Installation Instructions  VersaSteel, Inc. MODEL VSTIAE020  5032879822 1  August 4, 2011  Tank Indicator Installation Model:  VSTIAE020, Stainless Reverse Read System             Guide Cables         No Guide Cables                                  

Upload: others

Post on 23-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Tank Indicator Installationtankindicator.com/pdf/VS-AE020_install.pdf · Installation Instructions Versa‐Steel, Inc. MODEL VSTI‐AE020 503‐287‐9822 1 August 4, 2011 Tank Indicator

Installation Instructions    Versa‐Steel, Inc. MODEL VSTI‐AE020    503‐287‐9822 

1    August 4, 2011  

Tank Indicator Installation 

Model:  VSTI‐AE020, Stainless Reverse Read System  

              Guide Cables           No Guide Cables 

             

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 2: Tank Indicator Installationtankindicator.com/pdf/VS-AE020_install.pdf · Installation Instructions Versa‐Steel, Inc. MODEL VSTI‐AE020 503‐287‐9822 1 August 4, 2011 Tank Indicator

Installation Instructions    Versa‐Steel, Inc. MODEL VSTI‐AE020    503‐287‐9822 

2    August 4, 2011  

 

ITEM NO. PART NUMBER DESCRIPTION

1 1001241 UNIVERSAL MOUNTING BRACKET

2 FLOAT SUB ASSEMBLY A030, GUIDE CABLE

CLIP 3 7000478 CABLE TENSION ASSEMBLY 4 1000077 COUPLING BRACKET 5 7000018 TARGET 6 1000068 TANK BRACKET 7 1001201-5 STAFF GAUGE BOARD 5’ 8 1001336 TOP MOUNTING BRACKET 9 7000019 SHEAVE HOUSING

10 1000720-01 WEIGHTED PLATE 11 1000006 1" UNION 12 1000010 1" X 3" THREADED PIPE NIPPLE 13 1000067 1" X 24" THREAD PIPE NIPPLE 14 7000006 WIRE ROPE CLAMP 15 FLOAT CABLE 16 GUIDE CABLE 17 5/16" HEX HEAD BOLT 18 5/16" HEX NUT 19 5/16" FLAT WASHER 20 5/16" LOCK WASHER 21 1001207 LONG T-SLOT NUT 22 1001204 SHORT T-SLOT NUT

 

Page 3: Tank Indicator Installationtankindicator.com/pdf/VS-AE020_install.pdf · Installation Instructions Versa‐Steel, Inc. MODEL VSTI‐AE020 503‐287‐9822 1 August 4, 2011 Tank Indicator

Installation Instructions    Versa‐Steel, Inc. MODEL VSTI‐AE020    503‐287‐9822 

3    August 4, 2011  

 

There are different ways to assemble & mount the Staff Gauge Boards to the tank.  The method chosen 

largely depends on these factors: 

a. The height of the tank 

b. The equipment available 

c. Whether or not you are able to mount the Tank Brackets directly to the tank  

STEP A ‐ Assemble Staff Gauge Boards 

1. Each Staff Gauge Board comes with a vinyl decal displaying height values.  Lay the boards on a flat 

surface in the correct order/orientation. 

 

2. Install the bottom bracket assembly using the following parts: (1) Tank Bracket, (1) Universal 

Mounting Bracket, (2) 5/16” Hex Head Bolts, (4) 5/16” Flat Washers, (2) 5/16” Lock Washers, (2) 

5/16” Hex Nuts, (2) Short T‐Slot Nuts, and (2) 10‐32x1/2” Phillips Pan Screws.   

 

 

Bottom Bracket Assembly 

                           

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10‐32x1/2” 

Phillips Pan 

Screw 

Short T‐Slot Nut 

1001204

Universal Mounting Bracket 

1001241 

Staff Gauge Board 5’ 

1001201‐5 

Tank Bracket 

1000068 

5/16” Hex 

Head Bolt 

Page 4: Tank Indicator Installationtankindicator.com/pdf/VS-AE020_install.pdf · Installation Instructions Versa‐Steel, Inc. MODEL VSTI‐AE020 503‐287‐9822 1 August 4, 2011 Tank Indicator

Installation Instructions    Versa‐Steel, Inc. MODEL VSTI‐AE020    503‐287‐9822 

4    August 4, 2011  

Connector Bracket Assembly 

                      3. Configure and install the connector bracket assembly using the following parts: (1) Tank Bracket, (1) 

Universal Mounting Bracket, (2) 5/16” Hex Head Bolts, (4) 5/16” Flat Washers, (2) 5/16” Lock 

Washers, (2) 5/16” Hex Nuts, (2) Long T‐Slot Nuts, (8) ¼‐20x1/4” Set Screws, and (2) 10‐32x1/2” 

Phillips Pan Screws. 

4. Trim the bottom Staff Gauge Board as necessary to fit to the height of your tank.   

5. Install the top bracket assembly 12” below the top of the top Staff Gauge Board using the following 

parts: (1) Tank Bracket, (1) Universal Mounting Bracket, (2) 5/16” Hex Head Bolts, (4) 5/16” Flat 

Washers, (2) 5/16” Lock Washers, (2) 5/16” Hex Nuts, (2) Short T‐Slot Nuts, and (2) 10‐32x1/2” 

Phillips Pan Screws. 

Coupling Bracket Assembly 

Note: The pipe socket on the Coupling Bracket must point up to receive the Reeving Assembly. 

 

 

1. Install the coupling bracket assembly at the top of the Staff Gauge Board using the following parts: 

(1) Top Mounting Bracket, (2) Short T‐Slot Nuts, (2) 10‐32x1/2” Phillips Pan Screws, (1) Coupling 

Bracket, (2) 1/4” Hex Head Bolts, (2) 1/4” Flat Washers, (2) 1/4” Lock Washers, and (2) 1/4” Hex 

Nuts.                                   

Coupling Bracket 

1000077 Top Mounting Bracket 

 1001336 

The reeving assembly screws 

into this pipe socket. 

Long T‐Slot Nut 

1001207

10‐32x1/2” 

Phillips Pan 

Screws 5/16” Hex 

Head Bolt

10‐32x1/2” 

Phillips Pan 

Screws 

Page 5: Tank Indicator Installationtankindicator.com/pdf/VS-AE020_install.pdf · Installation Instructions Versa‐Steel, Inc. MODEL VSTI‐AE020 503‐287‐9822 1 August 4, 2011 Tank Indicator

Installation Instructions    Versa‐Steel, Inc. MODEL VSTI‐AE020    503‐287‐9822 

5    August 4, 2011  

STEP B ‐ Mount the Staff Gauge Boards – 2 Ways 

Mounting Option A: 

1. Field conditions permitting, mount the Tank Brackets directly to the tank.  Then mount each 

individual Staff Gauge Board to each bracket assembly – One bracket, then one Staff Gauge Board, 

next bracket, etc. 

 

2. Temporarily tape or tie the Target to the Staff Gauge Board so that it will not fall when the Staff 

Gauge Board is lifted vertically into position. 

       Note: We recommend tanks over 12’ tall to be done in sections to prevent bowing. 

 

3. Attach the Wire Rope Clamp to the Target. 

4. Slide the Target with attached Wire Rope Clamp onto the Staff Gauge Board.   

Mounting Option B: 

1. If unable to mount brackets directly to the tank, the Staff Gauge Board can be mounted to a support 

channel first.  This channel is supplied by the customer, and should be at least 5” wide and as tall as 

the tank in order to sufficiently support Staff Gauge Board assembly.  Once all components of the 

Staff Gauge Board assembly have been mounted to the channel, the entire assembly can be raised 

and mounted onto the tank as a unit.    

 

Note: No cable installation is needed at this time. 

 

Target 

7000018

Wire Rope Clamp 

7000006 

Staff Gauge Board 5’ 

1001206‐5 

Page 6: Tank Indicator Installationtankindicator.com/pdf/VS-AE020_install.pdf · Installation Instructions Versa‐Steel, Inc. MODEL VSTI‐AE020 503‐287‐9822 1 August 4, 2011 Tank Indicator

Installation Instructions    Versa‐Steel, Inc. MODEL VSTI‐AE020    503‐287‐9822 

6    August 4, 2011  

STEP C ‐ Reeving Assembly 

Reeving Assembly 

 

 

   

Note: Positioning of the Reeving Assembly is important because it is used to determine the exact point of 

penetration for the 1” NPT Coupling, where the Reeving Assembly meets the roof of the tank.  The Staff 

Gauge Board is mounted to the outside of the tank wall, and the Reeving Assembly directs the Float 

Cable from the Staff Gauge Board over and through the roof of the tank. 

1. Using the two Sheave Housings, assemble the 1” x 24” Threaded Pipe Nipple, 1” Unions, and 1” x 3” Threaded Pipe Nipples as shown above. 

 2. One end of the Reeving Assembly is attached to the Coupling Bracket.  The other end connects to 

the customer‐provided 1”NPT Coupling, located on the roof of the tank.    

3. Placement of the Reeving Assembly should mark exactly where the cable meets the tank.  It can be adjusted when necessary by adding or removing length to the 1” NPT nipples.  

 4. Disassemble the Reeving Assembly to seal all its pipe joints.   

 5. Reassemble the Reeving Assembly onto the tank. 

 6. The two Cable Tension Assemblies can now be installed at the roof of the tank.  The Float Guide 

Cable will be installed in a later step.  

Note:  The customer is encouraged to use all safety precautions, devices, and procedures when working 

in elevated locations.   

Sheave Housing 

7000019 1” Union 

1000006 

1” x 3” Threaded 

Pipe Nipple 

1000010 

1” x 24” Threaded 

Pipe Nipple 

1000067 

Page 7: Tank Indicator Installationtankindicator.com/pdf/VS-AE020_install.pdf · Installation Instructions Versa‐Steel, Inc. MODEL VSTI‐AE020 503‐287‐9822 1 August 4, 2011 Tank Indicator

Installation Instructions    Versa‐Steel, Inc. MODEL VSTI‐AE020    503‐287‐9822 

7    August 4, 2011  

Typical Arrangement on Roof 

                                                 

 

 

STEP D ‐ Feeding the Float cable 

1. Remove the covers of the Sheave Housing to aid in feeding the Float Cable through. 

2. Attach the Float Cable to the Weighted Float. 

3. Feed the Float Cable: The taped end of the Float Cable comes up from the Weighted Float, than 

feeds up and through the Reeving Assembly, down to the Target, outside the tank.   

4. Make sure the Float Cable is running on the pulleys in the Sheave Housing before placing the 

covers back on.   

5. Temporarily attach the Float Cable to the Wire Rope Clamp on the Target using two set screws.   

 

Note: You will later need to calibrate the length of the Float Cable by positioning the Target 

outside of the tank, to the same height as the float riding on top of the liquid inside the tank. 

(2) Cable Tension 

Assemblies 

7000478 

Partial tank 

shown

(3) 1” NPT Couplings 

(Customer Provided) 

3/16” Float Cable 

7000002 

Pipe may need to be cut 

& threaded to adjust for 

field conditions 

34‐1/4” Distance 

dependent upon 

field conditions

12” 

Float Guide Cable  

Page 8: Tank Indicator Installationtankindicator.com/pdf/VS-AE020_install.pdf · Installation Instructions Versa‐Steel, Inc. MODEL VSTI‐AE020 503‐287‐9822 1 August 4, 2011 Tank Indicator

Installation Instructions    Versa‐Steel, Inc. MODEL VSTI‐AE020    503‐287‐9822 

8    August 4, 2011  

 

 

STEP E ‐ Weighted Plate at the bottom of the tank  

 

1. The Weighted Plate should be secured to the tank floor while the tank is empty.  This can be 

done by welding, or using the two mounting holes provided.  The eyes in the plate should line 

up with the Cable Tension Assembly on top of the tank.  These eyes are 12” apart and are 

positioned in line with the Weighted Float.  A plumb‐bob may be used for accurate locating. 

 

Note: If the tank currently has liquid inside, the Weighted Plate and Float Guide Cable assemblies 

can be lowered into the tank. 

 

 

Float Guide Cable  

Wire Rope Clamp 

7000006 

Weighted Plate 

1000720‐01 

Page 9: Tank Indicator Installationtankindicator.com/pdf/VS-AE020_install.pdf · Installation Instructions Versa‐Steel, Inc. MODEL VSTI‐AE020 503‐287‐9822 1 August 4, 2011 Tank Indicator

Installation Instructions    Versa‐Steel, Inc. MODEL VSTI‐AE020    503‐287‐9822 

9    August 4, 2011  

2. Feed the Float Guide Cables through the Weighted Float; One Float Guide Cable should feed 

through the hole on each side of the Weighted Float. 

 

 

 

 

 

 

STEP F ‐ Calibrate Target 

1. Finally, adjust the Target to the height of the Weighted Float.  This is done by loosening the two 

set screws, and pulling the Float Cable through until the Target represents the correct height of 

the Weighted Float inside the tank.   

 

2. Tighten the screws and check for smooth operation by pulling down on the Target.   

Set Screws 

Wire Rope Clamp 

7000006 

3/16” Float Cable  

Target 

7000018 

Page 10: Tank Indicator Installationtankindicator.com/pdf/VS-AE020_install.pdf · Installation Instructions Versa‐Steel, Inc. MODEL VSTI‐AE020 503‐287‐9822 1 August 4, 2011 Tank Indicator

Installation Instructions    Versa‐Steel, Inc. MODEL VSTI‐AE020    503‐287‐9822 

10    August 4, 2011  

 

3. Cut off the excess Float Cable. 

 

 

 

STEP G.a – Tension Guide Cables on an Empty Tank 

1. Pull up on the Float Guide Cable to provide tension.  The Weighted Plate should be affixed 

to the tank floor, so you will not be able to lift if off the tank floor.   

2. Compress the conical spring and locking collar 3/8” to ½”; Mark the cable at the top of the 

locking collar.  Tighten the locking collar using the two set screws.  (Be careful not to over‐

tighten as this will damage the Float Guide Cable).   

3. Install the 3” Threaded Pipe Nipple back onto the base of the Cable Tension Assembly. 

4. Cut the excess Float Guide Cables at the top of the 3” Threaded Pipe Nipple. 

5. Replace the pipe caps using a sealant that is strong enough to retain the cap, but allowing 

you to remove it later to adjust tension as required. 

STEP G.b – Tension Guide Cables on a Live Tank 

1. Pull up on the Float Guide Cable until you feel the Weighted Plate being lifted off the tank 

floor.   

2. Using a marker; mark the cable at the top of the locking collar.   

3. Tighten the locking collar to the cable 3/8” to 1/2” down from the mark using the two set 

screws. (Be careful not to over‐tighten as this will damage the Float Guide Cable).   

4. Lower the conical spring, locking collar and Float Guide Cable down into the base.  This 

should tension the Float Guide Cables without lifting the Weighted Plate off the bottom of 

the tank.   

5. Install the 3” Threaded Pipe Nipple back onto the base of the Cable Tension Assembly. 

6. Cut the excess Float Guide Cables at the top of the 3” Threaded Pipe Nipple. 

Float Guide Cables 

Wire Rope Clamp 

7000006 

Weighted Plate 

1000720‐01 

Page 11: Tank Indicator Installationtankindicator.com/pdf/VS-AE020_install.pdf · Installation Instructions Versa‐Steel, Inc. MODEL VSTI‐AE020 503‐287‐9822 1 August 4, 2011 Tank Indicator

Installation Instructions    Versa‐Steel, Inc. MODEL VSTI‐AE020    503‐287‐9822 

11    August 4, 2011  

7. Replace the pipe caps using a sealant that is strong enough to retain the cap, but allowing 

you to remove it later to adjust tension as required. 

 

 

 

 

 

STEP H ‐ Tension the Float Guide Cables     

1. Tension the Float Guide Cable at the top of the tank using the Cable Tension Assembly.  

2. Remove the cap from the Cable Tension Assembly and the 3” Threaded Pipe Nipple.   

3. Slide the Float Guide Cable through the customer‐provided 1” NPT Coupling.    

4. Feed each Float Guide Cable through the base of each Cable Tension Assembly. 

5. Loosen the 2 set screws on the locking collar to feed the Float Guide Cable through the 

conical spring & locking collar. 

 

CONGRATULATIONS, YOU ARE NOW DONE INSTALLING A TROUBLE FREE 

TANK LEVEL INDICATOR FROM VERSA‐STEEL INC.! 

 

 

PIPE CAP

Locking Collar

Set Screws

Conical Spring

Float Guide Cable 

1000420

1” x 3” Threaded Pipe Nipple 

1000010

Cable Tension 

Assembly 7000478 

Guide Cable Shoulder Bushing 

1000448

Page 12: Tank Indicator Installationtankindicator.com/pdf/VS-AE020_install.pdf · Installation Instructions Versa‐Steel, Inc. MODEL VSTI‐AE020 503‐287‐9822 1 August 4, 2011 Tank Indicator

Installation Instructions    Versa‐Steel, Inc. MODEL VSTI‐AE020    503‐287‐9822 

12    August 4, 2011