te-mpe-em design office
DESCRIPTION
TE-MPE-EM Design Office. William Billereau. Structure. Design, manufacturing and assembly. Design Office. Planning and subcontracting Technological and commercial choices Ordering, collecting components, tracking Invoicing. 2 staff/ 2 FSU. 1 staff / 10 FSU. Repair. MPGD. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: TE-MPE-EM Design Office](https://reader036.vdocument.in/reader036/viewer/2022062222/56816027550346895dcf2d14/html5/thumbnails/1.jpg)
TE-MPE-EMDesign Office
William Billereau
29/11/2012 1
![Page 2: TE-MPE-EM Design Office](https://reader036.vdocument.in/reader036/viewer/2022062222/56816027550346895dcf2d14/html5/thumbnails/2.jpg)
Fine-pitch photolithography facility -
PCB manufacturin
g
Industry
Design Office
Assembly Workshop
Planning and subcontractingTechnological and commercial choices
Ordering, collecting components, tracking Invoicing
RepairMPGD
Design, manufacturing and assembly
Structure
29/11/2012 2
2 staff/ 2 FSU
1 staff / 10 FSU
4 Staff8 staff/ 12 FSU
![Page 3: TE-MPE-EM Design Office](https://reader036.vdocument.in/reader036/viewer/2022062222/56816027550346895dcf2d14/html5/thumbnails/3.jpg)
Design Office Mission Ressources Workload Quality Documents
329/11/2012
![Page 4: TE-MPE-EM Design Office](https://reader036.vdocument.in/reader036/viewer/2022062222/56816027550346895dcf2d14/html5/thumbnails/4.jpg)
Mission Design of products
Standard PCB 2 to 16 layers, rigid, flex, flex-rigid
Related mechanical parts front panels, boxes
Crates and racks Readout for MPGD
Design of CAD libraries Schematic diagram Footprints
429/11/2012
![Page 5: TE-MPE-EM Design Office](https://reader036.vdocument.in/reader036/viewer/2022062222/56816027550346895dcf2d14/html5/thumbnails/5.jpg)
1 team leader (staff) 8 technicians: the design of standard and
special PCB (FSU) 2 technicians: in CAD libraries (100% FSU
since 2010)
5
Resources
29/11/2012
![Page 6: TE-MPE-EM Design Office](https://reader036.vdocument.in/reader036/viewer/2022062222/56816027550346895dcf2d14/html5/thumbnails/6.jpg)
6
Equipment
CAD stations (Cadence, Altium) AutoCAD CAD to CAM software (Fabmaster, Aegis)
29/11/2012
![Page 7: TE-MPE-EM Design Office](https://reader036.vdocument.in/reader036/viewer/2022062222/56816027550346895dcf2d14/html5/thumbnails/7.jpg)
Workload
7
2008 2009 2010 2011 2012 (11m)
050
100150200250300350400
General situation25 jobs in progress,15 in the pipelineVisibility max 2 months
29/11/2012
![Page 8: TE-MPE-EM Design Office](https://reader036.vdocument.in/reader036/viewer/2022062222/56816027550346895dcf2d14/html5/thumbnails/8.jpg)
230*220mm 2-sided, PTH, BGA,
QFN, 0402 1325 components 5500 solder joints
8
BE/RF - LHC 1 Turn Delay Feedback
29/11/2012
![Page 9: TE-MPE-EM Design Office](https://reader036.vdocument.in/reader036/viewer/2022062222/56816027550346895dcf2d14/html5/thumbnails/9.jpg)
EN/EL Incomer Crate
929/11/2012
![Page 10: TE-MPE-EM Design Office](https://reader036.vdocument.in/reader036/viewer/2022062222/56816027550346895dcf2d14/html5/thumbnails/10.jpg)
Quality Design rules: IPC standard
Layout Librairies
Crosschecks (librairie and layout) Internal reviews Feedback from manufacturing EDMS Release system
1029/11/2012
![Page 11: TE-MPE-EM Design Office](https://reader036.vdocument.in/reader036/viewer/2022062222/56816027550346895dcf2d14/html5/thumbnails/11.jpg)
Documentation
PCB manufacturing files (Gerber, drilling) PCB specification Detailed drawing of all mechanical parts Detailed drawing of harnesses Assembly documents for PCB (Drawing,
BOM) Assembly documents for crates (3D drawing,
BOM)
1129/11/2012
![Page 12: TE-MPE-EM Design Office](https://reader036.vdocument.in/reader036/viewer/2022062222/56816027550346895dcf2d14/html5/thumbnails/12.jpg)
12
PCB manufacturing files (Gerber, drilling)PCB specification
29/11/2012
![Page 13: TE-MPE-EM Design Office](https://reader036.vdocument.in/reader036/viewer/2022062222/56816027550346895dcf2d14/html5/thumbnails/13.jpg)
13
Detailed drawing of mechanical parts
29/11/2012
![Page 14: TE-MPE-EM Design Office](https://reader036.vdocument.in/reader036/viewer/2022062222/56816027550346895dcf2d14/html5/thumbnails/14.jpg)
14
Detailed drawing of harnesses
29/11/2012
![Page 15: TE-MPE-EM Design Office](https://reader036.vdocument.in/reader036/viewer/2022062222/56816027550346895dcf2d14/html5/thumbnails/15.jpg)
15
Assembly documents for PCB (Drawing, BOM)
29/11/2012
![Page 16: TE-MPE-EM Design Office](https://reader036.vdocument.in/reader036/viewer/2022062222/56816027550346895dcf2d14/html5/thumbnails/16.jpg)
16
Assembly documents for crates (3D drawing, BOM)
29/11/2012
![Page 17: TE-MPE-EM Design Office](https://reader036.vdocument.in/reader036/viewer/2022062222/56816027550346895dcf2d14/html5/thumbnails/17.jpg)
17
Assembly documents for crates (3D drawing, BOM)
29/11/2012
![Page 18: TE-MPE-EM Design Office](https://reader036.vdocument.in/reader036/viewer/2022062222/56816027550346895dcf2d14/html5/thumbnails/18.jpg)
18
EDMS Release system
Released statusNo more change possibleProduction allowedAvailable to subcontractor
29/11/2012
![Page 19: TE-MPE-EM Design Office](https://reader036.vdocument.in/reader036/viewer/2022062222/56816027550346895dcf2d14/html5/thumbnails/19.jpg)
19
Any question?
29/11/2012