taxiway 'f' runway 5-23 taxiway 'f' - roberts field 11-29 phasing...

8
G R G R G R G R G R G R G R G R G R G R G R G R G R G R G R G R SD SD SD SD SD SD SD TAXIWAY 'C' TAXIWAY 'G' TAXIWAY 'D' SOUTH TAXIWAY 'A' SOUTH TAXIWAY 'A' NORTH TAXIWAY 'D' NORTH RUNWAY 11-29 RUNWAY 11-29 TAXIWAY 'J' SOUTH TAXIWAY 'J' NORTH TAXIWAY 'M' SOUTH TAXIWAY 'M' NORTH TAXIWAY 'C' TAXIWAY 'G' TAXIWAY 'F' TAXIWAY 'F' RUNWAY 5-23 TAXIWAY 'A' NORTH REALIGNMENT FOR 90° INTERSECTION TAXIWAY 'A' SOUTH REALIGNMENT FOR 90° INTERSECTION TAXILANE REALIGNMENT TO MEET GRADE REQUIREMENTS STORM DRAIN IMPROVEMENTS STORM DRAIN IMPROVEMENTS STORM DRAIN IMPROVEMENTS UPDATE TAXIWAY GEOMETRY UPDATE TAXIWAY GEOMETRY UPDATE TAXIWAY GEOMETRY UPDATE TAXIWAY GEOMETRY UPDATE TAXIWAY GEOMETRY UPDATE TAXIWAY GEOMETRY RUNWAY 11-29 RECONSTRUCTION RUNWAY 11-29 MILL AND OVERLAY TRANSITION NEW RUNWAY LIGHTS AND SIGNS SAFETY AREA GRADING IMPROVEMENTS SAFETY AREA GRADING IMPROVEMENTS SAFETY AREA GRADING IMPROVEMENTS STAGING AREA CONTRACTOR FIELD OFFICE, CONTRACTOR PROVIDED ENGINEER'S FIELD OFFICE. EXACT LOCATION TO BE COORDINATED WITH OWNER. SEE SPECIAL PROVISION SECTION 31. CONTRACTOR PROJECT ACCESS NORTH END. INSTALL TEMPORARY 24' WIDE X 7' HIGH CHAIN LINK FENCE GATE. SEE NOTE ABOVE. CONTRACTOR PROJECT ACCESS SOUTH END. CONTRACTOR EMPLOYEE PARKING MILLINGS DISPOSAL AREA. CONTRACTOR STAGING AREA. -ASPHALT PLANT LOCATION IF REQUIRED FOR PROJECT. WASTE EXCAVATION DISPOSAL AREA. HAUL ROUTE. NORTH SIDE OF PROJECT TO SOUTH SIDE OF PROJECT. FAA RADAR FACILITY. CONTRACTOR EMPLOYEE PARKING. TEMPORARY CHAIN LINK FENCE INSTALLATION NOTES: 1. SEE DETAIL DRAWING D-6 FOR FENCE INSTALLATION. 2. COORDINATE WITH OWNER FOR PADLOCK AND KEY FOR TEMPORARY GATE. 3. A GATE GUARD MUST BE PRESENT AT THE GATE DURING INSTALLATION AT ANY TIME THERE IS AN OPENING IN THE FENCE. 2017 COPYRIGHT © MORRISON-MAIERLE, INC., SHEET NUMBER PROJECT NUMBER DRAWING NUMBER VERIFY SCALE! THESE PRINTS MAY BE REDUCED. LINE BELOW MEASURES ONE INCH ON ORIGINAL DRAWING. MODIFY SCALE ACCORDINGLY! DATE DESCRIPTION NO. BY R:\2143\2143 AIP 40\054-RW 11-29 DESIGN\ACAD\SHEETS\2 PROJECT LAYOUT.DWG PLOTTED BY: CORY R. KESLER ON Jun/29/2017 REVISIONS DRAWN BY: DSGN. BY: APPR. BY: DATE: Q.C. REVIEW DATE: BY: 1 Engineering Place Helena, MT 59602 Phone: 406.442.3050 Fax: 406.442.7862 e n g i n e e r s s u r v e y o r s p l a n n e r s s c i e n t i s t s Morrison Maierle REDMOND MUNICIPAL AIRPORT-ROBERTS FIELD RUNWAY 11-29 PAVEMENT REHABILITATION AIP 3-41-0052-42-2016 2143.054 REDMOND OREGON PROJECT LAYOUT 2 G-2 AJG CRK TFO 6-28-2017 FINAL 6-28-2017 TFO 6-19-2017 LEGEND ASPHALT PAVEMENT RECONSTRUCTION MILL AND OVERLAY OR REGRADE AND PAVE SAFETY AREA GRADING NEW STORM DRAIN - PIPE SCALE IN 0 300 300 600 150 FEET SD SD NOTES: 1. REFER TO THE CONSTRUCTION SAFETY AND PHASING PLAN AS IT PROVIDES DETAILED INFORMATION ON THE SITE ACCESS, SECURITY, AND PHASING FOR THE PROJECT. 2. ALL ASPHALT MILLINGS FOR GENERATED FROM THE PROJECT SHALL REMAIN PROPERTY OF THE OWNER AS DISPOSED OF AT THE DESIGNATED LOCATION. MILLINGS FROM THE NORTH SIDE OF THE PROJECTS MAY BE TEMPORARILY STOCKPILED THEN MOVED TO THE FINAL STOCKPILE LOCATION. SEE TECHNICAL SPECIFICATION FOR FURTHER INFORMATION. 3. A LOCATION FOR AN ON-SITE ASPHALT PLANT HAS BEEN DESIGNATED ON THE CONSTRUCTION DRAWINGS FOR THE CONTRACTORS USE. THE CONTRACTOR IS REQUIRED TO OBTAIN ALL REQUIRED PERMITTING FOR THE ONSITE ASPHALT PLANT. THE CONTRACTOR SHALL PROVIDE MAXIMUM EQUIPMENT HEIGHTS ANTICIPATED WITHIN THE DESIGNATED AREA. 4. IF ON SITE CRUSHING OF MATERIAL IS PROPOSED FOR THE PROJECT, THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITTING FOR THEIR OPERATIONS. 5. A WASTE EXCAVATION SITE HAS BEEN LOCATED ON THE DRAWINGS. THE WASTE EXCAVATION SITE SHALL BE GRADED SMOOTH AT THE COMPLETION OF CONSTRUCTION AND GRADED TO DRAIN. 6. THE CONTRACTOR IS ALERTED THAT GATE GUARDS MAY BE REQUIRED SIMULTANEOUSLY AT MULTIPLE GATE LOCATIONS DURING CONSTRUCTION. 7. CONTRACTOR TO PROVIDE FIELD OFFICE FOR ENGINEER. MUST BE SEPARATE FROM CONTRACTOR'S FIELD OFFICE. PROVIDE MINIMUM 8' X 20' FIELD OFFICE WITH POWER, HEAT, AC, DESK, OFFICE CHAIR, TABLE, AND SANITARY FACILITIES. SEE SPECIAL PROVISIONS SECTION 31.

Upload: phamquynh

Post on 20-Jun-2018

220 views

Category:

Documents


1 download

TRANSCRIPT

G RG RG RG R

G RG RG RG R

GR

YW

YW

YW

YW

YW

YW

YW

YW

YW

YW

YW

YW

YW

YW

YW

YW

YW

YW

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

Y W

Y WY WY WY WY WY WY WY WY W

Y W Y W Y W Y W Y W Y W Y WY W

GRGRGR

GRGRGRGR

CONNECT TO EXISTING CONDUIT

SC

L-824 AIRFIELD CABLE, 1 CONDUCTOR

L-824 AIRFIELD CABLE, 2 CONDUCTOR

L-824 AIRFIELD CABLE, 3 CONDUCTOR

L-824 AIRFIELD CABLE, 4 CONDUCTOR

EXISTING TAXIWAY LIGHT

EXISTING PULL BOX OR ELECTRICAL MANHOLE

COUNTERPOISE

DTG

XX

DUCT BANK

S

SS

SS

SS

S

S

S

SS

S

S

S

S

S

S

S

S

S

S

S

SS

S

S

S

S

S

S

S

S

SS

S S

SS

SS

S

S

S S S S

SS

S

S

S

S

S

NEW OR SALVAGED ELECTRICAL MANHOLE -

SEE DETAIL DWG E-18

NEW OR SALVAGED ELECTRICAL SPLICE CAN-

SEE DETAIL DWG E-18

W Y

W Y

WY

WY

SSS

S S

W W

W W

S S

S

S

S S S S S

SSSSS

S

S

S

S

S

S

S

S

S

SDSD

SD

SDSD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SDSDSD

TAXIWAY 'C'

TAXIWAY 'G'

TAXI

WAY

'D'

SOU

TH

TAXI

WAY

'A'

SOU

THTA

XIW

AY 'A

'N

OR

TH

TAXI

WAY

'D'

NO

RTH

RUNWAY 11-29 RUNWAY 11-29

TAXI

WAY

'J'

SOU

THTA

XIW

AY 'J

'N

OR

TH

TAXI

WAY

'M'

SOU

THTA

XIW

AY 'M

'N

OR

TH

TAXIWAY 'C'

TAXIWAY 'G'

TAXI

WAY

'F'

TAXI

WAY

'F'

RUNW

AY 5

-23

TAXIWAY 'A' NORTH REALIGNMENTFOR 90° INTERSECTION

TAXIWAY 'A' SOUTH REALIGNMENTFOR 90° INTERSECTION

TAXILANE REALIGNMENTTO MEET GRADE REQUIREMENTS

STORM DRAIN IMPROVEMENTS

STORM DRAIN IMPROVEMENTS

STORM DRAIN IMPROVEMENTS

UPDATE TAXIWAY GEOMETRY

UPDATE TAXIWAY GEOMETRY UPDATE TAXIWAY GEOMETRY

UPDATE TAXIWAYGEOMETRY

UPDATE TAXIWAY GEOMETRY

UPDATE TAXIWAY GEOMETRY

RUNWAY 11-29 RECONSTRUCTION

RUNWAY 11-29 MILL ANDOVERLAY TRANSITION

NEW RUNWAYLIGHTS AND SIGNS

SAFETY AREA GRADING IMPROVEMENTS SAFETY AREA GRADING IMPROVEMENTS

SAFETY AREA GRADING IMPROVEMENTS

STAGING AREA

CONTRACTOR FIELD OFFICE, CONTRACTORPROVIDED ENGINEER'S FIELD OFFICE.EXACT LOCATION TO BE COORDINATED WITHOWNER. SEE SPECIAL PROVISION SECTION 31.

CONTRACTOR PROJECTACCESS NORTH END. INSTALL

TEMPORARY 24' WIDE X 7'HIGH CHAIN LINK FENCE GATE.

SEE NOTE ABOVE.

CONTRACTORPROJECT

ACCESS SOUTHEND.

CONTRACTOREMPLOYEEPARKING

MILLINGSDISPOSAL AREA.

CONTRACTOR STAGING AREA.-ASPHALT PLANT LOCATION IF

REQUIRED FOR PROJECT.

WASTE EXCAVATION DISPOSALAREA.

HAUL ROUTE.NORTH SIDE OF

PROJECT TOSOUTH SIDE OF

PROJECT.

FAA RADAR FACILITY.

CONTRACTOR EMPLOYEEPARKING.

TEMPORARY CHAIN LINK FENCE INSTALLATIONNOTES:

1. SEE DETAIL DRAWING D-6 FOR FENCEINSTALLATION.

2. COORDINATE WITH OWNER FOR PADLOCK ANDKEY FOR TEMPORARY GATE.

3. A GATE GUARD MUST BE PRESENT AT THE GATEDURING INSTALLATION AT ANY TIME THERE ISAN OPENING IN THE FENCE.

2017COPYRIGHT © MORRISON-MAIERLE, INC.,

SHEET NUMBER

PROJECT NUMBER

DRAWING NUMBER

VERIFY SCALE!

THESE PRINTS MAY BEREDUCED. LINE BELOW

MEASURES ONE INCH ONORIGINAL DRAWING.

MODIFY SCALE ACCORDINGLY!

DATEDESCRIPTIONNO. BY

R:\2143\2143 AIP 40\054-RW 11-29 DESIGN\ACAD\SHEETS\2 PROJECT LAYOUT.DWG PLOTTED BY:CORY R. KESLER ON Jun/29/2017

REVISIONS DRAWN BY:

DSGN. BY:

APPR. BY:

DATE:

Q.C. REVIEW

DATE:BY:

1 Engineering PlaceHelena, MT 59602

Phone: 406.442.3050Fax: 406.442.7862

engineers surveyors planners scientists

MorrisonMaierleREDMOND MUNICIPAL AIRPORT-ROBERTS FIELD

RUNWAY 11-29 PAVEMENT REHABILITATIONAIP 3-41-0052-42-2016

2143.054

REDMOND OREGON

PROJECT LAYOUT

2

G-2

AJG

CRK

TFO

6-28-2017

FINAL6-28-2017

TFO6-19-2017

LEGENDASPHALT PAVEMENTRECONSTRUCTION

MILL AND OVERLAY ORREGRADE AND PAVE

SAFETY AREA GRADING

NEW STORM DRAIN - PIPE

SCALE IN

0300 300 600150

FEET

SD SD

NOTES:

1. REFER TO THE CONSTRUCTION SAFETY AND PHASING PLAN AS IT PROVIDES DETAILEDINFORMATION ON THE SITE ACCESS, SECURITY, AND PHASING FOR THE PROJECT.

2. ALL ASPHALT MILLINGS FOR GENERATED FROM THE PROJECT SHALL REMAINPROPERTY OF THE OWNER AS DISPOSED OF AT THE DESIGNATED LOCATION. MILLINGSFROM THE NORTH SIDE OF THE PROJECTS MAY BE TEMPORARILY STOCKPILED THENMOVED TO THE FINAL STOCKPILE LOCATION. SEE TECHNICAL SPECIFICATION FORFURTHER INFORMATION.

3. A LOCATION FOR AN ON-SITE ASPHALT PLANT HAS BEEN DESIGNATED ON THECONSTRUCTION DRAWINGS FOR THE CONTRACTORS USE. THE CONTRACTOR ISREQUIRED TO OBTAIN ALL REQUIRED PERMITTING FOR THE ONSITE ASPHALT PLANT.THE CONTRACTOR SHALL PROVIDE MAXIMUM EQUIPMENT HEIGHTS ANTICIPATEDWITHIN THE DESIGNATED AREA.

4. IF ON SITE CRUSHING OF MATERIAL IS PROPOSED FOR THE PROJECT, THECONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITTING FOR THEIR OPERATIONS.

5. A WASTE EXCAVATION SITE HAS BEEN LOCATED ON THE DRAWINGS. THE WASTEEXCAVATION SITE SHALL BE GRADED SMOOTH AT THE COMPLETION OF CONSTRUCTIONAND GRADED TO DRAIN.

6. THE CONTRACTOR IS ALERTED THAT GATE GUARDS MAY BE REQUIREDSIMULTANEOUSLY AT MULTIPLE GATE LOCATIONS DURING CONSTRUCTION.

7. CONTRACTOR TO PROVIDE FIELD OFFICE FOR ENGINEER. MUST BE SEPARATE FROMCONTRACTOR'S FIELD OFFICE. PROVIDE MINIMUM 8' X 20' FIELD OFFICE WITH POWER,HEAT, AC, DESK, OFFICE CHAIR, TABLE, AND SANITARY FACILITIES. SEE SPECIALPROVISIONS SECTION 31.

SDSD

SD

SDSD

SD

SD

SD

SD

SD

2W

2W

SD

SD

SD

SD

SD

SD

SDSDSD

SDSD

SD

SDSD

SD

SD

SD

SD

SD

2W

2W

SD

SD

SD

SD

SD

SD

SDSDSD

SDSD

SD

SDSD

SD

SD

SD

SD

SD

2W

2W

SD

SD

SD

SD

SD

SD

SDSDSD

PHASE 6

PHASE 5

PHASE 1

FOREST SERVICE AIRTANKER BASE

CONTRACTOR STAGINGAREA 'A'PHASE 1-5.

PHASE 3

PHASE 4

PHASE 2

INSTALL TEMPORARY GATEFOR CONSTRUCTION ACCESS

PHASE 1-5 ACCESS

CONTRACTOR STAGINGAREA 'B'

PHASE 6.

EXISTING GATE F-2.PHASE 6 ACCESS

TAXIWAY 'D'

TAXI

WAY

'F'

RUNW

AY 5

-23

TAXIWAY 'C'

RUNWAY 11-29 RUNWAY 11-29

TAXIWAY 'G'TAXIWAY 'G'

TAXIWAY 'C'

RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA

RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA

RSA

RSA

RSA

RSA

RSA

RSA

RSA

RSA

RSA

RSA

RSA

RSA

RSA

RSA

RSA

RSA

RSA

RSA

RSA

RSA

RSA

RSA

RSA

EMPLOYEE PARKINGPHASE 1-5.

EMPLOYEE PARKINGPHASE 6

MILLING STOCKPILE AREA.ALL PHASES

WASTE EXCAVATION AREA.ALL PHASES

FOREST SERVICEJUMPER BASE

TW 'J

' NO

RTH

TW 'J

' SO

UTH

TW 'M

' NO

RTH

TW 'M

' SO

UTH

TW 'D

' NO

RTH

TW 'A

' NO

RTH

TW 'A

' SO

UTH

TW 'D

' SO

UTH

TAXIWAY 'N'

HANGAR AREA

FBO AREA

FBO AREA ANDGENERAL AVIATIONAREA.

2017COPYRIGHT © MORRISON-MAIERLE, INC.,

SHEET NUMBER

PROJECT NUMBER

DRAWING NUMBER

VERIFY SCALE!

THESE PRINTS MAY BEREDUCED. LINE BELOW

MEASURES ONE INCH ONORIGINAL DRAWING.

MODIFY SCALE ACCORDINGLY!

DATEDESCRIPTIONNO. BY

R:\2143\2143 AIP 40\054-RW 11-29 DESIGN\ACAD\SHEETS\5 CONSTRUCTION SAFETY AND PHASING PLAN (CSPP) OVERVIEW.DWG PLOTTED BY:CORY R. KESLER ONJun/29/2017

REVISIONS DRAWN BY:

DSGN. BY:

APPR. BY:

DATE:

Q.C. REVIEW

DATE:BY:

1 Engineering PlaceHelena, MT 59602

Phone: 406.442.3050Fax: 406.442.7862

engineers surveyors planners scientists

MorrisonMaierleREDMOND MUNICIPAL AIRPORT-ROBERTS FIELD

RUNWAY 11-29 PAVEMENT REHABILITATIONAIP 3-41-0052-42-2016

2143.054

REDMOND OREGON

CONSTRUCTION SAFETY ANDPHASING PLAN (CSPP) OVERVIEW

5

CP-2

AJG

CRK

TFO

6-28-2017

FINAL6-28-2017

TFO6-19-2017

      

      

      

      

SCALE IN

0100 100 20050

FEET

LEGEND

PHASE 1

PHASE 2

PHASE 3

PHASE 4

PHASE 5

PHASE 6

GENERAL NOTES:

1. THE CONTRACTOR IS ALERTED THAT OTHERCONSTRUCTION PROJECTS AT THE AIRPORT MAY BEONGOING DURING THE CONSTRUCTION OF THERUNWAY 11-29 PROJECT.

2. THE SEQUENCE OF THE CONSTRUCTION PHASES ISBASED THE ANTICIPATED SEQUENCE OFCONSTRUCTION AS IT RELATES TO OTHERCONSTRUCTION ACTIVITIES AT THE AIRPORT.

3. THE SEQUENCE OF THE CONSTRUCTION PHASES FORTHE PROJECT MAY BE ALTERED AT THE OWNER'SDISCRETION TO MINIMIZE IMPACTS TO AIRPORT USERSAND TO MINIMIZE CONSTRUCTION IMPACTS TO THEAIRPORT. THERE SHALL BE NO ADDITIONAL COST TOTHE OWNER FOR CHANGES IN SEQUENCE OF THEPHASES OF CONSTRUCTION.

PHASE 1 NOTES:

1. THE PHASE 1 CONSTRUCTION AREA IS DELINEATED TOMINIMIZE THE CLOSURE TIME OF TAXIWAY 'C' ANDTAXIWAY 'G'.

PHASE 3 NOTES:

1. THE PHASE 3 CONSTRUCTION IS DELINEATED TOPROVIDE FOR CONSTRUCTION AT THE INTERSECTIONOF TAXIWAY 'C' AND TAXIWAY 'D' NORTH.

2. TAXIWAY 'A' SHALL BE COMPLETED TO THE EXTENTTHAT IS IS AVAILABLE FOR TAXI OPERATIONS PRIOR TOSTARTING WORK IN PHASE 3.

3. PHASE 1 PAVING ON TAXIWAY 'D' NORTH MAY BECOMPLETED CONCURRENTLY WITH THE PHASE 3WORK. PHASE 6 NOTES:

1. THE PHASE 6 WORK MAY OCCUR CONCURRENTLY WITHTHE PHASE 1-5 WORK. HOWEVER, WORK ON PHASE 6SHALL NOT IMPACT DURATION OF CONSTRUCTION ONPHASE 1-5.

PHASE 4 NOTES:

1. THE PHASE 4 CONSTRUCTION IS DELINEATED TOPROVIDE FOR CONSTRUCTION AT THE INTERSECTIONOF TAXIWAY 'G' AND TAXIWAY 'D' SOUTH.

2. PHASE 2 SHALL BE COMPLETED PRIOR TO PHASE 4CONSTRUCTION OPERATIONS.

3. TAXIWAY 'A' SHALL BE COMPLETED TO THE EXTENTTHAT IS IS AVAILABLE FOR TAXI OPERATIONS PRIOR TOSTARTING WORK IN PHASE 4.

3. PHASE 1 PAVING ON TAXIWAY 'D' SOUTH MAY BECOMPLETED CONCURRENTLY WITH THE PHASE 4WORK.

PHASE 2 NOTES:

1. THE PHASE 2 CONSTRUCTION IS DELINEATED TOPROVIDE FOR CONSTRUCTION AT THE INTERSECTIONOF THE TAXILANE AND THE ADJACENT HANGAR AREA

2. PHASE 2 WORK WILL ELIMINATE AIRFIELD ACCESS TOSOME HANGAR OWNERS. THE DURATION OF THECLOSURE SHALL BE KEPT TO A MINIMUM.

3. WORK ON PHASE 2 SHALL TAKE PRECEDENT OVERWORK ON ALL OTHER PHASES. PHASE 5 NOTES:

1. THE PHASE 5 CONSTRUCTION IS DELINEATED TOPROVIDE FOR CONSTRUCTION AT THE INTERSECTIONOF THE RUNWAY 11-29 AND TAXIWAY 'F'. THE WORK INTHE PHASE 5 AREA IS MARKING AND SIGN RELOCATIONWORK.

2. THE DURATION OF THE CLOSURE SHALL BE KEPT TO AMINIMUM.

PHASE DURATIONS

PHASE 1 175 DAYS TOTALPHASE 2 30 DAYS TOTAL, CONCURRENT

WITH PHASE 1PHASE 3 14 DAYS TOTAL CONCURRENT

WITH PHASE 1PHASE 4 14 DAYS TOTAL CONCURRENT

WITH PHASE 1PHASE 5 3 DAYS TOTAL, CONCURRENT

WITH PHASE 1PHASE 6 230 DAYS CONCURRENT WITH ALL

OTHER PHASES

ANTICIPATED CONSTRUCTION SEQUENCING

CONSTRUCTION PHASE WORK TO BE PERFORMED

PHASE 3 ASPHALT MILLING AND OTHERREMOVALS WITHIN TAXIWAY 'C'

OBJECT FREE AREAPHASE 4 ASPHALT MILLING AND OTHER

REMOVALS WITHIN TAXIWAY 'G'OBJECT FREE AREA

PHASE 1 REMOVALS AND ALL WORK UP TOTHE TOP OF BASE COURSE

PHASE 2 ALL WORK

PHASE 1 ASPHALT PAVING, MARKING, ANDFINISH GRADING, OPEN TAXIWAY

'A' FOR OTHER PHASESPHASE 3 EARTHWORK, PAVEMENT

SECTION CONSTRUCTION, EDGEDRAIN, ELECTRICAL, MARKING

AND FINISH GRADINGPHASE 4 EARTHWORK, PAVEMENT

SECTION CONSTRUCTION, EDGEDRAIN, ELECTRICAL, MARKING

AND FINISH GRADINGPHASE 5 MARKING AND ELECTRICAL

PHASE 1 COMPLETE REMAINING ITEMS

PHASE 6 SEE PHASE 6 NOTES.

SDSD

SD

SDSD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SDSD

SDSD

SD

SDSD

SD

SDSD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SDSD

SDSD

SD

>> >> >>

>>>>

>> >> >> >> >> >> >>

>>

>> >>

>> >> >> >> >> >> >>

>> >> >>

>>

>>>>

>> >> >>

>>

>>>>

>> >>

TAXIWAY 'D'

TAXI

WAY

'F'

RUNW

AY 5

-23

TAXIWAY 'C'

RUNWAY 11-29

TAXI

WAY

'D'

NO

RTH

TAXI

WAY

'A'

NO

RTH

TAXI

WAY

'A'

SOU

TH

RUNWAY 11-29

TAXIWAY 'G'

TAXI

WAY

'D'

SOU

TH

STAGING AREA PHASE 1

93.0

0'

93.00'

93.0

0'

59.0

0'59

.00'

59.00'

250.00'

250.00'

250.00'

LOW PROFILELIGHTED BARRICADES

LOW PROFILELIGHTED BARRICADES

LOW PROFILELIGHTED BARRICADES

LOW PROFILELIGHTED BARRICADES

TAXIWAY 'C'

TAXIWAY 'G'

DEACTIVATE LIGHTSON TAXIWAY 'C'SOUTH OF RUNWAY5-23.

DEACTIVATE LIGHTSON TAXIWAY 'G'SOUTH OF RUNWAY5-23.

DEACTIVATE LIGHTSON TAXIWAY 'C & A' INCLOSED AREA.

DEACTIVATE LIGHTSON TAXIWAY ''A' INCLOSED AREA. DEACTIVATE LIGHTS

ON TAXIWAY 'D INCLOSED AREA.

SIGN COVER. TYP.

LOW PROFILELIGHTED BARRICADES

LOW PROFILELIGHTED BARRICADES

LOW PROFILELIGHTED BARRICADES

LOW PROFILELIGHTED BARRICADES

LIGHTED RUNWAYCLOSURE 'X'

PLACE ON RUNWAY29 NUMBERS.

LIGHTED RUNWAYCLOSURE 'X'

PLACE ON RUNWAY 11NUMBERS.

AIRCRAFT TAXI ROUTE.COORDINGATE WITH AIRPORT TOBLOCK OFF AIRCRAFT PARKINGAREAS WITHIN 93' OF TAXI ROUTE.

PHASE 1A AREA. SEENOTES.

GATE ACCESS PHASE 1

EMPLOYEE PARKING PHASE 1

2017COPYRIGHT © MORRISON-MAIERLE, INC.,

SHEET NUMBER

PROJECT NUMBER

DRAWING NUMBER

VERIFY SCALE!

THESE PRINTS MAY BEREDUCED. LINE BELOW

MEASURES ONE INCH ONORIGINAL DRAWING.

MODIFY SCALE ACCORDINGLY!

DATEDESCRIPTIONNO. BY

R:\2143\2143 AIP 40\054-RW 11-29 DESIGN\ACAD\SHEETS\6 CONSTRUCTION SAFETY AND PHASING PLAN (CSPP) PHASE 1.DWG PLOTTED BY:CORY R. KESLER ON Jun/29/2017

REVISIONS DRAWN BY:

DSGN. BY:

APPR. BY:

DATE:

Q.C. REVIEW

DATE:BY:

1 Engineering PlaceHelena, MT 59602

Phone: 406.442.3050Fax: 406.442.7862

engineers surveyors planners scientists

MorrisonMaierleREDMOND MUNICIPAL AIRPORT-ROBERTS FIELD

RUNWAY 11-29 PAVEMENT REHABILITATIONAIP 3-41-0052-42-2016

2143.054

REDMOND OREGONCONSTRUCTION

SAFETY AND PHASINGPLAN (CSPP) PHASE 1

6

CP-3

AJG

CRK

TFO

6-28-2017

FINAL6-28-2017

TFO6-19-2017

      

      

      

      

SCALE IN

0200 200 400100

FEET

NOTES FOR COVERING OR DEACTIVATING LIGHTS.1. LIGHTS ON CLOSED PORTIONS OF PAVEMENT SHALL BE COVERED OR

DEACTIVATED DURING CONSTRUCTION. THE CONTRACTOR MAY CHOOSE FROMTHE OPTIONS BELOW TO MEET THIS REQUIREMENT.

1.1. DISCONNECT THE PORTION OF THE ELECTRICAL CIRCUIT THE LIGHTS ARELOCATED ON. REMAINING PORTIONS OF THE AIRFIELD SHALL REMAINOPERATIONAL.

1.2. DISCONNECT THE LIGHT FIXTURE TRANSFORMER FROM THE ELECTRICALCIRCUIT. CONTRACTOR SHALL ALSO FLAG THE LIGHTS TO INDICATE THATTHERE IS AN ACTIVE CIRCUIT IN THE CAN.

1.3. COVER THE LIGHT FIXTURE WITH A SECTION OF PVC PIPE TO PREVENT LIGHTFROM BEING EMITTED FROM THE FIXTURE.

2. SHORT TERM CLOSURES THAT ARE NOT OVERNIGHT WILL NOT REQUIRE LIGHTDEACTIVATION OR COVERS.

NOTES FOR COVERING SIGNS1. SIGNS LEADING TO CLOSED PORTIONS OF PAVEMENT SHALL BE

COVERED. THIS CAN BE ACCOMPLISHED BY ONE OR ACOMBINATION OF THE FOLLOWING METHODS.

1.1. COVER SIGN WITH BLACK CANVAS, WITH STRAPS TO SECURETHE COVER TO THE SIGN.

1.2. REPLACE THE PANELS WITH BLANK SIGN PANELS.

1.3. REMOVE THE SIGN FROM THE CONCRETE FOUNDATION.

2. SIGNS DESIGNATED FOR REMOVAL ON THE PROJECT SHALL BECOVERED UNTIL THEY ARE REMOVED.

3. SHORT TERM CLOSURES THAT ARE NOT OVERNIGHT WILL NOTREQUIRE SIGN COVERS.

LEGEND

PHASE 1 CONSTRUCTION AREA

PHASE 1A CONSTRUCTION AREA

OTHER ALLOWABLE AREAS OF WORK

LOW PROFILE BARRICADES

CONSTRUCTION BOUNDARY FENCE

AIRCRAFT TAXIROUTE

CONSTRUCTION HAUL ROUTE

FULL OR PARTIAL SIGN COVERS

>>

PHASE 1

1. PHASE 1 WORK AREA REQUIRES CLOSURE OF THEFOLLOWING PAVEMENT AREAS: RUNWAY 11-29, PORTIONSOF TAXIWAY'S 'C' AND 'G', TAXIWAY 'A', TAXIWAY 'D'.CLOSURE ACCOMPLISHED WITH NOTAM, BARRICADES, SIGNCOVERS, AND DEACTIVATED LIGHTS TO CLOSED PAVEMENTAREAS AS INDICATED.

2. WITHIN PHASE 1 THERE ARE REQUIRED PORTIONS OF WORKTO BE COMPLETED PRIOR TO STARTING OTHER PHASES OFWORK. SEE PHASE 1A NOTES.

3. THE PHASE 1 AREA MAY BE CONSTRUCTEDSIMULTANEOUSLY WITH THE PHASE 2-5 AREAS , HOWEVERCONSTRUCTION EFFORTS IN PHASE 2-5 WORK AREA SHALLTAKE PRECEDENT TO MINIMIZE THE DURATION OF THECLOSURES REQUIRED FOR TAXIWAYS ADJACENT TO PHASE 1WORK AREA.

4. THE CONTRACTOR IS ALERTED THAT TEMPORARYELECTRICAL CIRCUITS MAY BE REQUIRED FOR PORTIONS OFTHE WORK. THE REQUIRED TEMPORARY CIRCUITS ARE NOTSHOWN. THE CONTRACTOR IS ALERTED TO REVIEW THE THEELECTRICAL CIRCUITS FOR ROUTING OF TEMPORARYCIRCUITS. TEMPORARY CIRCUITS ARE INCIDENTAL TOOTHER BID ITEMS.

5. TEMPORARY SHORT TERM CLOSURE OF TAXIWAY 'C' & 'G'ARE PERMITTED DURING PHASE 1 TO ALLOW FOR THEREQUIRED MILLING OPERATIONS FOR PHASE 3 & 4 .HOWEVER, THE SEQUENCE OF THE MILLING OPERATIONSHALL ALLOW AIRCRAFT ACCESS TO APRON PARKINGAREAS AT ALL TIMES. CLOSURE SHALL NOT BESIMULTANEOUS AND PAVEMENT SHALL BE USABLE ON FORAIRCRAFT ON TAXIWAY 'A' .

PHASE 1A NOTES

1. THE WORK IN THE PHASE 1A AREA IS REQUIRED TO BECOMPLETED TO THE EXTENT THAT IT IS AVAILABLE FORTAXIING AIRCRAFT PRIOR TO STARTING WORK ON THEPHASE 3 AND PHASE 4 WORK. THIS AREA IS REQUIRED FORAIRCRAFT TAXIING DURING PHASE 3 AND PHASE 4.

2. THE LEVEL OF COMPLETION ON THE PHASE 1A WORK ISDEPENDENT ON THE CONTRACTORS PROPOSED CLOSURESFOR THE PHASE 3 & 4 WORK.

3. IF THE CONTRACTOR ELECTS DAYTIME ONLY CLOSURESFOR THE PHASE 3 & 4 WORK THEN THE FOLLOWING ISREQUIRED TO BE COMPLETED IN THE PHASE 1A AREA:

· All PAVING COMPLETED· CENTERLINE MARKINGS PLACED· ALL SIGNS INSTALLED, BUT NOT LIGHTED.· GRADES WITHIN THE SAFETY AREA CONFORM TO THE

TYPICAL SECTION·· TOP DRESSING NOT REQUIRED PROVIDED THERE

ARE NO LIPS OVER 3 ".· NO TRENCHES OR DROPS OVER 3" WITHIN THE SAFETY

AREA

4. IF THE CONTRACTOR ELECTS DAYTIME AND NIGHTIMECLOSURES PHASE 3 & 4 WORK THEN THE FOLLOWING ISREQUIRED TO BE COMPLETED IN THE PHASE 1A AREA:

· All PAVING COMPLETED· GRADES WITHIN THE SAFETY AREA CONFORM TO THE

TYPICAL SECTION·· TOP DRESSING NOT REQUIRED PROVIDED THERE

ARE NO LIPS OVER 3 ".· NO TRENCHES OR DROPS OVER 3" WITHIN THE SAFETY

AREA· TAXIWAY CENTERLINE MARKING COMPLETED· TAXIWAY EDGE LIGHTS COMPLETED.· AIRFIELD SIGNS COMPLETED.

ckesler
Text Box
February 26th to August 13th

SDSD

SD

SDSD

SD

SD

SD

2W2W

2W

SD

SD

SD

SD

SD

SD

SDSD

SDSD

SD

SDSD

SD

SDSD

SD

SD

SD

2W2W

2W

SD

SD

SD

SD

SD

SD

SDSD

SDSD

SD

>>

>> >>

>>

>>

CONTRACTOR ACCESS PHASE 2

NEW TAXIWAY 'D'

TAXI

WAY

'F'

RUNW

AY 5

-23

TAXIWAY 'C'

RUNWAY 11-29

TAXI

WAY

'D'

NO

RTH

TAXI

WAY

'A'

NO

RTH

TAXI

WAY

'A'

SOU

TH

RUNWAY 11-29

TAXIWAY 'G'

TAXI

WAY

'D'

SOU

TH

STAGING AREA PHASE 2

93.0

0'

93.00'

93.0

0'

93'

59.0

0'59

.00'

59.00'

250.00'

250.00'

250.00'

LOW PROFILELIGHTED BARRICADES

LOW PROFILELIGHTED BARRICADES

LOW PROFILELIGHTED BARRICADES

LOW PROFILELIGHTED BARRICADES

TAXIWAY 'C'

TAXIWAY 'G'

DEACTIVATE LIGHTSON TAXIWAY 'C'SOUTH OF RUNWAY5-23.

DEACTIVATE LIGHTSON TAXIWAY 'G'SOUTH OF RUNWAY5-23.

DEACTIVATE LIGHTSON TAXIWAY 'C & A' INCLOSED AREA.

DEACTIVATE LIGHTSON TAXIWAY 'G & 'A' &TAXILANE IN CLOSEDAREA.

DEACTIVATE LIGHTSON TAXIWAY 'D INCLOSED AREA.

SIGN COVER. TYP.

LOW PROFILELIGHTED BARRICADES

LOW PROFILELIGHTED BARRICADES

LOW PROFILELIGHTED BARRICADES

LOW PROFILELIGHTED BARRICADES

LOW PROFILELIGHTED BARRICADESLOW PROFILE

LIGHTED BARRICADES

LIGHTED RUNWAYCLOSURE 'X'

PLACE ON RUNWAY29 NUMBERS.

LIGHTED RUNWAYCLOSURE 'X'

PLACE ON RUNWAY 11NUMBERS.

HANGAR AREACLOSED.

>> >> >> >> >> >>

AIRCRAFT TAXI ROUTE.COORDINGATE WITH AIRPORT TOBLOCK OFF AIRCRAFT PARKINGAREAS WITHIN 93' OF TAXI ROUTE.

>> >> >>

>>

>>>>

>> >>

>> >> >> >> >> >>

2017COPYRIGHT © MORRISON-MAIERLE, INC.,

SHEET NUMBER

PROJECT NUMBER

DRAWING NUMBER

VERIFY SCALE!

THESE PRINTS MAY BEREDUCED. LINE BELOW

MEASURES ONE INCH ONORIGINAL DRAWING.

MODIFY SCALE ACCORDINGLY!

DATEDESCRIPTIONNO. BY

R:\2143\2143 AIP 40\054-RW 11-29 DESIGN\ACAD\SHEETS\7 CONSTRUCTION SAFETY AND PHASING PLAN (CSPP) PHASE 2.DWG PLOTTED BY:CORY R. KESLER ON Jun/29/2017

REVISIONS DRAWN BY:

DSGN. BY:

APPR. BY:

DATE:

Q.C. REVIEW

DATE:BY:

1 Engineering PlaceHelena, MT 59602

Phone: 406.442.3050Fax: 406.442.7862

engineers surveyors planners scientists

MorrisonMaierleREDMOND MUNICIPAL AIRPORT-ROBERTS FIELD

RUNWAY 11-29 PAVEMENT REHABILITATIONAIP 3-41-0052-42-2016

2143.054

REDMOND OREGONCONSTRUCTION

SAFETY AND PHASINGPLAN (CSPP) PHASE 2

7

CP-4

AJG

CRK

TFO

6-28-2017

FINAL6-28-2017

TFO6-19-2017

      

      

      

      

SCALE IN

0200 200 400100

FEET

NOTES FOR COVERING OR DEACTIVATING LIGHTS.1. LIGHTS ON CLOSED PORTIONS OF PAVEMENT SHALL BE COVERED OR

DEACTIVATED DURING CONSTRUCTION. THE CONTRACTOR MAY CHOOSE FROMTHE OPTIONS BELOW TO MEET THIS REQUIREMENT.

1.1. DISCONNECT THE PORTION OF THE ELECTRICAL CIRCUIT THE LIGHTS ARELOCATED ON. REMAINING PORTIONS OF THE AIRFIELD SHALL REMAINOPERATIONAL.

1.2. DISCONNECT THE LIGHT FIXTURE TRANSFORMER FROM THE ELECTRICALCIRCUIT. CONTRACTOR SHALL ALSO FLAG THE LIGHTS TO INDICATE THATTHERE IS AN ACTIVE CIRCUIT IN THE CAN.

1.3. COVER THE LIGHT FIXTURE WITH A SECTION OF PVC PIPE TO PREVENT LIGHTFROM BEING EMITTED FROM THE FIXTURE.

2. SHORT TERM CLOSURES THAT ARE NOT OVERNIGHT WILL NOT REQUIRE LIGHTDEACTIVATION OR COVERS.

NOTES FOR COVERING SIGNS1. SIGNS LEADING TO CLOSED PORTIONS OF PAVEMENT SHALL BE

COVERED. THIS CAN BE ACCOMPLISHED BY ONE OR ACOMBINATION OF THE FOLLOWING METHODS.

1.1. COVER SIGN WITH BLACK CANVAS, WITH STRAPS TO SECURETHE COVER TO THE SIGN.

1.2. REPLACE THE PANELS WITH BLANK SIGN PANELS.

1.3. REMOVE THE SIGN FROM THE CONCRETE FOUNDATION.

2. SIGNS DESIGNATED FOR REMOVAL ON THE PROJECT SHALL BECOVERED UNTIL THEY ARE REMOVED.

3. SHORT TERM CLOSURES THAT ARE NOT OVERNIGHT WILL NOTREQUIRE SIGN COVERS.

LEGEND

PHASE 2 CONSTRUCTION AREA

OTHER ALLOWABLE AREAS OF WORK

LOW PROFILE BARRICADES

CONSTRUCTION BOUNDARY FENCE

AIRCRAFT TAXIROUTE

CONSTRUCTION HAUL ROUTE

FULL OR PARTIAL SIGN COVERS

>>

PHASE 2 REQUIREMENTS.

1. COORDINATE WITH THE AIRPORT TO NOTIFY HANGAR OWNERS OF CLOSURE OF ACCESS 30 DAYS INADVANCE OF CLOSURE.

2. PHASE 2 WORK AREA REQUIRES CLOSURE OF THE FOLLOWING PAVEMENT AREAS: RUNWAY 11/29,PORTIONS OF TAXIWAY 'C', TAXIWAY 'G', TAXIWAY 'D', AND THE TAXILANE TO THE HANGARS. CLOSUREACCOMPLISHED WITH NOTAM, BARRICADES, SIGN COVERS, AND DEACTIVATED LIGHTS TO CLOSEDPAVEMENT AREAS AS INDICATED.

3. THE PHASE 2 AREA MAY BE CONSTRUCTED SIMULTANEOUSLY WITH THE PHASE 1 AREA WITHIN THEINDICATED CONSTRUCTION BOUNDARY, HOWEVER CONSTRUCTION EFFORTS IN PHASE 2 WORK AREASHALL TAKE PRECEDENT TO MINIMIZE THE DURATION OF THE CLOSURES REQUIRED.

4. THE START OF THE PHASE 2 CONSTRUCTION SHALL BE COORDINATED WITH THE PHASE 1CONSTRUCTION TO ALLOW FOR PAVING OPERATIONS ON PHASE 1 AND 2 TO OCCUR SEQUENTIALLY.

5. THE CONTRACTOR IS ALERTED THAT TEMPORARY ELECTRICAL CIRCUITS MAY BE REQUIRED FORPORTIONS OF THE WORK. THE REQUIRED TEMPORARY CIRCUITS ARE NOT SHOWN. THE CONTRACTORIS ALERTED TO REVIEW THE THE ELECTRICAL CIRCUITS FOR ROUTING OF TEMPORARY CIRCUITS.TEMPORARY CIRCUITS ARE INCIDENTAL TO OTHER BID ITEMS.

ckesler
Text Box
April 2nd to April 24th

CONTRACTOR ACCESS PHASE 1

SDSD

SD

SDSD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SDSD

SDSD

SD

SDSD

SD

SDSD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SDSD

SDSD

SD

STAGING AREA PHASE 3

93.0

0'

93.00'

93.0

0'

59.0

0'59

.00'

59.00'

250.00'

250.00'

250.00'

LOW PROFILELIGHTED BARRICADES

LOW PROFILELIGHTED BARRICADES

LOW PROFILELIGHTED BARRICADES

LOW PROFILELIGHTED BARRICADES

DEACTIVATE LIGHTSON TAXIWAY 'C'SOUTH OF RUNWAY5-23.

DEACTIVATE LIGHTSON TAXIWAY 'G'SOUTH OF RUNWAY5-23.

DEACTIVATE LIGHTSON TAXIWAY 'D INCLOSED AREA.

SIGN COVER. TYP.

LOW PROFILELIGHTED BARRICADES

LOW PROFILELIGHTED BARRICADES

LOW PROFILELIGHTED BARRICADES

LIGHTED RUNWAYCLOSURE 'X'

PLACE ON RUNWAY29 NUMBERS.

LIGHTED RUNWAYCLOSURE 'X'PLACE ON RUNWAY 11NUMBERS.

LOW PROFILELIGHTED BARRICADES

>>>>>>>>>>>>>>>>

>>>>

>>>>

>>

>> >> >> >>

LOW PROFILELIGHTED BARRICADES

CONSTRUCTION TRAFFIC CROSSESACTIVE PAVEMENT AREA.CONTRACTOR TO PROVIDE RADIOGUARD TO CLEAR CONSTRUCTIONTRAFFIC ACROSS PAVEMENT.

CONSTRUCTION TRAFFIC TO HOLDSHORT AT CONSTRUCTION BOUNDARYON EACH SIDE FOR CLEARANCE FROMRADIO GUARD.

CONTRACTOR TO HAVE POWEREDBROOM TO CLEAN FOD OFF OFPAVEMENT ON A CONTINUOUS BASIS.

>>

>>>>

>>

TAXIWAY 'D'

TAXI

WAY

'F'

RUNW

AY 5

-23

TAXIWAY 'C'

RUNWAY 11-29

TAXI

WAY

'D'

NO

RTH

TAXI

WAY

'A'

NO

RTH

TAXI

WAY

'A'

SOU

TH

RUNWAY 11-29

TAXIWAY 'G'

TAXI

WAY

'D'

SOU

TH

TAXIWAY 'C'TAXIWAY 'C'

TAXIWAY 'G'

GATE ACCESS PHASE 1

EMPLOYEE PARKING PHASE 1

2017COPYRIGHT © MORRISON-MAIERLE, INC.,

SHEET NUMBER

PROJECT NUMBER

DRAWING NUMBER

VERIFY SCALE!

THESE PRINTS MAY BEREDUCED. LINE BELOW

MEASURES ONE INCH ONORIGINAL DRAWING.

MODIFY SCALE ACCORDINGLY!

DATEDESCRIPTIONNO. BY

R:\2143\2143 AIP 40\054-RW 11-29 DESIGN\ACAD\SHEETS\8 CONSTRUCTION SAFETY AND PHASING PLAN (CSPP) PHASE 3.DWG PLOTTED BY:CORY R. KESLER ON Jun/29/2017

REVISIONS DRAWN BY:

DSGN. BY:

APPR. BY:

DATE:

Q.C. REVIEW

DATE:BY:

1 Engineering PlaceHelena, MT 59602

Phone: 406.442.3050Fax: 406.442.7862

engineers surveyors planners scientists

MorrisonMaierleREDMOND MUNICIPAL AIRPORT-ROBERTS FIELD

RUNWAY 11-29 PAVEMENT REHABILITATIONAIP 3-41-0052-42-2016

2143.054

REDMOND OREGONCONSTRUCTION

SAFETY AND PHASINGPLAN (CSPP) PHASE 3

8

CP-5

AJG

CRK

TFO

6-28-2017

FINAL6-28-2017

TFO6-19-2017

      

      

      

      

SCALE IN

0200 200 400100

FEET

NOTES FOR COVERING OR DEACTIVATING LIGHTS.1. LIGHTS ON CLOSED PORTIONS OF PAVEMENT SHALL BE COVERED OR

DEACTIVATED DURING CONSTRUCTION. THE CONTRACTOR MAY CHOOSE FROMTHE OPTIONS BELOW TO MEET THIS REQUIREMENT.

1.1. DISCONNECT THE PORTION OF THE ELECTRICAL CIRCUIT THE LIGHTS ARELOCATED ON. REMAINING PORTIONS OF THE AIRFIELD SHALL REMAINOPERATIONAL.

1.2. DISCONNECT THE LIGHT FIXTURE TRANSFORMER FROM THE ELECTRICALCIRCUIT. CONTRACTOR SHALL ALSO FLAG THE LIGHTS TO INDICATE THATTHERE IS AN ACTIVE CIRCUIT IN THE CAN.

1.3. COVER THE LIGHT FIXTURE WITH A SECTION OF PVC PIPE TO PREVENT LIGHTFROM BEING EMITTED FROM THE FIXTURE.

2. SHORT TERM CLOSURES THAT ARE NOT OVERNIGHT WILL NOT REQUIRE LIGHTDEACTIVATION OR COVERS.

NOTES FOR COVERING SIGNS1. SIGNS LEADING TO CLOSED PORTIONS OF PAVEMENT SHALL BE

COVERED. THIS CAN BE ACCOMPLISHED BY ONE OR ACOMBINATION OF THE FOLLOWING METHODS.

1.1. COVER SIGN WITH BLACK CANVAS, WITH STRAPS TO SECURETHE COVER TO THE SIGN.

1.2. REPLACE THE PANELS WITH BLANK SIGN PANELS.

1.3. REMOVE THE SIGN FROM THE CONCRETE FOUNDATION.

2. SIGNS DESIGNATED FOR REMOVAL ON THE PROJECT SHALL BECOVERED UNTIL THEY ARE REMOVED.

3. SHORT TERM CLOSURES THAT ARE NOT OVERNIGHT WILL NOTREQUIRE SIGN COVERS.

LEGEND

PHASE 3 CONSTRUCTION AREA

OTHER ALLOWABLE AREAS OF WORK

LOW PROFILE BARRICADES

CONSTRUCTION BOUNDARY FENCE

AIRCRAFT TAXIROUTE

CONSTRUCTION HAUL ROUTE

FULL OR PARTIAL SIGN COVERS

>>

PHASE 3 ADDITIONAL REQUIREMENTS

1. PHASE 3 CLOSURE SHALL BE LIMITED TO DAYTIME ONLY TO COMPLETE THE WORK ADJACENT TOTAXIWAY 'C'.

2. TAXIWAY 'A' AND TAXIWAY 'G' SHALL BE AVAILABLE FOR TAXI OPERATIONS PRIOR TO CLOSING THEPHASE 3 AREA.

3. PHASE 2 SHALL BE COMPLETED PRIOR TO STARTING PHASE 3 CONSTRUCTION, WITH EXCEPTION OFTHE ALLOWABLE REMOVALS THAT MAY BE PERFORMED DURING THE PHASE 1 WORK.

4. PHASE 3 WORK AREA REQUIRES CLOSURE OF THE FOLLOWING PAVEMENT AREAS: RUNWAY 11-29,PORTIONS OF TAXIWAY 'C', AND TAXIWAY 'D' . CLOSURE ACCOMPLISHED WITH NOTAM, BARRICADES,SIGN COVERS, AND DEACTIVATED LIGHTS TO CLOSED PAVEMENT AREAS AS INDICATED.

5. THE PHASE 3 AREA MAY BE CONSTRUCTED SIMULTANEOUSLY WITH THE PHASE 1 AREA WITHIN THEINDICATED CONSTRUCTION BOUNDARY, HOWEVER CONSTRUCTION EFFORTS IN PHASE 3 WORK AREASHALL TAKE PRECEDENT TO MINIMIZE THE DURATION OF THE CLOSURES REQUIRED.

6. THE CONTRACTOR IS ALERTED THAT TEMPORARY ELECTRICAL CIRCUITS MAY BE REQUIRED FORPORTIONS OF THE WORK. THE REQUIRED TEMPORARY CIRCUITS ARE NOT SHOWN. THE CONTRACTORIS ALERTED TO REVIEW THE THE ELECTRICAL CIRCUITS FOR ROUTING OF TEMPORARY CIRCUITS.TEMPORARY CIRCUITS ARE INCIDENTAL TO OTHER BID ITEMS.

ckesler
Text Box
May 15th to May 25th

SDSD

SD

SDSD

SD

SD

SD

2W2W

2W

SD

SD

SD

SD

SD

SD

SDSD

SDSD

SD

SDSD

SD

SDSD

SD

SD

SD

2W2W

2W

SD

SD

SD

SD

SD

SD

SDSD

SDSD

SD

>>

>>>>

>>>>

>>

>> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >> >>

CONTRACTOR ACCESS PHASE 1

NEW TAXIWAY 'D'

TAXI

WAY

'F'

RUNW

AY 5

-23

TAXIWAY 'C'

RUNWAY 11-29

TAXI

WAY

'D'

NO

RTH

TAXI

WAY

'A'

NO

RTH

TAXI

WAY

'A'

SOU

TH

RUNWAY 11-29

TAXIWAY 'G'

TAXI

WAY

'D'

SOU

TH

TAXIWAY 'C'

STAGING AREA PHASE 1

93.0

0'

93.00'

93.0

0'

59.0

0'59

.00'

59.00'

250.00'

250.00'

250.00'

LOW PROFILELIGHTED BARRICADES

LOW PROFILELIGHTED BARRICADES

LOW PROFILELIGHTED BARRICADES

LOW PROFILELIGHTED BARRICADES

TAXIWAY 'C'

TAXIWAY 'G'

DEACTIVATE LIGHTSON TAXIWAY 'C'SOUTH OF RUNWAY5-23.

DEACTIVATE LIGHTSON TAXIWAY 'G'SOUTH OF RUNWAY5-23.

DEACTIVATE LIGHTSON TAXIWAY 'D INCLOSED AREA.

SIGN COVER. TYP.

LOW PROFILELIGHTED BARRICADES

LOW PROFILELIGHTED BARRICADES

LOW PROFILELIGHTED BARRICADES

LIGHTED RUNWAYCLOSURE 'X'

PLACE ON RUNWAY29 NUMBERS.

LIGHTED RUNWAYCLOSURE 'X'PLACE ON RUNWAY 11NUMBERS.

LOW PROFILELIGHTED BARRICADES

CONSTRUCTION TRAFFIC CROSSESACTIVE PAVEMENT AREA.

CONTRACTOR TO PROVIDE RADIOGUARD TO CLEAR CONSTRUCTION

TRAFFIC ACROSS PAVEMENT.

CONSTRUCTION TRAFFIC TO HOLDSHORT AT CONSTRUCTION BOUNDARYON EACH SIDE FOR CLEARANCE FROM

RADIO GUARD.

CONTRACTOR TO HAVE POWEREDBROOM TO CLEAN FOD OFF OF

PAVEMENT ON A CONTINUOUS BASIS.

LOW PROFILELIGHTED BARRICADES

>>>>

>>

2017COPYRIGHT © MORRISON-MAIERLE, INC.,

SHEET NUMBER

PROJECT NUMBER

DRAWING NUMBER

VERIFY SCALE!

THESE PRINTS MAY BEREDUCED. LINE BELOW

MEASURES ONE INCH ONORIGINAL DRAWING.

MODIFY SCALE ACCORDINGLY!

DATEDESCRIPTIONNO. BY

R:\2143\2143 AIP 40\054-RW 11-29 DESIGN\ACAD\SHEETS\9 CONSTRUCTION SAFETY AND PHASING PLAN (CSPP) PHASE 4.DWG PLOTTED BY:CORY R. KESLER ON Jun/29/2017

REVISIONS DRAWN BY:

DSGN. BY:

APPR. BY:

DATE:

Q.C. REVIEW

DATE:BY:

1 Engineering PlaceHelena, MT 59602

Phone: 406.442.3050Fax: 406.442.7862

engineers surveyors planners scientists

MorrisonMaierleREDMOND MUNICIPAL AIRPORT-ROBERTS FIELD

RUNWAY 11-29 PAVEMENT REHABILITATIONAIP 3-41-0052-42-2016

2143.054

REDMOND OREGONCONSTRUCTION

SAFETY AND PHASINGPLAN (CSPP) PHASE 4

9

CP-6

AJG

CRK

TFO

6-28-2017

FINAL6-28-2017

TFO6-19-2017

      

      

      

      

SCALE IN

0200 200 400100

FEET

NOTES FOR COVERING OR DEACTIVATING LIGHTS.1. LIGHTS ON CLOSED PORTIONS OF PAVEMENT SHALL BE COVERED OR

DEACTIVATED DURING CONSTRUCTION. THE CONTRACTOR MAY CHOOSE FROMTHE OPTIONS BELOW TO MEET THIS REQUIREMENT.

1.1. DISCONNECT THE PORTION OF THE ELECTRICAL CIRCUIT THE LIGHTS ARELOCATED ON. REMAINING PORTIONS OF THE AIRFIELD SHALL REMAINOPERATIONAL.

1.2. DISCONNECT THE LIGHT FIXTURE TRANSFORMER FROM THE ELECTRICALCIRCUIT. CONTRACTOR SHALL ALSO FLAG THE LIGHTS TO INDICATE THATTHERE IS AN ACTIVE CIRCUIT IN THE CAN.

1.3. COVER THE LIGHT FIXTURE WITH A SECTION OF PVC PIPE TO PREVENT LIGHTFROM BEING EMITTED FROM THE FIXTURE.

2. SHORT TERM CLOSURES THAT ARE NOT OVERNIGHT WILL NOT REQUIRE LIGHTDEACTIVATION OR COVERS.

NOTES FOR COVERING SIGNS1. SIGNS LEADING TO CLOSED PORTIONS OF PAVEMENT SHALL BE

COVERED. THIS CAN BE ACCOMPLISHED BY ONE OR ACOMBINATION OF THE FOLLOWING METHODS.

1.1. COVER SIGN WITH BLACK CANVAS, WITH STRAPS TO SECURETHE COVER TO THE SIGN.

1.2. REPLACE THE PANELS WITH BLANK SIGN PANELS.

1.3. REMOVE THE SIGN FROM THE CONCRETE FOUNDATION.

2. SIGNS DESIGNATED FOR REMOVAL ON THE PROJECT SHALL BECOVERED UNTIL THEY ARE REMOVED.

3. SHORT TERM CLOSURES THAT ARE NOT OVERNIGHT WILL NOTREQUIRE SIGN COVERS.

LEGEND

PHASE 4 CONSTRUCTION AREA

OTHER ALLOWABLE PHASES OF WORK

LOW PROFILE BARRICADES

CONSTRUCTION BOUNDARY FENCE

AIRCRAFT TAXIROUTE

CONSTRUCTION HAUL ROUTE

FULL OR PARTIAL SIGN COVERS

>>

PHASE 4 ADDITIONAL REQUIREMENTS

1. PHASE 4 CLOSURE SHALL BE LIMITED TO DAYTIME ONLY TO COMPLETE THE WORK ADJACENT TOTAXIWAY 'G'.

2. TAXIWAY 'A' AND TAXIWAY 'C' SHALL BE AVAILABLE FOR TAXI OPERATIONS PRIOR TO CLOSING THEPHASE 4 AREA.

3. PHASE 2 SHALL BE COMPLETED PRIOR TO PHASE 4 CONSTRUCTION OPERATIONS, WITH EXCEPTION OFTHE ALLOWABLE REMOVALS THAT MAY BE PERFORMED DURING THE PHASE 1 WORK.

4. PHASE 4 WORK AREA REQUIRES CLOSURE OF THE FOLLOWING PAVEMENT AREAS: RUNWAY 11/29,PORTIONS OF TAXIWAY 'G', TAXIWAY 'D', CLOSURE ACCOMPLISHED WITH NOTAM, BARRICADES, SIGNCOVERS, AND DEACTIVATED LIGHTS TO CLOSED PAVEMENT AREAS AS INDICATED.

5. THE PHASE 4 AREA MAY BE CONSTRUCTED SIMULTANEOUSLY WITH THE PHASE 1 AREA WITHIN THEINDICATED CONSTRUCTION BOUNDARY, HOWEVER CONSTRUCTION EFFORTS IN PHASE 4 WORK AREASHALL TAKE PRECEDENT TO MINIMIZE THE DURATION OF THE CLOSURES REQUIRED.

6. THE CONTRACTOR IS ALERTED THAT TEMPORARY ELECTRICAL CIRCUITS MAY BE REQUIRED FORPORTIONS OF THE WORK. THE REQUIRED TEMPORARY CIRCUITS ARE NOT SHOWN. THE CONTRACTORIS ALERTED TO REVIEW THE THE ELECTRICAL CIRCUITS FOR ROUTING OF TEMPORARY CIRCUITS.TEMPORARY CIRCUITS ARE INCIDENTAL TO OTHER BID ITEMS.

ckesler
Text Box
May 28th to June 11th

CONTRACTOR ACCESS PHASE 1

SDSD

SD

SDSD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SDSD

SDSD

SD

SDSD

SD

SDSD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SDSD

SDSD

SD

TAXIWAY 'D'

TAXI

WAY

'F'

RUNW

AY 5

-23

TAXIWAY 'C'

RUNWAY 11-29

TAXI

WAY

'D'

NO

RTH

TAXI

WAY

'A'

NO

RTH

TAXI

WAY

'A'

SOU

TH

RUNWAY 11-29

TAXIWAY 'G'

TAXI

WAY

'D'

SOU

TH

TAXIWAY 'C'

93.0

0'

93.0

0'

59.0

0'59

.00'

250.00'

250.00'

250.00'

LOW PROFILELIGHTED BARRICADES

LOW PROFILELIGHTED BARRICADES

LOW PROFILELIGHTED BARRICADES

LOW PROFILELIGHTED BARRICADES

TAXIWAY 'C'

TAXIWAY 'G'

DEACTIVATE LIGHTSON TAXIWAY 'C'SOUTH OF RUNWAY5-23.

DEACTIVATE LIGHTSON TAXIWAY 'G'SOUTH OF RUNWAY5-23.

DEACTIVATE LIGHTSON TAXIWAY 'D INCLOSED AREA.

SIGN COVER. TYP.

LOW PROFILELIGHTED BARRICADES

LOW PROFILELIGHTED BARRICADES

LIGHTED RUNWAYCLOSURE 'X'

PLACE ON RUNWAY29 NUMBERS.

LIGHTED RUNWAYCLOSURE 'X'

PLACE ON RUNWAY 11NUMBERS.

LOW PROFILELIGHTED BARRICADES

LOW PROFILELIGHTED BARRICADES

250.00'MIN.

59.0

0'

>>>>

>>

>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>

>>>>

>>>>

>>

>> >> >> >> >> >> >> >> >> >> >> >>

>>>>

>>

>>>>

>>>>

>>

SPECIAL OPERATIONS AREAS.SEE NOTES.

CONSTRUCTION TRAFFIC CROSSESACTIVE PAVEMENT AREA.

CONTRACTOR TO PROVIDE RADIOGUARD TO CLEAR CONSTRUCTION

TRAFFIC ACROSS PAVEMENT.

CONSTRUCTION TRAFFIC TO HOLDSHORT AT CONSTRUCTION BOUNDARYON EACH SIDE FOR CLEARANCE FROM

RADIO GUARD.

CONTRACTOR TO HAVE POWEREDBROOM TO CLEAN FOD OFF OF

PAVEMENT ON A CONTINUOUS BASIS.

SPECIALOPERATIONS AREAS.SEE NOTES.

SPECIALOPERATIONS AREAS.

SEE NOTES.

2017COPYRIGHT © MORRISON-MAIERLE, INC.,

SHEET NUMBER

PROJECT NUMBER

DRAWING NUMBER

VERIFY SCALE!

THESE PRINTS MAY BEREDUCED. LINE BELOW

MEASURES ONE INCH ONORIGINAL DRAWING.

MODIFY SCALE ACCORDINGLY!

DATEDESCRIPTIONNO. BY

R:\2143\2143 AIP 40\054-RW 11-29 DESIGN\ACAD\SHEETS\10 CONSTRUCTION SAFETY AND PHASING PLAN (CSPP) PHASE 5.DWG PLOTTED BY:CORY R. KESLER ON Jun/29/2017

REVISIONS DRAWN BY:

DSGN. BY:

APPR. BY:

DATE:

Q.C. REVIEW

DATE:BY:

1 Engineering PlaceHelena, MT 59602

Phone: 406.442.3050Fax: 406.442.7862

engineers surveyors planners scientists

MorrisonMaierleREDMOND MUNICIPAL AIRPORT-ROBERTS FIELD

RUNWAY 11-29 PAVEMENT REHABILITATIONAIP 3-41-0052-42-2016

2143.054

REDMOND OREGON

CONSTRUCTION SAFETY AND PHASING PLAN (CSPP)PHASE 5

10

CP-7

AJG

CRK

TFO

6-28-2017

FINAL6-28-2017

TFO6-19-2017

      

      

      

      

SCALE IN

0200 200 400100

FEET

NOTES FOR COVERING OR DEACTIVATING LIGHTS.1. LIGHTS ON CLOSED PORTIONS OF PAVEMENT SHALL BE COVERED OR

DEACTIVATED DURING CONSTRUCTION. THE CONTRACTOR MAY CHOOSE FROMTHE OPTIONS BELOW TO MEET THIS REQUIREMENT.

1.1. DISCONNECT THE PORTION OF THE ELECTRICAL CIRCUIT THE LIGHTS ARELOCATED ON. REMAINING PORTIONS OF THE AIRFIELD SHALL REMAINOPERATIONAL.

1.2. DISCONNECT THE LIGHT FIXTURE TRANSFORMER FROM THE ELECTRICALCIRCUIT. CONTRACTOR SHALL ALSO FLAG THE LIGHTS TO INDICATE THATTHERE IS AN ACTIVE CIRCUIT IN THE CAN.

1.3. COVER THE LIGHT FIXTURE WITH A SECTION OF PVC PIPE TO PREVENT LIGHTFROM BEING EMITTED FROM THE FIXTURE.

2. SHORT TERM CLOSURES THAT ARE NOT OVERNIGHT WILL NOT REQUIRE LIGHTDEACTIVATION OR COVERS.

NOTES FOR COVERING SIGNS1. SIGNS LEADING TO CLOSED PORTIONS OF PAVEMENT SHALL BE

COVERED. THIS CAN BE ACCOMPLISHED BY ONE OR ACOMBINATION OF THE FOLLOWING METHODS.

1.1. COVER SIGN WITH BLACK CANVAS, WITH STRAPS TO SECURETHE COVER TO THE SIGN.

1.2. REPLACE THE PANELS WITH BLANK SIGN PANELS.

1.3. REMOVE THE SIGN FROM THE CONCRETE FOUNDATION.

2. SIGNS DESIGNATED FOR REMOVAL ON THE PROJECT SHALL BECOVERED UNTIL THEY ARE REMOVED.

3. SHORT TERM CLOSURES THAT ARE NOT OVERNIGHT WILL NOTREQUIRE SIGN COVERS.

LEGEND

PHASE 5 CONSTRUCTION AREA

PHASE 5 SPECIAL OPERATIONS AREA

LOW PROFILE BARRICADES

CONSTRUCTION BOUNDARY FENCE

AIRCRAFT TAXIROUTE

CONSTRUCTION HAUL ROUTE

FULL OR PARTIAL SIGN COVERS

>>

PHASE 5 ADDITIONAL REQUIREMENTS

1. PHASE 5 CLOSURE SHALL BE LIMITED TO DAYTIME ONLY TO COMPLETE THE WORK ADJACENT TOTAXIWAY 'F'. THE WORK IN THIS AREA IS LIMITED TO TAXIWAY SIGN AND MARKING MODIFICATIONS.

2. TAXIWAY 'G' AND TAXIWAY 'C' SHALL BE AVAILABLE FOR TAXI OPERATIONS PRIOR TO CLOSING THEPHASE 5 AREA.

3. PHASE 5 WORK AREA REQUIRES CLOSURE OF THE FOLLOWING PAVEMENT AREAS: RUNWAY 11/29,PORTIONS OF TAXIWAY 'C', TAXIWAY 'G', TAXIWAY 'D', TAXIWAY 'F'. CLOSURE ACCOMPLISHED WITHNOTAM, BARRICADES, SIGN COVERS, AND DEACTIVATED LIGHTS TO CLOSED PAVEMENT AREAS ASINDICATED.

4. THE PHASE 5 AREA MAY BE CONSTRUCTED SIMULTANEOUSLY WITH THE PHASE 1 AREA WITHIN THEINDICATED CONSTRUCTION BOUNDARY, HOWEVER CONSTRUCTION EFFORTS IN PHASE 5 WORK AREASHALL TAKE PRECEDENT TO MINIMIZE THE DURATION OF THE CLOSURES REQUIRED.

5. THE CONTRACTOR IS ALERTED THAT TEMPORARY ELECTRICAL CIRCUITS MAY BE REQUIRED FORPORTIONS OF THE WORK. THE REQUIRED TEMPORARY CIRCUITS ARE NOT SHOWN. THE CONTRACTORIS ALERTED TO REVIEW THE THE ELECTRICAL CIRCUITS FOR ROUTING OF TEMPORARY CIRCUITS.TEMPORARY CIRCUITS ARE INCIDENTAL TO OTHER BID ITEMS.

6. PHASE 5 REQUIRES LIMITED PORTIONS OF WORK OUTSIDE OF THE DESIGNATED CONSTRUCTIONBOUNDARY. SEE NOTES FOR SPECIAL WORK AREAS.

PHASE 5 SPECIAL OPERATIONS AREA NOTES

1. THE PHASE 5 SPECIAL WORK AREAS ARE OUTSIDE OF THE DELINEATED CONSTRUCTION BOUNDARYFOR PHASE 5 AND REQUIRE OWNER ESCORT. THE REQUIRED WORK IN THESE AREAS AREMODIFICATIONS OR RE-STRIPING OF EXISTING PAINT MARKINGS.

2. THE PROPOSED WORK WILL REQUIRE CONSTRUCTION OPERATIONS WITHIN ACTIVE TAXIWAY OBJECTFREE AREAS. THE CONTRACTOR SHALL MOVE OUTSIDE OF THE TAXIWAY OBJECT FREE AREA WHENDIRECTED BY THE OWNER OR ENGINEER.

3. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER FOR A SCHEDULED TIME FORCONSTRUCTION IN THESE AREAS.

4. THE OWNER MAY REQUIRE ADDITIONAL BARRICADE PLACEMENT OVER WHAT IS SHOWN FOR WORK IN

THESE AREAS.

ckesler
Text Box
August 8th to August 10th

SDSD

SDSD

SDSD

SD

SD

SD

SD

SD

SD SD

SD

SDSD

SDSD

SDSD

SD

SD

SD

SD

SD

SD SD

SD

TAXIWAY 'D'

TAXI

WAY

'F'

RUNW

AY 5

-23

TAXIWAY 'C'

RUNWAY 11-29 RUNWAY 11-29

TAXIWAY 'G' TAXIWAY 'G'

TAXIWAY 'C'

STAGING AREA PHASE 6ASPHALT PLANT YARD

(OPTIONAL TOCONTRACTOR) - ALL

PHASES

59.00'

250.00'

250.00'

250.00'

LOW PROFILELIGHTED BARRICADES

LOW PROFILELIGHTED BARRICADES

LOW PROFILELIGHTED BARRICADES

DEACTIVATE LIGHTSON TAXIWAY 'C'SOUTH OF RUNWAY5-23.

DEACTIVATE LIGHTSON TAXIWAY 'G'SOUTH OF RUNWAY5-23.

SIGN COVER. TYP.

LOW PROFILELIGHTED BARRICADES

LIGHTED RUNWAYCLOSURE 'X'

PLACE ON RUNWAY29 NUMBERS.

LIGHTED RUNWAYCLOSURE 'X'

PLACE ON RUNWAY 11NUMBERS.

TAXI

WAY

'J'

NO

RTH

TAXI

WAY

'J'

SOU

TH

TAXI

WAY

'M'

NO

RTH

TAXI

WAY

'M'

SOU

TH

ACCESS AT GATE F-2

WASTE AREA FOR EXCESS EXCAVATION

MILLINGS WASTE AREA ALL PHASES.

PHASE 6A- SPECIALOPERATIONS AREAFOR STORM DRAINCONNECTION. SEENOTE.

PHASE 6B- SPECIAL OPERATIONSAREA FOR SIGNWORK. SEE NOTE.

PHASE 6B- SPECIAL OPERATIONSAREA FOR SIGNWORK. SEE NOTE.

2017COPYRIGHT © MORRISON-MAIERLE, INC.,

SHEET NUMBER

PROJECT NUMBER

DRAWING NUMBER

VERIFY SCALE!

THESE PRINTS MAY BEREDUCED. LINE BELOW

MEASURES ONE INCH ONORIGINAL DRAWING.

MODIFY SCALE ACCORDINGLY!

DATEDESCRIPTIONNO. BY

R:\2143\2143 AIP 40\054-RW 11-29 DESIGN\ACAD\SHEETS\11 CONSTRUCTION SAFETY AND PHASING PLAN (CSPP) PHASE 6.DWG PLOTTED BY:CORY R. KESLER ON Jun/29/2017

REVISIONS DRAWN BY:

DSGN. BY:

APPR. BY:

DATE:

Q.C. REVIEW

DATE:BY:

1 Engineering PlaceHelena, MT 59602

Phone: 406.442.3050Fax: 406.442.7862

engineers surveyors planners scientists

MorrisonMaierleREDMOND MUNICIPAL AIRPORT-ROBERTS FIELD

RUNWAY 11-29 PAVEMENT REHABILITATIONAIP 3-41-0052-42-2016

2143.054

REDMOND OREGONCONSTRUCTION

SAFETY AND PHASINGPLAN (CSPP) PHASE 6

11

CP-8

AJG

CRK

TFO

6-28-2017

FINAL6-28-2017

TFO6-19-2017

      

      

      

      

SCALE IN

0200 200 400100

FEET

NOTES FOR COVERING OR DEACTIVATING LIGHTS.1. LIGHTS ON CLOSED PORTIONS OF PAVEMENT SHALL BE COVERED OR

DEACTIVATED DURING CONSTRUCTION. THE CONTRACTOR MAY CHOOSE FROMTHE OPTIONS BELOW TO MEET THIS REQUIREMENT.

1.1. DISCONNECT THE PORTION OF THE ELECTRICAL CIRCUIT THE LIGHTS ARELOCATED ON. REMAINING PORTIONS OF THE AIRFIELD SHALL REMAINOPERATIONAL.

1.2. DISCONNECT THE LIGHT FIXTURE TRANSFORMER FROM THE ELECTRICALCIRCUIT. CONTRACTOR SHALL ALSO FLAG THE LIGHTS TO INDICATE THATTHERE IS AN ACTIVE CIRCUIT IN THE CAN.

1.3. COVER THE LIGHT FIXTURE WITH A SECTION OF PVC PIPE TO PREVENT LIGHTFROM BEING EMITTED FROM THE FIXTURE.

2. SHORT TERM CLOSURES THAT ARE NOT OVERNIGHT WILL NOT REQUIRE LIGHTDEACTIVATION OR COVERS.

NOTES FOR COVERING SIGNS1. SIGNS LEADING TO CLOSED PORTIONS OF PAVEMENT SHALL BE

COVERED. THIS CAN BE ACCOMPLISHED BY ONE OR ACOMBINATION OF THE FOLLOWING METHODS.

1.1. COVER SIGN WITH BLACK CANVAS, WITH STRAPS TO SECURETHE COVER TO THE SIGN.

1.2. REPLACE THE PANELS WITH BLANK SIGN PANELS.

1.3. REMOVE THE SIGN FROM THE CONCRETE FOUNDATION.

2. SIGNS DESIGNATED FOR REMOVAL ON THE PROJECT SHALL BECOVERED UNTIL THEY ARE REMOVED.

3. SHORT TERM CLOSURES THAT ARE NOT OVERNIGHT WILL NOTREQUIRE SIGN COVERS.

LEGEND

PHASE 6 CONSTRUCTION AREA

PHASE 6A SPECIAL OPERATIONS AREA

PHASE 6B SPECIAL OPERATIONS AREA

LOW PROFILE BARRICADES

CONSTRUCTION BOUNDARY FENCE

AIRCRAFT TAXIROUTE

CONSTRUCTION HAUL ROUTE

FULL OR PARTIAL SIGN COVERS

>>

PHASE 6 REQUIREMENTS.

1. PHASE 6 WORK AREA REQUIRES CLOSURE OF THE FOLLOWING PAVEMENT AREAS: RUNWAY 11-29,PORTIONS OF TAXIWAY 'C' & 'G', TAXIWAY 'J', AND TAXIWAY 'M'. CLOSURE ACCOMPLISHED WITH NOTAM,BARRICADES, SIGN COVERS, AND DEACTIVATED LIGHTS TO CLOSED PAVEMENT AREAS AS INDICATED.

2. PHASE 6 WORK MAY BE CONSTRUCTED CONCURRENTLY WITH THE PHASE 1-5 WORK. HOWEVER, THESEQUENCE OF CONSTRUCTION SHALL MINIMIZE THE PHASE 1-5 CLOSURE DURATIONS.

3. CONTRACTOR IS NOT PERMITTED TO CROSS RUNWAY 5-23 WITH CONSTRUCTION EQUIPMENT ORVEHICLES.

4. THE CONTRACTOR IS ALERTED THAT TEMPORARY ELECTRICAL CIRCUITS MAY BE REQUIRED FORPORTIONS OF THE WORK. THE REQUIRED TEMPORARY CIRCUITS ARE NOT SHOWN. THE CONTRACTOR ISALERTED TO REVIEW THE THE ELECTRICAL CIRCUITS FOR ROUTING OF TEMPORARY CIRCUITS.TEMPORARY CIRCUITS ARE INCIDENTAL TO OTHER BID ITEMS.

NOTES FOR TEMPORARY PAVED ACCESS FOR AIRCRAFT

1. THE AIRPORT HAS COORDINATED WITH THE LOCAL FIXED BASE OPERATOR (FBO)TO PROVIDED AIRCRAFT TOWING SERVICES DURING THE CLOSURE OF TAXILANETO THE HANGARS FOR THE PHASE 1-5 WORK.

2. THE CONTRACTOR SHALL SCHEDULE THIER WORK TO MINIMIZE THE DURATION OFTHE CLOSURE OF THE TAXILANE.

PHASE 6B SPECIAL OPERATIONS AREA -SIGN WORK

1. PHASE 6B WORK AREA CONSISTS OF RELOCATION OF AN EXISTING SIGN WITH IN THE SAFETY AREA OFRUNWAY 5-23 AND WILL REQUIRE RUNWAY 5-23 TO BE CLOSED.

2. THIS WORK SHALL BE COMPLETED WHILE RUNWAY 11-29 IS OPERATIONAL. CLOSURE PERIOD IS LIMITEDTO DAYTIME ONLY.

PHASE 6A SPECIAL OPERATIONS AREA -STORM DRAIN CONNECTION.

1. PHASE 6A WORK AREA CONSISTS OF CONNECTION OF NEW STORM DRAINAGE OR MODIFICATION OFEXISTING STORM DRAIN INLETS OR CONNECTIONS ON THE EDGE OF THE SAFETY AREA FOR RUNWAY5-23. THE WORK MAY REQUIRE EXCAVATION WITHIN 250' OF THE RUNWAY 5-23 CENTERLINE.

2. IF THE CONTRACTOR DETERMINES THAT THE REQUIRED WORK WILL RESULT IN EXCAVATIONS WITHINTHE RUNWAY 5-23 SAFETY AREA (250' FROM RUNWAY CENTERLINE), THE CONTRACTOR SHALLCOORDINATE WITH THE AIRPORT TO SCHEDULE AN AVAILABLE TIME TO RESTRICT THE RUNWAY USAGETO SPECIFIC AIRCRAFT TYPES TO ALLOW FOR A REDUCED SAFETY AREA WIDTH. THE ALLOWABLEREDUCTION IN SAFETY AREA WIDTH IS 200' FROM CENTERLINE OF RUNWAY 5-23. THIS WILL ALLOW ADGC-II OR LESS AND ADG B-III OR LESS. THE ALLOWABLE SCHEDULE OF SAFETY AREA REDUCTION SHALLBE COORDINATED WITH THE AIRPORT 14 DAYS IN ADVANCE, AND SHALL ONLY BE AUTHORIZED DURINGTIMES OF VISUAL FIGHT RULE (VFR) CONDITIONS.

ckesler
Text Box
February 26th to October 11th