TBPOCMarch 26, 2018

SUPPLEMENTAL PACKET

TBPOC March 26, 2018 Supplemental Packet

ITEM 3

Consent Calendar

TBPOC January 23, 2018 Meeting Minutes

TBPOC March 26, 2018 Supplemental Packet

TBPOC REGULAR MEETING MINUTES3:30 PM, January 23, 2018

Bridge Yard Building 210 Burma Road, Oakland, CA 94607

1 of 5

TBPOC_012318MtgMin-final-rev1.docx

Attendees: TBPOC Members: Malcolm Dougherty (Chair), Steve Heminger, Susan Bransen PMT Members: Dan McElhinney, Andrew Fremier, Stephen Maller

Participants: Chris Traina, Stefan Galvez, Blake Sanborn, Brian Maroney, Patrick Treacy, Peter Lee, Clive Endress, Sara Kuehl, Larry Goldzband, Robert Doyle, and Karen Wang

Convened: 3:33 pm

Items Action 1. Roll Call

All TBPOC members were present. NA

2. Chair’s Report The Chair reported on the successful completions of the various projects: 504/288 spans completed demolition in May 2017, SAS T1 anchor rod grout replacement work completed in June 2017, YBITS2 Contract completed on 11/29/17, Marine Foundations Removal Contract Piers 4 through 19 completed on 12/22/17. The Chair thanked the entire Toll Bridge Seismic Retrofit Program project team including Caltrans staff, expert consultants, resource agencies, project partners and stakeholders, MTC staff, CTC staff, and the PMT members for their successful group teamwork in all of these completion milestones in 2017. The Chair reported that per the TBPOC’s request, a letter was provided by FHWA Division Administrator Vincent Mammano outlining that FHWA participated in meeting discussions, observed field testing, and has fully reviewed the SFOBB project team’s procedures and findings documentation. FHWA officials are confident the bridge tower will function as designed.

No action.

TBPOC March 26, 2018 Supplemental Packet

(Continued)

2 of 5

TBPOC_012318MtgMin-final-rev1.docx

Items Action 3. Consent Calendar -

a) TBPOC December 12, 2017 Meeting Minutes The TBPOC approved the Consent Calendar. Motion by: Steve Heminger Second by: Susan Bransen Votes (3-0): Yes- Steve Heminger, Susan Bransen, Malcolm Dougherty; No-0

4. Marine Foundation Pier Retention (Piers E2, E19-23) – Environmental Enhancement Public Access Facilities instead of Pier Demolition

Dan McElhinney presented a brief introduction of the project team and the outline of the presentation. Blake Sanborn, project landscape architect, made a presentation on the preferred pier retention options for the YBI and Oakland shorelines. Presentation also included a recap of past TBPOC decisions on pier retention, list of stakeholders, overview of Bay trail and Water Trail, typical Bay Area local waterfront amenities, precedent pier life examples, overview of YBI shoreline site, proposed Pier E2 option, overview of Oakland shoreline site and features, Gateway Park, existing conditions, evaluated options, preferred option, site access, scale comparison, design proposal, programming opportunities, views of San Francisco Bay. The preferred option had the following benefits: maximized over-water experience, preferred by EBRPD for greatest programming opportunity, integration to Gateway Park vision, and best public asset to East Bay Community. The following project partners presented their comments in support of the proposed project such as Clive Endress (Architectural Coordinator of the New East Span), Sara Kuehl (Landscape Architect of Gateway Park), Larry Goldzband (Executive Director of BCDC), Robert Doyle (General Manager of EBRPD).Stefan Galvez presented an update on the progress and schedule of the environmental resource agency permit update. He noted that the Army Corp of Engineers is in support of public access for the retention of Piers E21 and E22, however, they would require that Piers E19 and E20 removed. Therefore, the project team is recommending the 600’ span for public access (and remove Piers E19 and 20).

The TBPOC approved Option 1 (Build public access on YBI to Pier E2 and on Oakland shoreline 600 feet long and 25 feet wide to Pier E21/23; Demo 2 Piers E19, 20), as the preferred alternative and authorized the staff to proceed and negotiate with the CMGC contractor a capital contract for a not to exceed amount of $52 million. Motion by: Steve Heminger Second by: Malcolm Dougherty Votes (2-1): Yes- Steve Heminger, Malcolm Dougherty; No-Susan Bransen

TBPOC March 26, 2018 Supplemental Packet

(Continued)

3 of 5

TBPOC_012318MtgMin-final-rev1.docx

Items Action Brian Maroney presented an overview of the project team’s recommended option design, schedule and costs. Chris Traina presented highlights of the estimated costs (capital outlay, capital outlay support and risk range). Steve Heminger pointed out potential available CO funding (savings of more than $19M) in the program (carried in the risk forecast): Richmond-San Rafael deck joint repair, Vincent Thomas funding shortfall, West Approach land sales. Steve and Malcolm agreed that they need to resolve these disputed costs. Susan Bransen expressed concern that the projected program budget deficit would become even greater if the pier retention option is approved versus imploding these foundations. “…what I heard today is just a lot of truly wonderful reasons to leave these foundations and build these piers out. But what I didn’t hear was anyone from Oakland/San Francisco Bay Area to talk about contributing to the overrun that would be created as a result of a decision that we might make to move forward on this proposal today. And for that reason, I am concerned there’s a request to go $19M over the amount budgeted and we would stay within our budget if we implode the foundations and so the question that I have for you is - has anyone approached you (project team) to contribute to the $19M overrun?” Brian Maroney responded, “no”. Susan Bransen added, “so that’s a concern because we have a responsibility to live within our means. We have a budget that is already projected to go over and we have a long list of risks.… I see that it is our charge to remove these foundations and do whatever we can to stay within budget and what I see as a Caltrans team and a PMT team that’s worked really hard to do that and you’ve done an excellent job on implosions and so it’s discouraging to be faced with this situation where we could do something really good for this generation and future generations but we do not have the means to move forward on this.” Steve Heminger commented that if “we” chose to do no public access then we would be missing a tremendous opportunity at YBI that

TBPOC March 26, 2018 Supplemental Packet

(Continued)

4 of 5

TBPOC_012318MtgMin-final-rev1.docx

Items Action would actually save money versus removing Pier E2. We value public access at the island then we ought to value it over at the Oakland shoreline. Steve Heminger moved to approve staff’s recommendation of the preferred alternative and authorize staff to negotiate a capital contract for a not to exceed amount of $52 million. Malcolm Dougherty seconded the motion. He echoed Steve’s sentiments on the value of public access. Susan Bransen commented that she would love to vote for this. “However, it is important that we adhere to the budget and we don’t make decisions that increase our deficit and for that reason, I am going to vote no on this.”

5. Public Comment / Other Business Robert Doyle of EBRPD commented that this (public access facility) will be such an attraction that will be able to raise public and private money to build out next to this. “I think this is a wise investment that I assure you that we will do everything we can to get from this investment. Thank you.”

6. Adjournment / Next Meeting The next meeting of the TBPOC will be held on February 13, 2018 at 1:00 p.m. Bay Area Metro 375 Beale Street, San Francisco, CA

1st Floor, Board Room Adjourned: 5:13 pm

TBPOC March 26, 2018 Supplemental Packet

(Continued)

5 of 5

TBPOC_012318MtgMin-final-rev1.docx

TBPOC REGULAR MEETING MINUTES 3:30pm, January 23, 2017

APPROVED BY:

_________________________________________ ______________ MALCOLM DOUGHERTY, TBPOC Chair DateDirector, California Department of Transportation

_________________________________________ ______________ SUSAN BRANSEN DateExecutive Director, California Transportation Commission

_________________________________________ ______________ STEVE HEMINGER, Date Executive Director, Bay Area Toll Authority

TBPOC March 26, 2018 Supplemental Packet

ITEM 4

Marine Foundation Pier Retention (Piers E2, E19 23)Environmental Enhancement Public Access Facilities

Instead of Pier Demolition

TBPOC March 26, 2018 Supplemental Packet

1TB

PO

C M

arch

26,

201

8 S

uppl

emen

tal P

acke

t

1

TBP

OC

Out

com

e 1/

23/1

8:

The

TBP

OC

app

rove

d by

a v

ote

of 2

-1 (2

vot

es y

es, 1

no)

staf

f’s re

com

men

datio

n of

the

pref

erre

d al

tern

ativ

e* a

nd

auth

oriz

ed s

taff

to p

roce

ed w

ith th

e pr

ojec

t and

to n

egot

iate

aca

pita

l con

tract

for a

not

to e

xcee

d am

ount

of $

52 m

illion

with

the

CM

GC

cont

ract

or.

*Pre

ferr

ed a

ltern

ativ

e: B

uild

pub

lic a

cces

s fa

cilit

ies

on Y

BI

(Pie

r E2)

and

the

Oak

land

sho

relin

e (P

iers

E21

-23;

600

feet

long

and

25

feet

wid

e) a

nd d

emol

ish

the

two

rem

aini

ng p

iers

E19

and

E20

.TB

PO

C M

arch

26,

201

8 S

uppl

emen

tal P

acke

t

Wor

k Lo

catio

n

2TB

PO

C M

arch

26,

201

8 S

uppl

emen

tal P

acke

t

Pier

sE1

9–

E23

Wor

k Lo

catio

n

3TB

PO

C M

arch

26,

201

8 S

uppl

emen

tal P

acke

t

Rem

ove

Pier

s E1

9 &

E20

by

Hig

hly

Con

trol

led

Impl

osio

n

4TB

PO

C M

arch

26,

201

8 S

uppl

emen

tal P

acke

t

Sche

dule

5

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

REC

OM

MEN

DA

TIO

N F

OR

TB

POC

A

PPR

OVA

L

6

In fo

llow

up

to th

e Ja

nuar

y 23

, 201

8 TB

PO

C a

ppro

val o

f

pier

rete

ntio

n sc

ope

and

TBP

OC

dire

ctio

n to

pro

ceed

,

nego

tiate

and

pre

pare

a c

onst

ruct

ion

cont

ract

to b

uild

out

a pu

blic

acc

ess

obse

rvat

ion

stru

ctur

es a

t Pie

r E2,

rem

ove

exis

ting

Pie

rs E

19 a

nd E

20, a

nd b

uild

out

a p

ublic

acc

ess

obse

rvat

ion

stru

ctur

e be

twee

n P

iers

E23

and

E21

, the

PM

T re

com

men

ds T

BP

OC

app

rova

l of t

he c

onst

ruct

ion

cont

ract

as

nego

tiate

d du

ring

Febr

uary

and

Mar

ch 2

018

CM

GC

cost

est

imat

ing

and

revi

ew m

eetin

gs.

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

TBPO

C R

eque

st

7

App

rova

l is

requ

este

d to

exe

cute

a c

ontra

ct fo

r $52

milli

on th

atha

s no

w b

een

nego

tiate

d w

ith th

e B

ay B

ridge

CM

GC

cont

ract

orK

M a

s pr

evio

usly

app

rove

d as

a n

ot to

exc

eed

budg

et a

mou

nt o

nJa

nuar

y 23

to c

ompl

ete:

1)R

emov

al o

f Pie

rs E

19 &

E20

by

the

dem

o pr

ojec

t’s h

ighl

yco

ntro

lled

impl

osio

n m

etho

d,2)

aspr

esen

ted

build

out

a p

ublic

acc

ess

faci

lity

from

the

YB

Ish

orel

ine

to P

ier E

2, a

nd3)

as p

rese

nted

bui

ld o

ut a

pub

lic a

cces

sfa

cilit

y fro

m th

eO

akla

nd s

hore

line

Pie

r E23

to P

ier E

21.

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

ITEM 5

Program Budget/Risks Management Update for FY 17 18(Capital Outlay/Capital Outlay Support/Risk

Management)

TBPOC March 26, 2018 Supplemental Packet

Item

5

Pro

gram

Bud

get/R

isks

Upd

ate

for F

Y 17

/18

(Cap

ital O

utla

y/ C

apita

l Out

lay

Sup

port/

Ris

k M

anag

emen

t)

1

Mar

ch26

, 201

8

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

Four

Key

Dec

isio

ns S

aved

Thr

ee Y

ears

Of C

OS

Cos

ts

TBPO

C M

arch

26,

201

8 –

Item

5

•4

Key

Stra

tegi

c an

d In

nova

tive

Dec

isio

ns b

y th

e TB

PO

C h

ave

enab

led

the

Pro

ject

Te

am to

cut

at l

east

thre

e ye

ars

off O

ld B

ay B

ridge

Dem

oliti

on S

ched

ule:

1.20

14 A

ccel

erat

e S

teel

Tru

ss C

antil

ever

Dis

man

tling

(Bet

wee

n P

iers

E

2/E

3) b

y 1

year

.2.

2014

Allo

win

g C

altra

ns to

pur

sue

mar

ine

foun

datio

n de

mol

ition

by

impl

osio

n co

ntro

lled

char

ges

inst

ead

of la

rge

coffe

rdam

s.3.

2015

Pro

curin

g by

CM

GC

con

tract

has

sav

ed a

t lea

st 1

yea

r in

perm

ittin

g.4.

2017

obt

aini

ng p

erm

its to

allo

w m

ultip

le p

ier d

emo

even

ts, s

avin

g 1

year

an

d ov

er $

10M

.

•Th

ese

deci

sion

s ha

ve s

aved

over

$90

in c

onve

ntio

nal d

emol

ition

cos

ts, $

60 m

illio

n in

retir

ed c

apita

l ris

ks a

nd3

or m

ore

year

s of

add

ed ti

me/

supp

ort c

osts

.

2

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

Brid

ge D

emo

CO

S &

CO

For

ecas

t Im

prov

emen

ts

TBPO

C M

arch

26,

201

8 –

Item

5

Dem

oliti

on C

OS

& C

O F

orec

asts

Sin

ce Q

3 20

16 (B

efor

e D

emo

Adv

ance

men

t) 3

Q3

2016

CO

S Fo

reca

stQ

420

17 C

OS

Fore

cast

Fore

cast

Red

uctio

ns50

4/28

8 C

OS

$20.

5M$1

0.6M

$9.9

M50

4/28

8 C

apita

l$9

7.4M

$81.

8M$1

5.6M

MF

E4 to

E18

CO

S$3

3.6M

$11.

8M$2

1.8M

MF

E4 to

E18

Cap

ital

$158

.9M

$111

.7M

$47.

2MTo

tal

$94.

5M

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

4

SFO

BB

Eas

t Spa

n Pr

ojec

tsFY

17/

18 C

OS

Stat

e St

aff a

nd A

&&

E C

ontr

acts

Bud

get A

ctio

n Pl

an (S

ep 2

017)

Bas

ed o

n 08

/29

TBPO

C A

lloca

tion

vs. B

udge

t Req

uest

Dec

isio

n

TBPO

C M

arch

26,

201

8 –

Item

5

Contracts

FY17/18

FTE

FY17/18

BudgetDlrs

Work

Description

Division

Contract

Vendor

Scopeof

Services

Task

Manager

FY17/18

BudgetDlrs

CONST

TBConst

D04

10.26

$2,515

04A4712

AECOM

Env

StefanG.

$1,800

TBConst

D59

4.41

$1,179

04A4969

BROWNANDCALD

WELL

Env

HardeepT.

$1,502

CONST

1.89

$386

04A3970

SFBayConser.&Dev.Comm

Env

StefanG.

$80

CONST

Total

16.6

$4,080

04A4312

WRECO

Env

HardeepT.

$0

TBDGN

TBDGN

2.67

$850

04A4506

WATERBOARD

Env

HardeepT.

$115

TOLL

BRDGNTotal

2.7

$850

04A4535

IBR

Env

StefanG.

$30

Dist4Support

DESIGN

0.40

$86

04.0135CM

Kiewit/M

ansonJV

Design

ChrisT.

$0

MGMT

3.19

$960

04A0148

PBAMERICASINC

Design

JohnU.

$400

ENV

3.55

$845

59A0040

TYLINM/N

JVDesign

HasanE.

$433

EXT_AFFAIRS

0.19

$36

METS

04A4542

ALTAVISTA

METS

KeithH.

$440

ROW

0.46

$110

GEO

04A4534

EMI

Geotech

Eng

SabaM.

$1,000

TRAFFIC

OPER

0.72

$210

CONST

04A4611

CH2M

HILL

Claims

DeannaV.

$200

MAINT

0.09

$19

MGMT

04A4265

CALTROPENG.Risk

RiskMgm

tPatrickT.

$90

ADMIN

0.03

$5

04A5045

HNTB

Mgm

tDanM.

$812

Dist4SupportTotal

8.6

$2,270

REGULARPROJECTSTotal

$6,902

ENGRSVCSSupport

ENGRSVCSDGN

0.79

$173

ENV

04A4712

AECOM

ENV

StefanG.

$20

ENGRSVCSMETS/GEO

1.05

$221

DESIGN

59A0040

TYLINM/N

JVDesign

HasanE.

$30

ENGRSVCSMGMT

0.17

$48

METS

04A4542

ALTAVISTA

METS

KeithH.

$50

ENGRSVCSOE

0.24

$59

RODS/GROUTREPAIR

Total

$100

ENGRSVCSSupportTotal

2.3

$501

CATHODIC

PROTECTION

DESIGN

59A0040

TYLINM/N

JVDesign

HasanE.

$550

REGULARPROJECTSTotal

30.1

$7,702

CATHODIC

PROTECTIONTotal

$550

CONST

TBConst

D04

0.62

$152

ENV

04A4712

AECOM

ENV

StefanG.

$250

TBConst

D59

0.90

$240

DESIGN

04.0135CM

Kiewit/M

ansonJV

Design

ChrisT.

$450

CONST

0.06

$12

PIERRETENTION(E2,E19to

E23)Total

$700

CONST

Total

1.6

$404

GrandTotal

$8,252

TBDGN

TBDGN

0.06

$20

TOLL

BRDGNTotal

0.1

$20

Dist4Support

MGMT

0.19

$58

ActionNotes(9/01/2017):

Dist4SupportTotal

0.2

$58

1.Finalizetask

orderswithA&Efirm

sto

deliver

therequired

scopeofservices

toachieve

needed

tasks

ENGRSVCSSupport

ENGRSVCSMETS/GEO

0.23

$48

withinbudget

foreach

contract.

ENGRSVCSSupportTotal

0.23

$48

2.Revisealltask

ordersto

bewithinthebudgetActionPlanofeachcontractandto

endonJune30,2018.

RODS/GROUTREPAIR

Total

2.06

$530

3.U

pdatedbudgetallocationshownbased

oninputfrom

task

managersandcontractmanagersSept2017.

TBDGN

TBDGN

0.50

$159

4.Expenditure

dataisavailablewithin34weeks

fortheexpenditure

month

withpendinginvoices

TBD.

TOLL

BRDGNTotal

0.5

$159

Dist4Support

MGMT

0.19

$56

TOLL

BRDGNTotal

0.2

$56

CATHODIC

PROTECTIONTotal

0.7

$216

TBDGN

TBDGN

0.79

$250

TOLL

BRDGNTotal

0.8

$250

Dist4Support

MGMT

0.17

$50

TOLL

BRDGNTotal

0.2

$50

PIERRETENTION(E2,E19to

E23)Total

1.0

$300

GrandTotal

33.8

$8,748

AdditionalNotes*:

1.A

ssumptionsinthisCOSBudgetActionPlanincludenocontingency

orrisk

reserveforscopeorschedulechangesat

thistime,asthese

changeswillonly

bepresentedas

separatefuture

budgetrequestsifunmitigatedrisks,scopeorschedulechangesoccur.

2.COSsavingswithincontractslistedabove

willbeshiftedto

othercontractswithinthesamelistifneeded.

3.A&EBudgetslistedwere

developedintask

orderdiscussionsto

balance

workload,expertise,andcosteffectivenesswithinbudgetsshown.

PIERRETENTION

(E2,E19to

E23)

PIERRETENTION

(E2,E19to

E23)

Table2

A&EContractsPlanDetail($

inthousands)

CATHODIC

PROTECTION

Table1

StateStaffPlanDetail($

inthousands)

RODS/GROUT

REPAIR

Division

REGULAR

PROJECTS

DESIGN

ENV

REGULARPROJECTS

RODS/GROUTREPAIR

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

5

TBPO

C M

arch

26,

201

8 –

Item

5SF

OB

B E

ast S

pan

Proj

ects

FY 1

7/18

CO

S St

ate

Staf

f and

A&

&E

Con

trac

tsB

udge

t Act

ion

Plan

(Mar

ch 2

018)

(With

Exp

endi

ture

dat

a th

ru F

eb 2

018)

Contracts

FY17/18

FTE

FY17/18

BudgetDlrs

ExpPY

thru

Feb

Exp

Dlrs

thru

Feb

Work

Description

Division

Contract

Ven

dor

Scopeof

Services

Task

Man

ager

FY17/18

BudgetDlrs

Estimated

Work

FY17/18

thru

Feb

CONST

TBConst

D04

10.26

$2,515

8.33

$1,840

04A4712

AEC

OM

Env

Stefan

G.

$1,800

$1,063

TBConst

D59

4.41

$1,179

2.67

$722

04A4969

BROWNANDCALD

WELL

Env

Hardeep

T.$1,502

$1,183

CONST

1.89

$386

1.43

$290

04A3970

SFBay

Conser.&

Dev.C

omm

Env

Stefan

G.

$80

$23

CONST

Total

16.6

$4,080

12.43

$2,853

04A4312

WREC

OEnv

Hardeep

T.$0

$0TB

DGN

TBDGN

2.67

$850

1.40

$434

04AA5133

WATERBOARD

Env

Hardeep

T.$115

$54

TOLL

BRDGNTo

tal

2.7

$850

1.40

$434

04A4535

IBR

Env

Stefan

G.

$30

$23

Dist4Support

DESIGN

0.40

$86

0.23

$41

04.0135C

MKiew

it/M

ansonJV

Design

ChrisT.

$0$0

MGMT

3.19

$960

1.57

$490

04A0148

PBAMER

ICASINC

Design

John

U.

$400

$378

ENV

3.55

$845

1.87

$472

59A0040

TYLINM/N

JVDesign

Hasan

E.$433

$0EXT_AFFAIRS

0.19

$36

0.45

$60

METS

04A4542

ALTAVISTA

METS

KeithH.

$1,235

$1,051

ROW

0.46

$110

0.32

$68

GEO

04A4534

EMI

Geo

tech

Eng

Saba

M.

$705

$603

TRAFFIC

OPER

0.72

$210

0.11

$29

CONST

04A4611

CH2M

HILL

Claims

DeannaV.

$200

$164

MAINT

0.09

$19

0.06

$8MGMT

04A4265

CALTROPEN

G.R

isk

RiskMgm

tPatrickT.

$90

$74

ADMIN

0.03

$50.02

$704A5045

HNTB

Mgm

tDan

M.

$812

$280

Dist4SupportTo

tal

8.6

$2,270

4.64

$1,176

Others

04A4952

ALTAVISTA

MatlsTesting

CatalinoN.

$25

ENGRSVCSSupport

ENGRSVCSDGN

0.79

$173

0.03

$5REG

ULARPR

OJECTS

Total

$7,402

$4,921

ENGRSVCSMETS/GEO

1.05

$221

0.50

$121

04A4712

AEC

OM

ENV

Stefan

G.

$20

$0EN

GRSVCSMGMT

0.17

$48

0.15

$56

04A4969

BROWNANDCALD

WELL

Env

Hardeep

T.$0

$0EN

GRSVCSOE

0.24

$59

0.00

$0DESIGN

59A0040

TYLINM/N

JVDesign

Hasan

E.$30

$7EN

GRSVCSPO

LICY

0.00

$0METS

04A4542

ALTAVISTA

METS

KeithH.

$50

$47

ENGRSVCSSupportTo

tal

2.3

$501

0.68

$182

RODS/GROUTREPAIR

Total

$100

$54

REG

ULARPR

OJECTS

Total

30.1

$7,702

19.15

$4,644

CATH

ODIC

PROTECTION

DESIGN

59A0040

TYLINM/N

JVDesign

Hasan

E.$550

$233

CONST

TBConst

D04

0.62

$152

0.35

$87

CATH

ODIC

PROTECTIONTo

tal

$550

$233

TBConst

D59

0.90

$240

0.85

$206

04A4712

AEC

OM

ENV

Stefan

G.

$818

$503

CONST

0.06

$12

0.04

$12

04A4969

BROWNANDCALD

WELL

Env

Hardeep

T.$270

$0CONST

Total

1.6

$404

1.25

$305

METS

04A4542

ALTAVISTA

METS

KeithH.

$400

$0TB

DGN

TBDGN

0.06

$20

GEO

04A4534

EMI

Geo

tech

Eng

Saba

M.

$123

$110

TOLL

BRDGNTo

tal

0.1

$20

0.00

$0DESIGN

04.0135C

MKiew

it/M

ansonJV

Design

ChrisT.

$455

$146

Dist4Support

MGMT

0.19

$58

0.19

$59

Others

$135

$0Dist4SupportTo

tal

0.2

$58

0.19

$59

PIER

RETEN

TION(E2,E19to

E23)To

tal

$2,200

$759

ENGRSVCSSupport

ENGRSVCSMETS/GEO

0.23

$48

0.14

$31

Grand

Total

$10,252

$5,966

ENGRSVCSSupportTo

tal

0.23

$48

0.14

$31

RODS/GROUTREPAIR

Total

2.06

$530

1.58

$396

CONST

TBCONST

D04

0.01

$2ActionNotes(12/21/2017):

CONST

Total

0.01

$21.Finalizetask

orderswithA&Efirmsto

deliver

therequiredscopeofservicesto

achieve

needed

tasks

TBDGN

TBDGN

0.50

$159

0.20

$57

withinbud

getforeach

contract.

TOLL

BRDGNTo

tal

0.5

$159

0.20

$57

2.Revisealltaskordersto

bewithinthebud

getActionPlan

ofeach

contractandto

endonJune30,2018.

Dist4Support

MGMT

0.19

$56

0.10

$29

3.U

pdatedbudgetallocationshownbased

oninputfrom

task

managersandcontractmanagersSept2017.

TOLL

BRDGNTo

tal

0.2

$56

0.10

$29

4.Expenditure

dataisavailablewithin34weeks

fortheexpenditure

month

withpendinginvoices

TBD

CATH

ODIC

PROTECTIONTo

tal

0.7

$216

0.31

$88

CONST

CONST

1.56

$400

0.14

$36

1.6

$400

0.14

$36

TBDGN

TBDGN

2.27

$581

1.09

$320

TOLL

BRDGNTo

tal

2.3

$581

1.09

$320

Dist4Support

MGMT/TR

AFFIC

1.76

$450

0.84

$211

Dist4Support

1.8

$450

0.84

$211

ENGRSVCSSupport

ENGRSVCSDGN/M

GMT

1.44

$369

0.88

$213

ENGRSVCSSupportTo

tal

1.4

$369

0.88

$213

PIER

RETEN

TION(E2,E19to

E23)To

tal

7.0

$1,800

2.94

$780

Grand

Total

39.9

$10,248

23.98

$5,908

AdditionalNotes*:

1.A

ssumptions

inthisCOSBudgetActionPlanincludenocontingency

orrisk

reserveforscopeorschedulechangesat

thistime,as

thesechangeswillonly

bepresentedas

separatefuture

budgetrequestsifunmitigated

risks,scopeorschedulechangesoccur.

2.COSsavings

withincontractslistedabove

willbeshiftedto

other

contractswithinthesamelistifneeded.

3.A&EBudgetslistedweredeveloped

intask

order

discussionsto

balance

workload,expertise,andcosteffectivenesswithinbudgetsshown.

Table2

A&ECo

ntractsPlanDetail($

inthousands)

Division

REG

ULAR

PROJECTS

REG

ULARPR

OJECTS

ENV

DESIGN

RODS/GROUTREPAIR

ENV

RODS/GROUT

REPAIR

PIER

RETEN

TION

(E2,E19to

E23)

ENV

CATH

ODIC

PROTECTION

PIER

RETEN

TION

(E2,E19to

E23)

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

6

TBPO

C M

arch

, 201

8 –

Item

5

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

7

TBPO

C M

arch

26,

201

8 –

Item

5

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

8

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

Con

stru

ctio

n Su

ppor

tPr

ojec

t Sup

port

CO

For

ecas

t ($i

n m

illion

s)92

100

15C

apita

l ($

in m

illion

s)3.

57.

14.

58.

07.

88.

439

.731

8.5

351.

031

2.8

347.

246

4.2

539.

554

4.8

441.

352

2.1

253.

923

8.8

261.

597

.273

.612

9.7

0.0

60.0

120.

018

0.0

240.

030

0.0

360.

042

0.0

480.

054

0.0

600.

0C

apita

l ($

in m

illion

s)

CO

For

ecas

t ($i

n m

illion

s)

CO

S Fo

reca

st ($

in m

illion

s)$2

0.5

$14.

0$9

.8C

OS

($ in

milli

ons)

$5.1

$12.

1$2

1.2

$46.

3$3

9.5

$36.

1$2

9.9

$47.

7$6

9.8

$58.

0$6

3.8

$75.

8$1

09.3

$118

.1$1

19.5

$107

.6$1

01.7

$80.

6$8

2.4

$44.

1$2

4.4

$18.

0$0

.0

$20.

0

$40.

0

$60.

0

$80.

0

$100

.0

$120

.0

$140

.0

$160

.0

$180

.0

$200

.0C

OS

($ in

milli

ons)

CO

S Fo

reca

st ($

in m

illion

s)

Expe

nditu

re th

ru D

ec 2

017

CO

and

CO

S C

ash

Flow

for E

ast S

pan

Proj

ects

To

ll Br

idge

Sei

smic

Ret

rofit

Pro

gram

Proj

ect

East

Bay

Rep

lace

men

t 01

20F,

SAS

-Sup

erst

ruct

ure

3K11

0, A

ncho

r Rod

s G

rout

ing

0120

T, Y

BITS

2-C

ant.

dism

ant.

0135

2, S

uper

stru

ctur

e D

ism

.01

354,

Pie

r 3 R

emov

al D

emo.

0135

7, P

ier E

4-E1

8.01

358,

Pie

r E2,

E19

-E22

.C

ompl

eted

Pro

ject

s

1/186

/20

11/1

45/

21

CO

For

ecas

t ($i

n m

illion

s)92

100

15C

apita

l ($

in m

illion

s)3.

57.

14.

58.

07.

88.

439

.731

8.5

351.

031

2.8

347.

246

4.2

539.

554

4.8

441.

352

2.1

253.

923

8.8

261.

597

.273

.612

9.7

0.0

60.0

120.

018

0.0

240.

030

0.0

360.

042

0.0

480.

054

0.0

600.

0C

apita

l ($

in m

illion

s)

CO

For

ecas

t ($i

n m

illion

s)

CO

S Fo

reca

st ($

in m

illion

s)$2

0.5

$14.

0$9

.8C

OS

($ in

milli

ons)

$5.1

$12.

1$2

1.2

$46.

3$3

9.5

$36.

1$2

9.9

$47.

7$6

9.8

$58.

0$6

3.8

$75.

8$1

09.3

$118

.1$1

19.5

$107

.6$1

01.7

$80.

6$8

2.4

$44.

1$2

4.4

$18.

0$0

.0

$20.

0

$40.

0

$60.

0

$80.

0

$100

.0

$120

.0

$140

.0

$160

.0

$180

.0

$200

.0C

OS

($ in

milli

ons)

CO

S Fo

reca

st ($

in m

illion

s)

Dat

e: 0

2/01

/201

8

CAP

ITAL

Cur

rent

App

rove

d Bu

dget

: $5,

177.

7M

For

ecas

t at C

ompl

etio

n: $

5,17

5.1M

Exp

endi

ture

thru

Dec

201

7: $

5,02

9.5M

Not

es: 1

) CO

and

CO

S fo

reca

sts

are

base

d on

4th

QTR

201

7 Fi

nanc

ial a

nd R

isk

Man

agem

ent R

epor

ts.

2

) For

ecas

ts in

clud

e 4t

h Q

TR 2

017

risk

of $

17.8

M C

OS.

3

) CO

S fo

reca

sts

for f

utur

e ye

ars

is b

eing

eva

luat

ed to

redu

ce u

p to

25%

.

4) T

otal

For

ecas

t & E

xpen

ditu

re in

clud

es $

6.37

1M th

at T

BPO

C a

utho

rized

BAT

A to

spe

nd o

n th

e So

uthg

ate

Roa

d

5) 1

8/19

Fis

cal Y

ear E

xpen

ditu

res

assu

mes

SAS

arb

itrat

ion

gets

reso

lved

by

June

201

9.

SU

PPO

RT

Cur

rent

App

rove

d Bu

dget

: $1,

349.

4M

Fore

cast

at C

ompl

etio

n: $

1,36

7.2M

Expe

nditu

re th

ru D

ec 2

017:

$1,

331.

5M

TBPO

C M

arch

, 201

8 –

Item

5

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

TBPO

C M

arch

26,

201

8 –

Item

5

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

FY 1

7/18

CO

S B

udge

tR

ecom

men

datio

n B

ased

on

the

Bud

get C

hang

e Ta

ble

Pres

ente

d:

• Sta

ff re

com

men

ds a

ppro

val o

f the

Bud

get C

hang

e fo

r CO

as

pres

ente

d w

ith th

e ca

pita

l bud

get s

avin

gs (i

.e. $

62.1

4 m

illio

n) to

be

set a

side

for

Mar

ine

Foun

datio

n P

iers

E2,

E19

to E

23 E

nviro

nmen

tal E

nhan

cem

ent

Pub

lic A

cces

s Fa

cilit

ies

fund

ing,

suc

h th

at $

52 m

illio

n is

for t

he a

ppro

ved

cont

ract

allo

tmen

t and

the

rem

aind

er a

s pr

ojec

t cap

ital r

isk

only.

• Sta

ff re

com

men

ds a

ppro

val o

f the

Bud

get C

hang

e fo

r CO

S a

s pr

esen

ted

with

the

prog

ram

sav

ings

of $

3.02

milli

on C

OS

to b

e tra

nsfe

rred

to th

e S

FOB

B E

ast S

pan

CO

S B

udge

t.

• Sta

ff pr

ovid

esin

follo

w u

p to

the

Janu

ary

23 P

ier R

eten

tion

supp

lem

enta

l CO

S b

udge

t $9

milli

on p

endi

ng re

ques

t to

com

plet

e th

e pi

er re

tent

ion

wor

k by

ear

ly 2

019

-the

PM

T is

stil

l eva

luat

ing

the

over

all

good

17/

18 F

Y C

OS

bud

get s

avin

gs tr

end.

The

PM

T w

ill pr

ovid

e an

up

date

or a

redu

ced

requ

est f

or th

e pi

er re

tent

ion

com

plet

ion

CO

S

supp

lem

enta

l bud

get a

t the

May

201

8 TB

PO

C m

eetin

g fo

r thi

s FY

and

FY

18/

19 b

udge

t..

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

TBP

OC

Bri

efin

gR

isk

Man

agem

ent

Res

ults

Four

th Q

uart

er 2

017

TBP

OC

Mee

ting,

Mar

ch 2

6, 2

018

Pre

sent

ed B

y P

atric

k Tr

eacy

, SFO

BB

Ris

k M

anag

er

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

Toll

Pro

gram

Ris

k M

anag

emen

t

•Q

uart

erly

Rep

ortin

g Si

nce

Q1

2006

48th

Rep

ort t

o TB

PO

C o

n st

atus

of r

isks

in p

rogr

amS

ince

200

6 P

roje

ct T

eam

s ha

ve id

entif

ied

2,03

2 R

isks

in 2

3 P

roje

cts

•C

urre

ntly

Qua

ntify

ing

Ris

ks o

n 5

Proj

ects

and

the

Prog

ram

89 A

ctiv

e R

isks

Bei

ng Q

uant

ified

Eac

h Q

uarte

r53

Act

ive

Cap

ital O

utla

y R

isks

36 A

ctiv

e C

ost o

f Sup

port

(CO

S) R

isks

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

Sum

mar

y of

Q4

2017

Cos

t Ri

sk R

esul

tsAd

equa

cy o

f Re

serv

es

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

Sum

mar

y O

f Q4

Cha

nges

$47.

5 M

illio

n Im

prov

emen

t in

“Bot

tom

-line

” th

is Q

uart

er

•$3

1.9

mill

ion

decr

ease

to C

apita

l Out

lay

Fore

cast

in Q

4 20

17$3

1.2

mill

ion

redu

ctio

n on

Mar

ine

Foun

datio

ns fo

reca

st$2

.4 m

illio

n re

duct

ion

on Y

BIT

S #

2 fo

reca

st$2

.6 m

illio

n in

crea

se in

Pro

gram

-leve

l ris

ks

•$1

5.6

mill

ion

decr

ease

in C

apita

l Out

lay

Sup

port

Fore

cast

in Q

4 20

17$1

2.0

mill

ion

redu

ctio

n in

Mar

ine

Stru

ctur

e D

ism

antli

ng E

4-E

18 C

OS

risk

s

•$1

4.77

Mill

ion

Rem

aini

ng in

Pro

gram

Con

tinge

ncy

Q4

2017

$3.0

mill

ion

redu

ctio

n fo

r CO

S B

udge

t Inc

reas

e (T

BP

OC

Dec

12,

201

7) s

till p

endi

ng

•C

ost o

f Pie

r Ret

entio

n E

xcee

ding

Cos

t of P

ier D

emol

ition

not

in P

rogr

am F

orec

ast

Ext

ra C

ost o

f Pie

r E2,

E21

and

E22

rete

ntio

n no

t in

Pro

gram

For

ecas

t: W

ill in

crea

se Q

1 20

18

Fore

cast

by

appr

ox. $

16 m

illio

n.

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

Q4

RM

C R

esul

ts

Q42017

Q32017

Change

%Ch

ange

MarineStructureDism

antling

E4E18

500,000

19,548,000

(19,048,000)

(97)

MarineStructureDism

antling

E1922

4,200,000

7,435,000

(3,235,000)

(44)

MarineStructureRe

tentionE2

5,998,000

14,871,000

(8,873,000)

(60)

SelfAn

chor

Suspen

sion

35,000,000

35,000,000

00

504'&288'Stee

lStructuresD

ismantling

220,000

233,000

(13,000)

(6)

YBI#2Po

stTraffic

Switch

233,000

2,618,000

(2,385,000)

(91)

TotalEastSpan

46,151,000

79,705,000

(33,554,000)

(42)

Program

levelrisks

(not

inacontract)

16,135,000

13,564,000

2,571,000

19TotalCapita

lOutlayRisk

62,286,000

93,269,000

(30,983,000)

(33)

COSRisks

20,000,000

35,600,000

(15,600,000)

(44)

TotalRisk

82,286,000

128,869,000

(46,583,000)

(36)

Draw

onProgramCo

ntingency

21,816,000

69,229,000

( 47,413,000)

(68)

ContractCo

ntingency

60,470,000

59,640,000

830,000

ProgramCo

ntingencyBalance

14,770,000

14,770,000

0TotalCon

tingency

75,240,000

74,410,000

830,000

50%Prob

ableRisk

Managem

entC

ost

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

Q4

CO

S C

hang

es

Q42017

Q32017

Change

SAS

7.3

26.2

(18.9)

SASAn

chor

RodRe

grou

ting

(0.7)

0.0

(0.7)

YBID

etou

r0.0

0.0

0.0

YBITS#1

(1.2)

(1.2)

0.0

YBITS#2

(0.1)

(2.9)

2.8

OTD

#2(0.2)

(0.2)

0.0

OTD

Detour

(0.1)

(0.1)

0.0

Program

level

12.0

10.7

1.3

Can

tilev

er D

ism

antli

ng(0.04)

0.0

(0.04)

504/

288

Dis

man

tling

(0.4)

(7.3)

6.9

Mar

ine

Foun

datio

ns P

aren

t(31.7)

(31.7)

0.0

Mar

ine

Foun

datio

ns E

4-E

1811.8

23.8

(12.0)

Mar

ine

Foun

datio

ns E

2, E

19-E

2217.8

12.8

5.0

E-3

Dem

onst

ratio

n4.0

4.0

0.0

TotalEastSpan

18.5

34.1

(15.6)

WestA

pproach

0.0

0.0

0.0

Antio

ch

Dumbarton

1.5

1.5

0.0

TotalCOSRisk

20.0

35.6

(15.6)

Contract

50%Prob

ableCO

SDifferen

tial*($M)

* C

OS

Cos

t Diff

eren

tial i

s m

easu

red

from

the

curre

nt C

OS

Bud

get

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

Dra

w T

rend

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

Pro

gram

Bal

ance

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

Rec

ent C

hang

es in

Dra

w T

rend

Dra

w T

rend

Impr

ovin

g Fo

r Las

t Eig

ht Q

uart

ers

•Fo

reca

st P

rogr

am C

ontin

genc

y de

ficit

at p

rogr

am c

ompl

etio

n de

crea

sed

by

$47.

5 m

illio

n th

is q

uarte

r to

$7.0

mill

ion

•Fo

reca

st d

efic

it ha

s de

crea

sed

by $

136.

2 m

illion

(95%

) fro

m p

eak

of $

143.

2 m

illio

n in

Q3

2015

Impr

ovem

ent A

ttrib

utab

le T

o M

inim

izin

g D

elay

s &

Adv

anci

ng W

ork

•E

3 C

ontra

ct: N

o D

elay

s To

Con

tract

•50

4’/2

88’ C

ontra

ct: C

CO

Del

ays

& W

eath

er D

ays

Miti

gate

d•

E4-

E18

Con

tract

: No

CC

O o

r Wea

ther

Del

ays

Tren

d W

ill C

hang

e in

Q1

2018

for P

ier R

eten

tion

•A

ll th

ings

bei

ng e

qual

, pro

ject

team

will

exp

ect P

rogr

am F

orec

ast C

ost t

o in

crea

se b

y $1

6 m

illio

n (in

clud

ing

risks

) as

a re

sult

of T

BP

OC

act

ion

on P

ier

Ret

entio

n.

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

50%

Pro

babl

e R

isk

vs. R

emai

ning

Con

tinge

ncy

50%Prob

able

Risk

($M)

Remaining

Contract

Contingency($M)

Draw

onProgram

Contingency($M)

OTD

1Westbou

nd2.47

(2.47)

Skyw

ay1.07

(1.07)

Stormwater

1.37

(1.37)

WestA

pproach

1.90

(1.90)

SouthSouthDe

tour

(0.05)

0.05

OTD

Detour

0.30

(0.30)

OTD

2Eastbo

und

1.37

(1.37)

SelfAn

chor

Suspension

35.00

32.90

2.10

SASTower

RodGrou

ting

3.12

(3.12)

E2/T1

(0.01)

0.01

YBI#1MainlineStructures

(0.11)

0.11

YBI#2Po

stTraffic

Switc

h0.23

1.06

(0.83)

Pier

E3De

mon

stratio

n0.66

(0.66)

504'&28

8'SteelStructuresDism

antling

0.22

21.90

(21.68

)MarineStructures

Dism

antling

E4E18

0.50

20.30

(19.80

)Du

mba

rton

1.73

(1.73)

Antio

ch0.01

(0.01)

Subm

arineCa

ble

(0.04)

0.04

Cantile

verD

isman

tling

Completed

Projects

35.95

89.95

(54.00

)YBI#3

0.00

Program

levelrisks

(not

inacontract)

16.14

16.14

COSRisks

20.00

20.00

Righto

fway

andMitigatio

n2.40

(2.40)

ProjectInd

irects

4.52

(4.52)

Miscella

neou

sCo

ntingencies

3.60

(3.60)

MarineStructures

E2Retention/Dism

antling

E19E22

10.20

(40.00

)50

.20

Ongoing

Projects

46.34

(29.48

)75

.82

Totals

82.29

60.47

21.82

14.77

ProgramCo

ntingencyBa

lance($M)

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

Top

10 R

isks

Tota

l ran

ges

from

$10

-110

M

Optim

istic

Pessim

istic

Prob

able

SAS

1000

ProjectC

lose

Out

100%

065

,000

,000

35,000

,000

Program

87VincentTho

mas

Bridge

Fund

ingshortfa

ll10

0%8,10

0,00

08,10

0,00

08,10

0,00

0Program

70Residu

alworkon

EastSpan

that

iscurrently

not

45%

020

,000

,000

4,50

0,00

0Program

65Cleanu

p/c

lose

outo

fCorrido

ronYBI

95%

1,52

0,00

05,40

0,00

03,18

9,00

0Program

84Organ

isationa

lcha

nges

lead

toprogramdelays

45%

010

,000

,000

1,77

0,00

0Program

1000

Residu

alWorkon

Oakland

Side:O

akland

Mole&

100%

1,00

0,00

02,50

0,00

01,76

7,00

0Marine*

904

CapitalC

osto

fscheduledelays

intheCo

nstructi

100%

640,00

02,52

0,00

01,54

7,00

0Program

67Renewal

ofPier

7Agreem

enta

ndDe

mob

ilizatio

n50

%1,00

0,00

05,30

0,00

01,21

7,00

0Program

65.1

CloseOut

ofDT

SCSite11

onYBI

100%

210,00

01,86

0,00

01,03

7,00

0Program

56Future

CCOsforM

EPSystem

s10

0%0

2,00

0,00

01,00

0,00

0Total

59,127

,000

*MarineFoun

datio

nsE2

Retention

Top10

CapitalO

utlayRisks

Project

IDTitle

Prob

ability

Cost

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

“Cos

ts” c

arrie

d in

Ris

k Fo

reca

stD

ata

from

Q4

2018

Qua

rterly

Rep

ort:

Fore

cast

to C

ompl

etio

n:

$8,9

59.1

mill

ion

Cos

t To

Dat

e:$8

,733

.5 m

illio

nW

ork

Rem

aini

ng( i

nc. R

isk)

:$2

25.6

mill

ion

Tota

l Ris

ks$9

9.2

mill

ion

(44%

of W

ork

Rem

aini

ng)

Cos

ts c

arrie

d in

Ris

k Fo

reca

st*:$

53.2

mill

ion

Futu

re R

isk:

$46.

0 m

illio

n (2

0% o

f Wor

k R

emai

ning

)

*“C

osts

” car

ried

in R

isk

Fore

cast

:$1

6.9

mill

ion:

200

5 D

eck

Join

t Rep

air o

n R

ichm

ond/

San

Raf

ael B

r.$8

.1 m

illio

n: V

ince

nt T

hom

as fu

ndin

g sh

ortfa

ll (2

005

AB

144)

$35.

0 m

illion

: SA

S C

lose

Out

Cos

t$8

.0 m

illio

n: B

asel

ine

CO

S c

osts

thru

Pro

gram

Com

plet

ion

($14

.8) m

illio

n: W

est A

ppro

ach

Land

Sal

es ($

7.8

mill

ion

retu

rned

to B

ATA

)$5

3.2

mill

ion:

Tot

al C

osts

bei

ng c

arrie

d in

Ris

k Fo

reca

st

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

“Cos

ts” C

arrie

d as

Ris

ks

Item

Cos

t(m

illio

ns)

Stat

us

R/S

RB

r Dec

k Jo

int R

epai

r$1

6.9

If TB

PO

C/B

ATA

appr

oved

rele

asin

g av

aila

ble

R/S

R C

ontin

genc

y, P

rogr

am “B

otto

m li

ne”

wou

ld im

prov

e by

$16

.9 m

illio

n.Vi

ncen

t Tho

mas

Fun

ding

$8.1

If fu

ndin

g de

ficit

back

fille

d P

rogr

am “B

otto

m

line”

wou

ld im

prov

e by

$8.

1 m

illio

nS

AS

Clo

se O

ut C

ost

$35.

0S

ubje

ct to

tim

elin

e of

Arb

itrat

ion

proc

ess

Bas

elin

e C

OS

thru

C

ompl

etio

n$8

.0Fi

scal

Yr 1

8/19

to T

BP

OC

in Q

2 20

18

Wes

t App

roac

hLa

nd S

ales

$14.

8If

fund

s tra

nsfe

rred

to B

ATA

not b

roug

ht b

ack

into

Pro

gram

, Pro

gram

“Bot

tom

line

” wou

ld

dete

riora

te b

y $1

0 m

illio

n.

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

Rem

aini

ng W

ork

($22

5.6M

) Bas

ed o

n Q

4 20

17 F

orec

ast

$63.

5 m

illion

: Pot

entia

l SA

S C

lose

Out

$50.

2 m

illio

n: E

2 R

eten

tion,

E19

to E

22 D

emol

ition

Cap

ital C

ost

$11.

2 m

illio

n Fi

nal P

aym

ent &

Clo

se O

ut in

Mar

ine

Dem

o E

4 to

E18

$5

.3 m

illio

n: F

inal

Pay

men

t & C

lose

Out

to Y

BIT

S2

$4.6

mill

ion:

Fin

al P

aym

ent &

Clo

se O

ut to

504

’/288

” Dem

oliti

on$8

.9 m

illio

n: R

ight

of W

ay &

Env

ironm

enta

l Miti

gatio

n$5

.1 m

illio

n: W

est A

ppro

ach

Util

ity R

eloc

atio

n (T

o be

Ret

ired

Q1

18)

$16.

9 m

illio

n: R

ichm

ond/

San

Raf

ael P

rogr

am R

isk

$8.1

mill

ion:

Vin

cent

Tho

mas

Pro

gram

Ris

k($

10.0

) mill

ion:

Wes

t App

roac

h P

rogr

am O

ppor

tuni

ty$9

.4 m

illio

n: Y

BI P

rogr

am R

isks

$8.6

mill

ion:

Oth

er P

rogr

am R

isks

$2.2

mill

ion:

Mis

cella

neou

s C

O (i

.e. Y

BIT

S1

Util

ity W

ork)

$3

5.4

mill

ion:

Eas

t Spa

n C

OS

$5.8

mill

ion:

BA

TA S

outh

Gat

e R

d C

OS

$0.3

mill

ion:

Pro

gram

CO

S

$225

.6 m

illio

n: T

otal

Rem

aini

ng W

ork

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

Cha

lleng

es G

oing

For

war

d

•B

udge

t Adj

ustm

ents

Fro

m P

roje

ct/P

rogr

am C

ontin

genc

y:1.

At l

east

one

yea

r of C

OS

18/

19: a

ctio

n ne

eded

Q2

2018

•A

war

d M

arin

e Fo

unda

tion

Ret

entio

n/R

emov

al c

ontra

ct b

y A

pril

1,

2018

.•

Tim

ely

Pro

cure

men

t of P

erm

its fo

r Pie

r Ret

entio

n.•

Det

erm

ine

Pro

cure

men

t Pro

cess

(CC

O to

CM

GC

, Sep

arat

e C

ontra

ct C

MG

C o

r DB

B) f

or re

sidu

al it

ems

on Y

BI a

nd O

TD M

ole

•P

roje

ct c

lose

-out

–S

AS

Arb

itrat

ion

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

Q1

2018

For

ecas

t Cha

nge

As

Res

ult o

f Pie

r Ret

entio

n

Cha

nge

To Q

1 20

18 F

orec

ast a

s re

sult

of T

BP

OC

App

rove

d P

ier R

eten

tion

Opt

ion:

Q1

2018

For

ecas

t ($8

4.2M

) -Q

4 20

17 F

orec

ast (

$68.

0M) =

$16

.2M

incr

ease

Dat

eSc

ope

CO

CO

SR

isk

(50%

)Fo

reca

st

Q4

2017

Qua

rterly

E2

Ret

entio

n &

E19

to E

22 D

emo

$40.

0M$1

3.4M

$14.

6M$6

8.0M

Jan

23th

201

8TB

PO

CE

2, E

19, E

20 R

eten

tion

&

E19

, E20

Dem

o$5

2.0M

$13.

0M$1

9.7M

$84.

7M

Mar

26t

h20

18TB

PO

CE

2, E

19, E

20 R

eten

tion

&E

19 &

E20

Dem

o$4

7.3M

$13.

0M$2

3.9M

$84.

2M

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

Que

stio

ns?

Proj

ect R

isk

Man

agem

ent

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket

TBP

OC

Mar

ch 2

6, 2

018

Sup

plem

enta

l Pac

ket