taranaki base hospital redevelopmentstatic2.stuff.co.nz/files/tdhb.pdf · taranaki base hospital...
TRANSCRIPT
Project Maunga Objectives 3
Modernise inpatient facilitiesImproved infection control
1-bed rooms increase from 15% to 47%PPE baysHand washing facilitiesNegative pressure isolation rooms - from 1 to 5
Improved patient privacy, dignity and comfortEnsuites increase from 10% to 100%No 6 bed rooms - 4 bed maximumPotential for patient TVComfortable temperature in wardLarge windows, low sill, great outlookPrivate travel to theatres and from ED
Project Maunga Objectives 4
Improved patient safetyBetter bathroom designBariatric rooms - 11 in totalSecure access control
Improved facilities for disabled and rehabilitation
Disabled friendly toilets and showersBifold, double action doorGym and ward co-locatedNew rehabilitation gardenPurpose built ADL facilities
Project Maunga Objectives 5
Modern IT EnvironmentImproved access to clinical information – lab and x-rayImproved communication between health care workers, service providers and patientsElectronic medication prescribing and recordingWireless and cabled network Nurse Call system - monitoringVideo conference capacity“Digital Theatre” – display of video images within the theatre
Improve Staff SatisfactionUser consultation in design and mock upReduce staff back injury - patient lifting track
Project Maunga Objectives 6
Future Proof Shell for angiography / theatreFuture plant spaceBed & theatre capacityBasement space Future stages enabled by Site Master PlanRFID tracking
Project Maunga – Scope 1
Acute Services Building (working title)4 patient occupied floorsEach clinical floor linked to existing buildingsPlant-rooms in basement and roof11,000 m2 area6 Operating Theatres 2 Procedure Rooms 172 Inpatient Beds1 shell angiography room
Project Maunga – Scope 2
BasementPlant and Waste Management
Level 1Operating Theatres - x6Endoscopy and Procedure Rooms - x2Sterile ServicesDay Stay SuiteNew Entry, Café and Atrium & mobility garden
Project Maunga – Scope 3
Level 2Older Person and Rehab Inpatient Unit (IPU) - 30 bedAllied Health / Rehab facilities and Gymnasium Paediatric Inpatient Unit - 20 bed
Level 3Surgical Inpatient Unit - 30 bed Orthopaedic Inpatient Unit - 30 bed
Level 4Medical Inpatient Unit - x2 30 bed wards