TANZANIA ELECTRIC SUPPLY
COMPANY LTD (TANESCO)
FINANCING INITIATIVES AND
BUSINESS PLANS THAT WORK Focusing on Grid Solutions
Presented by: ENG. DECKLAN MHAIKI DEPUTY MANAGING
DIRECTOR INVESTMENT (TANESCO-DMDI)
CONTENTS
Tanzania at a Glance
Electricity Sector & Resources
Sustainable Energy Agenda
Generation & Network Expansion Programs
Renewable Energy Development
Financing Initiatives
Conclusion
12/12/2016
2
TANZANIA AT A GLANCE
Main Figures Area 947,300sqm
Population 49.25million (2013)
GDP 48.6bn USD (2015)
GDP per capita 842 USD (2015)
Consumption per capita 100kWh
12/12/2016 3
ELECTRICITY SECTOR (Key stakeholders)
4
Board of Directors
Generation
Transmission
Distribution
Ministry of Energy & Minerals
Customers
EWURA TPDC
REA
IPPs Imports
LEGAL FRAMEWORK GOVERNING THE SECTOR
Electricity & Gas:
• National Energy Policy 2015
• Electricity Act, 2008
• Natural Gas Policy, 2013
• Natural Gas Act (under preparation)
• National Gas Utilization Master Plan (under prep).
• EWURA Act of 2001,
• REA Act of 2005 and
Cross-cutting Legislations
• Occupational Safety and Health Act, 2003
• Environmental Management Act, 2004
• Income Tax Act, 2004
• Public-Private-Partnership Act, 2010
12/12/2016 5
ENERGY RESOURCES
HYDRO – 4.7GW (12% Developed)
COAL – 1.9 Bn tons (0% developed)
12/12/2016 6
Mkuranga 2007 (0.2 TCF) Kiliwani 2008 (0.07 TCF) Songo Songo 1974 (2.5 TCF)
Mnazi Bay 1982 (5 TCF)
Ntorya 2012 ( 0.178 TCF)
NATURAL GAS DISCOVERIES
TOTAL GIIP: 57.25 TCF (Developed - 607MW)
Deep Sea : 47.08 TCF
Total GIIP Onshore = 10.17 TCF
12/12/2016
GEOTHERMAL POTENTIAL
58 sites – 5,000MW (none developed)
12/12/2016 8
SOLAR POTENTIAL – DEVELOPED SOLAR MAP
Tanzania is among the countries with high solar radiation.
Daily solar insolation – 4.21 – 6.13 kWh/m2/day
Annual insolation – 1,538 – 2,242 kWh/m2/yr
Central zone and part of southern and Lake Zone are dominating.
12/12/2016 9
40°0'0"E
40°0'0"E
38°0'0"E
38°0'0"E
36°0'0"E
36°0'0"E
34°0'0"E
34°0'0"E
32°0'0"E
32°0'0"E
30°0'0"E
30°0'0"E
2°0'0"N
0°0'0"
2°0'0"S
4°0'0"S
6°0'0"S
8°0'0"S
10°0'0"S
12°0'0"S
14°0'0"S
0 80 160 240 32040
Kilometers
±
Coordinate System: GCS WGS 1984Datum: WGS 1984Units: Degree
Legend
Solar radiation
(kWh/m2/day)
High : 6.13
Low : 4.22
ELECTRICITY SECTOR
Main figures by October, 2016 Generation grid installed capacity 1,357.69MW - Hydro 41.7%
- Natural gas 44.7%
- Oil 12.8%
- Biomas 0.8%
Installed Capacity by Ownership
Tanesco own 1,049.40MW – 77.3%
IPPs own 308.29MW – 22.7%
Transmission Lines 6,167.0km
Distribution Lines 33 & 11kV 32,324.0km
Distribution Lines 0.4/0.23kV 101,900.0km
System Frequency 50Hz, ±2.5%
Maximum Demand 1,041.63
Access to electricity 40% (March 2016)
Number of customers 1,973,754 12/12/2016
10
SUSTAINABLE ENERGY AGENDA
In Line With SDG 7 Tanzania has Developed the National Development Vision 2025 with the Following Main Objective:
Transform the Country Into a Middle Income by 2050.
Increase Generation Capacity to 10000MW by 2025
Increase Access to 75% by 2025
12/12/2016 11
SUSTAINABLE ENERGY AGENDA -
NATIONAL DEVELOPMENT VISION
National Development Vision 2025 has the Following Main Objective:
Transform the Country Into a Middle Income by 2025.
Increase Generation Capacity to 10000MW by 2025
Increase Access to 75% by 2025
Strengthening the national grid in terms of generation and transmission capacity is the main agenda
12/12/2016 12
GENERATION CAPACITY EXPANSION PROGRAMME
12/12/2016 13
The short and Medium Term plan is to increase generation capacity to
5,000MW and a huge potential of natural gas which is available locally as a
source of power generation will enable to achieve this target by 2020 including:
• Kinyerezi I Extension 185MW under construction - expected to be online by
2018.
• Kinyerezi II 240MW natural gas fired power plant with financing from Japan
and GOT under construction - expected to be online by 2018.
• 300MW natural gas fired plant proposed to be financed by JICA and GOT
and it is at the appraisal stage. Planned to be ready by 2020.
• Ongoing negotiation with various developers: 300MW (coal), 100MW
(wind), Solar PV (55MW), 850 MW (natural gas) and 70MW (Hydro) – All
these plant to be online by 2020.
GENERATION CAPACITY EXPANSION PROGRAMME……
12/12/2016 14
Long-term View:
• Competitive procurement of generation projects for all
technologies i.e. natural gas, coal, wind, hydro and
Solar.
NETWORK EXPANSION PROGRAMME
Network Expansion Involves:
Grid Extensions
Distribution Expansion and Rural Electrification
12/12/2016 15
GRID EXTENSION: Backbone / ZTK Transmission Line
Under Construction
Tanzania is the hub of EAPP and
SAPP and important for power interconnection.
The new 400kV Backbone line will connect the South and south west of Tanzania to the load centers in the North.
Iringa - Shinyanga to be ready by end of 2016 and Singida – Arusha – Namanga Kenya will be ready by end of 2018.
The ZTK interconnector will link the Southern and Eastern Power Pools and enable will power trading.
Backbone will be a part of the planned ZTK line
GRID EXTENSION……. Cont. North – West 400kV T/L (1,148km) from Mbeya – Sumbawanga – Mpanda –
Kigoma – Nyakanazi is under review of feasibility study from 220kV to 400kV.
220kV Bulyanhulu – Geita – Nyakanazi (188km) is under construction and expected to be completed in 2018.
North – East 400kV T/L (664km) from Dar – Chalinze – Segera – Arusha. Financing has been finalized and planned to commence construction early 2017 and completed in 2019.
220kV T/L Makambako – Songea (250km) is under construction and expected to be completed in 2018.
400kV T/L Somanga – Kinyerezi (198km). Compensation to the PAPs Contract negotiation with the Consultant for supervision of the project is ongoing.
400kV T/L Chalinze – Dodoma (350km). Feasibility study is at the final stage of completion.
12/12/2016 17
FUTURE GRID MAP BY 2033
18
CUSTOMER BASE AND CONNECTION RATE
Efforts towards universal access to modern energy involves connecting more customers through National Grid and Mini-grids.
The current customer base is about 1.9 million.
Annual connection rate stands at 250,000 customers.
Access/ Connectivity; All regional headquarters in Tanzania and (99%) of district headquarters have electricity. Currently the connectivity level stands at 33% and access level at 40%. Our target is to increase electricity connectivity level to 75% by 2025.
12/12/2016 19
STATUS OF ACCESS PER REGION
12/12/2016 20
0%
20%
40%
60%
80%
100%
120%
Arusha
Daressalaam
Dodoma
Geita
Iringa
Kagera
Katavi
Kigoma
Kilimanjaro
Lindi
Manyara
Mara
Mbeya
Morogoro
Mtwara
Mwanza
Njombe
Pwani
Rukwa
Ruvuma
Shinyanga
Simiyu
Singida
Tabora
Tanga
AccessRatesperRegion(March2016)–AVR:40%
%ofNon-ElectrifiedVillages
RURAL ELECTRIFICATION PROGRAMME
The Government of Tanzania through REA has set a target of providing electricity services to all villages in Tanzania by year 2021 through grid extension and off-grid renewable energy solutions.
Several initiatives have been developed and some of them are in various stages of implementation (i.e. Grid extension projects, Renewable energy projects, grid connected mini grids, off grid
projects, etc.)
12/12/2016 21
EXTENT OF RURAL ELECTRIFICATION
12/12/2016 22
Renewable Energy Development
The Government has established a Subsidiary Company for development of Geothermal named Tanzania Geothermal Development Company.
The Stability Study for integrating renewable energy sources mainly wind farm and Solar PV plant into the national Grid have been conducted.
The study provided Limit of the overall RE capacity to about:
- 385MW capacity at 1,250MW peak demand
- 710 MW capacity at 2,500MW peak demand.
Peak demand reached so far is 1026.48MW.
Financing Initiatives
Financing initiatives in Tanzanian Power Sector include:
Rural electrification financing (REA):
Government Project Financing through TANESCO:
Generation projects: E.g. Kinyerezi I, IE, & II
Transmission projects: E.g. Feasibility study for Chalinze - Dodoma transmission line
Distribution projects: E.g. Construction of Dar es Salaam Distribution Control Centre
Development partners.
Project financing through Concessional and Commercial loans.
CONCLUSION
The Demand for Energy will continue to increase over the coming years.
With its vast and untapped energy resources Tanzania is an ideal place for clean and renewable energy solutions to ensure sustainability of the electricity sector.
However, more Financing initiatives are needed to ensure successful implementation of various business plans and programmes.
12/12/2016
25