te whau shared path 2... · 2018-11-21 · • transformational project linking the waitemata and...

29
Te Whau Shared Path Earl Barretto Senior Engineer Investigation & Design Auckland Transport

Upload: others

Post on 14-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Te Whau Shared Path 2... · 2018-11-21 · • Transformational project linking the Waitemata and Manukau Harbours • 13km long coastal shared path • Links the suburbs of Green

Te Whau Shared Path Earl Barretto Senior Engineer Investigation & Design Auckland Transport

Page 2: Te Whau Shared Path 2... · 2018-11-21 · • Transformational project linking the Waitemata and Manukau Harbours • 13km long coastal shared path • Links the suburbs of Green

2

• Whau River is a significant landmark as it defines the south eastern corner of Hikurangi (Waitakere/ West Auckland)

Background

Page 3: Te Whau Shared Path 2... · 2018-11-21 · • Transformational project linking the Waitemata and Manukau Harbours • 13km long coastal shared path • Links the suburbs of Green

3

• Historically important transport corridor – waka could navigate from the Waitemata to the Manukau Harbour via a short portage at Green Bay Beach

Background

Green Bay Beach

Waitemata Harbour

Manukau Harbour

Whau River

Page 4: Te Whau Shared Path 2... · 2018-11-21 · • Transformational project linking the Waitemata and Manukau Harbours • 13km long coastal shared path • Links the suburbs of Green

4

1) Support investment in walking and cycling improvements, whilst enhancing the safety of current road users 2) Promote an increase in both walking and cycling in the region and contribute to the development of the Auckland Cycle Network (ACN). 3) Make Auckland a beacon for viable sustainable transport. Ties in nicely with …………..

Project Vision

Page 5: Te Whau Shared Path 2... · 2018-11-21 · • Transformational project linking the Waitemata and Manukau Harbours • 13km long coastal shared path • Links the suburbs of Green

5

Delivering transport choices to get you where you want, when you want

Auckland Transport’s Vision

Page 6: Te Whau Shared Path 2... · 2018-11-21 · • Transformational project linking the Waitemata and Manukau Harbours • 13km long coastal shared path • Links the suburbs of Green

6

• To build a coastal walkway that provides access to over 100,000 people for commuting, leisure, health and educational purposes

• To provide a quicker link from New Lynn transport interchange to adjacent areas along the coastline

• To provide an easier, quicker and an alternate access way to 12 + schools (6000 students) in the area

• To ease vehicle traffic volume by providing this alternative route • To open up the Whau river, coastal and local environment to promote community

engagement and education. • To create a landmark and promote the historical Maori cultural significance of

land • To restore and protect the coastline, and open it up to public, social and cultural

benefits

Project Objectives

Page 7: Te Whau Shared Path 2... · 2018-11-21 · • Transformational project linking the Waitemata and Manukau Harbours • 13km long coastal shared path • Links the suburbs of Green

7

• Transformational project linking the Waitemata and Manukau Harbours

• 13km long coastal shared path

• Links the suburbs of Green Bay, New Lynn, Kelston, Glendene and Te Atatu

Key Features

Page 8: Te Whau Shared Path 2... · 2018-11-21 · • Transformational project linking the Waitemata and Manukau Harbours • 13km long coastal shared path • Links the suburbs of Green

8

• Linkage will be a mix of timber boardwalk and concrete path

• Boardwalk sections mainly along the waterfront to maximise the ‘Whau River Experience’

Key Features

Page 9: Te Whau Shared Path 2... · 2018-11-21 · • Transformational project linking the Waitemata and Manukau Harbours • 13km long coastal shared path • Links the suburbs of Green

9

• Link in with the New Lynn to Waterview Cycleway (New Lynn) and the South Western Cycleway (Te Atatu)

• Connect at least 33 individual reserves and sports parks; and at least 13 schools

Key Features

Page 10: Te Whau Shared Path 2... · 2018-11-21 · • Transformational project linking the Waitemata and Manukau Harbours • 13km long coastal shared path • Links the suburbs of Green

10

• Weed removal and restoration to open up view shafts

• Will incorporate sustainable design and environment accountability (clean up of the water’s edge and improve water quality)

Key Features

Te Whau Pathway is now part of the ACN and also part of Auckland Transport’s Greenways network.

Page 11: Te Whau Shared Path 2... · 2018-11-21 · • Transformational project linking the Waitemata and Manukau Harbours • 13km long coastal shared path • Links the suburbs of Green

11

Auckland Council

Auckland Transport

Governance Structure

Project Steering Group

Local Boards (Whau &

Henderson – Massey)

Iwi (mana whenua) Te Kawerau a Maki

Ngati Whatua Orakei

Whau Coastal Walkway

Environmental Trust

Auckland Transport Auckland Council

AT / AC Project Manager

• Community led project • Collaborative partnership

Page 12: Te Whau Shared Path 2... · 2018-11-21 · • Transformational project linking the Waitemata and Manukau Harbours • 13km long coastal shared path • Links the suburbs of Green

12

Current Status

• Quick wins have been realised (Sections through

Ken Maunder, Archibald and Olympic Parks) • Whau Local Board has funded the design,

consultation, resource consenting and project management for the first stage

• Construction funding has been secured for these sections

Page 13: Te Whau Shared Path 2... · 2018-11-21 · • Transformational project linking the Waitemata and Manukau Harbours • 13km long coastal shared path • Links the suburbs of Green

13

• Archibald Park

Built sections of Te Whau Pathway

Page 14: Te Whau Shared Path 2... · 2018-11-21 · • Transformational project linking the Waitemata and Manukau Harbours • 13km long coastal shared path • Links the suburbs of Green

14

Archibald Park Opening

Page 15: Te Whau Shared Path 2... · 2018-11-21 · • Transformational project linking the Waitemata and Manukau Harbours • 13km long coastal shared path • Links the suburbs of Green

15

• Olympic Park

Built sections of Te Whau Pathway

Page 16: Te Whau Shared Path 2... · 2018-11-21 · • Transformational project linking the Waitemata and Manukau Harbours • 13km long coastal shared path • Links the suburbs of Green

16

• Ken Maunder Park (in progress)

Built sections of Te Whau Pathway

Page 17: Te Whau Shared Path 2... · 2018-11-21 · • Transformational project linking the Waitemata and Manukau Harbours • 13km long coastal shared path • Links the suburbs of Green

17

• Approximate length of Te Whau Pathway built to date – approx. 1km

• 7.5% of the total length

Built sections of Te Whau Pathway

Page 18: Te Whau Shared Path 2... · 2018-11-21 · • Transformational project linking the Waitemata and Manukau Harbours • 13km long coastal shared path • Links the suburbs of Green

18

AT’s Involvement

• Undertaken a holistic feasibility study

• Project cost estimate - $67 million

• Feasibility BCR around 6.3

• Currently at the procurement stage for preliminary

design.

Page 19: Te Whau Shared Path 2... · 2018-11-21 · • Transformational project linking the Waitemata and Manukau Harbours • 13km long coastal shared path • Links the suburbs of Green

19

• Indicative cost – approx. $67 million

• Auckland Transport - $2.5 million

• Auckland Council - $1.1 million

• The Trust Community Foundation (TTCF) - $4 million.

Funding Arrangement

Page 20: Te Whau Shared Path 2... · 2018-11-21 · • Transformational project linking the Waitemata and Manukau Harbours • 13km long coastal shared path • Links the suburbs of Green

20

$60 million shortfall

Page 21: Te Whau Shared Path 2... · 2018-11-21 · • Transformational project linking the Waitemata and Manukau Harbours • 13km long coastal shared path • Links the suburbs of Green

21

Page 23: Te Whau Shared Path 2... · 2018-11-21 · • Transformational project linking the Waitemata and Manukau Harbours • 13km long coastal shared path • Links the suburbs of Green

23

Funding Strategy / AT’s Involvement

• Next step: Complete preliminary design and

supporting Detailed Business Case (DBC)

• Approach NZTA for funding - Potential Partners (If the project meets the required criteria)

• Continue to seek alternative funding sources

Page 24: Te Whau Shared Path 2... · 2018-11-21 · • Transformational project linking the Waitemata and Manukau Harbours • 13km long coastal shared path • Links the suburbs of Green

24

Project timelines

• Feasibility study timeframe – Aug 2015 to Feb

2016

• Preliminary Design timeframe – August 2016 to June 2017

• Detailed design timeframe – 2017 to 2020 (5 - 6 logical sections)

Page 25: Te Whau Shared Path 2... · 2018-11-21 · • Transformational project linking the Waitemata and Manukau Harbours • 13km long coastal shared path • Links the suburbs of Green

25

Visual Representation

Page 26: Te Whau Shared Path 2... · 2018-11-21 · • Transformational project linking the Waitemata and Manukau Harbours • 13km long coastal shared path • Links the suburbs of Green

26

Visual Representation

Page 27: Te Whau Shared Path 2... · 2018-11-21 · • Transformational project linking the Waitemata and Manukau Harbours • 13km long coastal shared path • Links the suburbs of Green

27

Visual Representation

Page 28: Te Whau Shared Path 2... · 2018-11-21 · • Transformational project linking the Waitemata and Manukau Harbours • 13km long coastal shared path • Links the suburbs of Green

28

Visual Representation

Page 29: Te Whau Shared Path 2... · 2018-11-21 · • Transformational project linking the Waitemata and Manukau Harbours • 13km long coastal shared path • Links the suburbs of Green

QUESTIONS