![Page 1: TC or not TC - R744 · Copyright © 2015 shecco | All rights reserved. The$Discovery • InstallationRough(piping((and(final(connection(of(suction(and(liquid(lines(was(faster(and(less](https://reader034.vdocument.in/reader034/viewer/2022042111/5e8cb81457f5d97f3010de1d/html5/thumbnails/1.jpg)
The Path to Transcritical
TC or not TC That is the question.
Copyright © 2015 shecco | All rights reserved.
Ken Welter, PE
![Page 2: TC or not TC - R744 · Copyright © 2015 shecco | All rights reserved. The$Discovery • InstallationRough(piping((and(final(connection(of(suction(and(liquid(lines(was(faster(and(less](https://reader034.vdocument.in/reader034/viewer/2022042111/5e8cb81457f5d97f3010de1d/html5/thumbnails/2.jpg)
Copyright © 2015 shecco | All rights reserved.
The Journey
• 3-‐Rack, DX HFC PrototypeØ 3,000 lbs HFC, 2.56 lbs / MBH
• Cascade CO2, Glycol Secondary MT, HFC PrimaryØ 1,200 lbs HFC, 1.22 lbs / MBH
• Cascade CO2, DX HFC Medium TempØ 1,200 lbs HFC, 1.25 lbs / MBH
• Single Rack / Single Liquid LineØ 1,500 lbs HFC, 1.11 lbs / MBH
![Page 3: TC or not TC - R744 · Copyright © 2015 shecco | All rights reserved. The$Discovery • InstallationRough(piping((and(final(connection(of(suction(and(liquid(lines(was(faster(and(less](https://reader034.vdocument.in/reader034/viewer/2022042111/5e8cb81457f5d97f3010de1d/html5/thumbnails/3.jpg)
Copyright © 2015 shecco | All rights reserved.
The Destination• Transcritical CO2 Trial, Giant #2743-‐Springfield, VA
• Design decisionsØ Circuit Piping (dedicated circuits or loop piping)Ø Low-‐temp Defrost (hot gas or electric)Ø Gas Cooler (dry or evaporative pre-‐cooling)
• First Cost Comparison to DX HFC Single Rack PrototypeØ 180% Compression Gear ( rack and gas cooler)Ø 130% Cases, Unit Coolers & ControlsØ 93% Refrigeration InstallØ 94% Electrical Install
![Page 4: TC or not TC - R744 · Copyright © 2015 shecco | All rights reserved. The$Discovery • InstallationRough(piping((and(final(connection(of(suction(and(liquid(lines(was(faster(and(less](https://reader034.vdocument.in/reader034/viewer/2022042111/5e8cb81457f5d97f3010de1d/html5/thumbnails/4.jpg)
Copyright © 2015 shecco | All rights reserved.
The Discovery• Installation
Ø Rough piping and final connection of suction and liquid lines was faster and less expensive than HFC loop piping.
Ø Stainless steel discharge gas piping was faster , but more expensive than multi-‐condenser HFC system.
• EquipmentØ Compressor rack and gas cooler were better quality of construction than typical HFC equipment.Ø Case manufacturers not fully up to the task of installing case controllers/EEVs with consistent quality.Ø Coordinate evaporator specifications with system manufacturer.
• Start-‐upØ Not an incremental process. Once the system is charged, it has to stay running.Ø Be prepared for surprises.
• TrainingØ Mostly on the fly during factory assisted start-‐up.
• Operation / Energy PerformanceØ Time will tell
![Page 5: TC or not TC - R744 · Copyright © 2015 shecco | All rights reserved. The$Discovery • InstallationRough(piping((and(final(connection(of(suction(and(liquid(lines(was(faster(and(less](https://reader034.vdocument.in/reader034/viewer/2022042111/5e8cb81457f5d97f3010de1d/html5/thumbnails/5.jpg)
Copyright © 2015 shecco | All rights reserved.
Giant #2743-‐Springfield, VA
![Page 6: TC or not TC - R744 · Copyright © 2015 shecco | All rights reserved. The$Discovery • InstallationRough(piping((and(final(connection(of(suction(and(liquid(lines(was(faster(and(less](https://reader034.vdocument.in/reader034/viewer/2022042111/5e8cb81457f5d97f3010de1d/html5/thumbnails/6.jpg)
Copyright © 2015 shecco | All rights reserved.
“What’s past is prologue”William Shakespeare – The Tempest
• CFC’s & HCFC’s– Regulated– Phased-‐out
• HFC’s– Regulated– Phasing-‐out
• HFO’s– ?????