PROJECT MAUNGA

REPORT TO BOARD

TARANAKI BASE HOSPITAL REDEVELOPMENT

10 FEBRUARY 2011New Plymouth

Design Process

Aerial Photo – Building Site

construction site

Site Plan – Taranaki Base Hospital

Project Maunga Objectives 3

Modernise inpatient facilitiesImproved infection control

1-bed rooms increase from 15% to 47%PPE baysHand washing facilitiesNegative pressure isolation rooms - from 1 to 5

Improved patient privacy, dignity and comfortEnsuites increase from 10% to 100%No 6 bed rooms - 4 bed maximumPotential for patient TVComfortable temperature in wardLarge windows, low sill, great outlookPrivate travel to theatres and from ED

1 Bed Room

Four Bedroom

Project Maunga Objectives 4

Improved patient safetyBetter bathroom designBariatric rooms - 11 in totalSecure access control

Improved facilities for disabled and rehabilitation

Disabled friendly toilets and showersBifold, double action doorGym and ward co-locatedNew rehabilitation gardenPurpose built ADL facilities

Project Maunga Objectives 5

Modern IT EnvironmentImproved access to clinical information – lab and x-rayImproved communication between health care workers, service providers and patientsElectronic medication prescribing and recordingWireless and cabled network Nurse Call system - monitoringVideo conference capacity“Digital Theatre” – display of video images within the theatre

Improve Staff SatisfactionUser consultation in design and mock upReduce staff back injury - patient lifting track

Project Maunga Objectives 6

Future Proof Shell for angiography / theatreFuture plant spaceBed & theatre capacityBasement space Future stages enabled by Site Master PlanRFID tracking

Project Maunga – Scope 1

Acute Services Building (working title)4 patient occupied floorsEach clinical floor linked to existing buildingsPlant-rooms in basement and roof11,000 m2 area6 Operating Theatres 2 Procedure Rooms 172 Inpatient Beds1 shell angiography room

Project Maunga – Scope 2

BasementPlant and Waste Management

Level 1Operating Theatres - x6Endoscopy and Procedure Rooms - x2Sterile ServicesDay Stay SuiteNew Entry, Café and Atrium & mobility garden

Project Maunga – Scope 3

Level 2Older Person and Rehab Inpatient Unit (IPU) - 30 bedAllied Health / Rehab facilities and Gymnasium Paediatric Inpatient Unit - 20 bed

Level 3Surgical Inpatient Unit - 30 bed Orthopaedic Inpatient Unit - 30 bed

Level 4Medical Inpatient Unit - x2 30 bed wards

Perspective 1

Perspective 2

Perspective 3

Link & Lobby