tank construction

Upload: hansel-francis

Post on 01-Jun-2018

230 views

Category:

Documents


1 download

TRANSCRIPT

  • 8/8/2019 Tank Construction

    1/25

     TANK CONSTRUCTION TANK CONSTRUCTION

    ANNULAR PLATES

    BOTTOM PLATES

    SHELL PLATES

    ROOF STRUCTURES

    ROOF PLATES

    MANHOLES & NOZZELSSTAIRWAYS

    PLATFORMS

  • 8/8/2019 Tank Construction

    2/25

     TYPES OF TANKS TYPES OF TANKS

    CONE ROOF

    DOME ROOF

    INTERNAL FLOATING ROOF

    EXTERNAL FLOATING ROOF

    FLAT ROOF

  • 8/8/2019 Tank Construction

    3/25

     TYPES OF FOUNDATIONS TYPES OF FOUNDATIONS

    FULL CONCERETE FOUNDATIONBOTTOM SLOPE FOUNDATION

    FLAT BOTTOM FOUNDATION

    RINGWALL FOUNDATION

  • 8/8/2019 Tank Construction

    4/25

    CONSTRUCTIONCONSTRUCTION

    SEQUENCESEQUENCE1. LAY OUT ANNULAR PLATES

    2. LAY OUT BOTTOM PLATES

    3. ERECT 1ST SHELL COURSE

    4. FITUP AND TACK WELD BOTTOM TOSHELL OINT !CORNER OINT"

    #. FITUP AND TACK $ERTICAL OINTS

    %. ALLIGN $ERTICAL OINTS WITH KEYPLATES

    . START WELDING OF $ERTICAL FROMOUTSIDE !$1' $2' $3 AND $4"

  • 8/8/2019 Tank Construction

    5/25

    CONTINUE(.CONTINUE(.

    ). BACKGOUGE $ERTICAL*S FROM INSIDE

    +. START WELDING $ERTICALS FROM INSIDE

    1,. ERECT 2ND SHELL COURSE PLATES

    11. FITUP AND TACK WELD $ERTICALS12. ALLIGN USING KEY PLATES

    13. DO NOT FIT UP HORIZONTAL OINTS TILL YOU COMPLETE $ERTICAL OINTS

    14. CONTINUE THE SAME PROCESS FOR$ERTICALS

    1#. FOLLOW THE SEQUENCE.

  • 8/8/2019 Tank Construction

    6/25

    BOTTOM PLATE ERECTION AND WELDING SEQUENCE

    BOTTOM PLATES

  • 8/8/2019 Tank Construction

    7/25

    1 1

    2

    2

    4 4

    4 4

    33

    3 3

    55

    5 5

    W-/0

    S--5-

    W-/-67

    1 2

    2 2

    3 2

    4 2 86 4

    # 2 86 4

  • 8/8/2019 Tank Construction

    8/25

    BOTTOM PLATE LAYOUTBOTTOM PLATE LAYOUT

  • 8/8/2019 Tank Construction

    9/25

     TANKAGE

    BOTTOM PLATE ERECTION

    ERECTION WELDING BY SAW PROCESS

    BOTTOM PLATE JOINT TESTING

    VACUUM BOX TESTING

    Testing Requirements

    • 100% vacuum box test shall be carried our for allbottom welds.

    • 100% Visual Insection shall be erformed for allbottom welds rior to vacuum box test.

  • 8/8/2019 Tank Construction

    10/25

    ANNULAR PLATE ERECTION & TESTING

    Testing Requirements

    •100% Visual Insection shall be erformed.

    • 100% Vacuum box test shall be erformed.•!adio"rah# test shall be carried out as er $I &50'lause (.1.2.

     TANKAGE

    CORNER WELD JOINT (ANNULAR TOSHELL)

    OIL PENETRATE TESTING (OPT)

    Testing Requirements

    •)* on the entire len"th after 1st  ass of weldin" andafter comletion of first die weldin".•Inside fillet welds in a c#lindrical flat+bottom tan, shall beexamined b# either -#e+enetrant or et+fluorescentma"netic article method before h#drotest.•100% Visual Insection shall be erformed.

  • 8/8/2019 Tank Construction

    11/25

    G88/ F09 : ;/ -/ ?8998@98 7- 8097

    SELL PLATES ERECTION AN! "EL!INGSELL PLATES ERECTION AN! "EL!ING

    SE#UENCESE#UENCE

    /)**) $*

    $*

  • 8/8/2019 Tank Construction

    12/25

    SHELL ERECTIONSHELL ERECTION

  • 8/8/2019 Tank Construction

    13/25

     TANKAGE

    TANK SHELL VERTICAL WELDING WITH EGW PROCESS

    ELECTRO GAS "EL!ING (EG")

    Testing Requirements

    • 100% Visual Insection shall be erformed after comletion of weld.

    • 100% I ma"netic article test6 shall be done for inside or outside of the 7oint weld face side6

    • !adio"rah# testin" shall be carried out as er $I &50 clause (.1.2.

  • 8/8/2019 Tank Construction

    14/25

    TANK SHELL HORIZONTAL WELDING WITH SAW PROCESS

     TANKAGE

    SUB$MERGE! ARC "EL!ING (SA")

    Testing Requirements

    • 100% Visual Insection shall be erformed after comletion of weld.

    • !adio"rah# testin" shall be carried out as er $I &50 clause (.1.2.

  • 8/8/2019 Tank Construction

    15/25

     TANKAGE

    SIEL!E! METAL ARC "EL!ING (SMA")

    Testing Requirements

    •100% Visual Insection shall be erformed after comletion of weld.

    • !adio"rah# testin" shall be carried out as er $I &50 clause (.1.2.

    TAN% SELL BELO" &MM TIC% "EL!ING "IT SMA" PROCESS

  • 8/8/2019 Tank Construction

    16/25

    KEY PLATE INSTALLATIONKEY PLATE INSTALLATION

  • 8/8/2019 Tank Construction

    17/25

    V1V2 V3   V4

      V5

    F09 : ;/ T;5= >-/ 9- $-6905; 8097

    W-/ 9- $-6905;7 -/ 9- -6905;7

  • 8/8/2019 Tank Construction

    18/25

    V1 V2 V3   V4   V5

    F09 : ;/ T;5= >-/ 9- $-6905; 8097 8< 2/ 7-

    W-/ 9- $-6905;7 -/ 9- -6905;7

  • 8/8/2019 Tank Construction

    19/25

    'ACTORS A''ECTING TE CONSTRUCTION'ACTORS A''ECTING TE CONSTRUCTION

    1. I!)! 8I*9: I$*' )! I$I;

  • 8/8/2019 Tank Construction

    20/25

    FACTORS TO BE CONSIDERED DURINGFACTORS TO BE CONSIDERED DURING

    CONSTRUCTIONCONSTRUCTION

    ROUNDNESSPLUMBNESS

    PEAKING

    BANDING

    MISALLIGNMENTS

    EXCESSI$E WELD DEPOSIT

    HEAT INPUT CONTROL

  • 8/8/2019 Tank Construction

    21/25

     TANKAGE

    TANK SHELL INSPECTION REQUIREMENTS AS PER STD

    ROUNDNESS CHECKING PICKING / BANDING PLUMBNESS

    MAGNETIC PARTICLE TESTING ONTEMP. SUPPORT & VERTICAL JOINTS

    TESTING OF SHELL JOINTS USINGTFD METHOD INSTEAD OF RT

    TESTING OF SHELL JOINTS USINGRADIOGRAPHIC METHOD (RT)

  • 8/8/2019 Tank Construction

    22/25

    OTHER MAIN FACTORS TO BEOTHER MAIN FACTORS TO BE

    CONSIDERED IN CONSTRUCTIONCONSIDERED IN CONSTRUCTION

    PROPER $ENTILATION

    A$OID $ACCUM PRESSURE

    CORNER OINT WELD TO BE COMPLETED

    AFTER 3RD SHELL ERECTION

    INSTALL ER$ !EMERGENCY RELIEF $AL$E"

    BEFORE BOX UP.

    INSTALL SUPPORTI$E SLINGS' IN

    AGGRESSI$E WEATHER CONDITIONS.

  • 8/8/2019 Tank Construction

    23/25

     TANK FAILURE !$ACCUM" TANK FAILURE !$ACCUM"

  • 8/8/2019 Tank Construction

    24/25

     TANK FAILURE TANK FAILURE

  • 8/8/2019 Tank Construction

    25/25

     THANK YOU THANK YOU