TANTRANSCO Ltd. Spec.no.P&C. 971
Page 1 of 134
`
TAMIL NADU TRANSMISSION CORPORATION LIMITED
TENDER SPECIFICATION FOR
“SUPPLY AND COMMISSIONING OF C&R PANELS WITH
SAS FOR 230 kV/110 kV SUB STATIONS UNDER R&M
PROGRAMME ”
TANTRANSCO SPECIFICATION NO.P&C-971 dt. 18.11.2015
Office of the Chief Engineer, Protection & Communication,
I Floor, 5B-Block, 144, Anna Salai,
Chennai-600 002. TAMIL NADU.
![Page 2: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/2.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
Page 2 of 134
![Page 3: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/3.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
Page 3 of 134
I N D E X ----------------------------------------------------------------------------------------------------------------- SL.NO ITEM DESCRIPTION PAGE NO. -----------------------------------------------------------------------------------------------------------------
1. FOREWORD 5
2. SECTION-I : Earnest Money Deposit 7
3. SECTION-II : Bid Qualifying Requirements 9
4. SECTION-III : Rejection of Tender 10
5. SECTION-IV : Instructions to Tenderers 11
6. SECTION-V : Commercial 18
7. SECTION-VIA : Technical : General 30
8. SECTION – VIB: Technical Specification for C&R panels 36
9. SECTION – VIC : Technical Specification for SAS 69
10. SECTION – VIC : Bills of Materials 91
11. SECTION-VII : Formats
SCHEDULE-A : Price Schedule 109
SCHEDULE-B : Schedule of Equipment & Delivery Period 112
SCHEDULE-C-I : Deviation from Technical Specification. 112
SCHEDULE-C-II: Deviation from Commercial Specification. 113
SCHEDULE-D : Statement of previous Supply Orders. 113
SCHEDULE-E : Declaration Form. 114
SCHEDULE-F : GUARANTEED TECHNICAL PARTICULARS 115
SCHEDULE-G : Type Test particulars. 131
ANNEXURE - I : Undertaking towards jurisdiction of legal proceedings 132
ANNEXURE -II : Sales Tax Certificate 133
ANNEXURE III : Undertaking in Lieu of EMD. 134
![Page 4: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/4.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
4
![Page 5: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/5.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
5
TANTRANSCO
SPECIFICATION NO. P & C – 971, dt. 18.11.2015
* * *
F O R E W O R D
1) Name of the work : “Supply And Commissioning Of C&R Panels With SAS For 230 kV/110 kV Sub Stations
Under R&M Programme” 2) Due Date and time for : 2.00 p.m on 30.12.2015 receipt of Tender 3) Due date and time for : 2.00 p.m on 30.12.2015 opening of Tender 4) (a) Earnest Money Deposit (EMD) : Rs.11,00,000/- (or) (b) Permanent EMD : Rs.20,00,000/- and above in TANTRANSCO Ltd. 5) Tenders form should be : TANTRANSCO LTD addressed to Through The Chief Engineer/P&C, I Floor, 5-B Block,144, Anna Salai, Chennai-600 002. 6) Address to which sealed : Superintending Engineer/Design envelope should be forwarded Protection & Communication, II-Floor, MLDC Block, 144, Anna Salai, Chennai-600 002. 7) Required number of Tender copies : Duplicate 8) Place at which tender will be opened : O/o the Superintending Engineer/ Design/Protection and Communication,
2nd Floor, MLDC Block, 144, Anna Salai, Chennai-600 002. 9) Cost of Specification : Inside & outside Tamil Nadu - Rs.10,000/- Rs. 100/- extra if required by post.
10) Tender system adopted : Two part (open Tender)
11) Period of contract : One year from the date of acceptance of LOA 12) Delivery period : Delivery of materials ordered shall be completed
within three months from the date of receipt of indent from TANTRANSCO. The delivery period for works items is one month from the date of receipt of indent from the TANTRANSCO.
![Page 6: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/6.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
6
13) Pre-bid Meeting : Will be held on 07.12.2015 at 11.30hrs. 14) Specification at TNEB website : The tender specification will be placed at Tantransco
website (www.tantransco.gov.in) and TN Govt.
website.(www.tenders.tn.gov.in). The prospective
bidders may download the same. In such case, the
bidders need not pay the cost of specification
other wise tender specification shall be obtained
from the office of the tender inviting authority or
other authenticated officers on payment of
cash/Demand draft in favour of the TANTRANSCO
collection account, Chennai-2 for the specification.
***
![Page 7: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/7.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
7
SECTION – I EARNEST MONEY DEPOSIT
1) Tenderer should pay the specified amount towards Earnest Money Deposit, as follows.
Earnest Money Deposit: Rs. 11,00,000/- (Rupees Eleven lakhs only). The Earnest Money Deposit specified above should be in the form of DEMAND DRAFT/
BANKER’S CHEQUE for the above amount drawn on any Nationalised/ Scheduled / Foreign Banks with Branches in India in favour of the TANTRANSCO collection account, Chennai-2, payable at Chennai.
2) (i) The EMD will not carry any interest.
(ii) Firms having Permanent EMD with TANTRANSCO at Headquarters for an amount
equal to Rs.20,00,000/- and above in TANTRANSCO LTD are exempted from
payment of Earnest Money Deposit. Such tenderers should enclose the copy of the
PEMD certificate issued by the TANTRANSCO. The original PEMD certificate should
be produced for verification on demand by the purchaser if warranted. 3) The Earnest Money Deposit will be refunded to the unsuccessful tenderers on application
to the Superintending Engineer/Design/Protection & Communication after intimation of
the rejection/ non-acceptance of their tender is sent to them. 4) CHEQUE/BANK GUARANTEE will not be accepted towards E.M.D. and the tenders shall
be rejected if EMD is not paid in the prescribed manner. 5) The following categories of industries are exempted from payment of Earnest Money
Deposit.
(a) The Small Scale Industrial units located within the State and Registered with the
Tamil Nadu Small Industries Development Corporation.
(b) The Small Scale Industrial units located within the State and Registered with National
Small Industries Corporation.
(c) The SSI units holding Permanent Registration certificate from the District Industries
centers of Directorate of Industries and Commerce in respect of those items for which
the Registration Certificate has been obtained.
(d) Department of the Government of Tamil Nadu.
(e) Undertakings and Corporations owned by Government of Tamil Nadu.
(f) Labour Contract Co-operative Societies of Government of Tamil Nadu.
(g) Tiny Industries classified under SSI registered with the State of Tamil Nadu and
Registration Certificate issued by Department of Industries and Commerce/Government
of Tamil Nadu.
(h) Small Scale Industrial Units located outside the Tamil Nadu State but registered with
National small Industries Corporation in respect of the items manufactured by them.
(i) The Exemption from payment of EMD is also extended to the tenderers who have
furnished Entrepreneur memorandum Part II and acknowledgement issued by the District
Industries Centers concerned.
(j) In case of investment held by SSI in plant & machinery as per their financial statement of
accounts exceeds Rs. 5 crores, the General Manager, District Industries centre concerned
shall be requested to verify the SSI status of the firm. NO PRICE PREFERENCE SHALL
BE EXTENDED TO DOMESTIC SSI UNITS AND PUBLIC SECTOR UNDERTAKINGS
OF THE GOVERNMENT IN EVALUATING THE OFFERS.
![Page 8: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/8.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
8
NOTE: SSI units having provisional registration certificate are not eligible for EMD
Exemption.
6) Those Tenderers who are exempted from payment of EMD shall furnish, in lieu of EMD,
an undertaking on a non-judicial Stamp paper of value not less than Rs.80/- (Rupees Eighty
Only) to the effect to pay as penalty an amount equivalent to EMD or an amount equal to
the actual loss incurred whichever is less in the event of non-fulfillment or non-observance of
any of the conditions stipulated in the contract consequent to such breach of contract. The
State Government, Public Sector undertakings who are exempted from payment of EMD
should also pay as penalty an amount equivalent to the amount fixed as security deposit in
the event of non-fulfillment or non-observance of any of the conditions stipulated in the
contract. TENDERS RECEIVED WITHOUT THIS UNDERTAKING WILL NOT BE OPENED.
7) Small Scale Industries registered within the State of Tamil Nadu shall enclose Photostat
copy of their Registration Certificate showing the subject materials specifying capacity which
they are permitted to manufacture and the period of validity of the certificate as proof of
eligibility for exemption from payment of EMD in a sealed outer sealed cover or in “A” cover
as specified in Clause - 2.
8) Others viz. Central and Other State Government Departments, Undertakings and
Corporations other than Tamil Nadu shall have to pay Earnest Money Deposit.
9) The Earnest Money Deposit, proof of Permanent Earnest Money Deposit or proof of
exemption shall be placed in the outer sealed cover or in “A” cover but not in “B” cover.
Envelope – “A”, Envelope – “B” shall be enclosed in an overall envelope and the Earnest
Money Deposit/Permanent Earnest Money Deposit proof or proof of exemption from paying
Earnest Money Deposit shall be enclosed either in “A” Cover or inside the outer cover and
shall be sent to reach the prescribed officer. At the time of opening the tenders, any offer
which does not satisfy the EMD conditions will not be read out.
10) The Earnest Money Deposit made by the Tenderer will be forfeited if:-
a) He withdraws his tender or backs out after acceptance.
b) He withdraws his tender before the expiry of validity period stipulated in the specification
or fails to remit the security deposit.
c) The tenderer violates any of the provisions of these regulations contained herein.
d) The tenderer revises any of the terms quoted during the validity period.
e) In the event of the documents furnished with the offer being found to be bogus or the
documents contain false particulars, the EMD paid by the tenderers will be forfeited in
aaddition to blacklisting them for future tenders/contracts in TANTRANSCO.
f) If the permanent EMD holder back out an amount equivalent to EMD for this tender will be
forfeited.
***
![Page 9: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/9.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
9
SECTION – II The BIDDER shall become eligible to bid on satisfying the following “BID QUALIFICATION REQUIREMENTS” and on production of the required documentary evidences along with the Tender.
1. The bidder should be a manufacturer with at least three years of experience in
the Design, manufacture and supply of substation automation system with
control & relay panels based on IEC 61850 protocol to any SEB/Public
undertaking/power utility for application in 220kV/230 kV or higher voltage
rated substation in India. Necessary proof for compliance to the afore
mentioned bid qualification requirement shall be furnished which shall include
ISO certificate, Certificate of registration , Memorandum of association, End
user certification/ letter to prove the aforementioned experience etc.
2. The bidder should have tested and commissioned the Substation automation
system (SAS) based on IEC 61850 Protocol for at least one number
220kV/230kV or higher voltage rated substation of SEB/Public undertaking/
power utility in India during the last five years from the date of tender
opening. The aforementioned SAS should have been supplied by the bidder and
should be in satisfactory performance for at least one year during the last five
years from the date of tender opening. Necessary proof in this regard should be
furnished with authentication of the end user.
3. Annual turnover of the bidder shall be more than Rs.2.75 Crores during any
one of the last three financial years i.e. 2014-15, 2013-14 and 2012 - 13. The
bidder shall furnish either the Annual Turnover Certificate issued by the
Chartered Accountant or Audited Annual Statement of Accounts (or) the
attested copy of Income tax return filed by the bidder (or) the attested copy of
sales tax clearance certificate for the respective period as above.
Note: 1.The offers of the bidders not satisfying the above mentioned bid qualification
requirements will be summarily rejected. 2.All the bid documents furnished towards compliance of bid qualification
requirements should be clearly segregated folder-wise/divider with respect to compliance for each of the BQR’s. All the copies of documents furnished as documentary proof for compliance with BQR’s should be duly attested by a Notary public.
![Page 10: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/10.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
10
SECTION – III REJECTION OF TENDERS
I. Tender will be SUMMARILY rejected if,
a) The EMD requirements are not complied with. b) Not satisfying Bid Qualification Requirements.
II. Tender is LIABLE to be rejected, if it is:
(a) not covering the supply of equipments/materials with all Accessories and works.
(b) With validity period less than that stipulated in this specification.
(c) not in conformity with TANTRANSCO’s Commercial terms and conditions,Technical
Specifications, Type test requirements (Section - V & VI).
(d) not properly signed by the tenderer.
(e) Received from a tenderer who is directly or indirectly connected with Government
Service or TANTRANSCO Service or TANGEDCO or TNEB Ltd or Service of local
authority.
(f) From those who have not purchased the copy of the Tender document or not
downloaded from the Website (TANTRANSCO & Govt.)
(g) From any black listed or banned Firm or Contractor.
(h) Received by Telex/Telegram / E-Mail.
(i) From a tenderer whose past performance/Vendor rating is not satisfactory.
(j) Not containing all required particulars as per Schedule - A to G.
(k) Received after the expiry of the due date and time.
(l) Submitted without the Taxpayer identification number (TIN) of the bidder.
![Page 11: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/11.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
11
SECTION – IV INSTRUCTIONS TO TENDERERS
1.0. Sealed tenders in Two Part System (a) Technical Bid with Commercial terms but
without Price Bid and (b) Price Bid (both bids in duplicate) will be received for and on behalf
of TAMILNADU TRANSMISSION CORPORATION LIMITED, herein after referred as
TANTRANSCO, so as to reach on or before the due date prescribed. All the tenders shall be
prepared and submitted strictly in accordance with the Instructions set forth herein. THE
TENDERERS WHO DO NOT FULFILL THE “BID QUALIFICATION REQUIREMENTS” AS PER
SECTION – II NEED NOT PARTICIPATE IN THE TENDER. OFFERS NOT SATISFYING THIS
"BID QUALIFICATION REQUIREMENTS” WILL NOT BE CONSIDERED AND WILL BE
SUMMARILY REJECTED.
1.1. The Tamil Nadu Transparency in Tenders Act 1998 and Tamil Nadu Transparency in Tender Rules 2000 are applicable to this Tender. 2.0. SCOPE OF SUPPLY AND WORKS: (i) The scope of supply of the material (described in Schedule-A) includes design,
manufacture, Factory acceptance tests, packing and delivery of the materials as
detailed herein at TANTRANSCO stores/Site anywhere in Tamil Nadu.
(ii) The scope of works includes installation, testing and Commissioning (described in
Schedule - A) of complete substation automation system for respective substation. The
testing and commissioning of SAS is inclusive of system integration of control and protection
panels.
TRAINING SCOPE:
Training shall be imparted at works and at site as described below.
a) Training at supplier’s works (Appicable for each sub-station)
Minimum one week training for two batches of TANTRANSCO’s engineers at the manufacturer’s works with lectures and hands on training on complete SAS & protection relays. This training shall be imparted prior to commissioning of SAS & protection system. Training shall be organized in group(s) wherein each group shall comprise at least 5 trainees. All relevant training material, tools and equipments shall be provided for each trainee towards this training. The training shall cover the technology, principle of operation, functions etc of the protection relays and SAS devices. Training content should be furnished to TANTRANSCO for obtaining concurrence prior to training schedule.
All expenses for trainees towards boarding, lodging, travel , travel insurance etc to attend
the training program is in the bidder’s scope. In this context charges of any kind shall not be
levied to TANTRANSCO.
![Page 12: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/12.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
12
b) Training at site (Applicable for each sub-station):
Comprehensive hands on training of TANTRANSCO engineers at site should be imparted as follows:
i. For 1 batch of 5 engineers oriented for operations of SAS & protection system. This training shall be imparted after commissioning of SAS.
ii. For 1 batch of 5 engineers oriented for Testing, commissioning & maintenance of complete SAS & protection relays. This training shall be imparted after installation of SAS & protection system. This training should be implemented to enable the trainees to configure, trouble shoot all the SAS devices including numeric relays, BCU etc for rectification of faults and prepare the trainees to use all the configuration tools for all of the SAS devices. The training should enable the trainees to carry out the necessary modifications in SAS for bay extensions / deletion/modifications etc.
All expenses of the training instructor for executing the training at site is in the bidder’s scope.
Delivery receipt signed by the trainees deputed should be furnished towards completion of
training at works and at site. Training scope is included under the commissioning of SAS.
iii) General:
All the works shall be carried out with the witness of the concerned TANTRANSCO engineer
and the completion of the works should be certified by the concerned TANTRANSCO
engineer.
iv) Scope of system integration of control and protection panel (Applicable for optional price
item only ):
All necessary modifications in the hardware and software in the SAS servers, all LANs with
relevant cables, Engineering work station, Metering PC to integrate the control and
protection panel of any make.
All the updated ICD,SCD,CID,SSD files shall be provided in CD to TANTRANSCO.
All necessary configuration in the numerical relays, IEDs, Electronic meters in the control and
protection panel of any make to integrate these devices with the SAS offered by the bidder.
3.0. SUBMISSION OF TENDER OFFER: 3.01. The Tenderer is expected to examine all instructions and Schedules detailed in the Specification and submit the Schedule of prices and other required particulars in the schedules and drawings called for in this specification, only as per the formats prescribed, herein. 3.02 The bidder must quote for all the listed items in the price schedule. 4.0. TWO PART TENDER:
4.01. The Tenders shall be in Two Parts as detailed below, each in a separate sealed
Envelope marked,
" ENVELOPE- A " AND " ENVELOPE - B"
1. The first envelope, called “ Envelope – A ” shall contain :
a) DD / BC towards EMD, proof of exemption from payment of EMD & proof of PEMD and
Un-priced bid as per Schedule B, C-I, C-II, D, E & G (i.e. Technical Bid with commercial
terms except price.)
![Page 13: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/13.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
13
b) Any other information called for in the specification other than price. THIS ENVELOPE -
“A” SHOULD NOT CONTAIN ANY PRICE BID. 4.02. The second envelope, called Envelope-B, shall contain the PRICE BID only as per Schedule – A. 4.03. The Tender in two parts shall be prepared in duplicate and put in a separate, sealed, superscripted envelope (Envelope-A and Envelope-B) as instructed above. 4.04. Envelope- A and Envelope-B shall be enclosed in an overall envelope and the
Earnest Money Deposit/Permanent Earnest Money Deposit proof or proof of exemption from
paying EMD shall be enclosed either in “A” Cover or inside the outer cover and shall be sent
to reach the prescribed officer.
The EMD in approved FORM (DD/BANKERS CHEQUE/COPY OF PEMD CERTIFICATE), Proof of
Permanent EMD (OR) Proof of exemption from payment of E.M.D. along with
UNDERTAKING in lieu of EMD as per FORMAT in SCHEDULE-F shall be placed in the outer
sealed cover or in “A” cover but not in “B” cover.
At the time of opening the tenders, any offer which does not satisfy the EMD conditions will
not be read out. 4.05. Envelope-A and Envelope-B and the overall envelope should be individually sealed,
superscripted with the Specification number, materials offered and due date of submission
and addressed to the Chief Engineer/Protection & Communication, TANTRANSCO Ltd,
Chennai. 4.06. The Tender offers in complete shape in one envelope containing Envelope – A and
Envelope-B, as required in Clause 4.03 shall be sent so as to reach the Superintending
Engineer/Design, Protection & Communication, II Floor, MLDC Block, Electricity Avenue, 144,
Anna salai, Chennai – 600002 on or before 2.00 P.M on the due date for submission of
offers. 4.07. The Tender documents shall be addressed to the Chief Engineer, Protection &
Communication, TANTRANSCO Ltd, Chennai. 4.08. Envelope “A” of those bidders who satisfy the requirement of Earnest Money Deposit
will only be opened on the due date and time already mentioned. If any of the Bidders
indicate price in Envelope – A, the Bid will not be read out and will be rejected.
4.09. Envelope “B” will not be opened at the time of opening Envelope “A” but will be
authenticated in the covers by officers authorized to open the bids. Envelope “B” so
authenticated will be kept under the safe custody of the empowered officer to open the
tender. Envelope “B” Price Bid will be opened later, the date of which will be intimated to
the tenderer at a later date, after technical evaluation of the tender is completed. 4.10. If the tenderer finds any ambiguity in any of the terms and conditions stipulated in this
specification, he shall get it clarified, at least 48 hours before opening of the tender, from
the Chief Engineer/ Protection & Communication, TANTRANSCO Ltd and send the queries for
clarifications to The Superintending Engineer/ Design, Protection & Communication, II Floor,
MLDC Block, Electricity Avenue, 144, Anna salai, Chennai – 600002 or FAX to (044)
28521210 or email to [email protected] with a copy to [email protected] , If this is
![Page 14: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/14.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
14
not done and subsequent to the opening of the tenders, it is found that the doubt about the
meaning or ambiguity in the interpretation of any of the terms and conditions stipulated in
the specification are raised by the tenderer, either in this tender or by a separate letter, the
interpretation or clarification issued by the Chief Engineer/Protection & Communication,
TANTRANSCO Ltd on such of those terms and conditions of the Tender Document as may be
raised by the tenderer shall be final and binding on the tenderer. 4.11. All offers shall be prepared by typing or printing in the formats enclosed with the
specifications. One original and one duplicate of the original proposal, which are identical,
shall be submitted by each tenderer. 4.12. All information in the offer shall be in ENGLISH only. It shall not contain
interlineations, erasures or over writings except as necessary to correct errors made by the
tenderer. Such erasures or other changes in the tender document shall be attested by the
person signing the tender offer. 4.13. The offer shall contain full information asked for in the accompanying schedules and
elsewhere in the specification. 4.14. The tenderer has the option of sending the offer by Registered Post or submitting the
same in person so as to reach by the date and time indicated. 4.15. In case of postal delivery, tenderers are advised to send them well in advance so
that they are delivered before the prescribed date and time. 4.16. The tenders delivered in person/courier shall be handed over to the
Executive Assistant to The Superintending Engineer/Design/Protection &
Communication, II Floor, MLDC Block, Electricity Avenue, 144, Anna salai,
Chennai – 600002 before 14.00 hrs. on the due date for bid submission. 4.17. The TANTRANSCO will not be responsible for any postal or other transit loss or delay in
receipt of the tender offer. 4.18. Telex/Fax/E-Mail or telegraphic offers will not be entertained and will be rejected. 4.19. Any offer received by the TANTRANSCO after the due date and time specified for
submission of tender will be declared late, rejected and returned unopened to the tenderer. 4.20. No tender offer shall be allowed to be modified subsequent to the deadline for
submission of tender offers. 4.21. Tenderer shall bear all costs associated with the preparation and delivery of the offers,
and the TANTRANSCO will in no case be responsible or liable for these costs. 4.22. No offer shall be withdrawn by the tenderer in the interval between the deadline for
submission and the expiry of the period of validity specified/extended validity of the tender
offer. 4.23. The Tenderers are requested to furnish the exact location of their factories with
detailed postal address, Pin Code, Telephone and Fax Nos. etc., in their tender so as to
arrange inspection by the TANTRANSCO if considered necessary. 4.24. Joint ventures/Consortiums are not eligible to participate in this tender.
![Page 15: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/15.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
15
4.25. Tenderers shall indicate in their tender whether the company is potentially sick
industrial companies in terms of sec.23 or sec.15 of sick industrial companies special
provisions Act.1985. Further failure to furnish the above information will make the tender
liable for rejection.
5.0. TENDER OPENING:
5.01. The Tender offers except price Bid will be opened at 14.00 Hrs. on the date notified, at
the Office of the Superintending Engineer/Design/Protection & Communication, 2nd Floor,
MLDC Block, Electricity Avenue, 144, Anna Salai, Chennai – 600 002 in the presence of
tenderer’s authorized representative who may wish to be present on the date of opening.
5.02. If the last date set for submission of tender offers and opening date happens to be a
holiday, the tenders will be received and opened on the succeeding working day, without
any change in the timings indicated. 5.03. The duly authorized representatives of the tenderers who are present shall sign the
tender opening register. 5.04. The Tenderer’s Name, prices, all discounts offered, and such other details as the
TANTRANSCO, at its discretion, may consider appropriate will be announced and recorded at
the time of tender opening.
6.0. INFORMATION REQUIRED AND CLARIFICATIONS:
6.01. To assist in the examination, evaluation and comparison of tender offers, the
TANTRANSCO may, at its discretion, ask the tenderer for a clarification of his offers. All
responses to requests for clarification shall be in writing and to the point only. No change in
the price or substance of the offer shall be permitted. 6.02. The TANTRANSCO will examine the tender offers to determine whether they are
complete, whether any computational errors have been made, whether required sureties
have been furnished, whether the documents have been properly signed and whether the
offers are generally in order. 6.03. The Tender offers shall be deemed to be under consideration immediately after they
are opened and until such time official intimation of award/rejection is made by the Tender
Accepting Authority to the tenderers. The Tenderers shall not make attempts to establish
unsolicited and unauthorised contact with the Tender Inviting Authority, Tender Accepting
Authority or Tender Scrutiny Committee after the opening the tender and prior to the
notification of the award and any attempt by any tenderer to bring to bear extraneous
pressures on the Tender Accepting Authority shall be sufficient reason to disqualify the
tender. 6.04. Mere submission of any offer connected with these documents and Specification shall
not constitute any agreement. The tenderer shall have no cause of action or claim against
the TANTRANSCO for rejection of his offer. The TANTRANSCO shall always be at liberty to
reject or accept any offer or offers at its sole discretion and any such action will not be called
into question and the tenderer shall have no claim in that regard against the TANTRANSCO. 6.05. The Tamil Nadu Transparency in Tenders Act 1998 and Tamil Nadu Transparency in
Tender Rules 2000 are applicable to this Tender.
![Page 16: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/16.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
16
7.0. EVALUATION AND COMPARISON OF TENDER OFFERS:
7.01. The tender offers received for consideration will be examined to determine whether
they are in complete shape, all data required have been furnished, the tender offer is
properly signed and are generally in order and whether the tender offer conforms to all the
terms and conditions of the Tender document without any deviation. 7.02. For the purpose of evaluation of the tender offers, the following factors
will be taken into account for arriving at the evaluated price.
a) The quoted price will be corrected for Arithmetical errors.
b) In case of discrepancy between the prices quoted in words and in
figures, Lower value of the two will be considered. 7.03. The evaluation shall include all central duties such as Excise and Customs duties and
CST/TNVAT as detailed below:
i) In evaluation of an imported item, the price has to be determined inclusive of customs
duty.
ii) In evaluation of the price, articles which are subject to excise duty the price has to be
determined inclusive of such excise duty.
iii) In a tender where all the tenderers are from within the state of Tamil Nadu or where all the tenderers are from outside the state of Tamil Nadu, the sales tax or VAT shall be included for the evaluation of the price and in a tender where the tenderers are both from the state of Tamil Nadu as well as from the outside state of Tamil Nadu, the TNVAT quoted shall be excluded for the evaluation of price. 7.4 The offers will be evaluated as a whole. The lowest evaluated price will be accepted. The optional price item in schedule-A will not be considered for evaluation. 7.5 Tenderers shall quote for all the tendered items. 8.0. VALIDITY: 8.01. The Tender offer shall be kept valid for acceptance for a period of 180 days from
the date of opening of offers. The offers with lower validity period are liable for rejection. 8.02. Further, the tenderer shall agree to extend the validity of the Bids without altering the
substance and prices of the Bid for further periods, if any required by the TANTRANSCO. 9. 0. RIGHTS OF THE TANTRANSCO
Notwithstanding anything contained in this specification, the TANTRANSCO reserves the
right to:
a) Accept the lowest tender.
b) Revise the quantities to the level of +/-25% in either way at the time of placing orders.
c) Reject any or all the tenders or cancel without assigning any reasons there for.
d) To split the Tender Quantity and place orders on one or more than one Firm to meet the
delivery requirements.
e) Recover losses if any sustained by TANTRANSCO, from the supplier who pleads inability
to supply and backs out of his obligation after award of contract. The Security Deposit
paid shall be forfeited.
f) To cancel the orders for not keeping up the delivery schedule.
![Page 17: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/17.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
17
g) To reallocate the materials and works of a particular substation in this tender to any other
substation of TANRANSCO in Tamilnadu without increase in prices of respective items.
10.0 DEVIATIONS:
10.01. The tenderer shall furnish, if there are any deviations in the commercial and technical
terms in the Schedules C-I & C-II Annexed. Deviations mentioned elsewhere will not be
considered. If no deviations are furnished, it will be construed that the tenderer is accepting
all terms specified in the specification. Similarly, if any deviations are furnished in the said
schedules, it will be construed that these are the only deviations and the tenderer is
accepting all other terms of the specification and the offer will be taken for evaluation
accordingly. 10.02. THE OFFERS OF THE TENDERERS WITH DEVIATIONS IN COMMERCIAL TERMS AND
TECHNICAL TERMS OF THE TENDER DOCUMENT ARE LIABLE FOR REJECTION.
10.03. NO ALTERNATE OFFER WILL BE ACCEPTED.
10.04. Any attempt by any tenderer to bring to bear extraneous pressure on Tender
Accepting Authority shall be sufficient reasons to disqualify the tenderer.
11.0. BAR OF JURISDICTION:
Save as otherwise provided in Tamil Nadu Transparency in Tender Act 1998 no order passed
or proceeding taken by any officer or authority under this Act shall be called in question in
any Court, and no injunction shall be granted by any court in respect of any action taken or
to be taken by such officer or authority in pursuance of any power conferred by or under the
above Act.
12.0. APPEAL:
Any tenderer aggrieved by the order passed by the Tender accepting Authority under
Section-10 of the Tamil Nadu Transparency in Tenders Act 1998 may appeal to the
Government within 10 (Ten) days from the date of receipt of order.
13.0. Permanent Account Number (PAN):
The tenderers are requested to furnish the Permanent Account Number in their offer.
14.0. Taxpayer identification number (TIN) :
The tenderers shall furnish the Taxpayer identification number in their offer.
15.0. Pre bid meeting :
The pre bid meeting will be held at the O/o the Superintending Engineer/Design/Protection &
Communication ,IInd floor MLDC Block, 144 Annasalai, Chennai-2.
&&&&&&&
![Page 18: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/18.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
18
SECTION: V
COMMERCIAL
1.0. A) PRICE:
1.1. The Tenderers are requested to quote FIRM Price in Indian rupees only. 1.2. The prices quoted should be in Indian rupees only per unit all inclusive price including
Excise Duty, CST/TNVAT, Packing and Forwarding, Freight and Insurance for Delivery to
TANTRANSCO Stores/site anywhere in Tamil Nadu. A format for price is given in
Schedule `A’. 1.3. It is the responsibility of the tenderer to make sure about the correct rates of duty/tax
leviable on the materials at the time of tendering. If the rates assumed by the Tenderers
are less than the current rates prevailing at the time of tendering, the TANTRANSCO will not
be responsible for the mistake. 1.4. The tenderer should quote their rates taking into account the Excise Duty relief available
to them on account of duty paid for procurement of raw materials under CENVAT Scheme. 1.5. Also a certificate to the effect that the tenderers have taken into account CENVAT Credit
while quoting prices shall be given.
B) CONTRACT PERIOD:
The period of contract shall be one year from the date of receipt of acceptance of letter of
award of contract.
2.0. A) SALES TAX/VAT:
2.1. The Central Sales Tax/TNVAT will be paid extra as applicable. The amount of Central
Sales Tax/TNVAT and percentage payable shall be indicated separately in the tender offer.
Central Sales Tax/TNVAT is not applicable to Freight and Insurance charges. 2.2. The TANTRANSCO Ltd has been registered as a dealer, under Central Sales Tax Act
1956 (Registration No.956816) & under TNVAT Act 2006 TIN No. 33940641472.
As per G.O.MS No. 77 dated 11.07.2011 Notification – III No. II(1)/CTR/12(R-17)/ 2011,
the concessional rate of VAT @ 5% is applicable for the goods supplied to TNEB Ltd.,
TANGEDCO and TANTRANSCO, used in Generation, Transmission and Distribution of
Electrical Energy except petrol, cement & Diesel. Further, as per G.O.MS No.77,
dt.01.07.2011 Notification-IV No. II(1)/CT/12(R-18)/2011, the concessional rate of VAT @
5% is applicable for the sale of goods for use in the execution of turnkey projects by
contractors who have entered into agreement with TNEB Ltd., TANGEDCO and
TANTRANSCO, subject to the condition that the dealer / purchaser obtains and furnishes a
certificate in the prescribed form.
The necessary certificate as per G.O shall be furnished for availing concessional rate of VAT.
The C form for the classes of goods specified for the purpose as per CST Act shall be
furnished for availing concession / Nil rate of CST. 2.3. In case of delayed delivery, the Central Sales Tax/TNVAT prevailing on the date of
despatch or on the last day of the contractual delivery period whichever is LESS will be
admitted. For both the cases the supplier shall furnish documentary evidence while
submitting the bills for payment.
![Page 19: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/19.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
19
2.4. Provided always, it is hereby agreed and declared that in case, where the TANTRANSCO
has doubt and belief that Central Sales Tax/TNVAT is not at all payable for the transaction in
question, the TANTRANSCO reserves the right to withhold the amount of tax until the party
produces an order of court of competent jurisdiction, declaring the liability of the transaction
to Central Sales Tax/TNVAT. Concessional rate of Central Sales Tax/TNVAT, if any, shall be
taken into account and included in the price quoted giving proof thereof. 2.5. The following certificates have to be furnished for admittance of claim of Central Sales
Tax/TNVAT.
(i) Certified that the transaction in which the Central Sales Tax/TNVAT has been claimed and
has been/will be included in the return submitted/to be submitted to the Central Sales
Tax/TNVAT authorities for assessment of the Central Sales Tax/TNVAT and the amount of
Central Sales Tax/TNVAT claimed from the purchaser has been/will be paid to sales tax
authorities. (ii) Certified that the goods on which the Central Sales Tax/TNVAT has been charged have
not been exempted under C.S.T. Act or TNVAT and the rules made there under and the
charges on account of Central Sales Tax/TNVAT on these goods are correct, under provisions
of relevant Act or Rules made there under. (iii) Certified that we shall indemnify the TANTRANSCO, in case if it is found at a later date
that wrong / incorrect or excess payment has been recouped on account of Central Sales
Tax/TNVAT paid by us. (iv) Certified that we are registered as dealer under the Central Sales Tax Act and our
Registration No. is ………………………………………….and under TNVAT Act 2006 and our
Registration No is………………………………………….. (v) Certified that TNVAT credit availed by me has been taken into account in the rates
quoted.
Consequent to introduction of VAT, the additional Taxes such as Turnover Tax or Resale Tax, Surcharge and additional surcharge have been abolished. In the VAT Act 2006, there is no provision for availing concessional rate of 3% against Form
XVII. However the goods covered under above category can be procured at concessional
rate of VAT @ 5% against issue of certificate.
In regard to Central Sales Tax involving Interstate sale appropriate rate of CST against “C”
form shall be applicable.
2.0. B) SERVICE TAX: Applicable service tax along with educational cess will be reimbursed on production of documentary evidence for having paid the same and certificate copy of having registered at service tax cell. 3.0. A) EXCISE DUTY :
3.1. It is the responsibility of the tenderer to make sure about the correct rates of duty
leviable on the material at the time of tendering. If the rates assumed by the Tenderer are
less than the current rates prevailing at the time of tendering, the TANTRANSCO will not be
responsible for the mistake.
![Page 20: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/20.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
20
3.2. Any increase in Excise Duty consequent to the suppliers coming into different duty slab
during the execution of the contract shall have to be taken into account and the all inclusive
Firm Price shall be quoted accordingly by the tenderers. Any variation in Excise Duty due to
statutory variation within the contract delivery date shall be considered. 3.3. Authentic invoice containing the details of Central Excise Registration No. PLA No. Debit
entry in PLA/RG 23 duly authenticated by items manufactured by the tenderer.
3.4. In case of delayed delivery, Excise Duty prevailing on the date of despatch or the
Excise Duty applicable on the last date of contractual delivery period whichever is less will be
admitted. 3.5. Excise Invoice containing PLA No. debit entry in RG 23, etc. shall be furnished as proof
for having paid Excise Duty. 3.6. The tenderer who quotes ED as NIL and in the event of placement of order against this specification where the value of the order is above Rs.150 Lakhs, such tenderer shall furnish an Undertaking to the effect that the ED commitment on the account of crossing the turnover slab will be discharged to the ED authorities and that the TANTRANSCO shall not be responsible for any ED evasion by the tenderer in respect of the subject tender transaction.
B) Customs duty and Taxes:
3.7. The purchaser will decide and desire the list of accessories, tools and spares which are not manufactured in India and which will have imported as complete units and supplied by domestic bidders customs duties and other import taxes on such items will be included in the bid price by the domestic bidders and the same will be paid/reimbursed at actual by the purchaser. The custom duties and other import levies for these items will also be taken in to account for bid evaluation. When concessional customs duties is availed , the payment will be restricted to the actual on receipt of bill of entry in original. The customs duty shall be paid by the supplier. 3.8. Indian customs Act 1962 permits import of erection equipment required by a foreign vendor/contractor to perform his works in India under the ‘contract’. Such imports are exempted from payment of import duty subject to the vender/contractor giving a declaration to the Indian customs authorities to the effect that such imported equipment shall be re-exported out of India as soon as ‘Works’ are completed. The vender/contractor shall have to declare the time for which machinery shall be in India. Further clarification on this matter can be had from the office of the Director general of foreign trade, Minister of commerce, Government of India, udyog bhavan, Maulana azad road, New Delhi-110001. 3.9. The benefit of the same concessional customs duties, if any, availed by the tenderer, shall be passed on to the Board. 4.0 INSURANCE:
Contracting firms shall arrange insurance for the equipment and all its accessories being
supplied by them, through any of the Nationalised Insurance Companies. The equipment
shall be insured to cover transport (from Warehouse) and 60 days storage risk at store/site.
The damages, if any, during transit will be reported within 30 days of receipt of materials. It
will be the responsibility of the supplier to replace the defective/damaged materials and
make good the shortages and other losses in transit, free of cost, lodge and recover claim
from Insurance, Under-writers/Carriers.
![Page 21: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/21.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
21
5.0. PACKING AND FORWARDING :
The equipment and all its accessories shall be securely packed and despatched, freight paid,
duly insured, at supplier’s risk and cost. The packing may be in accordance with the
manufacturer’s standard practice. The supplier is responsible for ascertaining the facilities
that exist for Road Transport to site. Each package shall be clearly marked and contain
detailed packing list, such as gross weight, net weight etc. The supplier is solely responsible
for any loss or damage during transport. The despatch of materials shall be made only after
the approval of test certificates by the TANTRANSCO. The equipment/Materials shall be
unloaded at Destination Stores/Sites by the supplier free of cost.
6.0. PAYMENT:
6.1. Payments will not be made for equipments/materials damaged during transit. All
defective materials shall be replaced by the supplier free of charge. The payments shall be
made in the currency of Indian rupees only. All the money transactions will be in Indian
rupees only. 6.2. Payments for the supplies will be made by Cheque on any one of the Nationalized
Banks/Scheduled Banks approved by Reserve Bank of India, in Tamil Nadu. The bank
charges involved in making the payment will be to the account of the Tenderer. 6.3. Submission of bills with required documents is necessary for all payments. 6.4. Payment terms : I) For materials /works delivered within the delivery period:
75% of the all inclusive price of the equipments/materials will be paid within a reasonable
time after receipt of materials in good condition at stores/site.
Balance 20% of material price and 95% of works (i.e installation, testing and commissioning
of SAS) price will be paid within a reasonable time after completion of commissioning /
Integration of Sub-station automation system.
Balance 5% of material price as well as the 5% of the works price will be paid within a
reasonable time after completion of commissioning works in all respects. II) For materials / works delivered beyond the delivery period:
75% of the all inclusive price of the equipments/materials after deducting the appropriate
amount of Liquidated damages of each consignment will be paid within a reasonable time
after receipt of materials in good condition at stores/site.
Balance 20% of material cost and 95% of works (i.e installation, testing and commissioning
of SAS) price will be paid within a reasonable time on completion of commissioning of Sub-
station automation system with deduction of the Liquidated damages as applicable for works
item and the balance 5% will be paid after closure of P.O.. 6.4.3. For the delayed payments, if any, TANTRANSCO will not pay any interest on any
account. 6.5. In case of delay in supply, the materials will be accepted subject to the following
conditions.
(a) There should be no declining trend in prices.
(b) Payment will be released as per the recent purchase order rate or lowest rate obtained
during the recent tenders opened subject to levy of liquidated damage for belated supplies.
![Page 22: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/22.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
22
(c) TANTRANSCO reserves the right to accept or reject the delayed Supplies without
assigning any reason therefore and take action as per the other terms and conditions of
this specification. 6.6. The bills for payment will be passed only after the approval/ acceptance of the
following:
a) Approval of the Security Deposit cum Performance Bank Guarantee for 5% value of the
contract.
b) Acceptance of Test Certificate/reports.
c) Approval of the involved Drawings, supply of all the relevant Operation and maintenance
manuals etc.
d) Approval of Undertaking towards jurisdiction for Legal Proceedings.
e) Approval of the Guarantee certificates. 6.7. The supplier should despatch materials only after getting despatch instruction from
TANTRANSCO. If the supplier despatches the materials without the prior approval of the
TANTRANSCO, then the TANTRANSCO shall not be responsible for any demurrage or
wharfage or both and only the supplier should bear any expenditure arising out of such
unapproved despatches. 6.8. The purchase order will be closed on completion of supply and works in all respects.
6.9. In case quantity of materials delivered is more than that of the quantity stipulated in the delivery schedule of the delivery clause, then payments will be made only as per the payment milestone relevant to the original delivery schedule stipulated in the delivery clause. 7.0. Security Deposit cum Performance Bank Guarantee:
7.1. The successful tenderer will have to furnish Banker’s Cheque/DD/Irrevocable Bank Guarantee for 5% value of total contract valid for valid till the completion of the Guarantee period. 7.2. The successful tenderer will have to furnish the Security Deposit cum Performance Bank
Guarantee as per clause 7.1 within 15 days from the date of receipt of P.O. The Security
Deposit cum Performance Bank Guarantee will not carry any interest. The TANTRANSCO also
reserves the right to accept the belated payment of Security Deposit by levying penal
interest at the rate of 22% from the date of expiry of 15 days time limit till the date of
actual receipt of payment of Security Deposit cum Performance Bank Guarantee. The same
will be recovered from suppliers first bill. 7.3. The combined security deposit cum Performance Bank Guarantee will be released on
expiry of guarantee period after ensuring that defects/damages during the guarantee periods
are rectified/replaced. If the TANTRANSCO incurs any loss or damage on account of breach
of any of the clauses or any other amount arising out of the contract becomes payable by
the supplier to the TANTRANSCO, then the TANTRANSCO will in addition to such other dues
that he shall have under the law, appropriate the whole or part of the Security Deposit cum
Performance Bank Guarantee and such amount that is appropriated will not be refunded to
the supplier.
![Page 23: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/23.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
23
7.4. Failure to comply with the terms regarding Security Deposit cum Performance Bank
Guarantee set out in the purchase order within the stipulated time by the successful
tenderer will entail cancellation of the purchase order without any further reference to the
supplier.
8.0 DELIVERY:
8.01. Delivery of materials to be ordered shall be completed within three months from the date of receipt of indent from TANTRANSCO. The tenderer should agree for the delivery of materials anywhere in Tamilnadu state to be stipulated based on the schedule furnished by TANTRANSCO at the time of issue of indent. 8.02 The delivery period for works items is one month from the date of receipt of indent from TANTRANSCO. 8.03 The delivery so specified should be guaranteed by the tenderer under liquidated damages clause. Any other delivery period offered in the tender is liable for rejection. Detailed Schedule of Materials and Delivery Schedule required against this Tender is furnished in Schedule-B. 8.04. TANTRANSCO reserves the right to cancel the quantities not supplied as per delivery
schedule.
8.05. TANTRANSCO also reserves the right to cancel the order if the delivery schedule is not
kept up. 8.06. To ensure sustained supply without any interruption, TANTRANSCO reserves the right
to place orders among more than one tenderer. 8.07. TANTRANSCO will be at liberty to cancel the purchase order if the supply and /or
works are not made as per the delivery schedule specified in the indent, not
withstanding its right to claim liquidated damages for the belated supplies, works and the
quantity outstanding to be supplied as on the date of cancellation. The defaulting
contractors will be liable to pay to the TANTRANSCO in addition to the liquidated damages
for delay, the actual difference in price whenever TANTRANSCO orders the delayed quantity
to be supplied / executed by other agencies at higher rate.
9.0. LOSS OR DAMAGE :
9.1. External damages and/or shortages that are prima facie, the results of rough handling
in transit or due to defective packing will be intimated within one month from the date of
receipt of the materials at site. Internal defects, damages or shortages of integral parts
which cannot ordinarily be detected on a superficial visual examination, though due to bad
handling in transit or defective packing, would be intimated within 2 months from the date of
receipt of materials. In either case, the defective materials shall be replaced/ rectified by the
supplier, free of cost as per Clause 13-1. 9.2. If during the period of supply, it is found that goods already supplied are defective in
material or workmanship or do not conform to specification or are unsuitable for the
purpose for which they are purchased, then it will be open to the TANTRANSCO either to
reject the goods or repudiate the entire contract and claim such loss that the TANTRANSCO
may suffer on that account or require the supplier to replace the defective goods, free of
cost.
![Page 24: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/24.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
24
9.3. Similarly, if during the guarantee period any of the goods found to be defective in
materials or workmanship or do not conform to specification, it will be open to the
TANTRANSCO either to repudiate the entire contract and claim damages or accept such
parts of the goods that are satisfactory and require the supplier to replace the balance or to
claim compensation for the entire loss sustained by the TANTRANSCO on that account. 9.4. In the event of supplies being received damaged or any shortages at the destination
stations, the cost of such materials, Excise duty and Central Sales Tax/TNVAT (if payable)
and other charges payable thereof will be paid only proportionate to the value of materials
received in good condition, unless the damaged goods or short supplies are made good free
of cost by the suppliers. 9.5. For all legal purposes, the materials shall be deemed to pass into the TANTRANSCO’s
ownership at the destination Stores, where they are to be delivered and accepted.
10.0 LIQUIDATED DAMAGES AND PENALTY : 10.1. The delivery as specified should be guaranteed by the supplier under the liquidated
damages clause given below:
(a) If the supplier fails to deliver the equipments/materials within the time specified in the
contract or any extension thereof, the TANTRANSCO shall recover from the supplier as
liquidated damages, a sum of HALF PERCENT (0.5%) of the contract price of the undelivered
equipments / materials for each completed week of delay. The total liquidated damages shall
not exceed TEN PERCENT (10%) of the contract price of the equipments/materials so
delayed. Only the date of actual receipt of complete materials in good condition at stores/site
will be reckoned as date of delivery for this purpose. (b) If the contractor fails to complete the works within the time specified in the contract or any extension thereof, the TANTRANSCO shall recover from the contractor as liquidated damages, a sum of HALF PERCENT (0.5%) of the contract value of both supply and works pertaining to the equipments commissioned with delay, for the each completed week of delay. The total liquidated damages shall not exceed TEN PERCENT (10%) of the total contract value of both supply and works of the unit delayed. The defaulting contractor will be made liable to pay to the TANTRANSCO, in addition to liquidated damages for delay, the actual difference in price, wherever TANTRANSCO orders the delayed quantity to be supplied/executed by other agencies at a higher rate. This is without prejudice to other rights under the terms of contract. 10.2. Equipment will be deemed to have been delivered only when all its component parts
and its accessories are also delivered. If certain components and accessories are not
delivered in time the whole equipment will be considered as delayed unless, the missing
parts are delivered. The Liquidated damages will also be levied for the quantity not supplied
as is done for the delayed supplies. If supplies effected in part which could not be
beneficially used by the TANTRANSCO (due to such incomplete supply), liquidated damage
will be worked out on the basis of entire contract price of respective substation only and not
on the value of delayed portion. 10.3. If supplies to be rendered are made by the supplier beyond the period of delivery and
they are accepted by the TANTRANSCO, such acceptance is without prejudice to
TANTRANSCO’s right to levy liquidated damages for the delay in supply.
![Page 25: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/25.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
25
10.4. If the ordered materials are not delivered, the TANTRANSCO shall recover from the
supplier, as liquidated damages a sum equal to TEN PERCENT (10%) of the contract price of
the equipments/materials undelivered besides forfeiture of security deposit cum performance
guarantee. Similarly for ordered works that are not executed, the liquidated damages
amounting 10% of the contract price of the works not executed shall be recovered from the
supplier besides forfeiture of security deposit cum performance guarantee. 10.5. The suppliers are liable to pay the amount of loss sustained by the TANTRANSCO in
the event of non-execution of orders, if any placed on them either in full or part, to the
satisfaction of the TANTRANSCO under the terms and conditions of contract and in the event
of placing orders for such quantities on some others at a higher price. 10.6. Tenderers not giving clear and specific acceptance to the above clauses are liable for
rejection. 10.7. If there is any downward trend in prices on account of belated supplies/Works, the
tenderers have to accept the same with the levy of liquidated damages, for belated
supplies/Works.
11.0. FORCE MAJEURE:
11.1. If at any time, during the continuance of the contract, the performance in whole or in
part, in any obligation under this contract, shall be prevented or delayed by reasons of any
war, hostility, acts of public enmity, acts of civil commotion, strikes, lockouts, sabotages,
fires, floods, explosions, epidemics, quarantine restrictions or other acts of God (herein after
referred to as eventualities) then, provided notice of the happening of any such eventuality
is given by the tenderer to the TANTRANSCO within 15 days from the date of occurrence
thereof, neither party shall, by reasons of such eventuality, be entitled to terminate this
contract nor shall have any claim for damages against the other in respect of such non-
performance or delay in performance and deliveries under this contract, shall be resumed as
soon as practicable after such eventuality has come to an end or ceased to exist. 11.2. Provided that if the performance in whole or part by the supplier on any obligation
under this contract is prevented or delayed by reasons of any eventuality for a period
exceeding 60 days, the TANTRANSCO may at its option terminate the contract by a notice in
writing.
12. GUARANTEE:
12.1. The entire equipments pertaining to respective substation should be guaranteed for
satisfactory operation and good workmanship at least for a period of 24 (Twenty four)
months from the date of commissioning of the complete SAS with all the C&R panels.
Successful tenderer shall furnish an undertaking for the above. 12.2. Any defects noticed during this period shall be rectified free of cost to the
TANTRANSCO within 2 (Two) months from the intimation of defect/failure. Irrespective of
number of failures and repairs, the suppliers are responsible for free replacement of the
defective materials till the same serves a continuous period of 12 (Twelve) months from the
date of commissioning after the last repairs or 24 months from the date of receipt of last
![Page 26: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/26.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
26
consignment of materials, whichever is LATER. If they are not rectified or replaced within
this period the contractor shall pay Liquidated Damages as per Liquidated Damages clause in
the contract for the delay from the date of receipt of intimation for the defects or failures. 12.3. The incidental expenses, transport and freight charges for the replacement of defective
materials within the guarantee period may also be borne by the supplier till such time it
serves a continuous period of 12 (Twelve) months as said above. 12.4. The tenderers shall guarantee among other things, the following.
(i) Quality and strength of materials used.
(ii) Safe electrical and mechanical stresses on all parts of the equipments under all
specified conditions.
(iii) Performance figures given by the tenderers in the Schedule of Guaranteed technical
particulars.
13.0. REPLACEMENT OF DEFECTIVE/DAMAGED MATERIALS: 13.1. Notwithstanding anything contained in the above liquidated damages clause when the
whole or part of the materials supplied by the supplier are found to be defective/damaged or
are not in conformity with the specification or sample, such defects or damages in the
materials supplied shall be rectified within two months from the date of intimation of
defect/damage either at the point of destination or at the supplier’s works, at the cost of
supplier, against proper security and acknowledgement. In the alternative, the defective or
damaged materials shall be replaced free of cost within two months from the date of receipt
of the intimation from the TANTRANSCO of such defects or damages. If the defects or
damages are not rectified or replaced within this period, the supplier shall pay a sum
towards liquidated damages as per liquidated damages clause given above, for the delay in
rectification/replacement of the defects or damages. 13.2. If even after such rectification or replacement of the damaged or defective part, if the
equipment ordered is not giving the satisfactory performance as per the contract, then it will
be open to the TANTRANSCO either to reject the goods and recover the entire cost of such
goods and claim such loss sustained by the TANTRANSCO, from the supplier/contractor.
14.0. FAILURE TO EXECUTE THE CONTRACT:
Suppliers failing to execute the order placed on them to the satisfaction of the TANTRANSCO
under terms and conditions set forth therein, will be liable to make good the loss sustained
by the TANTRANSCO, consequent to the placing of fresh orders elsewhere at higher rate, i.e.
the difference between the price accepted in the contract already entered into and the price
at which fresh orders have been placed. This is without prejudice to the imposition of
Liquidated Damages and forfeiture of security deposit.
15.0. NON-ASSIGNMENT:
The supplier shall not assign or transfer the contract or any part thereof without the prior
approval of the TANTRANSCO.
![Page 27: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/27.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
27
16.0. EFFECTING RECOVERIES: Any loss arising due to non-fulfilment of this contract or any other contract, will be recovered from the SD CUM PBG and or any other amount due to the supplier from TANTRANSCO and TANGEDCO from the contract as well as from other contracts.
17.0. INCOME TAX PAN No.
The tenderer shall furnish their Income Tax (PAN) permanent assessment number with
documentary evidence.
18.0. PATENT RIGHTS ETC:
The supplier shall indemnify the TANTRANSCO against all claims, actions, suits and
proceedings for the infringement or alleged infringement of any patent, design or copy right
protected either in the country of origin or in India by the use of any equipment supplied by
the supplier other than for the purpose indicated by or reasonably to be inferred from the
specification.
19.0. JURISDICTION FOR LEGAL PROCEEDINGS :
No suit or any proceedings in regard to any matter arising in any respect under this contract
shall be instituted in any court, save in the appropriate civil court of Chennai or the Court of
Small Causes at Chennai. It is agreed that no other court shall have jurisdiction to entertain
any suit or proceedings, even though, part of the cause of action might arise within their
jurisdiction. In case, any part of cause of action might arise within the jurisdiction of any of
the courts in Tamil Nadu and rest within the jurisdiction of courts outside Tamil Nadu, then it
is agreed to between parties that such suits or proceedings shall be instituted in court within
Tamil Nadu and no other court outside Tamil Nadu shall have jurisdiction, even though any
part of the cause of action might arise within the jurisdiction of such courts. An
UNDERTAKING in this regard should be furnished on receipt of Purchase Order in a non
judicial stamp paper value of Rs. 80/- agreeing to be above conditions.
20.0. ARBITRATION:
The TANTRANSCO will not accept any arbitration in case of disputes arising in any respect
under this contract. Any dispute arising out of this contract shall not be subject to arbitration
under the provisions of Arbitration and Conciliation Act 1996 in the event of any dispute
between the parties.
21.0. DEVIATIONS FROM SPECIFICATION:
If the tenderer wish to deviate from any of the clause of this specification, he shall list out
such deviations, in the format enclosed and submit full particulars and reasons therefor.
Unless this is done, the equipment offered shall be considered to comply, in every respect
with the terms and conditions of this specification.
22.0. TEST CERTIFICATES:
The test certificates in triplicate for the materials furnishing the results of the tests as per
latest issue of the standards stipulated in this tender document shall be forwarded and got
approved before the materials are dispatched. In addition to the tests called for in the
specification, the TANTRANSCO reserves the right of having such tests as he desires carried
![Page 28: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/28.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
28
out at his own expenses to satisfy himself that the materials conform to the requirement of
this specification. The materials may be rejected if the test results are not satisfactory. The
type test certificates (Photostat copies) as per latest standards stipulated in this tender
document shall be furnished with the tender as indicated elsewhere in Section-VI Technical.
23.0. RESPONSIBILITY:
The tenderer is responsible for safe delivery of the materials at the destination stores. The
tenderer should include and provide for packing and secured protection of the materials so
as to avoid damages or loss in transit.
24.0. MAXIMUM WEIGHTS AND DIMENSIONS OF PACKINGS:
The supplier is responsible to make sure about the facilities that exist for Road and Rail
transport to site, the maximum packages which can be conveyed by the railways and crane
lift available at the destination railway station. The supplier is also responsible for any loss
or damage during transport and storage for 60 days. Each case or package should be clearly
marked and should contain detailed packing list.
25.0. INSPECTION:
25.1 The authorized representatives of the TANTRANSCO shall have access to the supplier’s
works at any time during working hours, for the purpose of inspecting the manufacture of
the materials and for testing the selected samples from the materials covered by this
specification. The supplier shall provide facilities for the above. 25.2. Tenderers are requested to furnish in their tenders the exact location of their factory
with detailed address to enable inspection by TANTRANSCO if considered necessary. 25.3. Not less than 15 days advance intimation shall be given about the quantity of materials
that will be ready for inspection by the TANTRANSCO’s officers. The arrangement for
inspection shall be made by supplier in such a way that the delivery schedule is kept up.
The materials shall not be despatched without instruction from TANTRANSCO. 25.4. All expenses including boarding, lodging, travel expenses, medical insurance of
TANTRANSCO inspector(s) during travel and inspection period, VISA expenses etc to perform
each of the factory inspection of the materials by TANTRANSCO inspector(s) shall be borne
by the supplier. In this context charges of any kind shall not be levied to TANTRANSCO.
26.0 COMPLETENESS OF TENDER: The tender should be complete with all details of illustrative and descriptive literature and
drawings. The tenderer shall furnish the complete technical details of the equipment.
Information regarding the country of manufacture or origin of materials used in the
manufacture of the articles should be furnished. The tender should include all minor
accessories even though not specifically mentioned in this specification but which are
essential for the completeness of the materials ordered. The tenderer shall not be eligible
for any extra charges in respect of such minor accessories though not included in the tender.
![Page 29: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/29.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
29
27.0. INTERCHANGEABILITY:
All similar parts and removable parts of similar items shall be interchangeable with each other. 28.0. MATERIALS AND WORKMANSHIP: All materials, equipments and spare parts thereof shall be new, unused and originally coming from manufacturer’s plant to the destination stores. Those including used, rebuilt or overhauled materials/ equipments will not be accepted. 29.1. All the materials shall be of best class and capable of satisfactory operation in the
tropics with humid atmospheric condition. Unless otherwise specified, they shall confirm to
the requirements of appropriate Indian standards. Where these are not available, IEC and
American/British standards shall be followed. 29.2. The design shall incorporate every reasonable precautions and provisions and
provisions for the safety of all those concerned in the operation and maintenance of
equipment.
30.0. RECOVERIES OF DUES:
The TANTRANSCO is empowered:
a) To recover any dues against this contract in any bills/Security Deposit/Earnest Money
Deposit due to the supplier either in this contract or any other contracts with TANTRANSCO.
b) To recover any dues against any other contract of the supplier with TANTRANSCO, with
the available amount due to the supplier against this contract.
31.0. RAW MATERIALS:
It is the responsibility of the tenderer to make his own arrangement to procure the necessary raw materials required for the manufacture.
32.0 BACKUP ASSURANCE FOR OPTIONAL PRICE ITEM
The bidder shall agree to provide service support with reasonable price for system
integration of control and protection panels of any make with the SAS offered by the bidder
in case a contract is placed for the SAS items tendered in this tender. An undertaking in this
regard in non-judicial stamp paper will be required to be furnished on demand from
TANTRANSCO. In this context the bidder shall furnish the optional prices in schedule-A for
which the validity of ex-works price shall be given till 2 years from the date of commissioning
of the SAS for the respective substation in this tender. In this context no other charges of
any kind apart from taxes and duties shall be levied to TANTRANSCO. ****
![Page 30: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/30.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
30
SECTIO N – VI A TECHNICAL- GENERAL
1.0 TEST CERTIFICATE : 1.1. Test Certificates/reports in triplicate for the materials furnishing the results of the routine tests conforming to the latest issue of the standards as specified in this tender documents shall be forwarded and got approved before the materials are despatched. 2.0. ROYALTIES AND PATENTS : 2.1. All Royalties for patents or the charges for the use or infringements thereof that may be involved in the contract shall be included in the tender prices. The tenderer shall protect the TANTRANSCO against any claim thereof. 3.0. GUARANTEED PARTICULARS: 3.1. The tenderer shall furnish all the particulars of the materials offered against this specification. Unless full details are furnished, the tender may not be considered. 4.0. DEPARTURE FROM SPECIFICATION: 4.1. Should the tenderer wish to depart from the provisions of this specification, he shall list such departures separately and submit full particulars and reasons for the departure in the form enclosed to part II of this specification. Unless this is done, the materials offered shall be considered to comply in every respect with the terms and conditions of this specification. 5.0. RESPONSIBILITY: 5.1. The tenderer is responsible for safe delivery of the materials at the destination stores/sites. The tenderer should also include and provide for security, protecting and packing the materials so as to avoid damages or loss in transit. 5.2. The Contractor shall have total responsibility for all equipment and materials in its custody, stored, loose, semi-assembled and/or erected by it at Site. The Contractor shall make suitable security arrangements to ensure the protection of all materials, equipment and works from theft, fire, pilferage and any other damages and loss. 6.0. PACKING : The packing may be in accordance with the manufacturer's standard practice. The contractor should however ensure that the packing is such that the materials reach their destination without damages after transport by Rail or Road. 7.0. MAXIMUM WEIGHTS AND DIMENSIONS OF PACKINGS: 7.1. The contractor is responsible for informing himself of the facilities that exist for road and rail transport to site, the maximum packages which can be conveyed by the Railway and crane lift available at the destination railway station. The contractor is also responsible for any loss or damage during transport. 7.2. Each case or package should be clearly marked and should contain detailed packing list.
![Page 31: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/31.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
31
8.0. INSPECTION : 8.1. The accredited representatives of the TANTRANSCO shall have access to the contractor's works at any time during working hours, for the purpose of inspecting the manufacture of the materials and for testing the selected samples from the materials covered by this specification. The contractor or the sub-contractor shall provide facilities for testing such samples as per standards agreed between the supplier and the TANTRANSCO. 8.2. The tenderer shall specify the international standards which are applicable for the equipments to be quoted under this specification. 8.3. The TANTRANSCO reserves the right to conduct any other reasonable tests at manufacturer's premises or at site. The TANTRANSCO shall be supplied with 2 copies of test result. A separate copy of type and routine tests to be carried out on the equipments shall be enclosed with the Tender. 8.4. Tenderers are requested to furnish in their tenders the exact location of their factory with address to enable inspection by TANTRANSCO if considered necessary. 8.5. It should be the supplier's responsibility to arrange for inspection, despatch etc., in time to keep up the delivery schedule. A reasonable time of at least 15-days shall be given to the TANTRANSCO for arranging inspection. 9.0. QUALITY PLAN : 9.1. You will prepare, submit and discuss with the TANTRANSCO and based on such discussions finalize within 30 days (thirty days) from the date of the letter of intent, detailed quality plans in the format as given in Schedules for all components of the equipments manufactured by you, setting out during the various stages of manufacture the quality practices and procedures to be followed by your quality control organization, the relevant reference documents / standards / acceptance level, inspection documentation raised etc. In these quality plans, we will identify "Hold Points" beyond which work will not progress without our consent in writing. For the components/equipments procured by you for the purpose of this contract, your purchase specifications and enquiries shall call for such quality plan of the successful vendor which shall be discussed and finalized by you, in association with us, in the aforesaid manner and the same shall form part of your purchase order on your sub vendor. We also reserve our right to carryout quality audit and quality surveillance of the system and procedures of your/your vendor's quality management and control activities. However, such audit/surveillance by us shall not relieve you of any of your responsibilities under the terms of contract. 10.0. COMPLETENESS OF TENDER : 10.1. The tender should be complete with all details of illustrative & descriptive literature and drawings. The tenderers shall furnish the complete technical details of the equipments. Information regarding the country of manufacture or origin of materials used in the manufacture of the articles should be furnished. The tenderer should include all minor accessories even though not specifically mentioned in this specification but which are essential for the completeness of the materials ordered and which are required for efficient operation of the equipment ordered. The tenderer shall not be eligible for any extra charges in respect of such minor accessories, though not included in the tender. 11.0. INTERCHANGEABILITY: All similar parts and removable parts of similar items shall be interchangeable with each other.
![Page 32: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/32.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
32
12.0. QUANTITIES: The quantities mentioned in this specification are only approximate. The TANTRANSCO reserves the right to revise the quantities at the time of placing the order to an extent of +/- 25%. 13.0 DESPATCH OF MATERIALS : Despatch of items should be done only after approval of test certificates/reports. The destination and the name of the officers to whom advance intimation regarding despatch to be sent will be intimated by the consignees in the despatch instructions. 14.0. CLIMATIC CONDITIONS: The materials are for use in Tamil Nadu and should be satisfactory for operation under
tropical conditions in Tamil Nadu.
The climatic conditions at site under which all the equipment shall operate
satisfactorily, are:
a) The ambient temperature will be within the range of + 10°C to + 50°C.
b) The altitude above M.S.L will be less than 1000 meters.
c) The maximum atmospheric humidity will be in the range of 95%.
d) Average Number of thunderstorm days per annum is 65.
e) Average Number of dust storm days per annum is occasional
f) Average Number of rainy days per annum is 65.
g) Average annual rainfall is 130 cm.
h) The climatic conditions are prone to wide variation in ambient condition and equipments
offered under this specification shall be suitable for installation at any of the Sub-Stations in
Tamil Nadu.
i) All electrical devices shall be given tropical and fungicidal treatment. Fog, smoke and
mild acids are also present in the atmosphere.
15.0. ELECTRICITY RULES : All works shall be carried out in accordance with the latest provisions of the Indian Electricity Act and the rules there under unless modified by this specification. 16.0. EQUIPMENTS/MATERIALS AND WORKMANSHIP : 16.1. All the equipments shall be of the best class and capable of satisfactory operation in the tropics with humid atmospheric conditions without distortion or deterioration. Unless otherwise specified, they shall conform to the requirements of appropriate Indian Standards. Where these are not available, IEC and American/British Standards shall be followed. Where a specification covering the equipments in question has not been published, the tenderer should specify to what extent they would be in a position to accept the various provisions in the specification. 16.2. The workmanship shall be of the highest grade and the entire construction in accordance with the best modern practice. The whole of the work shall be of the highest class throughout well finished and of approved make. The entire design and construction shall be capable of withstanding the severest stresses likely to occur in actual service and of resisting rough handling during transport. 16.3. The equipments should be designed to facilitate inspection and repairs and to ensure satisfactory operation under atmospheric conditions prevailing at site and under sudden variations of load and voltage as may be met with under working conditions
![Page 33: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/33.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
33
in the system including those due to faulty synchronizing and short circuits within the rating of the apparatus. 16.4. The design shall incorporate every reasonable precaution and provisions for the safety of all those concerned in the operation and maintenance. 16.5. All the equipments should operate without undue vibration and with the least practicable amount of noise. 17.0. PAST PERFORMANCE: 17.1. The intending tenderers shall furnish the documentary evidence with details of various Purchase Orders placed on them during the last three years as on the date of tendering in the proforma enclosed to the Tender Specification and also proof for having manufactured the tendered items and for their satisfactory performance from State Electricity Board / TANTRANSCO/Power Utilities. 17.2. The Bidders shall furnish documentary evidence for the constitution of the firm such as Memorandum and Articles of Association, Attested copy of Registered Partnership Deed with details of Name, Address, Telephone, and Electricity Service Connection No. of the manufacturing plants. 17.3. The details furnished by the tenderers shall be in complete shape and if it is found that any information is found omitted, suppressed, incomplete or incorrect, the same will be taken note of while dealing with the Tenderers in future.
18.0. TYPE TESTS :
Bidders are requested to furnish with their bid submittal a copy of type test certificates for the materials and equipments offered in full shape as conforming to the latest issue of the standards as specified in this tender documents, all the type test reports should be obtained from Government/Government recognized Lab/List of labs approved by TANTRANSCO Lab/ testing facilities recognized by Govt. of India or accredited by National Accreditation Board of testing and calibration Laboratories (NABL) or recognized by BIS or reputed/ accredited lab from foreign countries. The date of issue of type reports/certificates shall not be earlier than five years (5 years) as on the date of tender opening. The original type test certificates shall be furnished for verification on request. The details of type test should also be furnished in the Schedule-G. Bid submittals without necessary type test reports/certificates as required in the tender specification will be liable for rejection.
19.0. ADDITIONAL TESTS The TANTRANSCO reserves the right for carrying out any other tests of a reasonable nature at the works of the supplier/laboratory or at any other recognized laboratory/research institute in addition to the above mentioned type, acceptance and routine tests at the cost of the employer to satisfy that the material complies with the intent of this specification. 20.0. DRAWINGS & MANUALS: The scope of supply includes: i. Drawings for SAS and C&R panels towards design approval : 3 sets With all the technical literatures. ii. As-built drawings of all the panels & SAS : 5 sets + 1 soft copy. iii. Operation & maintenance Manuals for all equipments : 3 sets. One copy of the technical literatures, installation, operating, maintenance manuals in both hard copies and soft copies in CDs is included in the scope of supply for each of the relay and 3 copies in general. The
![Page 34: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/34.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
34
manual should contain exhaustive literature about each and every feature of the IED/Numeric relay/Meters/SAS devices etc along with literature on the THEORY OF OPERATION, ADOPTED ALGORITHM, tools for programming PLC/ Automation logic/Boolean logic etc. 21.0. TOOLS: One Set of necessary software in CDs for configuration and parameterization of the IEDs/Numeric relays/Digital Meters/SAS devices and SAS softwares etc, crimping tools for device termination (applicable for terminations requiring special crimping tools), cable for communicating with configuration port (as required) and suitable laptop computer are included in the scope of supply of SAS for each substation. 22.0 TRAINING : Refer scope of works vide clause –II of section-IV. Training at supplier’s works :
The training syllabus and facilities shall cover the following requirements. Lectures and hands on training on complete SAS & protection relays. All relevant training materials, tools and equipments shall be provided for each trainee towards this training. Training at supplier’s works shall include “Hands on” training on the following for which the actual devices shall be provided in the training : - On the tools for configuration, parameterization (for numeric relays), Automation logic, Boolean logic, PLC logic etc of all SAS devices such as Numeric relays, IEDs, BCUs, Servers , work stations and servers, Gateway, LAN devices etc. - On all softwares including On HMI editors, data base management softwares, NMS Software, etc. to maintain, trouble shoot the SAS system and for modifications in the SAS for future bay extensions/ modifications etc. Comprehensive hands on training at site should be imparted to TANTRANCO engineers. 23.0 INSTALLATION AND TESTING: i) Installation of SAS equipments is in the scope of the tenderer. All necessary tools and commissioning spares is in the tenderer’ scope. ii) The testing and commissioning of the Sub-station automation system will be by the tenderer. Customization/design engineering should be done only in the presence of TANTRANSCO Engineers. The complete system tests shall be performed on site together with the Site Acceptance Test (SAT). The Sub-station automation system shall work continuously for a period of 3 months from the date of taking over of Sub-station automation system by TANTRANSCO. The defect of minor nature shall be attended with in 24 hours and the defect of major nature shall be attended with in 3 days from the time of intimation during the SAT period. This shall be adhered to strictly failing which the cycle of SAT period will break. Once rectification of defects is done & intimation received from the tenderer, TANTRANSCO will give SAT period of three months starting from the beginning. The completion of work should be certified by TANTRANSCO. 24.0. BACK UP ASSURANCE:
i) The spares required towards maintenance of the equipments ordered shall be made
available for replacement for a minimum period of ten years from the date of last despatch
at a reasonable price.
![Page 35: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/35.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
35
ii) Necessary technical support for commissioning of the C&R panels should be provided
with out additional charges to TANTRANSCO.
iii) The bidder shall agree to provide service support with reasonable price under optional
price in schedule-A for system integration of control and protection panels of any make with
the SAS offered by the bidder in case a contract is placed for the SAS items tendered in this
tender. This will not be considered for evaluation.
****
![Page 36: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/36.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
36
SECTION – VI B TECHNICAL SPECIFICATION FOR CONTROL & RELAY PANELS
1.1General
This specification requires the design, manufacture, FAT, supply inclusive of insurance,
transport and delivery to site, testing and commissioning of SAS, 230 kV & 110 kV Control &
relay panels and other associated equipments. The equipments shall be capable of working
satisfactorily in the intended environmental conditions and suitable for satisfactory
performance for the application.
The manufacturer of control & relay panels and SAS equipments offered by the bidder is
subject to approval of TANTRANSCO.
2. Cabinet for Control & Relay Panel:
a) Construction:
Free standing simplex type, Metal enclosed with swing frame to house the devices and an
outer glass door. The gland and plate assembly shall be vermin proof. The panel shall be
designed for wiring access from front of the C&R panel
Cable entries to the panel shall be from the bottom. The design of the interior of the panel
shall allow sufficient access to the terminals of all devices for removal and repair. The design
shall ensure that the heat generated by various apparatus mounted in the panel shall not
affect the performance of any of the devices.
Dimension : Depth x width x height : 800 x 800 x 2312 (or more including base frame)
in mm
Degree of protection : IP-41 as per IEC 60529 / IS 12063
Tests : All type tests and routine tests prescribed in IS/IEC 60947 Low-voltage
Switchgear and Control gear standards shall be performed on the
complete panel assembly.
Thickness of metal : Minimum 3mm for planes housing the devices and for bottom
plates. Minimum 2mm for all other sides.
Swing frame :
Play of Swing frame : 120 degree or above capable of opening in the
opposite direction to glass door.
No of hinges : 3nos (minimum)
Door stopper : 1 No.
Protective Glass door : Splinter proof and transparent tempered glass of
minimum thickness 3mm.
Bottom plates : Knock slots shall be provided in the bottom plates
for facilitating cable entry at site.
b) Painting :
i) All sheet steel work shall be phosphated in accordance with IS-6005
ii) Oil, grease, dirt, swart, rust and scale shall be removed by adopting proper cleansing
procedure.
iii) After phosphating and thorough rinsing, the phosphate coating shall be sealed with
application of two coats of ready mixed stoved type zinc chromate primer. The first
coat shall be flash dried while the second coat shall be stoved.
![Page 37: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/37.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
37
iv) After application of primer, two coats of finishing synthetic enamel paint shall be
applied, each coat followed by stoving.
v) The colour of the panel shall match with the existing panel colour of subject
station and normally of following choice for new station.
Exterior - stoved enamel grey
Interior - stoved enamel white
Bus frame - stoved enamel black
Finish - glossy surface treatment shall be done as per BIS.
In case powder coating painting is adopted then the minimum thickness of paint shall be 70
micorns and subject to TANTRANSCO approval.
c) Accessories :
• A Door Stopper shall be provided with each door to hold it in the open position
at an angle/angles as specified for each type of panel.
• Door handle shall be provided with padlocking facility.
• Each cabinet is to be provided with removable type lifting eyes or lifting beams
installed on the top.
• Adequate ventilation openings in the form of louvres shall be provided. The
ventilation louvers shall be vermin proof and shall be provided with removable filters or
removable wire mesh to minimize ingress of dust.
• Labels to be provided at front and rear of the panel for each device.
Name plate to be provided on the top of each panel on front ,large and bold name plates
shall be provided for circuit/ feeder designation
• Name plate and labels shall be made of non rusting metal or 3 ply lamicoid.
Name plate shall be black with white engraving lettering.
Typical label size : Width: 1.5cm; length : as per the length of the inscription;
the letter size : 0.75cm.
• Panels shall have base frame with smooth bearing surface, anti vibration strips/
pad made of shock absorbing materials shall be placed between panels and base frame.
• All doors, removable covers shall be gasketted all around with neoprene
gaskets.
• Necessary cable gland should be fitted. Cable gland plates fitted on the bottom
shall be connected to the earthing of panel/station through a flexible braided copper
conductor rigidly.
• Each panel shall be provided with space heater rated for 230V single phase
A.C. supply with controlling thermostat.
• All equipments in the panel shall be mounted and completely wired to the
terminal blocks ready for external connection. The spare contacts shall also be
wired upto the terminal block.
• Each panel shall be provided with the interior fluorescent lights of sufficient
illumination capacity controlled by door limit switch.
• A 240V single phase, 3 pin A.C. socket 15/5A with switch – 1 No.
• Accessories required for fixing the panel such as foundation bolts and nuts
shall be provided along with a panel.
• DC voltage of the panels:- As per station DC supply voltage.
![Page 38: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/38.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
38
d) Circuit distribution and isolation :
i) Each C&R panel shall be provided with necessary arrangements for receiving,
isolating and fusing of AC and DC supplies for various control of signaling, lighting
and space heaters.
ii) Each of the distribution circuits and incomer circuits of the AC auxiliary supply and DC
auxiliary supply shall be provide with MCBs such as to ensure selective clearance of
sub circuit faults.
iii) All MCBs should be of suitable rating with auxiliary contact for trip indication which
shall be wired to SAS for alarm alert.
iv) Potential circuit for metering and relaying shall be protected by fuses.
v) All fuses shall be of HRC cartridge type conforming to IS 13703 mounted on plug in
type fuse bases. All accessible live connection of fuse base shall be adequately
shrouded.
vi) Fuse shall have operation indications for indicating blown fuse condition.
vii) Fuse carrier shall have imprints of fuse rating and voltage.
viii) Removable links should be provided at the output of each relay for trip output and
reclose output. Adequate space shall be left between fuse units when arranged
adjacently. e. Panel wiring:
i) Wire type :
Single core multi strand copper conductor wires with PVC insulation of FRLS and
shall be flame, vermin, and rodent proof. 1100V grade for CT,PT circuits. 600V/1100V
Grade for other circuits.
ii) Flexible wires shall be used for wiring of devices on moving parts such as swinging
panels or panel door.
iii) Wire size :
4 Sq.mm for Auxiliary AC supply circuits.
2.5 Sq.mm for CT circuits, Earthing circuits and DC Auxiliary supply wiring.
1.5 sq.mm for PT Circuits and all other circuits.
Higher size wires for all of the above mentioned circuits is applicable if required as per engineering requirement.
iv) Panel wiring shall be securely supported, neatly arranged, readily accessible and
connected to equipment terminals and terminal blocks. Wiring gutters and troughs
shall be used for this purpose. All wiring shall be made without splices.
v) Cables/wires shall be uniformly bunched and tied by means of PVC belts and carried
in PVC carrying troughs. The position of the PVC carrying troughs and having bunch
of wires shall not give any hindrance for fixing or removing relay casing, switches etc.
vi) Wire termination shall be made with solder less crimping type and tinned copper
lugs, which firmly grip the conductor. Insulated sleeves shall be provided at the wire
terminations.
vii) Engraved core identification plastic ferrules marked to correspond with panel wiring
diagram shall be fitted at both ends of each wire.
viii) The wire number shown on the wiring shall be in accordance with IS 5578.
ix) All wires directly connected to trip circuit breaker or device shall be distinguished by
addition of red colour unlettered ferrule.
![Page 39: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/39.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
39
x) Interconnection to adjacent panels shall be brought to a separate set of terminal
blocks located near to the slots or holes to be provided at the top of the panel.
Arrangements shall be made for easy connections to adjacent panels at site and
wires for this purpose shall be provided and bunched inside the panel.
xi) Bus wires shall run at the top the panels. The terminal blocks for the wires shall be
with isolating links.
xii) The terminal blocks used shall be minimum 600V (For other circuits) /1000V (for CT
& PT circuits) grade and have 10A continuous rating, moulded piece, complete with
insulated barriers, stud type terminals washers nuts and lock nuts suitable for
operation with a tubular box spanner or screw driver.
xiii) Terminal blocks shall be arranged in vertical formation at an inclined angle with
sufficient space between terminal blocks with minimum of 150mm for easy wiring.
xiv) Terminal blocks shall include a white fibre marking stripe with clear plastic, slip
on/clip on terminal covers. Marking on terminal strips shall correspond to wire
number and terminal number on the wiring diagrams.
xv) There shall be minimum clearance of 250mm between the first row of terminal blocks
and the associated cable and plate or panel side wall.
xvi) At least 20% of total terminal shall be provided as spare for further connections and
these spare terminals shall be uniformly distributed on all terminal blocks.
xvii) For CT and CVT termination, links terminal blocks to be used shall have links for
disconnection and plugging in facility for testing purposes.
xviii) Wiring is preferable with the following colour code.
PT supply : Red, yellow, blue for phase and black for neutral.
CT circuits : Red, yellow, blue for phase and black for neutral.
DC circuit : Grey for both positive and negative.
230V AC circuits : Black for both phase and neutral.
Earthing : Green.
xvii) Lugs : Solder less crimping type, Tinned copper lug. Ring type (Generally for
termination on devices). f. Earthing
i) All panels shall be equipped with bus securely fixed along the inside base of the
panels. When several panels are mounted adjoining to each other, the earth bus shall
be made continuous and necessary connectors and clamps for this purpose shall be
included in the scope of supply.
ii) The size of the earth bus shall be made of 25mmx6mm tinned copper flat.
iii) The earth of the substation will be 40mm diameter MS rods. Provision shall be made
on the earth bus bars of the end panels for connecting to the earth grid. Necessary
terminal clamps and connectors shall be included in the scope of supply.
iv) All metal case of the relays, instruments and other panel mounted devices shall be
connected to the earth bus by independent copper wires of size not less than 2.5
sq.mm. The colour code of the earthing wire shall be green. Earthing wire shall be
connected on the terminals with suitable clamp connectors and soldering shall not be
permitted.
![Page 40: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/40.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
40
3.TRIVECTOR METER:
The tri-vector meter shall be AC static micro-processor based ABT type tri-vector energy
meters, DLMS (Category-B) compliant, suitable for availability based tariff application. The
meter should be capable to record and display Active, Reactive and apparent energy and
maximum demand for 3 phase 4 wire as well as 3 phase 3 wire AC balanced/ unbalanced
loads without effecting the accuracy for a power factor range of zero (lagging), unity and
zero (leading) for export and import as per the requirement given in this specification. The
meter shall be capable to measure in all the four quadrants. The meter’s measurement of
metering values such as Voltage, current, frequency, energy etc shall be based on true rms
measurements.
3.1 STANDARDS APPLICABLE
Sl.No. Standard No. Title
1 IS 14697 – 1999
With latest amendment
AC static transformer operated
Watt-hour and VAR-hour meters
for class 0.2s and 0.5s.
2 CBIP technical report no. 304
with latest amendment (only for
Magnet compliance)
Specification for AC static
electricity energy meters
3 IEC 62053-22 with latest
amendment
AC static Watt-hour meters for
active energy, class 0.2 s.
5 IS-9000
With latest amendment
Basic environmental testing
procedures for electronic and
electrical items.
6 IS 15959 DLMS Companion Standard (ICS)
Meters matching with requirements of other national or international standard which ensure
equal or better performance than the standards mentioned above shall also be considered.
When the equipment offered by the bidder conforms to standards other than those specified
above, salient points of difference between standards adopted and the standards specified in
this specification shall be clearly brought out in the relevant schedule and copy of such
standards along with their English translation shall invariably be furnished along with the
offer.
Further, CMRI (Common Meter Reading Instrument) shall confirm to CBIP Technical report
no.88 with latest amendments.
3.2 TECHNICAL PARAMETERS
The energy meter shall be indoor type connected with the secondary side of outdoor current
and voltage transformers.
Supply system:
Rated Voltage: 3x110/ 3 V Phase to Neutral (3P4W)
3x110 V Phase to Phase (3P3W)
Rated current:1 Amps / 5 Amps
![Page 41: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/41.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
41
System frequency:50 Hz +/- 5%
Earthing system :Solidly grounded
Accuracy:Class 0.2S.
Actual primary values wherever applicable shall be programmable in the meter as per the
CT and PT value of the installed CTs and PTs.
3.3 GENERAL TECHNICAL REQUIREMENTS
3.3.1 The meter should be micro processor based 3 phase 4 wire type suitable for
connection to 3 phase 4 wire as well as 3 phase 3 wire system.
3.3.2 The meter shall compute the active energy and load import; active energy and load
export from the substation bus bars during each successive 15 minute integration
period block and store it in its non volatile memory.
3.3.3 The metering system shall normally operate with the power drawn through the PT
secondary voltage.
3.3.4 The meter shall be capable of withstanding surges and voltage spikes as per IS that
occur in the PT & CT circuits of EHV switch yards by providing necessary isolation
and/or suppression system built in the meter.
3.3.4 The active energy measurement shall be carried out on 3 phase 4 wire principle with
accuracy as per class 0.2S of IEC 62053-22. The meter shall compute the active
energy import and export and average frequency during each successive 15 minute
block and store in its memory along with its sign. It shall also display on demand the
active import and active export during the previous 15 minutes block. The values may
be displayed directly in secondary quantities.
3.3.5 Further the meter shall continuously integrate and display on demand the cumulative
active energy import and export from the substation up to date and time of meter
reading. The cumulative active energy import and export reading at each midnight
shall be stored in the meter memory for last forty-five (45) days and shall be reported
at Base Computer Software (BCS) end. Separate registers shall be maintained for
active energy import and export.
3.3.6 The average frequency (Hz) of previous 15 minute block shall be displayed on demand
in the metering system.
3.3.7 The meter shall continuously compute the average of the RMS values (fundamental
only) of the 3 lines to neutral PT secondary voltage as the percentage of 63.51 V and
then display the same on demand.
3.3.8 The meter shall compute the reactive power (VAR) on 3 phase 4 wire principle with
accuracy as per IEC 60687-2000 and integrate the reactive energy algebraically in
two separate registers, one for the period for which RMS voltage is higher than
103%(Reactive High), and the other for the period for which the RMS voltage is
below 97%.(Reactive Low). When lagging reactive power is being sent out from the
substation bus bars, reactive registers shall move forward. When reactive power flow
![Page 42: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/42.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
42
is in the reverse direction, reactive registers shall move backwards. The Nett KVARH
for voltage high (103%) & Nett KVARH for low voltage (97%) both shall be displayed.
3.3.9 Further, the reactive energy shall also be available as four different energy registers
for viewing at BCS and on meter display:
a) Reactive energy lag while active energy import (Q1)
b) Reactive energy lead while active energy import (Q2)
c) Reactive energy lead while active energy export (Q3)
d) Reactive energy lag while active energy export (Q4)
3.3.10 Each metering module shall have a built in calendar in clock, having an
accuracy as per IS standard. The calendar and clock shall be correctly set at the
manufacturer’s works. Current date (day-month-year) and time (hour-minute-
seconds) shall be displayed on the front display section on demand. Clock
adjustment shall be possible at site using the common meter reading instrument
(CMRI) with proper security it shall be possible to set the clock with BCS clock.
An automatic back up for continued operation of the offered meters clock and
calendar shall be provided through a long life battery capable of supplying the
required power for at least 2 years under meter un-powered conditions. The offered
meters shall be supplied duly fitted with the battery that shall not be required to be
changed for at least 10 years as long as total VT interruption does not exceed two
years.
3.3.11Each meter shall have a unique identification code (serial number), which shall be
marked permanently on the front as well as in its memory.
3.3.12 Each meter shall have a non volatile memory in which the parameters as specified in
this specification shall be stored. The non volatile memory shall retain the data for a
period not less than 10 years under un-powered condition; battery backup memory
shall not be treated as NVM.
3.3.13 All meters shall be totally identical in all respects except for their unique identification
codes. They shall be totally sealed with no possibility of any adjustment at site except
for clock correction.
3.3.14 The meters shall safely withstand the usual fluctuation arising during faults in
particular, VT secondary voltage 115% of rated voltage applied continuously and
190% voltage of rated for 3 seconds and CT secondary current 120% of rated
current applied continuously and 20 times of maximum current applied for 0.5 seconds, shall not cause any damage to or the mal-operation of the meters.
3.3.15 The meter should be user configurable for all the parameters at site using the tools
provided for the meter.
3.3.16 Power factor Range:
The meter shall be suitable for full power factor range from zero (lagging) through unity to
zero (leading). The meter shall work as an active energy import and export and reactive
(lag and lead) energy meter. The energy measurement should be true four quadrant type.
![Page 43: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/43.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
43
3.3.17 Power Supply Variation:
The meter shall be suitable for working with following supply variation
Specified operating range -0.8 to 1.15 Vref.
Limit range of operation - 0.7 to 1.2 Vref.
Frequency- 50 Hz 5%.
3.3.18 Accuracy:
Class of accuracy of the meter shall confirm to 0.2S as per the relevant standard. The
accuracy should not drift with time.
Each of the meter supplied should be tested and certified for accuracy from in a NABL
recognised laboratory in India.
3.3.19 Power Consumption:
i)Voltage circuit: The active and apparent power consumption in
each voltage circuit including the power supply of meter at reference voltage, reference
temperature and reference frequency shall not exceed 1.5 Watt per phase and 8 VA per
phase respectively.
ii)Current Circuit: The apparent power taken by each current circuit at basic current,
reference frequency and reference temperature shall not exceed 1 VA per phase.
3.3.20 Starting Current:
The meter should start registering the energy at 0.1% ln at unity power factor.
Maximum Current:
The rated maximum current of meter shall be 120% of basic current (Ib).
3.4 GENERAL AND CONSTRUCTIONAL REQUIREMENTS
3.4.1 Meters shall be designed and constructed in such a way so as to avoid causing any
danger during use and under normal conditions. However, the following shall be ensured:
a) Personnel safety against electric shock
b) Personnel safety against effects of excessive temperature
c) Protection against heat & spread of fire
d) Protection against penetration of solid objects, dust and water
3.4.2 All the material and electronic power components used in the manufacture of the
meter shall be of highest quality and reputed make to ensure higher reliability, longer life
and sustained accuracy.
3.4.3 The meter shall be designed with application specific integrated circuits. The electronic
components shall be mounted on the printed circuit board using latest Surface Mount
Technology (SMT).
3.4.4 All insulating materials used in the construction of metering module shall be non-
hygroscopic, non-ageing and of tested quality. All parts that are likely to develop corrosion
shall be effectively protected against corrosion by providing suitable protective coating.
![Page 44: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/44.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
44
3.4.5 The meter shall be suitable for being connected through test terminal blocks to the
voltage transformer having a rated secondary line to neutral voltage of 110/3 V and to
current transformers having a rated secondary current of 1A or 5A as per requirement.
Necessary isolation and suppression shall also be built-in, for protecting the meters from
surges and voltage spikes that occur in the VT and CT circuits of extra high voltage
switchyards.
3.4.6 Each meter shall have test output devices (visual) for checking the accuracy of active
energy (Wh), reactive energy (VARh) or apparent energy (VAh) measurement using a
suitable test equipment. This device shall be suitable for use with sensing probe used with
test benches or reference standards. The test output device shall have constant pulse rate
ie pulse/unit (KWh, KVARh) and its value (Meter constant) should be indelibly printed/
appropriately mentioned on the rating plate.
3.4.7 The metering system shall conform to the degree of protection IP 53 in the normal
working condition of IS12063/1EC529 for protection against ingress of dust, moisture and
vermin.
3.4.8 The meter base, meter cover, terminal block (as applicable) shall be made of
unbreakable, high grade, fire resistant, non-inflammable and good quality suitable material
to ensure safety. The manufacturer shall clearly indicate the material used.
3.4.9 The terminal block and the meter case shall be designed such that it ensures
reasonable safety against the spread of fire and shall not be ignited by thermic overload of
live parts in contact with them.
3.4.10 All terminals for CT and VT connections shall be arranged at the lower/ back side of
the meters. Terminal shall have a suitable construction with barriers and cover to provide a
safe and secure connection of CT & VT wires.
3.4.11 The metering system shall be compact in design. Entire design and construction shall
be capable of withstanding stresses likely to occur in actual service and rough handling
during transportation. The meter shall be convenient to transport and immune to shock and
vibrations during transportation and handling as per the relevant standard. Meter shall have
the capability and facility to compensate for errors of external measurement transformers i.e.
CT and VT
3.5 SEALING OF THE METER:
Reliable sealing arrangement shall be provided for meter to avoid fiddling by unauthorized
persons.
1. The meter cover shall have at least 2 sealing sources sealing
arrangement should be accessible from front only.
2. Separate sealing arrangements shall be provided for terminal cover.
3. Sealing arrangement should be suitable for application of poly
carbonate seals.
4. The manufacturer will provide his own seals on each meter before
dispatch.
![Page 45: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/45.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
45
3.6 MARKING OF METER:
The marking on every meter shall be in accordance with IS 14697-1999.
Every meter shall have name plate beneath the meter cover such that the name plate cannot
be accessed without opening the meter cover and without breaking the seals of the meter
cover and the name plate should be marked indelibly.
The basic markings on the meter name plate shall be as follows:
i.Manufacturer's name and trade mark and place of manufacture.
ii.Type designation
iii.Number of phases and wires
iv.Serial Number
v.Month and year of manufacture
vi.Reference voltage & Frequency
vii.Rated secondary current (Basic current & Maximum current)
viii.Principal unit(s) of measurement
ix.Meter constant (Impulse/unit KWh/KVARh)
x.Class index of meter
The marking shall be indelible, distinct & readable from outside the meter.
3.7 Connection Diagram and Terminal Markings:
The connection diagram of the meter shall be clearly shown for 3 phase 4 wire system as
well as 3 phase 3 wire system, on inside portion of the terminal cover and shall be of
permanent nature or suitably pasted in meter. The meter terminals shall also be marked and
this marking should appear in the above diagram. In case of any special precautions need to
be taken at the time of testing the meter, the same may be indicated along with the circuit
diagram.
3.8 SALIENT FEATURES:
The metering system shall have the following additional salient features:
3.8.1 It shall be possible to check the healthiness of phase voltages by displaying all the
voltages on the display of the metering system.
3.8.2 The meter shall work accurately irrespective of phase sequence of the mains supply.
3.8.3The meter should remain powered up and functional even when either of any two
phases or anyone phases along with neutral is available to the meter.
3.8.4 The meter shall continue to record accurately as per prevailing electrical conditions
even if the neutral of potential supply gets disconnected.
3.8.5 The metering system shall be provided with adequate design to ensure compliance to
CBIP Technical Report No.304 (with latest amendments) for external magnetic influence
criteria (AC electro magnet or DC magnet).
3.8.6 It shall not be possible to change the basic meter software by any means in the field.
Moreover critical events like time set, MD reset operation, and tariff change shall be logged
by the meter. Such events shall be logged in roll over mode for up to twenty numbers.
![Page 46: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/46.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
46
3.9 Display of Measured Values:
3.9.1 The measured value(s) shall be displayed through Liquid Crystal Display (Alpha
numeric LCD backlit) section of metering system.
3.9.2 It should be possible to easily identify the single or multiple displayed parameters
through legends/ unit on the metering system display.
3.9.3The register shall be able to record and display starting from zero, for a minimum of
1500 hours, the energy corresponding to rated maximum current at reference voltage and
unity power factor. The register shall not roll over in between this duration.
3.9.4 Any interrogation/ read operation shall not delete or alter any stored meter data.
3.10 Meter Serial Number:
In addition to providing serial number of the meter on the name plate, the meter serial
number shall also be programmed into meter memory for identification through CMRI meter
reading print out. The meter serial number shall also be made available on the metering
system display on selection of appropriate option.
3.11 Display, Load survey capability and billing point requirements:
The meter shall be capable of recording 15 minutes average of the following parameters for
at least last 45 days and shall display the following parameters on suitable selection through
push button:
1.Date & Time
2.Imp WH
3.Exp WH
4.Imp Varh lag Q1
5.Imp Varh Lead Q2
6.Exp Varh Lag Q3
7.Exp Varh Lead Q4
8.Voltage RN
9. Voltage BN
10. Voltage CN
11.AVG Frequency
The meter shall be capable of recording 15 minute average of the following parameter for
last 45 days
1. Date & Time
2. Imp WH
3. Exp WH
4. Imp Varh lag Q1
5. Imp Varh Lead Q2
6. Exp Varh Lag Q3
7. Exp Varh Lead Q4
![Page 47: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/47.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
47
8. Imp MD KW
9. Exp MD KW
10. AVG Volt Ph A
11. AVG Volt Ph B
12. AVG Volt Ph C
13. AVG Current Ph A
14. AVG Current Ph B
15. AVG Current Ph C
16. AVG Frequency
17. Net VARh High
18. Net VARh Low
15-minute average of the above parameters shall be available for last forty five (45) days. It
shall be possible to select either demand or energy view at the BCS end. The load survey
data shall be made available in the form of bar charts as well as in spread sheets at the
metering PC end. The Base computer software shall have the facility to give the complete
load survey data both in numeric and graphic form. All the 96 blocks shall be recorded for
data indication on block day and no supply period also shall be recorded .
3.12 Billing Parameters:
All billing parameters shall be transferred to billing registers; the parameter shall be
Active energy import
Active energy export
Apparent energy while active import .
Apparent energy while active export.
Cumulative Reactive energies for the voltage high condition.
Cumulative Reactive energies for the voltage low condition.
3.13 DAILY MIDNIGHT PARAMETERS:
The meter shall store following end day parameters for last forty five (45) days at
00:00 hrs.
1. Mid night Cum Imp WH (T)
2. Mid night Cum Exp WH (T)
3. Mid night Cum Varh High (V>103%)
4. Mid night Cum Varh Low (V<97%)
5. Mid night Cum Imp VARh Lag Q1
6. Mid night Cum Imp VARh Lead Q2
7. Mid night Cum Exp VARh Lag Q3
8. Mid night Cum Exp VARh Lead Q4
Other requirement as per CEA regulation
Above billing data, load survey data, anomaly information and instantaneous
parameters data shall be retrievable through the meter's communication port
through a common meter reading instrument (CMRI) using DLMS protocol as well as
transferred (down loaded) to a metering PC to get complete details for view and
![Page 48: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/48.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
48
print. It should be possible to export the data so collected into (common data
format). The supplier will provide necessary facilities for the same in the base
computer resident software. The necessary base computer software (BCS) for this
purpose shall be provided with complete details.
3.14 TOD (Time of day registers):
The meter shall have TOD registers for active energy import and export, apparent energy
import and export and apparent MD import and export. Maximum eight time of day registers
for each energy and MD can be defined. It shall be possible to program number of TOD
registers and TOD timings through software/CMRI with multilevel password security system
and authenticated transaction.
3.15 Maximum Demand (MD) Registration:
The meter shall continuously monitor and calculate the average demand (Active and
Apparent) during the integration period set and the maximum, out of these shall be stored
along with date and time when it occurred in the meter memory. The maximum demand
shall be computed on fixed block principle. The maximum registered value shall also be
made available in the meter reading. The integration period shall be set as 15 minutes it
shall be capable to change to other integration period (30/60 minutes), if required, through
suitable high level software /MRI as an authenticated transaction.
3.16 Maximum Demand Reset:
The meter should have any of the following MD resetting options:
(i) Auto reset of MD at predefined date and time shall be provided.
(ii) Resetting through meter reading Instrument or computer capable of
communicating with the meter with explicit password protection. The
manufacture shall provide a software module specifically for resetting MD
through MRI/Computer.
(iii) Manual via common MD reset button.
3.17 Data communication capability:
The metering system shall have multiple communication ports for local reading and remote
communication facility.
3.17.1 The meter shall be provided with a galvanically isolated optical communication port.
(Such as IEC, PACT, ANSI etc) with removable cover and with locking arrangement so that it
can be easily connected to a MRI / laptop for data transfer.
3.17.2 The optical communication port shall, be compliant to DLMS protocol and, also have
a sealing provision.
3.17.3 In addition to the optical port, the meter shall be provided with one communication
port either of Ethernet port IEC61850 protocol or RS-485 port with open protocol (MODBUS)
![Page 49: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/49.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
49
for integration with the sub-station automation system to facilitate real time data acquisition
of metered values and access of store metering records.
3.18 Real time clock:
3.18.1 The meter offered should have a real time clock and calendar based on a quartz
crystal with a battery totally independent of power supply.
3.18.2 A lithium maintenance free battery of long life (minimum ten years) shall be
provided for operation of time clock. It should be possible to select the various time
zones for various seasons of the year through suitable software built into the
electronic register.
3.18.2 The accuracy of the clock shall not be less than 5 minute in a year or better.
3.18.3 It should be possible to reset Real Time Clock of the meter through a manually
triggered command from Base Computer Software.
3.18.4 The clock of the trivector meter should be synchronised with the GPS clock of the
SAS.
3.19 Self Diagnostic Feature:
The meter shall be capable of performing complete self diagnostic check to monitor the
circuits for any malfunctioning to ensure integrity of data in memory location all the time.
The meter shall have indications/ display for unsatisfactory/non functioning/malfunctioning
of the following:
a) Time and date and
b) Non volatile memory failure indication
c) Low Battery indication at BCS
Above indication should be made available at BCS end also.
While installing the meter, it should be possible to check the correctness of CT/VT
connection to the meter and their polarity from the functioning of the meter for different
voltage injections with the help of vector phasor diagrams. For this purpose suitable software
for field diagnosis of meter connections with the help of MRI should be supplied.
The details of malfunctioning of time and date shall be recorded in the meter memory.
3.20 Anomaly detection features:
The meter shall have features to detect the occurrence and restoration of, at least, the
following common ways of anomaly:
a) Missing potential: The meter shall be capable of detecting and recording
occurrences and restoration of missing potential (1 phase or 2 phases) which can
happen due to intentional/ accidental disconnection of potential leads.
b) CT polarity reversal: The meter shall be capable of detecting and recording
occurrences and restoration of CT polarity reversal of one or more phases.
c) Current and voltage unbalance: The meter shall be capable of detecting and
recording occurrences and restoration of unbalance of current and voltage. Snap
shots (numerical values) of phase wise voltages, phase wise active currents,
![Page 50: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/50.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
50
phase wise power factors and energy (active energy) readings shall be provided
with the above specified events.
d) Last hundred (100) events (occurrence + restoration), in total, shall be stored in
the meter memory on first in first out basis.
e) There shall be four separate compartments for logging of different type of
anomalies:
Compartment No.1 20 events of Missing Potential
Compartment No.2 20 events of CT Reversal
Compartment No.3 40 events for Voltage Unbalance,
Current Unbalance
Compartment No.4 20 events of Feeder Fail and Power
On/Off
Once one or more compartments have become full, the last anomaly event pertaining to the
same compartment shall be entered and the earliest (First one) anomaly event should
disappear. Thus, this manner each succeeding anomaly event shall replace the earliest
recorded event, compartment wise. Events of one compartment/category should overwrite
the events of their own compartment/category only.
4. ANNUNCIATORS:
i) The announciator unit shall be microprocessor based and field configurable. An
automatic self supervision system to monitor the functioning of the annunciation
system shall be provided with a means to alert the operator.
ii) The annunciations facia shall be provided with flasher, hooters and bell for
separate indication of tripping alarm/non-tripping alarms. All the panels shall
have the inter connection for accepting the alarm but the reset shall be from the
individual panel.
ii) The display in the announciator unit shall be High density LED type or cluster LED
type.
iii) Trip and non-trip discrimination shall be made in the fascia. For example all trip
fascia shall have red colour and non trip fascia white colour.
iv) A test, accept and reset push button facilities shall be provided for testing the
annunciation unit.
v) The annunciator unit should conform to the applicable parts of the IEC 60255/
Equivalent for type tests and routine tests.
vi) The annunciator unit shall be equipped with 230VAC/220VDC redundant power
supply modules.
![Page 51: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/51.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
51
5. General requirements for Numeric type protection relays
i) Technology shall be based on numeric type.
ii) Equipped with Event recorder. Events storage shall be sufficient for the application.
minimum 200 events of storage is preferable and with a time stamp resolution of 1ms.
iii) Equipped with fault recorder to record in digital oscillography of instantaneous values of all
the relevant analog channels during faults and disturbances. Trigger criteria and record length
(pre-trigger and post trigger record length) for the recorder should be user configurable.
Storage capacity for Disturbance and fault record storage shall be sufficient for the
application.
Trigger criteria shall be user configurable to be triggered by any of the hardwired inputs and
outputs as well as virtual inputs and outputs , boolean logic, under/over threshold levels of
relevant analog channels etc. The sampling rate of fault recording shall be preferably 24
samples / cycle or higher.
iv) Relay casings shall have a degree of protection of IP 50 for relay enclosure,
IP50 for relay facia as per IEC 60529 or equivalent.
v) Time stamping of events shall be of resolution of 1ms.
vi) Equipped with optical Ethernet port for Bay level LAN interface and Support SNTP for time
synchronization with resolution of 1ms., IEC 61850 protocol with type test
certification/report for compliance with relevant parts of IEC 61850. The
compliance shall include :
-Model implementation conformance statement (MICS)
-Protocol implementation conformance statement (PICS)
vii) Equipped with communication port (USB or RS232 or Ethernet port) for relay
configuration, Data and records retrieval. It shall be possible to carry out firmware updates
of the numeric relay through internet connectivity free of cost.
viii) Equipped with self monitoring feature during start up and always while in service. A
relay fail alarm should be available in dry contact type alarm output. A relay healthy
indication shall be provided. The numeric relay shall be provided with diagnostic tools with
which it shall be possible to identify and display all the defective modules of the relay.
ix) Provided with the necessary software tools for complete configuration of the
protection relay, record retrieval, data retrieval. All firmware updates to the
numeric relays shall be feasible to be effected with download of files from
the manufacturer’s website free of cost.
x) Suitable to operate with the auxiliary DC supply voltage available in the sub-
Station (Nominal aux supply Voltage is 110V DC or 220V DC as per station DC supply
voltage.)
xi) Provision for display of alarms with LED/ LCD/Graphic display. The LEDs shall
![Page 52: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/52.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
52
be user programmable to any of the hardwired inputs and outputs as well as virtual inputs
and outputs.
xii) Support multiple relay settings for protection. The numeric relay should be provided with
a facility for settings file comparison. Facility should be provided to view the abstract of
adopted settings features of the relay.
xiii) All configuration files, data and records of the protection relay shall be stored in a non-
volatile memory and shall not be lost on absence of dc supply.
xiv) The relays should be suitable for testing with universally acceptable testing kit.
xv) The relay should be equipped with user configurable opto isolated Binary inputs and
potential free binary outputs as required for the specific application. Numeric relays with
non-programmable binary Inputs, non-programmable binary outputs, non-
programmable are not acceptable.
xvi) Where ever the numerical relay is connected to the 3phase VTs, the relay should be
equipped to display the angle of vectors with respect to A phase voltage vector i.e Va
angle=0 deg (Voltage vector of phase B and C with respect to Phase A ) similarly
current vector angle of phase A,B and C with respect to voltage vector A for relay
connected to 3 phase CTs.
xvii) All relays shall have screw type terminations for wiring terminations.
xviii) Thermal with stand capabilities:
3x In - Continuously
100x In - 1 Second
40x In for 3 second
xix) Equipped with Trip rated binary output contacts specifically for tripping with Minimum
of 4nos for 3-phase breaker application and 6nos for 3x1-ph breaker applications. The rating
of trip rated contacts shall be:
Make and carry continuously : 6 A , 300V.
Make and carry for 0.2 secs : 30A.
Breaking capacity for DC : 75W.
Breaking capacity for DC (when L/R is within 40 m sec) : 30 W.
- For alarm contacts:
Make and carry continuously : 4A DC/AC
Make and carry for 0.2 secs : 30A DC , 300V.
Operating time shall be less than 10ms for output contacts.
xx) Standards for type tests and routine tests compliance.
a) The numerical relay shall conform to the following standards with latest amendments:
- IS 8686 in general with impulse Impulse Voltage Withstand Test and High
Frequency Disturbance Test as per Class III of this standard.
- IS 3231 (Relevant parts) / IEC 60255
![Page 53: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/53.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
53
- IEC 60255-22-2 : ESD
- IEC 60255-22-3 : Radiation susceptibility test
- IEC 60255-22-4 : Fast transient interference
- IEC 60255-21-2 : Shock test
- IEC 60255-21-1 : Vibration test
- IEC 60255- 11 : Alternating component (Ripple) in DC auxiliary energizing
quantity.
- Environmental performance requirements :
IEC 60255-1 : Operating temperature range
IEC 60255-1 : Storage temperature range
IEC 60068-2-30 : Humidity
b) In particular the following type tests should be complied.
a. Power Input:
i. Auxiliary Voltage
ii. Current Circuits
iii. Voltage Circuits
iv. Indications
b. Accuracy Tests:
i. Operational Measured Values
ii. Currents
iii. Voltages
iv. Time resolution
c. Insulation Tests:
i. Dielectric Tests
ii. Impulse Voltage withstand Test
d. Influencing Quantities
i. Limits of operation
ii. Permissible ripples
iii. Interruption of input voltage
e. Electromagnetic Compatibility Test:
i. 1 MHZ. burst disturbance test
ii. Electrostatic Discharge Test
iii. Radiated Electromagnetic Field Disturbance Test
iv. Electrical Fast transient Disturbance Test
v. Conducted Disturbances Tests induced by Radio Frequency Field
![Page 54: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/54.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
54
vi. Magnetic Field Test
vii. Emission (Radio interference level) Test.
viii. Conducted Interference Test
f. Function Tests:
i. Indication
ii. Commands
iii. Measured value Acquisition
iv. Display Indications
g. Environmental tests:
i. Cold Temperature
ii. Dry Heat
iii. Wet heat
iv. Humidity (Damp heat Cycle)
v. Vibration
vi. Bump
vii. Shock
c) All acceptance and routine test as stipulated in the relevant standards should be
carried out by the supplier in presence of TANTRANSCO’s representative without
any extra cost
6. Electro-mechanical Relays:
i) All relays shall confirm to IS: 3231
ii) Unless otherwise specified all auxiliary relays and timers shall be supplied in
non-draw out cases / plug in type modular cases.
7. RELEVANT REFERENCE STANDARDS:
IS/IEC 60947 Low-voltage Switchgear and Control gear
IS – 3231 electrical relays for power system protection
IS – 8686 static protective relays
IEC 60529 Degrees of protection procured by enclosures (IP code 31).
IS – 1248 & IS – 2419 indicating instruments
IS – 0722 energy meters, control switches (LV switching devices for
control and auxiliary circuits)
IEC 60687 /IS 14697 AC static transformer operated watthour and Var-hour meters.
IS – 0337,0337-1 -do-
IS – 0297(part 1-3) Dimensions for the mechanical structures of the
482.6mm (19”)series
IS – 6875 control switches (LV switching devices for control and aux. circuits)
IS – 0005 Colour for ready mix paints
![Page 55: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/55.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
55
IS – 1554(part –I) PVC insulated cables upto and including 1000 volts
IS –3842(part I-VII) application guide for protection
IS –6005 code of practice for phospating iron and steel
IES –602555-1-0 electrical relays –all-or-nothing elec. relays.
IEC – 60255-3,5,6,7,8,10,11,12,13,16 electrical relays for various specifications
IEC – 60255-21-2,3
IEC – 60255-22-1,2,3,4 electrical relays – vibration and disturbance etc.
IEC – 60255-23 electrical relays – contact performance
IEC 61850-3 EMI Immunity and environmental compliance(Electrical utility substations)
IEC 61850 All applicable parts of this standard certified by KEMA/ reputed laboratory.
Including type test certification/report for :
- Model implementation conformance statement (MICS)
- Protocol implementation conformance statement (PICS)
Note : For standards other than IS mentioned above, the equivalent or better IS standards
may be complied.
8. 230kV LINE PROTECTION:
MAIN-I & MAIN –II DISTANCE PROTECTION:
The numeric distance protection relays shall be comply with the following requirements.
1. The numerical distance protection relays shall comply with the specification for general requirements for numerical protection relay as furnished in this document. 2. a) Equipped with a minimum of 16 nos.of programmable opto-isolated binary inputs and a minimum of 20 nos. of programmable potential free binary outputs selectable for wetting voltage of 48 V / 110 V / 220 V DC, as available at the substation concerned.
b) A minimum of 14 nos. LEDs shall be provided for alarms.
3. The numeric relay shall be suitable for operating with Nominal PT input of 110V~ phase to phase, 63.5V ~ phase to ground, CT input of 1A and 5A (user selectable).
4. Main-1 and Main-2 distance protection relays should be of different manufacturers. 5. The relay shall be equipped with the following built in protection functions: √ 21 : Distance protection
a) The operating time of the distance relay shall be less than 40 ms (including trip relay time) for any type of fault.
b)There shall be a minimum of 3 forward and 1 reverse selectable distance protection Zones.
c)Have six independent loop measurements system to cater phase to phase and phase to ground faults.
d) Polygonal characteristics for phase to phase fault and polygonal characteristics for phase to earth fault. In case of polygonal characteristics X and R or Z and R should be independently settable.
e) Have an impedance setting range of 0.05 – 120 ohm
![Page 56: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/56.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
56
f) Have a requisite independent continuously variable time setting with range 0-3 sec. g) Have a resetting time of less than 40 millisec. h) Have facility for zero-sequence compensation for earth fault on all zones of measuring
element. i)The relay shall be suitable for single phase tripping as well as for three phase tripping. j)Have cross polarization, assure 100% directional sensitivity for unbalance fault and
memory for balanced faults. k)Have built in fault locator with following features.
i) Shall display the fault location either in percentage of line length or in actual
distance in kilo meter based on reactance setting.
ii) Shall have an accuracy of +/-3% or better and watch dog output.
√ 98 : Fuse failure detection for single, two and three phases
The scheme shall incorporate necessary precaution in measurement to block the
distance protection. However, during blocking period the relay shall have over current
protection facility for fault detection.
√ 50/27 : SOTF
√ 25 : Synchro check function
√ 50BF : LBB Function
√ 79: Built in auto reclose function with single shot, single phase reclose with adjustable
dead time setting of 0.1sec to 1sec, and with adjustable reclaim time of 1 to 250sec.
√ 27/59 : Under voltage/ over voltage protection element. This protection element should
have two independent stages.
√ 50N/51N IDMT directional earth fault relay with adjustable setting range of 10 to 80%
with characteristic curve for normal inverse, very inverse and extremely inverse of both IEC
and IEEE curves. This facility should also be available with BLOCKING LOGICs.
√ DR : Disturbance recorder with minimum 8 analog and 12 digital inputs and with minimum memory capacity to store at least 8 disturbance records with each record of minimum 10 cycles. The sampling of analog inputs shall be at least 16 per cycle. Shall have features to adjust pre fault and post fault time. √ Event recorder shall be able to store at least 1000 time tagged events. The resolution of event recorder shall be at least 1 millisecond. √ Load enchroachment discrimination facility to prevent false tripping due to encroachment of heavy loads.
![Page 57: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/57.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
57
6. The distance protection function shall be provided with the following functionalities, features: √ 68 : power swing blocking protection The power swing shall be detected by rate of change of impedance with suitable characteristics. The blocking shall have continuously adjustable time delay with setting range of not less than 2sec or shall have feature to block the tripping as long as it exists. The relay shall have feature to unblock during fault. It shall be explained how blocking is effected during power swing for phase to earth fault, phase to phase faults and three phase faults. In each case the relay shall have feature to unblock during fault and with facility to block each distance zone independently.
√ 85 : Communication aided schemes PUTT, POTT, Blocking, weak infeed and current reversal logic.
√ 46BC : Broken conductor detection
7. Provided with metering function of class 1.0 accuracy or better and user programmable display.
9. 230 kV LINE PROTECTION (USING LINE DIFFERENTIAL RELAY WITH BUILT-IN
DISTANCE PROTECTION):
1. Comply with the general requirements for numeric type relay furnished in this
technical specification document.
2. Longitudinal differential protection shall be based on current. It shall be numerical
phase segregated type protection scheme (summation CT type scheme is not
acceptable) for application at each end of the line. The protection shall be designed
to detect all kinds of poly-phase and ground faults. Its operation shall compare
currents on a per phase basis.
- The protection shall be designed for fast operation and be suitable for protection of
lines.
- The relays when applied at both ends of the line must operate simultaneously to
clear a fault rapidly whether fault current is fed from one end or both.
-The relays should be designed to ensure time synchronization with the remote end
relay when same model relay is put in service at the remote end of the line with
direct optic fibre connectivity of up to 10km distance or as required for longer line at
site for implementation of line protection. The relay must be compatible to operate
with the remote end relay for implementation of line protection.
![Page 58: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/58.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
58
-The relay shall have display for indicating/display phase, differential and bias current magnitudes.
- The maximum operating time of the relay in respect of line differential
protection shall be 20ms.
-The relay shall have direct inter-trip/permissive inter-trip facilities selectable.
87L : Current differential protection
21 : Distance protection
50/51 : Non-directional phase over current protection
50N/51N : Non-directional stand by earth fault protection
68 : Power swing blocking
2. The relay shall be equipped with IEEE C37.94SM, 1310nm, Single mode compliant dual channel of fibre optic communication port’s for relay to relay communication for implementation of line differential protection. Fiber optic patch cables with end connectors of sufficient length to connect the relay port to the fiber optic patch panel shall be provided for each relay. Exact length of this FO cable shall be ascertained at site, 1 set of FO patch cable is required as spare for each site. 3. The relay shall have the built in distance protection functionality as specified for
distance protection relay for line protection.
10. 110kV LINE PROTECTION:
A. MAIN DISTANCE PROTECTION:
The numeric distance protection relays shall be comply with the following requirements.
1. The numerical distance protection relays shall comply with the specification for general requirements for numerical protection relay as furnished in this document. 2. a) Equipped with a minimum of 16 nos.of programmable opto-isolated binary inputs and a minimum of 20 nos. of programmable potential free binary outputs selectable for wetting voltage of 48 V / 110 V / 220 V DC, as available at the substation concerned.
b) A minimum of 14 nos. LEDs shall be provided for alarms.
3. The numeric relay shall be suitable for operating with Nominal PT input of 110V~ phase to phase, 63.5V ~ phase to ground, CT input of 1A and 5A (user selectable).
4. The relay shall be equipped with the following built in protection functions: √ 21 : Distance protection
a) The operating time of the distance relay shall be less than 40 ms (including trip relay time) for any type of fault.
b)There shall be a minimum of 3 forward and 1 reverse selectable distance protection Zones.
![Page 59: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/59.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
59
c)Have six independent loop measurements system to cater phase to phase and phase to ground faults.
d) Polygonal characteristics for phase to phase fault and polygonal characteristics for phase to earth fault. In case of polygonal characteristics X and R or Z and R should be independently settable.
e) Have an impedance setting range of 0.05 – 120 ohm f) Have a requisite independent continuously variable time setting with range 0-3 sec. g) Have a resetting time of less than 40 millisec. h) Have facility for zero-sequence compensation for earth fault on all zones of measuring
element. i)The relay shall be suitable for single phase tripping as well as for three phase tripping. j)Have cross polarization, assure 100% directional sensitivity for unbalance fault and
memory for balanced faults. k)Have built in fault locator with following features.
i) Shall display the fault location either in percentage of line length or in actual
distance in kilo meter based on reactance setting.
ii) Shall have an accuracy of +/-3% or better and watch dog output.
√ 98 : Fuse failure detection for single, two and three phases
The scheme shall incorporate necessary precaution in measurement to block the
distance protection. However, during blocking period the relay shall have over current
protection facility for fault detection.
√ 50/27 : SOTF
√ 25 : Synchro check function
√ 50BF : LBB Function
√ 79: Built in auto reclose function with single shot, single phase reclose with adjustable
dead time setting of 0.1sec to 1sec, and with adjustable reclaim time of 1 to 250sec.
√ 27/59 : Under voltage/ over voltage protection element. This protection element should
have two independent stages.
√ 50N/51N IDMT directional earth fault relay with adjustable setting range of 10 to 80%
with characteristic curve for normal inverse, very inverse and extremely inverse of both IEC
and IEEE curves. This facility should also be available with BLOCKING LOGICs.
√ DR : Disturbance recorder with minimum 8 analog and 12 digital inputs and with minimum memory capacity to store at least 8 disturbance records with each record of minimum 10 cycles. The sampling of analog inputs shall be at least 16 per cycle. Shall have features to adjust pre fault and post fault time.
![Page 60: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/60.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
60
√ Event recorder shall be able to store at least 1000 time tagged events. The resolution of event recorder shall be at least 1 millisecond. √ Load enchroachment discrimination facility to prevent false tripping due to encroachment of heavy loads. 5. The distance protection function shall be provided with the following functionalities, features: √ 68 : power swing blocking protection The power swing shall be detected by rate of change of impedance with suitable characteristics. The blocking shall have continuously adjustable time delay with setting range of not less than 2sec or shall have feature to block the tripping as long as it exists. The relay shall have feature to unblock during fault. It shall be explained how blocking is effected during power swing for phase to earth fault, phase to phase faults and three phase faults. In each case the relay shall have feature to unblock during fault and with facility to block each distance zone independently.
√ 85 : Communication aided schemes PUTT, POTT, Blocking, weak infeed and current reversal logic.
√ 46BC : Broken conductor detection
6. Provided with metering function of class 1.0 accuracy or better and user programmable
display.
B. BACK-UP PROTECTION FOR 110kV FEEDERS
: DIRECTIONAL O/C &E/F RELAY:
The relays shall be of numerical type
1. The numerical over-current protection relays shall comply with the specification for
general requirements for numerical protection relay as furnished in this document.
2. The numeric relays shall be equipped with sufficient digital output potential free contacts
for trip outputs, alarms and for the protection scheme implementation.
3. The numeric relay shall be suitable for operating with Nominal PT input of 110V~ phase
to phase, 63.5V ~ phase to ground, CT input of 1A and 5A (user selectable).
4. Features and characteristics.
Current settings : O/C Phase fault setting : 20 to 200 % of rated current in at least 1% steps E/F setting: 10% to 80 % of rated current in at least 1% steps. Time multiplier : 0.05 to 1.0 in steps of 0.01 for phase fault and earth fault settings. Definite Time Delay : 0.05 to 20 Sec. in steps of 0.01 sec. Drop out to pick up ratio : > 95%. Inverse Characteristic : Normal Inverse (3 Sec, 1.3 Sec), Very Inverse &Extremely Inverse of IEC curves. ( Curves should be Selectable at site)
![Page 61: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/61.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
61
Characteristic curves and settings shall be separately selectable for phase fault and earth fault. High set Instantaneous Unit : O/C : 50 % to 2500 % of rated current in steps of 50% or lesser step size. E/F : 50 % to 500 % of rated current in steps of 50% or lesser step size. Current settings o/c – 50 to 200% & E/F – 10 to 80% in convenient steps
Time multiplier settings 0 to 1 with a resolution of 0.01sec.
Have built in IDMT directional O/C and E/F relay with characteristic curve for
normal inverse, very inverse, extremely inverse of both IEC and IEEE curves
Directional element
P.T voltage : 110 V A.C
Phase fault : + 90 deg to -90 deg
E/F fault : + 90 deg to -90 deg
Equipped with in built 50LBB function.
Zero sequence voltage shall be based on 3-phase voltages.
5. Relay shall be provided with Event record & Fault record as stated below:
Storage and display of at least 100 event records with date and time stamp.
Storage and display of at least 16 fault records comprising information of Fault element
(R/Y/B/Earth) , Type of fault, Value of fault in true rms Amps.
6. Relay shall be provided with LED Indications for :
i) Protection healthy or In service
ii) Pickup
iii) Trip operated
iv) High set operated
v) Phase O/C operated
vi) Earth O/C operated
Note : Individual indication of hand reset type shall be provided for each O/C, Earth fault
element & each high set element.
11.BUS-BAR PROTECTION for 230kV / 110KV BUS:
1. The numerical bus bar protection relays shall comply with the specification for general requirements for numerical protection relay as furnished in this document.
2. Bus bar protection relay shall be of numerical low impedance, centralized type and shall have operate and restraint characteristics.
3. have maximum operating time up to trip impulse to trip relay for all types of faults of 25 milli seconds at 5 times setting value.
4. operate selectively for each zone of bus bars for all types of faults i.e Phase to phase,
Phase to ground faults including high resistive faults.
5. be stable for through fault condition up to 50KA fault level. 6. incorporate check zone feature for each phase and clear zone indication. The check
![Page 62: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/62.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
62
zone shall be without any switching. Also check zone shall not over stabilize during internal fault due to unequal source & load distribution.
7. shall include one overall check zone protection in addition to single/multiple zones specified.
8. incorporate continuous supervision of CT secondary’s against any possible open circuit and if it occurs, shall render the relevant zone of protection inoperative after a time delay and initiate an alarm. However facility to unblock CT supervision in case of actual fault occurring in the bus shall be provided.
9. be phase segregated type with separate relay for each phase and provide
independent zone of protection. If bus section is provided, then each side of the bus
section shall have separate set of bus bar protection scheme. The bus section
breaker and bus coupler breakers shall be covered by overlapping bus bar protection
scheme of respective buses.
10. be transient-free in operation.
11. includes continuous DC supply supervision.
12. include provision for protection IN/OUT for each zone and check zone.
13. The numeric relay shall be suitable for operating with CT inputs of 1A and 5A (user
selectable). The secondary of the CT shall be directly connected to the Bus bar relay
without the aid of external auxiliary CTs. Ratio correction shall be possible with
through the relay configuration tools itself.
14. the relay must have harmonic rejection and shall not operate on second and third harmonics. Second harmonic rejection ratio 2:1 minimum, third harmonic rejection ratio 40 :1 minimum.
15. the high speed tripping relays (96) for tripping each feeders on actuation of bus bar protection shall be on respective feeder relay panels and necessary provision for running the tripping bus wires to actuate these relays shall be made. The protection scheme shall be wired in such a way that both check zone and bus sectionalizing zone schemes shall operate to isolate the respective faulty bus bar for internal fault condition.
16. The relay should be equipped completely for supporting three numbers spare circuits
in addition to all the circuits for feeders/ bays depicted in the single line diagram for
the sub-station.
17. The bus bar protection relay should support various bus architectures selectable by
means of the relay configuration (Single bus bar, Double bus bar, Breaker and a half
bus bar, two section bus bar with a bus tie, Double bus bar with transfer bus and tie
breaker) for its bus bar protection.
18. The relay shall incorporate dynamic bus replica and provide necessary end
zone fault protection depending on the bus bar protection CT’s location. The status
of isolators shall be ascertained by hardwired double indication method i.e Both N/C
and N/O contact to be used.
19. The relay shall facilitate through relay configuration tools as well as through user
interface keypad/controls the following requirements:
- Adopting multiple CT ratios of different bays
- CT polarity selection
- Bay IN/OUT selection
- Bus differential enable or disable etc
- IN/OUT selection for each zone and check zone.
20. Facility to monitor the bay differential currents and bus restraint current for each
![Page 63: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/63.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
63
zones shall be supported in the relay display as well as through configuration tools.
21. The bus bar protection of respective bus sections shall trip respective set of bus bar lockout relays and shall initiate BF of respective CB. The bus bar protection scheme of each bus section shall be developed such that one lockout relay shall be provided with each circuit breaker. 22. The bus bar protection relay shall be provided with built in breaker fail (50BF) / LBB
protection for all the connected circuits. For LBB protection
Operating time : 15 ms
Resetting time : 15 ms
LBB protection scheme shall be implemented to get individual initiation from the
corresponding phase of main protections of line for each over current element.
However common three phase initiation is acceptable for other protections and
transformer/reactor equipment protections.
Have setting range of 20% to 80% of rated current.
Have timer with continuously adjustable setting range of 0.1 to 1 second.
23. The relay shall be equipped with VT modules to measure the bus voltages so that reference load flow can be taken from bus voltage as well as for providing secure operation in case of inadvertent shorting of CT.
12. TRANSFORMER PROTECTION (APPLICABLE FOR 230KV/ 110KV AUTO
TRANSFORMER ) :
a) BIAS DIFFRENTIAL PROTECTION RELAY FOR THREE WINDING
TRANSFORMER PROTECTION:
The numerical differential protection relays shall be comply with the following
requirements.
1. The numerical differential protection relays shall comply with the specification for general
requirements for numerical protection relay as furnished in this document.
2. The numeric relay shall be suitable for operating with CT inputs of 1A and 5A (user
selectable).
3. Differential protection features and characteristics:
i. Based on low impedance differential principle for protection of three winding
transformer. Three phase with faulty phase identification.
ii. Shall have three instantaneous high set over current units with facility to adjust 5 to 20
times normal current.
iii. Shall have second and fifth harmonic restraint feature with second harmonic content in
the range of 15 to 35%. Transformer inrush restraint functionality shall be provided.
Inrush and CT saturation shall not influence the differential function.
iv. Facility to set transformer vector group and CT ratio selection/ correction through relay
configuration software tools.
v. Basic bias setting 20 to 40% in steps 1%.
vi. Operating current setting range 15% to 30%.
vii. have operating time not greater than 35ms at 3 times normal current.
viii. Maximum operating time for instantaneous operation: 25ms +/-4% of set value.
ix. The differential protection shall have adjustable characteristics with adaptive
![Page 64: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/64.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
64
differential feature to maintain stability in case of through faults.
x. The protection relay shall be equipped with unrestrained differential protection element
for fast tripping on heavy internal faults.
xi. Facility to view the transformer differential current and bias current directly from the
Relay display as well as through configuration software.
4. Shall have inbuilt restricted earth fault protection and inbuilt over fluxing protection.
i) Over Fluxing Protection shall be provided for HV side and shall comply with the following
requirements:
(a) operate on the principle of Voltage to frequency ratio and shall be phase to phase connected
(b) have inverse time characteristics, matching with transformer over fluxing withstand
capability curve.
(c) provide an independent 'alarm' with the time delay continuously adjustable between
0.1 to 6.0 seconds at values of 'v/f' between 100% to 130% of rated values
(d) tripping time shall be governed by 'v/f' Vs. time characteristics of the relay
(e) have a set of characteristics for Various time multiplier settings. The maximum operating
time of the relay shall not exceed 3 seconds and 1.5 seconds at 'v/f' values of 1.4
and 1.5 times, the rated values, respectively.
(f) have an accuracy of operating time, better than +/-10%
(g) have a resetting ratio of 95 % or better
(h) Over flux protection shall be provided in the HV
ii) Restricted Earth Fault Protection shall
(a) be single pole type
(b) be of current/voltage operated type
(c) have a current setting range of 10-40% of 1 Amp./ have a suitable voltage setting range
(d) be tuned to the system frequency
5. The protection relay shall be equipped with built in Over excitation protection (ANSI 24).
6. The protection relay shall be equipped with built in thermal overload protection.
7. The disturbance recording functions should be integrated in the relay module. The
disturbance recorder shall have facility to record at least 4 numbers of digital signals apart
from digital signal from the relay and currents in HV&LV winding. Recording memory
capacity: 5secs.
8. Equipped with sufficient numbers (minimum is 16 nos ) of programmable of
opto isolated Binary inputs and sufficient numbers (minimum is 20 nos) of programmable
potential free binary outputs with wetting voltage for digital inputs to be field programmable
to 48V / 110V / 220V DC.
9. The minimum number of LEDs shall be 14 nos, In case Graphic display is provided then
atleast 4 nos LEDs shall be provided for important alarms.
b) BACKUP NON-DIRECTIONAL OVER CURRENT PROTECTION WITH HIGH SET
INSTANTANEOUS FOR HV:
Specification same as that required for numerical DIRECTIONAL O/C &E/F RELAY but without
directional feature. However the phase and ground Over current functions shall incorporate
![Page 65: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/65.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
65
a harmonic restraint feature.
c) BACKUP NON-DIRECTIONAL OVER CURRENT RELAY FOR LV:
Specification same as that required for numerical DIRECTIONAL O/C &E/F RELAY but without
directional feature.
13.0 Under Frequency Relay :
* Comply with the general requirements for numeric type relay furnished in this technical
specification document.
* The relay support programmable scheme logic. The PSL shall support Boolean logic and
shall be possible to configure using preferably IEC 61131-3 standard compliant tools.
* The relay shall be equipped with separate protection elements for 4 independent stages for
under frequency protection, 3 independent stages for (81RF) Frequency supervised rate of
change of frequency protection.
* The relay shall have a discrete (digital) selection unit with built in timer and associated tripping relays to activate tripping.
Under frequency protection function (81U)
1 No of Stages 4 independent Stages
2 Frequency range 45 Hertz to 55 Hertz
3 Frequency steps In 0.01 HZ
4 Timers
One timer for each stage independently programmable
settings
5 Timer setting Programmable between 0 to 5 sec in step of 0.01 sec
6 Operating time Within 100ms
7 No of phases 3
Frequency supervised df/dt protection (81RF)
1 No of Stages 3 independent Stages
2 Settings range 0.1 HZ/Sec to 1 HZ/Sec in steps of 0.1HZ/Sec
Operational
accuracy 5 milli Hz./sec
3 Measuring cycles Programmable between 2 to 10 cycles
4 Operating time Within 100ms
5 No of phases 3
![Page 66: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/66.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
66
* The relay shall be equipped with built in VT supervision function and 2 protection elements
for under voltage blocking function selectable between IDMT/DT to block all the frequency
based protection elements. The under voltage measurement shall be possible on phase to
phase as well as phase to neutral basis.
* The relay shall have negative sequence overvoltage function. zero sequence voltage
detection for VT fuse fail detection shall be used so that the relay does not maloperate on
system ground faults
* Operating Voltage : 50 to 100% of nominal voltage with provision for selection. Nominal voltage is 110V AC (Phase to phase). Ph-N (63.5V~ nominal ) voltage shall also supported. Facility for under voltage blocking shall be provided with programmable range for voltage setting. * The relay functionality shall include measurement of phase/ line voltages (True rms) , sequence voltages , system frequency and phase angles. * Relay should have the capability to build the logic with which one should be able to adapt to the load shedding requirement of the substation. *Blocking of each of the protection elements shall be possible with user interface through keypad/ buttons as well as through configuration port and Engineering work station. * The relay shall be highly reliable and immune to transient and surges. In case of any
component failure in the relay, the relay should not cause undesired trip.
Relay outputs:
* It shall be possible to assign each of the trip outputs reserved for feeders to any of the three stages of under frequency protection function as well as f+df/dt protection. Indications
* The relay shall be equipped with indication lamps that is programmable to any of the
protection elements, inputs, outputs and logic outputs. *Programmable LED indications shall be provided in the relay for each stage of protection
elements operated and for faulted phase indication.
Relay Inputs:
* The relay shall be highly reliable and immune to transient and surges.
* The relay shall be equipped with sufficient quantity of opto-isolated digital inputs for facilitating external blocking of under frequency as well df/dt protection elements for each feeder. Necessary isolation links should be provided to facilitate manual isolation of under 81U and 81RF protection feeder wise. * The relay shall be equipped with sufficient opto-isolated digital inputs and potential free digital outputs to accommodate feeders all the feeders plus 3 spare feeders for future use.
![Page 67: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/67.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
67
14.0 MISCELLANEOUS PROTECTION
14.1 D.C. Supply Supervision Relay.
The relay shall monitor continuously D.C. Supply to Protection System. The de-
energization of this relay will indicate the DC Supply failure. Auxiliary supply for the
relay is 110 V DC / 220V DC (Exact voltage will be specified at the time of issue of
indent). The relay shall have a time delay on drop off of not less than 100 milli
second. The relay shall be provided with operation indicators (Reverse flag) self
reset. Sufficient number of contacts potential free may be provided. Separate relays
for dual source are to be provided.
14.2 Trip Circuit Supervision Relays.
The relays shall supervise the healthiness of trip circuit continuously (Both pre-closing
and post-closing conditions of the circuit breakers). The relay shall be capable of
monitoring the healthiness of each phase trip coil and associated circuits of the circuit
breaker during “ ON and OFF ” conditions. The relay shall work on 110 V DC / 220V
DC with allowable margin as the case may be. The relay shall have adequate
contacts for providing connection to alarm and event logger, self reset. The relay
shall have a “ time delay on drop off of not less than 200 milli seconds ” and
provided with Operation indicators. The short circuiting of any series resistance
provided in this relay or short circuiting the coil of the relay should not energize the
trip coil of the breaker.
14.3 Tripping (Master) Relay :
-For tripping of feeder / transformer breakers in a station on operation of protective
relays and for interlock purposes. The relay shall be voltage rated for station DC
supply with allowable margin of variation, be instantaneous (Operating time not
exceed 10 milli seconds).
-Reset within 20 milli seconds.
- Hand and electrical reset type
-Have adequate contacts to meet the requirement of scheme, other functions like
auto reclose relay, LBB relay as well as to cater to associated equipments like SER,
DR etc., to be provided with operation element/ coil.
14.4 Check Synchronizing relay:-
Synchro check function should be part of the main relay.
The synchronism and energizing check functions shall feature:
Settable voltage, phase angle, and frequency difference.
Energizing for dead line - live bus, live line - dead bus or
dead line– dead bus with no synchro-check function.
Synchronising between live line and live bus with synchro-check function.
The relays equipped with synchronism and energizing check shall comply with the
requirements as mentioned above.
![Page 68: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/68.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
68
14.5 Relay for Automatic DC selection
Relay for automatic DC selection shall comply with the relevant parts of IEC 60255 / IS
standards. The performance of the relay shall be satisfactory so as to facilitate minimum
interruption of DC during DC change over and the DC interruption during change over shall
not cause the numeric relays to reboot / switch off, also all the numeric relays shall be type
tested for DC supply interruption and suitable to function without reboot/power off during
the DC change over. In case diode oring based DC selection scheme is proposed, then the
scheme should ensure that any kind of component failure will not cause shorting of the input
DC sources, the dielectric isolation between the two input DC sources should be sufficient for
safe operation.
******
![Page 69: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/69.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
69
SECTION-VI C
TECHNICAL SPECIFICATION FOR SUB-STATION AUTOMATION SYSTEM (SAS)
1) GENERAL :
This specification provides for complete Design & Engineering, Manufacture, FAT (Factory
acceptance test), packing, shipment, insurance, transport and delivery to site, installation,
testing and commissioning with SAT (Site acceptance test) of the substation automation
system completely as described in the following sections to control and monitor the 230 kV
bays, 110KV bays, 230 kV/ 110 kV Auto transformers, and associated equipments at the
substation and all the station auxiliary equipments of the substation. The scope of SAS
commissioning is inclusive of the system integration of control and protection panels with
SAS and system integration of online transformer diagnostic monitoring system (Where
applicable) supplied by others, in this context all necessary materials and works are included
in the SAS scope of supply and commissioning.
The testing and commissioning of the SAS Equipments shall be carried out by engineers
authorized /certified by the original equipment manufacturer of SAS with the witness of the
concerned TANTRANSCO P&C engineer and the completion of all the works should be to the
satisfaction of TANTRANSCO.All the relevant files such as ICD, SCD,SSD,CID etc shall be
updated in the relevant devices and provided in soft copy in CD and in a Spare HDD (Spare
HDD to be supplied in the spares for SAS) to the concerned Protection & Communication
engineer of TANTRANSCO.
The details of Electrical bays in the substation are given in the single line diagram of
respective substation.
The substation automation system (SAS) shall be installed to control and monitor all the
substation equipments from Local Control room as well as from the remote load dispatch
centre/ Master. The SAS shall be designed such that it enables the user for control &
monitoring of the substation at the HMI level (through Operator work stations), at the Bay
level ( through BCU) and at the switchgear level/Manually (facilitated by TNC switch, Energy
meters etc).
The SAS shall be based on a decentralized architecture and on a concept of bay-oriented,
distributed intelligence. Functions shall be decentralised, object-oriented and located as close
as possible to the process. The main process information of the station shall be stored in
distributed databases. The typical SAS architecture shall be structured in two levels i.e.
station and bay level. The database sizing shall be sufficient to accommodate for current
Single line diagram and future expansions.
At bay level, the IEDs shall provide all bay level functions regarding control, monitoring and
protection, inputs for status indication and outputs for commands. The IEDs should be
directly connected to the switchgear without any need for additional interposition of
transducers.
![Page 70: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/70.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
70
The data exchange between the electronic devices on bay and station level shall
take place via the communication infrastructure. This shall be realized using fiber
optic cables, thereby guaranteeing disturbance free communication. The fiber
optic cables shall be run in suitable conduit pipes. Data exchange is to be
realized using IEC 61850 standards with a external managed switched Ethernet
communication infrastructure in decentralized ring configuration.
o All the numerical IEDs must be fully IEC 61850 compliant and must have the
following features.
o Peer-to-peer communication using GOOSE messages (IEC 61850) for
interlocking.
o Interoperability with third party IEC 61850 compliant devices
o Generate XML file for integration/engineering with vendor independent SCADA
systems.
o Should be directly connected to the inter bay bus on IEC 61850 without the
use of any gateways. Connections of bay protection IEDs to the IEC 61850
bus through the bay control units are not acceptable.
The sub-station configuration language shall be based on XML format shall be defined for
system configuration and the same shall be furnished for system integration and end user.
Failure of one set of fiber shall not affect the normal operation of the SAS.
However, it shall be alarmed in SAS. Each fiber optic cable shall have adequate
spare fibers.
At station level, the entire station shall be controlled and supervised from the station
HMI. It shall also be possible to control and monitor the bay from the bay level equipment at
all times, accordingly a graphic user interface (GUI) display shall be provided in each bay
control unit. The GUI display in the BCU shall display the status of the bay devices (breakers,
isolators, switches etc) in real time along with the related measurands. All alarms related to
the respective bay shall be displayed in the BCU through its LED’s or in its GUI display as an
alarm list/scroll. A TNC switch shall be provided for each breaker in the respective C&R panel
of the bay for facilitating manual operation for facilitating operation in emergency condition.
The BCU’s shall be located in the respective relay panel itself and Multiple BCU’s shall
not be housed in a single panel. Clear control priorities shall prevent operation of a single
switch at the same time from more than one of the various control levels, i.e. station HMI,
bay level or apparatus level. The priority shall always be on the lowest enabled control level.
The station level contains the station-oriented functions, which cannot be realized at
bay level, e.g. alarm list or event list related to the entire substation etc. All the data cabling
& other interconnections shall be through fibre optic cables wherever possible except for
power supply.
Communication with the remote control centers State Sub-load Dispatch Centre through
Gateway on IEC 60870 – 5 – 101/104 of SCADA/EMS system through PLCC Modem’s/Fibre
optic interface equipment as applicable. This interface shall support communication to the
remote control centre on IEC 60870 – 5 – 101/104 through redundant communication ports.
TAN TRANSCO Engineers shall be coordinated for integration. The data should be made
available for the polling schedule of the SCADA/EMS system at State Sub-load Dispatch
control centre. Any support required for completing the task shall be in bidders scope.
![Page 71: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/71.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
71
2) FUNCTIONAL REQUIREMENTS :
a) Control of all equipments mentioned in the Single Line diagram.
b) Supervisory function (i.e.) Data Acquisition, Processing, Monitoring,
Analysis and Diagnostic,
c) Data Exchange
d) Report Generation and Printing.
e) The updating times on the operator station under normal and calm conditions
in the substation shall be as follows:
Function Typical values Exchange of display (first reaction) < 1 s Presentation of a binary change in the process display < 0.5 s Presentation of an analogue change in the process display < 1 s From order to process output < 0.5 s From order to updating the display < 1.5 s
3) CONTROL:
Basic Functions :
a) To execute commands from both operator work stations HMI.
b) Select before execute commands.
c) Operation of all 230 kV and 110 kV Circuit breakers and all the associated motorized
Isolators through output contacts of corresponding BCUs.
d) Operation of On load Tap Changer: Manual Operation from HMIs through BCU is
envisaged.
e) Provide interlocking of different switchgear/isolators for their correct and safe
operation.
f) Monitoring of Circuit breakers, Isolators and Earth Switch contacts (status)
4) OTHER FUNCTIONS:
a) Switching sequences. b) Time synchronizing through GPS. c) Monitoring of DC system input & output supply Voltages of chargers,load currents,
Battery voltages etc. d) Monitoring of fire-protection system. e) Monitoring of DG operation. f) Changing relay settings of all numerical relays from Engg./DR works
station with suitable software. g) Storage of data. h) Collection of disturbance record files from various relays and analysis of the same
from Engg/DR works station with suitable software. i) Auto re closure selection and monitoring. j) Bus PT change-over. k) Carrier IN/OUT selection. l) Synchro check provision. m) Reset facility from HMI for reset of all numerical relays, master trip relays. n) Monitoring of control room temperature, kiosk room temperature etc. Note : All necessary devices such as transducers, auxiliary relays, etc. as may be required to monitor substation auxiliary equipment (DG set, Auxiliary DC source, alarm system, RMU, etc.) are inclusive of the scope of substation automation.
![Page 72: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/72.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
72
5) INTERLOCKING:
The interlocking function provision through logic gates prevents unsafe operation of
equipments such as breakers ,isolators and earthing switches for all switching
operation within a bay or station . An override function at Bay level shall be provided,
which can be enabled to by-pass the interlocking function via a key/password, in
cases of maintenance or emergency situations. This over ride function should be
accessed with higher level pass word security. All critical interlocks such as close
operation of breakers and isolators etc shall be implemented in hardwired method
also. In order to provide additional security for safe operation of the primary
equipments, the hard wired interlock shall also be implemented preferably at the yard
control cubicle.
6) SUPERVISORY FUNCTION: DATA ACQUISITION, PROCESSING
MONITORING, ANALYSIS AND DIAGNOSTICS.
The status of each switchgear, e.g., circuit breaker, isolator, transformer tap changer
etc., shall be continuously acquired through polling sequences. ie.,
- Polling on request
- Automatic Polling (Every 5sec, 10sec,….)
- Polling by exception (change of digital status)
Every detected change of position shall be immediately visible on the screen in the
single-line diagram, recorded in the event list, Alarms shall be initiated in cases when
spontaneous position changes have taken place. Each position of an apparatus shall be indicated by two binary auxiliary switches
which are opposite each other in normally closed (NC) and normally opened (NO)
position. An alarm shall be initiated if these position indication indicate an excessive
running time of the operating mechanism to change position through watchdog
timers.
7) DATA ACQUISITION, PROCESSING AND MONITORING:
Conventional interlock through hardware wiring is to be provided in addition to the
software interlock. The BCU shall be located in the relay panel itself. The main and
redundant station HMI should be located in the operator table. The distance
between the BCU and the HMI will vary according to site conditions during execution.
Bay control shall be provided to each bay and the number of bays to be provided in
each substation as per SLD is furnished in the bill of materials.
The SA system shall acquire data (analog and digital inputs) from (1) Numerical
relays, Electronic Energy meters (to be made available in all the feeders,
transformers both HV & LV sides) (2) OLTC, Battery charger etc.,. Data for the
system shall be acquired as hard wired input for all station equipments stated in the
single line diagram.
Automatic Disturbance File Transfer
All recorded data from the IEDs with integrated disturbance recorder systems
shall be automatically uploaded to a station HMI database. All the analog values
![Page 73: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/73.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
73
shall in the disturbance records shall be displayed in primary values. A dedicated
computer as relay engineer’s console (EWS) shall be offered for analysis of
records additionally.
DATA REQUIRED:
KW, KVA, V,I, PF, kWh, kVah and kVarh from electronic energy meters (four
quadrant type) , bus voltage and frequency for the relevant 230 kV and 110 kV
system shall be measured and communicated on Modbus or standard IEC protocol to
SAS and values shall be obtained and displayed in both HMIs.
Provision shall also be available for extracting these measurements from the relays
and BCUs in addition to following protection function data (not exhaustive).
a. For each 230kV feeders
Main I distance relay tripping
Main II distance relay tripping
LBB relay actuation
Dc fail for source 1 & 2
Fuse failure
Auto reclose
Carrier send
Carrier receive
Fault reports including zone, phase, Fault I,V & Location in k.m b. For each 110kV feeders
Main distance relay tripping
LBB relay actuation
Dc fail for source 1 & 2
Fuse failure
Fault reports including zone ,phase, Fault I,V & Location in k.m c. For each transformer separately
Differential relay tripping
Over current relay for HV tripping
Over current relay for LV tripping
Master relays(1 & 2 separately)
LBB relay actuation
DC fail for source 1 & 2
Buchholz relay alarm
Buchholz relay trip indication
Oil/winding temperature alarm
PRD acted
Fault I& V d. For each breaker
Status ON/OFF
Air/gas pressure low
Air/gas pressure lockout
Pole discrepancy actuation
![Page 74: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/74.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
74
TSR (common for all trip coil per circuit breaker)
e. Isolator ON/OFF
f. earth switch On/Off
g. Others
Bus bar protection actuation for 230 kV and 110 kV buses. CT circuit supervision for
above bus bar protection(common for each voltage). In case the bus bar protection
relays provided with communication port the zone operation and CT supervision
function shall be acquired on the communication interface or DI.
The measured values shall be displayed locally, on the HMI, Threshold limit values
shall be selectable for alarm actuation.
Basic monitoring functions are:
Switchgear status indication
Measurements (U, P, Q, F)
Event list
Alarm list
Status and display of DC system
Status of display of fire protection system
Acquisition of alarm and fault record from protection relays
Disturbance records
Trend curves
All necessary Indication, alarms, analog values etc apart from the above mentioned items for
the complete substation shall be provided.
8) DATA EXCHANGE TO REMOTE CONTROL CENTRE
All data, records etc as available from all the SAS devices including protection relays and
meters shall be exchanged with Remote control centre through the gateway equipment
with out the aid of Station HMI servers. The gate way equipment shall be equipped with
sufficient memory for data, records etc and shall support IEC 61850 protocol towards
the SAS and IEC 60870 – 5 – 101/104 towards the remote control centre.
9) REPORT GENERATION:
Substation Automation System shall record all activities, switching, changes etc.,
made in a substation.
Following shall be Automatically monitored:
-Status
-Events, alarms
-Limit values.
Following printouts shall be available from the printer and shall be printed on
demand:
i. Hourly voltage and frequency curves.
ii. Trend curves for MW & MVAR.
iii. Printouts of the maximum and minimum.
iv. Printout on demand for MW, MVAR, Current, Voltage on
each feeder and transformer tap position, status of pumps
![Page 75: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/75.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
75
and fans for transformer.
v. Printout on demand system frequency and average
frequency.
vi. Daily, weekly and monthly reports are required. The SA
system shall be capable of delivering the same.
10) BAY CONTROL UNIT
Communication Port : Ethernet port with support for IEC 61850 protocol, SNTP.
Binary Inputs : Sufficient for application plus spare opto-isolated inputs
(Spare binary inputs shall be minimum 4 nos or 20% of application quantity whichever is
higher). Binary Outputs : Sufficient for application plus spare potential free outputs
(Spare binary outputs shall be minimum 4 nos or 20% of application quantity whichever is
higher).
For BCU used for common alarms for the substation : The BCU shall be equipped with I/O
modules sufficient for the application plus spare points of Binary input : 16 Nos, Binary
Output : 8 Nos, DC Analog input : 8 Nos. All necessary station alarms including but not
limited to GIS alarms, Fire alarm system, Inverter, online transformer diagnostic monitoring
system shall be wired to SAS and made available in the SAS HMI.
All binary inputs, binary outputs and LEDs of BCU must be user programmable, BCU without
this facility will not be acceptable.The IEDs should be directly connected to the switchgear
without any need for additional interposition of transducers. The bay control units shall be
equipped with I/O modules inherently in the unit without external I/O modules for
interfacing with the process inputs and outputs, However, all the commands extending for
control of switchgears (Breakers, isolators) shall be routed through suitable interposing
relays with a scheme to automatically check the healthiness of these interposing relays. The
Bay control IED should be provided with sufficient number of programmable LED’s. Each bay control IED shall be independent from each other and its functioning shall not be
affected by any fault occurring in any of the other bay control units of the station. “The bay
control unit shall be fed from redundant DC power supplies, this may implemented with
redundant power supply modules in the BCU or with automatic DC source selection with a
suitable auxiliary relay.”
Functions for BCU:
Control mode selection
Select-before-execute principle
Command supervision:
Interlocking and blocking
Double command
Synchro check, voltage selection
Run Time Command cancellation
Operation counters for circuit breakers and pumps
Hydraulic pump/ Air compressor runtime supervision
Operating pressure supervision through digital contacts only
![Page 76: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/76.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
76
Breaker position indication per phase
Alarm annunciation
Measurement and display of Vrms, Irms ,HZ ,W, Var for each phase and for 3phase
Local HMI (local guided, emergency mode) with Graphic display for real time display of the
bay status, measurands etc.
The single line diagram in the display of the BCU shall be user configurable at site.
Interface to the station HMI.
Data storage for at least 200 events
Capability to implement bay level interlocks
The update rate for measurement and display of digital inputs , analog inputs and the
control command execution scheme shall be of satisfactory performance as applied for sub-
station applications.
Wherever there is a redundant LAN architecture is specified for SAS, each BCU shall be
preferably equipped with two separate Ethernet ports for connection to redundant LANs
preferably with separate IP addresses.
Synchronism and energizing check The synchronism and energizing check functions shall feature:
Settable voltage, phase angle, and frequency difference. Energizing for dead line - live bus, live line - dead bus or
dead line– dead bus with no synchro-check function. Synchronising between live line and live bus with synchro-check function.
Each bay control IED shall be independent from each other and its functioning shall not be
affected by any fault occurring in any of the other bay control units of the station. “The bay
control unit shall be fed from redundant DC power supplies which may implemented with
redundant power supply modules in the BCU or with automatic DC source selection with a
suitable auxiliary relay.” The GUI display in the BCU shall display the status of the bay
devices (breakers, isolators, switches etc) in real time along with the related measurands.
All alarms related to the respective bay shall be displayed in the BCU through its LED’s or in
its GUI display as an alarm list/scroll. The BCU shall conform to the specification stipulated under General requirements for
Numeric type protection relays in this tender specification. The BCU should be compatible to
interoperate and integrate with the IEC 61850 based SAS in TANTRASNCO sub-stations.
11) TIME SYNCHRONISATION
The Time synchronization equipment shall receive the co-ordinate Universal Time (UTC)
transmitted through Geo Positioning Satellite System (GPS) and synchronize equipments to
the Indian Standard Time in substation. The time synchronization of all the relevant SAS
equipments shall be realized using the SNTP protocol through the SAS LAN. A time accuracy
of 1ms shall be achieved for all the devices within SAS.
Time synchronization equipment shall include antenna & its mounting facility, all special
cables and processing equipment etc.
The GPS antenna shall have adequate protection from wind, lightning etc. and shall be
mounted anywhere in the Substation roof at a place preferable by the TANTRANSCO
It shall be compatible for synchronization of all the SAS equipments through the SAS
LAN Event Loggers, Disturbance recorders and SCADA at a substation through Ethernet
![Page 77: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/77.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
77
realized through optic fiber bus.
The synchronization equipment shall have 2 micro second accuracy. Equipment shall give
real time corresponding to IST (taking into consideration all factors like voltage and
temperature variations, propagation and processing delays etc.)
Equipment shall meet the requirement of IEC 60255 for storage and operation. The system
shall be able to track the satellites to ensure no interruption of synchronization signal. The
output signal from each port shall be programmable at site for either one hour, half hour,
minute or second pulse, as per requirement. The equipment shall have a periodic time
correction facility of one-second periodicity. Equipment shall have real time digital display in
hour, minute, second (24 hour mode) and have a separate time display unit (100 mm display
high) at a suitable height in the control room.
The time synchronsiation equipment should also be equipped to provide time synrchonisation
through IRIG-B modulated port also in order to time synchronise atleast 10 more future
equipments that require accurate time synchronisation.
Apart from the communication port for NTP,SNTP time source, the unit should also be
equipped with the following ports for accurate time synchronisation facility.
- IRIG-B (Modulated) in BNC port and RS-485 Serial port to time synch additional 20 devices
- PPS Fibre optic port to time synch additional 20 devices.
12) HMI FUNCTIONS:
PRESENTATION AND DIALOGUES GENERAL
The Local HMI for Operation & Engineers console shall provide basic functions for
supervision and control of the substation. The operator shall give commands to the
switchgear on the screen via mouse clicks or soft-keys through keyboard. The HMI shall
provide the operator with access to alarm and events displayed on the screen. Besides
these lists on the screen, there shall be a print out of hard copies of alarm or events.
Following standard display shall be available from the HMI:
* Single line diagram showing the switchgear status and measured vales.
* Control dialogues.
* Measured values
* Alarms list.
* Events list.
* System status.
* A/R selection
* PT selection/ CT selection (one and half breaker scheme)
* Carrier status
* Tripping selection
13) SYSTEM SUPERVISION DISPLAY:
The SA system shall be comprehensively self-monitored and faults will be
immediately indicated to the operator before they develop into serious situation.
Such faults are recorded as faults in a system supervision display. The display shall
cover the status of the entire substation including all switchgear, Numerical relays
and communication links. Dynamic colouring of single line diagram with load, power
factor voltage. Bay view to zoom all the parameter.
All interlock status information for control circuits pertaining to the CB, Isolator, earth
![Page 78: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/78.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
78
switch should be displayed in the SAS. Where ever interlock is not satisfied that
should be highlighted in separate colour for operator alert.
14) EVENT LIST
The event list shall contain events with time tag (universal time synchronization with GPS), which are important for the control and monitoring of the substation. The date and time has to be displayed for events. The events shall be registered in a chronological events list in which the type of event and its time of occurrence are indicated. It shall be possible to store all event in the HMI. The information shall be obtainable also from printed event log.
15) ALARM LIST:
Fault and error occurring in the substation shall be listed in an alarm list and shall be
immediately transmitted to the control centre. The alarm list shall substitute a
conventional alarm table, and shall constitute an evaluation of all station alarm
however alarm and visual must be provided on receiving alarm. It shall contain
unacknowledged alarms and persisting faults. Date and time of occurrence shall be
indicated. Historical data sizing for storing Data for 35 days shall be available in the
SA system. The capacity of the server is to be designed accordingly. Also necessary
hardware and software to copy and store data from server should be provided. The
data collected shall not be lost due to overflow. Whenever overflow is likely to occur,
the date shall be archived into storage media like CD so that there is no change of
losing historical data.
16) RIGHTS:
Local HMI: Shall be able to get data from all the equipments for monitoring and
control.
Engineering/DR work station: shall have the facility for relay setting and analysis of
faults by acquiring disturbance recorder data from Numerical relays.
The alarm list consists of a summary display of the present alarm situation. Each
alarm shall be reported on one line that contain.
The alarm date and time.
The name of device in alarming state.
A descriptive text.
The acknowledgement state.
The operator shall be able to acknowledge alarms, which shall be either audible or
only displayed on the monitor. Acknowledged alarms shall be marked at the list.
Filters for selection of a certain type or group of alarm shall be available as for
events.
17) SYSTEM TESTING:
The supplier shall submit a test specification for factory acceptance test (FAT) and
commissioning tests of the station automation system for approval. If the complete
system consists of parts from various suppliers or some parts are already installed on
the site, the FAT shall be sub-system tests. In such a case, the complete system test
shall be performed on site together with the site acceptance test (SAT).
![Page 79: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/79.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
79
18) EXTENDABILITY IN FUTURE:
Offered substation automation system shall be suitable for extension in future for
additional bays. During such requirement, all the drawings and configurations,
alarm/event list etc. displayed shall be designed in the such a manner that its
extension shall be easily performed by the Engineers authorized. During such event,
normal operation of the existing substation shall be unaffected and system shall not
require a complete shutdown.
The SAS servers and the Engineering workstations, gateway devices shall be
equipped with all necessary hardware and original softwares to accommodate the
future electrical bays without additional cost to TANTRANSCO and without the need
for additional licenses from original equipment manufacturer.
19) RELIABLITY AND AVAILABLITY:
The bidder shall select & design & supply the SAS for the overall availability of
99.98% with the following understanding.
The SA system shall be designed to satisfy the very high demands for reliability and
availability concerning.
a. Solid mechanical and electrical design
b. Security against electrical interference (EMI).
c. High quality components and TAN TRANSCOs.
d. Modular, well-tested hardware.
e. Thoroughly developed and tested modular software.
f. Easy-to-understand programming language for application programming.
g. Detailed graphical documentation and application software.
h. Built-in supervision and diagnostic function.
i. Panel design appropriate to the harsh electrical environment and ambient
conditions.
j. Panel grounding immune against transient ground potential rise.
The entire SAS shall be provided with comprehensive cyber security including intrusion
protection and protection against virus attacks preferably integrated in the Ethernet
switches, routers, IEDs etc. The cyber security shall provide protection against unauthorized
access to the equipment and unauthorized transfer, modification or destruction of data
whether deliberate or accidental. The SAS vendor shall propose how the SAS solution
provides the cyber security. In this context all the necessary hardware and softwares is
included in the scope of the SAS.
20) DOCUMENTATION:
The following documentation to be provided for the system in the course of the
project shall be consistent, CAD supported, and of similar look/feel:
a. List of Drawings.
b. Substation automation system architecture.
c. Block Diagram.
![Page 80: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/80.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
80
d. Guaranteed technical parameters,
e. List of Signal-Analogue/Digital.
f. Schematic diagrams.
g. List of Apparatus.
h. List of Labels.
i. Logic Diagram.
j. Test schedule and reports of FAT/SAT
k. Product Manuals’
l. Operator’s Manual.
m. Listing of software and loadable in CD ROM.
3 sets of CD ROM containing all the as built documents/drawing shall be provided.
Also the final documentation shall provide:
- The System specification description (SSD) file that outlines this
substation automation project.
- IED capability description file (ICD) that describes the available functions logical
nodes and services available from IED.
- Substation capability description file (SCD) that describes the relationship among
the IEDs in the substation automation system and their information exchange
structure.
- Configured IED description file (CID) that is final file to download into IED to enable
its configuration.
21) HMI SERVER’s:
The HMI server functionality and operator work station facilities may be integrated in
the station HMI (Main) as well as in the redundant station HMI.
* Each server shall be equipped with at least one (1) CD/DVD RW drive to allow
transfer of data and other software from the Hard Disk(s) to removable CD/DVD media.
All computers including HMI servers, Work stations etc shall be provided with
comprehensive anti-virus protection and cyber protection as appropriate.
Type Industrial grade substation-hardened computer hardware
equipment suitable to be rack mount in a IP 41 compliant cabinet
housing 19” rack frames.
Includes all necessary software and hardware for the
application. KVM extender with Full size Keyboard with 10key
numeric keypad, Mouse ,Monitor. DVD +/- RW read write facility.
Communication ports : 3XUSB, Dual 1000Mbps LAN ports, Plus
ports for other user interface.
![Page 81: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/81.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
81
Cabinet for
Server
IP41 compliant standalone cabinet with outer protective glass door.
Equipped with all necessary accessories.
Processor Latest generation intel processor ,3 GHz or Higher
Bus side speed 1000MHZ or higher
Softwares Windows 8.1 professional or advanced version. 32 bit or higher.
With antivirus software package (with license as per project
guarantee period). All necessary softwares for the application.
HDD 2 nos HDD 500 GB in redundant RAID-2 configuration
(In case 500 GB is not sufficient for application including data then
higher capacity shall be provided for each HDD. The HDDs should
be configured such that mirror image of the data is available in the
other HDD.
RAM Expandable RAM equipped for 4GB or 200% application
requirement whichever is higher.
DISPLAY
MONITOR
29” LED monitor Flicker free, high resolution of reputed make.
Flicker free (TUV Certified), Anti glare, IPS Panel, Full HD
Resolution (1920x1080) with HDMI port and conventional port
interface for computer interface. Min height : 15.5”.
Note : The above configuration is minimum requirement, however a higher
configuration is required for the application then the server shall be provided
accordingly.
The redundant station HMI server shall operate in hot standby mode and vice versa in
case of a switch over. The real time data base of the main and redundant HMI servers
shall be synchronized at all times without loss of real time data in case of a switchover.
Also one remote client facility for Station HMI access with relevant original licenses and
software shall be provided. Each of the server shall be equipped with two Ethernet
ports for interface to SAS LANs and for for time synchronization using SNTP protocol
with guaranteed resolution of 1ms.
22) Engineering Work station
Type Industrial grade substation-hardened computer hardware equipment.
Includes all necessary software and hardware for the application. Full size Keyboard with 10 key numeric keypad, Mouse, Monitor, DVD +/- RW read write facility. Communication ports : 3xUSB, Dual 1000Mbps LAN ports, Plus ports for other user interface.
![Page 82: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/82.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
82
Processor Latest generation intel processor ,3 GHz or Higher
Bus side speed 1000MHZ or higher
Software Windows 8.1 professional or advanced version. 32 bit or higher. With .
MS Office suite, antivirus software package (with license as per
project guarantee period).
All necessary softwares for the application.
HMI Client access software. All softwares for configuration of
numerical relays, IEDs, BCUs etc.
DR Software for View and analysis of COMTRADE files.
HDD 2 nos HDD 500 GB in redundant RAID-2 configuration
(In case 500 GB is not sufficient for application including data then
higher capacity shall be provided for each HDD. The HDDs should be
configured such that mirror image of the data is available in the other
HDD.
RAM
Expandable RAM equipped for 4GB or 200% application requirement
whichever is higher.
DISPLAY
MONITOR
29” LED monitor Flicker free, high resolution of reputed make. Flicker
free (TUV Certified), Anti glare, IPS Panel, Full HD Resolution
(1920x1080) with HDMI port and conventional port interface for
computer interface. Min height : 15.5”.
Note : The above configuration is minimum requirement, however a higher
configuration is required for the application then the server shall be provided
accordingly.
The engineering work station should be equipped for :
- Data retrieval and analysis of recorded data from SAS devices including
disturbance records, fault records, event records etc
- Remote configuration of SAS IED’s, Numerical protection relays, Digital Energy
meters etc. All relevant software tools is to be provided for this purpose.
- Client access facility to station HMI with all the relevant softwares.
The engineering works station shall be provided with a simple Network Management
System (NMS) software for following management functions of Ethernet switches,
SAS devices supporting SNMP.
a. Configuration Management
b. Fault Management
c. Performance Monitoring
![Page 83: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/83.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
83
This system shall be used for management of communication devices and other IEDs
in the system. This NMS shall be easy to use, user friendly and menu based.
The Engineering work station shall be provided with comprehensive anti-virus protection
and cyber protection as appropriate.
Each workstation shall be equipped with at least one (1) CD/DVD RW drive to allow
transfer of data and other software from the Hard Disk(s) to removable CD/DVD media.
23) Metering PC
All relevant original software and tools for viewing in real time and generating reports
relevant to metering data. The metering data from the meters shall be integrated in to
the station HMI servers in real time through the SAS LAN and the same shall be
available from the HMI server to the metering PC as a client. All HMI servers shall be
provided with comprehensive anti-virus protection and cyber protection as appropriate.
Type Industrial grade substation-hardened computer hardware
equipment
Includes all necessary software and hardware for the application. Full size Keyboard with 10key numeric keypad, Mouse ,Monitor. DVD +/- RW read write facility. Communication ports : 3xUSB, Dual 1000Mbps LAN ports, Plus ports for other user interface.
Cabinet for
Server
IP41 compliant standalone cabinet with outer protective glass door.
Equipped with all necessary accessories.
Processor Latest generation intel processor ,3 GHz or Higher
Bus side speed 1000MHZ or higher
Software 1.Windows OS 8.1 professional or advanced version. 32 bit or higher. 2.Antivirus software package (with license as per project guarantee period) 3. MS Office suite. 4.Base communication software for ABT meter configuration and automated data retrieval from ABT meters using DLMS protocol.
HDD 2 nos HDD 500 GB SATA.
(In case 500 GB is not sufficient for application including data then
higher capacity shall be provided for each HDD.)
RAM Expandable RAM equipped for 4GB or 200% application
requirement whichever is higher.
DISPLAY MONITOR
27” LED monitor Flicker free, high resolution of reputed
make. Flicker free (TUV Certified), Anti glare, IPS Panel,
Full HD Resolution (1920x1080) with HDMI port and
![Page 84: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/84.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
84
conventional port interface for computer interface. Min
height : 15.5”.
Note : The above configuration is minimum requirement, however a higher
configuration is required for the application then the server shall be provided
accordingly.
All relevant original software and tools for viewing in real time and generating reports
relevant to metering data.
Metering reports should be customized as per TANTRANSCO’s requirements.
The metering data from the meters shall also be integrated in to the station HMI
servers in real time through the SAS LAN. The metering PC should be provided with
comprehensive anti-virus protection and cyber protection as appropriate.
24) COMMUNICATION NETWORK:
The station LAN’s shall be separate from the bay level LAN’s.
All the LANs (Level-1, level-2 stipulated in IEC 61850 standard) for SAS shall support
the following features:
* The entire SAS shall be provided with comprehensive cyber security including
intrusion protection and protection against virus attacks preferably integrated in the
Ethernet switches, routers, IEDs etc. The cyber security shall provide protection
against unauthorized access to the equipment and unauthorized transfer,
modification or destruction of data whether deliberate or accidental. The SAS vendor
shall propose how the SAS solution provides the cyber security.
* 802.1Q VLAN facility.
* Traffic segregation and prioritization control via IEEE 802.1p and IEEE 802.1Q
* Support SNMP preferably the latest version to provide secure and full network
management.
* Port Security through disabling of packets from unauthorized MAC addresses.
* RMON for monitoring of network status & statistics.
* IGMP Snooping enabling reductions in multicast traffic.
* SNTP for synchronizingtheinternal clock of all the devices connected to the LAN.
* RSTP (802.1w) industry standard method for providing recovery of redundant
networks
* RMON for monitoring of network status & statistics
* Port Mirroring assisting network trouble shooting.
* Event Logs creating a historical record of events occurring on the network.
* Port Security through disabling of packets from unauthorized MAC addresses.
* SSLWeb encryption preventing eavesdropping, tampering or message forgery.
25) CAPACITY:
The system should be capable of handling upto 150 IEDs and 10,000 data points. In
case the application considering with future bays necessitates to support higher number of
devices and data points then the system shall be equipped accordingly.
![Page 85: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/85.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
85
26) SEQUENCE OF EVENTS (SOE) FEATURE:
To analyze the chronology or sequence of events occurring in the power system, time
tagging of data is required which should be achieved through SOE feature of SA. The server
should have an internal clock with adequate stability. The Server time should be set from
time synchronization messages received from GPS equipment to be supplied by bidder. The
Server should maintain a clock and should time-stamp the digital status data. Any digital
status input data point in the Server should be assignable as an SOE point. Each time a SOE
status indication point changes the state, the Server should time-tag the change and store in
SOE buffer within it. SOE shall be transferable to the Remote Control Centre through the
IEC 60870-5-101 gateway. The time resolution for SOE should be 1 ms at point of
acquisition.
27) ETHERNET SWITCHES:
The Ethernet switches used for creating the LAN network should meet the specification as
laid down in the IEC 61850 standard and should be of managed type SNMP based. The
Ethernet switches should comply to IEC 61850-3 standard/equivalent for EMI Immunity and
environmental compliance pertaining with Electrical utility substations applications.
* The Ethernet switches shall be equipped with 50% spare ports.
* Separate Ethernet switches for 230kv Bays shall be separate from that for 110 kV bays.
* Ethernet switches shall support the features stipulated under general specification for the
LAN.
* Digital Diagnostic Monitoring (DDM) for Fiber :
Ethernet switches shall be equipped with the functionality to monitor ST/SC (as well as SFP) connectors, and NMS via SNMP trap when abnormalities are detected, allowing operators to initiate maintenance procedures, Further the complete LAN system shall allow system operators to monitor things like transmission and reception power, temperature, and voltage/current along optical fiber connections in real time.
28) GATEWAY EQUIPMENT
The Gateway equipment shall conform to the following technical requirements:
- The gateway equipment shall be based on embedded technology without moving
parts.
- The gateway equipment shall comply to IEC 60255 standards / Equivalent
IS for EMC and Environmental compliances.
- Support IEC 61850 protocol, IEC 60870-5-101/104 protocol.
- Perform the data concentration by directly collecting data from the bay level
devices and provide the same to the remote LDC/Master with out the aid of the SAS
HMI servers.
- The gateway device should be equipped with sufficient memories for firmware,
Configuration data, Process data, records.
- Equipped with redundant communication ports for SAS interfaces as well
as for remote LDC/Master interfaces.
- Equipped to run high speed programmable logic control function that
includes provision for implementing station level interlocks and automation logic as
necessary.
![Page 86: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/86.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
86
- Necessary software with original license for Anti-virus protection with
Relevant firewall should be provided for operating system based on MS
windows.
- The gateway equipment shall be rack mount housed in a IP31 compliant
cabinet with protective glass door. Cabinet design shall ensure to be
equipped with the standard accessories specified for relay cabinets.
- Gateway shall be equipped with redundant power supply modules and
communication modules.
If gateway device is specified in redundant configuration in the SAS BOM then
2 nos gateway devices with one of which operating in online and the other operating in
hot standby by shall be provided. The switchover between gateway devices shall be
Automatic, quick enough for the application, bump less without loss of SAS data during
switchover, the databases of the online and hot stand by shall be synchronized in realtime. It
shall be possible to operate with one gateway device in case of outage or failure of one
![Page 87: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/87.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
87
Station HMI
Redundant Station HMI
Engg. WS Metering PC
Event Printer
Report Printer
Protocol converter Device
Meter
Meter
GPS SYSTEM
Redundant Gateway Devices
Communication terminal Equipment
Ethernet switch: 230kV RP - Relays -BCU
Ethernet switch: 110kV RP - Relays -BCU
CONCEPTUAL DIAGRAM FOR SAS
STATION LAN (Redundant Dual LANs) IEC 60870-5- 101/104
. . BAY LEVEL LAN (IEC 61580, DOUBLE RING TOPOLOGY)
To Station LANs
….
Redundant Communication lines Towards LDC
![Page 88: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/88.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
88
29) INVERTER :
1.The inverters shall comply with the following specification and characteristics:
TYPE Type of inverter On Line µP controlled IGBT based Static inverter
Rating @ 50 ºc of each inverter 120% of assigned load or 3 KVA whichever is higher.
Type of power switching Pulse width modulation
No. of inverters
2 nos to operate in redundant configuration with automatic switch over in case of failure of one unit.
Input Voltage 220V DC +/- 10% taken from station battery banks
Output voltage Single phase 230V AC + /-1%
Nominal frequency 50 Hz
Frequency regulation i) Free running 0.01 HZ
Total harmonic distortion of output voltage Less than 2.5% for linear load & Less than 5% for non-linear load
Single harmonic of output voltage Less than 3%
Power factor range Rated 0.8 (0.6 to Unity, within KVA & KW)
Method of cooling Forced air cooling
Assigned Load
SAS Servers, Engineering Workstation, Metering PC, LAN Equipments pertaining to Level-2, Printers Etc.
Alarm Dry contact for minor and major alarm Note: A worksheet depicting the total calculation of the assigned load should be furnished in assessing the rating of the inverter.
2.The inverters shall comply with the following characteristics:
i) The inverters shall normally operate in synchronism with the mains AC power
source. Upon loss of the mains AC power source or its frequency deviating beyond a preset
range, the inverters shall revert to their own internal frequency standard. When the mains
AC source returns to normal, the inverters shall return to synchronized operation with the
mains AC source. Such reversal of operation of inverters from synchronous to free running
mode and vice-versa shall not introduce any distortion or interruption to the connected
loads.
A suitable dead band for frequency may be provided to avoid unnecessary frequent reversal
of inverter operation between free running mode and synchronized mode under fluctuating
frequency conditions.
![Page 89: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/89.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
89
ii). For safe operation in the event of Power failure or input source voltage dropping below
preset value, necessary safeguard software shall be built in for proper shutdown and restart.
iii) The inverters shall be synchronized to the main AC source unless that
source deviates from 50 Hz by more than 1% (adjustable to "1/2/3/4/5%).
iv). The inverters shall provide interrupter switch to isolate the unit from the load on failure
of the unit. The interrupter switch shall be rated to carry full continuous load and to interrupt
the inverter under full fault load.
v). The inverters shall be capable of supporting a start-up surge or
overload of 150 % of rated output for up to 60 seconds.
vi). The transient voltage response shall not exceed "4% for the first half-
cycle recovering to 1% within ten cycles for a 100 percent step load
application or removal.
3. Control panel for auto/manual switch over of the redundant inverters shall be provided with the inverter. The scope of supply, installation, testing and commissioning of inverter also
includes all the necessary AC Distribution boards, DC Distribution boards, Control
panel to facilitate manual change over, auto change over and bypass mode with
meters for monitoring the voltages.
4. Type tests for inverter: The inverter shall comply to IS 13314 / Equivalent standards as applicable for the KVA required for the project This includes the following tests. 1. Visual inspection test
2. High voltage test
3. Insulation resistance test
4. No-load test
5. Output test
6. Climatic tests
7. Harmonic contents test
8. Radio frequency interference test for conducted emission in the AC output circuit.
![Page 90: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/90.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
90
30. Laptop computer for SAS tool
Type Reputed make laptop computer
Processor Latest generation intel processor ,3 GHz or Higher
Software 1.Windows 8.1 professional or advanced version. 32 bit or higher.
2. Antivirus software package validity for entire project guarantee
period.
3. HMI software for client access to SAS HMI.
4. MS office suite latest version.
5.All other necessary software for configuration of SAS devices,
Relay panels devices.
HDD 2 nos HDD 500 GB
(In case 500 GB is not sufficient for application including data then
higher capacity shall be provided for each HDD. )
RAM
Expandable RAM equipped for 4GB or 200% application
requirement whichever is higher.
DISPLAY 15” LED monitor HD resolution, Anti glare.
Optical
drive
DVD +/-RW
Keyboard &
MOUSE
Full size Spill resistant keyboard with 10key numeric keypad,
Optical mouse.
Connectivity Wifi, Bluetooth, USB port-3nos, RJ45 10/100Mbs Ethernet
port.
31. FURNITURE FOR SAS All materials used for furniture should be industrial grade with design life of minimum 15
years. All wood based materials should be moisture proof, termite proof. All metal used
should be corrosion resistant, pretreated to withstand corrosive atmosphere, heavy duty
sturdy material. All workstation tables shall be provided with Keyboard tray.
![Page 91: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/91.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
91
SECTION-VI D BILL OF MATERIALS FOR PROTECTION RELAY PANELS
Note :
1.The bill of materials for relay panels in this section is for conceptual information, however any other necessary component and devices required in the relay panels to fulfill the protection, control and metering scheme is inclusive of the scope of supply of the respective panels without additional cost to TANTRANSCO. 2. The Bus bar protection panel shall be equipped completely to accommodate all the Bays including future Bays depicted in the single line diagram of the substations plus 3 spare bays. 3. The under frequency scheme for feeders shall be equipped completely to accommodate all the feeders including future feeders depicted in the single line diagram of the substations plus 3 spare feeders. 4. DC supervision relay should be provided for each of DC sources and at the DC output of the DC selection relay. The DC fail alarm should be made available to the SAS. 5. If Functions of supervision relays, trip relays, selector switches, auxiliary relays are incorporated in a multifunction IED then it is subject to design approval from TAN TRANSCO. Such scheme should be designed such that a single point of failure in the multifunction IED should not cause failure of simultaneous failures of Main-I/Main and main-II/Backup protection scheme 6.VT selection for 230KV Relay panes: VT selector switch for selection between Line VT/ Bus VT-1/ Bus VT2 shall be provided. However the scheme shall be provided with logic to ascertain the Bus section breaker close status to extend the non-native Bus VT. Separate core shall be wired for Main-1 protection, Main-2 protection and metering devices. 7. VT selection for 110KV Relay panes: VT selector switch for selection between Bus VT-1/ Bus VT2 shall be provided. However the scheme shall be provided with logic to ascertain the Bus section breaker close status to extend the non-native Bus VT. Separate core shall be wired for Main protection, Backup protection and metering devices. 8. In case TANTRANSCO orders additional Control & relay panels for 110kV bays and 230kV bays, then the control & relay panel should be provided with necessary materials such as Ethernet switch, Line interface unit with fibre optic cables etc. for inter bay LAN interface.
![Page 92: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/92.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
92
I. BOM : C&R PANEL FOR 230 kV FEEDER 1.Numerical distance protection relay for Main-1 protection as per Specification. 1 No
2. Numerical distance protection relay for Main-2 protection as per Specification 1 No
3. Bay control unit 1 No
4. Electronic Trivector meter 1 No.
5. Single phase trip relay (with self-reset contacts) 6 Nos.
6. Trip circuit supervision relay 6 Nos.
7. DC supply supervision relay As required.
8. Selector switch for L/R selection 1 No 9. Three phase Master Trip relay (H&ER reset contacts, Hand reset flags) 2 Nos.
10. P.T. selection scheme with bistable relays 1 Set
(includes 3 position (Bus VT1-Line VT-Bus VT2) PT Selector switch)
11. Bus bar Tripping relay (96) 1 No
12. Trip transfer switch 1 Set
(3 Postion: Normal-Auto-Transfer, Lockable type with removable key,
sufficient ways. This item applicable if transfer breaker is available)
13. TNC Switch 1 No.
14. Supervision relays for tripping and lockout relays As required
15. Selector switch for A/R (2Positiion :ON/OFF ) 2 Nos.
16. Selector switch (Carrier IN/OUT, 2Position, 4 Ways, Stay put) 2 Nos.
17. Auxiliary relays and timers to fullfill protection scheme -As required
18. Auxiliary relay for Automatic DC source selection As required
19. LBB Isolation links As required
20. Standard relay panel accessories as stipulated in this specification - As required
Note : 1. Functions of supervision relays, trip relays, selector switches, auxiliary relays may be incorporated in a multifunction IED subject to design approval from TAN TRANSCO. Such scheme should be designed such that a single point of failure in the multifunction IED should not cause simultaneous failures of Main-I and main-II protection scheme. The IED should conform to the Specification for the general requirements for numeric relay and equipped with redundant power supply modules. 2. Main-1 and Main-2 distance protection relays should be of different manufacturer.
![Page 93: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/93.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
93
II. BOM : C&R PANEL FOR 230 kV FEEDER WITH UF RELAY 1. Numerical distance protection relay for Main-1 protection as per Specification 1 No.
2. Numerical distance protection relay for Main-2 protection as per Specification. 1 No
3. Bay control unit 1 No
4. Electronic Trivector meter 1 No.
5. Single phase trip relay (with self-reset contacts) 6 Nos.
6. Trip circuit supervision relay 6 Nos.
7. DC supply supervision relay As required.
8. Selector switch for L/R selection 1 No
9.Three phase Master Trip relay (H&ER reset contacts, Hand reset flags) 2 Nos.
10. P.T. selection scheme with bistable relays 1 Set
11. Bus bar Tripping relay (96) 1 No
12. Supervision relays for tripping and lockout relays As required
13. Selector switch for A/R (3Positiion : M1/OFF/M2 ) 1 No.
14. Selector switch (Carrier IN/OUT, 2Position, 4 Ways, Stay put) 2 Nos.
15. Indicating lamp for carrier healthy common to both Main I & II 2 Nos.
16. TNC Switch 1 No.
17.Auxiliary relays and timers to fulfill protection scheme - As required
18. Trip transfer switch (3 Position, Lockable type with removable key, 1 Set sufficient ways.)/ Auxiliary relay to implement trip transfer scheme. (This item applicable if transfer breaker is available)
19. Auxiliary relay for contact multiplication of trip transfer switch 1 No
20. Auxiliary relay for Automatic DC source selection 1 No
21. Numerical under frequency protection relay as per specification 1 No.
22. 3-phase Master Trip relay for f+df/dt scheme: As required+3 nos. (Hand & Electrical reset contacts, Hand reset flags. 1 no per feeder plus 3nos spare for future feeders) 23. 3-phase Master Trip relay for (81RF) under frequency scheme : As required+3 nos. (Hand & Electrical reset contacts, Hand reset flags. 1 no per feeder plus 3nos spare for future feeders) 24. Isolation link for each feeder for under frequency scheme: As required
25. LBB Isolation link As required
26. Standard relay panel accessories as stipulated in this specification- As required
Note : 1. Functions of supervision relays, trip relays, selector switches, auxiliary relays may be incorporated in a multifunction IED subject to design approval from TAN TRANSCO. Such scheme should be designed such that a single point of failure in the multifunction IED should not cause simultaneous failures of Main-I and main-II protection scheme. The IED should conform to the Specification for the general requirements for numeric relay and equipped with redundant power supply modules.
![Page 94: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/94.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
94
2. Main-1 and Main-2 protection relays should be of different manufacturer. III.BOM : C&R PANEL FOR 230 kV/110 AUTO TRANSFORMER / 230KV/33KV POWER TRANSFORMER 1. Electronic Trivector meter 2Nos.
2.Numerical biased differential protection for three winding Transformer 1 No
with REF,LBB, over fluxing and synchro check Features
3. Numerical non-directional over current protection relay with
LBB and high set for HV side 1 No
4. Numerical non-direction over current protection relay with
LBB and high set for LV side 1 No
5. Bay control units for HV and LV 2 Nos
6. TNC Control switch spring return type with pistol grip handle for Breaker 2 Nos
7. Three Phase trip relay (H&ER reset contacts, Hand reset flags) 2 Nos
8. Trip transfer switch (3 Postion, Lockable type with removable key 1 Set sufficient ways.)/ Auxiliary relay to implement trip transfer scheme. (This item applicable if transfer breaker is available)
8. Trip circuit supervision relay for HV and LV trip coils As required (pre close and post close) 9. D.C. supply supervision relay 3 Nos
10. Five element high burden hand reset with flag indication relay for breaker 2 Nos Annunciation with a minimum of 4 set of N/O contacts ( for HV and LV )
11. Supervision relays for tripping and lockout relays As required
12. Auxiliary relay for transformer alarms and trip As required (Typically : Buchholz alarm-3 Element, Oil flow alarm-3, WTI-3 Element, OTI-3 Element, Oil level alarm-3 Element, PRV Trip-3 Element, Buchholz trip-3 Element, OLTC Low oil Level- 3Element ) 13. Auxiliary relay for circuit breaker alarms/trip As required (Typically :Loss of SF6, PD Trip, General Lockout, SF6 Lockout, 81X) 14.Auxiliary relays and timers to fulfill scheme As required
15. P.T. selection scheme with bistable relays ( for HV and LV ) 2 Sets.
16. High Speed tripping relay (96) for B/B protection 2 Nos
17. LBB isolation link As required. 18. Standard relay panel accessories as stipulated in this specification - As required 19. Selector switch for L/R selection 2 Nos 20. Relay for Automatic DC selection 1 no. 21. Transducer for Tap position indication 1 no. (30-250VDC auxiliary supply, IEC 60688 compliant, Output 4-20mA) Note : 1. Functions of supervision relays, trip relays, selector switches, auxiliary relays may be incorporated in a multifunction IED subject to design approval from TAN TRANSCO. Such scheme should be designed such that a single point of failure in the IED should not cause failure of the protection scheme. The IED should conform to the Specification for the general requirements for numeric relay and equipped with redundant power supply modules.
![Page 95: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/95.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
95
IV. BILL OF MATERIALS FOR 230 kV / 110kv BUS BAR PROTECTION RELAY PANEL : 1) Set of low impedance bus bar protection scheme of Numerical type for 1 Set
single/double zone with check zone for 230 kV bus (as per single line
diagram enclosed plus 3 numbers spare feeders)
2) DC supervision relays 2 Nos
3) Bus bar cut IN/OUT switch Main and check zones. As required
4) Auxiliary relays for automatic DC source selection As required
5) Auxiliary relays and timers to fulfill scheme As required
6) 3 Phase trip relay (96) (shall be be a part of relay panel of the
respective panels) As required
7) Supervision relay for B/B protection As required
trip relays (shall be a part of relay panel of the respective panels)
8) Isolation links for LBB & trip isolation As required
9) Standard relay panel accessories as stipulated in this specification- As required
V. BILL OF MATERIALS FOR 230 kV BUS COUPLER RELAY PANEL /230 kV TRANSFER BREAKER RELAY PANEL / 110KV BUS TIE BREAKER RELAY PANEL / 110KV BUS SECTION BREAKER RELAY PANEL / 110KV TRANSFER BREAKER RELAY PANEL: 1) Numerical non directional over current and earth fault relay with LBB 1 No
and synchro check
2) Bay control unit 1 No
3) TNC Switch 1 No.
4) 3 Phase trip relay (H&ER reset contacts, Hand reset flags) 2 Nos
5) Trip Circuit supervision relay 2nos/6 Nos
(quantity applicable as per 1-ph or 3-ph breaker)
6) DC supervision relays 2Nos
7) Selector switch for L/R selection 1 No 8) Supervision relay for Main, Backup and B/B protection Trip relays As required
9) Auxiliary relays and timers to fulfill scheme As required
10) High Speed tripping relay (96) for B/B protection 1No
11) Digital Voltmeter (LED Display for Bus voltage) 2 Nos.
13) Digital Frequency meter (LED Display) 2 Nos.
14) Selector switch (for voltmeter & Frequency meter) 2 Nos.
15) Relay for Automatic DC source selection 1 no.
![Page 96: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/96.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
96
16) Indication lamps (for checking bus PT ) 6 Nos.
17) Selector switch for L/R selection 1 No 18) LBB isolation link 1 No.
19) Standard relay panel accessories as stipulated in this specification-As required
Note :
1. Functions of supervision relays, trip relays, selector switches, auxiliary relays may be
incorporated in a multifunction IED subject to approval of TAN TRANSCO design approval.
Such scheme should be designed such that a single point of failure in the IED should not
cause protection failure. The IED should conform to the Specification for the general
requirements for numeric relay and equipped with redundant power supply modules.
VI. BOM : C&R PANEL FOR 110 kV FEEDER
1) Electronic Trivector meter 1 No.
2) Numerical distance protection relay for Main protection as per Specification. 1 No
3) Numerical directional O/C & E/F relay with LBB for back up protection as 1 No per specification. 4) Bay control Unit 1No
5) TNC Switch 1 No.
6) Three phase trip relay (H&ER reset contacts, Hand reset flags) 2 Nos
7) Trip Circuit Supervision relay ( pre close and post close) 2nos/6 Nos (quantity applicable as per 1-ph or 3-ph breaker)
8) D.C. Supervision relay 2 Nos
9) Selector switch for L/R selection 1 No 10) Selector switch (A/R IN/OUT, 4 Way, Stayput ) 1 No.
11) Supervision relays for tripping and lockout relays As required
12) P.T. selection scheme with bistable relay 1 Set
13) Highly Speed tripping relay(96) for B/B protection 1 No
14) Remote access block switch(For numeric relay) 1 No.
15) LBB isolation link 1 No
16) Auxiliary relays and timers to fulfill scheme As required
17) Trip transfer switch (3 Postion, Lockable type with removable key, 1 Set sufficient ways.)/ Auxiliary relay to implement trip transfer scheme. (This item applicable if transfer breaker is available)
18) Standard relay panel accessories as stipulated in this specification-As required Note : 1. Functions of supervision relays, trip relays, selector switches, auxiliary relays may be incorporated in a multifunction IED subject to approval of TAN TRANSCO design approval. Such scheme should be designed such that a single point of failure in the IED should not cause simultaneous failures of Main and backup protection scheme. The IED should conform
![Page 97: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/97.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
97
to the Specification for the general requirements for numeric relay and equipped with redundant power supply modules.
VII. BOM : C&R PANEL FOR 110 kV FEEDER WITH UF RELAY 1) Electronic Trivector meter 1 No.
2) Numerical distance protection relay for Main protection as per Specification. 1 No
3) Numerical directional O/C & E/F relay with LBB for back up protection as 1 No
per specification.
4) Bay control Unit 1 No
5) TNC Switch 1 No.
6) Three phase trip relay (H&ER reset contacts, Hand reset flags) 2 Nos
7) Trip Circuit Supervision relay ( pre close and post close) 2nos/6 Nos
(quantity applicable as per 1-ph or 3-ph breaker)
8) D.C. Supervision relay 2 Nos
9) Selector switch for L/R selection 1 No 10) Auxiliary relays and timers to fulfill scheme As required
11) Supervision relays for tripping and lockout relays As required
12) P.T. selection scheme with bistable relay 1 Set
13) Highly Speed tripping relay(96) for B/B protection 1 No
14) Remote access block switch(For numeric relay) 1 No.
15) Numerical under frequency protection relay as per specification 1 No.
16) LBB isolation link 1 No.
17) 3-phase Master Trip relay for (81U) under frequency scheme: As required+3 nos. (Hand & Electrical reset contacts, Hand reset flags. 1 no per feeder plus 3nos spare for future feeders) 18) 3-phase Master Trip relay for f+df/dt scheme: As required+3 nos. (Hand & Electrical reset contacts, Hand reset flags. 1 no per feeder plus 3nos spare for future feeders) 19) Isolation link for each feeder for under frequency scheme: As required 20) Auxiliary relays and timers to fulfill scheme As required
21) Trip transfer switch (3 Position, Lockable type with removable key, 1 Set
sufficient ways.)/ Auxiliary relay to implement trip transfer scheme.
(This item applicable if transfer breaker is available)
22. Selector switch for L/R selection 1 No 23. Standard relay panel accessories as stipulated in this specification- As required
Note : 1. Functions of supervision relays, trip relays, selector switches, auxiliary relays may be incorporated in a multifunction IED subject to approval of TAN TRANSCO design approval. Such scheme should be designed such that a single point of failure in the IED should not cause simultaneous failures of Main and backup protection scheme. The IED should conform
![Page 98: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/98.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
98
to the Specification for the general requirements for numeric relay and equipped with redundant power supply modules. VIII. BOM : C&R PANEL FOR 230 kV FEEDER (with Line differential)
1.Numerical line differential relay with built in distance protection for1 No
Main-1 protection. (Distance protection as per specification)
2. Numerical line differential relay with built in distance protection for1 NoMain-2
protection. (Distance protection as per specification),
3. Bay control unit 1 No
4. Electronic Trivector meter 1 No.
(3-phase,4W,3E,4 Quadrant, class 0.2s, with RS 485 port,110 V,1A)
5.Single phase trip relay (with self-reset contacts) 6 Nos.
6.Trip circuit supervision relay 6 Nos.
7. DC supply supervision relay 3 Nos.
8. Selector switch for L/R selection 1 No. 9.Three phase Master Trip relay (self reset contacts, Hand reset flags) 2 Nos.
10. P.T. selection scheme with bistable relays 1 Set
11. Bus bar Tripping relay (96) 1 No
13.Supervision relays for tripping and lockout relays As required
14. Selector switch (A/R IN/OUT, 4 Way,Stayput ) 1 No.
15. Selector switch (Carrier IN/OUT, 2Position, 4 Ways,Stay put) 2 Nos.
16. Indicating lamp for carrier healthy common to both Main I & II 2 Nos.
17. TNC Switch 1 No. 18.Auxiliary relays and timers to fullfill protection scheme - As required 19. Trip transfer switch 1 Set
(3 Position: Normal-Auto-Transfer, Lockable type with removable key)
20. Auxiliary relay for contact multiplication of trip transfer switch 1 No
21. Auxiliary relay for Automatic DC source selection 1 No
22. Fiber optic cables for interface between 87L relay to fiber optic patch panel As required. 23. LBB Isolation link 2 Nos 24. Master trip relay for UF scheme As required. 25.FO cable complete with connectors for interface between the Numerical 5 Sets relay (87L) Of required length. 26.Standard relay panel accessories as stipulated in this specification-As required 27. Original Software for Configuration , upload/download of files for Numerical relays, Digital meters,BCU etc.
![Page 99: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/99.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
99
Note : 1. Functions of supervision relays, trip relays, selector switches, auxiliary relays may be incorporated in a multifunction IED subject to design approval from TAN TRANSCO. Such scheme should be designed such that a single point of failure in the multifunction IED should not cause simultaneous failures of Main-I and main-II protection scheme. The IED should conform to the Specification for the general requirements for numeric relay and equipped with redundant power supply modules. 2. Main-1 and Main-2 Line-differential protection relays should be of same make & model.
IX. BOM : C&R PANEL FOR 110 kV Capacitor Bank
1) Electronic Trivector meter 1 No. 2) Numerical protection relay(s) for Main protection 1 set. 3) Numerical protection relay(s) for backup protection 1 set. 4) Bay control Unit 1 No 5) TNC Switch 1 No. 6) Three phase trip relay (Hand & Electrical reset for contact) 2 Nos 7) Trip Circuit Supervision relay ( pre close and post close) 2nos / 6 Nos (quantity applicable as per 1-ph or 3-ph breaker) 8) D.C. Supervision relay As required 9) Supervision relays for tripping and lockout relaysAs required 10) P.T. selection scheme with bistable relay 1 Set 11) Highly Speed tripping relay(96) for B/B protection 1 No 12) Remote access block switch(For numeric relay) 1 No. 13) LBB isolation link As required 14) Auxiliary relays and timers to fulfill protection & control scheme As required 15) Trip transfer switch (3 Postion, Lockable type with removable key, 1 Set sufficient ways.)/ Auxiliary relay to implement trip transfer scheme. (This item applicable if transfer breaker is available) 16) Standard relay panel accessories as stipulated in this specification As required Note : 1. Functions of supervision relays, trip relays, selector switches, auxiliary relays may be incorporated in a multifunction IED subject to approval of TAN TRANSCO design approval. Such scheme should be designed such that a single point of failure in the IED should not cause simultaneous failures of Main and backup protection scheme. The IED should conform to the Specification for the general requirements for numeric relay and equipped with redundant power supply modules. 2.The protection scheme shall be designed in accordance with the IEEE Guide for protection of capacitor banks ( C37.99 Latest) along with other capacitor bank manufacturer ‘s recommendations. The protection relays should be immune to the mal-effects of possible harmonics, ferro-resonance and surges. The protection shall be implemented with main and back up protection such that failure of any component /method used in the main protection shall not affect/fail the backup protection , similarly vice versa. The main and backup protection shall be preferably designed such that any type of fault shall be detected by minimum two principles. The protection shall cover the internal fault of the capacitor banks, inter phase faults within capacitor banks, inter-rack faults, variation in manufacturing tolerance of the capacitors adopted and be equipped with CT and VT supervision etc. and the breaker for capacitor bank.
![Page 100: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/100.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
100
3. The protection shall include but not limited to : - Time and instantaneous over current & E/F protection - Neutral unbalance current protection - Over voltage protection - Under voltage protection etc The detailed protection proposal may be furnished along with the drawing submittals for TANTRANSCO approval.
X. Synchronising Panel
1. Circuit Label 1 Each.
2. Voltmeter 2 Nos.
3. Frequency Meter (45-55 HZ) 2 Nos.
4. Synchroscope 1 No.
5. Synchroscope selector switch 1 No.
6. Check synchronizer IN/OUT selector switch 1 No.
7. Numerical Check synchronizing relay 1 No
8. Auxillary relays, Auxillary VTs, Gurad relay, synchronizing socket &plg : As required
9. Indication lamp for synchronising indication 1 No.
8. Panel Standard accessories As required
Note : The synchronism and energizing check functions of the relay shall feature: a. Settable voltage, phase angle, and frequency difference.
b. Energizing for dead line - live bus, live line - dead bus or dead line– dead bus with no
synchro-check function.
c. Synchronising between live line and live bus with synchro-check function.
XI. Standard relay panel accessories: All the Control & Relay panels shall have the following
1. Cubicle illumination Lamp (LED Type only) with door switch- 1 Set.
2. Space heater with thermostat and ON/OFF switch- 1 Set.
3. 5A&15A, 3-Pin socket with pin and ON/OFF switch- 1 Set.
4. Test terminal block for testing metering & protection devices- As required
5. Test block - As required
6. Cable glands As required
7. Terminal blocks As required+20% Spares
8. Wires for CT, Earthing As required (2.5 Sq.mm, Multi strand, 1100V Grade, PVC Insulated, FRLS)
9. Wires for VT, Alarms, status, Control As required
(1.5 Sq.mm, Multi strand, 600v/1100V Grade, PVC Insulated, FRLS)
10. 25*6mm Tinned copper bar As required
![Page 101: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/101.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
101
11. Cabinet 1 Each ( Free standing, self supported, with swing frame for devices and outer glass door.)
12. Labels for devices- 2 Sets (Inside and outside the panel)
13. Label for panel designation- 2 Nos
14. MCBs for AC distribution circuits, MCBs for DC distribution circuits As required (With auxiliary contact for MCB trip indication)
15.Links As required
16. DC fail test/accept button - 2 Each
17. AC bell for DC fail alarm- 1 no
18. Synchronising socket (12 Pin)- 1 No.
(Applicable when interface is with synchronising trolley)
19. Push button for reset of master trip relays and lockout relays As required.
20. Cable glands As required.
21. Line interface unit for interbay fiber optic LAN interface As required
22. Isolation links for isolation of LBB, trip outputs etc. As required
General: The following items are included under the scope of supply for relay panels and for SAS equipments
1. Manuals (hard copy & soft copy) 3 Sets.
2. As built drawings (hard copy & soft copy) 5 Sets.
![Page 102: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/102.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
102
XII. BOM FOR SAS (Applicable for each SAS)
Sl. No
Description Unit Qty
1 Industrial grade computer for station HMI (As per technical specification)
Nos.
2
2 Engineering work station (As per technical specification) No. 1
3 Metering PC (As per technical specification) No. 1
4 Gateway Panel (Complete with panel, Gateway Devices-2nos in redundant configuration, Hooter-2nos for substation urgent & non-urgent alarms)
No.
1
5 Communication equipment (Lightning arrestors for Communication ports and Media interface device etc for gateway redundant interface to LDC)
set
1
6 PLCC MODEM with 19” rack frame, 48V DC PS module, Wiring accessories. ( 1 set at SS and 1 set at Remote LDC)
Sets 2 (Applicable for SS with
PLCC communication)
7 Bay Control Unit Nos. As required. (Refer note
below.)
8 Ethernet Switches ( 50 % spare ports in each switch) to implement Redundant LANs at Station level and inter bay level
Nos. As required.
9 General printer (A3 Colour LASER Jet Printer)
No. 1
10 Report printer (A4 Colour LASER Jet Printer) No. 1
11 LAN accessories (Includes all cables and associated cable ducts, media converters etc for LAN) and all materials for establishing communication Link between the metering PC and all the ABT meters using DLMS protocol.
Lot 1
12 Time synchronization system (GPS with all accessories, Antenna, cables, software, Lightning arrestors for GPS etc)
Set
1
13 Configuration tools for SAS and Relay panels. 1.SAS HMI software for Client access. 2.Laptop computer with all necessary software-1 set. 3. CMRI Instrument (DLMS compatible for ABT meter)– 1No. 4. Software for configuration of all devices in relay panels- 1 set 5. Software for configuration of all SAS devices-1 set. 6. Special Crimping tools – 1 set 7. Test plug – 2nos 8.Any other necessary tools for SAS & relay panels.
Set
1
14 Inverter(As per technical specification) Nos. 2
15 Relevant manuals as per SA specification. Lot 1
![Page 103: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/103.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
103
16 Furniture : Chair – Industrial grade, Revolving type with wheels for mobility ,Adjustable height, Cushioned for bottom and for backrest with head rest. Reputed make.
Nos.
5
17 Furniture : Tables for SAS operator – 2Nos; Table for Engg WS & Metering PC : 2nos.
Lot
1
18 Furniture : Tables with drawers suitable for housing all the drawings & manuals of the SAS and protection system.
Lot
1
Note:
1. In respect of supply of C&R Panels with SAS for 230 kV and 110 kV level the price of the Relay panel shall be inclusive of the BCU. The BCUs/IEDs for common alarms shall be considered under supply of SAS.
2.IED(s)/ BCU(s) with graphic display of sufficient I/O capacity shall be offered for covering all the sub-station auxiliary items, RMU, Fire alarm system, complete Power supply (Charger, Battery and distribution system (DCDB,ACDB),common alarms in the sub-station. 3. Media type ( Fibre optic media ) for gateway interface to the remote load dispatch centre would be known during project execution. Includes FO patch cables between Gateway and FO distribution/Splice panel. XIII. Breakup of Bill of Quantities :
Sl.no Description of Items
Unit o
f Q
ty
Sale
m 2
30
Sin
gara
pet
230
S.P
.Koil
230
A SUPPLY ITEMS WIH SAS
1 230 kV Feeder C&R panel No. 3 6 4
2 230 kV Feeder C&R panel (with Line Diffl. protn.) No. - - 1
3 230 kV Feeder C&R panel with UF relay No. 1 1 1
4 230 kV /110 kV Auto trf C&R Panel Set
3 3 4
5 230 kV Bus section / Bus coupler/ TBC C&R Panel No. 1 2 1
6 230 kV Bus bar protection relay panel Set
1 1 1
7 110 kV Feeder C&R Panel No.
7 4 10
8 110 kV Feeder C&R Panel with UF relay No. 1 1 1
9 110 kV Bus section / Bus coupler/ TBC C&R panel No. 1 2 1
10 110 kV Bus bar protection relay panel Set
1 1 1
11 110 kV Cap.Bank C&R panel No.
2 2 2
12 230 kV Synchronising panel No.
1 1 1
13 Substation Automation System Lot 1 1 1
WORKS ITEMS
14 Installation, Testing & Commissioning of SAS per bay 1 1 1
![Page 104: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/104.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
104
TYPICAL FURNTURES DRAWINGS
OPERATOR AND METERING PC TABLE
ENGINEERING CUM DR WORK STATION
![Page 105: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/105.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
105
TABLE FOR HOUSING THE DRAWINGS AND PRINTERS
![Page 106: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/106.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
106
![Page 107: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/107.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
107
![Page 108: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/108.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
108
![Page 109: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/109.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
109
SECTION – VII – FORMATS
SCHEDULE – A : PRICE SCHEDULE
Sl. No
Description of Items
Unit o
f Q
ty
Tota
l Q
ty
PER UNIT PRICES Total all inclusive price
Ex-
work
s Price
Exc
ise D
uty
@
12.5
%
CST @
2%
/
TN
VAT @
5%
F&
I Charg
e
Per
unit A
ll in
clusi
ve F
OR (
D)
Price
A SUPPLY ITEMS WIH SAS
1 230 kV Feeder C&R panel (with Distance protn.)
No.
2 230 kV Feeder C&R panel (with Line Diffl. protn.)
No.
3 230 kV Feeder C&R panel with UF relay No.
4 230 kV /110 kV Auto trf C&R Panel Set
5 230 kV Bus section / Bus coupler/ TBC C&R Panel
No.
6 230 kV Bus bar protection relay panel Set
7 110 kV Feeder C&R Panel No.
8 110 kV Feeder C&R Panel with UF relay No.
9 110 kV Bus section / Bus coupler/ TBC C&R panel
No.
10 110 kV Bus bar protection relay panel Set
11 110 kV Cap.bank C&R panel No.
12 230 kV Synchronising panel No.
13 SAS for Salem 230 KV/ 110 KV SS Lot
14 SAS for Singarapet 230 kV/110 kV SS Lot
15 SAS for S.P.Koil 230 KV/ 110 KV SS Lot
Total of materials ( Items 1 to 15)
![Page 110: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/110.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
110
Sl. no Description of Items
Unit of Qty
Tota
l Q
ty
Per
unit E
x-
work
s Price
Serv
ice t
ax
(14%
)
Per
unit A
ll in
clusi
ve F
OR
(D)
Price
Tota
l all
incl
usi
ve p
rice
B WORKS ITEMS
14 Installation, Testing & Commissioning of SAS for Salem 230 KV/ 110 kV SS
LS 1
15 Installation, Testing & Commissioning of SAS for Singarapet 230 KV/ 110 KV SS
LS 1
16 Installation, Testing & Commissioning of SAS for S.P.Koil 230 KV/ 110 KV SS
LS 1
Total of Works ( Items 14 to 16)
C Total of materials and Works ( Items 1 to 16)
Legend:
LS : Lumpsum, SAS : Sub-station automation system, C&R : Control and relay
NOTE: 1.Destination means Stores/Site anywhere in Tamil Nadu.
2. All the prices shall be quoted in Indian rupees only.
3. In respect of supply of C&R Panels with SAS for 230 kV and 110 kV level the price
of the C&R panel shall be inclusive of the BCU. The BCU/IED for common alarms
shall be considered under supply of SAS.
![Page 111: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/111.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
111
D. OPTIONAL PRICE ITEM:
Sl.no DESCRPTION OF
WORKS
Quantity Ex-
works
Price (in
Rs)
Service tax (in Rs) Total price in
(Rs)
1 System integration of
230 kV control and
protection panel for
Feeder/ Auto
transformer with
SAS.
1 Each
2 System integration of
110 kV control and
protection panel for
Feeder with SAS.
1 Each
COMPANY SEAL
DATE SIGNATURE
DESIGNATION
COMPANY NAME
![Page 112: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/112.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
112
SCHEDULE – B SCHEDULE OF MATERIALS & WORKS WITH DELIVERY PERIOD (TO BE FILLED IN BY THE TENDERER)
Sl. No
Name of the Sub-station Delivery Schedule for supply
of all materials
Delivery Schedule
for all works
1 Salem 230 KV/ 110 KV SS
2 Singarapet 230 kV/110 kV SS
3 S.P.Koil 230 KV/ 110 KV SS
COMPANY SEAL DATE SIGNATURE DESIGNATION COMPANY NAME SCHEDULE – C-I
DEVIATION FROM TECHNICAL SPECIFICATION All technical deviations from the specification shall be filled in by the Tenderer, clause by clause, in the Schedule.
SECTION NO
CLAUSE NO DEVIATION
The tenderer herby confirms that the above mentioned are the only deviations from the Technical Specification and the tender conforms to the specification in all other respects. Even for Nil deviation, this schedule is to be duly filled in and enclosed in the offer cover. COMPANY SEAL DATE SIGNATURE DESIGNATION COMPANY NAME
![Page 113: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/113.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
113
SCHEDULE – C-II DEVIATION FROM COMMERCIAL SPECIFICATION All Commercial deviations from the specification shall be filled in by the Tenderer, clause by clause, in the Schedule.
SECTION NO
CLAUSE NO DEVIATION
The tenderer herby confirms that the above mentioned are the only deviations from the Commercial Specification and the tender conforms to the specification in all other respects. Even for Nil deviation, this schedule is to be duly filled in and enclosed in the offer cover. COMPANY SEAL DATE SIGNATURE DESIGNATION COMPANY NAME
SCHEDULE – D
STATEMENT OF SUPPLY ORDERS EXECUTED/ UNDER EXECUTION DURING THE
PAST THREE YEARS AS ON DATE OF TENDER OPENING
Sl No.
Name and address of the Organization
Description Purchase Order No. & Date
Qty Value of order in Rs. Lakhs
Schedule date of completion of Order
Actual date of Completion of Order
(1) (2) (3) (4) (5) (6) (7) (8)
COMPANY SEAL DATE SIGNATURE DESIGNATION COMPANY NAME
![Page 114: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/114.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
114
: TANTRANSCO : DECLARATION FORM
SPECIFICATION NO.P&C.XXX SCHEDULE –E
To The Chief Engineer, Protection & Communication, TAN TRANSCO Ltd, I Floor, 5-B Block, Electricity Avenue, 144, Anna Salai, Chennai – 600 002. Dear Sir, 1.Having examined the above specification together with the accompanying schedules etc., we hereby offer to supply the equipment and execute works covered in this specification at the rates entered in the attached schedule of prices. 2. We hereby guarantee the particulars entered in the schedules attached to the specification. 3. In accordance with Security Deposit cum Performance Bank Guarantee clause, Section-V of the specification we agree to furnish security to the extent of 5% of the total value of the contract. 4. Our company is not a potentially Sick Industrial Company or a Sick Industrial Company in terms of Section-23 or Section-15 of the Sick Industrial Companies (Special Provisions) Act, 1985. Yours faithfully, PLACE : SIGNATURE : DATE : DESIGNATION : COMPANY SEAL : COMPANY :
![Page 115: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/115.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
115
SCHEDULE – F GUARANTEED TECHNICAL PARTICULARS
1. GUARANTEED TECHNICAL PARTICULARS FOR DISTANCE PROTECTION NUMERICAL RELAY:
1. Make & Type: 2. Rated voltage, current and frequency: 3. Short time current rating: 4. No. of independent loop measurement: for phase fault and earth fault. 5. No. of zones: 6. Characteristic of relay for phaseand: Earth fault. 7. Range of ohmic setting: 8. Maximum operating time for the :
case mentioned under Sl.No.6, Technical Specification for distance relay. i) System impedance ratio ii) Relay setting (Ohms) iii) Fault locations (as % of relay setting) iv) Fault resistance (Ohms) v) Maximum operating time (milli seconds) 9. Resetting time: 10. Zone time setting range: 11. Facility for Zero sequence: Compensation for earth fault for zone 1, zone 2 & zone 3. 12. Method adopted for achieving: 100% direction sensitivity in case of balanced/unbalanced faults and frequency range for detecting the same. 13. Whether suitable for single phase and : three phase tripping. 14. Facility for switch on to fault feature: 15. Facility for carrier aided tripping: 16. Facility for weak end in feed: logic and current reversal logic. 17. VT fuse failure detection: a)Whether detects single phase : two phase, three phase PT fuse failure at Control room and yard. b)Method of detection: c)Whether block distance: protection in case of condition (a).
c) Whether distance protection: is allowed for tripping in case of fault when there is PT fuse failure.
![Page 116: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/116.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
116
18. Power swing blocking a) Detection method : b) Blocking time: c) Details of combination of Zones: that can be blocked. 19.a) Details of trip contacts: b) Details of additional contacts: provided. 20. Details of Auto reclose relay: a) Dead time setting: b) Reclaim time setting: c) Synchro check facility : d) Facility to initiate from main-2: 21. Details of IDMT directional earth: fault relay. a) Setting range: b) Characteristic curve at 10: times of set value. 22. Characteristic angle range of distance : relay. 23. Details of Disturbance recorder: a) No. of Analog input : b) No. of Digital input: c) Memory capacity to store records: d) Facility to down load and : analyse the recording. e) Sampling rate: 24. Details of fault locator: a) Whether in built : b) Whether accurate for all: operating conditions. c) Memory capacity to store records: d) Sampling rate: 25. Communication ports details (Media & protocol): 26. Details of software needed for setting,: down loading, fault analysis and programmable logic control. 27. Whether self diagnostic feature :
is provided. 28. Whether time Synchronising facility : is available. 29. Type tests complied (List out):
(Note : Separate GTPs have to be furnished for Main-I and Main-II relays proposed)
![Page 117: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/117.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
117
2.GUARANTEED TECHNICAL PARTICULARS FOR Transformer Biased Differential Relay:
S.no Description Guaranteed Specification
1 Make & Model
3 Current Rating: Continuous
4 Current Rating 1 sec
Operating time at 3 times normal current:
5 Operating time for instantaneous operation:
6 Bias setting range with steps
7 Availability of faulty phase identification
8 Availability of instantaneous High set feature with current setting range
9 Range of second harmonic restrain feature available.
10 Transformer vector group and CT ratio selection/corrections through software.
11 LBB Protection Setting range:
12 LBB Protection : Time range
13 Auxiliary supply operating range
14 Max Digital Input (Equipped)
15 Max Digital Input (Feasible)
16 Max Digital output (Equipped)
17 Max Digital Output (Feasible)
18 Rating of control output relays provided
19 Max. Single indications
20 Functionalities supported:
a) SOE (Mention resolution, record length)
b) Disturbance record (Mention resolution, record length, Sampling rate)
c) Fault recorder (Resolution, storage capacity)
d) Self diagnostics (Equipped)
33 Time synchronisation interface equipped (Mention media, standard supported)
34 Type tests Standards complied (List out)
![Page 118: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/118.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
118
3. GUARANTEED TECHNICAL PARTICUALRS FOR 230 KV LINE DIFFERENTIAL RELAY WITH BUILT IN DISTANCE PROTECTION FUNCTION : A. DISTANCE PROTECTION FUNCTIONS
1. Make & Type: 2.Rated voltage, current and frequency: 3.Short time current rating: 4.No. of independent loop measurement: for phase fault and earth fault. 5.No. of zones: 6.Characteristic of relay for phaseand: Earth fault. 7.Range of ohmic setting: 8.Maximum operating time for the : case mentioned under Sl.No.6, Technical Specification for distance relay. i)System impedance ratio ii)Relay setting (Ohms) iii)Fault locations (as % of relay setting) iv)Fault resistance (Ohms) v)Maximum operating time (milli seconds) 9.Resetting time: 10.Zone time setting range: 11.Facility for Zero sequence : Compensation for earth fault for zone 1, zone 2 & zone 3. 12.Method adopted for achieving: 100% direction sensitivity in case of balanced/unbalanced faults and frequency range for detecting the same. 13.Whether suitable for single phase and : three phase tripping. 14.Facility for switch on to fault feature: 15.Facility for carrier aided tripping: 16.Facility for weak end in feed: logic and current reversal logic. 17.VT fuse failure detection: a)Whether detects single phase : two phase, three phase PT fuse failure at Control room and yard. b) Method of detection: c) Whether block distance: protection in case of condition (a).
a)Whether distance protection: is allowed for tripping in case of
fault when there is PT fuse failure. 18. Power swing blocking
a) Detection method : b) Blocking time: c) Details of combination of Zones: that can be blocked.
![Page 119: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/119.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
119
19. a) Details of trip contacts: b) Details of additional contacts: provided.
20. Details of Auto reclose relay: a) Dead time setting: b) Reclaim time setting : c) Synchro check facility: d) Facility to initiate from main-2:
21. Details of IDMT directional earth: fault relay.
a) Setting range: b) Characteristic curve at 10: times of set value.
22. Characteristic angle range of distance : relay. 23. Details of Disturbance recorder:
a) No. of Analog input: b) No. of Digital input: c) Memory capacity to store records: d) Facility to down load and : analyse the recording. e) Sampling rate:
24. Details of fault locator: a) Whether in built : b) Whether accurate for all: operating conditions. c) Memory capacity to store records: d) Sampling rate:
25. Communication ports details (Media & protocol): 26. Details of software needed for setting,: down loading, fault analysis and programmable logic control. 27. Whether self diagnostic feature :
is provided. 28. Whether time Synchronising facility : is available. 29. Type tests complied (List out):
B. LINE DIFFERENTIAL FUNCTIONS
1. Communication port for relay to relay line differential protection
i) Physical port ii) Speed iii) IEEE C37.94SM compliant?
iv) Wave length supported. v) No of channels
2. Operating time for line differential protection.
![Page 120: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/120.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
120
4. GUARANTEED TECHNICAL PARTICUALRS FOR DIRECTIONAL AND NON DIRECTIONAL OVERCURRENT AND EARTH FAULT RELAYS:
S.no Description Guaranteed Specification
1 Make & Model
2 Selectability between definite: time & IDMT O/C function.
3 Over current setting range :
4 Phase fault
5 Earth fault
6 Time setting range and steps
7 High set Over current setting range:
8 Phase fault. : directional over current relays
9 Earth fault : for LV side of transformer)
10 Time setting range and steps:
11 IDMT characteristics:
12 P.T. Voltage: Nominal input voltage
13 Relay characteristic angle : settable for Phase fault and Earth fault.
14 Operating time for instantaneous : element.
15 Principle of Directionality selection 16 Built in CT circuit Supervision 17 Built in PT Supervision 18 Reset ratio:
19 Resetting time:
20 Auxiliary supply operating range
21 Indications provided: Indications provided:
22 Max Binary Input (Equipped)
23 Max Binary Input (Feasible)
24 Max Binary output (Equipped)
25 Max Binary Output (Feasible)
26 Rating of control output relays provided
27 Max. Single indications
28 Functionalities supported:
a) SOE (Mention resolution, record length)
b) Disturbance record (Mention resolution, record length, Sampling rate)
c) Fault recorder (Resolution, storage capacity)
d) Self diagnostics (Equipped)
29 Time synchronisation interface equipped (Mention media, standard supported)
30 Type tests Standards complied (List out)
![Page 121: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/121.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
121
5. GUARANTEED TECHNICAL PARTICULARS FOR BUS BAR PROTECTION RELAY:
S.no Description Guaranteed Specification
1 Make & Model
2 Architecture (Centralised / Distributed)
3 Max operating time at 5 times setting
4 CT Supervision facility
5 Dynamic bus replica facility
6 Phase segregated type
7 Current or voltage setting
8 Availability of faulty phase indication
9 Availability of Check feature
10 Rated voltage and current
11 Resetting value
12 Does the relay give 100% security and reliability under all operating conditions and upto applicable fault level
13 Second harmonic rejection ratio
14 Third harmonic rejection ratio
15 Phase current slope adjustment
16 Phase differential current threshold
17 Residual current slope adjustment
18 Residual differential current threshold
19 Dead zone protection
20 Accuracy
21 Pickup
22 Auxiliary supply operating range
23 Max Binary Input (Equipped)
24 Max Binary Input (Feasible)
25 Max Binary output (Equipped)
26 Max Binary Output (Feasible)
27 Rating of control output relays provided
28 Max. Single indications
29 Functionalities supported:
a) SOE (Mention resolution, record length)
b) Disturbance record (Mention resolution, record length, Sampling rate)
c) Fault recorder (Resolution, storage capacity)
d) Self diagnostics (Equipped)
30 Time synchronisation interface equipped (Mention media, standard supported)
31 Type tests Standards complied (List out)
![Page 122: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/122.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
122
6. GUARANTEED TECHNICAL PARTICULARS FOR UNDER FREQUENCY RELAY:
S.no Description Guaranteed Specification
1 Make & Model
2 Auxiliary supply operating range
3 Max Binary Input Equipped (mention number of LEDs for programmable type and for other standard indications)
4 Max Binary output Equipped (mention number of LEDs for programmable type and for other standard indications)
5 Rating of control output relays provided
6 Protection functionalities supported: 6.1 81U : No of stages 6.2 81U : Settings range with resolution 6.3 81U : Operational accuracy 6.4 81U : Operating time 6.5 81U : Timer range and resolution 6.6 81RF : No of stages 6.7 81RF : Settings range with resolution 6.8 81RF : Operational accuracy 6.9 81RF : Operating time 6.10 No of stages for automatic load restoration scheme 6.11 No of stages for under voltage protection function 6.12 Negative sequence overvoltage function Equipped
6.13 Total number of protection functions supported concurrently (State no stages of 81U,81RF,27,ALS supported concurrently)
7 Programmable scheme logic with Boolean functionalities supported
8 Blocking means of protection elements (Specify all possible means )
9 Recording Functionalities supported:
a) Disturbance recorder (Mention resolution, record length, Sampling rate, list also the Trigger criteria supported.)
b) Fault record: Storage length, no of records, Sampling rate, list also the Trigger criteria supported.
C)
Event record: Time resolution, Storage length, no of records,
d) Metering of which parameters, true rms e) Self diagnostics (Equipped) 10 Communication ports (Mention media, speed & protocol)
11 Communication port for device configuration (Mention media )
12 Time synchronisation interface equipped (Mention media, standard supported)
13 Operating temperature range
14 Relative humidity -Operating range
15 List out the type test standards complied by the relay
![Page 123: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/123.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
123
7. GUARANTEED TECHNICAL PARTICULARS FOR BAY CONTROL UNIT:
S.no Description Guaranteed Specification
1 Make & Model
2 Auxiliary supply operating range
3 Max Binary Input (Equipped)
4 Max Binary Input (Feasible)
5 Max Binary output (Equipped)
6 Max Binary Output (Feasible)
7 Rating of control output relays provided
8 Max. Single indications
9 Functionalities supported:
a) SOE (Mention resolution, record length)
b)
Disturbance recorder (Mention resolution, storage capacity, record length-Pre-trigger & post trigger, Sampling rate (samples/cycle))
c) Metering - Four quadrant measurement Accuracy class
d) Fault recorder (Mention resolution, record length-Pre-trigger, post trigger, Sampling rate (samples/cycle))
e) Self diagnostics (Equipped during start up and always in powered ON condition)
f)
Programmable logic control facility in BCU configurable with IEC 61131-3 compliant tool for complex and sequential automation application, Boolean logic.
10 Operating system
11 Data transmission speed supported
12 Communication ports (Mention media, speed & protocol)
13 Communication port for device configuration (Mention media )
14 Time synchronisation interface equipped (Mention media, standard supported)
15 Time to update the Binary event (Status change of Binary inputs etc ) in the graphic display of BCU.
16 Time to update the Analog measurand (in the graphic display of BCU.
17 Provision of sufficient protection in the BCU to protect from natural hazards viz lightning & thunder systems.
18
Provision of Electrical isolation between all the functional Boards and field connections. Mention the dielectric isolation rating for each I/O Modules.
19 Operating temperature range
20 Relative humidity -Operating range
21 List out the type test standards complied by the BCU
![Page 124: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/124.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
124
8. GUARANTEED TECHNICAL PARTICULARS FOR GATEWAY EQUIPMENT:
S.no Description Guaranteed Specification
1 Make & Model No. 2 Operating system
3
Processing platform :
(Embedded technology Processing capacity etc)
i Memory for data (Type and capacity) ii Memory for programme (Type and capacity) iii Facility for programmable logic functionality iv Maximum Binary Input/ Output Capabilities
Note :Mention for programme, data/records etc with type i.e
non-volatile/Flash etc.)
4
Availability of communication ports
(Mention media, protocol, data transmission speed)
i Towards Master Station’s
ii Towards SAS LAN/Bay level LAN iii For HMI interface (KB, Mouse, Monitor interface) iv Other ports (specify)
5 Switch over time (Applicable if redundant Gateway configuration is stipulated)
6 Type tests Standards complied (List out)
![Page 125: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/125.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
125
9. GUARANTEED TECHNICAL PARTICULARS FOR RELAY CABINETS
S.no Description Guaranteed Specification
1 Make & Model
2 Cabinet dimension state with tolerance level.
3 Thickness of cabinet
a) Weight bearing sides
b) Other sides
4 Swing frame play in deg
5 Outer Glass door thickness
6 Degree of protection (IP )
7 Paint shade
a) Exterior
b) Interior
c) Paint standard (IS-5), Thickness of paint
8 Type tests complied (List out)
10. GUARANTEED TECHNICAL PARTICULARS FOR HMI Server & Engg. WS
S.no Description
Guaranteed Specification
For HMI Server
For Engg. WS
For metering
PC
Laptop computer
for SAS tool
1 Make & Model
2 Power supply operating voltage range
3 Processor
4 RAM (Type & capacity)
5 HDD (Type & capacity)
6 DVD (Type & capacity)
7 I/O Ports (Type & quantity)
8 Clock speed & Bus speed
9 Operating system
10 Mounting (Rack mount) N.A
11
HMI Software : Limitation of license for data points, IEDs if any.
12
NMS Software : Limitation of license for Nodes, Devices, data points, if any. SNMP version
13 Degree of protection (IP) of computer hardware unit
![Page 126: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/126.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
126
14 Operating temperature range
15 Operating humidity range
16 Vibration protection (Mention standard complied)
17 Shock protection (Mention standard complied)
18 Type tests complied (List out)
11. GUARANTEED TECHNICAL PARTICULARS FOR ETHERNET SWITCH
S.no Description
Guaranteed Specification(Yes/No); Specify additional details wherever necessary.
1 Make & Model
2 SNMP version supported forsecure configuration of networkswitches
3
SNMP version supported for providing secure access tonetwork devices through authentication, and encryption
4
SSL Web encryption preventingeaves dropping,tampering or message forgery
5
Port Securitythrough disablingof packets from unauthorizedMAC addresses
6 SNTP forsynchronizing theswitch’s internal clock
7 RSTP(802.1w) industry standard method for providingrecovery of redundant networks
8 RMON for monitoring of network status & statistics
9 VLAN(802.1q) providing theability of segregating thenetwork into smaller Virtual networks
10 QoS-(802.1Q)forprioritizationofnetworktraffic
11 Port Mirroring assisting networktroubleshooting
12 IGMP Snooping enablingreductions in multicast traffic
13 Backbone port : Speed, physical port type.
14 Tributary port : Speed, physical port type. 15 Type tests complied
i Degree of protection of enclosure (IP)
ii IEC61850-3
iii Other tests (List out)
![Page 127: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/127.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
127
12.GTP PARAMETERS FOR TRIVECTOR METER Sl. No.
Description BIDDER’S CONFORMATION
1 MAKE & TYPE 2 APPLICABLE STANDARD IS 14697 (AMENDED UP TO DATE)
(YES/NO)
3 ACCURACY CLASS 0.2S (YES/NO) 4 RATED VOLTAGE (+20% TO -40%) (YES/NO) 5 BASIC CURRENT (In) 1/5 AMP (YES/NO) 6 MAXIMUM CONTINUOUS CURRENT (1.2In) (YES/NO) 7 STARTING CURRENT 0.001 In (YES/NO) 8 SHORT TIME OVER CURRENT 20 Imax (YES/NO) 9 DISPLAY PROVIDED WITH BACKELIT LCD TYPE (YES/NO)
10 SEVEN NUMBER (5+2) display DIGITS (YES/NO) 11 SIZE OF DIGITS 10X5 MM MINIMUM 12 POWER CONSUMPTION OF VOLTAGE CIRCUIT 1W, 8VA
(YES/NO)
13 POWER CONSUMPTION OF CURRENT CIRCUIT 1VA (YES/NO) 14 kVA/KW MD PROVIDED (YES/NO)
15 INTEGRATION PERIOD OF MD 30/15 MIN With sliding window. (YES/NO)
16 COMMUNICATION PORTS 3 Nos (1 No OPTICAL PORT, 1No DLMS,1 No IEC 61850/MODBUS) - ARE PROVIDED (YES/NO)
17 MATERIAL OF BASE AND COVER POLYCARBONATE (YES/NO)
18 ALL ANTI-TAMPER FEATURES AS PER TENDER SPEC ARE PROVIDED (YES/NO)
19 TYPE OF BACKUP POWER PROVIDED BATTERY (industrial type)/SUPER CAPACITOR.
20 PROVISION OF MD RESET (AUTO/MANUAL) RESET DATE AND TIME (YES/NO)
![Page 128: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/128.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
128
21 EXTENDED TRANSPARENT TERMINAL BLOCK COVER/ suitable
arrangement (50MM) IS PROVIDED & SEALING ARRANGEMENT
(YES/NO)
22 COMPLIANCE TO PROTECTION FROM TAMPER & FRAUD. (YES/NO)
23 INTERNAL DIAMETER OF TERMINAL HOLES (5mm)-(Y/N)
24 IN-HOUSE TESTING FACILITIES FOR CONDUCTING ACCEPTANCE
TESTS AS PER IEC AND THIS SPECIFICATION (YES/NO)
25 AVAILABILITY OF CALIBRATED RSS METER OF CLASS 0.05-0.1 ACCURACY WITH VALID CALIBRATION CERTIFICATE (YES/NO)
26 DATA RETENTION FOR A LONG PERIOD UNDER POWER OFF CONDITION. (YES/NO)
27 DECIMAL RESOLUTION IN CALIBRATION MODE (YES/ NO) 28 ICON/ display support FOR CURRNT REVERSAL, PHASE WISE.
(YES/NO)
29 FIXING ARRANGEMENT OF METERS AS PER SPEC. (Y/N) 30 FURNISH PRINCIPLE OF OPERATION OF METER OUTLINING THE
METHODS AND STAGES OF COMPUTATIONS OF VARIOUS
PARAMETERS STARTING FROM INPUT VOLTAGE AND CURRENT
SIGNALS INCLUDING SAMPLING RATE IF APPLICABLE.(AS A
DOCUMENT HARD&SOFT COPY) (Y/N)
32 WHETHER the tendered meter TYPE TESTED as per IS:14697,
CBIP:88 and DLMS compliant as per ETD 13(6211) of 2010 April
2010 (YES/NO)
33 TYPE TEST REPORT NO.
34 RTC TEMPERATURE COMPENSATED 0-50˚C (Y/N)
35 FACILITY FOR CORRECTING RTC DRIFT THRO CMRI/REMOTE(Y/N)
36 RTC MAKE & ACCURACY (MINUTES/YEAR)
37 PCB IS MANUFACTURED BY SMT AND WITHOUT ANY WIRE LOOPS
AND JOINTS (YES/NO)
38 TOD TIME ZONES ARE PROVIDED FOR ENERGY & DEMAND AS PER
SPECIFICATION (YES/NO)
39 INTERNAL BATTERY GUARANTEE/UNDERTAKING IS SUBMITTED
(YES/NO)
40 WHETHER VOLTAGE&CURRENT CIRCUIT ARE SOLIDLY
CONNECTED INSIDE THE METER BODY WITHOUT ANY LINKS
(Yes/No)
41 WHETHER TYPE TEST REPORTS, MANUAL ALONG WITH COPY
OF THE SAME IN TWO CD'S IS SUBMITTED (YES/ NO)
42 AS PER TECHNICAL SPECIFICATION LEAST COUNT TEST IS
CARRIED OUT (YES/NO)
43 DETAILS OF CT PROVIDED (YES/NO)
44 NUMBER OF PULSES/KWHR&KVARH COUNT.(P.U)
![Page 129: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/129.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
129
45 TIME TAKEN TO FUNCTION UPON POWERING UP OF METER
46 DETAILS OF TERMINAL BLOCKS PROVIDED (YES/NO)
47 a.) GLOW WIRE TEST OF POLYCARBONATE IS CARRIED OUT (YES/NO)
48 MEMORY CAPACITY IN MB.
49 NON VOLATILE RETENTION TIME IN ABSENCE OF POWER.
50 OVER ALL DIMENSIONS & WEIGHT.
51 SEALING PROVISION FOR COVER, TERMINAL COVER,
COMMUNICATION PORT (YES/NO)
52 PROTECTION FROM LIGHTNING & HV SURGE (YES/NO)
53 RANGE FOR SAFE OPERATION (Voltage & Current) as per
Specification (YES/ NO).
54 TOTAL NUMBER OF TAMPER EVENTS AVAILABLE as per Clause
10.2.2. (YES/ No).
55 CMRI/BCS SOFTWARE AS PER SPECIFICATION (YES/NO)
56 AVAILABILITY OF SELF DIAGONSITIC FEATURES (YES/NO)
57 VALUE UPTO WHICH METER CAN WITHSTAND DIRECT CURRENT
IN AC CIRCUITS WITH OUT GETTING CT SATURATED
RESULTING IN MEASUREMENT ERROR OF MORE THAN
PERMISBLE LIMIT.
58 MAGNETIC IMMUNITY LEVEL FOR AC/DC
![Page 130: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/130.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
130
59 WHETHER THE METER CAN RECORD ENERGY AS PER VOLTAGE
MEASURED BETWEEN INCOMING PHASE & NEUTRAL TERMINAL
WHEN DC SIGNAL IS INJECTED ON NEUTRAL TERMINAL
THROUGH A DIODE-(YES/NO)
60 PCB MATERIAL GLASS FR-4 GRADE (YES/NO), IF NO FURNISH
DETAILS.
61 SHORT TIME OVER CURRENT WITHSTANDS CAPACITY FOR ONE
HALF CYCLES AT REFERENCE FREQUENCY-(IN TERMS OF I-MAX.)
62 DISPLAY SEQUENCE AS PER SPECIFICATION (YES/NO)
63 READING PROVIDED IN THE METER IS DIRECT (YES/NO)
64 CONFIRMATION TO THE EFFECT THAT METER DOES NOT GET
DAMAGED EVEN IF 240V (AC) IS APPLIED FOR 5 MINUTES
BETWEEN meters aux PHASE AND NEUTRAL terminals AND
CONITNUE TO RECORD CORRECTLY AFTER RESTORATION OF
NORMAL SUPPLY.(YES/NO)
65 CAN METER PERFORM WITHIN CLASS 0.5S ACCURACY UPTO
150% OF Imax with PF RANGE 0.5 LAG, 0.8 LEAD & UNITY.
(YES/NO)
66 WHETHER METER CAN RECORD ENERGY IF VOLTAGE FALLS
UPTO 50% OF RATED VOLTAGE AT In TO 1.2In. (YES/NO)
67 DEGREE OF PROTECTION IP-51 (Y/N)
68 DATA TRANSFER TIME
A METER TO CMRI (MIN).
B CMRI TO BCS (MIN).
72 view formats as per specification (Y/N)
![Page 131: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/131.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
131
SCHEDULE - G
STATEMENT OF TYPE TEST PARTICULARS Sl.No.
Material and Description of Test
Standard complied
Name of Lab
Date of Test
NOTE: The above type tests should have been conducted in any Lab/ testing facilities recognized by govt. of India or accredited by National Accreditation Board of testing and calibration Laboratories (NABL) or recognized by BIS or reputed/ accredited lab from foreign countries within five (5) years from the date of Tender Opening. COMPANY SEAL DATESIGNATURE DESIGNATION COMPANY NAME
![Page 132: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/132.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
132
ANNEXURE I UNDERTAKING TOWARDS JURISDICTION OF LEGAL PROCEEDINGS
(To be furnished in non-judicial stamp paper value of not less than Rs. 80/-) This Undertaking executed at… ………………………………………………….. on this ……………..
(date ) ………………………………… …………………. Month Two Thousand …………by M/s
………………………………………………, a company registered under Companies Act , 1956 having
its registered office at ……………………………………………………………………………………….
hereinafter called the Contractor ( which expression shall where the context so admits mean
and include its successors in office and assigns ) with the Tamil Nadu
Transmission corporation limited (TANTRANSCO), a company registered under Companies
Act ,1956, having its registered office at 144, Anna Salai, NPKRR Maaligai, Chennai – 600
002, hereinafter called the Purchaser (which expression shall where the context admits
mean and include its successors in office and assigns ).
WHEREAS the contract is for the supply of……………………………….. in terms of the Purchase Order No…………….dated…………………………… AND WHEREAS in accordance with Clause ……….. of the above said P.O Certain terms were
stipulated for the above supply.
AND WHEREAS in accordance with clause …… ……………………… of the above mentioned
Purchase Order the contractor has to furnish an Undertaking that no suit or any proceedings
in regard to any matter arising in any respect under this contract shall be instituted in any
court other than in the City Civil Court of Chennai or other Court of small causes, at Chennai.
In consideration of the TANTRANSCO having agreed to accept the Undertaking from the
contractor, undertakes that no suit or proceedings in regard to any matter arising in any
respect under this contract shall be instituted in any court other than in the City Civil Court of
Chennai or other Court of small causes, at Chennai.
It is also agreed that no other court shall have jurisdiction to any suit or proceedings even
though part of the cause of action might arise within their jurisdiction. In case any part of
the action arises within the jurisdiction of any of the courts in Chennai City, then it is agreed
to between the parties that such suits or proceedings shall be instituted in court within Tamil
Nadu and no other court outside Tamil Nadu shall have jurisdiction even though any part of
the cause might arise within the jurisdiction of such courts.
IN WITNESS WHEREOF THIRU……………………………………………….. of the contractor hereby puts his hand and seal for due observance of the Undertaking in the presence of the following witnesses. SIGNATURE WITH SEAL WITNESSES: (Signature with Name and Address) 1. 2.
![Page 133: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/133.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
133
ANNEXURE – II
SALES TAX CERTIFICATE
To
( Name and address of the Company )
…………………………………………….
…………………………………………….
…………………………………………….
TNVAT NO……………………………………….
It is hereby confirmed that the goods listed below are purchased by us for use in Generation,
Transmission and Distribution of Electrical energy.
Sl Invoice No Description Quantity Value No. Date of goods
……………………… Total ………………………. ( Rupees ……………………………………………………………………………………only ) Place: Date : Signature : Name : Status : Seal of Office
![Page 134: TAMIL NADU TRANSMISSION CORPORATION LIMITED TENDER …4.imimg.com/data4/BB/LE/HTT-380/380_2015-12-01-12-54-53... · 2015. 12. 1. · tantransco ltd. spec.no.p&c. 971 page 1 of 134](https://reader036.vdocument.in/reader036/viewer/2022081411/60a60856b25f407d715731a6/html5/thumbnails/134.jpg)
TANTRANSCO Ltd. Spec.no.P&C. 971
134
ANNEXURE –III DRAFT UNDERTAKING IN LIEU OF PAYMENT OF EMD
THIS UNDERTAKING executed at . . . . . . . . . . . . . . . . on this the . . . . . .. . . . . . . . . . . . . . . .day of . . . Two thousand and .......... by M/S. ................................... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . a company registered under companies Act 1956, having its registered office at . . . . . . . . . . . . herein-under, called the "Tenderer" to AND IN FAVOUR OF the Tamil Nadu Transmission corporation limited, a company registered under Companies Act,1956 having its office at Electricity Avenue, 144, Anna Salai, Chennai -600 002, represented by . . . . . . . . . hereinafter called the 'TANTRANSCO'. WHEREAS the contract is for the supply/erection/construction etc. in terms of the Tender Specification NO.............dated AND WHEREAS in accordance with clause . . . . . . . . . . .of the above said tender specification, the tenderer has to furnish E.M.D. of Rs. (Rupees . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . only) AND WHEREAS the tenderer has requested the TANTRANSCO to accept an undertaking in lieu of payment in cash of the E.M.D. AND WHEREAS the TANTRANSCO has accepted the request of the tenderer subject to executing an undertaking to pay to the TANTRANSCO not exceeding Rs...... (Rupees . . . . . . . . . . . . . . . . . . . . . . only) representing the Earnest Money Deposit together with costs in case of non fulfillment of the conditions stipulated in the Tender Specification/or the conditions stipulated in the contract by the tenderer. IN CONSIDERATION OF THE TANTRANSCO having agreed to accept an undertaking from the tenderer in lieu of payment of Earnest Money Deposit in cash, the tenderer undertakes to pay the sum of Rs. (Rupees . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . .only) immediately when a demand is raised by the TANTRANSCO against the tenderer without any demur in the event of the following : i. If he withdraws his tender or backs out after acceptance of the tender or fails to remit the Security Deposit. ii.If he revises any of terms quoted during the validity period, without specific request by the TANTRANSCO. iii. If he violates any of the conditions of Tender Specification No. NOW THE CONDITION OF THE ABOVE WRITTEN UNDERTAKING is such that if the tenderer shall duly and faithfully observe and perform the terms and conditions specified in terms of above, then the above written undertaking shall be void, otherwise the same shall remain in full force. The tenderer undertakes not to revoke this guarantee till the contract is completed under the terms of contract. The expressions, 'tenderer' and ‘T' before used hereafter shall include their respective successors and assign in office. IN WITNESS WHEREOF Thiru for and on behalf of the tenderer has signed this undertaking on the day, the month and year first above written. In the presence of Witnesses: 1. Signature NAME IN BLOCK LETTERS Signature with names and addresses. SEAL OF THE COMPANY