Team SkyHawk Launch Readiness Review
Fort Lewis CollegeAdam Baker, Nick Laitsch,
Bill Fellman
Freezer Testing
• Heaters and boards were tested in a cooler filled with dry ice.
• Data logging measured temperatures near -40• Heaters were successfully controlled by two
methods:– Self regulating• Temperature sensor and relay.
– Arduino controlled• Temperature monitoring with mosfet trigger.
Vacuum Testing
• All components were vacuum tested.– Geiger tubes were our only real concern…
• Everything worked flawlessly.
Geiger Tube Vacuum Testing Video
Whip & Drop Tests
• Whip Test Video
• Drop Test Video
• Test piece had a 1kg water bottle taped to the flight string tube.
Test Results
Test Results
Future plans
Electronic Jungle
Any Questions?