Taxilane Reconstruction Adjacent to Active Gates at Washington Dulles International Airport Autor/Author: Richard G.Thuma, P.E. XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal Aviation Administration VII Curso Rápido de Mantenimiento de Pavimentos de Aeródromos 28/05 al 01/06 2018 – Ciudad de Quito - Ecuador

Upload: others

Post on 26-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

1

Taxilane Reconstruction Adjacent to Active Gates at

Washington Dulles International Airport

Autor/Author: Richard G. Thuma, P.E.

XIV Seminario ALACPA de Pavimentos Aeroportuarios

XII Taller Federal Aviation Administration

VII Curso Rápido de Mantenimiento

de Pavimentos de Aeródromos

28/05 al 01/06 2018 – Ciudad de Quito - Ecuador

Page 2: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

2

Agenda

• Dulles Airfield Pavement Background

• Airfield Pavement Management Approach

• Taxilane C Reconstruction

Page 3: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

3

Washington Dulles International Airport

• Airfield Original

Construction 1960-1961

• Multiple expansions over

years

• Ownership transfer from

FAA to MWAA in 1987

• Expansion of taxiways

continued until about

2001

• Annual Evaluation/

Reconstruction Program

started in 2003

Page 4: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

4

IAD Pavement Background

• Original Pavement composed of 15-inch PCC on

9-inch Aggregate Base

• Subgrade Soil = Weathered Shale, mostly low-

plasticity clay

• Paving Lanes 25-ft wide

• Transverse Joint Spacing at 20 to 25 feet

• Pavement Monitoring Program started in 1979 to

calculate PCI (Pavement Condition Index) and

determine repair budget

Page 5: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

5

Current Pavement Management Approach

• Established in 2002 for integrating the pavement

rehabilitation construction demands with the Dulles

Development (d2) program

• Two distinct deliverables:

• Pavement Management Update: A complete PCI

inspection and update to the PMS

• Project Definition Report: Document to identify areas

that require major reconstruction or rehabilitation

projects

Page 6: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

6

Pavement Management System Updates• Inspected in accordance with

FAA Advisory Circular

150/5380-06C. “Guidelines and

Procedures for Maintenance of

Airport Pavements”

• Five Complexes

• Runway 1L-19R

• Runway 1C-19C

• Runway 1R-19L

• Midfield

• Runway 12-30

• One or two complexes

inspected per year:

• Initially: 25% Inspection Rate

• Now: 100% Inspection Rate with

Distress Mapping

Page 7: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

7

Three Inspection Areas

2008 100% Inspection Rate

2006 100% Inspection Rate

2006 25% Inspection Rate

2007 25% Inspection Rate

(Due to Reconst.)

Page 8: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

8

PCI Section Map

Page 9: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

9

PCI Section Map

Page 10: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

10

Detailed Distress Map

Page 11: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

11

Project Definition Report

• Projects developed based on:

• Pavement Condition

• Type and severity of pavement distresses

• Feasibility of extended pavement closure period

• Future Development

• Constructability

• Impacts to Airfield Operations

Page 12: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

12

Project Definition Report

• REHABILITATION

• Partial-depth patches

• Full-depth patches

• Individual Slab replacement or Full Pavement Reconstruction

vs.

• RECONSTRUCTION

• Pavement Sections with PCI below ~55 become candidates

for reconstruction

Page 13: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

13

Example Project Development

Page 14: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

14

Example Project Development

Page 15: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

15

Example Project Development

Page 16: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

16

Project Cost and Duration Summary

Page 17: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

17

Project Definition Report

• Prioritize projects

according to condition and

operational value

• Runways

• Main Taxiways

• Taxilanes

• Concept-level cost and

construction duration :

• Accelerated construction

schedules

• Complex phasing

• Nights-only work

• Projects combined to

develop prioritized project

list

Page 18: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

18

Prioritized Project List

Page 19: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

19

Project Overview

• Reconstruct Taxilane C, Middle Section• 100’ x 1950’

• Full Depth PCC Reconstruction

• Construction Budget: $5M

T/L C

B44/B42 A22/A20B62 A14A24A32 A26B40/B38B48B50

T/L D

Page 20: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

20

Taxilane C

April 2002

T/L C

T/L D

Ramp Tower

B44/B42 A22/A20 A14B62

Page 21: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

21

Taxilane C

April 2006

T/L C

T/L D

Ramp Tower

B44/B42 A22/A20 A14B62

Page 22: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

22

Taxilane C

Oct 2008

T/L C

T/L D

Ramp Tower

B44/B42 A22/A20 A14B62

Page 23: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

23

Taxilane C

Aug 2010

T/L C

T/L D

Ramp Tower

B44/B42 A22/A20 A14B62

Page 24: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

24

Taxilane C

April 2011

T/L C

T/L D

Ramp Tower

B44/B42 A22/A20 A14B62

Page 25: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

25

Taxilane C

Oct 2012

T/L C

T/L D

Ramp Tower

B44/B42 A22/A20 A14B62

Page 26: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

26

Taxilane C

Apr 2015

T/L C

T/L D

Ramp Tower

B44/B42 A22/A20 A14B62

Page 27: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

27

Project LimitsPreliminary Geometry

Approx. Reconstruction Limits

T/L C

T/L D

B44/B42 A22/A20B62 A14

Page 28: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

28

Existing Pavement Section

15” PCC

9” CTB

Anticipated Soil

Anticipated

Gabion Stone

Taxilane C Typical Removal Detail Typical

Page 29: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

29

New Pavement Section

17.5” PCC

¼” Choke Stone

6” CTB

6” Aggregate

Base Course

18.25” Aggregate

Backfill Stone

48”

Page 30: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

30

Drainage

Page 31: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

31

Phasing Discussions

A

KJ

B

A4A5

Page 32: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

32

Phase 3 – Work Area

Page 33: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

33

Phase 3 – Temporary Marking

Page 34: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

34

Phase 3 – Gate B48A320-200W Power-in Operation

Wingtip Clearance: 27-ft

Barricade Movement Required

3

Airline: Avianca

Aircraft: A320

Page 35: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

35

Phase 3 – Gate B48A320-200W Push-back Operation

3

Airline: Avianca

Aircraft: A320

Tug

Page 36: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

36

Phase 3 – Gate B44A380 Power-in Operation

Wingtip Overhang

3

Airline: British Airways

Aircraft: A380*, B777

Wingtip

Trace

Engine Trace

(20-ft offset)

Nose Gear

Trace

Wingtip Clearance

Trace

(36-ft offset)

*Requires barricade movement after each work shift

Page 37: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

37

Phase 3 – Gate B44A380 Tug-in Operation

Wingtip Overhang

Airline: British Airways

Aircraft: A380*, B777

Wingtip

Trace

Nose Gear

Trace3

Main Gear

Clearance Trace

(15-ft offset)

Page 38: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

38

Phase 3 – Gate B44A380 Push-back Operation

Airline: British Airways

Aircraft: A380*, B777

Wingtip

Trace

Nose Gear

Trace

Main Gear

Clearance Trace

(15-ft offset)

3

Page 39: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

39

Phase 3 – BypassB737-800 Push-back Operation

3

*Potential on-site equipment storage on

north side of construction area.

A380 Wingtip Overhang

Page 40: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

40

Construction

Page 41: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

41

Construction

Page 42: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

42

Construction

Page 43: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

43

Construction

Page 44: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

44

Construction

Page 45: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

45

Construction

Page 46: Taxilane Reconstruction Adjacent to Active Gates at ... Reconstruction_IAD.pdf · XIV Seminario ALACPA de Pavimentos Aeroportuarios XII Taller Federal AviationAdministration VII Curso

46