Team 8 : Batteries Not Included. Dave Dickinsheets Matt Scholten David Qu Knoa Knapper. Presentation Outline. Project Re-introduction Design Process Major Obstacles Major Accomplishments Next Steps. Project Re-Introduction. Battery-free Tire Pressure Monitoring System. Design Process. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Team 8 : Batteries Not Included

Team 8 : Batteries Not Included

Dave DickinsheetsMatt Scholten

David QuKnoa Knapper

Page 2: Team 8 : Batteries Not Included

Presentation Outline

Project Re-introduction

Design Process

Major Obstacles

Major Accomplishments

Next Steps

Page 3: Team 8 : Batteries Not Included

Battery-free Tire Pressure Monitoring System

Project Re-Introduction

Page 4: Team 8 : Batteries Not Included

Design Process Utilized feasibility calculations/physics

resources Number of wraps on coil Coil diameter Magnet Orientation

Tested theories on test apparatus Adjusted design accordingly

Page 5: Team 8 : Batteries Not Included

Major Obstacles Magnet Orientation

Proper orientation gives higher voltage Proper orientation reduces the number of

magnets necessary Coil Design/Manufacturing

Compact coils Working coils

Mounting

Page 6: Team 8 : Batteries Not Included

Major Accomplishments Working test apparatus

Page 7: Team 8 : Batteries Not Included

Major Accomplishments Magnet Mounting Bracket Design

Caliper

Magnet

ThreadedHeightAdjustment

Caliper Mounting Holes

Page 8: Team 8 : Batteries Not Included

Major Accomplishments Voltage Generation

3 Volts at ~25 mph

6 Volts at ~60 mph

4.5 Volts at ~42 mph

7.5 Volts at ~75 mphAll voltages are half wave heightsAll speeds are simulated on test apparatus without a tire mounted

Readings taken at 5 V/division on Y-axis 5 ms/division on X-axis

Page 9: Team 8 : Batteries Not Included

Major Accomplishments Circuit Design Tested

Half Wave Rectifier Requires Voltage Regulator

Magnet Orientation Coil Design Improved Purchased TPMS System Budget Under Control

Page 10: Team 8 : Batteries Not Included

Next Steps Refine magnet and coil size Refine circuit design Mounting design for coil and circuit Magnet bracket construction Develop TPMS testing method

Page 11: Team 8 : Batteries Not Included

Questions?