TANGEDCO RAPDRP Project AS IS Process Document For Metering (LT) Latest Revision Version 1.0 ITI Limited ITI Limited: Corporate Marketing Unit: F84, ITI Complex, Doorvaninagar, Bangalore – 560 016, India Telephone: +91 80 25661305, Fax: +91 80 25661210, URL: www.itiltdindia.com Navayuga InfoTech Pvt. Ltd. Navayuga InfoTech Pvt. Ltd., EMPEE Towers, 59 Harris Road, Pudupet, Chennai – 600 002, India Telephone: +91 44 64622440, Fax: +91 40 23115192, URL: www.navayugaglobal.com This document is confidential and internal to ITI and Navayuga and has been submitted to TANGEDCO for review and acknowledgement. Copies of the document or any part thereof including but not limiting to design details / methodology details etc may be reproduced without prior written permission from ITI and Navayuga.

Upload: hahanh

Post on 11-Jun-2018

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: TANGEDCO RAPDRP Project - Welcome to the TNEB ... AEE Salem...The consumers up to a Contracted load of 112 KW are considered to be low tension consumers and the consumers with a contracted

  

      

TANGEDCO RAPDRP Project    

    

AS IS Process Document   

For   

Metering (LT)   

Latest Revision ‐ Version 1.0   

 ITI Limited 

 ITI Limited: Corporate Marketing Unit: F‐84, ITI Complex, Doorvaninagar,  

Bangalore – 560 016, India Telephone: +91 80 25661305, Fax: +91 80 25661210, URL: www.itiltd‐india.com 

 Navayuga InfoTech Pvt. Ltd. 

 Navayuga InfoTech Pvt. Ltd., EMPEE Towers, 59 Harris Road, Pudupet,  

Chennai – 600 002, India Telephone: +91 44 64622440,  Fax: +91 40 23115192, URL: www.navayugaglobal.com 

  

This document is confidential and internal to ITI and Navayuga and has been submitted to TANGEDCO for review and acknowledgement. Copies of  the document or any part  thereof  including but not  limiting  to design details / methodology details etc may be reproduced without prior written permission from ITI and Navayuga.

Page 2: TANGEDCO RAPDRP Project - Welcome to the TNEB ... AEE Salem...The consumers up to a Contracted load of 112 KW are considered to be low tension consumers and the consumers with a contracted

                                             

           

R-APDRP TANGEDCO

 

                           

ITI Limited & Navayuga InfoTech Pvt Ltd  

 © Copyright 2009 ITI Limited & Navayuga Infotech Private Limited.

All product names, trademarks owned by the respective owners are acknowledged.  

 

 Revision History 

   

  

S.No  Version  Date   Author  Reviewed  Approved 1  1.0  11‐Dec‐10  Mr.B.V.S.A Naidu  Dr. Nanda Gopal   

Page 3: TANGEDCO RAPDRP Project - Welcome to the TNEB ... AEE Salem...The consumers up to a Contracted load of 112 KW are considered to be low tension consumers and the consumers with a contracted

                                             

           

R-APDRP TANGEDCO

 

                           

ITI Limited & Navayuga InfoTech Pvt Ltd  

 © Copyright 2009 ITI Limited & Navayuga Infotech Private Limited.

All product names, trademarks owned by the respective owners are acknowledged.  

 

 

Table of Contents 

1.  COMMUNICATION DETAILS OF STUDY:.........................................................................................................................................4 

2.  LT METER READING PROCESS FLOW DIAGRAM:...........................................................................................................................5 

3.  LT METER REPLACEMENT PROCESS FLOW DIAGRAM: .................................................................................................................6 

4.  LT METER PERFORMANCE AND CHECK READING PROCESS FLOW DIAGRAM:...........................................................................7 

5.  BRIEF PROCESS DESCRIPTION AND PROCESS SCOPE:...................................................................................................................8 

5.1.  INTRODUCTION: ..............................................................................................................................................................................8 

5.2. METER TYPES AND CAPACITIES:.....................................................................................................................................................8 

5.3. METER SEALS:..................................................................................................................................................................................8 

5.4. METER DIGITS..................................................................................................................................................................................8 

5.5. METER MAKES:................................................................................................................................................................................9 

5.6. METER STATUS:...............................................................................................................................................................................9 

5.7. METER READING CYCLES : ..............................................................................................................................................................9 

5.8.  HAND HELD DEVICE (HHD): ..........................................................................................................................................................10 

5.9. METHODOLOGY OF TAKING METER READINGS: ........................................................................................................................10 

6.  PRECONDITIONS :..........................................................................................................................................................................15 

7.  BUSINESS RULES:...........................................................................................................................................................................16 

8.  BASIC FLOW :.................................................................................................................................................................................17 

METER MANAGEMENT .........................................................................................................................................................................17 

8.1. METER READING: ..........................................................................................................................................................................17 

8.2. METER REPLACEMENT AND TESTING: .........................................................................................................................................17 

8.3.  DEVOLUTION OF METERS:............................................................................................................................................................17 

8.4. METER PERFORMANCE AND  CHECK READINGS.........................................................................................................................18 

8.5.  OTHER OBSERVATIONS BY AE/ASSESSOR AT THE TIME OF CAPTURING METER READING:....................................................18 

10.  PROCESS EXCEPTIONS / VARIATIONS:.........................................................................................................................................19 

11.  KEY REPORTS: ................................................................................................................................................................................19 

  

Page 4: TANGEDCO RAPDRP Project - Welcome to the TNEB ... AEE Salem...The consumers up to a Contracted load of 112 KW are considered to be low tension consumers and the consumers with a contracted

                                             

           

R-APDRP TANGEDCO

 

                           

ITI Limited & Navayuga InfoTech Pvt Ltd  

 © Copyright 2009 ITI Limited & Navayuga Infotech Private Limited.

All product names, trademarks owned by the respective owners are acknowledged.  

 

1. Communication Details of Study:                  

               

Module/Process Name  Metering (LT) Module/Process Owner  Mr. B V S A Naidu Prepared By   Mr. B V S A Naidu 

Sites Visited 

Executive Engineer Office, Madhuranthakam Section Office, Madhuranthakam Protection&Communication,HQ,Chennai MRT Assistant Executive Engineer office,K.K Nagar,Chennai  

Personnel Interviewed 

Mr. Bala Subramanyam- JE, Mr. N.Rangaswami- RS (Revenue Supervisor), Mr.S.Venkatesh- AEE/ P&C, Mr.P.Shanti-MRT/LTAE-RC  

Date & Version  11‐Dec‐10 & Version 1.0 

Page 5: TANGEDCO RAPDRP Project - Welcome to the TNEB ... AEE Salem...The consumers up to a Contracted load of 112 KW are considered to be low tension consumers and the consumers with a contracted

                                             

           

R-APDRP TANGEDCO

 

                           

ITI Limited & Navayuga InfoTech Pvt Ltd  

 © Copyright 2009 ITI Limited & Navayuga Infotech Private Limited.

All product names, trademarks owned by the respective owners are acknowledged.  

 

2. LT Meter Reading Process Flow Diagram: 

 

Page 6: TANGEDCO RAPDRP Project - Welcome to the TNEB ... AEE Salem...The consumers up to a Contracted load of 112 KW are considered to be low tension consumers and the consumers with a contracted

                                             

           

R-APDRP TANGEDCO

 

                           

ITI Limited & Navayuga InfoTech Pvt Ltd  

 © Copyright 2009 ITI Limited & Navayuga Infotech Private Limited.

All product names, trademarks owned by the respective owners are acknowledged.  

 

3. LT Meter Replacement Process Flow Diagram: 

 

Flow chart for LT Meter Replacement

Meter Replacement

Meter Type

LTAE/MRT will visit the consumer

premises

Section AE/Staff will visit the consumer

premises

Whole Current MetersLT CT Meters

Meter Status

Amount Paid

Meter Burnt Defective Meters

Meter Stock

Available

No Replacement, Wait until payment

is made

No

Yes

Meter Stock

Available

1.Give the Direct Supply, Until Replace the meter 2.Wait until replenishment is made in stores

Replace the meter

No

Devaluate the meter to Stores

Wait until replenishment is made

in stores

Replace the meter

Yes

No

Meter Within

GauranteeYesNo

Devaluate the meter to Stores

Meter sent to MRT

MRT Division sent it to Meter Manufacturer for

Replacement

FIG2Metering Diagram

Give the 7 days Notice to Consumer to pay the amount

for Meter Charges

   

Page 7: TANGEDCO RAPDRP Project - Welcome to the TNEB ... AEE Salem...The consumers up to a Contracted load of 112 KW are considered to be low tension consumers and the consumers with a contracted

                                             

           

R-APDRP TANGEDCO

 

                           

ITI Limited & Navayuga InfoTech Pvt Ltd  

 © Copyright 2009 ITI Limited & Navayuga Infotech Private Limited.

All product names, trademarks owned by the respective owners are acknowledged.  

 

4. LT Meter Performance and Check Reading Process Flow Diagram: 

     

Page 8: TANGEDCO RAPDRP Project - Welcome to the TNEB ... AEE Salem...The consumers up to a Contracted load of 112 KW are considered to be low tension consumers and the consumers with a contracted

                                             

           

R-APDRP TANGEDCO

 

                           

ITI Limited & Navayuga InfoTech Pvt Ltd  

 © Copyright 2009 ITI Limited & Navayuga Infotech Private Limited.

All product names, trademarks owned by the respective owners are acknowledged.  

 

5. Brief Process Description and Process Scope:  

5.1. Introduction:  Metering  is  the  first  activity  in  the MBC  process  in  any  Power  Distribution  Utility.  Every  unit  consumed  is metered by HHDs. Every  consumer  is billed  for  the  recorded units under normal  functioning of  the meter or provisional units or average units as per the stipulated provisions.   We have  studied  in  depth  the  types  of meters  and  their  installations. Meter management  involves mapping consumers with the meters, monitoring the meter status etc.  The  consumers  up  to  a  Contracted  load  of  112  KW  are  considered  to  be  low  tension  consumers  and  the consumers with a contracted load above 112 KW are considered to be high tension consumers. 

5.2. Meter types and capacities: 

• LT:  The different  types of meters  installed at LT consumer premises can be any of the following:  Mechanical Meters  High Quality Mechanical Meters  Hybrid Meters  Static Meters  

 In case of LT services with a  load up to 18.6 KW (25 HP), single or three phase meters are  installed. These meters display KWH readings only. In case of LT services where the load is above 18.6 KW (25HP), electronic tri vector meters are installed which display KWH, KVAH and KVA readings. 

 • Whole current meters: Whole current meters have following meter capacities 

5‐20amp  10‐40amp  10‐60amp  50‐100amp  100‐120amp 

 Based on the meter capacity, the display of meters shall be as follows:  Meters with Meter Capacity < =  10‐40 amp (i.e.,5‐20 amp and 10‐40 amp), display KWH   Meters with Meter Capacity > = 10‐60 amps (i.e., 10‐60amp, 50‐100 amp and 100‐120 amp), 

display KWH, KVAh, KVA (MD). 

• LT CT Meters: LT CT Meters have meter capacity 240v/5amp LT CT meters display KWH, Kvah and KVA (MD).

5.3. Meter Seals: 

• Whole current meters  have TC seal and MRT seals  • LT CT Meters have TC seal, MRT seal and MD reset seal 

5.4. Meter Digits 

• Whole current Meters   Meter capacity up to 10‐40amp meters having 5 digits and after decimal one digit.  Meter capacity > = 10‐60amp meters having 6 digits and after decimal one digit. 

 • LT CT Meters: All meters having 6 Digit and after decimal one digit.  

Page 9: TANGEDCO RAPDRP Project - Welcome to the TNEB ... AEE Salem...The consumers up to a Contracted load of 112 KW are considered to be low tension consumers and the consumers with a contracted

                                             

           

R-APDRP TANGEDCO

 

                           

ITI Limited & Navayuga InfoTech Pvt Ltd  

 © Copyright 2009 ITI Limited & Navayuga Infotech Private Limited.

All product names, trademarks owned by the respective owners are acknowledged.  

 

5.5. Meter Makes:  

• Whole Current Meters: The different  types of meters  installed at LT consumer premises can be any of the following: 

TTL & Havels  India Meters Limited (IML)  BHEL  RC Meters  Conti Meters  Avon Meters  Landis  Sea Horse  ECE  Capital  Omniagate  TESCOM  Bentel  Maxwell India 

• LT CT Meters: The different  types of meters  installed at LT consumer premises can be any of the following:  Secure  L&T  Genius  Elstar  Omnigate 

5.6. Meter Status:  

Recorded consumption is to be billed under each billing cycle. The data captured may be for a period of one or two months. The bill  is generated on present month reading minus the previous month readings under the normal conditions of the meter. Otherwise as per the meter status there are stipulated procedures to arrive the average units.  

• Meter Status: Meter status shall be any of the following:   NL – Normal  DC – Under Disconnection  MC – Meter Change  WM – No Meter  DL – Door Lock  MB – Meter Burnt  MS – Meter Struck  TC – Tariff Change  NS – New Service  TR – Tariff revision  OR – Dial Complete  RL – Reading after door lock  NU – Not in Use 

5.7. Meter reading cycles :  

There are two types of meter reading cycles namely Monthly and Bi‐Monthly.  

Page 10: TANGEDCO RAPDRP Project - Welcome to the TNEB ... AEE Salem...The consumers up to a Contracted load of 112 KW are considered to be low tension consumers and the consumers with a contracted

                                             

           

R-APDRP TANGEDCO

 

                           

ITI Limited & Navayuga InfoTech Pvt Ltd  

 © Copyright 2009 ITI Limited & Navayuga Infotech Private Limited.

All product names, trademarks owned by the respective owners are acknowledged.  

 

Bi‐Monthly:  Assessor  shall  take  the meter  readings  for  the  services having  load up  to  60KW    (Whole  current meter readings)  

Monthly:  Section Officer (AE) shall take the meter readings for the services having  load   >= 60KW  and up to 112KW (LT CT meter readings) 

5.8. Hand held device (HHD): There are using analogic hand held device to take meter readings and give the assessment amount   for all LT Consumers. 

5.9. Methodology of taking meter readings:  

 • Meter reader routing and Scheduling: To take the meter reading, the routes are defined on walk order basis.  

 In case of Bi‐Monthly billing cycle, the Assessors who are the meter readers will take the meter readings. The meter  reading  schedule  for whole  current meters  (i.e., Bi‐Monthly)  is  from 1st  to 15th or  from 1st  to 30th 

depending on number of services in the section.  

In case of Monthly billing cycle, the meter readings for LT CT meters are taken by Assistant Engineers.   

• Meter readings for LT Meters are taken in either of the two ways listed below:  

Readings  are  taken  manually  and  entered  into  Hand  Held  Devices:  Meter  readings  are  read manually and entered  into hand held devices  for billing purpose. These  readings are  taken by  the departmental staff only. In case of Bi‐Monthly billing cycle, the assessor shall take the readings and in case of Monthly billing cycle, the section officer shall take the readings.   

Taking MRI Dumps  through CMRI:  LTAE/MRT will  take MRI dumps  for  the  services having meter Capacity >= 10‐60 Amp (Whole Current meters and LT CT Meters). MRT staff shall visit the consumer premises  if  the meter  is  found defective.  They  shall  check  the meter  status. MRI dumps  are not taken periodically.  

 The scope of this process is to capture the details starting from meter installation to devolution of meter 1. Key Activities: 

No.  Activity  Inputs  Outputs  Mechanism  Control/Validations 

1. Maintaining Meter Master 

Meter data  Meter history  The meter details right from drawal of meter till devolution is to be tracked 

1.Meter No. should be unique 2.Meter No. and Service No. are to be mapped 

2. Downloading Master  data  from Main  server  to HHD  through Local server 

1.Consumer master  with  the previous  meter reading details & status  2.New tariff rates

1.To be billed consumers data uploaded to HHD 2.Assessment (Billing) done as per tariff 

Data  generated  and downloading  master  data from  main  server  to  HHD through  local  server  to capture  the  current  month consumption  details  with 

1.For  Assessment (Billing)  live consumers  data only required.  2.  Category  tariff 

Page 11: TANGEDCO RAPDRP Project - Welcome to the TNEB ... AEE Salem...The consumers up to a Contracted load of 112 KW are considered to be low tension consumers and the consumers with a contracted

                                             

           

R-APDRP TANGEDCO

 

                           

ITI Limited & Navayuga InfoTech Pvt Ltd  

 © Copyright 2009 ITI Limited & Navayuga Infotech Private Limited.

All product names, trademarks owned by the respective owners are acknowledged.  

 

3.Old tariff rates  3. In case of tariff changed in current billing cycle, assessment is done under multiple tariffs based on the periods. 

current meter status.    

Agricultural  (V)  and Domestic  for  huts (I‐B)  data  not required  to  take meter  readings  as these  services  are not billed.  3.  Services  under disconnection  are also  not  billed, hence  data  is  not required.   

3. Taking  meter readings  (Whole Current Meters) 

Assessor  enter the  current month  reading and meter  status into the HHD  

1.  Current  month Assessment amount  and consumption details  with  meter status.  2.Exceptionals  and other  observations report   

Capturing  the  current month  reading  and  meter status  manually  for consumers  with  load  up  to 60KW.  Current  month  Meter reading details entered  into HHD  and  the  same  details entered  into  white  meter card and green meter card.   After  entering  the  meter readings  into  HHD,  it  will shows  assessment  amount that  can  be  entered  into White meter card and green meter card. 

Current  month reading  should  be greater  than previous  month reading  in  normal cases.  Meter status should be  satisfying one of the  HHD  Meter status  codes available.  If the meter is stuck up  or  nil consumption  case, present  and previous  meter readings  can  be same.  

4. Taking  meter readings  (LT  CT Meters ) 

Section‐AE  enter the  current month  reading and meter  status into the HHD 

1.  Current  month Assessment amount  and consumption details  with  meter status.  2.Exceptionals  and other  observations report  

Capturing  the  current month  reading  and  meter status  manually  for consumers  with  load =>60KW  Current  month  Meter reading details entered  into HHD  and  the  same  details entered  on  the  consumer white meter card.   After  entering  the  meter readings  into  HHD,  it  will 

Current  month reading  should  be greater  than previous  month reading  in  normal cases.  Meter status should be  satisfying one of the  HHD  Meter status  codes available.  

Page 12: TANGEDCO RAPDRP Project - Welcome to the TNEB ... AEE Salem...The consumers up to a Contracted load of 112 KW are considered to be low tension consumers and the consumers with a contracted

                                             

           

R-APDRP TANGEDCO

 

                           

ITI Limited & Navayuga InfoTech Pvt Ltd  

 © Copyright 2009 ITI Limited & Navayuga Infotech Private Limited.

All product names, trademarks owned by the respective owners are acknowledged.  

 

shows  assessment  amount that  can  be  entered  into White meter card and green meter card.  

5. Taking MRI Dumps (Meter capacity=>10‐60amp) 

MRT  –AE  read the  meter  data through CMRI 

MRI  reports  with current  month consumption  details 

Capturing the current billing cycle  consumption,  meter status and other parameters through MRI     

 

6. Rectifying  meter related problems 

Exceptional report  and  other observations  by Assessor  / Request    by consumer 

Rectifying  the meter  problem with  details  of resolution  ie., meter  changed date,  new  meter details. 

Based  on  the  Exceptional Report/request  by  the consumer. The action flow is as follows.  For Whole current meters: 

1. Section‐AE /staff will be visiting the consumer premises. 

2. If Meter status is meter burnt, 7 days notice to be issued and collect the amount from the consumer and replace the meter  

3. If meter is defective then replace the meter. 

4. In the case of Meter stock is not available at section office for meter replacement same meter is continued in the consumer premises until stock is available. 

5. If Defective meter within guarantee period meter is sent to MRT otherwise meter is sent to stores for scrap.  

 For LT CT Meters: 

1. MRT‐LTAE /RC will be visiting the 

  

Page 13: TANGEDCO RAPDRP Project - Welcome to the TNEB ... AEE Salem...The consumers up to a Contracted load of 112 KW are considered to be low tension consumers and the consumers with a contracted

                                             

           

R-APDRP TANGEDCO

 

                           

ITI Limited & Navayuga InfoTech Pvt Ltd  

 © Copyright 2009 ITI Limited & Navayuga Infotech Private Limited.

All product names, trademarks owned by the respective owners are acknowledged.  

 

consumer premises. 2. If Meter status is 

meter burnt, MRT division communicate to section‐AE to collect the amount from consumer and replace the meter. 

3. AE give the 7 days notice to Consumer and collect the amount. 

4. Meter defective cases, MRT‐ LTAE collect the new meter from Section‐ AE and replace the meter. 

5. In the case of Meter stock is not available at section office for meter replacement same meter is continued in the consumer premises until stock is available. 

6. If Defective meter within guarantee period meter is sent to Meter manufacturer, otherwise meter is sent to stores for scrap.   

7. Meter Performance  and  Check Readings 

1.Take  the Check Readings. 2.Check  of  TC Seal  and  MRT Seals. 3.LoadTesting 

1.  List  of  the Abnormal High and Abnormal  Low consumers. 2.  Found Tampering  cases and theft. 3.  Found  Meter Defective cases.  

RS/IA Check Readings: • RS/IA’s take check 

readings and Compare with White Meter Card. 

• If found difference consumption in positive , raise the short fall amount to Consumer. with knowledge of AE 

• Slip submitted to 

 

Page 14: TANGEDCO RAPDRP Project - Welcome to the TNEB ... AEE Salem...The consumers up to a Contracted load of 112 KW are considered to be low tension consumers and the consumers with a contracted

                                             

           

R-APDRP TANGEDCO

 

                           

ITI Limited & Navayuga InfoTech Pvt Ltd  

 © Copyright 2009 ITI Limited & Navayuga Infotech Private Limited.

All product names, trademarks owned by the respective owners are acknowledged.  

 

Consumer. • Consumer should be 

pay within 20 days from date of issue slip. 

• If consumer not paid that Slip amount, it is included into the next Bill in CC. 

• If found difference consumption in negative, Calculate the difference units amount and adjusted that amount in next Bill. 

AE’s performance Check: • AE’s take check 

readings and Compare with White Meter Card. 

• If found abnormal high consumption, raise the short fall amount to Consumer.  

• Slip submitted to Consumer. 

• Consumer should be pay within 20 days from date of issue slip. 

• If consumer not paid that Slip amount , it is included into the next Bill in CC. 

• If found consumption abnormal low, Calculate the difference units amount and adjusted that amount in next Bill. 

• Check of seals, see the all seals are ok or not  

•  If MRT seal missing 

Page 15: TANGEDCO RAPDRP Project - Welcome to the TNEB ... AEE Salem...The consumers up to a Contracted load of 112 KW are considered to be low tension consumers and the consumers with a contracted

                                             

           

R-APDRP TANGEDCO

 

                           

ITI Limited & Navayuga InfoTech Pvt Ltd  

 © Copyright 2009 ITI Limited & Navayuga Infotech Private Limited.

All product names, trademarks owned by the respective owners are acknowledged.  

 

with normal variation, Replace the meter with knowledge of AEE. 

• If MRT Seal tampered or any theft found call to vigilance. 

• Vigilance book the case and they will penalized to consumer. 

• Load testing conducted, if any found defective, Meter will be replaced. 

      

 

6. Preconditions : 

The service connection should have been released. The details of the consumer shall be available in the server.  

 

Page 16: TANGEDCO RAPDRP Project - Welcome to the TNEB ... AEE Salem...The consumers up to a Contracted load of 112 KW are considered to be low tension consumers and the consumers with a contracted

                                             

           

R-APDRP TANGEDCO

 

                           

ITI Limited & Navayuga InfoTech Pvt Ltd  

 © Copyright 2009 ITI Limited & Navayuga Infotech Private Limited.

All product names, trademarks owned by the respective owners are acknowledged.  

 

7. Business Rules: 

1. For release of service connections, the load conditions shall be as follows: According to the provisions in the Electricity Supply code metering shall be as follows. 

For the loads up to 4000 watts (4 KW) supply shall be single phase, 2 wire 240 volts between phase and neutral. 

For the loads above 4000 watts (4 KW) and up to 112 KW supply shall be three phase 4 wire 415 volts between phases and 240 volts between phase and neutral. 

Meters shall ordinarily be installed at the point of entry to the consumer’s premises at a suitable and easily accessible place as the Engineer may decide.  

2. Meter Status: Meter status shall be any of the following:   NL – Normal  DC – Under Disconnection  MC – Meter Change  WM – No Meter  DL – Door Lock  MB – Meter Burnt  MS – Meter Struck  TC – Tariff Change  NS – New Service  TR – Tariff revision  OR – Dial Complete  RL – Reading after door lock  NU – Not in Use 

 3. Consumption  calculator:  

KWH consumption = ( present Reading kwh – previous reading kwh) * MF  KVAH consumption = (present Reading kvah ‐ previous reading) * MF  KVA consumption = present Reading kva * MF 

 

Page 17: TANGEDCO RAPDRP Project - Welcome to the TNEB ... AEE Salem...The consumers up to a Contracted load of 112 KW are considered to be low tension consumers and the consumers with a contracted

                                             

           

R-APDRP TANGEDCO

 

                           

ITI Limited & Navayuga InfoTech Pvt Ltd  

 © Copyright 2009 ITI Limited & Navayuga Infotech Private Limited.

All product names, trademarks owned by the respective owners are acknowledged.  

 

8. Basic Flow :

Meter management 

8.1. Meter reading: 

For Manual Readings  Downloading the master data and new tariff rates into the Hand held device (HHD) from the server.   Assessor/AE will go to the consumer premises and enter the current month reading and meter status.  The meter readings are updated in Hand held device.   Assessment amount is arrived at HHD  Consumption details (meter readings) and assessment amount are entered on the consumer’s white 

meter card which is available with the consumer.  Uploading the billing data from HHD to Server. 

 For MRI Dumps 

MRT‐AE will go to the consumer premises and take the MRI dump through MRI.  Save the data in the computer at MRT division  Generate MRI analysis reports. 

 

8.2. Meter Replacement and Testing: 

• For Whole Current Meters  Section‐A E to check the meter as per observations given by Assessor or complaint by the consumer.  If Meter is burnt, Section‐AE gives the 7 days notice to Consumer and collect the amount.  After collect the amount, meter is to be replaced.  If meter is defective then replace the meter.  In case meter is not available in the stock at section office, for meter replacement, the existing meter or 

without meter is continued in the consumer premises until stock is available.  If the meter is found to be defective within guarantee period, the meter is sent to MRT. Otherwise meter 

is sent to stores for devolution.   • For LT CT Meters 

MRT‐LT AE to check the meter as per observations given by Section‐A E / complaint by the consumer / MRI report. 

If Meter is burnt, Section‐AE gives the 7 days notice to Consumer and collect the amount.  After collect the amount, meter is to be replaced.  If meter is defective then replace the meter.  In case meter is not available in the stock at section office, for meter replacement, the existing meter or 

without meter is continued in the consumer premises until stock is available.  If the meter is found to be defective within guarantee period, the meter is sent to MRT. Otherwise meter 

is sent to stores for devolution.  

8.3. Devolution of meters:  

If meter is found to be defective and it is beyond guarantee period, the meter is to be handed over in the stores for devolution. 

 

Page 18: TANGEDCO RAPDRP Project - Welcome to the TNEB ... AEE Salem...The consumers up to a Contracted load of 112 KW are considered to be low tension consumers and the consumers with a contracted

                                             

           

R-APDRP TANGEDCO

 

                           

ITI Limited & Navayuga InfoTech Pvt Ltd  

 © Copyright 2009 ITI Limited & Navayuga Infotech Private Limited.

All product names, trademarks owned by the respective owners are acknowledged.  

 

8.4. Meter Performance and  Check Readings 

• RS/IA Check Readings:  Inspector  of  Assessments  (IA)  in  the  office  of  the  Assistant  Engineer  has  to  check  10%  of  the  industrial  and commercial services. Revenue supervisor (RS) in the office of the Assistant Engineer has to based on exceptional reports has to review consumption and energy charges in respect of industrial services and 10% of commercial services and 5% of other services.   

RS/IA’s take check readings and Compare with White Meter Card.  If found difference consumption in positive, raise the short fall amount to Consumer. with knowledge of 

AE  Slip submitted to Consumer.  Consumer should be pay within 20 days from date of issue slip.  If consumer not paid that Slip amount, it is included into the next Bill in CC.  If found difference consumption in negative, Calculate the difference units amount and adjusted that 

amount in next Bill. • AE’s performance Check: 

 25% of the meters are checked once in a year by rotation under which are maintained in each section. Check the performance of the meters by a team of AE’s in the division. LT CT meters are inspected by MRT wing each service once in a year by rotation fixing an action plan for the year for verification.  

AE’s take check readings and Compare with White Meter Card.  If found difference consumption in positive, raise the short fall amount to Consumer.   Slip submitted to Consumer.  Consumer should be pay within 20 days from date of issue slip.  If consumer not paid that Slip amount, it is included into the next Bill in CC.  If found difference consumption in negative, Calculate the difference units amount and adjusted that 

amount in next Bill.  Check of seals, see the all seals are ok or not    If MRT seal missing with normal variation, Replace the meter with knowledge of AEE.  If MRT Seal tampered or any theft found call to vigilance.  Vigilance book the case and they will penalized to consumer.  Load testing conducted, if any found defective, Meter will be replaced. 

8.5. Other Observations by AE/Assessor at the time of capturing meter reading: 

 No Display  Digital Slipping  Glass Broken  MRT Seal missing 

  

    

Page 19: TANGEDCO RAPDRP Project - Welcome to the TNEB ... AEE Salem...The consumers up to a Contracted load of 112 KW are considered to be low tension consumers and the consumers with a contracted

                                             

           

R-APDRP TANGEDCO

 

                           

ITI Limited & Navayuga InfoTech Pvt Ltd  

 © Copyright 2009 ITI Limited & Navayuga Infotech Private Limited.

All product names, trademarks owned by the respective owners are acknowledged.  

 

 9. Interface:  

The various interfaces envisaged in the meter management are as follows:  Downloading data (PC to HHD)  Uploading data (HHD to PC)  Meter change  form  for CT and Non‐CT  Meter reading deletion for CT and Non‐CT  Check reading entry  CT Meter reading entry screen  Non‐CT meter reading entry screen  Tariff configuration screen  Uploading MRI data (CMRI to PC) 

10. Process Exceptions / Variations:   Disconnection services readings are not taken.  Agricultural services and Domestic huts meter readings are not taken.  JE has the privilege to delete meter readings within 5 days of the assessment date,  

               Next 15 days AAO have the privilege to delete the data.       

11. Key Reports:  

No.  Brief Description of Report  Frequency      1. Meter Reading report for CT and Non‐CT meters  Monthly 2. Door lock cases report  Periodic 3. Nil Consumption report  Periodic 4. Defective and No meter report  Periodic 5. Status Report CT   Periodic 6. Status report of Non‐CT  Periodic 7. Meter reading deletion report  Monthly 8. Exceptional Reports from MRI data   Periodic