
proposal
To reduce the Line
loss, etc 3.06 3.40 3.31 3.30 3.73 3.78 3.40 3.30 3.78 3.06 3.31 3.73
4 TrichyThanjavur
EDCR-APDRP APFC Power factor improvement 0.64
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
0.17 0.19 0.19 0.19 0.28 0.26 0.19 0.19 0.26 0.17 0.19 0.28
5 TrichyThanjavur
EDCR-APDRP 1Phase & 3phase static meters Accuracy in consumption 0.56
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
0.56 0.56 - - - - 0.56 - - 0.56 - -
6 TrichyThanjavur
EDCR-APDRP DSW To reduce AT&C loss 15.38
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
15.38 15.38 - - - - 15.38 - - 15.38 - -
7 TrichyThanjavur
EDCDDUGJY 34.11 24.40 27.11 9.71 7.00 - - 27.11 7.00 - 24.40 9.71 -
8 TrichyThanjavur
EDCIPDS New 33/11 kV SS To reduce AT&C loss 10.54
CMD TANGEDCO
proceedings No:15 dt
08.01.2016
4.21 4.68 4.69 4.69 1.64 1.17 4.68 4.69 1.17 4.21 4.69 1.64
9 TrichyThanjavur
EDCIPDS 33 kV new feeders To reduce AT&C loss 2.25 0.90 1.00 1.00 1.00 0.35 0.25 1.00 1.00 0.25 0.90 1.00 0.35
10 TrichyThanjavur
EDCIPDS New Feeder (Raccoon) 11kV To reduce AT&C loss 8.50 3.40 3.78 3.78 3.78 1.32 0.94 3.78 3.78 0.94 3.40 3.78 1.32
11 TrichyThanjavur
EDCIPDS New Feeder (Raccoon) 22kV To reduce AT&C loss 0.34 0.13 0.15 0.15 0.15 0.06 0.04 0.15 0.15 0.04 0.13 0.15 0.06
![Page 188: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/188.jpg)
12 TrichyThanjavur
EDCIPDS
Augmentation (OH to UG) (3 x 300sqmm/
11kV)To reduce AT&C loss 3.26 1.30 1.45 1.45 1.45 0.51 0.36 1.45 1.45 0.36 1.30 1.45 0.51
13 TrichyThanjavur
EDCIPDS Augmentation (OH to UG) (4 x 240sqmm) To reduce AT&C loss 3.95 1.58 1.76 1.75 1.75 0.62 0.44 1.76 1.75 0.44 1.58 1.75 0.62
14 TrichyThanjavur
EDCIPDS New Feeder (Rabbit) To reduce AT&C loss 3.74 1.49 1.66 1.66 1.66 0.59 0.42 1.66 1.66 0.42 1.49 1.66 0.59
15 TrichyThanjavur
EDCIPDS Feeder Bifurcation (Rabbit) To reduce AT&C loss 0.23 0.09 0.10 0.10 0.10 0.04 0.03 0.10 0.10 0.03 0.09 0.10 0.04
16 TrichyThanjavur
EDCIPDS
LT OH 1 Ph 2 wire to 3 Ph 4 wire
conversion with Rabbit phase wire and
Weasel Neutral on same supports
To reduce AT&C loss 0.53 0.22 0.24 0.23 0.23 0.08 0.06 0.24 0.23 0.06 0.22 0.23 0.08
17 TrichyThanjavur
EDCIPDS
LT OH 1 Ph 3 wire to 3 Ph 5 wire
conversion with Rabbit phase wire and
Weasel Neutral on same supports
To reduce AT&C loss 3.89 1.56 1.73 1.73 1.73 0.60 0.43 1.73 1.73 0.43 1.56 1.73 0.60
18 TrichyThanjavur
EDCIPDS
LT OH 1 Ph 3 wire to 3 Ph 5 wire
conversion with Rabbit phase wire and
Weasel Neutral with insertion of 7 Nos.
8M PSC poles
To reduce AT&C loss 0.70 0.28 0.31 0.31 0.31 0.11 0.08 0.31 0.31 0.08 0.28 0.31 0.11
19 TrichyThanjavur
EDCIPDS Capacitor Bank ( 1 x 2.4 MVAR) Power factor improvement 2.22 0.88 0.98 0.99 0.99 0.35 0.25 0.98 0.99 0.25 0.88 0.99 0.35
20 TrichyThanjavur
EDCIPDS 16 kVA/ 11kV To reduce AT&C loss 0.07 0.03 0.03 0.03 0.03 0.01 0.01 0.03 0.03 0.01 0.03 0.03 0.01
21 TrichyThanjavur
EDCIPDS 25 kVA/ 11kV To reduce AT&C loss 3.07 1.22 1.36 1.37 1.37 0.48 0.34 1.36 1.37 0.34 1.22 1.37 0.48
22 TrichyThanjavur
EDCIPDS 25 kVA/ 22kV To reduce AT&C loss 0.14 0.05 0.06 0.06 0.06 0.03 0.02 0.06 0.06 0.02 0.05 0.06 0.03
23 TrichyThanjavur
EDCIPDS 40 kVA/ 11kV To reduce AT&C loss 1.69 0.67 0.75 0.75 0.75 0.27 0.19 0.75 0.75 0.19 0.67 0.75 0.27
24 TrichyThanjavur
EDCIPDS 40 kVA/ 22kV To reduce AT&C loss 0.07 0.03 0.03 0.03 0.03 0.01 0.01 0.03 0.03 0.01 0.03 0.03 0.01
25 TrichyThanjavur
EDCIPDS 63kVA/ 11kV To reduce AT&C loss 0.78 0.31 0.34 0.34 0.35 0.13 0.09 0.34 0.35 0.09 0.31 0.34 0.13
26 TrichyThanjavur
EDCIPDS 63kVA/ 22kV To reduce AT&C loss 0.05 0.02 0.02 0.02 0.02 0.01 0.01 0.02 0.02 0.01 0.02 0.02 0.01
27 TrichyThanjavur
EDCIPDS
Boundary meters for ring fencing of Non-
RAPDRP Towns with population more
than 5000
Accuracy in consumption 1.18 0.47 0.52 0.53 0.53 0.18 0.13 0.52 0.53 0.13 0.47 0.53 0.18
28 TrichyThanjavur
EDCIPDS Feeder meter Accuracy in consumption 0.09 0.04 0.04 0.04 0.04 0.01 0.01 0.04 0.04 0.01 0.04 0.04 0.01
29 TrichyThanjavur
EDCIPDS DT Meter (Existing DT) Accuracy in consumption 0.92 0.37 0.41 0.41 0.41 0.14 0.10 0.41 0.41 0.10 0.37 0.41 0.14
30 TrichyThanjavur
EDCIPDS DT Meter for 16 & 25 kVA (Proposed DT) Accuracy in consumption 0.52 0.21 0.23 0.23 0.23 0.08 0.06 0.23 0.23 0.06 0.21 0.23 0.08
![Page 189: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/189.jpg)
31 TrichyThanjavur
EDCIPDS Single phase Accuracy in consumption 4.84 1.93 2.15 2.15 2.15 0.76 0.54 2.15 2.15 0.54 1.93 2.15 0.76
32 TrichyThanjavur
EDCIPDS Three Phase 10-60 A Accuracy in consumption 1.28 0.51 0.57 0.57 0.57 0.20 0.14 0.57 0.57 0.14 0.51 0.57 0.20
33 TrichyThanjavur
EDCIPDS Solar panal in SS 5KW Utilisation of Non-conversion energy 0.25 0.10 0.11 0.11 0.11 0.04 0.03 0.11 0.11 0.03 0.10 0.11 0.04
34 TrichyThanjavur
EDCIPDS Solar panal in EE Office 10KW Utilisation of Non-conversion energy 0.32 0.13 0.14 0.14 0.14 0.05 0.04 0.14 0.14 0.04 0.13 0.14 0.05
35 TrichyThanjavur
EDCIPDS Solar panal in SE Office 30 KW Utilisation of Non-conversion energy 0.19 0.07 0.08 0.09 0.09 0.03 0.02 0.08 0.09 0.02 0.07 0.09 0.03
36 TrichyThanjavur
EDC
Others
(REC/PFC) - - - - - - - - - - - - - - -
37 TrichyThanjavur
EDCDCW
Shifting of HT/LT lines as per party's
request- - - - - - - - - - - - - - - -
38 TrichyThanjavur
EDC
Any other related
works including
leSS than one
crore works
totally
- - - - - - - - - - - - - - -
1 TrichyNagapattinam
EDCCapital
Extension of LT & LT CT, HT Supply to
12000 Nos various tariff servicesNew service connections effected 9.13
Based on the application from
the consumers, approval was
accorded by the competent
authorities
Adding consumers 2.78 3.09 3.26 3.28 2.81 2.76 3.09 3.28 2.76 2.78 3.26 2.81
2 TrichyNagapattinam
EDCCapital
Establishment of New 33 kV sub stations
at Moovalur, Sirkali urban, Nagore,
Thirukkadaiyur, Kondal, Kallimedu
To improve the network and Load
growth 21.80
Approved by the competent
authority as per the field
proposal
To reduce the Line
loss, etc 10.87 12.08 4.70 3.88 5.65 5.84 12.08 3.88 5.84 10.87 4.70 5.65
3 TrichyNagapattinam
EDCImprovement
Improvement works- SS,Enhancement of
Pr.Trs in sub stations, sub station related
works.(Mayiladuthurai Urban,
Mekkirimangalam, Malliyakollai)
To improve the network and Load
growth 3.89
Approved by the competent
authority as per the field
proposal
To reduce the Line
loss, etc 2.27 2.52 1.62 1.37 - - 2.52 1.37 - 2.27 1.62 -
4 TrichyNagapattinam
EDCImprovement
Improvement works- Erection of DT,New
HT feeders, strengthening of HT cables,
Laying LT cable and erection of pillar
boxes.
To improve the network and Load
growth 9.38
Approved by the competent
authority as per the field
proposal
To reduce the Line
loss, etc 4.13 4.59 5.25 4.79 - - 4.59 4.79 - 4.13 5.25 -
5 TrichyNagapattinam
EDC
RAPDRP
Scheme I (Part
A/Part B)
Erection of New DTs, HVDS
490,APFC,Capacitor Bank etc.
To reduce AT&C loss of the project
towns 9.54
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
Reduction of AT&C
loss 4.13 4.59 5.41 4.95 - - 4.59 4.95 - 4.13 5.41 -
6 TrichyNagapattinam
EDC
RAPDRP
Scheme II - - - - - - - - - - - - -
7 TrichyNagapattinam
EDC
RAPDRP
Scheme III etc - - - - - - - - - - - - -
8 TrichyNagapattinam
EDC
RGGVY
Schemes - - - - - - - - - - - - -
9 TrichyNagapattinam
EDCDDUGJY
New SS, Enhancement of Power
Transformer,Replace by Electro
mechanical meter by Static meter
Improvement in Distribution network 23.21 REC/Chn/DDUGJY/215-
16/702 dt 05.01.2016
Reduction of AT&C
loss 10.36 11.51 12.85 11.70 - - 11.51 11.70 - 10.36 12.85 -
10 TrichyNagapattinam
EDCIPDS
New 33/11 kV SS Proposed in Kilvelur,
Thittacherry,Velankanni, feeder
bifurcation,HT line augmentation etc.
Improvement in Distribution network 25.15
CMD TANGEDCO
proceedings No:15 dt
08.01.16
Reduction of AT&C
loss 10.36 11.51 14.79 13.64 - - 11.51 13.64 - 10.36 14.79 -
11 TrichyNagapattinam
EDCNEFS
Replacement of damaged poles &
conductorsImprovement in Distribution network 76.60
CMD TANGEDCO
proceedings No:90 dt
04.03.2013
Reduction of AT&C
loss 34.47 38.30 31.41 30.64 10.72 7.66 38.30 30.64 7.66 34.47 31.41 10.72
![Page 190: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/190.jpg)
12 TrichyNagapattinam
EDCDCW
Shifting of HT/LT lines as per party's
request
Shifting of HT/LT lines as per party's
request 3.20
Approved by the competent
authority as per the field
proposal
As per party's request 1.16 1.29 1.00 0.97 1.04 0.94 - - - - - -
13 TrichyNagapattinam
EDC
Any other related
works including
leSS than one
crore works
totally
- - - - - - - - - - - - -
14 TrichyNagapattinam
EDC
CDRRP (Coastal
Disastor Risk
Reduction
Project)
EXPE UG Cable & L.T UG Cable laying
work
To maintain unintrupted Suppy and
reduce line loss 143.00 64.35 71.50 58.63 57.20 20.02 14.30 71.50 57.20 14.30 64.35 58.63 20.02
1 Vellore Vellore EDC CapitalExtension of LT & LT CT, HT Supply to
various tariff servicesNew SCs in HT & LT Tariff effected 78.00
Based on the application from
the consumers, approval was
accorded by the competent
authorities
For Energy
accounting 20.70 23.00 25.70 26.00 28.70 29.00 23.00 26.00 29.00 20.70 25.70 28.70
2 Vellore Vellore EDC CapitalEstablishment of 33 kV sub stations at
……… - - - - - - - - - - - - -
3 Vellore Vellore EDC Master PlanEstablishment of New 33/11kV SS at
Cheyyur (Nagavedu) To meet out the increasing demand 1.46 Yet to be sanctioned
To meet out future
load growth - - 1.46 1.46 - - - 1.46 - - 1.46 -
4 Vellore Vellore EDC Master Plan Establishment of New 33/11kV SS at Senji To meet out the increasing demand 1.46 Yet to be sanctionedTo meet out future
load growth - - 1.46 1.46 - - - 1.46 - - 1.46 -
5 Vellore Vellore EDC Master PlanEstablishment of New 33/11kV SS at
PoigaiTo meet out the increasing demand 1.46 Yet to be sanctioned
To meet out future
load growth - - 1.46 1.46 - - - 1.46 - - 1.46 -
6 Vellore Vellore EDC Master PlanEstablishment of New 33/11kV SS at
UssoorTo meet out the increasing demand 1.46 Yet to be sanctioned
To meet out future
load growth - - 1.46 1.46 - - - 1.46 - - 1.46 -
7 Vellore Vellore EDC Master PlanEstablishment of New 33/11kV SS at
ParavathurTo meet out the increasing demand 1.46 Yet to be sanctioned
To meet out future
load growth - - 1.46 1.46 - - - 1.46 - - 1.46 -
8 Vellore Vellore EDC Improvement
Improvement works- Erection of DT, New
HT feeders, strengthening of HT cables,
Laying LT cable and erection of pillar
boxes.
To improve the network and Load
growth 39.00
Approved by the competent
authority as per the field
proposal
Line loss saving 9.90 11.00 12.80 13.00 14.80 15.00 11.00 13.00 15.00 9.90 12.80 14.80
9 Vellore Vellore EDC
RAPDRP
Scheme I (Part
A/Part B)
- - - - - - - - - - - - -
10 Vellore Vellore EDCRAPDRP
Scheme II - - - - - - - - - - - - -
11 Vellore Vellore EDCRAPDRP
Scheme III etc - - - - - - - - - - - - -
12 Vellore Vellore EDCRGGVY
Schemes - - - - - - - - - - - - -
13 Vellore Vellore EDC DDUGJY Augmentation of Power transformer
5MVA to 8MVA at PudupadiTo meet out the increasing demand 1.44 Bp.No.183. Dt. 13.05.2013
To meet out future
load growth 1.44 1.44 - - - - 1.44 - - 1.44 - -
14 Vellore Vellore EDC DDUGJY
Installation of additional 8 MVA
power transformer with additional bay at
Peruvalayam (8MVA Pr.Tr.)
To meet out the increasing demand 1.44 BP.No. 537,Dt.17.12.15To meet out future
load growth 1.44 1.44 - - - - 1.44 - - 1.44 - -
15 Vellore Vellore EDC DDUGJY
Installation of additional 8 MVA power
transformer with additional bay at
Banavaram (8MVA Pr.Tr.)
To meet out the increasing demand 1.44 BP.No. 329, Dt. 04.08.15To meet out future
load growth 1.44 1.44 - - - - 1.44 - - 1.44 - -
16 Vellore Vellore EDC DDUGJY Establishment of New 33/11kV SS at
PonnaiTo meet out the increasing demand 1.46 Yet to be sanctioned
To meet out future
load growth 1.46 1.46 - - - - 1.46 - - 1.46 - -
17 Vellore Vellore EDC DDUGJY Establishment of New 33/11kV SS at
DamaraipakkamTo meet out the increasing demand 1.46 Yet to be sanctioned
To meet out future
load growth 1.46 1.46 - - - - 1.46 - - 1.46 - -
18 Vellore Vellore EDC DDUGJY Establishment of New 33/11kV SS at
KavanoorTo meet out the increasing demand 1.46 Yet to be sanctioned
To meet out future
load growth 1.46 1.46 - - - - 1.46 - - 1.46 - -
19 Vellore Vellore EDC DDUGJY
Installation of additional 8 MVA power
transformer with additional bay at Ozhugur
(8MVA Pr.Tr.)
To meet out the increasing demand 1.44 Bp.No.386. Dt. 04.09.2015To meet out future
load growth 1.44 1.44 - - - - 1.44 - - 1.44 - -
![Page 191: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/191.jpg)
20 Vellore Vellore EDC DDUGJY Establishment of New 33/11kV SS at
MusiriTo meet out the increasing demand 1.46 Yet to be sanctioned
To meet out future
load growth 1.46 1.46 - - - - 1.46 - - 1.46 - -
21 Vellore Vellore EDC DDUGJY Establishment of New 33/11kV SS at
ManthangalTo meet out the increasing demand 1.46 Yet to be sanctioned
To meet out future
load growth 1.46 1.46 - - - - 1.46 - - 1.46 - -
22 Vellore Vellore EDC DDUGJY Establishment of New 33/11kV SS at
ThiruvalamTo meet out the increasing demand 1.46 Yet to be sanctioned
To meet out future
load growth 1.46 1.46 - - - - 1.46 - - 1.46 - -
23 Vellore Vellore EDC IPDS
Distribution strengthening works,
Replacement of Meters, Provision of DT
Metering, Ring Fencing Points and Addl.
Pr.Transformer provision in Exg 33kV
SS,etc.,
To reduce the AT & C loss 30.67
(Per) CMD TANGEDCO
Proceedings
No.15,Dated:08.01.2016.
To reduce the AT &
C loss 5.52 6.13 25.15 24.54 - - 6.13 24.54 - 5.52 25.15 -
24 Vellore Vellore EDCOthers
(REC/PFC) - - - - - - - - - - - - -
25 Vellore Vellore EDC NEFS Replacement of exg old conductors &
damaged poles (7/4.09, 7/3.35 & Poles)To avoid accidents 42.06
CMD/Tangedco Proceedings
90 & 100 dt. 04.03.2013 &
08.03.2013
Line loss saving 22.55 25.06 19.51 17.00 - - 25.06 17.00 - 22.55 19.51 -
26 Vellore Vellore EDC DCWDCW works in HT & LT lines & net
works.Consumers request. 27.00
Based on the application from
the consumers, approval was
accorded by the competent
authorities
7.20 8.00 8.90 9.00 10.90 10.00 - - - - - -
27 Vellore Vellore EDC
Any other related
works including
less than one
crore works
totally
a). T&P Materials.
b). Plant & Mechinery 4.00 1.35 1.50 1.23 1.20 1.42 1.30 1.50 1.20 1.30 1.35 1.23 1.42
1 VelloreTirupattur
EDCCapital Extension of HT.SC New Service Connection effected 3.70
Based on the application from
the consumers, approval
accorded by the competent
authorities
Adding consumers 0.90 1.00 1.18 1.20 1.47 1.50 1.00 1.20 1.50 0.90 1.18 1.47
2 VelloreTirupattur
EDCCapital Extension of LT -SC.- New Service Connection effected 44.00
Based on the application from
the consumers, approval
accorded by the competent
authorities
Adding consumers 9.90 11.00 15.50 16.00 16.90 17.00 11.00 16.00 17.00 9.90 15.50 16.90
3 VelloreTirupattur
EDCCapital Extension of LTCT SC - New Service Connection effected 5.10
Based on the application from
the consumers, approval
accorded by the competent
authorities
Adding consumers 1.35 1.50 1.68 1.70 1.88 1.90 1.50 1.70 1.90 1.35 1.68 1.88
4 VelloreTirupattur
EDCCapital
Establishment of 33 kV SUB STATIONS
AT - - - - - - - - - - - - -
5 VelloreTirupattur
EDCImprovement
Improvement works in SS, Enhancement of
Pr Trs in substation related works
To improve the networks and load
growth - - - - - - - - - - - - -
6 VelloreTirupattur
EDCImprovement
improvement works in HT/LT lines,
provision of DT'S
IMPROVING NET WORKS
STRENTH AND QUALITY AND
REPLACEMENT OFAGED
CONDECTOR ECT…
27.00
Approvd by the competent
authority as per the field
proposel
To reduce the line
loss,etc 7.20 8.00 8.90 9.00 9.90 10.00 8.00 9.00 10.00 7.20 8.90 9.90
7 VelloreTirupattur
EDC
RAPDRP-PART
B-DSW
Provision of Wedge Connectors per DT
Structure
For redeuction of AT&C loss in HT
and LT Network 0.12
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
To reduce the AT &
C loss 0.12 0.12 - - - - 0.12 - - 0.12 - -
8 VelloreTirupattur
EDC
RAPDRP-PART
B-DSW
Provision of Wedge Connectors at LT
Cutpoints and Joints per Cutpoint
For redeuction of AT&C loss in HT
and LT Network 0.03
To reduce the AT &
C loss 0.03 0.03 - - - - 0.03 - - 0.03 - -
9 VelloreTirupattur
EDC
RAPDRP-PART
B-DSW
Renovation of Earthing in Distribution
Transformers
For redeuction of AT&C loss in HT
and LT Network 0.05
To reduce the AT &
C loss 0.05 0.05 - - - - 0.05 - - 0.05 - -
10 VelloreTirupattur
EDCDDUGJY
Establishment of 33/11 kV Velakalnatham
SS with 2x8 MVATo meet future load growth 3.48 B.P.NO.521, dt.7.12.15
To meet out load
growth 2.05 2.28 1.43 1.20 - - 2.28 1.20 - 2.05 1.43 -
11 VelloreTirupattur
EDCDDUGJY
Establishment of 33/11 kV Jolarpet SS
with 2x8 MVATo meet future load growth 3.63 B.P.NO.89, dt.17.2.16
To meet out load
growth 1.44 1.60 2.19 2.03 - - 1.60 2.03 - 1.44 2.19 -
12 VelloreTirupattur
EDCDDUGJY 33/11 kV Pudur Nadu SS To meet future load growth 3.35 Yet to be sanctioned
To meet out load
growth 1.66 1.85 1.69 1.50 - - 1.85 1.50 - 1.66 1.69 -
![Page 192: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/192.jpg)
13 VelloreTirupattur
EDCDDUGJY 33/11 kV Kunichi SS To meet future load growth 3.35 Yet to be sanctioned
To meet out load
growth 1.66 1.85 1.69 1.50 - - 1.85 1.50 - 1.66 1.69 -
14 VelloreTirupattur
EDCDDUGJY 33/11 kV Eggore SS To meet future load growth 3.35 Yet to be sanctioned
To meet out load
growth 1.66 1.85 1.69 1.50 - - 1.85 1.50 - 1.66 1.69 -
15 VelloreTirupattur
EDCDDUGJY
Establishment of 33/11 kV Patchur SS with
2x8 MVATo meet future load growth 3.63 B.P.NO.506, dt.24.11.15
To meet out load
growth 2.37 2.63 1.26 1.00 - - 2.63 1.00 - 2.37 1.26 -
16 VelloreTirupattur
EDCDDUGJY 33/11 kV Bramanamangalam SS To meet future load growth 3.35 Yet to be sanctioned
To meet out load
growth 1.66 1.85 1.69 1.50 - - 1.85 1.50 - 1.66 1.69 -
17 VelloreTirupattur
EDCDDUGJY
Establishment of 33/11 kV Upparapally
with 2x8 MVATo meet future load growth 3.35 B.P.NO.111, dt.10.3.15
To meet out load
growth 1.66 1.85 1.69 1.50 - - 1.85 1.50 - 1.66 1.69 -
18 VelloreTirupattur
EDCDDUGJY 33/11 kV Anuppu SS To meet future load growth 3.35 Yet to be sanctioned
To meet out load
growth 1.66 1.85 1.69 1.50 - - 1.85 1.50 - 1.66 1.69 -
19 VelloreTirupattur
EDCDDUGJY 33/11 kV Morasapally SS To meet future load growth 3.35 Yet to be sanctioned
To meet out load
growth 1.66 1.85 1.69 1.50 - - 1.85 1.50 - 1.66 1.69 -
20 VelloreTirupattur
EDCDDUGJY
Additional 2X8 MVA to 3X8 Pr. Tr. At
Koratty 33/11 kV SS To meet future load growth 0.90 B.P.NO.3, dt.5.1.15
To meet out load
growth 0.40 0.45 0.50 0.45 - - 0.45 0.45 - 0.40 0.50 -
21 VelloreTirupattur
EDCDDUGJY
Establishment of 33/11 kV Kurusilapet SS
with 2x8 MVATo meet future load growth 1.73 B.P.NO.55, dt.2.2.16
To meet out load
growth 0.93 1.03 0.80 0.70 - - 1.03 0.70 - 0.93 0.80 -
22 VelloreTirupattur
EDCDDUGJY
Establishment of 33/11 kV Matrapally SS
with 2x8 MVATo meet future load growth 1.97 B.P.NO.55, dt.2.2.16
To meet out load
growth 1.12 1.25 0.85 0.72 - - 1.25 0.72 - 1.12 0.85 -
23 VelloreTirupattur
EDCDDUGJY
Establishment of 33/11 kV Kandili SS with
2x8 MVATo meet future load growth 1.21 B.P.NO.55, dt.2.2.16
To meet out load
growth 0.90 1.00 0.31 0.21 - - 1.00 0.21 - 0.90 0.31 -
24 VelloreTirupattur
EDCDDUGJY
Establishment of 33/11 kV Mittur SS with
2x8 MVATo meet future load growth 2.32 Yet to be sanctioned 1.19 1.32 1.13 1.00 - - 1.32 1.00 - 1.19 1.13 -
25 VelloreTirupattur
EDCDDUGJY
Enhancement of Power Transformer
capacity from 2 x 8 MVA to 3 x 8 MVA at
existing Odugathur 33/11 kV SS
To meet future load growth 1.14 Yet to be sanctionedTo meet out load
growth 0.67 0.75 0.47 0.39 - - 0.75 0.39 - 0.67 0.47 -
26 VelloreTirupattur
EDCDDUGJY
Establishment of 33/11 kV Paradarami SS
with 2x8 MVATo meet future load growth 1.76 Yet to be sanctioned 0.90 1.00 0.86 0.76 - - 1.00 0.76 - 0.90 0.86 -
27 VelloreTirupattur
EDCIPDS
Erection of New 33/11kV Manned SS
with 2x8MVA PTs
To improve the tail end voltage of the
project area 3.75
CMD Tangedco proceedings
No.15,Dt.08.01.16
To reduce the AT&C
Loss 2.29 2.54 1.46 1.21 - - 2.54 1.21 - 2.29 1.46 -
28 VelloreTirupattur
EDCIPDS Erection of New 33kV feeder
To improve the tail end voltage of the
project area 1.73
CMD Tangedco proceedings
No.15,Dt.08.01.16
To reduce the AT&C
Loss 0.62 0.69 1.11 1.04 - - 0.69 1.04 - 0.62 1.11 -
29 VelloreTirupattur
EDCIPDS
Erection of New11kV line with 7/4.09
ACSR for feeder/HVDSTo Minimize the loss 3.01
CMD Tangedco proceedings
No.15,Dt.08.01.16
To reduce the AT&C
Loss 1.08 1.20 1.93 1.81 - - 1.20 1.81 - 1.08 1.93 -
30 VelloreTirupattur
EDCIPDS Erection of 100kVA DTS
To bifurcate the load from existing
250kVA DT 0.17
CMD Tangedco proceedings
No.15,Dt.08.01.16
To reduce the AT&C
Loss 0.06 0.07 0.11 0.10 - - 0.07 0.10 - 0.06 0.11 -
31 VelloreTirupattur
EDCIPDS Erection of LT 3 Phase 4 wire line To Minimize the loss 0.80
CMD Tangedco proceedings
No.15,Dt.08.01.16
To reduce the AT&C
Loss 0.29 0.32 0.51 0.48 - - 0.32 0.48 - 0.29 0.51 -
32 VelloreTirupattur
EDCIPDS LT Augmentation
To improve the the voltage regulation
and to reduce the line loss 0.70
CMD Tangedco proceedings
No.15,Dt.08.01.16
To reduce the AT&C
Loss 0.25 0.28 0.45 0.42 - - 0.28 0.42 - 0.25 0.45 -
33 VelloreTirupattur
EDCIPDS Erection of Capacitor bank To improve the Voltage at Sub station 0.49
CMD Tangedco proceedings
No.15,Dt.08.01.16
To reduce the AT&C
Loss 0.18 0.20 0.31 0.29 - - 0.20 0.29 - 0.18 0.31 -
34 VelloreTirupattur
EDCIPDS Erection of 63kVA DTs To Minimize the loss 0.41
CMD Tangedco proceedings
No.15,Dt.08.01.16
To reduce the AT&C
Loss 0.15 0.17 0.26 0.24 - - 0.17 0.24 - 0.15 0.26 -
35 VelloreTirupattur
EDCIPDS Erection of 40kVA DTs To Minimize the loss 1.62
CMD Tangedco proceedings
No.15,Dt.08.01.16
To reduce the AT&C
Loss 0.58 0.65 1.04 0.97 - - 0.65 0.97 - 0.58 1.04 -
36 VelloreTirupattur
EDCIPDS Erection of 25kVA DTs To Minimize the loss 1.03
CMD Tangedco proceedings
No.15,Dt.08.01.16
To reduce the AT&C
Loss 0.37 0.41 0.66 0.62 - - 0.41 0.62 - 0.37 0.66 -
37 VelloreTirupattur
EDCIPDS Erection of 16kVA DTs To Minimize the loss 0.10
CMD Tangedco proceedings
No.15,Dt.08.01.16
To reduce the AT&C
Loss 0.04 0.04 0.06 0.06 - - 0.04 0.06 - 0.04 0.06 -
38 VelloreTirupattur
EDCIPDS Erection of 11kV feeder Meter at SS end For energy accounting purpose 0.04
CMD Tangedco proceedings
No.15,Dt.08.01.16
Evaluation of
townwise AT&C loss 0.02 0.02 0.02 0.02 - - 0.02 0.02 - 0.02 0.02 -
39 VelloreTirupattur
EDCIPDS
Erection of 11kV Ring Fencing Meter at
town boundaryFor energy accounting purpose 0.48
CMD Tangedco proceedings
No.15,Dt.08.01.16
Evaluation of
townwise AT&C loss 0.17 0.19 0.31 0.29 - - 0.19 0.29 - 0.17 0.31 -
![Page 193: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/193.jpg)
40 VelloreTirupattur
EDCIPDS Erection of DT Metering arrangement For energy accounting purpose 0.63
CMD Tangedco proceedings
No.15,Dt.08.01.16
Evaluation of
townwise AT&C loss 0.22 0.25 0.41 0.38 - - 0.25 0.38 - 0.22 0.41 -
41 VelloreTirupattur
EDCIPDS Static whole current meter 50-100a For accurate billing 0.01
CMD Tangedco proceedings
No.15,Dt.08.01.16
Evaluation of
townwise AT&C loss - - 0.01 0.01 - - - 0.01 - - 0.01 -
42 VelloreTirupattur
EDCIPDS
Replacement of existing 3phase EMM into
10-60A Static metersFor accurate billing 0.86
CMD Tangedco proceedings
No.15,Dt.08.01.16
Evaluation of
townwise AT&C loss 0.31 0.34 0.55 0.52 - - 0.34 0.52 - 0.31 0.55 -
43 VelloreTirupattur
EDCIPDS
Replacement of existing 1phase EMM into
5-20A Static metersFor accurate billing 1.34
CMD Tangedco proceedings
No.15,Dt.08.01.16
Evaluation of
townwise AT&C loss 0.49 0.54 0.85 0.80 - - 0.54 0.80 - 0.49 0.85 -
44 VelloreTirupattur
EDCIPDS
Provision of solar panel at Sub station and
EE office 0.11
CMD Tangedco proceedings
No.15,Dt.08.01.16 0.04 0.04 0.07 0.07 - - 0.04 0.07 - 0.04 0.07 -
45 VelloreTirupattur
EDCIPDS Erection of 11kV bay extension 0.26
CMD Tangedco proceedings
No.15,Dt.08.01.16 0.09 0.10 0.17 0.16 - - 0.10 0.16 - 0.09 0.17 -
46 VelloreTirupattur
EDCIPDS Erection of Mini Tower 0.19
CMD Tangedco proceedings
No.15,Dt.08.01.16 0.07 0.08 0.12 0.11 - - 0.08 0.11 - 0.07 0.12 -
47 VelloreTirupattur
EDCErection of UG Cable For Railway crossing 0.17
CMD Tangedco proceedings
No.15,Dt.08.01.16 0.06 0.07 0.11 0.10 - - 0.07 0.10 - 0.06 0.11 -
48 VelloreTirupattur
EDC
Others
(REC/PFC)Replacement of aged conductor and poles
To avoid accidents and improve the
voltage regulation 15.21
(Per) CMD TANGEDCO
Pro. No: 100 dt 08.03.2013 To avoid accident 15.21 15.21 - - - - 15.21 - - 15.21 - -
49 VelloreTirupattur
EDCExtension of Agl. SC New Service Connection effected 5.91
Based on the application from
the consumers, approval
accorded by the competent
authorities
Adding consumers 1.66 1.85 1.95 1.96 2.30 2.10 1.85 1.96 2.10 1.66 1.95 2.30
50 VelloreTirupattur
EDCDCW Shifting of HT / LT lines & structures
Deviation of Poles, lines & structures
obstructing consumers / public 9.00
Based on the application from
the consumers, approval
accorded by the competent
authorities
Deviation of Poles,
lines & structures
obstructing
consumers / public
2.25 2.50 3.13 3.20 3.62 3.30 - - - - - -
1 VelloreDharmapuri
EDCCapital
Extension of LT & LTCT, HT supply to
24200 Nos various Tariff services during
2016-17 and 25950 Nos during 2017-18
and 26500 Nos During 2018-19
Essential for extension of HT and LT
and LT CT 126.36
Approved by the competent
authority as per the field
proposal
To reduce T&D
Lossess & Line
Lossess in the excute
not work
35.82 39.80 41.76 41.98 44.32 44.58 39.80 41.98 44.58 35.82 41.76 44.32
2 VelloreDharmapuri
EDCCapital Establishment of 33kV Sub station - - - - - - - - - - - - -
3 VelloreDharmapuri
EDCImprovement
Enhancement of Power Transformer
capacity from 2X5 into 2X8MVA at
existing Irumathur 33/11 kV SS
To meet future load growth 1.18
(per) CMD TANGEDCO
PROCEEDINGS No.384 dt.
03.09.2014
To meet out future
load growth 1.18 1.18 - - - - 1.18 - - 1.18 - -
4 VelloreDharmapuri
EDCImprovement
Improvement works- Erection of DT, New
HT feeders, strengthening of HT cables,
Laying LT cable and erection of pillar
boxes.
To improve the network and Load
growth 13.11
Approved by the Competent
Authority as per the field
proposal
To reduce the line
loss 3.51 3.90 4.18 4.21 4.92 5.00 3.90 4.21 5.00 3.51 4.18 4.92
5 VelloreDharmapuri
EDC
RAPDRP - (Part
B)
Extension of 1 km., 11 kV line with 7/3.35
mm ASCR at 45 m span on 9 m psc poles,
400 kg. Working load and 75 kg/sq.m
wind pressure
For extension of supply to HVDS DTs 0.46
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
For extension of
supply to HVDS DTs 0.46 0.46 - - - - 0.46 - - 0.46 - -
6 VelloreDharmapuri
EDC
RAPDRP - (Part
B) HT ABC Cable To reduce line loss 0.34
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
To reduce line loss 0.34 0.34 - - - - 0.34 - - 0.34 - -
7 VelloreDharmapuri
EDC
RAPDRP - (Part
B) Erection of New 63 kVA DTs To offer load relief to the existing DTs 0.08
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
To offer load relief to
the existing DTs 0.08 0.08 - - - - 0.08 - - 0.08 - -
8 VelloreDharmapuri
EDC
RAPDRP -
Scheme -IIErection of New 100 kVA DTs To offer load relief to the existing DTs 0.30
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
To offer load relief to
the existing DTs 0.30 0.30 - - - - 0.30 - - 0.30 - -
9 VelloreDharmapuri
EDC
RAPDRP - (Part
B) Erection of New 25 kVA DTs To offer load relief to the existing DTs 0.03
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
To offer load relief to
the existing DTs 0.03 0.03 - - - - 0.03 - - 0.03 - -
![Page 194: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/194.jpg)
10 VelloreDharmapuri
EDC
RAPDRP - (Part
B) Erection of New 16 kVA DTs (HVDS)
To reduce HT - LT ratio to ensure
reduction of line loss 0.37
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
To reduce HT - LT
ratio to ensure
reduction of line loss
0.37 0.37 - - - - 0.37 - - 0.37 - -
11 VelloreDharmapuri
EDC
RAPDRP -
Scheme-III Erection of New 25 kVA DTs (HVDS)
To reduce HT - LT ratio to ensure
reduction of line loss 0.76
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
To reduce HT - LT
ratio to ensure
reduction of line loss
0.76 0.76 - - - - 0.76 - - 0.76 - -
12 VelloreDharmapuri
EDC
RAPDRP - (Part
B)
Provision of wedge connectors at LT
cutpoint and joint per cut pointTo reduce line loss 0.07
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
To reduce line loss 0.07 0.07 - - - - 0.07 - - 0.07 - -
13 VelloreDharmapuri
EDCRGGVY 16kVA 11/0.4kV with DT metering
For Rural electrification and BPL
household electrification. 1.86
Lr. No. SE/RE&I(D)
/F.RGGVY-3Dist./ D03/
13DT 08.01.14
For Rural
electrification and
BPL household
electrification.
1.86 1.86 - - - - 1.86 - - 1.86 - -
14 VelloreDharmapuri
EDCRGGVY
11kV line with weasel with 9.14 m RCC
Pole
For Rural electrification and BPL
household electrification. 1.80
Lr. No. SE/RE&I(D)/
F.RGGVY-3Dist./D03/13DT
08.01.14
For Rural
electrification and
BPL household
electrification.
1.80 1.80 - - - - 1.80 - - 1.80 - -
15 VelloreDharmapuri
EDCRGGVY
LT line with weasel with 8.om PSC Pole
(LT 3 Ph. 4 w)
For Rural electrification and BPL
household electrification. 0.28
Lr. No. SE/RE&I(D)
/F.RGGVY-3Dist./
D03/13DT 08.01.14
For Rural
electrification and
BPL household
electrification.
0.28 0.28 - - - - 0.28 - - 0.28 - -
16 VelloreDharmapuri
EDCRGGVY
LT line with weasel with 8.om PSC Pole
(LT l Ph 2 W)
For Rural electrification and BPL
household electrification. 0.64
Lr. No. SE/RE&I(D)
/F.RGGVY-3Dist./
D03/13DT 08.01.14
For Rural
electrification and
BPL household
electrification.
0.64 0.64 - - - - 0.64 - - 0.64 - -
17 VelloreDharmapuri
EDCRGGVY BPL Service connections
For Rural electrification and BPL
household electrification. 0.46
Lr. No. SE/RE&I(D)
/F.RGGVY-3Dist./
D03/13DT 08.01.14
For Rural
electrification and
BPL household
electrification.
0.46 0.46 - - - - 0.46 - - 0.46 - -
18 VelloreDharmapuri
EDCDDUGJY Acquistion of Land for estt. of New SS To meet future load growth 0.25
(Per) CMD TANGEDCO
Pro. No:39 dt 23.01.16 ,Pro.
No:212 dt 18.05.2015 ,
ProNo. 335 dt.12.08.13, Pro.
No:38 dt 23.01.2016 , Pro.
No:39 dt 23.01.16 ,Pro.
No:398 dt 11.09.15 , ( Pro.
No:320 dt 31.07.15 , Pro.
No:71 dt 09.02.16
To meet out future
load growth 0.19 0.21 0.06 0.04 - - 0.21 0.04 - 0.19 0.06 -
19 VelloreDharmapuri
EDCIPDS
5Nos New Estt. of 33/11kV SS and 8Nos
SS augumentationTo meet future load growth 32.61
To meet out future
load growth 18.00 20.00 14.61 12.61 - - 20.00 12.61 - 18.00 14.61 -
20 VelloreDharmapuri
EDCIPDS New 33/11 kV SS
To improve Town Panchayat and to
reduce line loss 1.45
(per) CMD TANGEDCO
Proceedings NO.15
dt.08.01.2016
To improve Town
Panchayat and to
reduce line loss
0.66 0.73 0.59 0.58 0.20 0.14 0.73 0.58 0.14 0.66 0.59 0.20
21 VelloreDharmapuri
EDCIPDS 33/11 kV S/S : Additional Transformer
To improve Town Panchayat and to
reduce line loss 1.26
(per) CMD TANGEDCO
Proceedings NO.15
dt.08.01.2016
To improve Town
Panchayat and to
reduce line loss
0.57 0.63 0.51 0.50 0.18 0.13 0.63 0.50 0.13 0.57 0.51 0.18
22 VelloreDharmapuri
EDCIPDS
33/11 kV S/S Transformer Capacity
enhancement
To improve Town Panchayat and to
reduce line loss 1.20
(per) CMD TANGEDCO
Proceedings NO.15
dt.08.01.2016
To improve Town
Panchayat and to
reduce line loss
0.54 0.60 0.49 0.48 0.17 0.12 0.60 0.48 0.12 0.54 0.49 0.17
23 VelloreDharmapuri
EDCIPDS New 33 kV Feeder
To improve Town Panchayat and to
reduce line loss 0.80
(per) CMD TANGEDCO
Proceedings NO.15
dt.08.01.2016
To improve Town
Panchayat and to
reduce line loss
0.36 0.40 0.33 0.32 0.11 0.08 0.40 0.32 0.08 0.36 0.33 0.11
24 VelloreDharmapuri
EDCIPDS New 11 kV Line
To improve Town Panchayat and to
reduce line loss 6.45
(per) CMD TANGEDCO
Proceedings NO.15
dt.08.01.2016
To improve Town
Panchayat and to
reduce line loss
2.91 3.23 2.64 2.58 0.90 0.64 3.23 2.58 0.64 2.91 2.64 0.90
25 VelloreDharmapuri
EDCIPDS 11 kV Bay Extension
To improve Town Panchayat and to
reduce line loss 0.50
(per) CMD TANGEDCO
Proceedings NO.15
dt.08.01.2016
To improve Town
Panchayat and to
reduce line loss
0.22 0.25 0.21 0.20 0.07 0.05 0.25 0.20 0.05 0.22 0.21 0.07
![Page 195: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/195.jpg)
26 VelloreDharmapuri
EDCIPDS New LT Line
To improve Town Panchayat and to
reduce line loss 2.16
(per) CMD TANGEDCO
Proceedings NO.15
dt.08.01.2016
To improve Town
Panchayat and to
reduce line loss
0.97 1.08 0.89 0.87 0.30 0.21 1.08 0.87 0.21 0.97 0.89 0.30
27 VelloreDharmapuri
EDCIPDS LT Line Reconducturing
To improve Town Panchayat and to
reduce line loss 7.52
(per) CMD TANGEDCO
Proceedings NO.15
dt.08.01.2016
To improve Town
Panchayat and to
reduce line loss
3.38 3.76 3.09 3.01 1.05 0.75 3.76 3.01 0.75 3.38 3.09 1.05
28 VelloreDharmapuri
EDCIPDS Capacitor bank
To improve Town Panchayat and to
reduce line loss 0.23
(per) CMD TANGEDCO
Proceedings NO.15
dt.08.01.2016
To improve Town
Panchayat and to
reduce line loss
0.11 0.12 0.09 0.09 0.03 0.02 0.12 0.09 0.02 0.11 0.09 0.03
29 VelloreDharmapuri
EDCIPDS HVDS DTs
To improve Town Panchayat and to
reduce line loss 4.47
(per) CMD TANGEDCO
Proceedings NO.15
dt.08.01.2016
To improve Town
Panchayat and to
reduce line loss
2.02 2.24 1.83 1.79 0.62 0.44 2.24 1.79 0.44 2.02 1.83 0.62
30 VelloreDharmapuri
EDCIPDS Metering
To improve Town Panchayat and to
reduce line loss 6.82
(per) CMD TANGEDCO
Proceedings NO.15
dt.08.01.2016
To improve Town
Panchayat and to
reduce line loss
3.06 3.40 2.81 2.74 0.95 0.68 3.40 2.74 0.68 3.06 2.81 0.95
31 VelloreDharmapuri
EDCIPDS Provision of Solar panel
To improve Town Panchayat and to
reduce line loss 0.37
(per) CMD TANGEDCO
Proceedings NO.15
dt.08.01.2016
To improve Town
Panchayat and to
reduce line loss
0.17 0.19 0.15 0.15 0.05 0.03 0.19 0.15 0.03 0.17 0.15 0.05
32 VelloreDharmapuri
EDC
Others
(REC/PFC)
Replacement of aged conductors and poles
(NEFS Scheme)To avoid accidents 9.25
(Per) CMD TANGEDCO
Pro.No:100 dt 08.03.2013 -- 9.25 9.25 - - - - 9.25 - - 9.25 - -
33 VelloreDharmapuri
EDCDCW
Shifting / Deviation of Existing structure,
poles , lines service connection and 24 hrs
supply / dedicated supply to ex HT/ LT/
LTCT services
On Consumer request 12.50
Approved by the competent
authority as per the field
proposal
on Consumer
Request 3.37 3.75 3.98 4.00 5.15 4.75 - - - - - -
1 VelloreKrishnagiri
EDCCapital
Extension of LT & LT CT, HT Supply to
75615.Nos various tariff servicesNew service connections effected 236.60 Various approvals
For effecting new
service 58.14 64.60 78.37 79.90 90.88 92.10 64.60 79.90 92.10 58.14 78.37 90.88
2 VelloreKrishnagiri
EDCCapital
Establishment of 33 kV sub stations at
……… - - - - - - - - - - - - -
3 VelloreKrishnagiri
EDCImprovement
Improvement works- SS,Enhancement of
Pr.Trs in subs tations, sub station related
works.
- - - - - - - - - - - - -
4 VelloreKrishnagiri
EDC
RAPDRP
Scheme I (Part
A)
Provision of Data concentrator unit To Improve the work 0.69
CMD TANGEDCO
proceedings No:60 dt
14.07.2009
To Improve the work 0.69 0.69 - - - - 0.69 - - 0.69 - -
5 VelloreKrishnagiri
EDCRAPDRP
18 kVAR, 36 kVAR & 72 kVAR APFC
panels installed and commissioned in 100
kVA, 250 kVA & 500 kVA DTs
Power factor improvement 0.73
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
Power factor
improvement 0.73 0.73 - - - - 0.73 - - 0.73 - -
6 VelloreKrishnagiri
EDCRAPDRP
Replacement of single phase and three
phase EM/HQ meter with static meters
Accurate recording of consumption and
also to avoid human error in taking
reading
0.01
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
Accurate recording of
consumption and also
to avoid human error
in taking reading
0.01 0.01 - - - - 0.01 - - 0.01 - -
7 VelloreKrishnagiri
EDC
RAPDRP -
DSW Strengthening of existing 11 kV line
To augment the current carrying
capacity of the conductor 0.01
CMD TANGEDCO
proceedings No:124 dt
8.04.2011
To augment the
current carrying
capacity of the
conductor
0.01 0.01 - - - - 0.01 - - 0.01 - -
8 VelloreKrishnagiri
EDC
RAPDRP -
DSW Erection of New 63 kVA DTs To offer load relief to the existing DTs 0.15
CMD TANGEDCO
proceedings No124 dt
08.4.11
To offer load relief to
the existing DTs 0.15 0.15 - - - - 0.15 - - 0.15 - -
9 VelloreKrishnagiri
EDC
RAPDRP -
DSW Erection of New 100 kVA DTs 0.03 0.03 0.03 - - - - 0.03 - - 0.03 - -
10 VelloreKrishnagiri
EDC
RAPDRP -
DSW Erection of New 16 kVA DTs
To reduce HT - LT ratio to ensure
reduction of line loss 0.12
CMD TANGEDCO
proceedings No:124 dt
08.4.11
To reduce HT - LT
ratio to ensure
reduction of line loss
0.12 0.12 - - - - 0.12 - - 0.12 - -
11 VelloreKrishnagiri
EDC
RAPDRP -
DSW Erection of New 25 kVA DTs 2.32 2.32 2.32 - - - - 2.32 - - 2.32 - -
12 VelloreKrishnagiri
EDC
RAPDRP -
DSW Erection of New 40 kVA DTs 0.24 0.24 0.24 - - - - 0.24 - - 0.24 - -
![Page 196: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/196.jpg)
13 VelloreKrishnagiri
EDC
RAPDRP -
DSW Erection of New 63kVA DTs 0.02 0.02 0.02 - - - - 0.02 - - 0.02 - -
14 VelloreKrishnagiri
EDC
RAPDRP -
DSW Erection of New 100 kVA DTs 0.08
CMD TANGEDCO
proceedings No:124dt
08.4.11
0.08 0.08 - - - - 0.08 - - 0.08 - -
15 VelloreKrishnagiri
EDC
RAPDRP-
PART B - DSW
Provision of Wedge Connectors per DT
Structure
For redeuction of AT&C loss in HT
and LT Network 0.18
CMD TANGEDCO
proceedings No:124dt
08.4.11
0.18 0.18 - - - - 0.18 - - 0.18 - -
16 VelloreKrishnagiri
EDCDDUGJY
Scheme works- SS,Enhancement of Pr.Trs
in subs tations, sub station related works.
To improve the network and Load
growth 38.63
CMD/TANGEDCO
Proceedings No:366 dt.
30.08.2013 & other 18
To reduce the line
loss and to meetout
the increasing
demand
12.36 13.73 26.27 24.90 - - 13.73 24.90 - 12.36 26.27 -
17 VelloreKrishnagiri
EDCIPDS
33/11kV NEW Ss Construction of control
room building, inclusive of cost of 33& 11
kV Breakers 33 kV & 11kV 1x630 sq mm
Cable, Battery and Control cable and other
Elecl accessories
To meet out load growth 2.12 Work to be Taken up 2.12 2.12 - - - - 2.12 - - 2.12 - -
18 VelloreKrishnagiri
EDCIPDS 33 kV NEW Feeder /Bifurcationof feedr To meet out load growth 0.14 Work to be Taken up 0.14 0.14 - - - - 0.14 - - 0.14 - -
19 VelloreKrishnagiri
EDCIPDS 11kV Line New Feedr/Feeder Bifuraction To meet out load growth 2.22 Work to be Taken up 2.22 2.22 - - - - 2.22 - - 2.22 - -
20 VelloreKrishnagiri
EDCIPDS Arial Bunched Cable 1.15 Work to be Taken up 1.15 1.15 - - - - 1.15 - - 1.15 - -
21 VelloreKrishnagiri
EDCIPDS 11 kV Bay Extension 0.26 Work to be Taken up 0.26 0.26 - - - - 0.26 - - 0.26 - -
22 VelloreKrishnagiri
EDCIPDS Installation of Distribution Transformer 0.25 Work to be Taken up 0.25 0.25 - - - - 0.25 - - 0.25 - -
23 VelloreKrishnagiri
EDCIPDS LT Line New Feeder/Feeder Bifuration 0.67 Work to be Taken up 0.67 0.67 - - - - 0.67 - - 0.67 - -
24 VelloreKrishnagiri
EDCIPDS Lt Line Augmentation / Reconductoring 1.12 Work to be Taken up 1.12 1.12 - - - - 1.12 - - 1.12 - -
25 VelloreKrishnagiri
EDCIPDS capacitor Bank 0.49 Work to be Taken up 0.49 0.49 - - - - 0.49 - - 0.49 - -
26 VelloreKrishnagiri
EDCIPDS HVDS 2.78 Work to be Taken up 2.78 2.78 - - - - 2.78 - - 2.78 - -
27 VelloreKrishnagiri
EDCIPDS Metering 4.77 Work to be Taken up 4.77 4.77 - - - - 4.77 - - 4.77 - -
28 VelloreKrishnagiri
EDCIPDS Provision of Solar Panels 0.04 Work to be Taken up 0.04 0.04 - - - - 0.04 - - 0.04 - -
29 VelloreKrishnagiri
EDCIPDS Others 0.11 Work to be Taken up 0.11 0.11 - - - - 0.11 - - 0.11 - -
1 VillupuramCuddalore
EDCCapital
Extension of LT & LT CT, HT Supply to
20000. Nos various tariff services (Year
wise)
New service connections effected 95.00
Based on the application from
the consumers, approval is
being accorded by the
Competent Authority
Adding Consumers 26.10 29.00 31.70 32.00 33.80 34.00 29.00 32.00 34.00 26.10 31.70 33.80
2 VillupuramCuddalore
EDCCapital Establishment of 33 kV sub stations
To improve the network and Load
growth 24.03
Approval is being accorded
by the Competent AuthoritySystem Strengthening 7.20 8.00 7.10 7.00 8.83 9.03 8.00 7.00 9.03 7.20 7.10 8.83
3 VillupuramCuddalore
EDCImprovement
Improvement works - SS, Enhancement of
Pr.Trs in sub stations, sub station related
works.
To improve the network and Load
growth 6.00
Approval is being accorded
by the Competent Authority
To Reduce the AT &
C losses 1.62 1.80 1.98 2.00 2.18 2.20 1.80 2.00 2.20 1.62 1.98 2.18
4 VillupuramCuddalore
EDCImprovement
Improvement works- Erection of DT,New
HT feeders, strenthening of HT cables,
Laying LT cable and erection of pillar
boxes.
To improve the network and Load
growth 51.50
Approval is being accorded
by the Competent AuthorityNil 14.17 15.75 17.10 17.25 18.38 18.50 15.75 17.25 18.50 14.17 17.10 18.38
5 VillupuramCuddalore
EDC
RAPDRP
Scheme I(Part
A/Part B)
- - - - - - - - - - - - -
6 VillupuramCuddalore
EDC
RAPDRP
Scheme II - - - - - - - - - - - - -
![Page 197: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/197.jpg)
7 VillupuramCuddalore
EDC
RAPDRP
Scheme III etc - - - - - - - - - - - - -
8 VillupuramCuddalore
EDC
RGGVY
Schemes - - - - - - - - - - - - -
9 VillupuramCuddalore
EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
To reduce AT & C Loss 80.51
Lr. No. SE/RE&I (D)/
EE/PCII/
A1/.DDUGJY/D.27/15,
dt.30.01.15.
To achieve precise
and correct Billing of
consumption of
Electricity
18.90 21.00 34.96 36.51 26.65 23.00 21.00 36.51 23.00 18.90 34.96 26.65
10 VillupuramCuddalore
EDCIPDS
Erection of HVDS DTs, LT line
reconditioning & Augmentation,
Replacement of Electromechanical meters
To reduce AT & C Loss 34.60
(per) - CMD TANGEDCO
Proceeding No. 15 dt.
08.01.16.
Reduction of AT & C
Losses 18.00 20.00 16.60 14.60 - - 20.00 14.60 - 18.00 16.60 -
11 VillupuramCuddalore
EDC
CDRRP (Coastal
Disastor Risk
Reduction
Project)
To avoid line loss To reduce AT & C Loss 217.64 Approval yet to be givenTo avoid losses from
Natural calamities 72.00 80.00 71.00 70.00 74.64 67.64 80.00 70.00 67.64 72.00 71.00 74.64
12 VillupuramCuddalore
EDCNEFS
Replacement of damaged poles, conductors
in Distribution Network.To reduce AT & C Loss 72.48
NEFS san. No. Memo.No.
SE/ RE&I (D)/ EE/
RGGVY/A2/F.Recond/D.148
/14, dt.26.09.14.
System Improvement 22.50 25.00 25.00 25.00 24.98 22.48 25.00 25.00 22.48 22.50 25.00 24.98
13 VillupuramCuddalore
EDCDCW To deviate existing Network as per request - 7.50 Nil
Line deviation work
as per Party request 2.02 2.25 2.48 2.50 3.00 2.75 - - - - - -
14 VillupuramCuddalore
EDC
Any other related
works including
less than one
crore works
totally
- - - - - - - - - - - - -
1 VillupuramThiruvannamal
ai EDCCapital
Extension of LT & LT CT, HT Supply to
various tariff services (Year wise)New service connections effected 72.03
Based on the application from
the consumers, approval is
being accorded by the
Competent Authority
Adding Consumers 18.67 20.75 24.06 24.42 26.61 26.86 20.75 24.42 26.86 18.67 24.06 26.61
2 VillupuramThiruvannamal
ai EDCImprovement
Improvement works - SS, Enhancement of
Pr.Trs in sub stations, sub station related
works.
Establishment of new 33/11 kV SS at
Kadambai 4.31 - - - - 4.31 4.31 - - - 4.31 - - 4.31 -
3 VillupuramThiruvannamal
ai EDCImprovement
Improvement works - SS, Enhancement of
Pr.Trs in sub stations, sub station related
works.
Establishment of new 33/11 kV SS at
Melpadur 4.31 - - - - 4.31 4.31 - - - 4.31 - - 4.31 -
4 VillupuramThiruvannamal
ai EDCImprovement
Improvement works - SS, Enhancement of
Pr.Trs in sub stations, sub station related
works.
Establishment of new 33/11 kV SS at
Arasampattu 4.31 - - - - 4.31 4.31 - - - 4.31 - - 4.31 -
5 VillupuramThiruvannamal
ai EDCImprovement
Improvement works - SS, Enhancement of
Pr.Trs in sub stations, sub station related
works.
Establishment of new 33/11 kV SS at
Salukkai 4.74 - - - - - - 4.27 4.74 - - 4.74 - - 4.27
6 VillupuramThiruvannamal
ai EDCImprovement
Improvement works - SS, Enhancement of
Pr.Trs in sub stations, sub station related
works.
Establishment of new 33/11 kV SS at
Ammapalayam 4.74 - - - - - - 4.27 4.74 - - 4.74 - - 4.27
7 VillupuramThiruvannamal
ai EDCImprovement
Improvement works - SS, Enhancement of
Pr.Trs in sub stations, sub station related
works.
Establishment of new 33/11 kV SS at
Randam 4.74 - - - - - - 4.27 4.74 - - 4.74 - - 4.27
8 VillupuramThiruvannamal
ai EDCImprovement
Improvement works - SS, Enhancement of
Pr.Trs in sub stations, sub station related
works.
Enhancement of Power Transformers 1.50 - - - - 1.35 1.50 - - 1.50 - - 1.35
9 VillupuramThiruvannamal
ai EDCImprovement
Improvement works - SS, Enhancement of
Pr.Trs in sub stations, sub station related
works.
11 kV line augmentation 12.60 3.24 3.60 4.41 4.50 4.50 4.50 3.60 4.50 4.50 3.24 4.41 4.50
10 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Establishment of new 33/11 kV SS at
Varagur 3.03 BP.No. 465/20.10.14 3.03 3.03 - - - - 3.03 - - 3.03 - -
![Page 198: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/198.jpg)
11 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Establishment of new 33/11 kV SS at
Melma 3.90 BP.No.396/11.09.15 3.90 3.90 - - - - 3.90 - - 3.90 - -
12 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Establishment of new 33/11 kV SS at
Ariyalam 3.92 BP.No. 13/ 6.1.16 3.92 3.92 - - - - 3.92 - - 3.92 - -
13 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Establishment of new 33/11 kV SS at
Onnupuram 3.92 - 3.92 3.92 - - - - 3.92 - - 3.92 - -
14 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Establishment of new 33/11 kV SS at
Athanur 4.31 - 4.31 4.31 - - - - 4.31 - - 4.31 - -
15 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Establishment of new 33/11 kV SS at
Melchengam 4.31 - 4.31 4.31 - - - - 4.31 - - 4.31 - -
16 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Establishment of new 33/11 kV SS at
Nambedu 4.31 - 4.31 4.31 - - - - 4.31 - - 4.31 - -
17 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Establishment of new 33/11 kV SS at
Kadalady 4.31 - 4.31 4.31 - - - - 4.31 - - 4.31 - -
18 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Establishment of new 33/11 kV SS at
Ariyapady 4.31 - 4.31 4.31 - - - - 4.31 - - 4.31 - -
19 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Establishment of new 33/11 kV SS at
Appedu 4.31 - 4.31 4.31 - - - - 4.31 - - 4.31 - -
20 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Establishment of new 33/11 kV SS at
Vasudevanpet 4.31 - 4.31 4.31 - - - - 4.31 - - 4.31 - -
21 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Establishment of new 33/11 kV SS at
Perumpallam 4.31 - 4.31 4.31 - - - - 4.31 - - 4.31 - -
22 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Establishment of new 33/11 kV SS at
Collectrate 4.31 - - - 4.31 4.31 - - - 4.31 - - 4.31 -
23 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Establishment of new 33/11 kV SS at
Anakkavur 4.31 - - - 4.31 4.31 - - - 4.31 - - 4.31 -
24 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Establishment of new 33/11 kV SS at
Mekkalur 4.31 - - - 4.31 4.31 - - - 4.31 - - 4.31 -
25 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Establishment of new 33/11 kV SS at
Sathiyavady 4.31 - - - 4.31 4.31 - - - 4.31 - - 4.31 -
26 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Enhancement of Pr.Tr capacity from
1X5 MVA to 1X8 MVA at Anaibogi
33/11 kV SS
0.57 - - - 0.57 0.57 - - - 0.57 - - 0.57 -
27 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Enhancement of Pr.Tr capacity from
1X5 MVA to 1X8 MVA at Desur
33/11 kV SS
0.57 - - 0.57 0.57 - - - 0.57 - - 0.57 -
28 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Enhancement of Pr.Tr capacity from
1X5 MVA to 1X8 MVA at
Jamunamarathur 33/11 kV SS
0.57 - - 0.57 0.57 - - - 0.57 - - 0.57 -
29 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Enhancement of Pr.Tr capacity from
1X5 MVA to 1X8 MVA at
Melravandhavadi 33/11 kV SS
0.57 - - 0.57 0.57 - - - 0.57 - - 0.57 -
![Page 199: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/199.jpg)
30 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Enhancement of Pr.Tr capacity from
1X5 MVA to 1X8 MVA at
Paramananthal 33/11 kV SS
0.57 - - 0.57 0.57 - - - 0.57 - - 0.57 -
31 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Enhancement of Pr.Tr capacity from
1X5 MVA to 1X8 MVA at
Vadamathimangalam 33/11 kV SS
0.57 - - 0.57 0.57 - - - 0.57 - - 0.57 -
32 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Enhancement of Pr.Tr capacity from
1X8 MVA to 2X8 MVA at
Kilkodungalur 33/11 kV SS
1.45 - - 1.45 1.45 - - - 1.45 - - 1.45 -
33 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Enhancement of Pr.Tr capacity from
1X8 MVA to 2X8 MVA at Kottaiyur
33/11 kV SS
1.45 - - 1.45 1.45 - - - 1.45 - - 1.45 -
34 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Enhancement of Pr.Tr capacity from
1X8 MVA to 2X8 MVA at
Mansurabath 33/11 kV SS
1.45 - - 1.45 1.45 - - - 1.45 - - 1.45 -
35 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Enhancement of Pr.Tr capacity from
2X5MVA to 2X8 MVA at Mazhaiyur
33/11 kV SS
1.15 - - 1.15 1.15 - - - 1.15 - - 1.15 -
36 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Enhancement of Pr.Tr capacity from
1X8 MVA to 2X8 MVA at
Perungulathur 33/11 kV SS
1.45 - - 1.45 1.45 - - - 1.45 - - 1.45 -
37 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Enhancement of Pr.Tr capacity from
1X8 MVA to 2X8 MVA atSomasibady
33/11 kV SS
1.45 - - 1.45 1.45 - - - 1.45 - - 1.45 -
38 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Enhancement of Pr.Tr capacity from
1X8 MVA to 2X8 MVA at Thirumani
33/11 kV SS
1.45 - - 1.45 1.45 - - - 1.45 - - 1.45 -
39 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Enhancement of Pr.Tr capacity from
1X3.15 MVA to 1X5 MVA at Doosi
LT SS
0.41 - - 0.41 0.41 - - - 0.41 - - 0.41 -
40 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
Enhancement of Pr.Tr capacity from
1X3.15 MVA to1X5 MVA atPickup
Dam LT SS
0.41 - - 0.41 0.41 - - - 0.41 - - 0.41 -
41 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
9 No's 11 kV Feeder separation at
varoius places 38.15 - - 38.15 38.15 - - - 38.15 - - 38.15 -
42 VillupuramThiruvannamal
ai EDCDDUGJY
Improvement works erection of DTs, New
HT Line, Feeder Segregation, LT
Strengthening and conversion works.
33 kV Line augmentation at various
places 4.14 - - - 4.14 4.14 - - - 4.14 - - 4.14 -
43 VillupuramThiruvannamal
ai EDCRAPDRP
DISTRIBUTION STRENGTHENING
WORKS
11 kV Line augmentation at various
places - - - - - - - - - - - - -
44 VillupuramThiruvannamal
ai EDCIPDS
DISTRIBUTION STRENGTHENING
WORKS
Work yet to be started at 12 Nos. town
of TEDC 45.42
(Per.) CMD TANGEDCO
Proceedings No.15/
Dt.08.01.2016
16.35 18.17 22.26 22.71 6.81 4.54 18.17 22.71 4.54 16.35 22.26 6.81
1 VillupuramVillupuram
EDCCapital
Extension of LT & LT CT, HT Supply to
32,220 No. various tariff servicesNew service connections effected. 138.84
To be approved by the
competent authoritiesAdding consumers 41.26 45.84 45.98 46.00 46.90 47.00 45.84 46.00 47.00 41.26 45.98 46.90
2 VillupuramVillupuram
EDCImprovement
Improvement works in certain HT/LT lines,
provision of DTs in required area &
upgradation of DTs.
Improving network strength & quality.
Replacement of aged conductors and
poles etc.,
51.03 To be approved by the
competent authorities
To reduce the line
loss etc., 15.33 17.03 17.00 17.00 17.00 17.00 17.03 17.00 17.00 15.33 17.00 17.00
3 VillupuramVillupuram
EDC
RAPDRP
Scheme I (Part
Part B)
(1) Erection of 215 Nos. New 22 kV/ 433
V HVDS DTs at Villupuram town and 110
Nos New 11 kV/433 V HVDS DT s at
Tindivanam. (2) Erection of Wedge
connectors, Distribution box etc.
To reduce AT & C loss of project
towns. 2.52
(Per.) CMD TANGEDCO
Proceedings 124/ 08.04. 2011
& 255/ 16.07.2011
Reduction of AT & C
loss 2.52 2.52 - - - - 2.52 - - 2.52 - -
4 VillupuramVillupuram
EDC
RAPDRP
Scheme II - - - - - - - - - - - - -
5 VillupuramVillupuram
EDC
RAPDRP
Scheme III etc - - - - - - - - - - - - -
![Page 200: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/200.jpg)
6 VillupuramVillupuram
EDC
RGGVY
Schemes - - - - - - - - - - - - -
7 VillupuramVillupuram
EDCDDUGJY
Improvement works (1)
Feeder segregation, (2)
Replacement of Electro Mech meters
(3) Establishment of new SS &
Enhancement of Pr.Tr.
1.Ural 33/11kV Um SS
2.Unnamandal 33/11kV Um SS
3.Periyathatchur 33/11kV Um SS
4.Nagandur 33/11kV Um SS
5.Avalurpet 33/11kV Manned SS
Electrification of Rural Habitations &
associted infrastructure development. 18.11 BP.No. 538/12.12. 2014
Development of
Rural Electrical
infrastructre
3.27 3.63 14.84 14.48 - - 3.63 14.48 - 3.27 14.84 -
8 VillupuramVillupuram
EDCIPDS
Improvement works in certain HT/LT lines,
provision of DTs in required area &
upgradation of DTs.
To reduce AT & C loss of project
towns. 26.72
(Per.) CMD TANGEDCO
Proceedings 15/08.01.2016
Reduction of AT & C
loss 9.62 10.69 17.10 16.03 - - 10.69 16.03 - 9.62 17.10 -
9 VillupuramVillupuram
EDC
Others
(REC/PFC)
Extension of LT & LT CT Supply to
29,000 No. various tariff services in Rural
areas
New service connections effected. 1.45
Based on the applications
received from consumers,
approval was accorded by the
competent authorties
Adding consumers 1.45 1.45 - - - - 1.45 - - 1.45 - -
10 VillupuramVillupuram
EDCNEFS
Replacement of damaged poles &
conductors in Rual habitationsTo avoid electrical accident. 13.45
Per CMD/ TANGEDCO
Proceedings No.
100/08.03.2013
To avoid electrical
acccident 13.45 13.45 - - - - 13.45 - - 13.45 - -
11 VillupuramVillupuram
EDCDCW To deviate existing network as per request To avoid electrical accident. 0.61
Approved based on
competent authority
To reduce the line
loss etc., 0.61 0.61 - - - - - - - - - -
1 VillupuramKallakurichi
EDCCapital
Extension of LT & LT CT, HT Supply to
39,040 Nos various tariff servicesNe service connection effected 44.50
Tobe approved by the
competent authoritiesAdding consumers 12.10 13.44 14.65 14.79 16.12 16.27 13.44 14.79 16.27 12.10 14.65 16.12
2 VillupuramKallakurichi
EDCImprovement
Improvement works- Erection of DT,New
HT feeders, strenthening of HT cables,
Laying LT cable and erection of pillar
boxes.
Improving network strength and
quality. Replacement of Aged
conductors and pols etc.,
18.05 Tobe approved by the
competent authorities
To reduce the line
loss 4.90 5.45 5.95 6.00 6.54 6.60 5.45 6.00 6.60 4.90 5.95 6.54
3 VillupuramKallakurichi
EDC
RAPDRP
Scheme I (Part
A/Part B)
Erection of New Distribution
Transformers, Strengthening of HT/LT
Lines, etc.
To reduce AT&C loss of the project
towns 3.72
(Per) CMD TANGEDCO
Proceedings No.124/
dt.08.04.2011
Reduction of AT&C
Loss 3.72 3.72 - - - - 3.72 - - 3.72 - -
4 VillupuramKallakurichi
EDC
RAPDRP
Scheme II - - - - - - - - - - - - -
5 VillupuramKallakurichi
EDC
RAPDRP
Scheme III etc - - - - - - - - - - - - -
6 VillupuramKallakurichi
EDC
RGGVY
Schemes - - - - - - - - - - - - -
7 VillupuramKallakurichi
EDCDDUGJY
Improvement works 1)
Feeder segregation, 2)
Replacement of Electro Mech meters,
3) Establishment of new SS &
Enhancement of Pr.Tr..
1) Sendhanadu 33/11 KV SS,
2)Eraiyur, 33/11 KV SS.
To extend supply upto Rural areas to
reduce line loss and improve Network
in Rural Areas.
54.75 Expected Adding consumers 35.21 39.12 19.54 15.63 - - 39.12 15.63 - 35.21 19.54 -
8 VillupuramKallakurichi
EDCIPDS
Erection of HVDS DTs, LT line
reconditioning & Augmentation,
Replacement of Electromechanical meters
To reduce line loss, to impove voltage
and to avoid accidents 23.70
CMD TANGEDCO
Proceeding No.15
dt.08.01.2016
Adding Consumers 10.66 11.85 13.04 11.85 - - 11.85 11.85 - 10.66 13.04 -
9 VillupuramKallakurichi
EDC
Others
(REC/PFC)
Extension of LT & LT CT Supply to
various tariff services in Rural areaNe service connection effected 2.00
Based on the application
received from consumer
approval was accorded by the
competent authority
Adding Consumers 2.00 2.00 - - - - 2.00 - - 2.00 - -
10 VillupuramKallakurichi
EDCNEFS
Replacement of damaged poles, conductors
in Distribution Network.
To reduce lineloss, to avoid accidents
and to improve voltage. 10.90 B.P.No.100/08.03.2013 Adding Consumers 10.90 10.90 - - - - 10.90 - - 10.90 - -
11 VillupuramKallakurichi
EDCDCW To deviate existing Network as per request To avoid accident 4.20
Approved based on
competent authority
To reduce the line
loss 1.14 1.27 1.38 1.39 1.68 1.54 - - - - - -
![Page 201: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/201.jpg)
12 VillupuramKallakurichi
EDC
Any other related
works including
less than one
crore works
totally
- 47 - - - - - - - - - - - -
![Page 202: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/202.jpg)
Chennai North 765.98 415.03 425.55 192.2 193.56 144.3 146.87 419.85 193.56 146.87 409.33 192.2 144.3
Chennai South 1783.72 1144.66 1178.53 327.46 324.95 286.03 280.24 1127.57 323.45 278.64 1093.8 326.01 284.28
Coimbatore 1291.44 677.86 698.14 300.63 309.73 298.55 283.57 613.86 274.73 242.07 596.53 266.18 253.55
Erode 1392.95 568.34 625.88 506.7 487.87 297.53 279.2 580.36 453.25 250.1 527 471.37 264.96
Madurai 1146.82 693.84 712.52 222.19 215.33 215.64 218.97 698.84 203.33 206.97 681.36 210.19 202.44
Tirunelveli 747.98 402.3 422.79 212.08 203.42 127.79 121.77 397.29 187.42 104.77 378.3 196.18 109.19
Trichy 1332.86 621.96 670.04 469.15 452.61 228.91 210.21 635.3 439.2 198.83 590.64 453.66 216.19
Vellore 947.66 336.32 366.13 347.94 340.71 241.79 240.82 351.88 324.51 222.77 323.5 331.93 222.12
Villupuram 1285.38 438.16 477.54 494.68 488.21 332.78 319.63 473.41 484.32 315.34 434.39 490.82 328.1
Total 10,694.79 5,298.47 5,577.12 3,073.03 ##### 2,173.32 2,101.28 ###### 2,883.77 ###### 5,034.85 2,938.54 ######
Chennai Central EDC 406.02 199.32 204.1 106.82 108.22 90.51 93.7 198.4 108.22 93.7 193.62 106.82 90.51
Chennai West
EDC145.02 97 99.34 27.67 27.18 18.5 18.5 99.34 27.18 18.5 97 27.67 18.5
Chennai North
EDC214.94 118.71 122.11 57.71 58.16 35.29 34.67 122.11 58.16 34.67 118.71 57.71 35.29
Chennai South
EDC981.3 906.61 916.39 45.34 39.51 26.81 25.4 866.39 39.51 25.4 856.61 45.34 26.81
Kanchipuram EDC 378.31 103.38 114.86 144.59 147.9 120.53 115.55 113.9 146.4 113.95 102.52 143.14 118.78
Chengalpattu
EDC424.11 134.67 147.28 137.53 137.54 138.69 139.29 147.28 137.54 139.29 134.67 137.53 138.69
Coimbatore
Metro EDC295.36 209.93 213.11 38.73 39.5 43.4 42.75 181.54 32 34.25 178.96 31.38 34.15
Coimbatore
North EDC189.35 106.41 109.6 39.48 39.88 41.66 39.87 100.42 34.88 33.87 97.73 34.48 35.16
Coimbatore
South EDC198.41 91.31 94.19 55.53 58.5 49.54 45.72 81.46 53.5 39.72 79.08 50.53 43.04
Tiruppur EDC 319.52 125.72 132.5 93.18 96 95.92 91.02 113.91 86 79.02 107.93 83.38 82.92
Udumalpet
EDC200.16 108.09 110.37 42.78 45 46.99 44.79 98.8 38 36.79 97.02 35.98 38.29
Nilgiis EDC 88.64 36.4 38.37 30.93 30.85 21.04 19.42 37.73 30.35 18.42 35.81 30.43 19.99
Erode EDC 388.85 193.76 214.74 157.04 143.77 36.66 30.34 201.28 131.61 19.24 181.55 144.85 24.34
Gobi EDC 210.94 90.6 99.52 72.75 70.59 44.73 40.83 97.08 68.09 37.98 88.38 70.28 41.63
Mettur EDC 224.62 88.22 97.45 71.87 69.62 60.72 57.55 90.25 63.97 54.55 81.73 66.08 57.15
Salem EDC 303.37 116.08 126.39 105.6 102.41 76.16 74.57 119.96 95.83 67.33 110.25 99.08 68.26
Namakkal EDC 265.17 79.68 87.78 99.44 101.48 79.26 75.91 71.79 93.75 71 65.09 91.08 73.58
Sivaganga
EDC275.59 102.86 111.49 109.34 106.58 59.78 57.52 99.49 94.58 45.52 92.06 97.34 46.58
Theni EDC 103.54 49.24 52.35 30.96 30.95 23.34 20.24 51.81 30.95 20.24 48.7 30.96 23.34
Madurai Metro EDC 374.19 236.24 238.46 37.39 35.17 90.5 100.56 238.46 35.17 100.56 236.24 37.39 90.5
Ramnad EDC 41.85 20.32 21.35 10.25 10.25 10.28 10.25 21.35 10.25 10.25 20.32 10.25 10.28
Dindigul EDC 72.98 34.77 38.22 31.59 29.96 6.14 4.8 38.22 29.96 4.8 34.77 31.59 6.14
Part - B Palani Town 137.25 137.25 137.25 0 0 0 0 136.11 0 0 136.11 0 0
Madurai EDC 111.92 109.26 109.5 2.66 2.42 0 0 109.5 2.42 0 109.26 2.66 0
Usilampatty 29.5 3.9 3.9 0 0 25.6 25.6 3.9 0 25.6 3.9 0 25.6
Virudhunagar
EDC100.99 40.97 42.82 40.18 39.99 18.85 18.18 42.82 39.99 18.18 40.97 40.18 18.85
Tirunelveli
EDC316.15 200.66 207.45 72.78 70.84 40.98 37.86 196.95 70.84 37.86 190.16 72.78 40.98
Kanyakumari
EDC223.23 106.36 113.73 74.9 71.16 39.84 38.34 98.73 55.16 21.34 92.86 59 21.24
Tuticorin EDC 107.61 54.31 58.79 24.22 21.43 28.12 27.39 58.79 21.43 27.39 54.31 24.22 28.12
![Page 203: TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Central … order/2017/CIP Order.pdf · 2017-08-02 · Page 1 of 52 TAMIL NADU ELECTRICITY REGULATORY COMMISSION (Constituted under section](https://reader034.vdocument.in/reader034/viewer/2022042803/5f4e321c72a3781dfe6abe40/html5/thumbnails/203.jpg)
Trichy Metro EDC 240.21 116.15 121 76.03 76.31 45.86 42.9 121 76.31 42.9 116.15 76.03 45.86
Thiruvarur EDC - Thiruvarur 76.21 22.36 24.57 25.82 25.82 25.77 25.82 24.57 25.82 25.82 22.36 25.82 25.77
Thiruvarur EDC-Mannargudi Town 5.01 5.01 5.01 0 0 0 0 5.01 0 0 5.01 0 0
Thiruvarur EDC-Thiruvarur town 12.65 10.47 10.67 2.18 1.98 0 0 10.67 1.98 0 10.47 2.18 0
IPDS - (8 Nos.Town Panchayat) 29.86 12.12 13.44 11.55 11.37 6.19 5.05 10.5 8.43 2.11 9.47 8.61 2.96
Karur EDC 110.39 59.87 64.13 38.78 36.48 11.74 9.78 63.62 36.48 9.78 59.36 38.78 11.74
Pudukkottai EDC 305.74 123.15 134.55 104.24 99.83 72.35 71.36 104.55 90.33 63.86 96.15 92.69 63.9
Perambalur
EDC95.16 56.42 57.97 28.1 27.79 9.89 9.4 57.97 27.79 9.4 56.42 28.1 9.89
Thanjavur
EDC132.73 71.53 77.72 43.53 40.61 16.87 14.4 77.72 40.61 14.4 71.53 43.53 16.87
Nagapattinam
EDC324.9 144.88 160.98 138.92 132.42 40.24 31.5 159.69 131.45 30.56 143.72 137.92 39.2
Vellore EDC 242.55 81.74 89.21 100.59 98.04 55.82 55.3 81.21 89.04 45.3 74.54 91.69 44.92
Tirupattur
EDC173.24 69.64 75.72 64.49 61.72 36.07 35.8 73.22 58.52 32.5 67.39 61.36 32.45
Dharmapuri EDC 235.94 93.74 102.17 78.22 76.15 59.02 57.62 98.42 72.15 52.87 90.37 74.24 53.87
Krishnagiri
EDC295.93 91.2 99.03 104.64 104.8 90.88 92.1 99.03 104.8 92.1 91.2 104.64 90.88
Cuddalore
EDC589.26 182.51 202.8 207.92 206.86 192.46 179.6 200.55 204.36 176.85 180.49 205.44 189.46
Thiruvannamal
ai EDC281.57 87.51 91.77 137.28 138.18 52.08 51.62 91.77 138.18 51.62 87.51 137.28 52.08
Villupuram
EDC252.73 87.51 95.22 94.92 93.51 63.9 64 94.61 93.51 64 86.9 94.92 63.9
Kallakurichi
EDC161.82 80.63 87.75 54.56 49.66 24.34 24.41 86.48 48.27 22.87 79.49 53.18 22.66
Total 10694.79 5298.47 5577.12 3073.03 3016.4 2173.32 2101.28 5298.36 2883.77 1966.36 5034.85 2938.54 2025.13
TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE TRUE